Loading...
2021-14425 G (Plans)DRAWING NO. SHEET 2 OF 5 CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARK LWD SEWER NOTES 1.LWD APPROVAL OF THESE PLANS DOES NOT RELIEVE THE APPLICANT, PRIVATE ENGINEER OF WORK, OR CONTRACTOR FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING OR AFTER CONSTRUCTION. 2. ALL DESIGN, MATERIALS, AND CONSTRUCTION WORK SHALL CONFORM TO THE LEUCADIA WASTEWATER DISTRICT LWD SEWER STANDARDS AND TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK) AND THE REGIONAL STANDARD DRAWINGS, MOST CURRENT EDITIONS. IN THE EVENT OF CONFLICT THE LWD SEWER STANDARDS GOVERN. 3. OSHA SAFETY ORDERS AND OSHA CONFINED SPACE ENTRY REQUIREMENTS SHALL BE FOLLOWED AT ALL TIMES WITHOUT EXCEPTION. 4. THE CONTRACTOR SHALL HAVE A COPY OF THE SEWER NOTES 2. & 3. DOCUMENTS ON THE JOB SITE AT ALL TIMES. 5. THE CONTRACTOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE OF FINAL ACCEPTANCE BY LWD AND SHALL REPAIR OR REPLACE ANY WORK THAT MAY PROVE DEFECTIVE IN WORKMANSHIP AND/OR MATERIALS WITHIN THE ONE YEAR PERIOD WITHOUT EXPENSE WHATSOEVER TO LWD. 6. QUANTITIES SHOWN HEREON ARE FOR BOND ESTIMATE PURPOSES ONLY. NEITHER THE PRIVATE ENGINEER NOR LWD GUARANTEE THE ACCURACY OR COMPLETENESS OF THE SEWER QUANTITIES. 7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS REPRESENTING ALL MATERIALS AND SUPPLIES SATISFACTORY TO LWD. WORK SHALL NOT COMMENCE UNTIL SUCH MATERIALS ARE APPROVED BY LWD. 8. PRIOR TO BEGINNING SEWER WORK, THE LWD INSPECTOR SHALL BE FURNISHED A SETS OF CUT SHEETS AND THE CONTRACTOR SHALL COMPLY WITH LWD STANDARD SPEC SURVEY REQUIREMENTS. 9. PRIOR TO START OF WORK, CONTRACTOR SHALL SECURE A LWD PERMIT FOR CONSTRUCTION, SUBMIT SHOP DRAWINGS FOR ALL MATERIALS FOR REVIEW & APPROVAL, SCHEDULE AND ATTEND A PRECONSTRUCTION MEETING PER APPENDIX V OF STD SPEC, PROVIDE 3-WEEK LOOK AHEAD SCHEDULE(S) FOR ALL SEWER WORK THRU-OUT PROJECT IN ADDITION TO 72 HOURS NOTICE OF NEED FOR EACH INSPECTION. 10. NO WORK SHALL BE COMMENCED UNTIL ALL RIGHT-OF-WAY AND OTHER REQUIRED PERMITS HAVE BEEN OBTAINED FROM THE JURISDICTIONAL CITY, COUNTY, AND/OR OTHER APPROPRIATE AGENCIES. 11. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL PLAN TO THE DISTRICT ENGINEER SHOWING THE DESIGN OF SHORING, BRACING, SLOPING, OR OTHER PROVISIONS TO BE MADE FOR PROTECTION OF WORKERS FROM THE HAZARD OF CAVING GROUND DURING TRENCH EXCAVATION AND PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET OR MORE IN DEPTH. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8, CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE LWD INSPECTOR PRIOR TO EXCAVATION. 12. ALL SEWER FACILITIES SHALL BE INSTALLED IN DRY EXCAVATIONS AND TRENCHES. CONTRACTOR SHALL DEWATER AND MAINTAIN DEWATERING CONTINUOUSLY UNTIL THE WORK IS COMPLETED INCLUDING PLACEMENT AND COMPACTION OF BACKFILL MATERIALS IN A DRY STATE. ALL PIPE ZONE MATERIAL LOCATED IN WET OR AREAS SUSPECTED TO BE WET IN THE FUTURE SHALL BE ENCASED IN GEOTEXTILE MATERIAL. SUITABLE GEOTEXTILE MATERIAL SHALL BE SUBMITTED TO THE DISTRICT ENGINEER FOR REVIEW AND APPROVAL. CONTRACTOR SHALL OBTAIN DEWATERING PERMITS AS NECESSARY AND RETURN OF GROUNDWATER TO THE SEWER SHALL NOT BE ALLOWED. 13. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES SHOWN ON THESE PLANS WAS OBTAINED BY AVAILABLE RECORDS SEARCH BY THE PRIVATE ENGINEER. TO THE BEST OF THE PRIVATE ENGINEER'S KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER UTILITIES OR STRUCTURES NOT SHOWN, OR IN A DIFFERENT LOCATION FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR SHALL TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. 14. APPROVAL OF THIS PLAN BY LWD DOES NOT CONSTITUTE A REPRESENTATION OF THE ACCURACY OF THE LOCATION OF, OR THE EXISTENCE OR NONEXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE, OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 15. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (800) 422-4133, AS REQUIRED BY STATE LAW. ALL UTILITY CROSSINGS SHALL BE POT HOLED PRIOR TO TRENCHING. 16. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL LOCAL, STATE, AND FEDERAL SAFETY REGULATIONS INCLUDING, BUT NOT LIMITED TO, TRENCH SAFETY AND CONFINED SPACE ENTRY 17. SOILS REPORTS SHALL BE SUBMITTED TO LWD BY A QUALIFIED SOILS ENGINEER WHICH CERTIFIES THAT TRENCH BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS ENGINEER IN ACCORDANCE WITH ON SITE EARTHWORK SPECIFICATIONS AND THE LWD STANDARD SPEC. 18. SEWER ELEVATIONS SHOWN ARE INVERT ELEVATION (I.E.), INSIDE BOTTOM OF PIPE. SEWER LENGTHS SHOWN ARE FROM CENTER OF MANHOLE TO CENTER OF MANHOLE. 19. ALL REVISIONS TO DRAWINGS SHALL BE APPROVED BY THE LWD DISTRICT ENGINEER AS CONSTRUCTION CHANGES TO THE ORIGINAL MYLAR DWGS. WITH INITIALED APPROVAL ON THE MYLARS. 20. CONTRACTOR IS RESPONSIBLE FOR KEEPING COMPLETE RECORD OF CHANGES AND SHALL MAKE SUCH RECORD AVAILABLE TO THE PRIVATE ENGINEER. THE PRIVATE ENGINEER SHALL PROVIDE AS-BUlLT DRAWINGS TO LWD FOR REVIEW AND APPROVAL PRIOR TO FINAL ACCEPTANCE OF THE PROJECT. 21. LENGTH OF OPEN TRENCH SHALL BE LIMITED TO 350 FEET, INCLUDING COLLECTORS AND LATERALS, UNLESS OTHERWISE APPROVED IN WRITING BY THE DISTRICT. TRENCH SHALL BE BACKFILLED OR PLATED AT THE CONCLUSION OF EACH DAY OF WORK. 22. THE CONTRACTOR SHALL PROTECT ALL SURVEY MONUMENTATION. IF ANY SURVEY MONUMENTS ARE DISTURBED OR DESTROYED, THE CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR TO REESTABLISH AND RECORD THE MONUMENT CHANGE PER STATE LAW. 23. A MINIMUM OF 12-INCHES OF VERTICAL CLEARANCE SHALL BE PROVIED BETWEEN THE SEWER PIPE AND ANY OTHER UTILITIES. EXIST. SEWER CROSSED WITHIN 3-FT VERTICAL ABOVE OR BELOW SHALL BE CCTV INSPECTED BOTH BEFORE AND AFTER THE CROSSING WORK IS COMPLETED FOR LWD REVIEW, APPROVAL, & RETENTION OF DIGITAL VIDEO FILES. ANY DAMAGED LWD FACILITIES SHALL BE REPAIRED TO LWD SATISFACTION AT NO COST TO LWD INCLUDING ADDITIONAL CCTV INSPECTION. 24. SEPARATION OF SEWER I WATER AND SEWER I RECLAIMED WATER SHALL COMPLY WITH LWD STD DWG S-2 AND WITH ALL COUNTY AND STATE HEALTH DEPT REGULATIONS 25. CONNECTIONS TO EXISTING SEWER PIPE OR MANHOLES SHALL ONLY BE DONE IN THE DIRECT PRESENCE OF THE LWD INSPECTOR. NEW SEWER SHALL NOT BE CONNECTED OR ALLOWED TO FLOW TO EXISTING SEWER UNTIL AFTER FINAL ACCEPTANCE OF ALL UPSTREAM WORK BY THE LWD INSPECTOR, OR AS APPROVED BY DISTRICT ENGINEER. 