Loading...
Project and Expenditure Report User GuideProject and Expenditure Report User Guide 0 January 24, 2022 0 U.S. DEPARTMENT OF THE TREASURY Table of Contents SectionI. Reporting Basics.................................................................................................1 Section II. Navigation and Logistics....................................................................................3 Section III. Reporting Requirements....................................................................................8 Section IV. Project and Expenditure Report .......................................................................12 Appendix A — Designating SLFRF Points of Contact by SLFRF Account Administrators 42 Appendix B — Bulk File Upload Overview...............................................................................49 Appendix C — Expenditure Categories and Template Mapping............................................65 Appendix D — SLFRF Expenditure Category Programmatic Data and Other Information .68 AppendixE — List of Sectors...................................................................................................78 Appendix F — Frequently Asked Questions............................................................................79 List of Figures Figure1 Landing Page.......................................................................................... Figure2 Navigation Bar........................................................................................ Figure 3 Sample Bulk Upload Icon....................................................................... Figure 4 Successful Bulk Upload Example........................................................... Figure 5 Bulk Upload Validation Screen............................................................... Figure 6 Manual Validation Text Box.................................................................... Figure 7 Sidebar indicating Unsubmit Button........................................................ Figure 8 Relationship between Expenditure Categories and Multiple Projects .... Figure 9 Recipient Information.............................................................................. Figure 10 Point of Contact List.............................................................................. Figure 11 Budget Approval and Obligation........................................................... Figure12 SAM.gov question................................................................................. Figure 13 Additional SAM.gov questions(1)......................................................... Figure 14 Additional Sam.gov questions (2)......................................................... Figure 15 Record of Highest Paid Officer............................................................. Figure 16 No Projects Available Option................................................................ Figure 17 No Projects Available Entry Screen ...................................................... Figure 18 My Projects Screen Example................................................................ Figure 19 Project Expenditure Category Group .................................................... Figure 20 Project Expenditure Category ............................................................... Figure 21 Bulk Upload for EC 1.1......................................................................... Figure 22 Project Entry Screen............................................................................. Figure 23 Manual Entry for EC 1.9....................................................................... Figure 24 Programmatic Data for EC 1.9.............................................................. Figure 25 Edit and Delete Project Screen............................................................. Figure 26 Premium Pay Screen and Additional Questions ................................... Figure 27 Programmatic Data for Infrastructure Projects ..................................... Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide ...................... 3 ...................... 4 ...................... 5 ...................... 5 ...................... 6 ...................... 6 ...................... 7 ....................11 ....................12 ....................13 ....................13 ....................14 ....................14 ....................14 ....................15 ....................16 ....................16 ....................18 ....................18 ....................19 ....................19 .................... 20 .................... 21 .................... 21 .................... 22 .................... 23 .................... 25 0 U.S. DEPARTMENT OF THE TREASURY Figure 28 Davis Bacon Certification............................................................................................26 Figure 29 Additional Questions if Response to Davis Bacon Certification is "No"......................26 Figure 30 Certification for Labor Agreements.............................................................................27 Figure 31 Additional Questions if response is"No".....................................................................27 Figure 32 Revenue Replacement Screen...................................................................................29 Figure 33 Subrecipient Bulk Upload Icon....................................................................................31 Figure 34 Manually Create a Subrecipient or Beneficiary ...........................................................31 Figure 35 Sam.gov Questions for Subrecipients........................................................................32 Figure 36 Additional SAM.gov questions for Subrecipients........................................................32 Figure 37 Five Highest Paid Officers for Subrecipients or Beneficiaries.....................................33 Figure 38 Subrecipients Entered................................................................................................33 Figure 39 Subaward Bulk Upload(1)..........................................................................................34 Figure 40 Subaward Bulk Upload(2)..........................................................................................34 Figure41 Subaward Reporting...................................................................................................35 Figure42 Subaward Entered......................................................................................................35 Figure 43 Expenditures>$50,000...............................................................................................37 Figure 44 Aggregated Expenditures <$50,000...........................................................................37 Figure 45 Payments to Individuals..............................................................................................38 Figure 46 Tax Offset Provision Screen.......................................................................................39 Figure 47 Official Certification.....................................................................................................39 Figure 48 Summary of Reported Information..............................................................................40 Figure 49 Submission Verification..............................................................................................40 Figure 50 Submission Verification with additional language.......................................................41 Figure 51 State, Local and Tribal Support Landing Page...........................................................42 Figure52 My Compliance Reports.............................................................................................43 Figure53 Account.......................................................................................................................43 Figure54 Account Name............................................................................................................43 Figure55 Landing Page..............................................................................................................44 Figure56 Certification.................................................................................................................44 Figure 57 Official Certification of Authorization...........................................................................45 Figure58 Designation Form.......................................................................................................45 Figure 59 Designation of Account Administrator, Point of Contact of Reporting and Authorized Representativefor Reporting......................................................................................................45 Figure60 Designation Form.......................................................................................................47 Figure61 Bulk Upload pop up....................................................................................................50 Figure 62 File uploaded message...............................................................................................51 Figure 63 File added to Bulk Upload portal.................................................................................51 Figure 64 Listing of Bulk Upload Errors......................................................................................51 Figure 65 Bulk Upload Creation..................................................................................................52 Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide ii U S. DEPARTMENT OF THE TREASURY Section I. Reporting Basics a) Overview This document provides information on using Treasury's Portal to submit the required Coronavirus State and Local Fiscal Recovery Funds (SLFRF) Project and Expenditure (P&E) reports. It is a supplement to the Compliance and Reporting Guidance (Reporting Guidance), which contains relevant information and guidance on the reporting requirements. Additionally, you should visit Treasury's SLFRF home page for the latest guidance and updates on programmatic and reporting topics, as well as information on Treasury's Interim Final Rule (IFR). Each SLFRF recipient is required to submit periodic reports with current performance and financial information including background information about the SLFRF projects that are the subjects of the reports; and financial information with details about obligations, expenditures, direct payments, and subawards. b) What is Covered in this User Guide? This User Guide contains detailed guidance and instructions for SLFRF recipients in using Treasury's Portal for submitting the Project and Expenditure reports. All recipients must submit the required reports via Treasury's Portal. This guide is not comprehensive and is meant to be used in conjunction with the documents mentioned above. This User Guide provides detailed instructions to help recipients enter and submit the following: • Project data • Subrecipient data • Subaward data • Expenditure data • Project and Expenditure Bulk Upload Templates c) Designating Staff for Key Roles in Managing SLFRF Reports User Designations SLFRF recipients are required to designate staff or officials for the following three roles in managing reports for their SLFRF award. Recipients must make the required designations prior to accessing Treasury's Portal. The required roles are as follows: Account Administrator for the SLFRF award has the administrative role of maintaining the names and contact information of the designated individuals for SLFRF reporting. The Account Administrator is also responsible for working within your organization to determine its designees for the roles of Point of Contact for Reporting and Authorized Representative for Reporting and providing their names and contact information via Treasury's Portal. Finally, the Account Administrator is responsible for making any changes or updates to the user roles as needed over the award period. We recommend that the Account Administrator identify an individual to serve in his/her place in the event of staff changes. • Point of Contact for Reporting is the primary contact for receiving official Treasury notifications about reporting on the SLFRF award, including alerts about upcoming Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide U.S. DEPARTMENT OF THE TREASURY reporting, requirements, and deadlines. The Point of Contact for Reporting is responsible for completing the SLFRF reports. Authorized Representative for Reporting or ARR is responsible for certifying and submitting official reports on behalf of the SLFRF recipient. Treasury will accept reports or other official communications only when submitted by the Authorized Representative for Reporting. The Authorized Representative for Reporting is also responsible for communications with Treasury on such matters as extension requests and amendments of previously submitted reports. The official reports may include special reports, quarterly or annual reports, interim reports, and final reports. Some key items to note: • Each designated individual must register with ID.me or Login.gov for gaining access to Treasury's Portal. • Users who have previously registered through ID.me may continue to access Treasury's Portal through that method. This link includes further instructions. • If you have not previously registered with ID.me, you should register through Login.gov following this link. The following links provide additional information: o https://Iogin.gov/create-an-account/ o https://login.gov/help/qet-started/create-your-account/ • An individual may be designated for multiple roles. For example, the individual designated as the Point of Contact for Reporting may also be designated as the Authorized Representative for Reporting. • The recipient may designate one individual for all three roles. • Multiple individuals can be designated for each role. • An organization may make changes and updates to the list of designation individuals whenever needed. These changes must be processed by the Account Administrator. Refer to Appendix A for guidance on designating individuals for the three roles. The designated individuals' names and contact information will be pre -populated in the "Recipient Profile" portion of the recipient's SLFRF reports, and recipients will be able to update the information, if necessary. Please contact SLFRP(a-)-treasury.gov for additional information on procedures for registering with ID.me or Login.gov. d) Questions? If you have any questions about the SLFRF program's reporting requirements, please contact us by email via SLFRP(a)treasury.gov. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 0U S. DEPARTMENT OF THE TREASURY Section II. Navigation and Logistics a) Login to Landing Page and Portal Navigation After logging into Treasury's Portal, the landing page (see Figure 1) will appear listing the Treasury's Office of Recovery Programs (ORP)-administered program for which your organization may be eligible. welcome to t nent as part of the 2021 American Rescue Plan. Help/Contact Us State and Local Fiscal Recovery Funds sLF RF) s3"fo bsr-:onxaibblt to sn[e,tttrKpry Tribal.and lace , - -ti'-�tz to ppgrt :.._� chea:ihrespnnst and{rytlkfWMa[lonfo[asK�gbtd tyui[aU'.e _,az, ar...,��. KOM3rrtCrKavery. �. -c. a aeys�oean Emergency Rental Assistance (ERA) r.iroductlm S21.6billiorixailabk fxstaCe. territory, ant local gpwrrtnxnts to 253ist hWsehaldsthx xeunade W pry rent andutiities. Homeowner Assistance Fund (HAF) ...xrro lance RepMz r'—lY sic Gilion avaiiabk iorstace,territory. and Tribal gavenn—rns to provide rCzel for arc country'smanvWocraGehcnneov— Capital Projects Fund (CPF) SSebill'wn xailabe for stale Eercitory,freely usacxed nam, and Tribal gowrrinentsfxcapital projects designedtajaintlyanddrectlyenabi.,—ILedic on. and health mavtaring, wh4ctr ixkdes the provsza+xd:rrWravementoiMoad4aM iMrastructmewhere it rs Ixking Submission Process CKperdiligon if youarca state territory, kxal. orTribal governmerlc yvuvnll6e etigbktx different programs. Y now haws loyn and 2417 xtesi to this portal. Youhaae t cation whileworldngon the subs OWS- saw you progress or wMvttnes—u-tfyrx saw, you canreturn adedi—for—tion a needed. To resume —Idngona draftwbrniss on. dick onSubmissions' usiNthe ravigztion w the left of the page. This 11 bring ywto)— list of dick 'Edt' euttonto continuerwrking. Once yee- binit ant certify the agremxrt.yeucarawt edit—irformxion for mat part.lx wrenwitl—t—Nog out W Trparyto re-openthe case xd edit aeady staainstarbed? olds 1Go To Vow Sibrt§siora'bel— Go To Your Submissions Compliance Process You mvrhawa!ogin and 24/7 axes co[his portal. Youhaw tvro MlCions vAtitwwkirrgon Your cmnpiiance repoRtisi -save Y'b✓Crogresirw subm•tthe report, If Yau saw, you tan return "edit Wwroation u needed To resumewprkirpon a draft report,Vck on"Conciance Reports..using the n iss[an mthe!eft of tee Par, Tfvsvftlbrng you to your �.-:st o!complianra reppru,Cick"Ed¢" Wttonto cwxiiweihe prxas. NOTE:onceacomphancereportiscertihed:tan bereopened.Contxtthe Treasurywreopenacue. ReadytogetAarted?Click'Go w your Reports" beiaw Go To Your Reports Figure 1 Landing Page From the landing page, select Go to Your Reports or Compliance Reports on the left side panel to be taken to a list of options for the programs you have access to under the Report Selection section. At this time, you may select the Project and Expenditures report. Each listed report constitutes a link to that specific report's online forms. Selecting a report from the landing page will open the first in a series of screens. To begin completing a specific report, click on Provide Information for the given report. Refer to the Reporting Guidance for details about each type of required report for submittal. The Navigation Bar (see Figure 2) on the left of Treasury's Portal will allow you to freely move between screens. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 3 ,—h U S. DEPARTMENT OF THE TREASURY IRecipient Profile Project Overview Subrecipients/ Beneficiaries Subawards/Direct Payments Expenditures Recipient Spedhc Certification Figure 2 Navigation Bar b) Helpful Tips/Shortcuts for Submitting Data to Treasury's Portal Treasury's Portal leads you through a series of online forms that, when completed, will fulfill your reporting obligations. While navigating through Treasury's Portal and submitting required information, users will have the option of manually entering data directly into Treasury's Portal or providing information via a bulk upload file that includes all relevant information in a Treasury approved process and format. 1. Bulk File Upload Files Recipients can use the bulk upload function for providing required information for the modules listed here: • Project Overview • Subrecipients • Subawards • Expenditures When using the bulk upload, recipients must provide the required information in specified formats and use the Treasury approved templates for each respective bulk upload. Recipients must download each of the templates separately from within the relevant Treasury's Portal module. Please see Appendix B — Bulk File Upload Overview for complete guidance on using this important function. Modules accepting bulk upload files are clearly marked in Treasury's Portal and identified in later sections of this User Guide. The template for each upload file is available in the relevant module for download (see Figure 3). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 4 U.S. DEPARTMENT OF THE TREASURY NO General Project Information Project Expenditure Category Group 1-Public Hraltb Project Expenditure Category 1.1-COVID-19 Vaccutatioc t.. Download the Project 6aselirre TenxNate ,t. Upload Proact Baseline Template Figure 3 Sample Bulk Upload Icon All bulk file templates download in the .xIs format, but these files must be converted to .csv format to properly upload. When you click the upload button you will be directed to an upload screen. You can either choose to add files or drag and drop files to initiate the bulk upload (see Figure 4). Refer to Appendix B for additional instructions to submit bulk upload file. a Add Projects - Bulk Instructions Step 1- Upload File Step 2 - Select "Validate" to ensure your data meets the field requirements Step 3 - If errors exist, correct and select "Update' Step 4 - Select "Validate" repeat step 3 and 4 if additional errors exist Step 5 - Select' Create" to generate records and complete process Upload File t Upload Files Ordropfiles Em Project Expenditure Category .. Sub Category .. Funded Proj Figure 4 Successful Bulk Upload Example Treasury's Portal will reject the file if an incorrect template, data format, or file format other than .csv is used for upload (see Figure 5). Treasury's Portal will display an error message on screen if the bulk data upload file contains errors. If you receive an error message, you will need to correct the errors either in the bulk upload file or on screen and re -submit the corrected version. There are three common Bulk File Upload errors as described below (see Figure 5): • Blank Data: When a required field is left blank within your bulk upload file, the specific bulk upload file row and cell number will be provided on the screen. In the example below, the user made an error pertaining to the "Completion Status" and the error is located in Column F, Row 9. • Invalid Data: Invalid data includes any type of data (numeric or text) that does not meet the requirements set forth in the Help Text within each bulk upload template. In the example below, the user made an error pertaining to the "Adopted Budget" and the error is located in Column G, Row 9. • Duplicate Data: Duplicate data includes any type of data (numeric or text) that is repeated in the same column when the Help Text within a bulk upload template requires a unique entry. For example, unique numbers should be provided for the Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 5 0 U.S. DEPARTMENT OF THE TREASURY project identification number. In the example below, the user made an error pertaining to the "Project Identification Number" and the error is in Column E, Row 8. 0 Download - Export Errors IMI Row Column Field Error Message 8 E Project_Identlfication_Number_c -- (Project_Aentifxation Number_c):1.2Test:salreac, - use 9 G Adopted Budget_c C„. (Adopter Budget_c): Please providean Adopted Budget —� (Completlon_Status_c): Project status ofcompletion is 9 F Completlon_Status_c required. v Project Expenditure Category Sub Category Funded Pro 1-Public Health 1.10-Mental Health Services asdf b Public Health 1.10-Mental Health Services test 2 Figure 5 Bulk Upload Validation Screen 2. Manual Data Entry Manual data entry requires you to provide inputs as instructed on the screen. Manual inputs are described in detail below for each section of this user guide. Note: An asterisk indicates a required field. Entry into the field is required before you can save or proceed to the next screen. Your inputs will be subject to validation by Treasury's Portal to ensure that the data provided is consistent with expected format or description (e.g., entering "one hundred" instead of 100). If a given data entry fails a validation rule, Treasury's Portal will display an error for you to address. You will not be able to submit manually entered data that does not satisfy the data validation rules. 