Loading...
2015 Development User Fee Cost Recovery Findings MGTCity of Encinitas, CaliforniaCost Recovery Study FindingsFiscal 2014/2015April, 2015MGT Sacramento2251 Harvard Street, Suite 134Sacramento, CA 95815 ph: 916.443.3411http://www.mgtamer.com Section PageIExecutive Summary Introduction 1 Study Scope & Objectives 1 Study Findings 2 Methodology 6 Economic & Policy Considerations 8 Report Organization 9IIPlanning Fees 10IIIFire Fees 16IVEngineering Fees 19VFully Burdened Hourly Rates 25VIFee Comparison Survey 29Table of Contents Section IExecutive Summary INTRODUCTION MGT of America, Inc (MGT) is pleased to present the City of Encinitas with this summary of findings for the cost of services study for development-related user fee services. This study is an update of a study that MGT performed for the City in 2011. This is the third update of an original study performed in 2005 by Public Resource Management Group (PRM). That original 2005 study focused primarily on establishing a baseline of fees and cost recovery policies for development-related services, and identified significant opportunities for increased user fee revenues (slightly more than $1.3 million in potential increased revenues). The updates performed in 2009 and 2011 followed the same methodology as the original study, but rather than presenting a significant opportunity for increases in user fee revenues, those studies reflected the economic downturn (beginning in 2008) and its impact on the City’s development activity and associated user fee services; minimal adjustments were made to fees in 2009 and no fees were adjusted in 2011. In order to better reflect the current economic situation as well as in the interest of keeping its fees current, the City contracted with MGT to update the FY 2011 study with proposed 2014/2015 fiscal year budget and staffing information, and projected activity levels for the upcoming fiscal year. STUDY SCOPE AND OBJECTIVES The focus of the study was on development-related user fee activities; specifically Planning, Fire Prevention, and Engineering fees. Building permit and inspection fees were not included in the analysis. The following departments provide support to these services:  Planning  Fire – Fire Loss Prevention and Planning  Engineering  Water – Planning and Engineering Division Page 1 The study was performed under the general direction of the Finance Department with the participation of the above-mentioned departments. The primary goals of the study were to:  Define what it costs the City to provide various fee-related services.  Determine whether there are any opportunities to implement new fees.  Identify service areas where the City might adjust fees based on the full cost of services and other economic or policy considerations.  Develop revenue projections based on recommended increases (or decreases) to fees.  Provide a comparison of what other jurisdictions are charging for similar services. The information summarized in this report addresses each of these issues and provides the City of Encinitas with the tools necessary to make informed decisions about possible fee adjustments and the resulting impact on general fund revenues. STUDY FINDINGS While the purpose of this study is to identify the cost of fee-related activities, one of the outcomes of the analysis is a complete picture of the full cost of all services provided. It is necessary to identify all costs, whether fee-related or not, so that there is a fair distribution of all citywide and departmental overhead costs (discussed in a subsequent section of this report) across all activities, ensuring a clear relationship between the cost of the service and the fee that is charged. No service should be burdened with costs that cannot be directly or indirectly associated with that service. Therefore the first task in this study is to separate the fee-for-service activities from the non-fee activities. Some non-fee related activities are appropriately funded by general fund monies (or other special revenue sources), such as public projects or code enforcement services. The costs of these other services are identified and set aside from the user fee services. Exhibit I on the following page displays the split of the total costs of each department into either user fee-related or other service costs. Of the $13.0 million in total costs analyzed, just over $3.4 million (or 26%) of that total is related to user fee services. It is this $3.4 million that is the focus of this study, and this represents the total potential of user fee-related revenues for the City of Encinitas. Page 2 Exhibit IDepartment/Division Total CostsPlanning$6,208,471 $1,100,852 18% $5,107,619 82%Fire