Loading...
2021-15837 G (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DIVISION AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "GEOTECHNICAL INVESTIGATION AND INFILTRATION TESTING" PREPARED BY TERRA PACIFIC CONSULTANTS, INC. DATED MAY 10, 2021, FILE NO. 27189 SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE -CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE -CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. LDEV-015837-2021 HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS -GRADED PLAN". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. 18. IF ANY ARCHAEOLOGICAL, HISTORICAL, OR PALEONTOGICAL RESOURCES ARE INADVERTENTLY DISCOVERED GRADING ACTIVITY, THE PROJECT CONTRACTOR SHALL DIVERT, DIRECT OR TEMPORARILY HALT GROUND -DISTURBING ACTIVITIES IN THE AREA OF DISCOVERY TO ALLOW EVALUATION OF THE SIGNIFICANCE OF SUCH RESOURCES. THE PROJECT APPLICANT SHALL IMMEDIATELY NOTIFY DEVELOPMENT SERVICES DEPARTMENT STAFF OF SUCH FINDING AT THE TIME OF DISCOVERY. THE SIGNIFICANCE OF THE DISCOVERED RESOURCE(S) SHALL BE DETERMINED BY A QUALIFIED ARCHAEOLOGIST, HISTORIAN, OR PALEOTOLOGIST IN CONSULTATION WITH THE DEVELOPMENT SERVICES DEPARTMENT AND, FOR ARCHEOLOGICAL RESOURCES, THE NATIVE AMERICAN COMMUNITY. THE DEVELOPMENT SERVICES DIRECTOR MUST CONCUR WITH THE EVALUATION PROCEDURES AND ANY NECESSARY DATA RECOVERY SERVICES BEFORE GRADING ACTIVITIES ARE ALLOWED TO RESUME. 19. AS SPECIFIED BY CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050.5, IF HUMAN REMAINS ARE FOUND ON THE PROJECT SITE DURING CONSTRUCTION ACITIVITY, THE PERSON RESPONSIBLE FOR THE EXCAVATION, OR HIS OR HER AUTHORIZED REPRESENTATIVE, SHALL IMMEDIATELY NOTIFY, THE SAN DIEGO COUNTY CORONER'S OFFICE BY TELEPHONE. NO FURTHER EXCAVATION OR DISTURBANCE OF THE DISCOVERY OR ANY NEARBY AREA REASONABLY SUSPECTED TO OVERLIE ADJACENT REMAINS, AS DETERMINED BY A QUALIFIED ARCHAEOLOGIST AND/OR A TRADITIONALLY AND CULTURALLY AFFILIATED (TCA) NATIVE AMERICAN MONITOR, SHALL OCCUR UNTIL THE CORONER HAS MADE THE NECESSARY FINDINGS AS TO ORIGIN AND DISPOSITION PURSUANT TO PUBLIC RESOURCES CODE 5097.98. IF SUCH A DISCOVERY OCCURS, A TEMPORARY CONSTRUCTION EXCLUSION ZONE SHALL BE ESTABLISHED SURROUNDING THE AREA OF THE DISCOVERY SO THAT THE AREA WOULD BE PROTECTED (AS DETERMINED BY THE QUALIFIED ARCHAEOLOGIST AND/OR THE TCA NATIVE AMERICAN MONITOR), AND CONSULTATION AND TREATMENT COULD OCCUR AS PRESCRIBED BY LAW. AS FURTHER DEFINED BY STATE LAW, THE CORONER WOULD DETERMINE WITHIN TWO WORKING DAYS OF BEING NOTIFIED IF THE REMAINS ARE SUBJECT TO HIS OR HER AUTHORITY. IF THE CORONER RECOGNIZES THE REMAINS TO BE NATIVE AMERICAN, HE OR SHE SHALL CONTACT THE NATIVE AMERICAN HERITAGE COMMISSION (NAHC) WITHIN 24 HOURS. THE NAHC WOULD MAKE A DETERMINATION AS TO THE MOST LIKELY DESCENDENT. IF NATIVE AMERICAN REMAINS ARE DISCOVERED, THE REMAINS SHALL BE KEPT IN SITU ("IN PLACE"), OR IN A SECURE LOCATION IN CLOSE PROXIMITY TO WHERE THEY WERE FOUND, AND THE ANALYSIS OF THE REMAINS SHALL ONLY OCCUR ON -SITE IN THE PRESENCE OF THE TCA NATIVE AMERICAN MONITOR. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT PROPERTY MANAGER KARI MCCALLUM AT (760) 643-2200, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP/IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP FACILITIES AND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP/IMP FACILITY AND/OR THE TURF/LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP/BMP. 6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY -APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. SAN DIEGUITO WATER DISTRICT NOTES: 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE. 5. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS. 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-1 8. STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436-4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633-2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - CSD/ESD - (760)-633-2770 LWD 760-753-0155 B. GAS & ELECTRIC - SDGE - (760)-438-6200 C. WATER - SAN DIEGUITO WATER DISTRICT-1-800-227-2600 D. TELEPHONE - SBC BELL - (760)-489-3411 E. CABLE TV - COX COMMUNICATIONS-(760)-806-9809 X-2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)-633-2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633-2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. IMPERVIOUS AREA IMPERVIOUS AREA PRIOR TO CONSTRUCTION: -0- SQ FT IMPERVIOUS AREA AFTER CONSTRUCTION: -0- SQ FT INCREASE IN IMPERVIOUS AREA: 7 SQ FT IMPERVIOUS AREA REPLACED: -0- SQ FT SI PUBLIC WORKS 1 /26/2023 DATE SIGN APPROVED 1/26/2023 , fcarr PLANNING DIVISION OWNER PARK PLACE BLUFFS HOMEOWNERS CORP 1390 EVERGREEN DR CARDIFF, CA 92007 SITE ADDRESS WOODLAKE DRIVE APN: 260-221-28-00 LEGAL DESCRIPTION LOT 581 OF MAP 7808, IN THE CITY OF CARDIFF, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, FILED IN THE OFFICE OF THE COUNTY RECORDER, APRIL 5, 1910. ZONE/GENERAL PLAN DESIGNATION ZONING CODE R5 RESIDENTIAL 3.01-5.00 DU/AC OVERLAY ZONES -COASTAL ZONE -SPECIAL STUDY -HILLSIDE INLAND BLUFF SUMMARY OF SCOPE OF WORK REINFORCEMENT/RESTORATION OF SLOPE TO SANTA FE DR o cl: Q z z_ cf) Y z � � w LWOODLAKE DR c�a _ z� V/C/N/TY MAP 15 PREVIOUSLY GRADED CONDITION THOMAS BROS. MAP 1 167-F2 OWNER'S CERTIFICATE NO SCALE I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. I (WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITY'S OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OWNER OR OWNER'S AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORI< OR CONSTRUCTION COVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR APPROVED PLANS WITHIN THE PRIVATE PROPERTY OR PUBLIC EASEMENTS. SIGNATURE: DATE: I/ �/ 23 LISA R dkRY, B _ NT ON BEHALF OF PA P CE UFFS HOMEOWNER'S CORPORATION 0 SITE CARDIFF I DR 1 OILS ENGINEER'S CERTIFICATE MATHEW MARQUEZ A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON MAY 10, 2021 FOR AN UPDATE ON (N/A). ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS. SIGNED: RCE NO.: 70072 QROFESS/�,I EXP. DATE: 9/30/2024 C,)� 'y91, OG Z JOB #: 27189 w N m Of 70072 X TERRA PACIFIC CONSULTANTS, INC. * Expires 09/30/ 4010 Morena Boulevard, Suite 108 SAN DIEGO, CA y C / V \�. (858) 521-1190 F OF CA��Fo� STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. SIGNATURE: DATE: 12119122 J. DANIEL J. DEZ J. COFFEY ENGINEERING, INC. cl) Q fit^ 2 9666 BUSINESSPARK AVENUE, SUITE 210 LU ~ SAN DIEGO, CA 92131-1646 1 PH (858)831-0111 1 FAX (858)831-0179 * No. C076074 RCE EXPIRES: JUNE 30, 2024 EARTHWORK DATA CI V1� STEEPEST EXISTING NATURAL SLOPE ON -SITE = 1_5 H : 1 V OF CA\_\F MAXIMUM VERTICAL DEPTH OF CUT = 6.0 FT MAXIMUM VERTICAL DEPTH OF FILL = 6.0 FT CUT = -0- C.Y. FILL = 200 C.Y. IMPORT = 200 C.Y. REMEDIAL = 240 C.Y. (VARIABLE DEPTH BENCHING AND RECOMPACTION OF SLOPE) DISTURBED AREA = 2,000 FT (0.0459 ACRES) DRAWING INDEX BMP PROJECT STATUS TITLE SHEET .................................... 1 GRADING PLAN ................................ 2 CONSTRUCTION BMP PLAN ............ 3 PARKS AND RECREATION SAN DIEGUITO WATER DISTRICT Bob Keele DATE SIGN DATE SIGN 01126/2023 DATE STANDARD DR 0 ENCINITAS FIRE DEPARTMENT Steven Kelly Gaffrey 1/26/2023 SIGN DATE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT kzi 1-4 ""r: UKIsr: `'"c`'�t" �Y: ENGINEERING DIVISION APPROVALS (iR) CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. D\ D DK DDV V DV DESCRIPTION: 2.5" CITY OF ENCINITAS BRASS DISK; ENC-39 LOCATION: TOP OF CURB, NORTHWEST QUADRANT OF BIRMINGHAM DR & LAKE DRIVE RECORD FROM: CITY OF ENCINITAS- #1039 ROS 18416 ELEVATION: 323.983' DATUM: NAVD88 INT. DATE PLANS PREPARED UNDER SUPERVISION OF DATE • 12 19 22 R.C.E. NO.: 76074 DANIEL J. VALDEZ I EXP.: 6/3 /24 RECOMMENDED: RECOMMENDED: Jill T. GRADING PLAN FOR: WOODLAKE DRIVE PARK PLACE BLUFFS SLOPE REPAIR I(APN: 260-221-28) LDEV-015837-2021 PUBLIC WORKS DANIEL VALDEZ, PE DATE PLANNING _ ICHAEL TRIZIC JILL T. BANKSTON PRINCIPAL ENGINEER CITY ENGINEER 02/06/2023 02/08/2023 REVIEWER I PRINCIPAL ENGINEER DATE INSPECTOR DATE DATE SHEET 1 OF 3 U� z V LL z LLI W /z V U z° w LLI LLJ ILL. LL N 0 w U' Q Q nz _ - 60' - 20' - � 30' - ODLNj�iF Dix -}- 288.39 /Aso+ 285. + 281.33 L-356.8 p-21*4 '4 36» R p= 21 � SAWCUT, REMOVE AND 1 68 REPLACE EX. PCC + 2 9.6� =� SIDEWALK FOR o 15 3 EA. 4" PVC @ DRAINAGE INSTALLATION + 280 / + 277.72 0.50% SPACED � / + 278.36 \ �i + 277.64 �,� + 8� `" AT 6" O.C. moo / z + 276.47 _ + 2 6. 