3. Narrative Boxes When filling out detailed narratives, you are encouraged to type out responses in a word processing application (such as Microsoft Word) to minimize grammatical errors, track word count, and concisely answer all required narrative details. You can then copy and paste the final written narratives directly into the text boxes. The text boxes (see Figure 6) can be expanded by clicking and dragging the icon in the bottom - right corner. Project Description Figure 6 Manual Validation Text Box Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 6 0 U.S. DEPARTMENT OF THE TREASURY 4. Corrections and Resubmissions In the event a file is uploaded, or information is entered into Treasury's Portal, the information will be accepted by Treasury's Portal as a record. After a recipient's submission has been certified and submitted in the system by the ARR, it can be corrected in the Portal by selecting the Unsubmit button. Recipients may unsubmit, then resubmit their Project and expenditure Report any time before the reporting deadline (see Figure 7). R.p n Inforc SLT-0035. Interim Report- 2021 k� x.,1,� Project and Expenditure Report Quarter 12022 Ganuary- March; rtrwurx �akaz4 e�s� 1/1/2022 Bgani.�fkrEogfrdtAtc 3/31/2022 �0w0� 12/5/202312t00 PM $1.250.000.00 4Unwbmit _! \� Figure 7 Sidebar indicating Unsubmit Button Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 7 0 U S. DEPARTMENT OF THE TREASURY Section III. Reporting Requirements a) Reporting Requirements by Recipient For the SLFRF program, reporting requirements vary by recipient type, as shown in the table below. Detailed instructions for completion and submission of each report are covered in Part 2 of the Reporting Guidance. Project and Recovery • Tier Recipientlan -..rt Expenditure Performance Report-.. States, U.S. territories, By August 31, By January 31, By August 31, metropolitan cities and 2021 or 60 days 2022, and then 2021 or 60 days counties with a population after receiving 30 days after the after receiving 1 that exceeds 250,000 funding if end of each funding, and residents funding was quarter annually received by thereafter' thereafter by October 15, with expenditures by July 312 Metropolitan cities and Not required counties with a population category 2 below 250,000 residents which received more than $10 million in SLFRF funding Tribal Governments which 3 received more than $30 million in SLFRF funding Tribal Governments which By April 30, 4 received less than $30 2022, and then million in SLFRF funding annually thereafter Metropolitan cities and counties with a population 5 below 250,000 residents which received less than $10 million in SLFRF funding NEUs Not required 6 b) Project and Expenditure Report Requirements 1. Quarterly Reporting The following recipients are required to submit quarterly Project and Expenditure Reports: • States, and U.S. territories ' Interim final rule Page 111 2 Interim final rule page 112 s Interim final rule Page 111 Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 8 'T' U.S. DEPARTMENT OF THE TREASURY • Metropolitan cities and counties with population that exceeds 250,000 residents • Metropolitan cities and counties with a population below 250,000 residents which received more than $10 million in SLFRF funding • Tribal Governments that received more than $30 million in SLFRF funding For these recipients, the initial quarterly Project and Expenditure Report will cover the period from March 3, 2021 to December 31, 2021 and must be submitted to Treasury by January 31, 2022. The subsequent quarterly reports will cover one calendar quarter and must be submitted to Treasury within 30 calendar days after the end of each calendar quarter States and territories should continue to submit the monthly NEU/Non-UGLG distribution information through the separate module in Treasury's Portal. 2. Annual Reporting The following recipients are required to submit annual Project and Expenditure Reports: • Tribal Governments that received less than $30 million in SLFRF funding • Metropolitan cities and counties with a population below 250,000 residents which received less than $10 million in SLFRF funding • Non -Entitlement Units of Local Government (NEU). To facilitate reporting, each NEU will need a NEU Recipient Number. This is a unique identification code for each NEU assigned by the State or U.S. Territory to the NEU as part of its request for funding. For these recipients, the initial Project and Expenditure Report will cover from March 3, 2021 to March 31, 2022 and must be submitted to Treasury by April 30, 2022. The subsequent annual reports will cover one calendar year and must be submitted to Treasury by April 30 each year. c) Key Concepts for Reporting The following concept structure applies to all report types: Expenditure Categories • Each recipient is required to report the obligations and expenditures by project according to the corresponding Expenditure Category (EC). As noted in the Reporting Guidance, there are a wide range of eligible uses of the SLFRF funds, and Treasury must be able to track how funds are used by recipients for oversight and transparency purposes. In addition, States, U.S. territories and metropolitan cities and counties with a population over 250,000 also need to provide the adopted budget for each project. o An obligation is an order placed — such as a contract — and similar transactions that require payment. o An expenditure is when the service has been rendered or the good has been delivered to the entity, and payment is due. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 0 U.S. DEPARTMENT OF THE TREASURY l' o The adopted budget is the budget adopted for each project by a recipient associated with SLFRF funds. Recipients will enter the Adopted Budget based on information that exists currently in the recipient's financial systems and the recipient's established budget process. Treasury understands that recipients may use different budget processes. For example, a recipient may consider a project budgeted once a legislature has appropriated funds; whereas another recipient may consider a project budgeted at the moment when the funds have been obligated. Note that Treasury is not approving or pre -approving projects or budgets. Treasury will use this information to better understand the intended impact, identify opportunities for technical assistance, and understand the recipient's progress in program implementation. Treasury is also collecting additional descriptive information about the budget process in order to better understand the context of recipients' budget processes. • For each project, the recipient will be asked to select the appropriate Expenditure Category based on the scope of the project (as described in Appendix 1 of the Reporting Guidance). Projects should be scoped to align to a single Expenditure Category. • The Expenditure Categories are important not only for tracking projects and expenditures, but also because for certain Expenditure Categories you will need to provide additional programmatic data. You will see them referred to regularly throughout the Reporting Guidance and in this User Guide with "EC" followed by a number. • _Appendix C includes the full list of the 66 Expenditure Categories4, which refers to the detailed level. For instance, 1.1 is the EC related to Public Health: 1.1 COVID- 19 Vaccination. • While 66 Expenditure Categories are identified, they are a very broad categorization — each Expenditure Category could include many different programs and activities. 2. Project • A project is defined as a grouping of closely related activities that together are intended to achieve a specific goal or directed toward a common purpose. • These activities can include new or existing services, funded in whole or in part by the SLFRF award. • Within this broad definition, recipients have flexibility to define their projects in a way that provides the greatest clarity on the work which will be performed. • Each project must align to one Expenditure Category. Projects break down an Expenditure Category into more detail. • You are required to define projects at a sufficient level of granularity to be able to do any programmatic reporting that is required. ' Included in Appendix 1 of the Reporting Guidance Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 10 0 U.S. DEPARTMENT OF THE TREASURY • For each Expenditure Category you use funding for, you will have one or more projects. • For each project, you will need to track obligations and expenditures, as well as any subawards made. Figure 8 depicts the relationship between EC and multiple projects. Figure 8 Relationship between Expenditure Categories and Multiple Projects Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 11 0 U.S. DEPARTMENT OF THE TREASURY Section IV. Project and Expenditure Report The Project and Expenditure Report provides information on projects funded, expenditures, and contracts and subawards over $50,000, and other information required from recipients. Multiple modules or "screens" will help navigate recipients through the Project and Expenditure Report in Treasury's Portal as follows: a) Recipient Profile b) Project Overview c) Subrecipients/Beneficiaries d) Subawards/Direct Payments e) Expenditures f) Recipient Specific g) Certification The following sections describe the reporting steps and information to be collected in each module. a) Recipient Profile Upon login, you will be directed to the recipient information page, which is intended to verify relevant information in Treasury's Portal. On this screen, you will review and confirm key information on your organization, and input information required for the Project and Expenditure Report. Recipient Profile information will be pre -populated from your SLFRF Application file (see Figure 11). If you have previously entered a DUNS (+4) number, it will appear here. 1. Review and confirm your Recipient Profile prepopulated from your SLFRF Application file (see Figure 9). 2. If you have a Recipient DUNS (+4) number and the field is not populated, update as necessary. 3. Verify the names and contact information for individuals the recipient has designated for key reporting roles for the SLFRF program displayed on the screen (see Figure 10). Recipient Information DUNSO 123456782 Addresso 571 State Park Road 56 DUNS (-4)o Address 2e TIN* 987654322 Address 3* Legal Entity Names Sample Recipient City* Livingston Type* StateJerritory* TX FAINO Zip5e 77351 CFDA NaO Zip+40 5731 Reporting Tier* Tier 2. Metropolitan cities and counties with a population below 250,000 residents which i ecelveci more than $10 million In SLFRF funding Please report discrepancies (if any) on the Recipient Information Figure 9 Recipient Information Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 12 0 U.S. DEPARTMENT OF THE TREASURY Point of Contact List './ Nac:c .. Tula )-h- i hn Phone v Emai! Roles 111-222-3333 m gov SLFRF Account Administrator:SLFRF-Authorize. 111.222.3333 is gov SLFRF-Account Administrator:SLFRF.Authorize_. Figure 10 Point of Contact List If changes are needed to the information displayed on the screen, use the textbox (see Figure 11). Please refer to the instructions in Appendix A if the updates are associated with reporting roles or contact SLFRP(a)-treasury.gov. 4. For States, U.S. territories, and metropolitan cities and counties with a population over 250,000, provide the answers to the following two questions (see Figure 11): Who approves the budget in your jurisdiction? Select from the picklist as follows: Legislature; Executive; Legislature & Executive; Other. o If Other, specify who approves the budget. Please include information about the role or function, not an individual's name. Is your budget considered executed at the point of obligation? Select "Yes" or "No". Please note that if you select "Yes" and your budget is considered executed at the point of obligation, then your adopted budget and total dollar value of obligations for each project would be the same. 'Who approves the budget in your jurisdiction? I Is your budget considered executed at the point of obligation? --None-- Co npkte 7is 1`,e4 Figure 11 Budget Approval and Obligation Treasury is requiring descriptive information about budget processes to support analysis of adopted budget information. Treasury is collecting adopted budget information to better understand the intended impact of recipient projects and help tell the story of how these funds are used, identify opportunities for technical assistance, and understand the recipient's progress in program implementation. Treasury is requesting this descriptive information to inform these efforts. Treasury is not approving or pre -approving projects or budgets. Treasury also recognizes that recipients may adjust project budgets over time, and recipients will have the ability to reflect these changes in future reporting. 5. Complete the SAM.gov Registration and Executive Compensation information. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 13 U S. DEPARTMENT OF THE TREASURY a. Use the dropdown (see Figure 12) to confirm your entity's SAM.gov status and Executive Compensation reporting eligibility questions. Is the Recipient Registered in SAM.Gov? None-- Figure 12 SAM.gov question b. If you are registered in SAM.gov, select "Yes" from the picklist and move on to Step 6 below. c. If you are not registered in SAM.gov, select "No" from the picklist. Two additional questions will populate the space below (see Figure 13). 'Is the Recipient Registered in SAM.Gov? N0 � I In the preceding fiscal year, did recipient receive 80% or more of its annual gross revenue from federal funds? --None-- In the preceding fiscal year, did recipient receive $25 million or more of its annual gross revenue frorn federal funds? --Xone-- Figure 13 Additional SAM.gov questions (1) d. If the recipient received 80% or more of its annual gross revenue from federal funds AND the recipient received $25 million or more of its annual gross revenue from federal funds, an additional question will appear (see Figure 14). If the answer is "No" to any of these two questions, move on to step 6 below. Is the Recipient Registered in SAM.Gov? No . In the preceding fiscal year, did recipient receive 80% or more of its annual gross revenue from federal funds? Yes 'In the preceding fiscal year. did recipient receive $25 million or more of its annual gross revenue from federal funds? Is the "total compensation" for the organization's five highest paid officers publicly listed or otherwise listed in SAM.gov? --\-one-- Figure 14 Additional Sam.gov questions (2) Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 14 0U S. DEPARTMENT of THE TREASURY e. Select "Yes" if the total compensation for the organization's five highest paid officers is publicly listed or otherwise listed in SAM.gov and move on to Step 6 below. f. Select "No" if the total compensation for the organization's five highest paid officers is not publicly listed or otherwise listed in SAM.gov. Enter the name(s) of the officer(s) in the chart that will appear (see Figure 15) and the total compensation received by each. If fewer than five (5) officers exist, enter "N/A" and $0 in the empty field(s). I f no. Dlease enter the information below. if number of officers is less than 5. please enter N/A for Name and 0 for Total Compensation.01111 Figure 15 Record of Highest Paid Officer 6. Once all fields have been reviewed and verified, click the Save button to save your progress, then click the Next button to proceed to the following screen. b) Project Overview Recipients are required to enter all projects funded through SLFRF funds as part of their Project and Expenditure Report. Once projects are entered, they are viewable on the Project Overview screen and can be updated in future reporting periods. There are a couple of things to keep in mind when planning and executing your project inventory entry: Manual versus Bulk Upload Entry: There are two ways to enter project information — manual data entry and bulk upload. Bulk upload templates are specific to the project's expenditure category group. Recipients may upload information for multiple projects within the same expenditure category group template simultaneously. Appendix B provides step by step instructions for using the bulk upload option. Due to the different data collected across expenditure categories, you should not use the same bulk upload template from one expenditure category group to another. No Projects Available Option: If your jurisdiction has not yet identified any projects to report, please know that maintaining a project list is a core requirement of the SLFRF program. For the Project and Expenditure Report due January 31, 2022, in the event recipients have no projects available for entry, an option has been included in Treasury's Portal to allow recipients to select "No Projects Available" in lieu of adding projects not otherwise Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 15 0 U.S. DEPARTMENT OF THE TREASURY approved. Selecting this option will require providing a written explanation and may result in additional compliance follow-up from Treasury. To utilize this option, on the Add Project screen 1. Select "No Projects Available" from the Project Expenditure Category Group (See Figure 16). 2. Select "No Projects Available" from the Project Expenditure Category (see Figure 17) 3. Enter in a Project Name of your choosing (See Figure 17). 4. Enter a description as to the rationale for no projects being available for reporting. Add Protect General Project Infprmat�on Project Expenditure Category Group ..None-. J ...yqp. 1Mu�aHoalN 2+wpxkmro;uga. 1WstaxOW mNuax rtpKu.; r,.nryav�n a Aerw+oa. Project Description Figure 16 No Projects Available Option Add Project (S General Project Information Project Expenditure Category Group No Projects Available Project Expenditure Category No Projects Available Please note: at this time. obligations and expenditures reported under Expenditure Category: No Projects Available do not need to have subrecipients. subawards. or expenditures separately reported. 'Project Name Project Description Figure 17 No Projects Available Entry Screen • Non -Infrastructure and Infrastructure Projects Programmatic Data: Treasury requests various programmatic data or impact measures for projects in several non - infrastructure (i.e., projects in EC 1 — 4) and infrastructure projects (i.e., projects in EC 5.1 — 5.17). The programmatic data can be provided via manual project entry or via bulk Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 16 0U.S. DEPARTMENT OF THE TREASURY upload templates. Appendix B provides step by step instructions for using the bulk upload option for projects with programmatic data. Appendix D provides additional detail _. on the programmatic data requested by EC. Treasury recognizes that some programmatic data may not be available until a project starts. Infrastructure Projects with expected total cost over $10M: Information for infrastructure projects with expected total cost over $10 million must be entered manually at this time in Treasury's Portal. Appendix D provides additional detail on the programmatic data requested by EC. When creating infrastructure projects via bulk upload, it is important to re -open those project records to manually complete fields related to costs over $10M. Transfers to NEUs (EC 7.4) (only applicable to States and U.S. territories): States and U.S. territories should report any transfers to NEUs as part of the separate NEU/Non-UGLG module. A project cannot be added under EC 7.4. Recipients should refer to Appendix C when planning your project inventory entry, as it includes a table identifying which ECs require the programmatic data. The table also maps each EC to its appropriate bulk upload template. All projects, regardless of Expenditure Category, require a set of "standard" data fields. Some of these fields, such as project name and project ID, are static and do not change across reporting periods. Other fields, such as status of completion and total obligations, will change across reporting periods. On the Project Overview Screen, recipients can view previously established projects and enter new projects (see Figure 18). The screen displays the total number of projects and total obligations for the recipient. The screen also displays the following for each project entered: project name, project ID, adopted budget (if applicable), total obligations, total expenditures, expenditure category, project status, subaward status, and expenditure status. To go directly to a project to edit or add information, click the colored green or red status button for that project. IsFor Project Status, the green check icon indicates all required fields have been answered. For Subaward Status and Expenditure Status, this indicates that at least one subaward or expenditure entry has been made. For Project Status, the yellow pencil icon indicates that the sum of all obligation or expenditure amounts associated with the project is not equal to that project's total obligations or expenditures. IsFor Project Status, the red pencil icon indicates that not all required fields have been answered. For Subaward Status and Expenditure Status, this indicates that no subaward or expenditure entries have been made. To add a new project from this screen, click the Add New Project button. You may need to refresh your browser screen to see your previous new entries. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 17 ANIL U.S. DEPARTMENT OF THE TREASURY My Projects ®=Compkte0^Warningi ID=NotCompletei Total Number of Projects: 21 Total Obligations Total Expenditures: r _ • Re ms Mr page: 10 Page; 1 of 3 r Projec[Name Redpient Project ld _ Total Obligations ., _ Total Expenditures v Es Penditure Categary Projecrstatus Suha..aare mm, Expenditure Status 1.1 test 123456789 $1.000.000.00 $1A00.000.00 1-Publk Heatn ■ Q ID 1.3 test 112345678 $SW.000.00 $500,000,00 1-Publk Health iD Q a test 45689 $1.000M0.00 $1000,000.00 1-Publlc Health Q Q - test 47659 $1.000,000.00 $2,000,000.00 1-Public HeaHn ID ll/ test 47855 $Imo,000.00 $1.000.000A0 1 Pubtic Health a Q lest 77777 $10.00 51000 2-Neptrx Economic Impacts D Q Q test 66666 smoo 510.W 2-Negatfve Economic Impacts 3-Servkes to test 30303 $20,00 $20.00 Disproportionately Impacted Q w Communities - 100test 7896541 $20.00 S20.00 4P,—wm Pay ■ Q .: test 74 $20.0r1 $20.00 4-Premium Pay ■ Figure 18 My Projects Screen Example c) Add project manually 1. Select the Project Expenditure Category Group and Project Expenditure Category from the picklists. Selection of Expenditure Category drives the template by which you will manually enter the project data (see Figures 19 through 22). To view all of the ECs, scrolling may be necessary. Add Project General Project Information P,cI<: E*penditureCategory Group twd:<MUM .'+fgEDx Ecemm<nnpacn . xry <a to P.a�rRp:�t..�uteh �mwaedCannunrte- SIM�strunun a.Rere�we RK��^<n: Figure 19 Project Expenditure Category Group Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 18 0 U.S. DEPARTMENT OF THE TREASURY Add Project General Project Information Project Expenditure Category Group I -Pubbe Health Project Expenditure Category s�wa..rw...,aMw:ecmw.•..c»,.x+a+r i aw W e-, c,k.,p ww«w.ro. aw....,e oa«.vaa s.n> scr+wx Figure 20 Project Expenditure Category 2. Note that once you select values from the Project Expenditure Category Group and the Project Expenditure Category picklists, the bulk download and upload links will appear (see Figure 21). As you are entering the information manually, go to step 3. -Project Expenditure Category Group I-Pubh, Health • Project Expenditure Category 1.1-COVID-I9 t'ettwenm ,_1—iow. Pro;Kt. a ... ;na TemPllte vW.ae r,.w-@aaeluK-emdatx Figure 21 Bulk Upload for EC 1.1 3. Enter the project name. 4. Enter the unique project identification number you assigned to the project. Do not use duplicate project numbers for multiple projects. 5. Select the completion status of the project from the drop -down list. Options are: • Not started • Completed less than 50% • Completed 50% or more • Completed 6. For States, U.S territories and metropolitan cities and counties with population over 250,000, enter the adopted budget for the project. 7. Enter the total dollar value of obligations for this project. If funds have not been obligated, enter "0". 