Loading...
2021-137 SI (Plans)605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H CONSTRUCTION PLANS CITY OF ENCINITAS FOR JUNE 2020 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION PROJECT VICINITY MAP CSD PROJECT NO. CC04E G-1 TITLE SHEET ESD PROJECT NO. CE04H SHEET INDEX 06/05/20 INSPECTED BY DATE APPROVED BY DATE AS-BUILT AS-BUILT 10/22/2021 09/23/2021 24 23 D- 3 EMERGENCY WORK ADDED - SEWER LINING - BONITA AVE AND SANTA FE DR 24 D- 4 EMERGENCY WORK ADDED - SEWER LINING - ALLEY AT K STREETB B Emergency Work requested by PW/WW - CCO #5 J. Ballesteros 07/21/2021 DI D 8 9 4 8 SI-137 RIGHT OF WAY NOTES: SEWER NOTES: ”¾” ” GENERAL NOTES: G-2 GENERAL NOTES, RIGHT-OF-WAY NOTES AND SEWER NOTES 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 G-3 TRAFFIC CONTROL NOTES AND WORK TO BE DONE NOTES 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H TRAFFIC CONTROL NOTES “” “” “” WORK TO BE DONE “” “” “” INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ABBREVIATIONS G-4CROSS REFERENCING SYSTEM, LEGENDS AND ABBREVIATIONS 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H 358' - 8" VCP-CIPP-SHC-SBP-SRSS 3.13% ÅÆ MH 2 5 4 2 10 ' MANHOLE LEGEND 12 6 ' POINT REPAIR LEGEND 4' LEGEND DETAIL 1 SECTION A CROSS REFERENCING SYSTEM Æ LINING LEGEND PER PLAN ID #3030 INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 A R C A D I A R D ENC I N I T A S B L V D EN C I N I T A S B L V D Q U A I L R D SA N T A F E D R SA N A N D R A D E D R A L O H A D R A V E D E S A N C L E M E N T E GU A D A L A J A R A DR SA N A B E L L A D R CAMINITO SEPTIMO B A L O U R D R B A L O U R D R MO N T E R E Y VIS T A P L ME L B A R D M O N T E R E Y VI S T A W Y O C E A N I C D R L A K E D R RE Q U E Z A S T R E G A L R D SUMMER VIEW CIR EN C I N I T A S B L V D C A L L E R E G A L G O L D E N R D GA R D E N C T PI E D R A S O R O C A L L E G A R D E N A R D W E S T L A K E S T ME L B A R D WES T L A K E S T Q U A I L G A R D E N S D R QUAIL G A R D E N S C T TE A B E R R Y S T CONE F L O W E R S T W O T A N D R C R E S T D R C R E S T D R TOR R E Y D R E S T C A L L E M A G D A L E N A T R I T O N C I R C O R N I S H D R S A N D I E G U I T O D R A R D E N D R S T R A T F O R D D R D E V O N S H I R E D R INTERSTATE 5 S W E E T A L I C E L N C A M I N O E L D O R A D O ME L B A R D BR A S S W Y B O N I T A D R E V E R G R E E N D R W I N D S O R R D B L U E S K Y D R G R E E N L A K E D R J U S T I N R D GR A N G E HA L L R D GR E E N L A K E CT D ST RE Q U E Z A S T MC N E I L L A V C A M I N O D E O R C H I D I A N A R D O R D B R A C E R O R D M A C K I N N O N A V N A R D O R D INTERSTATE 5 KI N G S C R O S S D R KIN G S C R O S S C T KIN G S C R O S S D R ME L B A R D ME L B A R D RU B E N S T E I N P L SA N D C A S T L E D R SA N T A F E D R FA I T H A V E V E R G R E E N D R B O N I T A D R O R K N E Y L N S O M E R S E T A V CA R E T T A W Y WO O D G R O V E D R WO O D L A K E D R L O W E R L A K E C T O L D C R E E K C T BI G C A N Y O N TE R WO O D G R O V E D R WIND S O R C R E E K C T WO O D L A K E D R MU N E V A R D R M U N E V A R C T CA T H Y L N OC E A N C R E S T R D R U T H L O R R D E D I L E E D R BU R K S H I R E A V G L A S G O W A V M A C K I N N O N A V D E B A N N D R JU D Y L N NO L B E Y S T CA R D I F F D R ROBLE Y P L EMMA D R P L A Y A R I V E R A D R BI R M I N G H A M D R L E G A Y E D R F R E D A L N D O R A D R L A K E D R 2008 2438 2468 2945 23132312 2311 2618 2315 2624 2204 2460 2314 2334 2626 2486 2205 2203 2202 2449 2432 2426 2000 2510 2009 3204 2294 2297 2295 2302 2300 2301 3835 3836 2775 3270 2776 559 560 561 3211 2133 3841 2874 2899 2941 2142 3837 3840 3118 3268 2494 2495 2496 2497 2506 2511 2522 2638 2640 3209 3269 31203119 