8 12x 12 GRAT I -� - -� - � _ - ®+ 27 .8 INLET (TYP.) + 276.22-lE-,2,16343 111 41oo=0.41 CFS -1 275.03 V100=1.11 FPS + 27 .49 + 274.53 + 275.30 + 275.66 10.0' WATER EASEMENT 6 GRANTED SAN DIEGUITO + 2 IRRIGATION DISTRICT ECORDED 10/19/19722�9.64 FILE NO. 281504 O.R. + 275.07 0.0'SEWER EASEMENT + 275.1 RANTED TO CARDIFF NITATION DISTRICT E 0 ED 12/14 1 E N0. 3333 9 YI. 4� + 27 .09 + 275., 310 300 1 s 10 0 10 20 30 SCALE: I "=1oil + 91 58 DO D �g CON TION P P DETAI ' f• ~ 29gq i 9 ).20 I REMOVE & REPLACE I PORTION OF EXISTING CONCRETE BROW DITCH PER SDRSD D-75, TYPE 'A' 11,121 DOWELLED CONNECTION POINT PER DETAIL 'C' ff + 27 •91 1 + 2 7.04 I DISCHARGE + 2 7 00 TO SWALE 9 PORTION OF G + 276.58 27 IE=276.57///////l / / I EXISTING SLOPE TO + � BE REINFORCED I EARTHEN � I � - 276.18 SWALE PER 'A' DETAIL 11.7' -*,g �44 4 N N N I I � N _ __---APPRX. LOCATIONOF RFORATED I HEEL DRAIN. PRECISE TION TO - - BE FIELD DE TR INED BY II GEOTECHNICAL GQ SULTANT I I PORTION OF EXISTING SLOPE TO BE REINFORCED I I / I LOT 581 _ MAP 2�• KEYMAP SCALE. 1 "=120' DRAIN STRUCTURES ID TYPE RIM IE A 12x 12 GRATED INLET 279.30 277.30 B 12x 12 GRATED INLET 279.30 277.23 C 12x 12 GRATED INLET 277.94 277.17 D 12x 12 GRATED INLET 278.13 277.12 E 12x 12 GRATED INLET 278.08 277.06 F 12x 12 GRATED INLET 278.04 277.02 G 12x 12 GRATED INLET 278.40 276.96 H 12x 12 GRATED INLET 278.90 276.91 I 12x 12 GRATED INLET 279.50 276.88 J 12x 12 GRATED INLET 279.30 276.82 K 24x24 GRATED INLET 277.68 276.66 L DISCHARGE TO SWALE 277.38 276.57 310 COBBLE BERM 2_i 1.5' SWALE 611 MIN. 1-W-11 I, - 300 VEGETATED COVER (MIN. 4 " GRASS) _j WOODLAKE DRIVE AREA OF WORK I LEGEND DESCRIPTION PROPERTY LINE ROW CENTERLINE BUILDING FOOTPRINT EXISTING CONTOUR PROPOSED CONTOUR EXISTING SPOT ELEVATION GRATED INLET DIRECTION OF FLOW 6" PVC DRAIN LINE (0.5% MIN.) UNLESS NOTED OTHERWISE ON PLAN PERFORATED HELL DRAIN DETAIL A' - EARTHEN SWALE NOT TO SCALE REFERENCE SEE SECTION 'A -A' SYMBOL N45'45'45 "W 90 90 1000 Em GRAVEL BAG CHIMNEY DRAIN COBBLE BERM BURLAP SAND BAGS OR NON -WOVEN NYLON BAGS FILLED W/ %2" - 3/" CLEAN GRAVEL. 27, MIN - STACK ON TOP OF EACH OTHER IN SINGLE ROW. STACK BAGS AS FILL LIFTS ARE PLACED MAINTAIN CONTACT BETWEEN BAGS AND DRAIN HEEL DRAIN GEOCOMPOSITE CHIMNEY DRAIN BACKFILL MOISTURE CONDITIONED AND PLACE LAPS ON HORIZONTAL 290 I REMOVE-EX.-TENCE. 