8. Enter the total dollar value of expenditures for this project. If expenditures have yet to be made, enter "0". • Note — Recipients should ensure that Total Expenditures are less than or equal to Total Obligations for each project. Treasury's Portal will otherwise return an error. Ift- Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 19 0U.S. DEPARTMENT OF THE TREASURY 9. Provide a description for the project between 50 to 250 words. Treasury encourages recipients to include a description of the population they are serving, the desired impact, and how this impact will be measured. 10. For projects reported under the Project Expenditure Categories EC1: Public Health, EC2: Negative Economic Impact and EC3: Services to Disproportionately Impacted Communities, provide answers to the questions "Does this project include a capital expenditure"? If "Yes", what is the total expected cost of the capital expenditure, including pre -development costs? If the answer is "No", include a zero for the expected total cost of the capital expenditure. 11. If the project earns income or has expended that income, enter the total dollar value of program income earned and Program income expended in the fields of the same name, respectively. This field is optional. 12. If the project is in an EC which requires additional programmatic data, additional fields will display on the screen. Please see Section IVA below for more information on providing programmatic data and Appendix D for more information on the programmatic indicators themselves. General Project Information -Nowt E>wpeW.— Category G,.p 'PrPject Eepe fture Category 1 i-COt'II5 I9Cmron?rv^�rp w: Qcrptcd E.rage-: 'Status tc (:crnyk:ion 'Project D—I lWlon Prpgram Income Earneee 'Clow NIe peajec[ IPcloee a capital eape{Waure? Add Project a T9GI OUa.gota:so vial Caper Ji,::re rProg{em IMpme ExpeMeOe Figure 22 Project Entry Screen Once all of the above information is entered, click the Add Project button, then click the Next button to proceed to the following screen or you can stay on this screen and continue adding projects to your project inventory. Refer to Figure 22. d) Programmatic Data for Projects As noted above, projects in several ECs require programmatic data in addition to the standard project information covered above and as described in Part B.3.i and B.3.j of the Reporting Guidance. Appendix D provides additional detail on the measures and information required, by Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 20 U S. DEPARTMENT OF THE TREASURY Expenditure Category. This information should be provided at the project -level (e.g., disaggregated by project if the recipient has multiple projects in a single EC). Programmatic data can be provided via the manual project entry process described above, or in some cases via bulk upload using the Expenditure Category -specific templates, described in Section IV.e and Appendix B. For example, to manually enter a new project in Expenditure Category 1.9 (see Figure 23) Payroll Cost for Public Health, Safety, and other Public Sector Staff Resp, the recipient should: 1. Follow steps 1 — 11 in Section IV.c.1 above. 2. Populate the programmatic data field for "Number of government FTEs responding to COVID-19 supported under this authority" (see Figure 24). 3. Once all of the above information is entered, click Add Project. 4. Click the Next button to proceed to the following screen. Add Project General Project Information Project Expenditure Category Group 1-Public Heath Project Expenditure Category 1.9-➢—U C.- for PAI. H-11h, safcr. anc Url:,r Fi;b;, It---r irac `tt,p ., I I r",!I, 1 1 T .plate ,- Vuxum P,14 F.C. 1.9T 'ur -Project Name 'Recipient Project IDe iI Adopted Budget -Total Ouigat—a -Total Eapenditurese -Statusto Completlon 'Project Desorption Program Income Eanm de Program Income Expendede ' Dda th6 Project Include a caplGl expen�nlre? Figure 23 Manual Entry for EC 1.9 Additional Questions •Number ofgovernrnem FTE resp mdingtoCOVID-19 supported under this authority Figure 24 Programmatic Data for EC 1,9 If entering projects via bulk upload, recipients should populate the programmatic data columns contained in the appropriate EC's bulk upload template. Refer to Appendix D for a full listing of project Expenditure Categories with detail on the additional information needed for specific categories. Appendix C provides a helpful table mapping each Expenditure Category to the bulk upload template recipients should use if inputting or updating projects via the bulk upload method. lxl Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 21 0 U.S. DEPARTMENT OF THE TREASURY Projects entered into the system can be edited or deleted before final submission. To edit a project, open the project from the My Projects screen. To delete a project, use the Delete Project Button. If a report is already submitted, users will need to un-submit to edit or delete a project record. See Figure 25. E :..owiMYq�[l4¢Ulf i<+r4Yww�ti4K.! 10 Figure 25 Edit and Delete Project Screen 1. Premium Pay (EC 4.1 and EC 4.2) If EC 4.1 or 4.2 is selected as the project expenditure category, recipients will need to provide additional data. Add Project General Project Information -Project Expenditure Category Group 4-P—um Pa% Project Expenditure Category 4.1-Pubtie Sntor Emploree> .yD—load the Project EC 41-4.2 Template .L Upload Pnolert FC. 4.'1 4.2 Tenplatf Project Name 'Recipient Project ID,, Adopted Budget 'Total Obligationse -Total Expenditures* -Status to Completion No - Project Description Prcgran,.Irco %,Earned* Program Income Expendede 0 Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 22 U.S. DEPARTMENT OF THE TREASURY Additional Questions Sectors Designated as Essential Critical lnfrastructureo Number of workers !c• oe served . r_riuro'a; Van a.>ie. Figure 26 Premium Pay Screen and Additional Questions In addition, recipients need to provide additional information in regard to Premium Pay, as reflected in Figure 26. Note - Recipients that are either creating or supporting a Premium Pay program may only provide premium pay to eligible workers, e.g., workers needed to maintain continuity of operations of essential critical infrastructure sectors (see sector list below), for essential work, e.g., work that is not performed while teleworking from a residence; and involves either: • regular, in -person interactions with patients, the public, or coworkers of the individual that is performing the work; or • regular physical handling of items that were handled by, or are to be handled by, patients, the public, or coworkers of the individual that is performing the work. Sectors designated as essential critical infrastructure sectors: Recipients should refer to the list of sectors below when providing information for this question. Recipients may also refer to this list of sectors on the Subaward screens (see section IV.q) to answer the question: Employer sector for all subawards to third -party employers (i.e., employers other than the State, local, or Tribal government). Any work performed by an employee of a State, local, or Tribal government; Behavioral health work; Biomedical Research; Dental care work; Educational work, school nutrition work, and other work required to operate a school facility; Election's work; Emergency response; Family or childcare; Grocery stores, restaurants, food production, and food delivery Health care; Home- and community -based health care or assistance with activities of daily living; Laundry work; Maintenance work; Medical testing and diagnostics; Pharmacy; Public health work; 1111111mol Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 23 U.S. DEPARTMENT OF THE TREASURY SectorsDesignated as Essential Critical Infrastructure Sectors Sanitation, disinfection, and cleaning work; Social services work; Solid waste or hazardous materials management, response, and cleanup work; Transportation and warehousing; Vital services to Tribes; Work at hotel and commercial lodging facilities that are used for COVID-19 mitigation and containment; Work in a mortuary; Work in critical clinical research, development, and testing necessary for COVID-19 response. Work requiring physical interaction with patients; Other Beyond this list, the chief executive (or equivalent) of a recipient government may designate additional non-public sectors as critical so long as doing so is necessary to protecting the health and wellbeing of the residents of such jurisdictions. Premium Pay Narrative: Premium pay must be responsive to eligible workers performing essential work during the public health emergency. For groups of workers that do not meet one of the two criteria below, Recipients must submit a written justification to Treasury describing how the premium pay or grant is responsive to workers performing essential work during the public health emergency: 1. Eligible worker receiving premium pay is earning (with the premium included) below 150 percent of their residing state or county's average annual wage for all occupations, as defined by the Bureau of Labor Statistics Occupational Employment and Wage Statistics5, whichever is higher, on an annual basis; or 2. Eligible worker receiving premium pay is not exempt from the Fair Labor Standards Act overtime provisions. 2. Infrastructure Projects Programmatic Data (EC 5) Programmatic data is requested for Infrastructure projects in addition to data uploaded by bulk template. That additional programmatic data can only be entered manually at this time in Treasury's Portal. If adding an infrastructure project via the bulk upload method, recipients will be asked to provide additional data in Treasury's Portal screens manually (see Figure 27 for example of a project providing water or sewer services). Alternatively, recipients can enter all infrastructure project information manually. Reference Appendix D for detailed information on infrastructure project entry and the Reporting Guidance for more general information on infrastructure project entry. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 24 0 J S. DEPARTMENT OF THE TREASURY Additional Questions 'ProJected/M-Walconstructionsta date -acted/acwwkgdKlondeParati dv4 e _ 'tocallon Typettor broadband, Beosloatial location data) 'location Detallse r_...._.....--- . _ . _ _.__ Public Water System(PNS) ID Numbero - National Pollutant Dlnhazge Elimination SWtem{NPDES) Permit Numbere _- Figure 27 Programmatic Data for Infrastructure Projects 3. Infrastructure Projects with total expected costs over $10M Recipients entering infrastructure projects with total expected costs over $10 million are required to respond to two questions manually. If you expect a project to exceed $10 million over its lifetime, it is strongly recommended to complete the certifications in advance to avoid future retroactive reporting burden and project -associated expenses. Recipients are required to provide the following two certifications, or provide additional information: a) Davis Bacon Act Certification (see Figures 28 and 29): 1) Select "Yes" or "No" response to Certification question for compliance with Davis - Bacon Act: Do you intend to certify that "all laborers and mechanics employed by contractors and subcontractors in the performance of the project are paid wages at rates not less than those prevailing, as determined by the U.S. Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code (commonly known as the "Davis -Bacon Act'), for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the State (or the District of Columbia) in which the work is to be performed, or by the appropriate state entity pursuant to a corollary state prevailing -wage -in -construction law (commonly known as "baby Davis -Bacon Acts')? 2) If response is "No", enter the following information in the revealed questions: i. The number of employees of contractors and sub -contractors working on the project; ii. The number of employees on the project hired directly and hired through a third party; and iii. The wages and benefits of workers on the project by classification; and iv. Whether those wages are at rates less than those prevailing6. PLEASE NOTE: Selecting "Yes" to 1(a) means that you intend to certify that all contractors and subcontractors are paying prevailing wages and fringe benefits to all laborers and mechanics on the project. 6 As determined by the U.S. Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code (commonly known as the "Davis -Bacon Act"), for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the State (or the District of Columbia) in which the work is to be performed. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 25 U.S. DEPARTMENT OF THE TREASURY I—, Davis Bacon Certification Do you intend to certify that "all laborers and mechanics employed by contractors and subcontractors in the performance of the project are paid wages at rates not less than those prevailing. as determined by the U.S. Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40. United States Code (commonly known as the' Davis - Bacon Act"). for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the State (or the District of Columbia) in which the work is to be performed. or by the appropriate state entity pursuant to a corollary state prevailing -wage -in -construction law (commonly known as"baby Davis -Bacon Acts) None_ Figure 28 Davis Bacon Certification Davis Bacon Certification Do you intend to cer tify that "all laborers and mechanics employed by contractors and subcontractors in the performance of the project are paid wages at rates not less than those prevailing, as determined by the U.S. Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40. United States Code (commonly known as the"Davis-Bacon Act"). for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the State (or the District of Columbia) in which the work is to be performed, or by the appropriate state entity pursuant to a corollary state prevailing -wage -in -construction law (commonly known as"baby Davis -Bacon Acts") Project Employment and Local Impact Report Number of employees of contram,sand subcontractor working on the project Number ofemployees on the project hired directly Number of employees on the project hired through a third party Are any of the wages at rates less than those prevailing? Wages and benefits of workers on the project by classification :,:i fof:'r Saes l_ �- e ti _ ,. -1� -I- _ z a T. Figure 29 Additional Questions if Response to Davis Bacon Certification is "No" b) Project Labor Agreement Certification (Figures 30 and 31): 1) Select "Yes" or "No" response to Certification question for existence of project labor agreement: Do you intend to certify that "the indicated project includes a project labor agreement, meaning a pre -hire collective bargaining agreement consistent with section 8(f) of the National Labor Relations Act (29 U.S.C. 158(f))? 2) If response is "No", enter the following information about a project continuity plan in the pop-up window: i. How the recipient will ensure the project has ready access to a sufficient supply of appropriately skilled and unskilled labor to ensure high -quality construction throughout the life of the project, including a description of any required professional certifications and/or in-house training; ii. How the recipient will minimize risks of labor disputes and disruptions that would jeopardize timeliness and cost-effectiveness of the project; iii. How the recipient will provide a safe and healthy workplace that avoids delays and costs associated with workplace illnesses, injuries, and fatalities, including descriptions of safety training, certification, and/or licensure requirements for all relevant workers (e.g., OSHA 10, OSHA 30); iv. Whether workers on the project will receive wages and benefits that will secure an appropriately skilled workforce in the context of the local or regional labor market; and v. Whether the project has completed a project labor agreement. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 26 0 U.S. DEPARTMENT OF THE TREASURY PLEASE NOTE: Selecting "Yes" to 2(a) means that you intend to or are using an 8(f) pre -hire agreement on your project. Certification for Labor Agreements Do you intend to certify that'the indicated project includes a project labor agreement. meaning a pre -hire collective bargaining agreement consistent with section 8(f) of the National Labor Relations Act (29 U.S.C.158(f))" Figure 30 Certification for Labor Agreements Project Workforce Continuity Plan 'Haw will the recipient ensure the protect has ready access taa sufficient supply of appropriately skilled and unshed Tatar to ensurehigh-gwiityconstructlw throughout the life of the project? -How will the recipient minimize risks of labor disputes and disruptions that would jeopardize timeliness and cost-effec[Iveriass of [he project? How will the recipient provide a safe and healthy workplace that avoids delays and costs associated with workplace illnesses, Injuries. and fatalities? 'will workers on the project recalye'wages and benehts that will secure an appropriately Wiled workforce In the cored of the local and reglonal labor market? -N—,- 'Does the project have a completed project labor agreement? .vane.. 'Does the project prioritize local hires? __N_ 'Does the project have a Community Behar, Agreemem, with a description of any such agreement? \one - Figure 31 Additional Questions if response is "No" Once all of the above information is entered, click Add Project. Click the Next button to proceed to the following screen. 4. Water and sewer projects (EC 5.1-5.15) Recipients will provide information associated with water and sewer projects, under EC 5.1 through 5.15 when the project starts. Recipients are not required to provide the information if the project has not started. When the "Status of Completion" field is marked "Not Started, the additional questions required for water and sewer projects will not populate. 5. Revenue Replacement Recipients will have the option to update or provide information associated with revenue replacement not previously provided as part of prior submissions. Information previously provided as part of the Interim Report (if provided) will display in this screen. Depending on your answer to the question, "is your jurisdiction electing to use the standard allowance of up to $10 million for identifying the revenue loss?" you will be asked conditional questions. Refer to Figure 30. As outlined in the final rule, Recipients will have the option to make a one-time decision to calculate revenue loss according to the formula outlined in the final rule or elect a "Standard Allowance" of up to $10 million, not to exceed the award allocation, to spend on government services throughout the period of performance. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 27 0 U S. DEPARTMENT OF THE TREASURY For recipients calculating revenue loss according to the formula, note that the final rule permits recipients are permitted to choose whether to use calendar or fiscal year calculation dates. Recipients must use the same calculation time frame (calendar or fiscal year) throughout the award period. For recipients electing the "Standard Allowance," Treasury will presume that up to $10 million, not to exceed the award allocation, in revenue has been lost due to the public health emergency and recipients are permitted to use that amount to fund "government services." Please note that electing the standard allowance does not change a recipient's total allocation. Treasury's Portal will allow all recipients to elect to use this standard allowance instead of calculating lost revenue using the formula. Refer to Figure 32. The following question will display in the screen for all recipients, including those with total allocations of $10 million or less: Is your jurisdiction electing to use the standard allowance of up to $10 million, not to exceed your total award allocation, for identifying revenue loss? Yes/No (Please note electing the standard allowance does not change your total allocation). Based on the recipient's election, certain information will display in Treasury's Portal which the recipient will need to complete, as noted in the table below: Data Standard Allowance — Yes Standard . . Base Year Revenue N/A Required Fiscal Year End Date N/A Required Growth Adjustment Used N/A Required Actual General Revenue as of 12 N/A Required months ended December 31, 2020 Estimated Revenue Loss N/A Required Select whether Fiscal Recovery Funds Required Required were used to a make a deposit into a pension fund. Please note that no recipients except for Tribal governments may use Fiscal Recovery Funds to make a deposit to a pension fund Provide an explanation of how revenue Required Required replacement funds were allocated to government services: Please provide an explanation Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 28 U S. DEPARTMENT OF THE TREASURY WWV Revenue Replacement Key Inputs a I.Wt titer m Resort data Sexed Yasr Z020 1/ Is your jurisdiction electing to use the standard allowance of up to $10 million, not to exceed your total award allocation. for identifying r evenue loss? 'Base Year General Revenues `Growth Adjustment Used* T , *Fiscal year End Dates 'Actual General Revenue as of 12 months ended December 31.2020 i Estimated Revenue Loss Due to Covid-19 Public Health Emergency as of December 31, 2020 'Were Fiscal Recovery Funds used to make a deposit Into a pension fund? Please provide an explanation of how revenue replacement funds were allocated to government services Explanation Salesfbme Saus _ ,_ Figure 32 Revenue Replacement Screen e) To enter projects using the bulk upload method: Recipients have the option to provide project information via bulk upload, in lieu of manual entry for some or all of their projects. Please note, bulk upload templates are specific to the EC the project best aligns to. The table in Appendix C provides a mapping of project ECs to their a appropriate bulk upload template. 1. Fill the downloaded template with information specific to each project's EC, as follows. Projects within the same EC or set of ECs covered by a given template can be uploaded together. For example, all projects in EC 2.1 to 2.5 (Negative Economic Impacts) can be entered together on the Project Bulk Upload for Project EC 2.1-2.5 Template. Optional fields are denoted by (*). "Column" below refers to the applicable area in the bulk upload file. • Column B: Select the Project Expenditure Group • Column C: Select the Project Expenditure Category • Column D: Enter the Project Name • Column E: Enter the unique project identification number assigned by the State or U.S. Territory to the project. Do not use duplicate project numbers for multiple projects • Column F: Select the completion status of the project • Column G: Enter the total dollar value of the adopted budget for this project (only applicable to States, U.S. Territories, and metropolitan cities and counties with population over 250,000) Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 29 0 U.S. DEPARTMENT OF THE TREASURY • Column H: Enter the total dollar value of obligations for this project. If no amounts are obligated, enter "0" • Column I: Enter the total dollar value of expenditures for this project. If no expenditures have been incurred, enter "0" • Column J: For projects in EC 1, EC 2, or EC 3, enter a yes or no response to the question, does this project include a capital expenditure? • Column K: If yes, what is the total expected cost of the capital expenditure? • Column L: Enter a description of the project • Column M: Enter the amount of Federal program income earned • Column N: Enter the amount of that was used to cover eligible project costs • Column O: Enter a brief description of the structure and objectives of assistance program(s) (e.g., nutrition assistance for ow income households) • Column P: Enter the number of households served (by program if recipient establishes multiple separate household assistance programs) • Column Q: Enter a brief description of recipient's approach to ensuring that aid to households responds to a negative economic impact of Covid-19. 