3653 2837 2838 3654 2512 241 3127 3838 2885 2888 2475 3951 2134 3114 3330 3226 3112 3839 262326222620 2208 2406 2405 2634 2636 2415 1670 1703 1697 16853993 1672 1673 1698 3936 3938 3953 3789 3632 2420 2513 2646 3930 24223934 2869 1687 1688 1704 1695 638 1148 1151 639 1153 3937 3935 39522873 3954 2871 2872 32273228 2546 2556 2557 1858 2558 1696 2317 2189 2190 2191 1808 2067 2068 2075 1813 2324 2316 2436 3552 2007 2006 2434 2507 2064 2325 3801 2197 2199 2200 2201 2326 2327 3553 3554 2427 3551 2331 4039 3602 2318 558 228 206 208 209 245 246 244 218 215 216 219 220 221 222 223 207 247 217 578 239 240 242 243 237 C-4 11485 C-5 11950 C-4 11161 C-5 11933 C-5 11982 C-5 11964 C-4 11379 C-4 11143 C-6 12517 C-6 12518 C-6 12519 C-5 3542 C-5 3541 C-5 3564 C-3 10952 C-3 10956 C-3 10957 C-5 12294 C-5 11918 C-4 11678 C-2 12132 C-3 10959 C-4 12516 C-4 11609 C-3 11213 C-3 10958 C- 9 47 3 C- 9 47 4 C- 9 55 4 C-1 12608 C-1 12609 C- 1 0 C- 1 0 11 8 0 9 C- 1 0 C-2 12010 C-2 12025 C-2 12622 C-2 12623 C-2 12080 P-2 12093 C-1 12211 C-1 12630 C-1 12629 C-1 12648 C-1 12647 C-2 15374 C-2 16653 C-2 16654 C-2 16645 C-3 15372 C-5 16643 C-1 16591 C-3 15369 C-3 153772430 C-3 15368 2330 CS D B O U N D A R Y ES D B O U N D A R Y CS D B O U N D A R Y ES D B O U N D A R Y C S D B O U N D A R Y HIGHW A Y 1 0 1 V E R D I A V SUMMI T A V RU B E N S T E I N A V 2498 22322261 2566 2268 2279 2535 2536 3131 C-6 12611 C-6 15353 CSD BOUN D A R Y 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H G-5INDEX AND PROJECT SUMMARY - 1 CSD LEGEND: EX C-1 3030 IN LL 2277 531 2704 12 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 21 22 23 24 2526 27 28 29 30 31 32 33 34 35 36 37 38 39 40 UV Sec UV Sec UV Sec UV Sec UV Sec UV Sec SLC P-Tap SHC SHC INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 E L P O R T A L S T UN I O N S T INTERSTA T E 5 OR P H E U S A V HA L C Y O N R D UN I O N S T AL V I S O W Y AL V I S O W Y VIA JULITA AR R O Y O D R EN C I N I T A S B L V D NEPTUN E A V E L P O R T A L S T AT H E N A S T E L P O R T A L S T LA MES A A V MELRO S E A V LA VET A A V R O S E T A S T M A R C H E T A S T FL O R I T A S T LO L I T A S T SY L V I A S T E S T E S T H S T SUNSE T D R 5TH ST FIRST ST D S T SUNS E T D R VULC A N A V 4TH ST MELROSE AV 2ND ST 3RD STA S T B S T C S T HIGH W A Y 1 0 1 PES C A D O P L TRITON CIR BELLEVIEW AV CORNISH DR SAN DIEGUITO DR ARDEN DR STRATFORD DR DEVONSHIRE DR D S T D ST RE Q U E Z A S T VULCAN AV MC N E I L L A V H S T F S T G S T G S T F S T SA N T A F E D R B R I G G S A V I S T ME L B A R D K S T J S T J S T I S T SEALANE DR DEWITT AV 3745 2592 2775 2776 559 560 561 2896 2868 249 2372 2482 226 2483 2361 2364 2356 2355 2357 233 231227 2349 2350 2351 23542353 2352 23662365 2274 248 558 228 2717 2718 206 208209 245246 244 218 215216 219 220 221 222 223 224 225 207 247 217 3166 3282 2374 578 577 2373 2370 2377 2371 2606 2607 2609 2608 2692 2610 2611 2612 26722673 2674 4009 2591 2602 238 2484 3286 2705 27032704 IN EX 530 531 532 534 535 537 528 18 19 20 24 593 985986987 1057 1059 3084 3086 C-9 558 C-9 561 C-11 11770 C-10 11787 C-11 11789 C-11 15767 C-10 11788 C-11 11772 C-11 11771 C-11 11773 C-11 11776 C-11 11774 C-11 11779 C-11 11777 C-9 473 C-9 474 C-9 554 C-10 11797 C-8 12995 C-8 16394 C-9 12849 C-10 16446 C-8 13703 C-8 13981 C-10 11786 C-10 16381 C-10 11801 C-10 11798 C-10 11802 C-10 11810 C-10 11805 C-10 11809 C-10 11804 C-10 492 C-8 12968 C-8 12972 C-8 13010 C-8 13964 C-8 13965 C-8 13011 C-8 13013 C-7 13721 C-12 14127 CS D B D R Y ES D B D R Y ESD BOU N D A R Y C-12 14128 C-12 16805 SAXONY RD PU E B L A S T URANIA AV CLARK A V LE U C A D I A B L V D OCEAN VIEW AV LA MIRADA AV DEL RIEGO AV UN I O N S T PO I N S E T T I A P A R K EZ E E S T DEL RIO AV UN I O N