26. ALL SERVICE LATERALS SHALL BE LOCATED AT RIGHT ANGLES TO THE SEWER MAIN UNLESS OTHERWISE SHOWN AS APPROVED BY LWD ON THE PLANS. 27. A 2-INCH HIGH "S" SHALL BE INSCRIBED ON THE CURB FACE AT EACH LATERAL LOCATION BY THE CONTRACTOR. 28. ALL PIPE SHALL BE HANDLED AND INSTALLED SO AS TO PROTECT PIPE, JOINTS, LINING, AND COATING. THE PIPE SHALL BE CAREFULLY BEDDED TO PROVIDE CONTINUOUS BEARING AND PREVENT UNEVEN SETTLEMENT. PIPE SHALL BE PROTECTED AGAINST FLOTATION AT ALL TIMES. OPEN ENDS OF PIPE SHALL BE SEALED AT ALL TIMES WHEN CONSTRUCTION IS NOT IN PROGRESS. 29. PIPE JOINTS SHALL NOT BE DEFLECTED UNLESS SO DESIGNED AND SHALL THEN BE LIMITED TO LESS THAN ONE-HALF OF THE ANGLE RECOMMENDED BY THE PIPE MANUFACTURER. 30. SEWER PIPE ZONE AND TRENCH BACKFILL SHALL BE PER THE LWD SEWER STANDARDS. WATER JETTING SHALL NOT BE ALLOWED. 31. ALL LATERALS SHALL BE CONSTRUCTED CLEAR OF DRIVEWAYS. 32. JOB MIXING OF CONCRETE IS NOT ALLOWED WITHOUT EXCEPTION. CONCRETE TESTING BY LWD WILL BE AT CONTRACTOR EXPENSE. LWD SEWER NOTES (CONTINUED) 33. MANHOLE BASES SHALL BE MONOLITHICALLY PLACED, FINISHED, AND COMPLETED AT TIME OF PLACEMENT. GPK PRODUCTS, INC., OR APPROVED EQUAL, MANHOLE ADAPTERS SHALL BE SET IN THE BASE FOR EACH PIPE CONNECTION. SETTING OF MH RINGS SHALL NOT BE ALLOWED FOR 48 HOURS AFTER CONCRETE PLACEMENT. PRECAST MANHOLE BASES ARE ACCEPTABLE FOR USE WITH DISTRICT APPROVAL. 34. JOINTS BETWEEN MH BASE, SHAFTING, CONE SECTIONS, AND RING SHALL HAVE A 2" BY 2" BUTYL RUBBER GASKET PLACED WITHIN THE FULL CIRCUMFERENCE. GASKET SHALL BE CPS-210 BY PRESS-SEAL GASKET CORP., OR APPROVED EQUAL. 35. ALL MANHOLES SHALL BE VACUUM TESTED 1) BEFORE BACKFILL, 2) AFTER BACKFILL, AND 3) SUBSEQUENT TO ANY SUSPECTED MOVEMENT OR DAMAGE AFTER BACKFILL. 36. ALL SEWERS AND LATERALS SHALL BE WAYNE BALLED OR JETTED, LOW PRESSURE AIR TESTED, AND TELEVISED AT THE APPLICANT/CONTRACTORS EXPENSE PRIOR TO CONSIDERATION FOR FINAL ACCEPTANCE BY LWD. AIR TEST SHALL BE DONE AFTER CONSTRUCTION OF ALL OTHER UTILITIES AND UTILITY LATERALS. 37. ALL SEWERS AND LATERALS SHALL BE IN PLACE AND SHALL HAVE FINAL APPROVAL BY THE LWD INSPECTOR PRIOR TO BACKFILL. 38. MANHOLES SHALL BE 4-FEET DIAMETER FOR PIPE UP TO 15-INCH DIAMETER PER LWD STD DWG S-3. MANHOLES SHALL BE 5-FEET DIAMETER FOR PIPE 18-INCHES AND LARGER OR 12-FEET OR GREATER DEPTH PER LWD STD DWG S-4. 39. ALL NEW MH SHAFTS AND PRECAST MH BASES SHALL BE LINED WITH AN INTEGRALLY LOCKING PVC (T-LOCK) PROTECTIVE LINING SYSTEM. ALL EXISTING MH'S WITH MODIFICATIONS AND NEW CAST-IN-PLACE MH BASES SHALL BE PROVIDED WITH EPOXY LINING SYSTEM. LINING SYSTEM TO MATCH EXISTING LINING, IF ANY. T-LOCK, EPOXY LINING SYSTEMS SHALL BE PER SECT 500-2 OF THE GREENBOOK. A MINIMUM OF FIFTEEN PERCENT (15%) OF MANHOLES AND NOT LESS THAN ONE (1) WITH EPOXY LINERS SHALL SUCCESSFULLY PASS PULL-TEST AND BE REPAIRED UNTIL PASSING. 40. MAXIMUM DEPTH OF SEWER FOR SDR 35 PVC PIPE IS 15'. C900 PIPE IS REQUIRED FOR DEPTH OF COVER OVER 15'. 41. FINAL APPROVAL OF PLANS BY DISTRICT ENGINEER IS VALID FOR A PERIOD OF TIME NOT TO EXCEED ONE YEAR FROM APPROVAL DATE TO START OF CONSTRUCTION. IF THE ONE YEAR TIME LIMIT IS EXPIRED PRIOR TO START OF CONSTRUCTION THE DEVELOPER SHALL RESUBMIT THE PLAN CHECK TO THE DISTRICT ENGINEER FOR AN UPDATED REVIEW AND APPROVAL. ANY CHANGES REQUIRED TO THE PLANS SHALL BE MADE AT THE DEVELOPERS EXPENSE AND APPROVED BY THE LWD DISTRICT ENGINEER PRIOR TO THE START OF CONSTRUCTION. 