2. Upload the Project Entry and Status template, in this case the template for EC 2.1-2.5, separately as a .csv file by using the respective Upload button on the screen or dropping the files in this view. 3. Once all of the above information is entered, click Add Project. Click the Next button to proceed to the following screen. Refer to Appendix B for additional information related to the bulk file upload process f) Subrecipients or Beneficiaries The Subrecipients or Beneficiaries Profile documents the information about each subrecipient or beneficiary that has received at least one Subaward or Direct Payment of federal funding greater than $50,000 to execute projects supporting the SLFRF program. Please note that projects entered under EC 6.1 Provision of Government Services are not required to enter Subrecipient, Subaward, or Expenditures (for a subaward) information for the January reporting cycle. The Subrecipients or Beneficiaries module allows users to enter data manually or leverage the bulk file upload capability. For bulk -upload instructions specific to this submodule, see Appendix B. You can download the bulk file template for use in submitting the required data via bulk upload. When ready to submit the data, use the upload button (see Figure 33). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 30 0U S. DEPARTMENT OF THE TREASURY Subrecipient Information Bulk Uploads Download the Subrecipient Template _ Upload Subrecipient Template Figure 33 Subrecipient Bulk Upload Icon Note: When using the bulk file upload capability, the Subrecipient bulk upload must be completed prior to beginning the data entry for the Subawards module. If you choose to individually enter records, follow the instructions below. 1. Enter the relevant Subrecipient or Beneficiary information in each of the required fields (see Figure 34). Recipients must enter at least one of the following three identifiers for a subrecipient: UEI (Unique Entity Identifier), DUNS, or TIN. Subrecipient Information SWI, Uploads ,t Dovmload the Subredpient Template S Upload Subrecipient Template Manual Entry UEI:O DUNS:O 'Address Line 1:0 DUNS (+4):0 0 Address Line 2:0 TiN:e Address Line le ' Legal Name:* ' City:O -Zip:O POC Email Address:* -State:* ZIP+4:0 -None-- ' Is the subreciplent registered in SAM.gov'O Figure 34 Manually Create a Subrecipient or Beneficiary Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 31 0 U.S. DEPARTMENT OF THE TREASURY 2. If the subrecipient or beneficiary is not registered in SAM.Gov, select "No" from the picklist. Two additional questions will populate the space below (see Figure 35). 'is the subrecipient registered in SAM.gov?o No In its preceding fiscal year. did the recipient receive 80% or more of its annual gross revenue from federal funds? - Aone-- In the preceding fiscal year. did recipient receive $25 million or more of its annual gross revenue from federal funds? Figure 35 Sam.gov Questions for Subrecipients 3. If the recipient received 80% or more of its annual gross revenue from federal funds AND the recipient received $25 million or more of its annual gross revenue from federal funds, an additional question will appear (see Figure 36). Is the subrecipient registered in SAM.gov?o :\ o In its preceding fiscal year. did the recipient receive 80% or more of its annual gross revenue from federal funds? In the preceding fiscal year, did recipient receive $25 million or more of its annual gross revenue from federal funds? Yes Is the "total compensation" for the organization's five highest paid officers publicly listed or otherwise listed in SAM.gov? --\one-- Figure 36 Additional SAM.gov questions for Subrecipients 4. Select "Yes" if the total compensation for the organization's five highest paid officers is publicly listed or otherwise listed in SAM.Gov and move on to step 6 below. 5. Select "No" if the total compensation for the organization's five highest paid officers is not publicly listed or otherwise listed in SAM.Gov. Enter the name(s) of the officer(s) in the chart that will appear (see Figure 37) and the total compensation received by each. If fewer than five (5) officers exist, enter "N/A" and $0 in the empty field(s). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 32 NiOtM U.S. DEPARTMENT OF THE TREASURY 'is the subrecipient registered in 5AM.gov?6 No In its preceding fiscal year, did the recipient receive SO% or more of its annual gross revenue from federal funds? Yes , 'in the preceding fiscal year, did recipient receive $25 million or more of its annual gross revenue from federal funds? Yes 'Is the "total compensation"for the organizationMs five highest paid officers publicly listed or otherwise listed in SAgov? CNo —�W-I ii If no, please enter the information below. If number of officers is less than 5. please enter NJAfor Name and 0 for Total Compensatlon.p No. Name Total Compensation 1 .____ 2 _ , 3 4 i _ - 5 l� - Figure 37 Five Highest Paid Officers for Subrecipients or Beneficiaries 6. At the bottom of the page, click the Create Subrecipient icon to complete the Subrecipient record and return to Subrecipient screen. 7. Subrecipient or Beneficiaries entered into the system are shown at the bottom portion of the screen (see Figure 38). My Subrecipients Records per page; 10 . Page: 1 of 0 i Name - Duns TIN UEI Figure 38 Subrecipients Entered g) Subawards or Direct Payments The Subawards or Direct Payments section allows recipients to enter the required information regarding Subawards or Direct Payment of federal funding greater than $50,000 for all direct payments, subawards, and contracts made by your organization under SLFRF. Please note that projects entered under EC 6.1 Provision of Government Services are not required to enter Subrecipient, Subaward, or Expenditures (for a subaward) information for the January reporting cycle. The Subawards or Direct Payments module allows users to enter data manually or leverage the bulk file upload capability. For bulk -upload instructions specific to this submodule, see Appendix B. You can download the bulk template using the provided link in Treasury's Portal before using the upload button (see Figures 39 and 40). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 33 0U.S. DEPARTMENT OF THE TREASURY Subaward Information Project Name: �"'rdt Projects_ i 10 ` Test S <t D-. 1337C Q5I&S.17T-t mectir i231 Ma RCnaNmha c-WOO'. 5123 Bulk UPWd PrgKt 1 arc�at t� 123a2 Bulk UVI dPM. 2 Figure 39 Subaward Bulk Upload (1) Subaward Information Project Name: Q Test x Bulk Uploads _+- Download Subaward Template ,* Subaward Bulk Upload Figure 40 Subaward Bulk Upload (2) Note: Subaward bulk upload can only be completed after Subrecipient bulk upload is completed. If you choose to individually enter records, follow the instructions below. 1. Enter the following fields pertaining to the Subawards or Direct Payments (see Figure 41): • Subrecipient or Direct Payment Recipient Name from the picklist • Subaward Number • Subaward Amount (Obligation) • Subaward Date • Period of Performance Start • Period of Performance End • Place of Performance Address, City, State, Zip, Zip+4 2. Select the Subaward Type from the drop -down picklist: • Contract: Purchase order • Contract: Delivery order • Contract: Blanket Purchase Agreement • Contract: Definitive contract • Grant: Lump sum Payment(s) • Grant: Reimbursable Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 34 --R U.S. DEPARTMENT OF THE TREASURY • Loan - Maturity prior to 12/31/26 with planned forgiveness (please see note below on use of loans) • Loan - Maturity prior to 12/31/26 without planned forgiveness (please see note below on use of loans) • Loan - Maturity past 12/31/26 with planned forgiveness (please see note below on use of loans) • Loan - Maturity past 12/31/26 without planned forgiveness (please see note below on use of loans) • Direct Payment • Transfer: Lump Sum Payment(s) • Transfer: Reimbursable Manual Entry -Subrecipient Name: 'Subaward No:• 'Subaward Type:* --None-- 'Place of Performance Address 1:0 7 Place of Performance Address 2:0 Place of Performance Address 3:0 'Subaward Amount (Obligation):& 'Place of Performance City:O 'Subaward Date:& 'Place of Performance State:* Period of Performance Start:* ' Place of Performance Zip:* 'Period of Performance End:* Place of Performance Zip+A:O Brief description of Subaward and its undertying eligible use (750 characters):* Figure 41 Subaward Reporting 3. Click Create Subaward to establish the Subaward record. Repeat Steps 1 through 3 to create additional Subaward records. 4. Subawards entered into the system are shown at the bottom portion of the screen (see Figure 42). My Subawards �Recordsperpage: 10 • Page: 1 of0 . Project Name . Award No Award Amount Subrecipient Name Figure 42 Subaward Entered Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 35 toU.S. DEPARTMENT OF THE TREASURY h) Expenditures In the Expenditures tab, recipients will provide information for each contract, grant, loan, transfer, or direct payment greater than $50,000. Additionally, aggregate reporting is required for contracts, grants, transfers made to other government entities, loans, direct payments, and payments to individuals that are less than $50,000. If aggregated expenditures linked to a project equal the total Expenditures reported for that project, the Subaward status box on the My Projects screen is changed to `Complete'. Please note that projects entered under EC 6.1 Provision of Government Services are not required to enter Subrecipient, Subaward, or Expenditures (for a subaward) information for the January reporting cycle. The Expenditures reporting module allows users to enter data manually or leverage the bulk file upload capability. For bulk -upload instructions specific to this submodule, see Appendix B. If you do not use the bulk upload function, follow the steps listed below. 1. To report new expenditures under a specific subaward, enter the subaward number. The Project Name associated with the subaward will auto populate. 2. Enter the following: • Expenditure Start Date • Expenditure End Date • Expenditure Amount 3. Enter narrative for Administrative Costs, if applicable. 4. Click the Create Expenditure button to submit the record. Repeat Steps 1 through 6 to report additional sub -award expenditures. Proceed to the next segment once all sub - award expenditures are reported. 1. Expenditures Greater than $50,000 For expenditures for awards greater than $50,000, fill out the "Expenditures for Awards> $50,000" box (see Figure 43). Project name and subaward will be selected to link each expenditure to the appropriate entries. Note that the Project name is automatically identified based on the associated Subaward No. entered. Once the information has been entered, click the Create Expenditure button on the bottom left of the box. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 36 0 U.S. DEPARTMENT OF THE TREASURY Expenditures > $50,000 In the below section, please provide further detail on each award for, and subsequent expenditure of, $50.000 or more. Your organization must identify a subaward identifier to each expenditure. In addition, you must also provide the: Expenditure Date and Expenditure Amount, as well as any required information for specific Subaward types. Project Nameo el Bul Sat x Bulk Uploads Download Bulk Upload Template U Upload Bulk Upload Template Manual Entry Subaward No Subaward Amount Subaward Type Subrecipient Name $10 Contract: Delivery Hogwarts nMa� mi,-e Order Expenditure Start O Expenditure End 0 Expenditure Amount 0 -- -- s — --- --� — — —1 Figure 43 Expenditures >$50,000 Alternatively, the Expenditures for Awards greater than $50,000 bulk upload template (Figure 43) may be used and uploaded with the relevant information. 2. Expenditures Less than $50,000 For expenditures for awards less than $50,000 fill out the "Aggregate Expenditures < $50,000" box (see Figure 44). Once the information has been entered, click the Create Expenditure button on the bottom left of the box. Note the need to manually identify the Project Name as no Subaward is necessary for Aggregate Expenditures less than $50,000. Aggregate Expenditures < $50,000 For disbursements less than $50,000. please provide the aggregate expenditures and obligations forthe current reporting period and total todate. Your organization must assign project and subaward identifiers to each aggregate expenditure. Project Name 0 Test , Bulk Uploads m Download Bulk Upload Template .b Upload Bulk Upload Template Manual Entry Suba,vard Type ;Aggregates%0 -gene-- Total Period Expenditure Amount Total Period Obligation Amount* Cumulative Expenditures Cumulative Obligations g0.00 so.00 Figure 44 Aggregated Expenditures <$50,000 1-1 Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 37 0 U.S. DEPARTMENT OF THE TREASURY Aggregate subaward types available for selection are as follows. • Aggregate of Contracts Awarded • Aggregate of Grants Awarded • Aggregate of Loans Issued • Aggregate of Transfers • Aggregate of Direct Payments Alternatively, the Aggregate Expenditures less than $50,000 bulk upload template may be used and uploaded with the relevant information. 3. Payments to Individuals For disbursements to individuals less than $50,000, recipients should complete the "Payments to Individuals" box (see Figure 45) with expenditure information. Once this information has been entered, click the Create Expenditure button on the bottom left of the box. Payments to Individuals For disbursements to individuals less than $50.000. please provide the aggregate expenditures and obligations for the current reporting period and total to date. Project Name 0 Test x Bulk UPI—& � Download BWk Upload Template y Upload Bulk Upload Template Manual Entry Total Period Expenditure Amount p Cumulative Expenditures $0.00 Total Period Obligation Amounto Cumulative Obligations Moo Figure 45 Payments to Individuals Alternatively, the Payments to Individuals bulk upload template (Figure 45) may be used and uploaded with the relevant information. Note the need to manually identify the Project Name as no Subaward is necessary for Payments to Individuals less than $50,000. Once entries are complete, click the Next button on the bottom right of the page. This will bring recipients to the Report tab. i) Tax Offset Provision (Only for States and U.S. Territories) Baseline revenue or revenue -increasing covered charges information are not required at this time. State and U.S territory recipients should provide the amount of revenue -reducing covered changes covering the periods of date of award through July 31, 2021 and separately, August 1, 2021 through December 31, 2021. (See Figure 46). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 38 0 U.S. DEPARTMENT OF THE TREASURY See Section C (11) of the Reporting Guidance for additional information. Additional guidance will be forthcoming for additional reporting requirements regarding the tax offset provision. Ineligible Activities: Tax Offset Provision Please provide the amounts for Revenue -reducing covered changes covering the periods of date of award through July 31.2021 and August 1.2021 - December 31.2021. Revenue -reducing Covered Changes from date of award through July 31, 20210 Revenue -reducing Covered Changes from August 1.2021- December 31.20210 Figure 46 Tax Offset Provision Screen j) Official Certification On this screen, the Authorized Representative for Reporting (ARR) will be asked to certify information pertaining to the Project and Expenditure. By certifying this submission, the ARR is confirming that all reported information is accurate and approved for submission (see Figures 47 and 48). Users who are not designated as an ARR will not be presented with the screen. 1. The ARR's Name, Title, Telephone Number, and E-Mail Address will be presented on screen for review. 2. Allow the Certifying Official to review all prior screens and entries to verify accuracy of the inputted record. Official Certification Statement I certify that the information provided Is accurate and complete after reasonable inquiry of people, systems, and other information available to the SLFRF recipient. The undersigned acknowledges that any materially false. fictitious, fraudulent statement, or representation (or concealment or omission of a material fact) in this submission maybe the subject of criminal prosecution under the False Statements Accountabi I ity Act of 1996. as amended.18 USC 1001. and also may subject me and the SLFRF Recipient to civil penalties. damages. and administrative remedies for false claims or otherwise (including under 31 USC 3729 et seq.) The undersigned Is an authorized representative of the SLFRF Recipient with authority to make the above certifications and representations on behalf of the SLFRF Recipient. By signing this report. the Authorized Representative for Reporting acknowledges in accordance with 31 CFR 35.4(c) that recipients shall provide to the Secretary periodic reports providing detailed accounting of the uses of funds. as applicable. all modifications to a States or Territory's tax revenue sources, and such other information as the Secretary may require for the administration of this program. In addition to regular reporting requirements. the Secretary may request other additional information as may be necessary or appropriate. Including as may be necessary to prevent evasions of the requirements of this program. False statements or claims made to the Secretary may result In criminal. civil. or administrative sanctions. Including fines. Imprisonment. civil damages and penalties. debarment from participating in Federal awards or contracts, and/or any other remedy available by law. Figure 47 Official Certification Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 39 U.S. DEPARTMENT OF THE TREASURY 3. Verify information included in Figure 48 and confirm that the values presented are as expected based on the information included or uploaded in previous screens. Name of Current Login User The information for the currently signed in user will populate as the Authorizer of this submittal. Only those in Role of Authorized Representative for Reporting or Authorized Representative on the Submission record will have access to Certify and Submit. Name: Telephone: Title: Email: Testes 0 Total Number of Projects: 2 Total Obligations: Total Expenditures: $100.000.00 Figure 48 Summary of Reported Information 4. When certifying and submitting the report, a confirmation box will appear asking if the recipient is sure it wants to submit (see Figure 49). Are you sure you want to submit? s b.4 Figure 49 Submission Verification Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 40 0 U.S. DEPARTMENT OF THE TREASURY 5. A confirmation box may also appear with additional certification language depending on the programmatic data inputs in the user's report. Figure 50 shows an example of project -dependent certification language. Are you sure you want to submit? BY signing here. the Authorized Representative for Reporting certifies that for applrcable mfrastAKture projects over $10 mdflon, as identified in this report. all laborers and mechanics empkrved by contractors and subcontractors in the performance of such project are paid wages at rates not less than those prevailing, as determined by the U.S. Secretary of Labor in accordance with subchapter IV of chapter 31 of titte 40. United States Code iCommonty, known as the "Davis Bacon Act'). for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the State (or the District of Columbia) in which the work is to be performed, or by the appropriate state entity pursuant to a corollary state prevailing-wage-m construction law (commonly known as 'baby Davis Bacon Acts').. By signing here the Authorized Representative for Reporting certifies that for applicable infrastructure projects over S 10 million, as identified in this report, the projectfs) includes) project labor agreement(s(. meaning (a) pre hire collective bargaining agreement(s) consistent with section 8(f) of the National Labor Relations Act (29 US.CC 156(f)) Your sub•award and expenditure entry indicates use of loans with maturity beyond the end of the SLFRF program. Please note that SLFRF funds can ONLY be used for the cost of the pi olected cost of the ban. Treasury requit es you to estimate the subsidy cost using one of the two allowable approaches, outlined in FAQ 411 on our website, tot estimating the cost of the loan. Treasury will require additional documentation and information in future reporting periods on such loans. This guidance also applies to revolving loan funds. For loans maturing prior to 12/31/2026, or where there is planned forgiveness unanticipated payment of principal or interest received on loans must be reported a program income. Program income may be applied to other eligible uses during the period of performance, provided that it is obligated by 12i3112024. Any program income that is not obligated by 12M I2024 must be returned to Treasury. I acknowledge the requirements for using SLFRF funds for bans with extended matur ices andror revolving loan funds sauna Figure 50 Submission Verification with additional language 6. Once all of the information is validated, click the Submit button to complete the entry. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 41 Evilitlillill U S. DEPARTMENT OF THE TREASURY Appendix A — Designating SLFRF Points of Contact by SLFRF Account Administrators This section provides a brief instruction for SLFRF Account Administrators on accessing Treasury's Portal to provide the names and contact information of officials to be designated as your organization's points of contact for the SLFRF award(s). The following pages provide step- by-step guidance. See FAQ Section B for commonly asked questions/answers on this topic. Note- the screens noted below may be subject to change. Section A: Instructions Step 1 You must be registered in the ID.me or Login.gov system to access Treasury's Portal. If you have questions about registering in ID.me or Login.gov, please email SLFRP@treasury.gov. Step 2 Once you are registered in ID.me or Login.gov, click on the link in the email you received requesting the POC designations. If you do not have the email link, please email us via SLFRP@Treasury.gov and we will provide the link. Step 3 The link will take you to the Treasury Portal "State, Local, and Tribal Support" landing page as shown below. Once on that page, click on the Go to Your Reports button at the bottom left of the screen, as indicated in by the red box below. Welcome to the Treasury Programs supporting State. Territory. Tribal. and Local Gn,,errrnent as pa'- of the 202 Americar Rescue Plan. State and Local Fiscal Recovery Funds (SLFRF) SM billion svallable fbn state. territory. Tribal, and local governments to support the public health response and lay the foundation for a strong and eduhable etonomicrecaery. Inuoduclfon Emergency Rental Assistance (ERA) ?2 L6 bhlkrn 3va113We fur slate, terrltorv. and Iaa1 governments to aasisthousanolde that areunableto pay rent and utillties. Submlaebm Homeowner Assistance Fund (HAF) compiar"Reports N-1,S1C billion evadabL-1,, late, ter -'to ..a,dT-tbal:owrnments to pew;de relief for our country most winerable homeowners, Capital Projects Fund (CPF) 11301bi!!on 4;,itlefor state, nitor, freely..--fatedstate.s d Tribal governments for copal projects designed to)Nnily am directly enablework. education. and health morilorl.ryd, which ind des the provision and imoroyementof btuadbarul Infrastructurewhere it is lacking. Submission Process Dependngan if ya; are a sate.