Loading...
2021-112 SI (Plans)NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT ENCINITAS FIRE DEPARTMENTSAN DIEGUITO WATER DISTRICTPARKS AND RECREATIONPLANNING DIVISIONFIELD OPERATIONS SIGN DATESIGNDATESIGNDATESIGNDATESIGNDATE ENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 DESIGNED BY:DRAWN BY:CHECKED BY: PLANS PREPARED UNDER SUPERVISION OF IMPROVEMENT PLAN FOR: MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS WORK ORDER NO: CS2OD TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE SHEET OF 8 MSN JRW LT MICHAEL STEVEN NASLAND PLAN DATE IDENTIFIER DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 1 C-100 “” ” NO SCALE SHEET DESCRIPTION C-100 TITLE SHEET C-101 NOTES C-102 NOTES AND DETAILS C-200 IMPROVEMENT PLAN C-201 IMPROVEMENT PLAN C-202 IMPROVEMENT PLAN C-203 IMPROVEMENT PLAN C-204 IMPROVEMENT PLAN MB SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 2 C-101 “” ”¾” ” ” ¾” 10.“” ” ” “”“” SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 3 C-102 SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 4 C-200 ” ’” ’ ’” ” ’” “ ” “” “” SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 5 C-201 ” ’” ’ ’” ” ’” “ ” “” “” “” “” SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 6 C-202 ” ’” ’ ’” ” ’” “ ” ” “” “” SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 7 C-203 ” ’” ’ ’” ” ’” “ ” “” “” “” SI-112 DI D # 8 9 5 9 DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY: MSN JRW LT PLANS PREPARED UNDER SUPERVISION OF MICHAEL STEVEN NASLAND DATE: 11/23/2020 R.C.E. NO.: 88512 EXP.: 03/31/2022 IMPROVEMENT PLAN FOR: PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc. AS-BUILT APPROVALS ENGINEER'S NAME DATE CITY ENGINEER DATE PUBLIC WORKS PLANNING REVIEWER INSPECTOR INT.DATE NA S L A N D E N G I N E E R I N G 47 4 0 R U F F N E R S T R E E T (8 5 8 ) 2 9 2 - 7 7 7 0 SHEET OF 8 MACKINNON AVENUE BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC LOCATION: IN THE SIDEWALK OVER THE SE END OF THE NE ABUTMENT OF THE MACKINNON AVE BRIDGE OVER INTERSTATE HIGHWAY 5 RECORD FROM: ROS 18416 ELEVATION: 231.691'DATUM: NAVD88 PLAN DATE IDENTIFIER RECOMMENDED:APPROVED: JILL BANKSTON, PE EDWARD J. WIMMER, PE CITY ENGINEER 11/23/2020 11/23/2020 DATE DATE 8 C-204 ” ’” ’ ’” ” ’” “” “” “” “” SI-112 DI D # 8 9 5 9