Loss Prevention/Planning$942,173 $408,496 43% $533,677 57%Engineering$5,351,001 $1,702,322 32% $3,648,679 68%Water Planning & Engineering$473,682 $128,527 27% $345,154 73%Grand Total:$12,975,326 $3,340,198 26% $9,635,129 74%City of Encinitas2014/2015Total Costs by User Fee AreaCosts, User Fee ServicesCosts, Non-Fee Services (Note that the San Dieguito Water District (SDWD) incurs $128,527(3.85%) of the total user fee service cost of $3,340,198. When fees are collected for development-related services, SDWD should receive 3.85% of the total.) One of the key aspects of this study is that the departments were careful to identify staff time spent in support of fees collected outside of the “home” department. For example, Fire Prevention spends time on and incurs costs for several planning and engineering fee activities in addition to providing its own services. This study calculated the cost of this crossover support between the departments (including SDWD support to these services; SDWD does not collect its own development-related user fees). The costs of user fee services identified above represent the costs of all development-related services. The costs are then split between planning, fire prevention, and engineering fees in the two exhibits below. The next step in the process is to identify the source of funds for the user fee services. Exhibit II below breaks down the $3.4 million in user fee services between costs that are recovered through current user fee charges and costs that are currently unrecovered. Overall, the City is experiencing a 52% cost recovery level for its fee-related services. Within each department, cost recovery levels range from 32% for Fire Prevention, 51% for Engineering, and 60% for Planning. At the individual program or service level, individual fee recoveries range from 0% to more than 100%. The information about individual fees may be found in subsequent sections of this report. Page 3 Exhibit IIFunction/ActivityCosts, User Fee ServicesPlanning User Fees$1,046,272 $630,825 60% $415,447 40%Fire Prevention User Fees$298,090 $95,800 32% $202,290 68%Engineering User Fees$1,995,836 $1,017,200 51% $978,636 49%Grand Total:$3,340,198 $1,743,825 52% $1,596,373 48%* - based on fees as shown in the City's current fee schedules.City of EncinitasUnrecovered CostsSource of Funds- User Fee Activities -Funded by User Fees*2014/2015 Exhibit II indicates that the general fund is not recovering user fee costs totaling $1,596,373. This $1,596,373 represents a potential cost recovery opportunity for the City to increase fees and general fund revenues, with a corresponding decrease in the subsidization of services. While it is not likely (nor would MGT recommend) that the City completely recover all costs for fees, it is possible for the City to implement moderate increases to current fees and implement new fees for some services. The study's primary objective is to provide the City's decision-makers with basic data needed for setting fees. This report details the full cost of services and presents proposed fees and projected revenues based on established city policy for user fee cost recovery levels. Each department, working with the Finance Department, made its own recommendations for fee increases based upon careful consideration of the results of the cost analysis, historical cost recovery levels, economic considerations, and the elasticity of demand unique to each department’s services. Page 4 Exhibit III below summarizes the report's financial analysis of the City's user fee program. It is estimated that adoption of the recommended fees would increase the specified fee revenue by $167,460 (assuming a static volume of activity). This would bring the overall cost recovery level up to 57%. Exhibit IIIRevenues @Department/DivisionCosts, User Fee ServicesUnrecovered CostsIncreased / (Decreased) RevenuePlanning User Fees$1,046,272 $415,447$630,825 60% $651,710 62% $20,885Fire Prevention User Fees$298,090 $202,290$95,800 32% $125,160 42% $29,360Engineering User Fees$1,995,836 $978,636 $1,017,200 51% $1,134,415 57% $117,215Grand Total:$3,340,198 $1,596,373 $1,743,825 52% $1,911,285 57% $167,460Recommended FeesCity of EncinitasUser Fee Revenue Analysis2014/2015Current Fees Note that as mentioned above, SDWD should receive 3.85% of the revenues collected for these services, since their costs contribute 3.85% of the total. Therefore, if fees are implemented as recommended, this study projects a total revenue collection of $1,911,285 and SDWD would receive approximately $73,544 of that total.  