42. WHEN CONNECTION TO AN EXISTING MANHOLE IS NECESSARY AND SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL CONNECT TO EXISTING MANHOLE STRUCTURES AND CONSTRUCT THE NEW FLOW-THROUGH CHANNELS IN EACH MANHOLE BASE TO ACCOMMODATE THE NEW SEWER LINES AS REQUIRED. SMOOTH TRANSITIONS SHALL BE INSTALLED FROM THE INVERTS OF NEWLY INSTALLED PIPES TO THE EXISTING MANHOLE STRUCTURES. MANHOLES SHALL BE CORE DRILLED AND MANHOLE CONNECTION FITTINGS SHALL BE CONNECTED TO THE CORE DRILLED HOLE BY LINK-SEAL, OR APPROVED EQUAL. THE FIRST FLEXIBLE JOINT SHALL BE LOCATED WITHIN ONE-FOOT OF THE MANHOLE BASE. JACK HAMMERING SHALL NOT BE ALLOWED. 43. ALL NEW CONNECTIONS TO EXISTING SEWER SHALL BE MADE TO EXISTING WYES OR SHALL BE MADE BY INSTALLING NEW MANUFACTURED WYES. FOR INSTALLING NEW MANUFACTURED WYES, STANDARD BELL AND SPIGOT OR PLAIN END WYES AND PLAIN END PIPE SPOOLS MATCHING THE ADJACENT EXISTING PIPE MAY BE USED FOR INSERTING WYES INTO AN EXISTING SEWER. GASKETED PVC SADDLE WYES MAY BE USED FOR EXISTING SEWER MAINS 12-INCHES AND LARGER. ALL CONNECTIONS NOT MADE TO EXISTING WYES MUST BE IN ACCORDANCE WITH LWD STANDARD DRAWING S-32. 44. IF NECESSARY DURING THE LATERAL CONNECTION WORK, UPSTREAM FLOW IN THE EXISTING SEWER SHALL BE TEMPORARILY PLUGGED AND BY-PASSED. A BY-PASS PLAN IN ACCORDANCE WITH LWD STANDARD DRAWING S-32 MUST BE REVIEWED AND APPROVED BY THE LWD DISTRICT ENGINEER PRIOR TO INSTALLING THE TEMPORARY PLUG 45. FOR CONNECTION OF PLAIN END TO PLAIN END PVC SEWER, REPAIR COUPLINGS SHALL BE MADE OF PVC MATERIAL MEETING THE SAME MATERIAL REQUIREMENTS AS THE PIPE BEING REPAIRED. PVC SEWER REPAIR COUPLINGS SHALL BE RUBBER GASKETED WITH NO CENTER STOP. PIPE ENDS SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF THE REPAIR COUPLING(S). THE REPAIR COUPLING SHALL BE SLIPPED ALL THE WAY ON TO ONE PLAIN END PIPE, THEN THE PIPE AND ADJOINING PIPES SHALL BE ALIGNED TOGETHER AND THE REPAIR COUPLING SLIPPED BACK INTO A POSITION EQUALLY SPACED BETWEEN THE TWO PLAIN END PIPES. PVC SEWER REPAIR COUPLINGS SHALL BE AS MANUFACTURED BY PW PIPE OR EQUAL APPROVED BY THE LWD DISTRICT ENGINEER. 46. PVC OR VITRIFIED CLAY PIPE (VCP) SEWER PIPE AND WYES MAY BE USED TO TIE-IN TO EXISTING VCP. FOR CONNECTION OR REPAIR OF PLAIN END VCP TO VCP OR VCP TO PVC A FERNCO SERIES 5000 COUPLING OR APPROVED EQUAL SHALL BE USED 47. FOR CONNECTION OF NEW LATERALS TO EXISTING PIPE GREATER THAN 8-INCH DIAMETER CONTRACTOR SHALL CUT IN A NEW WYE PER ABOVE OR MAY USE A SUITABLY SIZED SEWER SADDLE WYE PER STD. DWG. S-32. 48. CONTRACTOR SHALL BE AWARE THAT LWD FACILITIES PROVIDE WASTEWATER CONVEYANCE, TREATMENT, AND DISPOSAL TO THE PUBLIC 24 HOURS A DAY, 365 DAYS A YEAR. THEREFORE, LWD OR THEIR CONTRACTORS MAY NEED ACCESS TO FACILITIES FOR OPERATIONS, MAINTENANCE, OR EMERGENCY REPAIR AT ANY TIME. THE CONTRACTOR WILL ENSURE THAT ACCESS TO THE FACILITIES IS MAINTAINED AT ALL TIMES (DURING CONSTRUCTION AND AT THE END OF EACH CONSTRUCTION DAY) AND SHALL NOT HINDER AND WOULD BE EXPECTED TO ASSIST WITH ACCESS WHILE WORKING AROUND LWD FACILITIES. 49. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT LWD FACILITIES AND STRUCTURES DURING CONSTRUCTION. SHOULD THE CONTRACTOR AT ANY TIME DAMAGE LWD OR PRIVATE SEWER LATERAL FACILITIES, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, NOTIFY LWD, MINIMIZE AND CONTROL ANY SEWAGE SPILL, AND REPAIR DAMAGED FACILITIES TO THE SATISFACTION OF THE LWD ENGINEER AT NO COST TO LWD INCLUDING INSPECTION AND ANY BYPASSING REQUIRED. DAMAGE CAUSED TO SEWER FACILITIES SHALL BE REPAIRED IN ACCORDANCE WITH ALL APPLICABLE LWD STANDARD SPECIFICATIONS AND DRAWINGS. SUBMIT FOR LWD APPROVAL PRIOR TO REPAIR. 50. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PREVENTING SEWAGE SPILLS; CONTAINING ANY SEWAGE SPILLS; RECOVERY AND LEGAL DISPOSAL OF ANY SPILLED SEWAGE ARISING FROM ANY WORK ADJACENT TO LWD FACILITIES OR ALLOWING A SEWAGE SPILL OR FAILURE TO PREVENT A SEWAGE SPILL WHILE PERFORMING THE WORK. CONTRACTOR WILL BE RESPONSIBLE FOR ALL CLEAN-UP COSTS AND PENALTIES ASSESSED TO THE DISTRICT AS A RESULT OF A SEWAGE SPILL CAUSED BY THE CONTRACTOR. 51. CONTRACTOR SHALL NOTIFY LWD A WEEK IN ADVANCE OF PLANNED CONSTRUCTION ACTIVITIES IN THE AREA OF WORK POTENTIALLY AFFECTING LWD SEWER FACILITIES. 52. CONTRACTOR SHALL NOTIFY LWD 48 HOURS PRIOR TO EXCAVATION OF SEWER UNDER CROSSINGS, OVER CROSSINGS, OR PARALLEL INSTALLATIONS WHERE SEWER MAY BE EXPOSED. 53. PLANS APPROVED ON THE CONDITION THAT THE PROPERTY IS ANNEXED INTO THE LEUCADIA WASTEWATER DISTRICT PRIOR TO THE CONNECTION OF THE PROPOSED SEWER TO THE LWD SYSTEM. AS-BUILT APPROVALS 8" SEWER IN ORPHEUS AVENUE AND SUNSET DRIVE WORK TO BE DONE THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE ACCORDING TO THESE PLANS AND THE LEUCADIA WASTEWATER DISTRICT STANDARD SPECIFICATIONS AND PROCEDURES DATED MAY 2019 AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK) LEGEND ITEM STD. DWG.SYMBOL QUANTITY 8" PVC SEWER MAIN SDR35 AND TRENCH RESURFACING PER CITY OF ENCINITAS ENGINEERING DESIGN MANUAL, PAGE 450 S-11, S-12 810 LF SEWER MANHOLE S-3, S-31, S-33 5 EA 4" PVC SEWER LATERAL S-17, S-25 2 EA CURRENT EDITION, AS MODIFIED BY LWD. SAN DIEGUITO WATER DISTRICT NOTES: 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). THE CONTRACTOR SHALL AND HEREBY DOES GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE OF ACCEPTANCE. 2. THE CONTRACTOR SHALL NOTIFY THE DISTRICT'S INSPECTION DEPARTMENT 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE FOR INSPECTION OF PROJECT. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 633-2709. ALL WORK PREFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. 3. THE CONTRACTOR WILL BE REQUIRED TO SCHEDULE A MANDATORY PRE-CONSTRUCTION CONFERENCE WITH THE SAN DIEGUITO WATER DISTRICT INSPECTOR PRIOR TO COMMENCEMENT OF WORK ON WATER IMPROVEMENTS. PHONE: (760) 633-2709. 4. UNLESS OTHERWISE NOTED, ALL CONNECTIONS TO EXISTING MAINS WILL BE MADE BY THE CONTRACTOR, UNDER THE SUPERVISION OF SAN DIEGUITO WATER DISTRICT, AFTER PAYMENT OF THE ESTIMATED COST BY THE DEVELOPER. 5. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN PROFILE, TOP OF PIPE PROFILE IS 48 INCHES BELOW CENTERLINE FINISH GRADE OF STREET. 