Loading...
2024-04-17 Special Meeting Presentation for FY 2024-25 Council Operating and CIP Budget Workshop 2FY 2024 -25 Operating and CIP Budget Workshop 2 April 17, 2024 AGENDA City Council Strategic Framework /Plan General Fund Financial Overview Projected Unassigned Fund Balance General Fund Requests Next Steps 2 CITY COUNCIL STRATEGIC FRAMEWORK / PLAN 3 4 COUNCIL GOALS 2024 -25 •100% Affordable Housing Project •Prioritize Remaining Streetscape Elements •Safe, Legal Railroad Crossings & Establish Citywide Quiet Zones •Expand Habitat Stewardship & Explore Open Space Preservation •Consider Infrastructure Task Force Prioritization & Funding Recommendations •Build on the Bike Safety Emergency Declaration Goals & Implement Vision Zero 5 •Ensure a balanced budget o Revenues > Expenditures •Ensure that reserves are funded at policy levels o Contingency Reserve:20% of Operating Budget, $20.0M o Budget Stabilization Reserve:2% of Revenue, $2.2M •Meet debt, pension and contractual obligations •Review CIP Plan to fund priority projects •Consider maintaining $2.0M in the General Fund unassigned ending fund balance FINANCIAL STRUCTURE INFORMATION REQUESTED AT 3/27 WORKSHOP ✓ACFR links with percent of General Fund committed to CIP o City of Encinitas $12.9M 37.0% of General Fund balance o City of Carlsbad $13.3M 11.7% of adjusted General Fund balance o City of Vista $5.9M 4.3% of General Fund balance o City of San Marcos $1.9M 4.2% of adjusted General Fund balance o City of Del Mar $1.7M 8.5% of General Fund balance o City of Solana Beach $2.8M 2.3% of General Fund balance ✓Mitigation Fee Study – 6 to 8 months to complete, selecting consultant in April ✓Development (Permitting) Fees o If increase cost -recovery to 80% +$2.5M o If increase cost -recovery to 100% +$3.8M 6 INFORMATION REQUESTED AT 3/27 WORKSHOP (Continued) ✓L7 100% Affordable Housing – can design from Affordable Housing Fund ✓Native Plant Ordinance – confirmed consultant costs $350K for whole effort o Staff can do basic codification (without the planting areas) of current 50% native requirement ✓Chamber $40K request - implement initiatives (i.e., new website, new tourism board, implement pop ups, and launch PR and marketing campaigns, etc.) for the Visitor Center 7 Projected $4.3 Million available for appropriation 8 FY25 GENERAL FUND UNASSIGNED FUND BALANCE 9 CAPITAL IMPROVEMENT PROGRAM Planned $1.413 Million Programmed $0.538 Million OTHER ITEMS NOTED FOR CONSIDERATION Studies, Consulting, Design General Fund Cost Native Plant Ordinance Consultant $0.35M Native Plant Ordinance Related Activities (demo garden, education, etc.)$0.15M L7 100% Affordable Housing Design ($0.35M from Affordable Housing instead)- Pacific View Phase 2 Parking Lot Design/Permitting $0.25M Stormwater Harvesting Study $0.25M Hygeia (Hygeia to Andrew) Drainage Study $0.75M Q3 On-call Drainage Consulting $0.10M Citywide Drainage Master Plan $0.75M 10 OTHER ITEMS NOTED FOR CONSIDERATION (Continued) Studies, Design, Consulting (Continued)General Fund Cost Vulcan South Drainage Design*$0.35M Public Road Standards Update $0.20M Active Transportation Plan (ATP) Update $0.30M Reconsideration of Beacons Staircase Review, Permitting, etc.$0.60M RR Pedestrian Tunnel/Bridge north of La Costa Study $0.30M S101 Ped Xing by Solana Beach $0.04M TOTAL Studies, Design, Consulting $4.39M 11 *Note: Engineering recommend items in bold ITEMS NOT INCLUDED IN 03/27 WORKSHOP Not included in 03/27 Workshop Presentation General Fund Cost Additional Funding for N101 Drainage (Grandview to Jupiter)$3.30M Additional Funding for Annual Stormdrain Repair $0.50M Additional Funding for Paving $1.00M La Costa Ped Path Construction $1.00M General Mobility $0.30M Safe Routes to School $0.20M Traffic Safety and Calming $0.08M Chamber of Commerce Additional Funds $0.04M Encinitas Historical Society Request for Tree Lighting $ 8.5K 12 OTHER SUGGESTED CIP PROJECTS (Not on "Donut" List) Other Suggested CIP Projects (not on "donut" list)General Fund Cost Extend N101 Drainage to Grandview (New Scope for N101 Drainage)$1.80M Protected Bike Lanes Santa Fe East (New Scope for Santa Fe East Project)$1.00M Protected Intersection ECR & Santa Fe (Design & Construction estimate)$0.80M Leucadia Blvd Paving $0.80M Drainage Improvement San Elijo/Norfolk $0.15M Drainage Improvement B St Sidewalk $0.25M Manchester Slope Stabilization $0.30M TOTAL Other Suggested CIP Projects $5.10M 13 ITEMS NOT INCLUDED IN 03/27 WORKSHOP (Continued) Not Included in 03/27 Workshop Presentation, in CIP Plan General Fund Cost Beach Staircase Access Refurbishment $0.46M Encinitas Habitat Stewardship Program $1.00M Innovative Bike Lanes $0.03M TOTAL Not Included 3/27 Workshop $7.01M 14 ENGINEERING RECOMMENDATIONS Projects General Fund Cost Extend N101 Drainage to Grandview (New Scope for N101 Drainage)$1.80M Additional Funding for Annual Storm Drain Repair $0.50M General Mobility $0.30M Safe Routes to School $0.20M Public Road Standards Update $0.20M Vulcan South Drainage Design $0.35M Drainage Improvement San Elijo/Norfolk $0.15M Additional Funding for Paving (Partial Funding)$0.80M TOTAL $4.30M 15 NEXT STEPS 1)Introduction of FY 2024 -25 Operating and Capital Budget May 15 2)Adoption of FY 2024 -25 Operating and Capital Budget June 12 16 17 DISCUSSION