Page 5 METHODOLOGY A cost of service study analyzes two components of costs: the direct costs associated with providing each fee-for-service activity, and the indirect costs that support these activities. A brief discussion of each of these components follows. Direct Costs. The direct costs associated with fee-for-service activities were analyzed in great detail in this study. MGT worked closely with staff and management within each of the departments to develop the analysis that is summarized in the following sections of this report. Fiscal year 2014/2015 proposed budget estimates were used to identify direct costs. The first step in the process was to identify staff time spent directly on each of the user fee activities. Each staff person that participates in the user fee services identified time spent to complete each task associated with all user fee services. Annual volume statistics were also gathered in order to develop total annual workload information. Salary and benefit dollars were assigned to the time estimates to come up with the direct staff costs. Indirect Costs. A proportionate share of other operating expenses and internal department administrative costs were layered onto the direct costs as a departmental overhead. Citywide overhead costs coming from the cost allocation plan (described below) were also added in as indirect overhead. Finally, crossover direct costs were added in as necessary. These four components of costs: 1) direct salary and benefits, 2) departmental overhead, 3) citywide overhead, and 4) crossover direct costs total up to the full cost of providing each service. The cost of each activity is then compared to the fee currently charged, and an under- or over-recovery of costs is identified. Cost Allocation Plan. Many of the costs that support all city programs and services are budgeted in centralized activities such as Finance, which provides budgeting and accounting support, and Facility Maintenance, which provides building maintenance and custodial services. The costs of these activities and other centralized services are considered indirect overhead that support fee-for-service activities as well as other programs and functions within the City. As part of this study, MGT developed an indirect cost allocation plan that identifies and distributes these indirect costs to all operating programs and functions within the City’s organizational structure. The cost allocation plan takes a detailed approach to analyzing indirect costs. MGT collected and analyzed data within each central service activity to determine: Page 6 1. What indirect support functions are provided (e.g. payroll, legal services, civic center maintenance, etc), 2. How to allocate centrally budgeted personnel and other operating expenses into these functions, 3. Which departments receive benefit from these services (e.g. payroll services benefit all departments that have budgeted staff, civic center maintenance benefits all departments that are housed in the Civic Center), and 4. What is the best method of allocating these costs to the users (e.g. payroll services are allocated based on the number of full-time equivalent (FTE) positions department). The end result of this analysis is the allocation of all indirect costs to all operating departments and programs. The indirect costs are then added to the direct costs to determine the full cost of all city operations – whether fee-related or not. This accounting exercise is important in that it can result in an increase in general fund revenues for reimbursement of support to enterprise and internal service funds, state or federally funded programs, and user fee services.  Page 7 ECONOMIC & POLICY CONSIDERATIONS Calculating the true cost of providing city services is a critical step in the process of establishing user fees and corresponding cost recovery levels. But although it is the most important factor, others must also be given consideration. City decision-makers must also consider the effects that establishing fees for services will have on the individuals purchasing those services as well as the community as a whole. The following economic and policy issues help illustrate these considerations.  It may be a desired policy to establish fees at a level that permits lower income groups to participate in services that they might not otherwise be able to afford.  A consideration of community-wide benefit versus specific benefit should be considered for certain services (e.g. free installation of child safety seats for residents).  In conjunction with the second point above, the issue of who is the service recipient versus the service driver should also be considered. For example, code enforcement activities benefit the community as a whole, but the service is driven by the individual or business owner that violates city code.  