6. ALL SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS. 7. CONTRACTOR TO FURNISH ONE INCH COPPER WATER SERVICE AND METER BOX FOR EACH RESIDENTIAL LOT. 8. CONTRACTORS SHALL ACQUIRE A TRENCHING PERMIT FROM THE CALIFORNIA DIVISION OF SAFETY FOR ALL TRENCH WORK. 9. INSTALL FIRE HYDRANTS 2.5 FEET FROM FACE OF CURB, IF NO SIDEWALK EXISTS, OR 7 FEET FROM FACE OF CURB WHERE SIDEWALK EXISTS OR WILL BE CONSTRUCTED. 10. PROVIDE AIR RELEASE ASSEMBLIES AT ALL HIGH POINTS IN WATER MAIN. 11. CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE CITY OF ENCINITAS FOR ANY EXCAVATION WITHIN EXISTING CITY RIGHTS-OF-WAY. 12. THE DISTRICT REQUIRES THAT COMPACTION TESTS BE TAKEN WHERE WATER LINES ARE INSTALLED WITHIN EXISTING COUNTY RIGHTS-OF-WAY, CITY OF ENCINITAS RIGHTS-OF-WAY, OR PRIVATE EASEMENTS, AND THE RESULTS APPROVED BY THE CITY OF ENCINITAS, BEFORE THE WATER LINES ARE ACCEPTED AND A COPY SENT TO THE SAN DIEGUITO WATER DISTRICT OFFICE. 13. PRIOR TO AWARDING WATER LINE CONTRACT, OWNER SHALL ADVISE PROSPECTIVE CONTRACTORS TO OBTAIN AND REVIEW CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) SPECIFICATIONS. 14. FILL AREAS MUST BE COMPACTED TO 90%, PRIOR TO PIPE INSTALLATION. 15. APPROVAL OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE A REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 16. ALL EXISTING FACILITIES WHICH MAY EFFECT FINAL DESIGN, I.E., LINE CROSSINGS, LINE PARALLELING, OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSINGS WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 17. WATER CONNECTIONS TO COMMERCIAL DEVELOPMENTS SHALL HAVE AN APPROVED BACKFLOW DEVICE INSTALLED TO THE DISTRICT'S SATISFACTION AND CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. BACKFLOW DEVICES ARE TO BE INSTALLED DIRECTLY OUTSIDE CITY OR COUNTY RIGHT-OF-WAY OR OUTSIDE WATER DISTRICT EASEMENT. REPAIR, MAINTENANCE AND ANNUAL TESTING OF BACKFLOW DEVICE ARE RESPONSIBILITY OF OWNER. 18. MINIMUM HORIZONTAL SEPARATION OF 10 FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 19. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 20. CONTRACTOR AND DEVELOPER ARE RESPONSIBLE TO RELOCATE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) THAT ARE EFFECTED BY THEIR PROJECT. 21. CONTRACTOR TO SUPPLY DOCUMENTATION SHOWING THAT ANY ASBESTOS WATER PIPES REMOVED FROM THE GROUND WERE DISPOSED OF IN A MANNER ACCEPTABLE TO THE SAN DIEGO COUNTY WASTE DIVISION. 22. USE THE FOLLOWING VARIOUS COMBINATIONS OF PLAIN END PIPE LENGTHS WITH HIGH DEFLECTION COUPLINGS AND INTEGRAL BELL END PIPE FOR CURVED ALIGNMENTS IN BOTH HORIZONTAL AND VERTICAL DIRECTIONS. DO NOT BEND PIPE BETWEEN COUPLINGS. SAW CUT INTEGRAL BELL END OF STANDARD PIPE AND BEVEL END FOR USE WITH DEFLECTION COUPLINGS. USE 9.5-FOOT PLAIN END PIPE LENGTHS WITH DEFLECTION COUPLINGS FOR ALL RADII BETWEEN 140 FEET TO 270 FEET. USE 19-FOOT PIPE LENGTHS WITH DEFLECTION COUPLINGS FOR ALL RADII BETWEEN 270 FEET TO 560 FEET. USE AND INTEGRAL BELL END PIPE LENGTH JOINED TOGETHER WITH A 19-FOOT PLAIN END PIPE LENGTH TO FORM A CHORD. USE DEFLECTION COUPLINGS ON EACH END OF THE CHORD AND CONTINUE THIS COMBINATION THROUGH THE CURVED ALIGNMENT FOR ALL RADII BETWEEN 560 FEET TO 1,150 FEET. PIPE LENGTHS SHORTER THAN 9 FEET WILL NOT BE USED UNLESS SPECIFICALLY AUTHORIZED THE BY THE DISTRICT'S REPRESENTATIVE. 1. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO-LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECT JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO-LEAD BRASS PARTS. 2. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18. 3. WATER SERVICES TO BE ABANDONED THAT ARE CONNECTED TO PIPELINES THAT WILL REMAIN IN SERVICE SHALL BE DISCONNECTED AT THE CORPORATION STOP, SHALL HAVE THE CORPORATION STOP REMOVED AND SHALL HAVE A BRASS PLUG INSTALLED; OR BE ABANDONED AS DIRECTED BY THE SDWD INSPECTOR. MANHOLE ID NUMBER UPS DWN UPS MH COORDINATES X Y PIPE LENGTH (FT) PIPE DIA. (IN) PIPE MATERIAL SLOPE (%) LOCATION OF MANHOLE (ADDRESS) UPSTREAM DOWNSTREAM ADDRESS DESCRIPTION MH RIM EL. (FT) MH INVERT EL. (FT) UPS DWN MH DEPTH (FT) MANHOLE TYPE (ANG,STD,DE,DRP,SMT) UPS DWN UPS DWN MH LINING UPS DWN UPS DWN NOTES: ADDRESS DESCRIPTION G G G G GGGGG WWWWWWWWGGGTTTT GGSSSVULCAN AVENUEWORPHEUS AVENUE GEEEEWAPN: 256-400-43 APN: 256-400-63 APN: 256-400-62 APN: 256-300-16 APN: 256-300-15 APN: 256-300-14 APN: 256-300-13 APN: 256-400-43 20'35' G APN: 256-400-49 W W W W W WWWWWWWW WWWPROP O SE D 8" P V C SE WE R MANHOLE NO. 01-007912+23.9910+00 CONNECT TO EXISTING SEWER MANHOLE NO. 01-0080. EXISTING MANHOLE TO BE EPOXY LINED PER LWD STD. SPEC DIVISION 2, PART 5. CONNECTION AND PLUG PLAN PER NOTES ON THIS SHEET. 20' ELECTRIC METER ELECTRIC CABINETS ELECTRIC CABINET POWER POLE GUY WIRES 2" AIR RELEASE CLCLCLCL C LR/W R/W 28' R/W 2" GAS APPROXIMATE LOCATION OF WATERMETER PER AS-BUILT PLAN10+00 12+00 13+ 0 0 11+00 POWER POLEEX. LWD 8"PVC SEWEREXISTING 6" ACP WATERPER WO-57-212" GAS2~3" TELE DUCTSEX. LWD 8"PVC SEWER12" WATER6" WATEREXISTING 12" PVC WATERPER WO-93-2912" GAS12" GASDAMAGED STRIPING AND MARKINGS TO BE REPLACED. STOP BAR TO BE REPLACED WITH THERMOPLASTIC. MONUMENT PER ROS 22112 TO BE TIED OUT PRIOR TO CONSTRUCTION AND REPLACED AFTER CONSTRUCTION BY A LAND SURVEYOR. MONUMENT PER ROS 22112 TO BE PROTECTED IN PLACEMONUMENT PER ROS 22112TO BE PROTECTED IN PLACEWATER METERW WATERMETERWWWATER METER CAUTION: OVERHEAD LINES PROPOSED 8" PVC SEWER WATER METER 2'11+80.00 4" SEWER LATERALPER LWD S-1712+31.00 4" SEWER LATERAL PER LWD S-17 DRAWING NO. SHEET 3 OF 5 CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARK 8" SEWER IN ORPHEUS AVENUE AS-BUILT APPROVALS N 0 SCALE: 1"= 60'40'20'10'20' 20' SEE S H E E T 42" GAS EXI S TI N G 6" A C P W A T E R PER W O-54-27 GGGGGGGGGGGGGGGG G G G GE E ORPHEUS AVENUE W G APN: 256-314-49APN: 256-400-39APN: 256-400-44APN: 256-400-43 A P N : 2 5 6 - 4 0 0 - 6 2 A P N : 2 5 6 - 3 0 0 - 1 4 APN: 256-300-13 APN: 256-300-12 APN: 256-300-11 APN: 256-300-29A P N : 2 5 6 - 4 0 0 - 4 3 A P N : 2 5 6 - 4 0 0 - 4 9 W W W W W W W W WWWWWWWWWWWWW W WWWWW W W ORPHEUS AVENUEAPN: 256-300-29APN: 256-300-30 5' PROPOSED 8" PVC SEWER MANHOLE NO. 01-007912+23.99MANHOLE NO. 01-007814+01.0616+00 20'R/W17+002 0 ' E L E C T R I C M E T E R E L E C T R I C C A B I N E T S R/W R/W R/W POW E R PO L E C L CLCL R / W 2 