2021-15759 G (Plans)LEGAL DESCRIPTIONEROSION CONTROL1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT JAYME TIMBERLAKE AT (760)-633-2632, 24 HOURS A DAY.2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMESDURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BESTOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPIDCONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT.3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THEENGINEERING INSPECTOR.4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TOTHE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL.5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BEREQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE CONSTRUCTION OPERATION ORUNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TOPREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE.7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED LANDSCAPE RESTORATIONPLAN SHALL BE INCORPORATED HEREON.NOTIFICATIONS1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WEREOBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIESEXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARYMEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THECONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TOANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK:A. SEWERS - CSD/ESD - (760)-633-2770LWD 760-753-0155B. GAS & ELECTRIC - SDGE - (760)-438-6200C. WATER - SAN DIEGUITO WATER DISTRICT-1-800-227-2600D. TELEPHONE - SBC BELL - (760)-489-3411E. CABLE TV - COX COMMUNICATIONS-(760)-806-9809 X-22332. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THISPROJECT. PHONE: (760)-633-2770.3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633-2770. ALL WORKPERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL.RIGHT OF WAY NOTEOWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DIVISION AT LEAST 48HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT INISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THEOWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS.DRAINAGE NOTENO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATERIS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BECONVEYED TO AN APPROVED DRAINAGE FACILITY.UTILITY NOTEALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND.GENERAL NOTES1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONSFOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OFENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES ORREVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FORINSPECTION.2. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAYOR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS.3. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE CONSTRUCTION.4. THE CONTRACTOR SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH ISDISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVILENGINEER OR A LICENSED LAND SURVEYOR.5. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDINGSHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERALSAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.6. CONSTRUCTION AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE FORHUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M.NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS.7. NO CONSTRUCTION OPERATIONS SHALL COMMENCE UNTIL A PRE-CONSTRUCTION MEETING HASBEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER,CONTRACTOR AND PERMITTEE. THE PRE-CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THECITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2632.8. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITEWITHIN THIS PROJECT THE CONTRACTOR SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THECITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE CONTRACTOR SHALL COMPLY WITH ALLCONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THEHAULING OPERATION.9. UPON FINAL COMPLETION OF THE WORK UNDER THE PERMIT, BUT PRIOR TO FINAL APPROVALAND/OR FINAL RELEASE OF SECURITY, AN "AS-BUILT" SHALL BE PROVIDED WITH THE APPROVEDLANDSCAPE RESTORATION PLAN. THIS STATEMENT SHALL BE FOLLOWED BY THE DATE ANDSIGNATURE OF THE ENGINEER WHO CERTIFIES SUCH CONSTRUCTION OPERATION.10. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILEDOR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREASTHAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLYDEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEERAND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL.11. IF ANY ARCHAEOLOGICAL, HISTORICAL, OR PALEONTOGICAL RESOURCES ARE INADVERTENTLYDISCOVERED DURING CONSTRUCTION ACTIVITY, THE PROJECT CONTRACTOR SHALL DIVERT,DIRECT OR TEMPORARILY HALT GROUND-DISTURBING ACTIVITIES IN THE AREA OF DISCOVERY TOALLOW EVALUATION OF THE SIGNIFICANCE OF SUCH RESOURCES. THE PROJECT APPLICANT SHALLIMMEDIATELY NOTIFY INFRASTRUCTURE AND SUSTAINABILITY DEPARTMENT STAFF OF SUCHFINDING AT THE TIME OF DISCOVERY. THE SIGNIFICANCE OF THE DISCOVERED RESOURCE(S)SHALL BE DETERMINED BY A QUALIFIED ARCHAEOLOGIST, HISTORIAN, OR PALEOTOLOGISTIN CONSULTATION WITH THE INFRASTRUCTURE AND SUSTAINABILITY DEPARTMENT AND, FORARCHEOLOGICAL RESOURCES, THE NATIVE AMERICAN COMMUNITY. THE INFRASTRUCTURE ANDSUSTAINABILITY DIRECTOR MUST CONCUR WITH THE EVALUATION PROCEDURES AND ANYNECESSARY DATA RECOVERY SERVICES BEFORE CONSTRUCTION ACTIVITIES ARE ALLOWED TORESUME.12. AS SPECIFIED BY CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050.5, IF HUMAN REMAINSARE FOUND ON THE PROJECT SITE DURING CONSTRUCTION ACTIVITY, THE PERSON RESPONSIBLEFOR THE EXCAVATION, OR HIS OR HER AUTHORIZED REPRESENTATIVE, SHALL IMMEDIATELY NOTIFYTHE SAN DIEGO COUNTY CORONER'S OFFICE BY TELEPHONE. NO FURTHER EXCAVATION ORDISTURBANCE OF THE DISCOVERY OR ANY NEARBY AREA REASONABLY SUSPECTED TO OVERLIEADJACENT REMAINS, AS DETERMINED BY A QUALIFIED ARCHAEOLOGIST AND/OR A TRADITIONALLYAND CULTURALLY AFFILIATED (TCA) NATIVE AMERICAN MONITOR, SHALL OCCUR UNTIL THECORONER HAS MADE THE NECESSARY FINDINGS AS TO ORIGIN AND DISPOSITION PURSUANT TOPUBLIC RESOURCES CODE 5097.98. IF SUCH A DISCOVERY OCCURS, A TEMPORARY CONSTRUCTIONEXCLUSION ZONE SHALL BE ESTABLISHED SURROUNDING THE AREA OF THE DISCOVERY SO THATTHE AREA WOULD BE PROTECTED (AS DETERMINED BY THE QUALIFIED ARCHAEOLOGIST AND/ORTHE TCA NATIVE AMERICAN MONITOR), AND CONSULTATION AND TREATMENT COULD OCCUR ASPRESCRIBED BY LAW. AS FURTHER DEFINED BY STATE LAW, THE CORONER WOULD DETERMINEWITHIN TWO WORKING DAYS OF BEING NOTIFIED IF THE REMAINS ARE SUBJECT TO HIS OR HERAUTHORITY. IF THE CORONER RECOGNIZES THE REMAINS TO BE NATIVE AMERICAN, HE OR SHESHALL CONTACT THE NATIVE AMERICAN HERITAGE COMMISSION (NAHC) WITHIN 24 HOURS. THENAHC WOULD MAKE A DETERMINATION AS TO THE MOST LIKELY DESCENDENT. IF NATIVE AMERICANREMAINS ARE DISCOVERED, THE REMAINS SHALL BE KEPT IN SITU (“IN PLACE”), OR IN A SECURELOCATION IN CLOSE PROXIMITY TO WHERE THEY WERE FOUND, AND THE ANALYSIS OF THEREMAINS SHALL ONLY OCCUR ON-SITE IN THE PRESENCE OF THE TCA NATIVE AMERICAN MONITOR.SAN DIEGUITO WATER DISTRICT NOTES:1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THESTANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC).2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTEREPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE ORNON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THISPROJECT.3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINEPARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSEDUTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ONIMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVENWRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT.4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANYEXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH ISAFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATERAGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS,THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE.5. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES.6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SANDIEGO GAS AND ELECTRIC VAULTS.7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELEDWAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING.8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO-LEAD BRASS BE USED INTHE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. INCOMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO-LEAD BRASSPARTS.9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDEDWITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18.OWNERCITY OF ENCINITAS505 S. VULCAN AVE760-633-2632SITE ADDRESS948 NEPTUNE AVE, ENCINITAS, CA 92024254-040-31-00IMPERVIOUS AREAIMPERVIOUS AREA PRIOR TO CONSTRUCTION: N/ASQFTIMPERVIOUS AREA AFTER CONSTRUCTION: N/ASQFTINCREASE IN IMPERVIOUS AREA: 0SQFTIMPERVIOUS AREA REPLACED: 0SQFTTRAININGCONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BEFAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALLBE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORMSUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES.WASTE MANAGEMENTCONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTIONMATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THECONVEYANCE SYSTEM IS STRICTLY PROHIBITED.NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACEDAROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FORLEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHINSTRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANYTRASH MATERIAL.MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER-BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALTAND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON-RECYCLABLE MATERIALS MUST BE TAKENTO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OFHAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ONLANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436-4151.POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUNDTHE SITE.PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALLPROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUSSURFACES.ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUSTROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITEFOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACTTHE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633-2770.EARTHWORK DATASTEEPEST EXISTING NATURAL SLOPE ON-SITE = N/A H : N/A VMAXIMUM VERTICAL DEPTH OF CUT = N/A 'MAXIMUM VERTICAL DEPTH OF FILL = N/A 'CUT = N/A C.Y. FILL = N/A C.Y.EX/IMPORT = N/A C.Y.REMEDIAL = N/A C.Y. ( N/A ' REMOVAL AND RECOMPACTION UNDER AND N/A ' OUTSIDE OF BUILDINGAREAS)DISTURBED AREA = N/ABMP PROJECT STATUSSTANDARDRECORDED ON AS DOC. #: DRAWING NO.SHEET 1 OF 2CITY OF ENCINITAS - INFRASTRUCTURE AND SUSTAINABILITY DEPARTMENTENCINITAS FIRE DEPARTMENTSAN DIEGUITO WATER DISTRICTOR OLIVENHAIN MUNICIPALWATER DISTRICTPARKS AND RECREATIONPLANNING DIVISIONPUBLIC WORKSSIGNDATESIGNDATESIGNDATESIGNDATESIGNDATEENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTIONAPPROVEDDATEDESCRIPTION: 1025 (ENC-25 L.S. 7322)LOCATION: MIDDLE OF INTERSECTION OF S. EL PORTAL ST & LA MESA AVERECORD FROM: RECORD OF SURVEY 18416ELEVATION: 60.601' DATUM: NAVD88DESIGNED BY:DRAWN BY:CHECKED BY:MESFPLANS PREPARED UNDER SUPERVISION OF STUART FRASERDATE: 10/04/2021R.L.A. NO.: 5301EXP.: 10/31/2022 RECOMMENDED:APPROVED:STEVE NOWAK JILL T. BANKSTONACTING