-r!tory.loce. z Tribal government you will be ellglblefor different programs. You now have a login arld 24:7 access to this portal. You have tun options while york'mg on the subminion-s - save your progress or submit the subnasslon. If you save. you can return and edit Information as needed. To resume working on a draft submission, cllckon'Submissions' using the navigator to the left of the page. This will bring you to your list of sucarado e, click' Edit' Button toconNnue working, once an you submit d certify the agreement.wyour information cannot edit information for that particular program sWthout reachingout to Treasury to mopes the case and edit. Reedy toget started? Ciick'GoToYourSubmisWoma' below. I_—_.v..._ 4 Go To Your Submissions J Compliance Process Ya:.1., have alogin a,424;7 xcess to his portal you nave two opti whileswrkire onyour compliance repatsl-save your progress or submit tn°report. It you says. you an return and edit information as needed. To resurle working on a draft report click on'Compgance Reportsusing the navigation to the left of the base. This will bringyou toyour list of rwnpilence tabors. click -Edit" butronto continue the process. NOTE: Once a compliance report Is certified it cannot be reopened. Contact the Treasury to reopen a case. Ready to get started?CIKk'W to your Reports" bake, Go To Your Reports Figure 51 State, Local and Tribal Support Landing Page Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 42 0 U.S. DEPARTMENT OF THE TREASURY Step 4 The green Go to Your Report button will take you to the Submissions and Compliance page as shown below. Once on that page, click on the three -line navigation icon at the top left of the screen. The red box indicates the icon. My Compliance Reports SLFRF Compliance Reports Figure 52 My Compliance Reports Step 5 After clicking on the three -line navigation icon, a drop -down menu will appear on the top left of the screen as shown below. Please click on "Account" from the drop -down menu, as shown by the red box below. x Figure 53 Account Step 6 Next you will see the screen below. Under the "Account Name" heading, click on the name of your organization (as shown by the red box). OAd`I Accounts .£� ,..e :..e-s�c, �.,x�....a aas^e:. si;cres is - tsr .t i:;• V• M C / O A—'t4—t CammuMky Ufa*TY'vs .: MM R—d T`M WTT slC�Wrc5iail '-'PE Figure 54 Account Name Step 7 By clicking the name of your organization, Treasury's portal will open to allow you to provide names and contact information on your organization's designees for the SLFRF reports, as shown below. The landing page provides basic information about the designations. Please see section B for more details about the roles and responsibilities for each or the three roles. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 43 .-a-. U.S. DEPARTMENT OF THE TREASURY Mranttctian !ui _. . �.,,-. _ uun MCKMa1MReR. .., nw AYtMiSw Rwiwmeaw {N ReoNMa t. r:!fi<atk�r. facnfinerewcr Ramat Minunse;ERN wNn•Kimv=!xastax:aroxwto^ree �vbw»ta SNve es Trex,nr's4aaconexts!w npaHnaforeKhER0.1 K,a ERR3 eHK0, iMre are:nrnenr,.m�r'entaexo CRRl wefaAE enarnex5x:ws: nlMvih a;at�aritNrP,nauMaNVOt+ra(Kuzae�4'+eq#r+desip,utaa mtln.zeuiYtgr the ERA]aEW Kvararsgw!Ny1ntMT FKra,. a^'sa M(mv�+ttw R_�... tip tnGiv,drs'retC6r�efNf FBrrK4+tiW otMltl TrkKUYnotiM��MtMPM1 rsBbRMfM IM ERh1 Jt (RFI MrdI ncAMi gwkrte➢beuf,rscar,uu {reOwli�Flq�pMMy,KW WK%hKs.7MWPnrM -ontxr o wa^M�rarw urasuab��ebmmpM,^^i rhrrmensmur fRRl mEAwl svrc man fim resoomak rwza MKH ry att vttrcnS aN�r�a+rwurtsa;0eswf afrM EAA1a6RA]errKarw'.u*Kx. iPe Au4ror:twl4aewMKM WsaMbettoan:eie+ar<.emn,unR,✓t wiq T.eewtmwcnmattKsxenenum NewsraaMwwdewirs Upreiomv+�km;.W.ec«;e.'ae.Mfic+Lrwwtsmav MGUCe aprc'.q»awtf.maMlry rerorn.purtxWrpait ieMmnpane^d Margwfs. TM Ppm OfCwKtbrRwortay mM aetMswa�vRY4W Wwa!uax9rt M1utnd!xw WK<+anbtlNarn RwatirM TMAetapN nm,loL�411aiarmMMaesia^atwbtlea rdesxviNt. USN aidattbns uKaxsw MtM'Certlh[vf:w� taONW<omp+e:ntM Mh:aC,M:�jtm oviwu«. mvlhari:anav uarKra�t3nert.erowtr+atromxmtna,ria,w..Nwaremtsorueoro KeanewnaenerKrowm Mrne raks bN+tlx.. . ', wow or savour.. or war:wanmwaweweN tmwavNa. 2SWtotM'Otppation Corm"ewvtl cm Wete:hemka'amwwgYW lnsrvsxesaM cm#aa MarmNbnta yoxor�KantionSaMpweF krtMERA2a ERA2avwa Figure 55 Landing Page Step 8 When you are ready to key in the names of the designated individuals, click on the Certification button on the left navigation bar, as noted in the red box shown below. inuoductimt actOemt Adminlittatbr.Pfytq INContettfa Reporting and Au&.i,ed RCpreStlrtarV Mr Rewbq �— ..,,,, _:chsys.-o rec:ptn^ant designrteuCt,thret'raty duaKt¢sen<ss 71t;-ysI—crate t—tgxtinp, ....,. Thtreare 9ua Cntlrc roles. ufINiaoa. Wrt Adrrrisunor-=pdvdual wthxizep to mzrrcinsyavxgarv'aNpis list ddesignatto irdnid.�ats Vr rePortirvg in tte irtasurvPrsr I R'�t of Cora-r'ruR+mr*%,�-1'rvidua�resprnsitiefw raeivi�otklN Trcsiw nCTlfinttans sUaRr�rspar the svnnrci lnp,�r�skrs:6aut upcominy reWr,Irg 'fy�rcRren*S vfddf]diitYi. The PpiM QiCMtstf for RepWtir{wil,Nsobf'esOprtfibitM C6p'�pkutQ tht ?!p(SKi6tte Staard. •aht+rix.,i Rervesa„ax w rs-tndivih�rest>asibkMrcert3hng and x;aittir;sotfziad repau atGetut!o!the>xanOrWpitM. TheAuthX'izedRepreWAY,iJe wfp 9sobe respaasiHttor mrmumi<stiom vfihTrtae;ryon.wA matters as eaerdon bud b*kfdmeMSMt'YeviadY SubaettM reports The afl+GSsi repots msti b'cNde'.oecY KPOrts, mMtNVrepotlls. puarterPlrMorK. intOimreports ard/uW reports. The ftiMaCWtn rot Re thg IW eetttsnme-ldv4N1 idemJAW ss tf*AuthmlxedReoretntxive fV Reootitrg, TheAc-4 A4rtin nu>r mNbedesipatev for then 'V. n VA-JI Vier IM uai— ]J Pkuegowv*,CNbfintiM' tab VWtMVIe4VW0hCi&ovbfiwian that y+pU remtsofindlvw"c whoue iu'iMl*>� t0 M M 11419i} 4? TIX reelO,Mt in fl5e r�tl id V 1t11FM 11 W.E h"' ?UrOp3ti rA rtPa bs M hS l+YNd lirUer tFt Pr�r4rM1 21 fia t0the "dPs']PIa21oF' Eorm" tibardCOnfpiC! tf5et leitprrtlpfovSngthe NpXS aM ContaCti:,ytrlati00tpr}gyr OrgXaUUdni �groesim Itkdrrd Figure 56 Certification Step 9 On the "Official Certification of Authorization" screen, you should type in your name to indicate you are authorized to submit the names of the designated individuals. Once you enter your name, click on the Submit button. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 44 0 U.S. DEPARTMENT OF THE TREASURY f„v u<.ticx, Ofta. ;AuO ization Ce Wt ation iCe^.ifyhkrizedcr t!x 2cioicrtgrxneetos,bmit ft b—names of irtrFi+C als.riM xeau3h 6zWto an onbeWdthe recipient in 04 role$ ldtnt;f4d abrn ror Wrow,esof repaJogoa�its awrd+z'iidvthe ao�am I ackrontedgethataoymate+fa!2rtai$e, ficY,6as. tlatadtaMLsbtasnCR, a reaetentationiasa+ctakrenta onissSor: aarttatefiaf7Qi^W Deounstsbkbline a:3*tprAnrywnt a bate utder fife False Raterents =LftJNrIy'ActOf 19%.asxr&*d 18 US5 C 1001 WC giro mi ubte Designation Form tt me toddl eenahies ar! aLsVaS+erenadiesrorfahcdsmsaotheralx flnckW"x�g under co 33 U.iC. #§ 3729xad373CF.. 5gnatve ofAMOwlAL4'vnis-to,;:gpen iign"eeaui•.akra :. I I I Figure 57 Official Certification of Authorization Step 10 Next, click on the Designation Form button on the left navigation bar, as noted by the red box shown below. Off"C ;fi<aeW OAWW � i�J .:xrdrvmtt��*xaMnf4'h5:e roc went'Yurt«mstttre abrx names st'rM:.iA:a�s.aRa xe a�Umrizeotoxt mbeRaaJtlscrscfRert nteu mes'rxnieoatvre wrrDaaCf M re0ar',1Tan rts awva sidertFeaKa.•n � aCMnated@ethat>T'matelalMt.�fuiiclats, haudeemstsun�tm,arraiesMatbntoueKes�mem aorissior c's matriariarr ^nr bep.,rvskrak'eD} firza'•r�isame+ta M.tnurck� thei�5e5tata*ccrosAxcaueab`Grvcxtaf 19sf.a5arncesiM 1E V.SC s i�ird also rcvrwbiec: ^we W ci�i7 �'altres srd a^n>rrrx xrane6les iwr hedrrta ora6w.Msc''mduti*g:mdrto 31 USC #33729aM 37�: SiptipAe otAteWntA�%NArN.or[TVPe++am[.vgatxe z� Figure 58 Designation Form Step 11 Clicking on the Designation Form button will open the "Designation of Account Administrator, Point of Contact for Reporting, and Authorized Representative for Reporting" screen shown below. ,orm �.,a.vvba.wue,.viams,.an,u.weeavw6wrws•+�ttldw.trvm.�nnr+a�a.Nm•uu, ten ,rmfP.t. mfawaam.e PoneYSanurr'a a,ae,vn xa.n4,waww...�xxwara aa,.<xn .aau Hn.iana0w:e4nM rraEWt aarRa,»bnw,-. n;m:eaw<nr'�mrcwssx,amaa w,a : M+naWst'eortWWf'MLtr�.wKwwartMdlM<¢+tactlKamatbmiarw Ets�fwas :. Wav,ama�,vuc+n�awtMRFWmMmraMantakuMr Wnl Me:tK:'a Mre smzi roar -wwdkatt aMwntlaraG6mxA^Y8«�laAa«„c.c+riiie»ixv.M�Ykaw ccMr'Poftror Ptpvllne'IntMt�KKw,gw�p anubnbta. sw:eewa ten. meneawi., nd. _........... ._e t ....... _. .. _J _-- 4vM1v Qfarl+Nlaa ,w d ------ _- Su!ar Figure 59 Designation of Account Administrator, Point of Contact of Reporting and Authorized Representative for Reporting Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 45 U.S. DEPARTMENT OF THE TREASURY You can use the Designation Form to enter the names and contact information for each of the three designations for each of you SLFRF allocations. The roles for the SLFRF allocations are displayed as follows: • SLFRF — Account Administrator • SLFRF — Point of Contact for Reporting • SLFRF — Authorized Representative for Reporting The Designation Form screen shows nine data fields for entering key information about the individual being designated. These include: • Salutation (optional) • First Name • Middle Name (optional) • Last Name • Suffix (optional) • Title • Phone • Email • Name of Entity/Organization (Recipient entity) Note: The screen will display a list at the bottom of the screen with the names and contact information of individuals (if any) who have previously been designated for any of the three roles. This list will be important in maintaining and updating your organization's designees in the future. a. Designation of the Account Administrator Remember, we have temporarily authorized you as the SLFRF — Account Administrator. There is no need to re-enter your name and contact information if you plan to continue in that role. If you need to designate someone else as the SLFRF Account Administrator, • Find your name at the bottom of the screen. • Hit the blue Edit button located to right of your name. • Enter the name and contact information of the new SLFRF Account Administrator. • Hit the blue Complete button. b. Designation of Point of Contact for Reporting and Authorized Representative for Reporting • Enter the next designee's name and contact information. • After entering their name and required contact information, select the Program Role(s) for which he/she is being designated. • Once the role is selected, click on the small arrow to the right of the role, which will move the role to the box on the right. • Click on the Complete button at the bottom of the screen. • Follow the same process for each of the remaining designees. • When you have entered all three designations, please press the Complete button. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 46 U.S. DEPARTMENT OF THE TREASURY As a final step, go to the icon on the upper right of the screen as shown below to exit the system. ?Nrtbtxet WVefen*MMtuR wr:y ' MMrMAW+9ti NrwlnaYa•mxnrMm. Wtnr am,4asvrasiNw+ta ma EkAluL&V wrarGanh.nama�ncru:waaccxrareu.�rus. Pena Mnsr'twro'ate"aRw v:.�nmaa+uMomocp�Wflr+amaHorvb epee��f+n= Mu�tnae.vP+smareWM'adekvmxCreewnbhwtxvice�efM fiMr inW erw?mtx. 8n•�itl3MaiM'4'iw's to EmM#�'rpMutR35M �Treaaw'xP•V.eexurlwJe'RKibMWti`B etttssW:fctANw brw'eKKf. SNutrlcn TR4 Rryrew-kWn -yaoe • Urmgn PowN PFme I __ AMd?�IiM CrvB Cia - du I. 4MlNw MiMwdFMftYnibn a Figure 60 Designation Form Section B: Questions and Answers Who is authorized to designate the Account Administrator, the Point of Contact for Reporting, and the Authorized Representative for Reporting for my organization's SLFRF's award? Treasury requests that each SLFRF should follow its own decision -making procedures in making the three designations for each award. What is the deadline for making the designation? Treasury requests that users of Treasury's portal make the three designations as soon as possible to enable your organization to submit its Interim Report and Recovery Plan Performance Report (if applicable). What are the responsibilities for each of the three designated roles? The required roles are as follows: Account Administrator for the SLFRF award has the administrative role of maintaining the names and contact information of the designated individuals for SLFRF reporting. The Account Administrator is also responsible for working within your organization to determine its designees for the roles of Point of Contact for Reporting and Authorized Representative for Reporting and providing their names and contact information via Treasury's Portal. The Account Administrator can also view and submit reports. Finally, the Account Administrator is responsible for making any changes or updates as needed over the award period. We recommend that the Account Administrator identify an individual to serve in his/her place in the event of staff changes. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 47 Idlikhk A'WIAM U.S. DEPARTMENT OF THE TREASURY • Point of Contact for Reporting is the primary contact for receiving official Treasury notifications about reporting on the SLFRF award, including alerts about upcoming reporting, requirements, and deadlines. The Point of Contact for Reporting is responsible for completing the SLFRF reports but cannot certify and submit these reports. Authorized Representative for Reporting is responsible for certifying and submitting official reports on behalf of the SLFRF award recipient. Treasury will accept reports or other official communications only when submitted by the Authorized Representative for Reporting. The Authorized Representative for Reporting is also responsible for communications with Treasury on such matters as extension requests and amendments of previously submitted reports. The official reports may include special reports, monthly reports, quarterly reports, interim reports, and final reports. May my organization designate one individual for multiple roles? Yes, an individual may be designated for multiple roles. For example, the individual designated as the Account Administrator can also be designated as the Authorized Representative for Reporting or Point of Contact for Reporting. It is also acceptable for an organization to designate one individual for all three roles however it should also adhere to any applicable rules on personnel checks and balances. May my organization designate more than one individual per role? Yes, you may designate more than one person per each role but are encouraged to limit the number of users assigned to each role. May my organization change the designations from time to time? Yes, an organization may make changes and updates to the list of designation individuals whenever needed. Must each of the designated individuals register for using Treasury's Portal? Yes, everyone designated for any of the roles must register with ID.me or Login.gov before they will be given access to Treasury's portal. Please contact us at the email address below for more information and guidance on registering with ID.me or Login.gov. If you are already registered with ID.me, you do not have to register to Login.gov to access your reports. Additional Questions or Additional Assistance? If you have additional questions about accessing or using Treasury's portal to provide the designees' names and contact information, please send us an email via SLFRP(a)treasury.gov. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 48 0 U.S. DEPARTMENT OF THE TREASURY Appendix B — Bulk File Upload Overview a) Purpose This Appendix provides an overview of the SLFRF bulk file upload process. The six (6) bulk file upload templates listed below are presented in the order in which they should be populated and submitted to the SLFRF Treasury Portal. The data requirements for each template can be found in subsequent sections of this Appendix. 1. Project Baseline Template (Note: This template will be used for Expenditure Categories 1.1-1.8, 1.10-1.12, 2.6-2.13, 3.6-3.16, 7.1-7.3) 2. Subrecipient Template 3. Subaward Template 4. Expenditures GT $50,000 Template 5. Aggregate Expenditures LT $50,000 Template 6. Payments to Individuals LT $50,000 Template b) Expenditure Category (EC) Templates Expenditure Categories (EC) which require additional programmatic data and other information are listed below. The reporting requirements for each EC can be found in Appendix D. 1. Project Baseline Template 2. Project EC 1.9 Template 3. Project EC 2.1 - 2.5 Template 4. Project EC 2.14 Template 5. Project EC 3.1 - 3.5 Template 6. Project EC 4.1 - 4.2 Template 7. Project EC 5 Template c) Template Description Each of the bulk file upload templates contains instructions on how to populate the respective fields within each file. When adding content to each template, please follow the "Help" text, which will provide what is and isn't permitted for each cell. Each Module in the web application provides a link to download the template. All templates have the same structure as described below: Row 1: Template Version Row 2: Template Name Row 3: Instructions: Brief description of the template constraints. Row 4: Field IDs: Column identifiers Row 5: Required or Optional: This field specifies if the field is optional or required. When the column is required, and a recipient does not provide the required data, the system will not accept any record or allow the file to be uploaded. Row 6: Field Name: Brief description of each Field or Column Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 49 0 U.S. DEPARTMENT OF THE TREASURY Row 7: Field Help Text: Provides a description of the column. There are 2 types of fields, 1). an open value either text or numbers and 2). A predefined list of pick list values: • Open Value: Any text or number. Text for State name or a Number that represents amounts. Most text types are free formats, the only expectation is for Dates, each column that represents a date describes the accepted format. For any number field, it is not required to add "," to represent thousands or it is not required to add "$" to represent currency. Only add decimal rr." when needed. ■ Pick List: A Predefined list of values that is accepted by the system. When the column is a pick list, row 7 provides the list of options that the system accepts. End users should "copy and paste" the valid value for each record. If the respondent provides a value that is not in the predefined pick list, the system will not accept the file. Responses should not contain double quotes Row 8: Data that recipient submits. Row 8 is where recipients insert specific data to submit. The system accepts 1 or many rows. The following is special guidance for each row or set of rows: 1. Do not change the content of rows 1 to 7. 2. Rows 4 to 7 provide metadata of each data element or column of the information that recipients will provide. 3. Add your data beginning in row 8, column B. d) Bulk Upload Process The upload process includes the following steps: 1. Download the template from the link provided in the web application section of the module. 2. Open the template in Microsoft Excel. 3. Add your data starting with row 8, column B of the applicable template. 4. When you finish adding your data for row 8, repeat on additional rows as required. 5. Save the template as a .CSV file and change the name of the file if needed. 6. Click the Bulk Upload link to open the Bulk Upload box (see Figure 61). Add Projects • Bulk Upload Instructions Step 1 - Upload File Step 2 - Select "Valldate'to ensure yourdata meets the field requirements Step 3 - If errors exist. correct and select "Update' Step 4 - Select "Validate' repeat step 3 and 4 if additional errors exist Step 5 - Select "Create" to aenerate records and complete process Upload File S Upload Fiies Ordrophles :As, Figure 61 Bulk Upload pop up Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 50 0 U.S. DEPARTMENT OF THE TREASURY 7. Attach your saved .CSV file by clicking on "Upload Files", alternatively you can drag the file to the designated area. -- 8. A message will appear confirming that your file is uploaded (see Figure 62). Click I1Done". Upload Files PrnjectBxeiinei3u'kUpbadTempl9te,3) c5v O +Y,. Figure 62 File uploaded message 9. Your file will be listed at the bottom of the bulk upload window (see Figure 63). a Add Projects - Bulk Upload mstructbre Step] udoad Foe SI<pi-Sekcf -Vi(MM¢'t0<re5{n<yOW dala�roCt9 t1�<bSld rtgYKtmtr145 Step 5 if prIXs aalst„<ara<t pry stied "i)tyatt" Slaps' Seiett'VatyNo`rgxat step 4 and 4 daddM1ionalerrors list Steps - Sekct'Creatc' tahtmraft rt<ordz antl erxnpkte Notts up" File e Vpbad Files Q4ropfirn II1GJi� Projen Expenditure Cattgaiv SVb GteQory Fury,.'. I Nbgr nth t.I CMD 19 Vectfoafion Figure 63 File added to Bulk Upload portal 10. Click "Validate" to have the system verify that your bulk upload does not have errors. 11. If the system validation finds errors in your bulk upload, it will return the screen with the list of the errors (see Figure 64). From here, you can either update on the screen by manually typing in your corrections in the Value column, or you may restart the process with a corrected bulk upload file. In cases when it may be preferable to work from a master list of errors, click the Download — Export Errors link, highlighted in red box in Figure 62, to download a spreadsheet detailing all errors in the bulk upload file. Once your errors are corrected, click "update". The system will once again check your upload for errors. (4nad File .t. Upload Files Ordrepfiles Row Calumn Mein Varvc Error Mesup (Proje T_Expandfture_Category_c): Project Expenditure 8 B Proiec[ ExpeMlture Catngory_c CategoryG,.P1—q*ea a C Sub_Cacegory_c (Sub Category_c): Proect Expenditure Category is required. a 6 Name lNeinej: Proect Nam :s required. v P(oycl Expendit. — Subcategory Fullded ProjectN CustomerNoiec... - Completion Status t CPmpleteo Figure 64 Listing of Bulk Upload Errors Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 51 0 U.S. DEPARTMENT OF THE TREASURY 12. If the system validates that your bulk upload has no errors, it will return the same screen as Figure 63 with instead the option to "Create" (see Figure 65). Click the "Create" button. II Add Projects - Bulk Upload 1. 1.. Step E. U01— Poe Sp1 Sdtct "VBftlate" waawx sear datvneea Nefk10 rew"aemencs Step3-Nerrpzedit correct adsekct'Up ,' Sep d - SeieQ'VNeWe'rePeatsrep 3 arW -0 if atl�itionalerrors a.ist Step 5 5ekct'Gea a tag atc r ds and w pkte prpUess :.1p=naG f do +,==.Jts'xsan filets fX &gtfik5 lllllllll, Pray c'E ExperviiWre Categw'4 Sub Cain( . Fv' I Pu k P.." I COVt014 VeccfoetT v Figure 65 Bulk Upload Creation 13. Once created, your records will show at the bottom of the relevant screen. e) Bulk Upload Creation Steps The collective bulk file upload process is contingent upon end -users following the below steps to ensure successful submission. Note: All data submitted via the bulk upload functionality must be submitted as a .CSV file. f) CSV Guidance Refer to the following link for descriptions of the CSV format. https://en.wikipedia.om/wiki/Comma-separated values g) Specific CSV characteristics • The date format is: MM/DD/YYYY. Example: a. 06/22/2021 • All currency values are numeric. It is not required to add "," for thousand or millions. • All currency values should not contain a "$" sign. The file will be rejected if a "$" is included in the data entry. • Once you've saved the excel spreadsheet as a .csv file, do not re -open the file. Re- opening the file will cause excel to possible revert to an .xIs type file and leading zeros or other issues may occur, h) Upload Template Description Each data element and/or column in the CSV files is described below: • Index No: Reference number for the data element. For internal use only. • Defined term: Column Short description. • Definition: Column long description or definition. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 52 U.S. DEPARTMENT OF THE TREASURY • CSV Column Name: The column header name that must be used in the CSV file. • Required: Indicates if the column is required or not required. - • List Value: The content of the column is from a list of predefined values. This is valid for some of the columns. The list is provided for all cases. Most of the cases is N/A which means that the type is ether String or Numeric. • Data type: Specify the data type of the column. The options are: Numeric, Text, Date and Pick List. • Max Length: Indicates the maximum length in characters that is allowed for each column. i) Project Baseline Template The downloadable templates provide all information required to create the upload files. The following table highlights the data elements required to complete the Project Baseline Template. Expenditure categories not covered by the Project Baseline Template have a devoted template as described in Appendix C. Defined Term .- Data Type Max Optional Project Per guidance, this field Required "l-Public Picklist (see n/a Expenditure represents the predefined Health" permissible Category Group project expenditure category "2-Negative values in Economic previous Impacts" column "3-Services to Disproportionat ely Impacted Communities" 7- Administrative and Other" Project Per guidance, this field Required Refer to Picklist (see n/a Expenditure represents and is aligned to "Expenditure permissible Category the project expenditure Categories values in category covered by the previous Project Baseline column Template" table below Project Name Name of the project. Required n/a String 150 Project Identification number assigned Required n/a Alphanumeric 20 Identification to project by recipient. Number (Assigned by recipient) Status of Completion status of the Required "Not started", Picklist (see n/a Completion project. "Completed permissible less than 50%", values in "Completed previous 50% or more", column "Completed" Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 53 U.S. DEPARTMENT OF THE TREASURY Defined Term Definition Required/Data Type Max • Adopted Budget Amount of the adopted budget Required for n/a Currency 12,2 for this project Tier 1 recipients Optional for other Tier recipients Total Total dollar value of Required n/a Currency 12,2 Obligations obligations for this project. Total Total dollar value of Required n/a Currency 12,2 Expenditures expenditures for this project. Does this project Does this project include a Required Yes Picklist (see n/a include a capital capital expenditure No permissible expenditure? values in previous column If yes, what is the If you answered "yes" to the Optional n/a Currency 12,2 total expected previous question, enter the capital total dollar value of the expenditure? expected capital expenditure Project Brief description of the project. Required n/a String 1,500 Description Program Income The amount of Federal Optional n/a Currency 12,2 Earned program income earned. Program Income The amount of program Optional n/a Currency 12,2 Expended income that was used to cover eligible project costs. Expenditure Categories covered by the Project Baseline Template 1.1 COVID-19 Vaccination 1.2 COVID-19 Testing 1.3 COVID-19 Contact Tracing 1.4 Prevention in Congregate Settings (Nursing Homes, Prisons/Jails, Dense Work Sites, Schools, etc.) 1.5 Personal Protective Equipment 1.6 Medical Expenses (including Alternative Care Facilities) 1.7 Capital Investments or Physical Plant Changes to Public Facilities that respond to the COVID-19 public health emergency 1.8 Other COVID-19 Public Health Expenses (including Communications, Enforcement, Isolation/Quarantine) 1.10 Mental Health Services 1.11 Substance Use Services 1.12 Other Public Health Services Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 54 Allikk l S. DEPARTMENT OF THE TREASURY 2.6 Unemployment Benefits or Cash Assistance to Unemployed Workers 2.7 Job Training Assistance (e.g., Sectoral job -training, Subsidized Employment, Employment Supports or Incentives) 2.8 Contributions to UI Trust Funds 2.9 Small Business Economic Assistance (General) 2.10 Aid to nonprofit organizations 2.11 Aid to Tourism, Travel, or Hospitality 2.12 Aid to Other Impacted Industries 2.13 Other Economic Support 3.6 Healthy Childhood Environments: Child Care 3.7 Healthy Childhood Environments: Home Visiting 3.8 Healthy Childhood Environments: Services to Foster Youth or Families Involved in Child Welfare System 3.9. Healthy Childhood Environments: Other 3.10 Housing Support: Affordable Housing 3.11 Housing Support: Services for Unhoused persons 3.12 Housing Support: Other Housing Assistance 3.13 Social Determinants of Health: Other 3.14 Social Determinants of Health: Community Health Workers or Benefits Navigators 3.15 Social Determinants of Health: Lead Remediation 3.16 Social Determinants of Health: Community Violence Interventions 7.1 Administrative Expenses 7.2 Evaluation and data analysis 7.3 Transfers to Other Units of Government j) Subrecipient Template The downloadable templates provide all information required to create the upload files. The following table highlights the data elements required to complete the Subrecipient Template. Defined Term Definition Required List Values Data Type Max Length Subrecipient The DUNS unique identification Optional n/a Numeric 9 DUNS number for the Subrecipient Organization. NOTE: Sub -recipients must provide one of the following numbers: -DUNS, or -TIN, or -UEI Subrecipient A 4-character suffix that may be Optional n/a String 4 DUNS (+4) assigned by a business concern and appended to its DUNS. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 55 0 U.S. DEPARTMENT OF THE TREASURY Defined Term DefinitionRequired List Values Data Type Max Length Subrecipient TIN The Subrecipient's Internal Optional n/a Numeric 9 Revenue Service (IRS) Taxpayer Identification Number NOTE: Sub -recipients must provide one of the following numbers: -DUNS, or -TIN, or -UEI Subrecipient UEI The Sub -recipient's Unique Entity Optional n/a Numeric 12 Identifier (UEI) created in SAM.gov. NOTE: Sub -recipients must provide one of the following numbers: -DUNS, or -TIN, or -UEI Subrecipient The name of the Subrecipient. Required n/a String 80 Name POC Email The email address of the primary Optional n/a String 40 Address point -of -contact for the Subrecipient. Address Line 1 First line of the Subrecipient's Required n/a String 150 address. Address Line 2 Second line of the Subrecipient's Optional n/a String 150 address. Address Line 3 Third line of the Subrecipient's Optional n/a String 150 address. City Name Name of the city in which the Required n/a String 40 Subrecipient is located. State Code United States Postal Service Required (AL, AK, AS, String 2 (USPS) two -letter abbreviation for AZ, AR, CA, the state or territory in which the CO, CT, DE, Subrecipient is located. DC, FM, FL, GA, GU, HI, ID,IL,IN,IA, KS, KY, LA, ME, MH, MD, MA, MI, MN, MS, MO, MT, NE, NV, NH, NJ, NM, NY, NC, ND, MP, OH, OK, OR, PW, PA, PR, RI, SC, SD, TN, Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 56 va U.S. DEPARTMENT OF THE TREASURY Defined Term Definition Required List Values Data Type Max Length TX, UT, VT, VI, VA, WA, WV, WI, WY) Zip5 United States ZIP code (five Required n/a Numeric 5 digits) associated with the Subrecipient's address. Zip4 Zip Plus4 (four digits) identifying Optional n/a Numeric 4 where the predominant performance of the subaward will be accomplished. Subrecipient Confirmation that the Subrecipient Required Yes/No Picklist (see n/a SAM.gov is registered in SAM.gov permissible Registration values in previous column In its preceding Confirmation that the proportion of Optional Yes/No Picklist (see n/a fiscal year, did the Subrecipient's federal funding- permissible recipient receive to -total annual gross revenue for values in 80% or more of the preceding fiscal year is at previous its annual gross least 80% column) revenue from federal funds? In the preceding Confirmation that the Optional Yes/No Picklist (see n/a fiscal year, did Subrecipient's total annual gross permissible recipient receive revenue from federal funding values in $25 million or across all programs for the previous more of its preceding fiscal year is greater column) annual gross than $25 million. revenue from federal funds? Is the "total Confirmation that qualifying Optional Yes/No Picklist (see n/a compensation" Subrecipient's publicly identify permissible for the their top five highest compensated values in organization's executives or have it listed in their previous five highest paid SAM.gov profile, if No please column) officers publicly provide names and compensation listed or for top 5 executives. otherwise listed in SAM.gov? Executive Name The legal name belonging to one Required (If n/a String 100 (1) of the five highest paid executives, you officers, or employees of the answered Subrecipient. "No" to question in cell Q5 Total The Total Compensation, as Required (If n/a Currency 12,2 Compensation defined in 2 CFR part 170.330, you Executive (1) earned by the five highest paid answered executives, officers, or employees "No" to of the Subrecipient. question in cell Q5 Executive Name The legal name belonging to one Required (If n/a String 100 (2) of the five highest paid executives, you officers, or employees of the answered Subrecipient. "No" to question in cell Q5 Total The Total Compensation, as Required (If n/a Currency 12,2 Compensation defined in 2 CFR part 170.330, you Executive (2) earned by the five highest paid answered executives, officers, or employees "No" to of the Subrecipient. question in cell Q5 Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 57 0 U.S. DEPARTMENT OF THE TREASURY Defined Term Definition Required List Values Data Type Max Length Executive Name The legal name belonging to one Required (If n/a String 100 (3) of the five highest paid executives, you officers, or employees of the answered Subrecipient. "No" to question in cell Q5 Total The Total Compensation, as Required (If n/a Currency 12,2 Compensation defined in 2 CFR part 170.330, you (3) earned by the five highest paid answered executives, officers, or employees "No" to of the Subrecipient. question in cell Q5 Executive Name The legal name belonging to one Required (If n/a String 100 (4) of the five highest paid executives, you officers, or employees of the answered Subrecipient. "No" to question in cell Q5 Total The Total Compensation, as Required (If n/a Currency 12,2 Compensation defined in 2 CFR part 170.330, you (4) earned by the five highest paid answered executives, officers, or employees "No" to of the Subrecipient. question in cell Q5 Executive Name The legal name belonging to one Required (If n/a String 100 (5) of the five highest paid executives, you officers, or employees of the answered Subrecipient. "No" to question in cell Q5 Total The Total Compensation, as Required (If n/a Currency 12,2 Compensation defined in 2 CFR part 170.330, you Executive (5) earned by the five highest paid answered executives, officers, or employees "No" to of the Subrecipient. question in cell Q5 k) Subaward Template The downloadable templates provide all information required to create the upload files. The following table highlights the data elements required to complete the Subaward Template. Defined Term Definition Required List Values Data Type Max Length Subrecipient DUNS The DUNS unique identification Optional n/a Numeric 9 number for the Subrecipient Organization. Recipient Project Id Recipient Project ID associated Required n/a Numeric 20 with this Sub Award. This is your unique Project Identification Number. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 58 0 U.S. DEPARTMENT OF THE TREASURY Defined Term Subaward No. Definition Recipient's internal account number for the grant, contract, transfer, or direct payment. This can be the account number, or any other unique identifying number assigned by the Recipient to the award. This number is strictly for the Recipient's recordkee in . Required Required List Values n/a Data Type String Max Length 20 Subaward Type The type of Subaward. Required "Contract: Picklist (see 30 Purchase permissible Order" values in "Contract: previous Delivery column) Order" "Contract: Blanket Purchase Agreement" "Contract: Definitive Contract" "Grant: Lump Sum Payment(s)" "Grant: Reimbursabl e" "Direct Payment" "Transfer: Lump Sum Payment(s)" "Transfer: Reimbursabl e" "Loan - maturity prior to 12/31 /26 with planned forgiveness" "Loan - maturity prior to 12/31 /26 without planned forgiveness" "Loan - maturity past 12/31 /26 with planned forgiveness" "Loan - maturity past 12/31 /26 without planned forgiveness" Subaward Amount Total amount of SLFRF funds Required n/a Currency 12,2 (Obligation) obligated by the Recipient to a Subrecipient under a given Subaward. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 59 VPU.S. DEPARTMENT OF THE TREASURY Defined Term Definition. • List Values Data Type Max Length Subaward Award The date the Recipient Required n/a Date 8 Date obligated funds to a Subrecipient. Primary Sector Select Primary Sector from Refer to Picklist (see 30 picklist. Required Sectors permissible Designated values in as Essential previous Critical column) Infrastructure Sectors table below If Other Explain Required (If n/a String 100 previous question is "Other") Period of The date on which efforts begin Required n/a Date 8 Performance Start or the Subaward is otherwise effective. Period of The date on which all effort is Required n/a Date 8 Performance End completed or the Subaward is otherwise ended. Place of First line of the address where Required n/a String 120 Performance the predominant performance of Address 1 the Subaward will be accomplished. Place of Second line of the address Optional n/a String 120 Performance where the predominant Address 2 performance of the Subaward will be accomplished. Place of Third line of the address where Optional n/a String 120 Performance the predominant performance of Address 3 the Subaward will be accomplished. Place of The name of the city where the Required n/a String 40 Performance City predominant performance of the Subaward will be accomplished. Place of United States Postal Service Required (AL, AK, AS, String 2 Performance State (USPS) two -letter abbreviation AZ, AR, CA, Code for the state or territory CO, CT, DE, indicating where the DC, FM, FL, predominant performance of the GA, GU, HI, Subaward will be accomplished. ID, IL, IN, IA, KS, KY, LA, ME, MH, MD, MA, MI, MN, MS, MO, MT, NE, NV, NH, NJ, NM, NY, NC, ND, MP, OH, OK, OR, PW, PA, PR, RI, SC, SD, TN, TX, UT, Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 60 ElftM U.S. DEPARTMENT OF THE TREASURY lqww Defined Term Definition Required List Values Data Type Max Length VT, VI, VA, WA, WV, WI, WY) Place of United States ZIP code (five Required n/a Numeric 5 Performance Zip digits) identifying where the predominant performance of the subaward will be accomplished. Place of United States ZIP code (four Optional n/a Numeric 4 Performance Zip4 digits) identifying where the predominant performance of the Subaward will be accomplished. Purpose of Funds Recipients must submit a Required n/a Sting 3000 written justification to Treasury describing how the premium pay or grant is responsive to workers performing essential work during the public health emergency unless the worker or groups of workers receiving premium pay meet one of two criteria: (1) the eligible worker(s) receiving premium pay earn (with the premium included) below 150 percent of their residing state or county's average annual wage for all occupations, as defined by the Bureau of Labor Statistics Occupational Employment and Wage Statistics; or (2) the eligible worker(s) receiving premium pay is not exempt from the Fair Labor Standards Act overtime provisions. Subaward A description of the overall Required n/a String 750 Description purpose and expected outputs and outcomes or results of the funded subaward, including significant deliverables and, if appropriate, associated units of measure. The purpose and outcomes or results should be stated in terms that allow an understanding that the subaward constitutes an eligible use of funds. Any work performed by an employee of a State, local, or Tribal government; Behavioral health work; Biomedical Research; Dental care work; Educational work, school nutrition work, and other work required to operate a school facility; Election's work; Emergency response; Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 61 0 U.S. DEPARTMENT OF THE TREASURY Family or childcare; Grocery stores, restaurants, food production, and food delivery Health care; Home- and community -based health care or assistance with activities of daily living; Laundry work; Maintenance work; Medical testing and diagnostics; Pharmacy; Public health work; Sanitation, disinfection, and cleaning work; Social services work; Solid waste or hazardous materials management, response, and cleanup work; Transportation and warehousing; Vital services to Tribes; Work at hotel and commercial lodging facilities that are used for COVID-19 mitigation and containment; Work in a mortuary; Work in critical clinical research, development, and testing necessary for COVID-19 response. Work requiring physical interaction with patients; Other 1) Expenditures GT $50,000 Template The downloadable templates provide all information required to create the upload files. The following table highlights the data elements required to complete the Expenditures GT $50,000 Template. Defined Term Definition Required List Values ... Type Max Length Subaward Subaward number that Required n/a Numeric 20 Number allows the Recipient to associate Expenditure records to Subaward records. Enter Subaward Number. Subaward Number is not required if Expenditure Category is "Administrative Cost". Expenditure Start Start date for the range of Required n/a Date 8 Date time when the expenditure(s) occurred. Expenditure End End date for the range of Required n/a Date 8 Date time when the expenditure(s) occurred Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 62 U.S. DEPARTMENT OF THE TREASURY m) Aggregate Expenditures LT $50,000 Template The downloadable templates provide all information required to create the upload files. The following table highlights the data elements required to complete the Aggregate Expenditures LT $50,000 Template. Defined Term Definition Required List Values D.. Type Max Length Recipient Project Recipient Project ID that Required n/a Numeric 20 Id allows the Recipient to associate Expenditure records to Project records. Subaward Type The Subaward Type that had Required "Aggregate of Picklist (see 100 Aggregates obligation or Contracts permissible SLFRF expenditure/payment activity Awarded " values in during the reporting period. "Aggregate of previous Grants Awarded " column) "Aggregate of Loans Issued " "Aggregate of Transfers " "Aggregate of Direct Payments " Total Period Sum of Expenditures or Required n/a Currency 12,2 Expenditure Payments during the most Amount recent period for this Sub - (Aggregates) Award Type (Aggregates). Total Period Sum of sub -award Required n/a Currency 12,2 Obligation Amount amounts/obligations during (Aggregates) the most recent period for this Sub -Award Type (Aggregates). n) Payments to Individuals LT $50,000 Template The downloadable templates provide all information required to create the upload files. The following table highlights the data elements required to complete the Payments to Individuals LT $50,000 Template. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 63 0 U.S. DEPARTMENT OF THE TREASURY Defined Term Definition Required List Talues sata I ype Wax Length Sub Award Type The Sub -Award Type that Required "Aggregate of Picklist n/a Aggregates had obligation or Contracts SLFRF expenditure/payment activity Awarded" during the reporting period. "Aggregate of Grants Awarded" "Aggregate of Loans Issued" "Aggregate of Transfers" "Aggregate of Direct Payments" Total Period Sum of Expenditures or Required n/a Currency 12,2 Expenditure Payments during the most Amount recent period for this Sub - (Aggregates) Award Type (Aggregates). Total Period Sum of sub -award Required n/a Currency 12,2 Obligation Amount amounts/obligations during (Aggregates) the most recent period for this Sub -Award Type (Aggregates). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 64 Iddikk U S. DEPARTMENT OF THE TREASURY Appendix C — Expenditure Categories and Template Mapping The Expenditure Categories (EC) listed below must be used to categorize each project as noted in the Reportinq Guidance. The term "Expenditure Category" refers to the detailed level (e.g., 1.1 COVID-10 Vaccination). When referred to at the summary level (e.g., EC 1) it includes all Expenditure Categories within that summary level. For the table below, the following legend applies. * Denotes areas where recipients should note if the project includes a capital expenditure The Programmatic Data column indicates which Expenditure Categories have associated programmatic data, in addition to the project standard information. More information on each EC's programmatic data is contained in Appendix C and in the Reporting Guidance. Programmatic Category Data? Bulk Upload Template 1 Expenditure Category: Public Health 1.1 COVID-19 Vaccination * No Project Baseline Template 1.2 COVID-19 Testing * No Project Baseline Template 1.3 COVID-19 Contact Tracing* No Project Baseline Template 1.4 Prevention in Congregate Settings No Project Baseline Template (Nursing Homes, Prisons/Jails, Dense Work Sites, Schools, etc.) * 1.5 Personal Protective Equipment* No Project Baseline Template 1.6 Medical Expenses (including Alternative No Project Baseline Template Care Facilities) * 1.7 Capital Investments or Physical Plant No Project Baseline Template Changes to Public Facilities that respond to the COVID-19 public health emergency* 1.8 Other COVID-19 Public Health Expenses No Project Baseline Template (including Communications, Enforcement, Isolation/Quarantine 1.9 Payroll Costs for Public Health, Safety, Yes Project EC 1.9 Template and Other Public Sector Staff Responding to COVID-19* 1.10 Mental Health Services* No Project Baseline Template 1.11 Substance Use Services* No Project Baseline Template 1.12 Other Public Health Services* No Project Baseline Template 2 Expenditure Category: Negative Economic Impacts 2.1 1 Household Assistance: Food Programs * Yes Project EC 2.1 — 2.5 Template 2.2 Household Assistance: Rent, Mortgage, Yes Project EC 2.1 — 2.5 Template and Utility Aid * 2.3 Household Assistance: Cash Transfers * Yes Project EC 2.1 — 2.5 Template 2.4 Household Assistance: Internet Access Yes Project EC 2.1 — 2.5 Template Programs * 2.5 Household Assistance: Eviction Yes Project EC 2.1 — 2.5 Template Prevention * Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 65 tom. 0 U.S. DEPARTMENT OF THE TREASURY Programmatic Category Data? Bulk Upload Template 2.6 Unemployment Benefits or Cash No Project Baseline Template Assistance to Unemployed Workers * 2.7 Job Training Assistance (e.g., Sectoral No Project Baseline Template job -training, Subsidized Employment, Employment Supports or Incentives 2.8 Contributions to UI Trust Funds No Project Baseline Template 2.9 Small Business Economic Assistance No Project Baseline Template General * 2.10 Aid to nonprofit organizations * No Project Baseline Template 2.11 Aid to Tourism, Travel, or Hospitality* No Project Baseline Template 2.12 Aid to Other Impacted Industries* No Project Baseline Template 2.13 Other Economic Support * No Project Baseline Template 2.14 1 Rehiring Public Sector Staff* Yes Project EC 2.14 Template 3 Expenditure Category: Services to Dis ro ortio ately Impacted Communities 3.1 Education Assistance: Early Learning * Yes Project EC 3.1 - 3.5 Template 3.2 Education Assistance: Aid to High- Yes Project EC 3.1 - 3.5 Template Poverty Districts * 3.3 Education Assistance: Academic Yes Project EC 3.1 - 3.5 Template Services * 3.4 Education Assistance: Social, Emotional, Yes Project EC 3.1 - 3.5 Template and Mental Health Services * 3.5 Education Assistance: Other * Yes Project EC 3.1 - 3.5 Template 3.6 Healthy Childhood Environments: Child No Project Baseline Template Care * 3.7 Healthy Childhood Environments: Home No Project Baseline Template Visiting * 3.8 Healthy Childhood Environments: No Project Baseline Template Services to Foster Youth or Families Involved in Child Welfare System * 3.9. Healthy Childhood Environments: Other * No Project Baseline Template 3.10 Housing Support: Affordable Housing * No Project Baseline Template 3.11 Housing Support: Services for Unhoused No Project Baseline Template persons 3.12 Housing Support: Other Housing No Project Baseline Template Assistance 3.13 Social Determinants of Health: Other * No Project Baseline Template 3.14 Social Determinants of Health: No Project Baseline Template Community Health Workers or Benefits Navigators * 3.15 Social Determinants of Health: Lead No Project Baseline Template Remediation * 3.16 Social Determinants of Health: No Project Baseline Template Community Violence Interventions 4 Ex enditure Category: Premium Pa 4.1 Public Sector Employees Yes Project EC 4.1 - 4.2 Template 4.2 Private Sector: Grants to other Yes Project EC 4.1 - 4.2 Template employers 5 Expenditure Category: Infrastructure Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 66 0 U S. DEPARTMENT OF THE TREASURY 5.1 Category Clean Water: Centralized wastewater treatment Programmatic Data? Yes Bul• •.