Elasticity of demand is a factor in pricing certain city services; increasing the price of some services results in a reduction of demand for those services, and vice versa.  Public sector agencies have a monopoly on providing certain services within its boundaries, such as development-related services. However, other services such as recreation programs may be provided by the private sector, and therefore demand for these services is highly dependent on what else may be available at lower prices.  Pricing services can encourage or discourage certain behaviors. Some examples of this would be to establish a low fee for a water heater permit to encourage homeowners to ensure their water heater is properly installed, or setting false alarm response fees on an incremental scale to discourage multiple false alarms.  It may be impractical to establish a cost recovery system for some services or too costly to collect the fees. Many fees that are charged after a service has been provided fall under this category, e.g. DUI response fees, false alarm response fees, code enforcement violations, etc. Page 8 REPORT ORGANIZATION Following are report sections II through VI which present findings and recommendations, fully burdened hourly rates, and a comparison survey of selected fees. Sections II, III, and IV contains two summary schedules for each department’s fees, which display the results of the cost analysis and recommendations. The summary sheets are structured with the following format:  Per Unit Information. This summary sheet provides information about each user fee activity analyzed. This spreadsheet shows the annual volume of activity, the current fee charged, the full cost calculated, and the resulting cost recovery level. The last three columns on the right display information about recommended fee adjustments.  Annual Projections. This summary sheet displays the same fee information and recommendations identified in the per-unit information spreadsheet, but annualize the cost/revenue projections by multiplying that information by the annual volume of activity. Total projected revenue figures are displayed at the bottom of the summary. Section V displays fully burdened hourly rates for all staff within the departments analyzed. The burden rate that is attached to hourly salary and benefit costs includes overhead costs such as department administration, service and supply costs, and citywide overhead. It should be noted that for Planning, Fire Prevention, and Engineering, the calculated burden rates ranged from 69% up to 87%, but have been capped at 50% due to Council direction at the conclusion of the 2005 study. In addition to the user fee departments, hourly rates were also developed for Public Works staff. The burden rate for Public Works is 37.5% and that rate (instead of the capped 50% rate) is used for the hourly rates for staff within these departments. Section VI shows the results of a comparison of selected fees. Surveys provide information relative to what other cities are charging for similar services. It should be noted this survey provides only a simple comparison of fees as listed on each cities’ fee schedule. It is intended to give the City Council an idea of how Encinitas’ fees compare to those in surrounding communities. It does not however address the question of whether these cities have undertaken studies such as this one, which identifies all costs associated with the services provided. It does not attempt to determine whether these agencies have made a conscious decision to subsidize their fees with general fund monies (and to what degree). Nor does it address whether each agency provides a similar level of service for similar fees. Page 9 Section IIPlanning Fees User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy Level1 Appeals Flat Fee 5 $250.00 5.46% $4,582.91 $4,332.91 6.11% $280.00 $4,302.912 Annexation Flat Fee 1 $2,600.00 40.13% $6,478.70 $3,878.70 44.14% $2,860.00 $3,618.703 Boundary Adjustment Flat Fee 5 $900.00 57.35% $1,569.41 $669.41 63.08% $990.00 $579.414 Certificate of Compliance Flat Fee 10 $600.00 66.44% $903.10 $303.10 70.87% $640.00 $263.105 Coastal Development Permit Flat Fee 100 $1,600.00 73.17% $2,186.65 $586.65 73.17% $1,600.00 $586.656 Commercial Plan Check Flat Fee 6 $1,500.00 120.63% $1,243.42 -$256.58 80.42% $1,000.00 $243.427 Single Family Plan Check Flat Fee 125 $400.00 71.68% $558.07 $158.07 71.68% $400.00 $158.078 Duplex Plan Check Flat Fee 2 $700.00 81.47% $859.17 $159.17 81.47% $700.00 $159.179 Multi-Family (3-10 units) Plan Check Flat Fee 3 $1,000.00 84.55% $1,182.71 $182.71 84.55% $1,000.00 $182.7110 Multi-Family (11+ units) Plan Check Flat Fee 1 $1,200.00 