S T 2798 2799 2801 2802 3141 2816 2795 3208 3206 3207 3166 INTERSTAT E 5 C-7 13205 C-7 13206 C-7 13208 C-7 13227 C-7 13721C-7 13270 C-7 13782 C-7 13780 C-7 13779 C-7 13781 C-7 13269 ES D B O U N D A R Y SIDONIA ST PA S S I F L O R A P L WOODLEY PL EUGENIE AV SI D O N I A S T PASSIFLORA A V S T A L B A N S D R GUILDFORD CT OLD H A M W Y PASSIFLORA AV OLDHAM C T LE U C A D I A B L V D 2788 3136 653 654 C-12 16499 ES D B O U N D A R Y 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H G-6INDEX AND PROJECT SUMMARY - 2 ESD IN IN EXEX LEGEND: EX C-1 3030 IN LL 2277 531 2704 94 42 43 44 45 46 52 76 47 48 49 50 51 53 54 55 56 57 58 59 67 60 61 62 6364 65 69 66 68 857071 7273 74 75 77 78 79 80 81 82 83 84 86 87 88 89 90 91 92 93 95 UV Sec UV Sec INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 L O N E H I L L L N 1 3 4 1 3 5 1 3 6 ESD SERVICE AREA LO N E H I L L L N LATIGO ROW LA G O O N V I E W D R C R E S T D R CR E S T D R V I A T I E M P O RUDDY DUCK C TV I A T I E M P O PL A Y A R I V E R A D R M A C K I N N O N A V G L A S G O W A V E D I N B U R G A V C A M B R I D G E A V V I A T I E M P O AVOCET C T L A K E D R B R U C E A L A C T WA L E S D R LA G O O N V I E W D R WA L E S D R SE A V I L L A G E C I R SEA VILLAGE W Y LA K E D R S E A V I L L A G E D R LA K E D R LA H O U D D R PA R K C R E S T D R M O N T G O M E R Y A V ORINDA DR DE A N D R GENIE L N PA R I V A D R D O R A D R I N T E R S T A T E 5 R A M P WA L E S P L LIVE R P O O L D R O X F O R D A V CHE S T E R F I E L D D R NOR F O L K D R LAS BRISAS WY SEA V I L L A G E D R FR E D A L N C A R O L V I E W D R B U L L R U S H L N I N T E R S T A T E 5 NE W C A S T L E A V BU L L R U S H L N I N T E R S T A T E 5 NORFOLK DR DUB L I N D R KILK E N N Y D R 2 9 4 5 1 5 9 7 1 5 8 5 1 7 1 0 1 6 8 7 1 7 0 4 1 4 1 8 1 7 9 0 1 7 8 2 1 7 9 1 477478 482 485 486487488489490492493 494 495496 501 512 519 520 522 980 981982 984 992 994 10681069 3049 3126 CSD SERVICE AREA C - 6 8 4 6 3 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H G-7INDEX AND PROJECT SUMMARY - 3 ESD AND CSD LEGEND: EX C-1 3030 IN LL 2277 531 2704 41 INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 16591ID# 12608ID# 12609 114 LF 8" VCP-CIPP - 0.64% ►288 LF 8" VCP-CIPP - 0.4% ►354 LF 8" VCP-CIPP - 0.4% ►236 LF 8" VCP-CIPP - 0.4% ► ID# 12648ID# 12647 234 LF 8" VCP-SHC - 0.64% ►114 LF 8" VCP-CIPP - 0.64% ► 23 3 ' 4' ID# 12211 326 LF 8" VCP-CIPP-SHC - 0.4% ► ID# 12630ID# 12629 375.8 LF 8" VCP-CIPP - 1.04% ►353 LF 8" VCP-CIPP - 6.32% ► 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. GRAPHIC SCALE C-1SEWER LINING PLAN - 1 CARDIFF SANITARY DIVISION NARDO RD NARDO RD MACKINNON AVE NARDO RD LATERAL DATA TABLE Post CCTV: 1/6/21 CIPP Length: 236ft Laterals Reinstated : 10/EA Post CCTV: 1/7/21 CIPP Length: 355ft Laterals Reinstated : 14/EA Post CCTV: 3/1/21 CIPP Length 287ft Laterals Reinstated : 7/EA Post CCTV: 1/6/21 CIPP Length 114ft Laterals Reinstated : 2/EA Post CCTV: 1/26/21 CIPP Length 323ft Laterals Reinstated : 6/EA 1-SLCS (156' from MH 2009) Post CCTV: 11/24/20 CIPP Length 352.4ft Laterals Reinstated : 4/EA Post CCTV: 11/24/20 CIPP Length 375.8t Laterals Reinstated : 7/EA Post CCTV: 5/12/21 UV Sectional Laterals Reinstated : 0/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 12025ID# 16645 401 LF 8" VCP-CIPP-SHC - 1.16% ◄ CL E A N O U T SE E N O T E 1 CL E A N O U T SE E N O T E 1 259 LF 8" VCP-CIPP - 0.4% ► ID# 12132 275 LF 8" VCP-CIPP - 0.4% ► 25 9 L F 8 " V C P - C I P P - 0 . 