• Template Project EC 5 Template 5.2 Clean Water: Centralized wastewater collection and conveyance Yes Project EC 5 Template 5.3 Clean Water: Decentralized wastewater Yes Project EC 5 Template 5.4 Clean Water: Combined sewer overflows Yes Project EC 5 Template 5.5 Clean Water: Other sewer infrastructure Yes Project EC 5 Template 5.6 Clean Water: Stormwater Yes Project EC 5 Template 5.7 Clean Water: Energy conservation Yes Project EC 5 Template 5.8 Clean Water: Water conservation Yes Project EC 5 Template 5.9 Clean Water: Nonpoint source Yes Project EC 5 Template 5.10 Drinking water: Treatment Yes Project EC 5 Template 5.11 Drinking water: Transmission & distribution Yes Project EC 5 Template 5.12 Drinking water: Transmission & distribution: lead remediation Yes Project EC 5 Template 5.13 Drinking water: Source Yes Project EC 5 Template 5.14 Drinking water: Storage Yes Project EC 5 Template 5.15 Drinking water: Other water infrastructure Yes Project EC 5 Template 5.16 Broadband: "Last Mile" projects Yes Project EC 5 Template 5.17 Broadband: Other projects Yes Project EC 5 Template 6 Expenditure Category: Revenue Replacement 6.1 1 Provision of Government Services N/A Revenue Replacement Module 7 Administrative and Other 7.1 Administrative Ex )enses No Project Baseline Template 7.2 Evaluation and data analysis No Project Baseline Template 7.3 Transfers to Other Units of Government No Project Baseline Template Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 67 0U S. DEPARTMENT OF THE TREASURY Appendix D — SLFRF Expenditure Category Programmatic Data and Other Information The downloadable templates contain information required to create the upload files to include required/optional fields, help text, and permissible data types. The following table highlights the standard data elements required for the Project Bulk Upload for Baseline Projects. Project Bulk Upload for Project Baseline Template Table Defined Term Definition Required or List Values Data Type Max Optional Project Expenditure Required Select from Pick List n/a Expenditure category Project EC Category Group Group Pick List [1,2,3, and 71 Project Sub -Category Required Select from Pick List n/a Expenditure Project EC Pick Category List [1,2,3, and 7] Project Name Official name of Required n/a String 150 the project Recipient Project Identification Required n/a Alpha Numeric 20 ID number assigned to project by recipient Status of Completion Required "Not started", Pick List n/a Completion status of the "Completed less project than 50%", "Completed 50% or more", "Completed" Adopted Budget Amount of the Required for Tier n/a Currency 12,2 adopted budget 1 recipients for the project Optional for other Tier recipients Total Obligations The total dollar Required n/a Currency 12,2 value of obligations for this project Total The total dollar Required n/a Currency 12,2 Expenditures value of expenditures for this project Does this project Does this project Required Yes Picklist (see n/a include a capital include a capital No permissible expenditure? expenditure values in revious column If yes, what is the If you answered Optional n/a Currency 12,2 total expected "yes" to the capital previous expenditure? question, enter the total dollar value of the expected capital expenditure Project Description of Required n/a String 1,500 Description Project Program Income The amount of Optional n/a Currency 12,2 Earned Federal program income earned. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 68 .-, U S. DEPARTMENT OF THE TREASURY There is no additional programmatic data required for the following EC: • EC 1.1 COVID-19 Vaccination • EC 1.2 COVID-19 Testing • EC 1.3 Contact Tracing • EC 1.4 Prevention in Congregate Settings (Nursing Homes, Prisons/Jails, Dense Work Sites, Schools, etc.) • EC 1.5 Personal Protective Equipment • EC 1.6 Medical Expenses (including Alternative Care Facilities) • EC 1.7 Capital Investments of Physical Plant Chances to Public Facilities that respond to the COVID-19 public health emergency • EC 1.8. Other COVID-19 Public Health Expenses (including Communications, Enforcement, Isolation/Quarantine) EC 1.9 (Payroll Costs for Public Health, Safety, and Other Public Sector Staff Resp) There are additional programmatic data required for EC 1.9. that can be provided via bulk upload file or manual entry. The Project Template EC 1.9 contains fields required to create the upload files and includes required/optional fields, help text, and permissible data types for EC 1.9 Public Health: Payroll Costs for Public Health, Safety, and Other Public Sector Staff Responding to COVID-19. In addition to the project base information noted in the Project Bulk Upload for Base Projects table above, additional data to provide is as follows: EC 1.10 — 1.12 There is no additional programmatic data required for the following EC: • EC 1.10 Mental Health Services. • EC 1.11 (Substance Use Services) Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 69 U.S. DEPARTMENT OF THE TREASURY • EC 1.12 (Other Public Health Services) EC 2.1-2.5 (Household Assistance) There are additional programmatic data required for EC 2.1 — 2.5 that can be provided via bulk upload file or manual entry. Project Template EC 2.1 — 2.5 contains fields required to create the upload files and include required/optional fields, help text, and permissible data types for the following categories under EC 2 Negative Economic Impacts: • 2.1-Household Assistance: Food Programs • 2.2-Household Assistance: Rent, Mortgage, and Utility Aid • 2.3-Household Assistance: Cash Transfers • 2.4-Household Assistance: Internet Access Programs • 2.5-Household Assistance: Eviction Prevention In addition to the project base information noted in the Project Bulk Upload for Base Projects table above, additional data to provide is as follows: Term Definition Required or List Values Data Type Max OptionalDefined Structure and Brief description Required n/a String 500 objectives of of structure and assistance objectives of program(s) assistance program(s) (e.g., nutrition assistance for low-income households Number of Number of Required n/a Numeric 6 households households served served (by program if recipient establishes multiple separate household assistance programs) Brief description Brief description Required n/a String 500 of recipient's of recipient's approach approach to ensuring that aid to households responds to a negative economic impact of Covid-19, as described in the final rule. EC 2.6 — 2.13 There is no additional programmatic data required for the following EC: • EC 2.6 Unemployment Benefits or Cash Assistance to Unemployed Workers. • EC 2.7 Job Training Assistance (e.g., Sectoral job -training, Subsidized Employment, Employment Supports or Incentives). Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 70 U.S. DEPARTMENT OF THE TREASURY • EC 2.8 Contributions to UI Trust Funds. • EC 2.9 Small Business Economic Assistance (General) • EC 2.10 Aid to nonprofit organizations • EC 2.11 Aid to Tourism, Travel, or Hospitality • EC 2.12 Aid to Other Impacted Industries • EC 2.13 Other Economic Support EC 2.14 (Rehiring Public Sector Staff) There is additional programmatic data required for EC 2.14 that can be provided via bulk upload file or manual entry. Project Template EC 2.14 contains fields required to create the upload files and includes required/optional fields, help text, and permissible data types for the Expenditure Category EC 2 Negative Impacts: 2.14 Rehiring Public Sector Staff. In addition to the project base information noted in the Project Bulk Upload for Base Projects table above, additional data to provide is as follows: EC 3.1-3.5 (Services to Disproportionately Impacted Communities) There is additional programmatic data required for EC 3.1 — 3.5 that can be provided via bulk upload file or manual entry. Project Template EC 3.1 — 3.5 contains fields required to create the upload files and includes required/optional fields, help text, and permissible data types for the following categories under EC 3 Services to Disproportionately Impacted Communities: • 3.1-Education Assistance: Early Learning • 3.2-Education Assistance: Aid to High -Poverty Districts • 3.3-Education Assistance: Academic Services • 3.4-Education Assistance: Social, Emotional, and Mental Health Services • 3.5-Education Assistance: Other In addition to the project base information noted in the Project Bulk Upload for Base Projects table above, additional data to provide is as follows: Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 71 0 U.S. DEPARTMENT OF THE TREASURY Policy Information When providing the National Center for Education Statistics ("NCES") School ID or NCES District ID, please list the School District if all schools within the school district received some funds. If not all schools within the school district received funds, please list the School ID of the schools that received funds. These can allow evaluators to link data from the NCES to look at school -level demographics and, eventually, student performance. For more information on NCES identification numbers see https://nces.ed.gov/ccd/districtsearch/ (districts) and https://nces.ed.gov/ccd/schoolsearch/ (schools). EC 3.6 — 3.16 There is no additional programmatic data required for the following ECs: • EC 3.6 Healthy Childhood Environments: Child Care. • EC 3.7 Healthy Childhood Environments: Home Visiting • EC 3.8 Healthy Childhood Environments: Services to Foster Youth or Families Involved in Child Welfare System • EC 3.9 Healthy Childhood Environments: Other • programmatic data required for EC 3.10 Housing Support: Affordable Housing • EC 3.11 Housing Support: Services for Unhoused Persons • EC 3.12 Housing Support: Other Housing Assistance • EC 3.13 Social Determinants of Health: Other • EC 3.14 Social Determinants of Health: Community Health Workers or Benefits Navigators • EC 3.15 Social Determinants of Health: Lead Remediation • EC 3.16 Community Violence Interventions. EC 4.1-4.2 (Premium Pay) There is additional programmatic data required for EC 4.1 — 4.2 that can be provided via bulk upload file or manual entry. Project Template EC 4.1 — 4.2 contains fields required to create the upload files and includes required/optional fields, help text, and permissible data types for the categories under EC 4 Premium Pay: • EC 4.1 Public Sector Employees • EC 4.2 Private Sector: Grants to other employers In addition to the project base information noted in the Project Bulk Upload for Base Projects table above, additional data to provide is as follows: Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 72 Ar7 M U.S. DEPARTMENT OF THE TREASURY Term Definition Sectors List of sectors designated as designated as essential critical essential critical infrastructure infrastructure sectors sector Required or List Values OptionalDefined Required Valid entries for Sectors designated as essential critical infrastructure sectors. (See Appendix E Data Type Max String 1500 Number of Number of Required n/a Numeric 7 workers to be workers to be served served Premium Pay For groups of Required n/a String 3000 Narrative workers that do not meet one of the two criteria below, submit a written justification to Treasury describing how the premium pay or grant is responsive to workers performing essential work during the public health emergency unless the worker or groups of workers receiving premium pay meet one of two criteria: (1) the eligible worker(s) receiving premium pay earn (with the premium included) below 150 percent of their residing state or county's average annual wage for all occupations, as defined by the Bureau of Labor Statistics Occupational Employment and Wage Statistics; or (2) the eligible worker(s) receiving premium pay is not exempt from the Fair Labor Standards Act overtime provisions. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 73 0 U.S. DEPARTMENT OF THE TREASURY In addition, please see Section IV.d.1 Step 5 and Appendix E for additional information needed on sub -awards supporting projects in these Expenditure Categories. Note- • Recipients that are either creating or supporting a Premium Pay program may only provide premium pay to eligible workers, e.g., workers needed to maintain continuity of operations of essential critical infrastructure sectors (see sector list for additional details), for essential work, e.g., work that is not performed while teleworking from a residence; and involves either: regular, in -person interactions with patients, the public, or coworkers of the individual that is performing the work; or • regular physical handling of items that were handled by, or are to be handled by, patients, the public, or coworkers of the individual that is performing the work. EC 5.1-5.17 (Infrastructure) There is additional programmatic data required for EC 5.1 — 5.17 that can be provided via bulk upload file or manual entry. There is also additional programmatic data required for all projects that can only be entered via manual entry. Project Template EC 5 contains fields required to create the upload files and includes required/optional fields, help text, and permissible data types for all subcategories under Expenditure Category EC 5 Infrastructure: • 5.1-Clean Water: Centralized wastewater treatment • 5.2-Clean Water: Centralized wastewater collection and conveyance • 5.3-Clean Water: Decentralized wastewater • 5.4-Clean Water: Combined sewer overflows • 5.5-Clean Water: Other sewer infrastructure • 5.6-Clean Water: Stormwater • 5.7-Clean Water: Energy conservation • 5.8-Clean Water: Water conservation • 5.9-Clean Water: Nonpoint source • 5.10-Drinking water: Treatment • 5.11-Drinking water: Transmission & distribution • 5.12-Drinking water: Transmission & distribution: lead remediation • 5.13-Drinking water: Source • 5.14-Drinking water: Storage • 5.15-Drinking water: Other water infrastructure • 5.16-Broadband: "Last Mile" projects • 5.17-Broadband: Other projects In addition to the project base information noted in the Project Bulk Upload for Base Projects table above, additional data to provide is as follows: Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 74 U.S. DEPARTMENT OF THE TREASURY Term Definition Required or List Values Data Type Max OptionalDefined Projected/actual Projected/actual Optional n/a Date 10 construction start construction start date date REQUIRED if the project has started. NOT REQUIRED if you selected "Not Started" for the "Status to Completion" question. Projected/actual Projected/actual n/a Date 10 initiation of initiation of Optional operations date operations date REQUIRED if the project has started. NOT REQUIRED if you selected "Not Started" for the "Status to Completion" question. Location Type Location (for REQUIRED if the - Picklist n/a broadband, project has Latitude/longitud geospatial started. e (WGS84 or location data) NAD83 NOT REQUIRED geographic if you selected coordinate "Not Started" for system) the "Status to -Address Completion" -Address Range question. -Road Segment After the bulk upload of EC 5 infrastructure project information, manual entry of additional programmatic data will be required in Treasury's Portal. a) Additional manual entry for all infrastructure projects 1. Location 2. For projects over $10 million in expected total cost i. Complete Davis -Bacon certification or provide the following: • Number of employees of contractors and sub -contractors working on the project (number) • Number of employees on the project hired directly (number) • Number of employees on the project hired through a third party (number) • Wages and benefits of workers on the project by classification (rich text field) • Are any of the wages at rates less than those prevailing? (Y/N) Complete certification for labor agreements or provide the following: Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 75 U S. DEPARTMENT OF THE TREASURY How will the recipient ensure the project has ready access to a sufficient supply of appropriately skilled and unskilled labor to ensure high -quality construction throughout the life of the project, including a description of any required professional certifications and/or in-house training? (text box) • How will the recipient minimize risks of labor disputes and disruptions that would jeopardize timeliness and cost- effectiveness of the project? (text box) • How will the recipient provide a safe and healthy workplace that avoids delays and costs associated with workplace illnesses, injuries, and fatalities, including descriptions of safety training, certification, and/or licensure requirements for all relevant workers (e.g., OSHA 10, OSHA 30);"? (text box) • Will workers on the project receive wages and benefits that will secure an appropriately skilled workforce in the context of the local and regional labor market? (Y/N) • Does the project have a completed project labor agreement? (Y/N) iii. Respond to the question, Does the project prioritize local hires? (Y/N) iv. Respond to the question, Does the project have a Community Benefit Agreement, with a description of any such agreement? (Y/N) b) Additional manual entry for Projects in the Water and Sewer Infrastructure Expenditure Categories (5.1 — 5.15): 1. National Pollutant Discharge Elimination System (NPDES) Permit Number (if applicable; for projects aligned with the Clean Water State Revolving Fund) 2. Public Water System (PWS) ID number (if applicable; for projects aligned with the Drinking Water State Revolving Fund) Note- Please provide the NPDES Permit Number or Public Water System (PWS) ID number for projects on systems with such permit/ID numbers. Otherwise, please leave this field blank. Providing this information allows Treasury to connect your reporting data to existing information about the systems. c) Additional manual entry for Broadband Projects Expenditure Categories (5.16 — 5.17): 1. Project is designed to, upon completion, reliably meet or exceed symmetrical 100 Mbps download and upload speeds. 2. If the project is not designed to reliably meet or exceed symmetrical 100 Mbps download and upload speeds, explain why not, 3. Confirm that the project is designed to, upon completion, meet or exceed symmetrical 100 Mbps download speed and between at least 20 Mbps and 100 Mbps upload speed, and be scalable to a minimum of 100 Mbps download speed and 100 Mbps upload speed. EC 6.1 (Provision of Government Services) Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 76 0 U.S. DEPARTMENT OF THE TREASURY There is no additional programmatic data required for EC 6.1 and there is no bulk upload template option. In addition, note that obligations and expenditures reported under EC 6.1 Revenue Replacement do not need to have subrecipients, subawards, or expenditures separately reported. If the only project created is for EC 6.1 Revenue Replacement, the following sections will be greyed out: Subrecipient module, Subaward Module, Expenditure Module EC 7.1 — 7.3 There is no additional programmatic data required for the following ECs: EC 7.1 Administrative Expenses EC 7.2 Evaluation and Data Analysis. EC 7.3 Transfers to Other Units of Government. EC 7.4 Transfers to Non -entitlement Units (States and Territories only) Do not enter projects under EC 7.4 (Transfers to Non -entitlement Units (States and Territories only). This information will be collected as part of NEU and Non-UGLG information. Please reference NEU User Guide. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 77 U S. DEPARTMENT OF THE TREASURY Appendix E — List of Sectors When entering information for project subawards, selection of a Primary Sector is required for subawards tied to projects in Expenditure Categories: • 4.1 Premium Pay: Public Sector Employees; and • 4.2 Premium Pay: Private Sector: Grants to other employers. A primary sector is defined as the sector targeted by the work performed under the sub -award. It is not required for other expenditure categories. The table below lists primary sectors available in the system for selection. If the primary sector is not listed, select "Other" and clarify in the manual entry box. SectorsSectors Designated as Essential Critical Infrastructure Any work performed by an employee of a State, local, or Tribal government; Behavioral health work; Biomedical Research; Dental care work; Educational work, school nutrition work, and other work required to operate a school facility; Elections work; Emergency response; Family or childcare; Grocery stores, restaurants, food production, and food delivery Health care; Home- and community -based health care or assistance with activities of daily living; Laundry work; Maintenance work; Medical testing and diagnostics; Pharmacy; Public health work; Sanitation, disinfection, and cleaning work; Social services work; Solid waste or hazardous materials management, response, and cleanup work; Transportation and warehousing; Vital services to Tribes; Work at hotel and commercial lodging facilities that are used for COVID-19 mitigation and containment; Work in a mortuary; Work in critical clinical research, development, and testing necessary for COVID-19 response. Work requiring physical interaction with patients; Other Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 78 0 U S. DEPARTMENT OF THE TREASURY Appendix F — Frequently Asked Questions These questions are aligned to section 9 of the main FAQs and included in Section IV of the F User Guide: Treasury's Portal for Recipient Reporting. However, please note that the list of FAQs has been reordered. 1.1. What records must be kept by governments receiving funds? Financial records and supporting documents related to the award must be retained for a period of five years after all funds have been expended or returned to Treasury, whichever is later. This includes those which demonstrate the award funds were used for eligible purposes in accordance with the ARPA, Treasury's regulations implementing those sections, and Treasury's guidance on eligible uses of funds. 