290 BENCH WHERE NEEDED. GEOCOMPOSITE DRAIN BOARD SUCH EX. BUILDING FACE _ _ REPLACE AFTER SLOPE _ _ _ _ _ _ _ _ - -- -- VALUE REINFORCE WITH BIAXIAL GEOGRID, I.E., LAP MIN. 6' AS MIRAFI G20ON OR SIMILAR HAS--BEEN-REGRADEtY - DOUBLE -SIDED DRAINBOARD. - - - - - - - i =_ =i LONG ROLLED BACK THE TOP START DOWELLS SECTION OF EXISTING MINIMUM 2 FT WIDE STRIP. ROLL DOWN BENCHES 3" FROM TOP PCC DITCH TO REMAIN -i EDGE OF DITCH IJySrAI I (H/MNFY nRAINS AT .M' nN _ MAINTAIN CONTACT CENTER WITH GRAVEL BAGS OR DRAINAGE BOARD, I.E. MIRAFI 620ON -_ W/ DRAIN �pFESS/p�, - E� J. 280 I SEE DETAIL B THIS SHEET - 280 - -l 12" #4 REBAR _ DOWELL -- -- TACK BOARDS TO BACKCUT DURING FILL PLACEMENT HEEL DRAIN (P) 12x 12 GRATED INLET PER PLAN I INSTALL SUBDRAIN AT HEEL OF KEYWAY 4" DIAMETER PERFORATED @ 8" O.C. (TYP.) I SOR-35 PVC PIPE .SURROUNDED BY ¢" - 1" CI FAN DRAIN ROCK 6„ _ 6" No. C076074 WRAPPED IN MIRAFIFILTER C OR SIMILAR (MIN. 2 DETAIL 'C' - DOWELLED CONNECTION �t�' FT /LINEAR FOOT) OUTLLET T0DRAINAGEI SYSTEM PER PLAN VIEW DETAIL q�F I LIMITS OF KEY PER (@ 12x 12 GRATED INLET) OF CAS\� 275 275 / Orc 'l SEW PCC DITCH TO EXISTING CHIMNEYDRAIN GEOTECHNICAL FIELD 0+00 OBSERVATIONS SECTION A -A - SLOPEREINFORCEMENT -SCALE 1 "=5' 0+94 NO SCALE NOT TO SCALE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT DESIGNED BY DESI: DRAWN BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. Dv Dv Dv DESCRIPTION: 2.5" CITY OF ENCINITAS BRASS DISK; ENC-39 � LOCATION: TOP OF CURB, NORTHWEST QUADRANT OF BIRMINGHAM DR & INT. DATE PLANS PREPARED UNDER SUPERVISION DATE OF : 12 19 22 RECO MENDED: RECOMMENDED: JIII T. GRADING PLAN FOR: WOODLAKE DRIVE PARK PLACE BLUFFS LDEV-015837-2021 PUBLIC WORKS LAKE DRIVE RECORD FROM: CITY OF ENCINITAS- 11039 ROS 18416 ELEVATION: 323.983' DATUM: NAVD88 DAN I EL VALDEZ, PE DATE PLANNING R.C.E. DANIEL J. VALDEZ EXP. NO.: 76074 6 30 24 ICHAEL RIZIC PRINCIPAL ENGINEER 02/06/2023 DATE JILL T. BANKSTON CITY ENGINEER 02/08/2023 DATE SLOPE REPAIR (APN: 260-221-28) REVIEWER PRINCIPAL ENGINEER DATE INSPECTOR SHEET 2 OF 3 `•J Z� po x LL Z� Ir Lu W ZM N Q U Z° 2 Lu Z LLJ L N O= w U' Y Q CONSTRUCTION & POST -CONSTRUCTION BMP PLAN LEGEND DESCRIPTION STD DWG SYMBOL PROPERTY LINE N45'45_45 "W SILT FENCE SE-1; DETAIL 'R' 13 GRAVEL BAG BERM/BARRIER SE-6; DETAILS 'W' & 'V' Oc=�= DIRECTION/COURSE OF FLOW HAZARDOUS AND CONCRETE WM-6, WM-8 'Z' WM-6 WM-8 WASTE MANAGEMENT DETAIL SANITARY WASTE WM-9; DETAIL 'T' WM-9 (PORTABLE TOILET) INLET PROTECTION SE-10 MATERIALS DELIVERY AND STORAGE AREA WM-1 WM-1 TEMPORARY TRASH/SOLID WASTE WM-5 WM-5 STREET SWEEPING SE-7 (NO SYMBOL) STABILIZED CONSTRUCTION ENTRANCE TR-1 o 00 0 00 0 STANDARD DRAWINGS (SE-5, WM-5, ETC.) CAN BE FOUND AT THE CALIFORNIA STORMWATER QUALITY ASSOCIATION (CASQA) WEBSITE. https://www.cosga.orglresources/bmp-handbooks/construction CONSTRUCTION BEST MCI NCI GEMENT PRACTICES (BMP) NOTE EROSION CONTROL MEASURES (E.G. BONDED FIBER MATRIX, VEGETATIVE COVER, JUTE MATTING) MUST BE IMPLEMENTED WHERE APPLICABLE TO PREVENT SOIL EROSION ON SITE. SEDIMENT CONTROL MEASURES (E.G. SILT FENCING, FIBER