4 % ► ID# 16653ID# 16654 236 LF 8" VCP-CIPP - 1.56% ►76 LF 8" VCP - 1.56% ► 56 ' 4' ID# 12080 271 LF 8" VCP-CIPP - 0.5% ► ID# 12010 183 LF 8" VCP-CIPP - 3% ◄ ID# 15374 213 LF 10" VCP-CIPP - 0.5% ◄ ID# 12622ID# 12623 400 LF 8" VCP-CIPP - 6.6% ►305 LF 8" VCP-CIPP - 1.04% ► CL E A N O U T SE E N O T E 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-2SEWER LINING PLAN - 2 CARDIFF SANITARY DIVISION FAITH AVE LOCH LOMOND DR MACKINNON AVE ORKNEY LN LOCH LOMOND DR BETWEEN LOCH LOMOND DR & ORKNEY LN ARCADIA RD IN LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 3/2/21 CIPP Length 303ft Laterals Reinstated : 7/EA Post CCTV: 3/2/21 CIPP Length 401ft Laterals Reinstated : 8/EA 4-SLCS (41', 108', 230' & 365' from MH 2507) Post CCTV: 12/16/20 CIPP Length 277ft Laterals Reinstated : 5/EA Post CCTV: 3/11/21 UV Sectional Installed Laterals Reinstated : 1/EA Post CCTV: 11/25/20 CIPP Length 271ft Laterals Reinstated : 7/EA Post CCTV: 2/18/21 CIPP Length 259ft Laterals Reinstated : 8/EA Post CCTV: 2/4/21 CIPP Length 403ft Laterals Reinstated : 10/EA Post CCTV: 1/28/21 SPR Liner Length 216ft Laterals Reinstated : 14/EA 3-SLCS Post CCTV: 4/23/21 CIPP Length 240ft Laterals Reinstated : 3/EA 1-SLCS (182' from MH 2468) Post CCTV: 12/15/20 CIPP Length 181ft Laterals Reinstated : 4/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 15372 ID# 10958ID# 10959 400 LF 8" VCP-CIPP - 2.6% ◄260 LF 8" VCP-CIPP-SHC - 5% ◄ 284 LF 8" VCP- C I P P - 6 . 6 3 % ◄ 401 LF 8" VCP-CIPP - 3.08% ◄ ID# 10956ID# 10957 350 LF 8" VCP-CIPP - 6.8% ◄260 LF 8" VCP-CIPP-SHC - 5% ◄ID# 1536 8 ID# 15369 25 LF 8" V C P - C I P P 1.92% ◄ 330 LF 8" VCP-CIPP - 1.92% ◄ ID# 15377 271 LF 8" VCP - 0.28% ► 47 ' 4' IN ID# 10952 114 LF 8" VCP-CIPP - 2.52% ◄ CL E A N O U T SE E N O T E 1 ID# 11213 298 LF 8" VCP-CIPP - 0.4% ► 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-3SEWER LINING PLAN - 3 CARDIFF SANITARY DIVISION CATHY LN CATHY LN TO GRANGE HALL RD OCEAN CREST RD MACKINNON AVE JUSTIN RD WINDSOR RD LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 12/14/20 CIPP Length 284ft Laterals Reinstated : 5/EA Post CCTV: 12/14/20 CIPP Length 402ft Laterals Reinstated : 13/EA 2-SLCS (93' & 325' from MH 2202) Post CCTV: 11/30/20 CIPP Length 375ft Laterals Reinstated : 10/EA 1-SLCS (56' from MH 2201) Post CCTV: 1/13/21 CIPP Length 324ft Laterals Reinstated : 9/EA Post CCTV: 1/13/21 CIPP Length 21.5ft Laterals Reinstated : 0/EA Post CCTV: 2/25/21 SPR Liner Length 259ft Laterals Reinstated : 4/EA 4-SLCS Post CCTV: 1/27/21 CIPP Length 348ft Laterals Reinstated : 9/EA Post CCTV: 11/30/20 CIPP Length 297ft Laterals Reinstated :6/EA Post CCTV: 1/13/21 CIPP Length 110ft Laterals Reinstated : 3/EA Post CCTV: 3/12/21 UV Sectional Length 7ft Laterals Reinstated : 1/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 11609 351 LF 8" VCP - 0 . 4 7 % ◄ 2 5 6 ' 4 ' IN ID# 12516 325 LF 8" VCP-CIPP - 1.48% ◄ ID# 11678 238 LF 8" VCP-CIPP - 10.18% ◄ I D # 1 1 1 4 3 ID# 11379 1 0 2 L F 8 " V C P - C I P P - S R S S - 0 . 4 % ► 402 LF 8" VCP-CIPP-SH C - S R S S - 0 . 4 % ► S 293' 4' I N ID# 11161 297 LF 8" VCP - 7.77% ◄ 29 3 ' 4' IN ID# 11485 350 LF 8" VCP-CIPP - 0.4% ► 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-4SEWER LINING PLAN - 4 CARDIFF SANITARY DIVISION GREENLAKE DRBLUE SKY DR GREENLAKE DRBIG CANYON TERRACE WOODGROVE DRLOWER LAKE CT LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 12/15/20 CIPP Length 351ft Laterals Reinstated : 17/EA Post CCTV: 3/3/21 CIPP Length 405ft Laterals Reinstated : 16/EA 1-SLCS (374' from MH 2297) Post CCTV: 3/3/21 CIPP Length 99ft Laterals Reinstated : 0/EA Post CCTV: 1/14/21 CIPP Length 236ft Laterals Reinstated : 3/EA Post CCTV: 12/1/20 CIPP Length 325ft Laterals Reinstated : 8/EA Post CCTV: 3/3/21 SLCS Installed 1/11/21 Laterals Reinstated : 0/EA Post CCTV: 3/3/21 Insitu Point Repair 1 Installed 1/13/21 Laterals Reinstated : 0/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 16643 240 LF 8" VCP-CIPP - 0.48% ◄ ID# 12294 240 LF 8" VCP - 0.4% ◄ 14 6 ' 4' IN ID# 1195 0 ID# 1 1 9 6 4 ID# 119 8 2 223 LF 8" V C P - C I P P - 0 . 