1.2. What reporting will be required, and when will the first report be due?' Recipients will be required to submit an interim report, project and expenditure reports, and annual Recovery Plan Performance Reports as specified below, regarding their utilization of Coronavirus State and Local Fiscal Recovery Funds. Interim reports: States (defined to include the District of Columbia), territories, metropolitan cities, counties, and Tribal governments will be required to submit one interim report. The interim report will include a recipient's expenditures by category at the summary level and for states, information related to distributions to non -entitlement units of local government must also be included in the interim report. The interim report covered activity from the date of award to July 31, 2021 and were due to Treasury by August 31, 2021 or 60 days after receiving funding if funding was received by October 15, 2021. Non -entitlement units of local government were not required to submit an interim report. Project and Expenditure reports: State (defined to include the District of Columbia), territorial, metropolitan city, county, and Tribal governments will be required to submit project and expenditure reports. This report will include financial data, information on contracts and subawards over $50,000, types of projects funded, and other information regarding a recipient's utilization of award funds. Reports will be required quarterly for the following recipients: • States and territories Metropolitan cities and counties with population over 250,000 Metropolitan cities and counties with population less than 250,000 that received an award of more than $10 million Tribal governments that received an award of more than $30 million. The initial project and expenditure report for quarterly recipients will be due January 31, 2022 and will cover the period of March 3, 2021 to December 31, 2021. The subsequent quarterly reports will cover one calendar quarter and must be submitted to Treasury within 30 days after the end of each calendar quarter. Reports will be required annually for the following recipients: ' This question was updated on November 15, 2021 Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 79 -- U S. DEPARTMENT OF THE TREASURY --� . Metropolitan cities and counties with population less than 250,000 that received an award less than $10 million, Tribal governments that received an award less than $30 million • Non -entitlement units of government The initial project and expenditure report for annual filers will be due April 30, 2022 and will cover the period of March 3, 2021 to March 31, 2022. The subsequent annual reports must be submitted to Treasury by April 30 each year. The reports will include the same general data as those submitted by recipients of the Coronavirus Relief Fund, with some modifications to expenditure categories and the addition of data elements related to specific eligible uses. Recovery Plan Performance Reports: States (defined to include the District of Columbia), territories, metropolitan cities, and counties with a population that exceeds 250,000 residents will also be required to submit an annual Recovery Plan Performance Report to Treasury. This report will include descriptions of the projects funded and information on the performance indicators and objectives of each award, helping local residents understand how their governments are using the substantial resources provided by Coronavirus State and Local Fiscal Recovery Funds program. The initial Recovery Plan Performance Report will cover activity from date of award to July 31, 2021 was due to Treasury by August 31, 2021 or 60 days after receiving funding. Thereafter, the Recovery Plan Performance Reports will cover a 12-month period and recipients will be required to submit the report to Treasury within 30 days after the end of the 12-month period. The second Recovery Plan Performance Report will cover the period from July 1, 2021 to June 30, 2022 and must be submitted to Treasury by July 31, 2022. Each annual Recovery Plan Performance Report must be posted on the public - facing website of the recipient. Local governments with fewer than 250,000 residents, Tribal governments, and non -entitlement units of local government are not required to develop a Recovery Plan Performance Report. Please see the Guidance on Recipient Compliance and Reporting Responsibilities for more information. 1.3. What provisions of the Uniform Guidance for grants apply to these funds? Will the Single Audit requirements apply? Most of the provisions of the Uniform Guidance (2 CFR Part 200) apply to this program, including the Cost Principles and Single Audit Act requirements. Recipients should refer to the Assistance Listing for detail on the specific provisions of the Uniform Guidance that do not apply to this program. The Assistance Listing will be available on beta.SAM.gov. 1.4. Once a recipient has identified a reduction in revenue, how will Treasury track use of funds for the provision of government services? The ARPA establishes four categories of eligible uses and further restrictions on the use of funds to ensure that Fiscal Recovery Funds are used within the four eligible use categories. The interimfinal rule implements these restrictions, including the scope of the eligible use categories and further restrictions on tax cuts and deposits into pensions. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 80 0 U.S. DEPARTMENT OF THE TREASURY Consistent with the broad latitude provided to recipients to use funds for government services to the extent of the reduction in revenue, recipients will be required to submit a description of services provided. These services can include a broad range of services but may not be used directly for pension deposits, contributions to reserve funds, or debt service. Recipients may use sources of funding other than Fiscal Recovery Funds to make deposits to pension funds, contribute to reserve funds, and pay debt service, including during the period of performance for the Fiscal Recovery Fund award. For recipients using Fiscal Recovery Funds to provide government services to the extent of reduction in revenue, the description of government services reported to Treasury may be narrative or in another form, and recipients are encouraged to report based on their existing budget processes and to minimize administrative burden. For example, a recipient with $100 in revenue replacement funds available could indicate that $50 were used for personnel costs and $50 were used for pay -go building of sidewalk infrastructure. In addition to describing the government services provided to the extent of reduction in revenue, all recipients will also be required to indicate that Fiscal Recovery Funds are not used directly to make a deposit in a pension fund. Further, recipients subject to the tax offset provision will be required to provide information necessary to implement this provision. Treasury does not anticipate requiring other types of reporting or recordkeeping on spending in pensions, debt service, or contributions to reserve funds. These requirements are further detailed in the guidance on reporting requirements for the Fiscal Recovery Funds available here. 1.5. What is the Assistance Listing and Catalog of Federal Domestic Assistance (CFDA) number for the program? The Assistance Listing for the Coronavirus State and Local Fiscal Recovery Funds (CSLFRF) was published May 28, 2021 on SAM.gov. This includes the final Assistance Listing number for the program, 21.027. The assistance listing includes helpful information including program purpose, statutory authority, eligibility requirements, and compliance requirements for recipients. The Assistance Listing number is the unique 5-digit code for each type of federal assistance, and can be used to search for program information, including funding opportunities, spending on usaspending.gov, or audit results through the Federal Audit Clearinghouse. To expedite payments and meet statutory timelines, Treasury issued initial payments under an existing Assistance Listing number. If you have already received funds or captured the initial Assistance Listing number in your records, please update your systems and reporting to reflect the final Assistance Listing number 21.027. Recipients must use the final Assistance Listing number for all financial accounting, audits, subawards, and associated program reporting requirements. To ensure public trust, Treasury expects all recipients to serve as strong stewards of these funds. This includes ensuring funds are used for intended purposes and recipients have in place effective financial management, internal controls, and reporting for transparency and accountability. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 81 0U.S. DEPARTMENT OF THE TREASURY Please see Treasury's most recent Rule and the Guidance on Recipient Compliance and Reporting Responsibilities for more information. 1.6. If a recipient has received funding as of October 15, 2021 but has not incurred obligations or expenditures as of the end of the reporting period, what are the reporting requirements? Interim Report: Recipients should submit a report showing no ($0) obligations or expenditures have yet been incurred. Recovery Plan: Recipients should submit a Recovery Plan, if applicable, describing the planned approach to the use of funds and planned projects. Project and Expenditure Report: Recipients should submit a report showing no ($0) obligations or expenditures have yet been incurred. 1.7. If a recipient has received funding as of October 15, 2021 but has not established projects as of the end of the reporting period, what are the reporting requirements? No project level reporting is required in the Interim Report. Recipients should submit a Recovery Plan, if applicable, describing the planned approach to the use of funds and planned projects. Recipients should submit a Project and Expenditure Report describing the adopted budget, where applicable based on reporting tier, for any planned projects. 1.8. If a recipient has not received funding as of October 15, 2021 but received funding before the end of December 31, 2021, what are the reporting requirements? Treasury recognizes that recipients will need sufficient time to gather the information and determine how to allocate funds in accordance with the interim final rule. As such, recipients that have received funding between October 16, 2021 and December 31, 2021 are not required to submit an Interim Report. However, recipients in this circumstance and are subject to quarterly reporting (those in Reporting Tiers 1, 2, or 3) will be required to submit a Project and Expenditure Report by January 31, 2022. Recipients that are not subject to quarterly reporting will be required to submit a Project and Expenditure Report by April 30, 2022. Recipients must submit a Recovery Plan (if applicable) within 60 days of receiving funding. 1.9. Does the $10 million for metropolitan cities and counties with population less than 250,000 and the $30 million (for tribes) threshold apply to funds received or the total allocation? The reporting threshold is based on the total allocation expected under the SLFRF program, not the funds received by the recipient as of the time of reporting. Recipient Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 82 U.S. DEPARTMENT OF THE TREASURY reporting tiers will be displayed in the reporting portal. If you believe there is an error with the reporting tier or application of the $10 million (for metropolitan cities and counties with a population below 250,00 residents) or $30 million (for tribes) thresholds, please email SLFRP(a)treasury.gov. 1.10. How should a recipient report funds if funds were received as multiple entity types (e.g., a county and an NEU, or county and a city)? When receiving funds as multiple entity types, a recipient's reporting tier is determined by their total allocation across both recipient types and the highest tier for which they qualify. For example, if a recipient receives funding as an NEU and a county with population under $250,000 and their total allocation across both entity types is over $10M, the recipient should report as a county with population under 250,000 and over $10M in total SLFRF funding. A recipient's reporting tier will be available for review in the Treasury's Portal. If you believe there is an error in consolidating or not consolidating your governmental entities for the purposes of reporting, please email SLFRP .treasury.gov. 1.11. The guidance covering submission of the Recovery Plan indicates that in addition to submitting a PDF version of the Recovery Plan recipients must also upload a project inventory file and input other programmatic data. Is this no longer required? Treasury has delayed the collection of this information in Treasury's Portal in order to streamline reporting and lessen the reporting burden for recipients. Recipients are still required to upload a PDF version of their Recovery Plan by August 31, or 60 days after receiving funding. Recipients are encouraged to use the suggested template posted in the www.treasury.gov/SLFRPReporting website when preparing the Recovery Plan template. Some data from the Recovery Plan will be phased in to be submitted with the Project and Expenditure report. 1.12. How should recipients report if the population threshold changes during the four- year reporting period? The population threshold is determined by Treasury at award date and will not change during the four-year reporting period. A recipient's reporting tier will be available for review in the reporting portal. 1.13. How do Recipients identify what Reporting Tier they are in? A list of all SLFRF Recipients and their corresponding Reporting Tiers will be published on the Treasury website www.Treasury.gov/SLFRPReporting Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 83 U.S. DEPARTMENT OF THE TREASURY In addition, Recipients will be able to find their Reporting Tier after logging into the Treasury Reporting Portal and selecting the Project and Expenditure Report record. The Reporting Tier will be displayed as part of the Recipient Profile. 1.14. Can records be edited or updated after submission? How do I report changes? Interim Report: No changes will be allowed after the initial submission. Any updates will be captured when the first Project and Expenditure Report is submitted. Project and Expenditure Report: Recipients will have an opportunity to reopen and provide edits to their submitted Project and Expenditure Reports anytime before the reporting deadline. Recipients will then be required to re -certify and submit the report again to properly reflect any edits made. Recovery Plan: Similarly, Recipients will be allowed to reopen and provide an update of their submitted Recovery Plan report record anytime before the reporting deadline. They should also provide concurrent updates to the publicly posted version. Recipients will then be required to re -certify and submit the report again to properly reflect any edits made. 1.15. How do recipients correct or edit pre -populated information or project information in Treasury's Portal? In the event that information presented in Treasury's Portal requires correction, recipients should email SLFRP@treasury.gov and provide the necessary edits. 1.16. Is there any possibility of extension for the reporting deadlines for individual recipients? Generally, No. The data submitted by recipients will be used internally for oversight purposes and to fulfill Treasury's transparency and legal obligations. Late submissions undermine the efficiency and timeliness of these processes. Recipient submissions after the reporting deadline will be considered as late, and recipients will be asked to provide a date by which the delayed reporting will be submitted so that Treasury can plan for incorporating the data. Treasury's own reporting will highlight those recipients whose reports were not received by the deadline. If there are any changes to the overall reporting deadlines, they will be communicated to the relevant impacted recipients. 1.17. Is there a penalty for not submitting timely reports? A record of late reporting could lead to a finding of non-compliance, which could result in development of a corrective action plan, or other consequences. 1.18. What is meant by Date of Award? The Date of Award is the day the recipient certifies the funding. 1.19. When are recipients subject to the quarterly reporting? Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 84 0 U S. DEPARTMENT OF THE TREASURY Recipients are required to provide quarterly reporting if they are in Reporting Tiers 1, 2, or 3 (see Section Ill.b). If applicable, reporting will start in the period funds were received and certified and will be required for all quarters thereafter. 1.20. How should interest or principal received from loans made with SLFRF Funds be treated? The Project and Expenditure Report will include fields for reporting on program income at the Project level. Interest received on loans made with SLFRF funds should be tracked as program income (See 2 CFR § 200.1 Program income). Any program income that comes in before 2024 can be recycled by the recipients on eligible projects. 1.21. Will there be a way to capture and tally a total award amount that includes program income for ensuring all funds are spent or that any funds that need to be returned are? Yes, since Program Income is being collected, Treasury will use the information reported to determine total allowable obligations and expenditures. That information will be made available in the Treasury portal for Recipients as part of future enhancements. Please note, interest earned on advances of federal funds are not considered program income and are not subject to these reporting requirements. (See 2 CFR § 200.1 Program income 1.22. How should Recipients define expenditure for loans made with SLFRF funds? For the purposes of reporting through the Treasury portal, expenditures for a loan should be identified as the value of the cash disbursement of the loan at the time of the disbursement. Separately, Recipients will have the opportunity to report, if applicable, on program income. As noted above, interest earned on advances of federal funds are not considered program income. 1.23. Are Recipients required to collect a DUNS number for each of their subrecipients? The Dun & Bradstreet D-U-N-S number remains the official identifier for doing business with the U.S. Government and will be used for confirming SAM.gov registration. For subrecipients that do not yet have DUNs numbers, Recipients should encourage as many of their subrecipients to obtain a DUNs number as possible. At the same time, Treasury recognizes that the Federal government is also transitioning away from using the DUNs number will only remain as the official identifier until April 4, 2022. In its place, the Federal government will use a Unique Entity Identifier (SAM) created in SAM.gov. To accommodate Recipients during this shifting period, if there are subrecipients who do not yet have a DUNs number, and/or have challenges in obtaining one, the January 2022 Project and Expenditure Report form will accept for each subrecipient one of the following three identifiers: o Dun & Bradstreet D-U-N-S number o Taxpayer Identification Number (TIN) o Unique Entity Identifier (UEI) After April 4, 2022 all Subrecipients will be expected to provide a Unique Entity Identifier. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 85 1.24. Who are beneficiaries and are Recipients required to report for them? A subrecipient is an entity that receives a subaward to carry out a project funded by Fiscal Recovery Funds on behalf of a recipient. Individuals or entities that are direct beneficiaries of a project funded by Fiscal Recovery Funds are not considered subrecipients. Households, communities, small businesses, nonprofits, and impacted industries are all potential beneficiaries of projects carried out with SLFRF funds. The terms and conditions of Federal awards flow down to subawards to subrecipients, requiring subrecipients to comply with all requirements of recipients such as the treatment of eligible uses of funds, procurement, and reporting requirements. Beneficiaries are not subject to the requirements placed on subrecipients in the Uniform Guidance, including audit pursuant to the Single Audit Act and 2 CFR Part 200, Subpart F or subrecipient reporting requirements. The distinction between a subrecipient and a beneficiary, therefore, is contingent upon the rationale for why a recipient is providing funds to the individual or entity. If the recipient is providing funds to the individual or entity for the purpose of carrying out a SLFRF program or project on behalf of the recipient, the individual or entity is acting as a subrecipient. Acting as a subrecipient, the individual or entity is subject to subrecipient monitoring and reporting requirements. Conversely, if the recipient is providing funds to the individual or entity for the purpose of directly benefitting the individual or entity as a result of experiencing a public health impact or negative economic impact, the individual or entity is acting as a beneficiary. Acting as a beneficiary, the individual or entity is not subject to subrecipient monitoring and reporting requirements. While the definition above is used for Single Audit purposes, Treasury does require that the prime recipient report on both a beneficiary and a subrecipient in the Treasury reporting portal. Similar to reporting under the Coronavirus Relief Fund (CRF), information on both beneficiaries and subrecipients will be collected in a single form in the Project and Expenditure Report. 1.25. Do recipients who have projects under Expenditure Category 6.1 "Provision of Government Services" need to report on Subrecipients, Subawards, and Expenditures? Recipients who have projects categorized under EC 6.1 "Provision of Government Services" are not required at this time to report on the subrecipients, subawards, and expenditures (for subawards or in aggregate) for those projects for the January reporting cycle. 1.26. How should a Recipient report the Subaward's "Place of Performance" address if the work was performed over a broad area and no specific address is available? For the Subaward module, if a specific address is not available for a Subaward, you can enter the corresponding Subrecipient's address or the nearest headquarters of your jurisdiction in the required address fields. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 86 0 U S. DEPARTMENT OF THE TREASURY 1.27. Do jurisdictions need to have committed or dedicated funding received by the August 31, 2021 deadline or 60 days after receiving funding for the initial Recovery Plan? No. Funding does not need to be committed or dedicated by the time the initial Recovery Plan is submitted. The Recovery Plan should include planned uses of funds and projects to the extent known at the time the Recovery Plan is submitted. Updates can be provided in subsequent Recovery Plans and project and expenditure reports. 1.28. Will the data recipients submit be made publicly available? Yes, Treasury will make the data submitted by recipients publicly available. The content and timing of release is still under development. Treasury encourages recipients to make their data directly available through their own websites. States and territories are reminded that they need to post the Recovery Plan in their public website by the date the report is transmitted to Treasury. 1.29. What reporting is required if no SLFRF funding was used for the activities covered by the Required Performance Indicators noted in Part 2 C.2. of the Reporting Guidance related to the Recovery Plan? A recipient only needs to report on mandatory performance indicators if funds were used for that purpose / Expenditure Category. Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 87 0 U.S. DEPARTMENT OF THE TREASURY Revision Log Version Date Published Summary of changes 1.0 January 7, 2022 Initial publication 1.1 January 24, 2022 . Added language around use of "No Projects Available" • Updated language around bulk uploads, including edits to Appendix B Coronavirus State and Local Fiscal Recovery Funds: Project and Expenditures Report User Guide 88 0 ■