ROLLS, DETENTION BASINS) MUST BE IN PLACE TO PREVENT ERODED SOIL FROM LEAVING SITE. MATERIALS MANAGEMENT BMP MUST ALSO BE FOLLOWED TO ENSURE NO CONTACT OF RAINWATER WITH MATERIALS THAT MAY CONTRIBUTE TO WATER QUALITY DEGRADATION DOWNSTREAM (E.G. CONCRETE OR STUCCO WASHOUT AREAS, COVERED STORAGE AREAS FOR HAZARDOUS MATERIALS, PLACEMENT OF PORTABLE TOILETS OVER A PERVIOUS SURFACE). POST -CONSTRUCTION BEST MANAGEMENT PRACTICES (BMP) NOTE NO DIRECTLY CONNECTED IMPERVIOUS AREAS (DCIA) SHALL BE ALLOWED. DCIA MEANS STORM RUNOFF GENERATED AND CONVEYED VIA IMPERVIOUS AREAS, SUCH AS ROOF, ROOF DRAIN, DRIVEWAY, AND STREET. BMP MEASURES SHALL BE IDENTIFIED ON THE SITE PLAN. MOST COMMON MEASURES ARE DESIGNATED TURF AREAS, WHICH RECEIVE ROOF DRAINS AND RUNOFF FROM IMPERVIOUS AREAS. TURF AND LANDSCAPED AREAS THAT ARE DESIGNED FOR BMP S SHALL BE DELINEATED ON PLANS AND A NOTE PLACED ON PLANS PROHIBITING MODIFICATION OR REMOVAL OF THE BMP LANDSCAPE AREAS WITHOUT A CITY PERMIT. ALLOW 2'-5' AT TOE OF SLOPE FOR SEDIMENT TO ACCUMULATE FILTER BIFFY TWO LEVELS OF SAND OR GRAVEL 4 BAGS - ONE BELOW VISQUEEN, ONE ABOVE (TOSPILLAO E)AIN VISQUEEN SKIRT STAKE SEDIMENT INS TALLA TON STREET SWEEPING PER SE- 7 -:�' + 27 .49 + 2�.53 + 2 DIN ANOODLAI + 285. + 276.47 t I + 27 6.22 + 276.37 - + 21n , - = A-21'44 36 6, �=g70 p0_ L 3 2 INLET 6 -� PROTECTION ��L=301 PER SE-10 ❑ +29.64 �� - + 280.15 CONSTRUCTION (n'P•) ENTRANCE + 8.27 PER TC-1 - - c �O OO p �_ -26. n W W. - a + 27 .8 +275.03 10OOO-I STREET SWEEPING PER SE-7 .66 / + 276.5E \ \ ' 075.3C WM-9 10.0' WATER EASEMENT 6 GRANTED SAN DIEGUITO IRRIGATION DISTRICT RECORDED 10/19/197+22�9,64 FILE NO. 281504 O.R. \ + 275.07 \ 0.0'SEWER EASEMENT + 275.1 RANTED TO CARDIFF SANITATION DISTRICT E OF ED 12/14/1� � 4�}S ENO. 333319 0. R. + 27�.09 + 275.4 275.31 - - 0 1 �- + 2 7.0 7.+ 277.09 ��. + 2 , / / 77// 2*71 60' 30' + 278.3E a8 SILT FENCE PER SE-1 WM-6 WM-8 WM-1 WM-5 + 2BB.39 I I I 1I I ////////�''' I I I I I 11 I I I I LoT!i_8 MAP 7808 i + ❑o O __ �� 91.31 291. 2 HYDROSEEDING PER NOTES BELOW + 307.63 HYDROSEEDING NOTES III. HYDROSEEDING SUSPENSION OR SLURRY COMPOSITION THE SEED SHALL BE ADDED FOLLOWED BY THE FIBER MULCH. FIBER MULCH 1. GENERAL SPECIFICATIONS: SHALL ONLY BE ADDED TO THE MIXTURE AFTER THE SEED AND WHEN THE A. SEED MIXTURE ® REG. RATE PER ACRE. TANK IS AT LEAST ONE-THIRD ()/3) FILLED WITH WATER. THE ENGINE SLOPES HIGHER THAN 3' SHALL BE HYDROSEEDED PER B. CONWEB OR EQUAL VIRGIN SOD CELLULOSE FIBER THROTTLE SHALL BE OPENED TO FULL SPEED WHEN THE TANK IS THE FOLLOWING NOTES. MULCH - 2000 LB/ACRE HALF-FILLED WITH WATER. ALL THE FIBER MULCH SHALL BE ADDED BY THE C.. ECOLOGY CONTROL M-BINDER- 150 LB/ACRE TIME THE TANK IS TWO THIRDS (2/3) TO THREE FOURTHS (3/4) FULL. IRRIGATED SEED MIX FOR PADDED