5 2 % ◄ 298 L F 8 " V C P - C I P P - 0 . 4 6 % ◄ 403 LF 8 " V C P - C I P P - 0 . 4 6 % ◄ S ID# 354 2 ID# 3541 304 LF 8 " V C P - 0 . 6 6 % ◄ 372 LF 8" V C P - 0 . 7 % ◄ 193' 4' I N 2 5 0 ' 4 ' IN 17 0 ' 4' IN ID# 356 4 ID# 11918 ID# 11933 200 LF 8 " V C P - S H C - 0 . 4 % ◄ 318 LF 8" V C P - C I P P - 1 0 . 4 8 % ◄ 230 LF 8" VCP-CIPP - 6.12% ◄ 1 9 3 ' 4 ' IN 250' 4' I N 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-5SEWER LINING PLAN - 5 CARDIFF SANITARY DIVISION ALOHA DR CAMINITO SEPTIMO CAMINITO SEPTIMO EVERGREEN DR WOODLAKE DR LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 12/16/20 CIPP Length 244ft Laterals Reinstated : 9/EA Post CCTV: 12/18/20 CIPP Length 323ft Laterals Reinstated : 6/EA Post CCTV: 12/18/20 CIPP Length 228ft Laterals Reinstated : 1/EA Post CCTV: 1/14/21 CIPP Length 221ft Laterals Reinstated : 5/EA Post CCTV: 12/17/20 CIPP Length 298ft Laterals Reinstated : 7/EA Post CCTV: 12/17/20 CIPP Length 401ft Laterals Reinstated : 9/EA Post CCTV: 3/3/21 Insitu Point Repair 1 Installed 1/8/21 Laterals Reinstated : 0/EA Trimmed Protruding Lateral Post CCTV: 3/3/21 Insitu Point Repair 1 Installed 1/11/21 Laterals Reinstated : 0/EA Post CCTV: 3/3/21 Insitu Point Repair 1 Installed 1/12/21 Laterals Reinstated : 0/EA Post CCTV: 6/25/21 Insitu Point Repair 1 Installed 6/25/21 Laterals Reinstated : 0/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 12519ID# 12518ID# 12517 370 LF 8" VCP-CIPP - 1.04% ◄394 LF 8" VCP-CIPP - 1.04% ◄406 LF 8" VCP-CIPP-SHC - 0.52% ◄ CL E A N O U T SE E N O T E 1 ID# 12611 353 LF 8" VCP-CIPP-SRSS - 2.08% ► CL E A N O U T SE E N O T E 1 ID# 15353 344 LF 6" VCP-CIPP-SRSS - 4.30% ◄ CL E A N O U T SE E N O T E 1 S ID# 8463 384 LF 8" VCP-CIPP - 0.88% ► CL E A N O U T SE E N O T E 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-6SEWER LINING PLAN - 6 CARDIFF SANITARY DIVISION BALOUR DR BETWEEN SAN ELIJO AVE AND SUMMIT AVE BETWEEN SUMMIT AVE AND RUBENSTEIN AVE LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. CAMBRIDGE AVE Post CCTV: 1/4/21 CIPP Length 370ft Laterals Reinstated : 8/EA Post CCTV: 3/1/21 CIPP Length 396ft Laterals Reinstated : 12/EA Post CCTV: 1/26/21 CIPP Length 405ft Laterals Reinstated : 11/EA 1-SLCS (18' from MH 2638) Post CCTV: 3/29/21 CIPP Length 359ft Laterals Reinstated : 3/EA Post CCTV: 4/13/21 CIPP Length 356ft Laterals Reinstated : 12/EA Post CCTV: 3/2/21 CIPP Length 388ft Laterals Reinstated : 11/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 13782 ID# 13780 ID# 13779 ID# 13781 260 LF 8" VCP-CIPP - 5.5% ►250 LF 8" VCP-CIPP - 0.64% ◄320 LF 8" VCP-CIPP - 1.2% ◄190 LF 8" VCP-CIPP - 5% ◄ CL E A N O U T SE E N O T E 1 CL E A N O U T SE E N O T E 1 ID# 13205ID# 13206ID# 13269 324 LF 8" VCP-CIPP - 0.4% ◄324 LF 8" VCP-CIPP - 0.4% ◄153 LF 8" VCP-CIPP - 2.8% ◄ S ID# 13227 ID# 13208 ID# 13270 330 LF 8" VCP-CIPP-SRSS - 2.94% ◄324 LF 8" VCP-CIPP - 5.78% ◄171 LF 8" VCP-CIPP - 2.8% ◄ S ID# 13721 170 LF 8" VCP-CIPP-SHC - 9.64% ◄ 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-7SEWER LINING PLAN - 7 ENCINITAS SANITARY DIVISION DEL RIO AVE CLARK AVE CLARK AVE UNION ST LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 2/10/21 CIPP Length 193ft Laterals Reinstated : 7/EA Post CCTV: 2/10/21 CIPP Length 322ft Laterals Reinstated : 6/EA Post CCTV: 1/12/21 CIPP Length 248ft Laterals Reinstated : 6/EA Post CCTV: 2/10/21 CIPP Length 262ft Laterals Reinstated : 8/EA 3-SLCS (166', 196' & 228' from MH 3207) Post CCTV: 1/6/21 CIPP Length 170ft Laterals Reinstated : 2/EA Post CCTV: 3/12/21 CIPP Length 325ft Laterals Reinstated : 9/EA 6-SLCS (2', 76', 168', 174', 192', 