CITY ENGINEERDATEDATELANDSCAPE RESTORATION PLAN FOR:BEACON'S BEACH COASTAL BLUFF LANDSCAPERESTORATION PROJECT948 NEPTUNE AVEAPN: 254-040-31PLANNING CASE NO: MULTI-003977 MUP/CDPSTORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP/IMP NOTES1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUSSURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREASPRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM DRAINSYSTEM.2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALLNOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY.3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP FACILITIESAND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGEFROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP/IMP FACILITYAND/OR THE TURF/LANDSCAPED AREAS.4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREAUNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP.5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVEANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGEIT TO AN ADEQUATE IMP/BMP.6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTEREDWITHOUT A PERMIT FROM THE CITY.7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAYREQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED.8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORMWATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE ANIMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THEENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERMSHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THEDUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSUREAREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER INAND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGESTHROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH ACITY-APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWERSYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BEREQUIRED FOR THIS STRUCTURE.AS-BUILT APPROVALSENGINEER'S NAMEDATEACTING CITY ENGINEERDATEPUBLIC WORKSPLANNINGREVIEWERINSPECTORINT.DATELEUCADIA WASTEWATER DISTRICTSIGNDATELDEV-015759-2021STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIESCONCRETE WASHOUTCONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETEWASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE,SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEMOR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUTLOCATION.CONSTRUCTION SITE ACCESSA STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS ANDINGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3"CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES.CONSTRUCTION VEHICLESA SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FORCONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE.ALL MAJOR REPAIRS SHALL BE MADE OFF-SITE.EROSION CONTROLEROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACESESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANTSURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, ANDBONDED FIBER MATRIX.NO EXCAVATION AND CONSTRUCTION ACTIVITIES ARE ALLOWED DURING WET WEATHER.DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTIONSITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT ANDTEMPORARY EROSION CONTROL MEASURES.REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BECONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DONOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION.TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOTIMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BYPLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL.PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND CONSTRUCTIONACTIVITIES ARE COMPLETE.WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED.ON-SITE CONSTRUCTION MATERIAL STORAGESTORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE ANDSPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THERAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON-SITE.ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON-SITE.STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC.STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWSAND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOILSTABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THEPERIMETER AT ALL TIMES.SEC 5-13-4W*10.60 AC M/L IN SEC 4&INSCOPE OF WORKTHE PRIMARY PURPOSE OF RESTORING BEACON'S BEACH COASTAL BLUFF IS TO PRESERVE THE BEACON'SBEACH ACCESS TRAIL THROUGH LESSENING SURFACE EROSION BY ESTABLISHING NATIVE PLANTS ONPLANTABLE AREAS OF THE BLUFF. RESTORATION WILL ENTAIL TREATMENT OF EXOTIC SPECIES REPLACINGNON-NATIVE SPECIES WITH NATIVE CONTAINER PLANTS, PROTECTING EXISTING NATIVE PLANTS, ANDHYDROSEEDING ALL PLANTABLE SLOPE AREAS.DRAWING INDEX1.TITLE SHEET2.LANDSCAPE RESTORATION PLANJAMES KNOWLTONBob Keeley 10/20/2110/21/2021John Ugrob 10-21-2021James Knowlton10/28/2021Jill T. Bankston DRAWING NO.SHEET 2 OF 2CITY OF ENCINITAS - INFRASTRUCTURE AND SUSTAINABILITY DEPARTMENTENGINEERING DIVISION APPROVALSBENCHMARKCHANGE NO.DESCRIPTIONAPPROVEDDATEDESCRIPTION: 1025 (ENC-25 L.S. 7322)LOCATION: MIDDLE OF INTERSECTION OFS. EL PORTAL ST. & LA MESA AVERECORD FROM: RECORD OF SURVEY 18416ELEVATION: 60.601'DATUM: NAVD88DESIGNED BY:DRAWN BY:CHECKED BY:MESFPLANS PREPARED UNDER SUPERVISION OF STUART FRASERDATE: 10/04/2021R.L.A. NO.: 5301EXP.: 10/31/2022 LANDSCAPE RESTORATION PLAN FOR:BEACON'S BEACH COASTAL BLUFF LANDSCAPERESTORATION PROJECT948 NEPTUNE AVENUEAPN: 254-040-31LDEV-015759-2021AS-BUILT APPROVALSENGINEER'S NAMEDATEACTING CITY ENGINEER DATEPUBLIC WORKSPLANNINGREVIEWERINSPECTORINT.DATERECOMMENDED:APPROVED:STEVE NOWAKJILL T. BANKSTON ACTING CITY ENGINEERDATEDATEPLANNING CASE NO: MULTI-003977 MUP/CDPPROJECT SCOPE:THE PRIMARY PURPOSE OF RESTORING BEACON'S BEACH COASTAL BLUFF IS TO PRESERVE THE BEACON'S BEACH ACCESS TRAIL THROUGH LESSENING SURFACE EROSION BY ESTABLISHING NATIVE PLANTS ON PLANTABLE AREAS OF THE BLUFF. RESTORATION WILL ENTAIL TREATMENT OF EXOTIC SPECIES REPLACING NON-NATIVE SPECIES WITH NATIVECONTAINER PLANTS, PROTECTING EXISTING NATIVE PLANTS, AND HYDROSEEDING ALL PLANTABLE SLOPE AREAS.CONSTRUCTION NOTES:1.CONTRACTOR SHALL USE HAND TOOLS ONLY TO PERFORM ALL WORK. THE USE OF ANY HEAVY EQUIPMENT ANDCONSTRUCTION MACHINERY IS PROHIBITED.2.THERE SHALL BE NO GRADING. SOIL DISTURBANCE SHALL BE LIMITED TO EXCAVATING CONTAINER PLANTING HOLES.3.CONTRACTOR SHALL KEEP TRAIL ACCESS OPEN TO PEDESTRIANS AT ALL TIMES DURING THE FULL LENGTH OF THEPROJECT.4.CONTRACTOR SHALL NOT IMPEDE OR BLOCK ACCESS TO THE PARKING LOT OR TO BEACON'S BEACH UNLESSOTHERWISE NOTED ON THESE PLANS.5.CONTRACTOR SHALL REVIEW PLANTING SPECIFICATIONS BEFORE BEGINNING WORK.6.CONTRACTOR SHALL REVIEW PLANTING INSTALLATION DETAILS PRIOR TO BEGINNING WORK.7.CONTRACTOR SHALL NOTIFY THE CITY OF ANY DISCREPANCIES IN THE EXISTING CONDITIONS.8.ALL WORK WILL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF ENCINITAS.9.ANY CHANGES TO THE DEFINED SCOPE OF WORK MUST BE PRE-APPROVED BY THE DESIGNATED CITY REPRESENTATIVE.CONTRACTOR TO KEEP MARKED AREA(INCLUDING FIRST PARKING STALL) CLEARAT ALL TIMES (NO CONSTRUCTIONPARKING OR STORAGE OF MATERIALS).SDWD 1" WM TABLE 1-2 PLANT PALETTE TO BE USED WITHIN SOUTHERN COASTAL BLUFF SCRUB PLANTINGVARIES17-20 FT10 FTEROSION CONTROL NOTES:1.SOIL DISTURBANCE WILL BE AVOIDED TO THE GREATEST EXTENT POSSIBLE DURING ALL WEEDCONTROL EFFORTS. THE CONTRACTOR SHALL IMPLEMENT EROSION CONTROL BEST MANAGEMENTPRACTICES (BMPs) TO MAINTAIN SLOPE STABILITY.2.STORMWATER BMPs SUCH AS BIODEGRADABLE STRAW WATTLES/FIBER ROLLS, BIODEGRADABLEGRAVEL