AREAS. SPRAYIN6 SHALL COMMENCE IMMEDIATELY WHEN THE TANK IS FULL. 10 0 10 20 30 IV. APPLICATION PROCEDURES AND EQUIPMENT III II. HYDROSEEDING MIXTURES AND RATES OF APPLICATION C. APPLICATION. DETAIL 'T' HAY = _ - III IRRIGATED HYDROSEED MIX THE OPERATOR SHALL SPRAY THE AREA WITH A UNIFORM, VISIBLE COAT BALE A. EQUIPMENT. BY USING THE GREEN COLOR OF THE FIBER MULCH AS A GUIDE. THE SANITARY TOILET BIFFY) PROTECTION - - - - - - - _ _ BOTANICAL NAME - RATE/ACRE HYDRAULIC EQUIPMENT USED FOR THE APPLICATION OF / - ___ 1 SLURRY SHALL BE APPLIED IN A SWEEPING MOTION IN AN ARCHED tti _ ���������i _ _ SCALE � - / O THE SEED AND SLURRY OF PREPARED FIBER MULCH ' NO SCALE rI - - - _,;,_,;,!,, „=11I-III-I11= STREAM SO AS TO FALL LIKE RAIN, ALLOWING THE WOOD FIBERS TO 11 111 - =1=� 111 111 11I BACK FILL ENCELLA CALIFORNICA - 4 LB/ACRE SHALL BE OF THE "SUPER HYDROSEEDER" TYPE. THIS _ _ II"'� 1i" "'-" _ _ BUILD ON EACH OTHER. CONTINUE APPLICATION UNTIL A GOOD COAT IS 11=III=11 IIIIIIIIII �_�_�_� -III=III=1 ESCHSCHOLZIA CALIFORNICA - 4 LB ACRE I�I°=11111-111-°- / EQUIPMENT SHALL HAVE A BUILT-IN AGITATION '='���� _rrll� III III I ACHIEVED AND THE MATERIAL IS SPREAD AT THE REQUIRED RATE PER STRENGTHENING III ISOMERIS ARBORIA - 5 LB ACRE SYSTEM AND OPERATING CAPACITY SUFFICIENT TO / III III II III III ISOCOMA MENZIESIL - 3 LB/ACRE AGITATE, SUSPEND AND HOMOGENEOUSLY MIX A ACRE. GRAVEL BAGS II -III-III= GRAVEL BAGS GRADE LASTHENIA GALBRATA - 2 LB ACRE SLURRY CONTAINING NOT LESS THAN 40# OF FIBER III III OVERLAP ENDS / D. ALL BARE SPOTS SHALL BE RESEEDED WITH SAME HYDROSEED AND OVERLAP ONTO III=III= LOTUS SCOPARIUS - 8 LB ACRE MULCH FOR EACH 100 GALLONS OF WATER. THE CURB OR SIDE M CURB OR SIDE KEY IN FILTER FABRIC A / SUSPENSION COMPOSITION WITHIN THIRTY (30) DAYS TO THE SLURRY DISTRIBUTION LINES SHALL BE LARGE ENOUGH OF TRAVELWAY STAKE --- - -- -- - - -- LUPINUS SUCCULENTUS - 5 LB/ACRE SATISFACTION OF THE OWNER. MINIMUM OF 6' BELOW TO PREVENT STOPPAGE AND SHALL BE EQUIPPED WITH THE GROUND SURFACE OFF - - MIMULUS PUNICEUS - 4 LB/ACRE A SET OF HYDRAULIC SPRAY NOZZLES WHICH WILL AND 6 ACROSS, THEN 1=III=III=11I SALVIA APIANA - 4 LB ACRE 2. GRADED DISTURBED OR ERODED AREAS TO BE TREATED WITH " / PROVIDE A CONTINUOUS NON -FLUCTUATING BACKFILL WITH DIRT OR 11111111 SISYRINCHIUM BELLUM - 2 LB/ACRE DISCHARGE. THE SLURRY TANK SHALL HAVE A NON-IRRGATED HYDROSEED MIX SHALL RECEIVE AN INTERIM GRAVEL III III TOTAL 41 LB ACRE MINIMUM CAPACITY OF 1,500 GALLONS AND SHALL BE BIN DER/TACKIFIER AS NEEDED BETWEEN APRIL 2ND AND AUGUST 31ST FILTER -III RUNOFF MOUNTED ON A TRAVELING UNIT, EITHER FOR DUST EROSION CONTROL AND SUBSEQUENT APPLICATION OF STAKE FABRIC = -III NON -IRRIGATED SEED MIX FOR PADDED AREAS. SELF-PROPELLED OR DRAWN BY A SEPARATE UNIT, HYDROSEED MIX