218' from MH 2798) Post CCTV: 2/11/21 CIPP Length 325ft Laterals Reinstated : 13/EA 2-SLCS (131', 322' from MH 2798) Post CCTV: 2/11/21 CIPP Length 152ft Laterals Reinstated : 3/EA Post CCTV: 3/12/21 CIPP Length 170ft Laterals Reinstated : 5/EA 1-SLCS (152' from MH 3141) Post CCTV: 5/12/21 CIPP Length 327ft Laterals Reinstated : 3/EA Post CCTV: 2/1/21 CIPP Length 327ft Laterals Reinstated : 3/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 12968 360 LF 8" VCP-CIPP-SHC - 0.34% ► ID# 12972 285 LF 6" VCP-CIPP-SHC - 0.60% ► CL E A N O U T SE E N O T E 1 ID# 12995 315 LF 8" VCP-CIPP-SRSS - 9.31% ► S S ID# 13703 182 LF 8" VCP - 6.47% ► 12 2 ' 4' IN S ID# 13965 ID# 13964 ID# 13981 43 LF 8" VCP-CIPP 0.4% ► 208 LF 8" VCP-CIPP - 0.4% ►135 LF 8" VCP-CIPP - 0.4% ► ID# 13010 ID# 13011ID# 13013 222 LF 8" VCP-CIPP-SHC - 0.4% ►224 LF 8" VCP-CIPP-SHC - 0.4% ►244 LF 8" VCP-CIPP - 2.4% ► ID# 16394 95 LF 8" VCP-CIPP 2.00% ► 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-8SEWER LINING PLAN - 8 ENCINITAS SANITARY DIVISION LA MESA AVELA VETA AVE ARROYO DR ARROYO DR OCEAN VIEW AVE OCEAN VIEW AVE HIGHWAY 101 & ENCINITAS BLVD LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 1/6/21 CIPP Length 244ft Laterals Reinstated : 3/EA Post CCTV: 1/6/21 CIPP Length 224ft Laterals Reinstated : 2/EA Post CCTV: 1/6/21 CIPP Length 226ft Laterals Reinstated : 5/EA Post CCTV: 3/11/21 Insitu Point Repair 1 Installed 1/13/21 Laterals Reinstated : 0/EA Post CCTV: 1/4/21 CIPP Length 43ft Laterals Reinstated : 0/EA Post CCTV: 1/4/21 CIPP Length 206ft Laterals Reinstated : 4/EA Post CCTV: 1/4/21 CIPP Length 135ft Laterals Reinstated : 2/EA Post CCTV: 12/30/20 CIPP Length 287ft Laterals Reinstated : 9/EA 1-SLCS (194' from 2722) Post CCTV: 2/12/21 CIPP Length 360ft Laterals Reinstated : 10/EA Post CCTV: 2/1/21 CIPP Length 312ft Laterals Reinstated : 3/EA Post CCTV: 3/12/21 CIPP Length 98ft Laterals Reinstated : 0/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 561 195 LF 8" VCP-CIPP - 0.4% ► CL E A N O U T SE E N O T E 1 ID# 558 346 LF 8" VCP - 3.28% ► 23 8 ' 4' IN ID# 554 336 LF 10" VCP-CIPP - 0.2% ► ID# 473ID# 474 331 LF 10" VCP-CIPP - 0.2% ►350 LF 10" VCP-CIPP - 0.2% ► ID# 12849 350 LF 8" VCP-CIPP-SHC - 0.4% ► 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-9SEWER LINING PLAN - 9 ENCINITAS SANITARY DIVISION SAN DIEGUITO DR SAN DIEGUITO DRSAN DIEGUITO DR SAN DIEGUITO DR ALLEY BETWEEN HIGHWAY 101 & 2ND ST LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 3/4/21 CIPP Length 352ft Laterals Reinstated : 11/EA Post CCTV: 2/5/21 CIPP Length 329ft Laterals Reinstated : 6/EA Post CCTV: 2/17/21 CIPP Length 197ft Laterals Reinstated : 5/EA 1-SLCS (141 from 233) Post CCTV: 3/4/21 CIPP Length 336ft Laterals Reinstated : 8/EA Post CCTV: Deleted UV Sectional 0ft Laterals Reinstated : 0/EA Post CCTV: 3/4/21 CIPP Length 352ft Laterals Reinstated : 11/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 11786 ID# 11787 ID# 11788 40 LF 6" VCP-CIPP 10.35% ◄ 99 LF 6" VCP-CIPP 16.53% ◄ 240 LF 6" VCP-CIPP-SHC - 17.17% ◄ CL E A N O U T SE E N O T E 1 ID# 11798 ID# 11797 200 LF 6" VCP-CIPP - 0.7% ► 200 LF 6" VCP-CIPP - 0.7% ► CL E A N O U T SE E N O T E 1 S I D # 1 6 3 8 1 4 0 L F 6 " V C P - C I P P - S H C - 1 0 . 8 % ► 19 7 ' 9' EX ID# 11804 ID# 11805 200 LF 6" VCP-CIPP - 0.7% ◄200 LF 6" VCP-CIPP - 2% ◄ CL E A N O U T SE E N O T E 1 ID# 11810ID# 11809 200 LF 6" VCP-CIPP - 2.8% ◄200 LF 6" VCP-CIPP - 2.8% ◄ CL E A N O U T SE E N O T E 1 18 7 ' 9' EX ID# 492 148 LF 6" VCP-CIPP - 10.35% ◄187' 9' EX ID# 16446 160 LF 8" VCP-CIPP - 6.71% ► CL E A N O U T SE E N O T E 1 S ID# 11802 ID# 11801 200 LF 6" VCP-CIPP - 2.15% ►200 LF 6" -CIPP - 0.7% ► 41 L F 6 " V C P - C I P P - 1 0 . 