2021-112 SI (Plans)NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT
ENCINITAS FIRE DEPARTMENTSAN DIEGUITO WATER DISTRICTPARKS AND RECREATIONPLANNING DIVISIONFIELD OPERATIONS
SIGN DATESIGNDATESIGNDATESIGNDATESIGNDATE
ENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
DESIGNED BY:DRAWN BY:CHECKED BY:
PLANS PREPARED UNDER SUPERVISION OF IMPROVEMENT PLAN FOR:
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
WORK ORDER NO: CS2OD TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE SHEET OF 8
MSN JRW LT
MICHAEL STEVEN NASLAND
PLAN DATE IDENTIFIER
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 1
C-100
“”
”
NO SCALE
SHEET DESCRIPTION
C-100 TITLE SHEET
C-101 NOTES
C-102 NOTES AND DETAILS
C-200 IMPROVEMENT PLAN
C-201 IMPROVEMENT PLAN
C-202 IMPROVEMENT PLAN
C-203 IMPROVEMENT PLAN
C-204 IMPROVEMENT PLAN
MB
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 2
C-101
“”
”¾”
”
”
¾”
10.“”
”
”
“”“”
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 3
C-102
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 4
C-200
”
’”
’
’”
”
’”
“
”
“”
“”
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 5
C-201
”
’”
’
’”
”
’”
“
”
“”
“”
“”
“”
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 6
C-202
”
’”
’
’”
”
’”
“
”
”
“”
“”
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 7
C-203
”
’”
’
’”
”
’”
“
”
“”
“”
“”
SI-112
DI
D
#
8
9
5
9
DRAWING NO.CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTION APPROVED DATE DESIGNED BY:DRAWN BY:CHECKED BY:
MSN JRW LT
PLANS PREPARED UNDER SUPERVISION OF
MICHAEL STEVEN NASLAND
DATE: 11/23/2020
R.C.E. NO.: 88512
EXP.: 03/31/2022
IMPROVEMENT PLAN FOR:
PLANNING CASE NO: TPM/TM/CDP/DR/MUP/MIN/EIA, etc.
AS-BUILT APPROVALS
ENGINEER'S NAME DATE
CITY ENGINEER DATE
PUBLIC WORKS
PLANNING
REVIEWER
INSPECTOR
INT.DATE
NA
S
L
A
N
D
E
N
G
I
N
E
E
R
I
N
G
47
4
0
R
U
F
F
N
E
R
S
T
R
E
E
T
(8
5
8
)
2
9
2
-
7
7
7
0
SHEET OF 8
MACKINNON AVENUE
BIRMINGHAM DRIVE TO INTERSTATE 5 OVERPASS
DESCRIPTION: FD 3.5" CALTRANS ALUMINUM DISC
LOCATION: IN THE SIDEWALK OVER THE SE END
OF THE NE ABUTMENT OF THE MACKINNON AVE
BRIDGE OVER INTERSTATE HIGHWAY 5
RECORD FROM: ROS 18416
ELEVATION: 231.691'DATUM: NAVD88
PLAN DATE IDENTIFIER
RECOMMENDED:APPROVED:
JILL BANKSTON, PE EDWARD J. WIMMER, PE
CITY ENGINEER
11/23/2020 11/23/2020
DATE DATE 8
C-204
”
’”
’
’”
”
’”
“”
“”
“”
“”
SI-112
DI
D
#
8
9
5
9