8 ' R /W CL CLAPPROXIMATE LOCATION OF WATER METER PER AS-BUILT PLAN1 2 + 0 0 13+00 15+00 20'MANHOLE NO.01-007716+40.09MANHOLE TO BE CHANNELEDFOR FUTURE SEWEREXTENSION NORTH ONORPHEUS. IE 96.86.POWER POLE R/W M O N UM E N T P E R R O S 2 2 1 1 2 T O B E P R O T E C T E D I N P L A C E DAMAGED STRIPINGTO BE REPLACEDWATERMETERWA T E R M E T E R WATERMETER WWWA T E R M E T E R C A U T I O N : O V E R H E A D L I N E S POWER POLEWWATERMETERWWWATERMETER2'2' 2' C AU T ION :OV E R H E AD L IN E SGU Y W I R E14+31.00 4" SEWER LATERALPER LWD S-1714+95.00 4" SEWER LATERAL PER LWD S-17 10+0 0 C O N N E C T T O E X I S T I N G S E W E R M A N H O L E NO. 0 1 - 0 0 8 0. E X I S T I N G M A N H O L E T O B E E P O X Y L I N E D PER L W D S T D. S P E C D I V I S I O N 2, P A R T 5. C O N N E C T I O N DRAWING NO. SHEET 4 OF 5 CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKAS-BUILT APPROVALS N0 SCALE: 1"= 60'40'20'10'20' 20' 8" SEWER IN ORPHEUS AVENUE EXISTING 12" PVC WATER PER WO-82-102 2" GAS EXISTING 8" PVC WATER PER WO-82-102 S E E S H E E T 3 2 " G A S E X I S T I N G 6 " A C P W A T E R P E R W O - 5 4 - 2 7 SEE SHEET 5 SUNSET DRIVE D A M A G E D S T R I P I N G T O B E R E P L A C E D M O N U M E N T P E R R O S 2 2 1 1 2 T O B E P R O T E C T E D I N P L A C E 14+63.00 4" SEWER LATERALPER LWD S-17 GGGG W E G G SUNSET DRIVE WWWWWWWWWWWWWWWWWWWWWEE WWWGGGGG O R P H E U S A V E N U E CCS 83 TIE TRAVERSE 09-22-21PROPOSED 8" PVC SEWER8'6'16+00MANHOLE NO. 01-007617+03.65MANHOLE NO. 01-007518+09.8720'20'20'20'R/W A P N : 2 5 6 - 3 0 0 - 2 9 2 " G A S 1 2 " W A T E R 6 " W A T E R 17+88.26 4" SEWER LATERAL ANDCLEANOUT PER LWD S-17 AND S-2517+93.26 4" SEWER LATERAL ANDCLEANOUT PER LWD S-17 AND S-25APN: 256-300-3016+40.0918+00 17+0020'20'20'R/W R/W POWER POLEWATERMETER2 " G A S 1 2 " W A T E R 6 " W A T E R FI R E H Y D R A N T WATER METERELECTRICVAULTCLCLWATER METERCL APN: 256-314-53APN: 256-314-50 APN: 256-314-57APN: 256-314-52APN: 256-400-39APN: 256-300-29 APN: 256-400-39 APN: 256-300-30 MANHOLE NO. 01-0077 R/ W R /W AP N : 2 5 6 - 3 1 4 - 4 9 DAMAGED STRIPING TO BE REPLACEDMONUMENT PER ROS 22112TO BE TIED OUT PRIOR TOCONSTRUCTION AND REPLACED AFTERCONSTRUCTION BY A LAND SURVEYOR.POWER POLE2'2'5'WWWCAUTION:OVERHEAD LINESCAUTION: OVERHEAD LINESGUY WIRE14+95.00 4" SEWER LATERAL17+80.00 4" SEWER LATERALPER LWD S-17NO. 0 1 - 0 0 8 0. E X I S T I N G M A N H O L E T O B E E P O X Y L I N E D PER L W D S T D. S P E C D I V I S I O N 2, P A R T 5. C O N N E C T I O N LOT NO. STREET REMARKSSTATION OF LATERAL AT MAIN GROUND ELEV. AT PL INVERT AT MAIN IE LATERAL ELEV. AT PL IE ELEV. UPSTREAM FT. MH RIM BACKWATER VALVE REQ'D SEQ. NO. LATERAL SLOPE % LENGTH OF LATERAL DROP TO MAIN DEPTH BELOW PL PL TO IE PAD 2 3 4 5 6 7 ELEV. 8 10 11 12 13 14 --17+88.26 105.8 20'1.2' --17+93.26 106.0 20'1.2' 107.4 2.2% 107.6 1 9 114.4 114.6 7.0' 7.0'2.2% 141 114.52 NO 114.52 NO134 - - DRAWING NO. SHEET 5 OF 5 CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKAS-BUILT APPROVALS N0 SCALE: 1"= 60'40'20'10'20' 20' 8" SEWER IN SUNSET DRIVESEE SHEE T 4 6 " WA TER 2 " GAS 2" GAS2" GAS EXISTING 12" PVC WATER PER WO-82-109 EXISTING 8" PVC WATER PER WO-82-109