8 % ◄ ► CL E A N O U T SE E N O T E 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-10SEWER LINING PLAN - 10 ENCINITAS SANITARY DIVISION I ST ALLEY BETWEEN CORNISH DR & DEWITT AVEDEWITT AVE ALLEY BETWEEN CORNISH DR & DEWITT AVEF STCORNISH DR DEWITT AVE LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 1/6/21 CIPP Length 150ft Laterals Reinstated : 2/EA 2-SLCS (19' & 136' from MH 578) Post CCTV: 2/19/21 CIPP Length 201ft Laterals Reinstated : 6/EA Post CCTV: 2/19/21 CIPP Length 200ft Laterals Reinstated : 3/EA Post CCTV: 12/21/20 CIPP Length 201ft Laterals Reinstated : 4/EA Post CCTV: 12/21/20 CIPP Length 200ft Laterals Reinstated : 4/EA 2-SLCS (26' & 78' from MH 2374) Post CCTV: 2/4/21 CIPP Length 198ft Laterals Reinstated : 3/EAPost CCTV: 2/4/21 CIPP Length 197ft Laterals Reinstated : 4/EA Post CCTV: 2/4/21 CIPP Length 37ft Laterals Reinstated : 2/EA Post CCTV: 12/22/20 CIPP Length 201ft Laterals Reinstated : 5/EA 2-SLCS (62' & 197' from 2373) Post CCTV: 12/22/20 CIPP Length 201ft Laterals Reinstated : 3/EA Post CCTV: 12/30/20 CIPP Length 245ft Laterals Reinstated : 0/EA Post CCTV: 12/30/20 CIPP Length 99ft Laterals Reinstated : 1/EA Post CCTV: 12/30/20 CIPP Length 40ft Laterals Reinstated : 0/EA Post CCTV: 2/12/21 CIPP Length 165ft Laterals Reinstated : 3/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 11779 ID# 11777 113 LF 8" VCP-CIPP 11.46% ◄ 181 LF 8" VCP-CIPP - 12.06% ◄ ID# 11773 ID# 11774 345 LF 6" VCP-CIPP-SRSS - 0.7% ►341 LF 6" VCP-CIPP-SRSS - 1.64% ► ID# 11789 ID# 15767 200 LF 6" VCP-CIPP - 0.7% ◄200 LF 6" VCP-CIPP - 0.7% ◄ CL E A N O U T SE E N O T E 1 ID# 11776 297 LF 8" VCP-CIPP - 0.6% ► ID# 11772 ID# 11771 ID# 11770 125 LF 6" VCP-CIPP - 0.7% ►350 LF 6" VCP-CIPP - 0.7% ►345 LF 6" VCP-CIPP-SRSS - 0.7% ► CL E A N O U T SE E N O T E 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-11SEWER LINING PLAN - 11 ENCINITAS SANITARY DIVISION SANTE FE DR ALLEY BETWEEN DEWITT AVE & VULCAN AVE ALLEY BETWEEN DEWITT AVE & VULCAN AVECORNISH DR DEWITT AVE LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 12/28/20 CIPP Length 126ft Laterals Reinstated : 3/EA Post CCTV: 12/28/20 CIPP Length 351ft Laterals Reinstated : 4/EA 1-SLCS (49' from 2352) Post CCTV: 12/24/20 CIPP Length 351ft Laterals Reinstated : 2/EA Post CCTV: 1/6/21 CIPP Length 297ft Laterals Reinstated : 4/EA 1-SLCS (126' from 2349) Post CCTV: 12/29/20 CIPP Length 205ft Laterals Reinstated : 4/EA Post CCTV: 12/29/20 CIPP Length 203ft Laterals Reinstated : 6/EA 1-SLCS (111' from 2366) Post CCTV: 12/29/20 CIPP Length 346ft Laterals Reinstated : 4/EA 1-SLCS (49' from 2353) Post CCTV: 12/29/20 CIPP Length 343ft Laterals Reinstated : 0/EA Post CCTV: 12/29/20 CIPP Length 181ft Laterals Reinstated : 0/EA Post CCTV: 12/29/20 CIPP Length 113ft Laterals Reinstated : 0/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 14127 145.2 LF 8" VCP-CIPP 0.4% ► ID# 14128 302.76 LF 8" VCP-CIPP 0.4% ► ID# 16805 298 LF 6" VCP-CIPP-SRSS 2.0% ◄ 21 5 ' 4' EX ID# 16499 300 LF 8" VCP-CIPP - 4.8% ◄ 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-12 SEWER LINING PLAN - 12 B STREET LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. EASEMENT BETWEEN SAXONY PL AND SEACREST WAY LEUCADIA BLD Deleted from Contract Deleted from Contract Post CCTV: 2/26/21 CIPP Length 310ft Laterals Reinstated : 0/EA Post CCTV: 2/12/21 CIPP Length 258ft Laterals Reinstated : 3/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 P-1 MACKINNON AVENUE SEWER PLAN AND PROFILE 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE 1"=40' 1"=4' GENERAL NOTES: MACKINNON AVENUE CONSTRUCTION NOTES: PROFILE INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 D-1 DETAILS 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H 1 POINT REPAIR OR SERVICE