BAGS, AND BIODEGRADABLE GEOTEXTILES AND MATS WILL BE INSTALLED TO STABILIZE STEEPAND BARE AREAS OF THE BLUFF, AS DIRECTED BY THE CITY.3.HYDROSEED WILL ACT AS ANOTHER FORM OF EROSION CONTROL IN BOTH THE SHORT AND LONG TERM.4.ALL EROSION CONTROL DEVICES SHALL BE CONSTRUCTED OF 100% BIODEGRADABLE MATERIALS.PLASTIC NETTING OR PLASTIC WOVEN MATERIALS ARE NOT ALLOWED.CONCEPTUAL RESTORATION MAPNOT TO SCALESEE TABLE 1-1CONTRACTOR TO APPLY APPROVEDHYDROSEED MIXCONTRACTOR TO INSTALL APPROVEDCONTAINER PLANTS SHOWN IN TABLE 1-2AND APPLY APPROVED HYDROSEED MIX.CONTRACTOR TO USE EROSION CONTROLMETHODS IF NEEDEDNOT TO SCALEPLANTING NOTES:1.CONTAINER PLANTING AND SEEDING WILL BE CONDUCTED ONLY WHEN ALL REQUIRED INITIAL EXOTIC VEGETATIONTREATMENT IS COMPLETED AND APPROVED BY THE DESIGNATED CITY REPRESENTATIVE (CITY).2.ALL CONTAINER PLANTS AND SEED SHALL BE ACQUIRED FROM A NATIVE PLANT NURSERY/SEED SUPPLIERPRE-APPROVED BY THE CITY.3.ALL CONTAINER PLANT MATERIALS SHALL BE ADEQUATE SIZE AND SHAPE FOR THEIR CONTAINER. ROOT BOUND, ORPOORLY ROOTED PLANTS WILL NOT BE ACCEPTED. ALL PLANTS SHALL BE FREE OF PESTS AND DISEASES AND SHALL BEIN A HEALTHY AND VIGOROUS CONDITION. ALL MATERIALS REJECTED BY THE CITY SHALL BE REMOVED FROM SITE ANDREPLACED IN-KIND BY THE CONTRACTOR AT HIS/HER EXPENSE.4.ALL CONTAINER PLANTS MUST BE PLANTED WITHIN 10 WORKING DAYS FOLLOWING DELIVERY TO THE SITE. THECONTRACTOR SHALL BE RESPONSIBLE FOR HAND WATERING AND MAINTAINING IN OPTIMAL CONDITION, AS WELL ASALL OTHER MATERIALS STORED ON-SITE.5.PLANTING SHALL ONLY OCCUR WHEN ENVIRONMENTAL CONDITIONS ARE FAVORABLE FOR SUCH ACTIVITIES, BASED ONSTANDARD HORTICULTURAL PRACTICES. PLANTING OR SEEDING SHALL NOT TAKE PLACE IF TEMPERATURES AREUNREASONABLY HIGH, OR IF THE SITE IS EXCESSIVELY WET OF MUDDY.6.CONTAINER PLANTS SHALL BE LOCATED BY THE CONTRACTOR PER THE CITY'S DIRECTION. LAYOUT SHALL MIMICNATURAL PLANT DISTRIBUTION AND SHOULD NOT BE PLANTED IN UNIFORM ROWS. ONCE ALL THE CONTAINER PLANTSHAVE BEEN SPOTTED IN PLACE, THE CONTRACTOR SHALL ACQUIRE FINAL APPROVAL FROM THE CITY PRIOR TOEXCAVATING PLANTING HOLES.7.PLANTING HOLES SHALL BE FILLED WITH WATER AND ALLOWED TO DRAIN COMPLETELY BEFORE PLANTING CONTAINERPLANTS.8.CONTAINER PLANTS SHALL BE PLANTED PER THE PLANTING DETAIL, TABLE 1-2 AND THESE PLANTING NOTES.INSTALLED PLANTS SHALL BE WATERED THOROUGHLY IMMEDIATELY AFTER BEING PLANTED.9.DOWNSLOPE RUNOFF AND OVERTOPPING PLANTING HOLES SHALL BE AVOIDED DURING ALL WATERING EVENTS.10.FOLLOWING COMPLETION OF PLANTING, CONTAINER PLANTS SHALL BE INSPECTED AND APPROVED BY THE CITY PRIORTO SEEDING.11.THE DELIVERED SEED MIXES SHALL REQUIRE INSPECTION AND APPROVAL BY THE CITY PRIOR TO APPLICATION. ALLSEED SHALL REQUIRE CLEAR LABELING INCLUDING, PERCENT LIVE SEED (PLS), LBS/ACRE AND TOTAL SEED LBS. (PERSPECIES). LBS PER SPECIES MAY VARY BASED ON CURRENT FORMULATION INCLUDING ADJUSTMENT FOR AVAILABLEPLS.12.SEED MIXES SHALL BE APPLIED THROUGHOUT AREAS DEPICTED ON THE CONCEPTUAL RESTORATION MAP. ANYADJUSTMENTS TO THE APPLICATION AREA WILL BE PROVIDED BY THE CITY PRIOR TO APPLICATION.13.AVOID EXISTING NATIVE VEGETATION WHEN APPLYING HYDROSEED, OR WASH HYDROSEED MULCH OFF OF EXISTINGNATIVE VEGETATION WITHIN 24 HOURS OF HYDROSEED APPLICATION.14.SEED SHALL BE APPLIED WITH THE FOLLOWING HYDROSLURRY MIXTURE:- SEED AT DESIGNATED POUNDS PER ACRE- VIRGIN FIBER MULCH AT 2500 POUNDS PER ACRE- GUAR GUM TACKIFIER AT 150 POUNDS PER ACRESTRAW WATTLE/FIBER ROLLNOT TO SCALEBIODEGRADABLE GRAVEL BAGSNOT TO SCALEGEOTEXTILES AND MATS TABLE 1-1 RESTORATION TREATMENT TYPES*CONTRACTOR TO CONTROL NON-NATIVE SPECIES IN ALL AREAS* PLANT PALETTE SUBJECT TO CHANGE UPON AVAILABILITY AND CITY APPROVAL*NOT TO SCALE1 GAL CONTAINER PLANTING DETAILJAMES KNOWLTONJames Knowlton10/28/2021Jill T. Bankston