DURING THE RAINY SEASON BETWEEN OCTOBER 1ST AND 5 FT MIN. ��_ II USE SAME SEED MIX AS NOTED ABOVE. GRADED, WHICH WILL PLACE THE SLURRY TANK SPRAY NOZZLES APRIL 1ST. IIIII'' " "I I-III=11I-III ANCHORING DISTURBED, OR ERODED AREAS THAT WILL NOT BE PAVED, WITHIN SUFFICIENT PROXIMITY TO THE AREAS TO BE "'-"'-"'-" =III=III- COVERED BY A STRUCTURE, OR PLANTED FOR A PERIOD SEEDED. -III-III-III=III=11 ___��� III=III II II=III II 1111-I 1= 3. PROPOSED HYDROSEED MIX IS FOR EROSION CONTROL PURPOSES ONLY. RUNOFF -III=-II��� OF OVER 90 DAYS SHALL BE TEMPORARILY REVEGETATED _„I_III--I-II PRIOR TO ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, IT SHALL BE III III GAP BETWEEN BAGS WITH A NON -IRRIGATED NATIVE HYDROSEED MIX, GROUND B. PREPARATION. GAP BETWEEN BAGS - THE RESPONSIBILITY OF THE PERMITTEE OR SUBSEQUENT OWNER TO I=11 IIIIII=III=III ACTS AS SPILLWA COVER, OR EQUIVALENT MATERIAL. NO SEED THE SLURRY PREPARATION SHALL TAKE PLACE AT THE ACTS AS SPILLWAY THREE LAYERS OF GRAVEL BAGS =11I I1 III III BACK FILL -- - - SUBSTITUTIONS WILL BE ALLOWED WITHOUT PRIOR EXPRESS SITE OF WORK AND SHALL BEGIN BY ADDING WATER INSTALL ALL LANDSCAPE IN ZONE ONE CONSISTENT WITH THE BRUSH WITH ENDS OVERLAPPED II III (IIIIII - -__- WRITTEN AUTHORIZATION FROM THE LANDSCAPE TO THE TANK WHEN THE ENGINE IS AT MANAGEMENT REGULATIONS -SECTION 142.0412-LDC. ALL PLANT _ - � � ARCHITECT. ALL SEEDS ARE AVAILABLE AT S&S SEEDS - HALF -THROTTLE. WHEN THE WATER LEVEL HAS MATERIAL IN ZONE ONE SHALL BE IRRIGATED WITH A PERMANENT, DETAIL IX/ DETAIL 'R' DETAIL V (805) 684-0456. REACHED THE HEIGHT OF THE AGITATOR SHAFT, GOOD BELOW -GRADE IRRIGATION SYSTEM. THE SYSTEM SHALL BE AUTOMATIC, GR�I VEL BSI GS ON TRA VEL IX/�I YS NO SCALE SILT FENCE INSTALLATION NO SCALE GRAVEL BAGS BARRIER NO SCALE RECIRCULATION SHALL BE ESTABLISHED AND, AT THIS ELECTRICALLY CONTROLLED, AND DESIGNED TO PROVIDE WATER TO ALL TIME, REQUIRED PLANTINGS TO MAINTAIN THEM IN A HEALTHY, DISEASE -RESISTANT CONDITION. CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT DESIGNED BY: DRAWN BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. Dv Dv Dv DESCRIPTION: 2.5" CITY OF ENCINITAS BRASS DISK ENC-39 � LOCATION: TOP OF CURB, NORTHWEST QUADRANT OF BIRMINGHAM DR & LAKE DRIVE RECORD FROM: CITY OF ENCINITAS- #1039 ROS 18416 ELEVATION: 323.983' DATUM: NAVD88 INT. DATE PLANS PREPARED UNDER SUPERVISION OF DATE • 12 19 22 R.C.E. NO.: 76074 DANIEL J. VALDEZ EXP. 6 30 24 RECO MENDED: RECOMMENDED: Jill T. GRADING PLAN FOR: WOODLAKE DRIVE PARK PLACE BLUFFS SLOPE REPAIR (APN: 260-221-28) LDEV-015837-2021 PUBLIC WORKS DANIEL VALDEZ, PE DATE PLANNING _ N41CHAEL RIZIC JILL T. BANKSTON PRINCIPAL ENGINEER CITY ENGINEER 02/06/2023 02/08/2023 REVIEWER PRINCIPAL ENGINEER DATE INSPECTOR DATE DATE SHEET 3 OF 3