CONNECTION REPAIR DETAIL NOTES: 2MANHOLE CONNECTION DETAIL 3TYPICAL TRENCH DETAIL NOTES: NONE NONE INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 D-2 MANHOLE REHABILITATION 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04HNONE NONE INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 A A Work removed - previously completed J.Ballesteros 03/03/2021 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 12519ID# 12518ID# 12517 370 LF 8" VCP-CIPP - 1.04% ◄394 LF 8" VCP-CIPP - 1.04% ◄406 LF 8" VCP-CIPP-SHC - 0.52% ◄ CL E A N O U T SE E N O T E 1 ID# 12611 353 LF 8" VCP-CIPP-SRSS - 2.08% ► CL E A N O U T SE E N O T E 1 ID# 15353 344 LF 6" VCP-CIPP-SRSS - 4.30% ◄ CL E A N O U T SE E N O T E 1 S ID# 8463 384 LF 8" VCP-CIPP - 0.88% ► CL E A N O U T SE E N O T E 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-6SEWER LINING PLAN - 6 CARDIFF SANITARY DIVISION BALOUR DR BETWEEN SAN ELIJO AVE AND SUMMIT AVE BETWEEN SUMMIT AVE AND RUBENSTEIN AVE LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. CAMBRIDGE AVE Post CCTV: 1/4/21 CIPP Length 370ft Laterals Reinstated : 8/EA Post CCTV: 3/1/21 CIPP Length 396ft Laterals Reinstated : 12/EA Post CCTV: 1/26/21 CIPP Length 405ft Laterals Reinstated : 11/EA 1-SLCS (18' from MH 2638) Post CCTV: 3/29/21 CIPP Length 359ft Laterals Reinstated : 3/EA Post CCTV: 4/13/21 CIPP Length 356ft Laterals Reinstated : 12/EA Post CCTV: 3/2/21 CIPP Length 388ft Laterals Reinstated : 11/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 NOT TO SCALE B B Emergency Work requested by PW/WW - CCO #5 J. Ballesteros 07/21/2021 D-3 23 of 24 AS-BUILT DI D 8 9 4 8 SI-137 ID# 11779 ID# 11777 113 LF 8" VCP-CIPP 11.46% ◄ 181 LF 8" VCP-CIPP - 12.06% ◄ ID# 11773 ID# 11774 345 LF 6" VCP-CIPP-SRSS - 0.7% ►341 LF 6" VCP-CIPP-SRSS - 1.64% ► ID# 11789 ID# 15767 200 LF 6" VCP-CIPP - 0.7% ◄200 LF 6" VCP-CIPP - 0.7% ◄ CL E A N O U T SE E N O T E 1 ID# 11776 297 LF 8" VCP-CIPP - 0.6% ► ID# 11772 ID# 11771 ID# 11770 125 LF 6" VCP-CIPP - 0.7% ►350 LF 6" VCP-CIPP - 0.7% ►345 LF 6" VCP-CIPP-SRSS - 0.7% ► CL E A N O U T SE E N O T E 1 605 Third Street Encinitas, CA 92024 760.942.5147 Fax 760.632.0164 36 x 2 4 2019-2020 ANNUAL CITYWIDE SEWER REHABILITATION CSD PROJECT NO. CC04E - ESD PROJECT NO. CE04H GRAPHIC SCALE C-11SEWER LINING PLAN - 11 ENCINITAS SANITARY DIVISION SANTE FE DR ALLEY BETWEEN DEWITT AVE & VULCAN AVE ALLEY BETWEEN DEWITT AVE & VULCAN AVECORNISH DR DEWITT AVE LATERAL DATA TABLE NOTES: 1.INSTALL LINER THROUGH CLEANOUT IF FEASIBLE OR REMOVE AND RECONSRUCT CLEANOUT PER SDRSD SC-01, TYPE A. 2.REINSTATE DROP CONNECTION AT MANHOLE AFTER LINING. 3.ALL UTILITIES SHOWN ARE APPROXIMATE LOCATIONS ONLY. ALL SEWER LATERALS MAY NOT BE SHOWN. THE CONTRACTOR SHALL VERIFY ALL VERTICAL AND HORIZONTAL LOCATIONS PRIOR TO CONSTRUCTION. Post CCTV: 12/28/20 CIPP Length 126ft Laterals Reinstated : 3/EA Post CCTV: 12/28/20 CIPP Length 351ft Laterals Reinstated : 4/EA 1-SLCS (49' from 2352) Post CCTV: 12/24/20 CIPP Length 351ft Laterals Reinstated : 2/EA Post CCTV: 1/6/21 CIPP Length 297ft Laterals Reinstated : 4/EA 1-SLCS (126' from 2349) Post CCTV: 12/29/20 CIPP Length 205ft Laterals Reinstated : 4/EA Post CCTV: 12/29/20 CIPP Length 203ft Laterals Reinstated : 6/EA 1-SLCS (111' from 2366) Post CCTV: 12/29/20 CIPP Length 346ft Laterals Reinstated : 4/EA 1-SLCS (49' from 2353) Post CCTV: 12/29/20 CIPP Length 343ft Laterals Reinstated : 0/EA Post CCTV: 12/29/20 CIPP Length 181ft Laterals Reinstated : 0/EA Post CCTV: 12/29/20 CIPP Length 113ft Laterals Reinstated : 0/EA INSPECTED BY DATE APPROVED BY DATE AS-BUILT 10/22/2021 09/23/2021 NOT TO SCALE B B Emergency Work requested by PW/WW - CCO #5 J. Ballesteros 07/21/2021 D-4 24 of 24 AS-BUILT DI D 8 9 4 8 SI-137