111.58% $1,075.51 -$124.49 74.38% $800.00 $275.5111 Conceptual Review - Admin or Comm Flat Fee 1 $1,200.00 79.75% $1,504.67 $304.67 79.75% $1,200.00 $304.6712 Design Review - Admin Level Flat Fee 15 $1,000.00 54.20% $1,845.03 $845.03 59.62% $1,100.00 $745.0313 Design Review - Plan Comm (<2500 sq ft) Flat Fee 6 $2,400.00 62.23% $3,856.94 $1,456.94 68.45% $2,640.00 $1,216.9414 Design Review - Plan Comm (2501-10k sq ft) Flat Fee 8 $3,600.00 74.20% $4,851.70 $1,251.70 74.20% $3,600.00 $1,251.7015 Design Review - Plan Comm (>10k sq ft) Flat Fee 8 $4,800.00 89.28% $5,376.11 $576.11 89.28% $4,800.00 $576.1116 Design Review Modifications - Admin Flat Fee 1 $800.00 64.15% $1,247.01 $447.01 69.77% $870.00 $377.0117 Design Review Modifications - Plan Comm Flat Fee 1 $1,800.00 55.95% $3,217.22 $1,417.22 61.54% $1,980.00 $1,237.2218 Comprehensive Initial Study Contract Admin Flat Fee 1 $800.00 50.71% $1,577.50 $777.50 55.78% $880.00 $697.5019 Comprehensive Initial Study (in-house) Flat Fee 8 $4,200.00 59.90% $7,011.11 $2,811.11 65.90% $4,620.00 $2,391.11d)20 General Plan Amendment (no vote req)Actual Cost 0$0.00 0.00% $0.00 $0.00N/AN/AN/Ad)21 General Plan Amendment (vote req)Actual Cost 0$0.00 0.00% $0.00 $0.00N/AN/AN/A22 Major Use PermitFlat Fee 2$6,000.00 80.25% $7,476.65 $1,476.6580.25% $6,000.00 $1,476.6523 Minor Use PermitFlat Fee 14 $1,600.00 50.84% $3,147.06 $1,547.0655.93% $1,760.00 $1,387.0624 Use Permit Modifications - MajorFlat Fee 5$2,400.00 55.92% $4,291.71 $1,891.7161.51% $2,640.00 $1,651.7125 Use Permit Modifications - MinorFlat Fee 1$1,200.00 46.78% $2,565.26 $1,365.2651.46% $1,320.00 $1,245.26RecommendationsService NameCity of EncinitasPlanning Fees2014/2015Page 10 User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy LevelRecommendationsService NameCity of EncinitasPlanning Fees2014/201526 Comm or Council Interpretation Determination Flat Fee 4$1,000.00 89.02% $1,123.35 $123.3589.02% $1,000.00$123.3527 Misc Service RequestsFlat Fee 21$125.00 63.41% $197.12 $72.1271.02%$140.00$57.1228 Temporary Sign/Banner PermitFlat Fee 40$75.00 41.38% $181.26 $106.2644.13%$80.00$101.2629 Sign ProgramFlat Fee 2$800.00 69.61% $1,149.34 $349.3470.48%$810.00$339.3430 Sign ReviewFlat Fee 2$350.00 64.74% $540.61 $190.6170.29%$380.00$160.61b)31 Tentative Subdivision MapFlat Fee + per lot4 $12,500.00 54.25% $23,042.99 $10,542.9959.67% $13,750.00 $9,292.9932 Final Subdivision Map Check (5+ lots)Flat Fee 4$2,000.00 282.84% $707.11 -$1,292.8970.71%$500.00$207.1133 Tent Parcel Map Appl or Mod (2-4 lots)Flat Fee 5$3,500.00 53.61% $6,528.70 $3,028.7058.97% $3,850.00 $2,678.7034 Final Parcel Map Check (2-4 lots)Flat Fee 5$1,600.00 333.16% $480.25 -$1,119.7570.80%$340.00$140.2535 Time ExtensionsFlat Fee 1$800.00 53.26% $1,502.04 $702.0458.59%$880.00$622.0436 Variance - AdministrativeFlat Fee 1$1,200.00 47.18% $2,543.59 $1,343.5951.90% $1,320.00 $1,223.5937 Variance - Planning CommissionFlat Fee 2$3,200.00 57.55% $5,560.37 $2,360.3763.31% $3,520.00 $2,040.3738 Substantial Conformance ReviewFlat Fee 15$250.00 39.01% $640.84 $390.8443.69%$280.00$360.8439 Affordable Unit PolicyFlat Fee 2$900.00 62.49% $1,440.23 $540.2368.74%$990.00$450.2340 Minor Plan CheckFlat Fee 800$50.00 54.59% $91.60 $41.6065.51%$60.00$31.6041 EIR Contract AdminFlat Fee 1$3,400.00 44.59% $7,625.25 $4,225.2549.05% $3,740.00 $3,885.2542 Geotechnical Review Contract AdminFlat Fee 4$600.00 45.50% $1,318.61 $718.6150.05%$660.00$658.6143 Wireless Review Contract AdminFlat Fee 6$250.00 57.56% $434.35 $184.3564.46%$280.00$154.3544 Misc Technical Studies Contract AdminFlat Fee 1$500.00 47.54% $1,051.67 $551.6752.30%$550.00$501.67d)47 Zoning Code AmendmentsDeposit 0$0.00 0.00% $0.00 $0.00N/AN/AN/Ad)48 Specific PlanDeposit 0$0.00 0.00% $0.00 $0.00N/AN/AN/A50 Variance - Planning Commission SFDFlat Fee 1$1,600.00 59.59% $2,685.09 $1,085.0965.55% $1,760.00$925.09Page 11 User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy LevelRecommendationsService NameCity of EncinitasPlanning Fees2014/201551 Resolution AmendmentsFlat Fee 1$1,000.00 58.78% $1,701.16 $701.1664.66% $1,100.00$601.1652 Envtal Review - ExemptionFlat Fee 150$50.00 47.54% $105.17 $55.1757.05%$60.00$45.1753 Parcel Map Waiver (condo conversion)Flat Fee 5$1,800.00 79.99% $2,250.34 $450.3479.99% $1,800.00$450.3454 Amendment Authorization by CouncilFlat Fee 1$500.00 12.64% $3,955.04 $3,455.0413.91%$550.00 $3,405.0455 General Plan Update FeeFlat Fee 900$25.00 22.50% $111.11 $86.1127.00%$30.00$81.1156 Resubmittal Fee1/2 Orig Fee 1$0.00 0.00% $0.00 $0.00N/A 1/2 original feeN/A150 Tentative Map ModificationFlat Fee 1 $10,000.00 69.21% $14,448.66 $4,448.6670.32% $10,160.00 $4,288.66e)154 Geotech Letter Report Review - Contract Admin Flat Fee 4$50.00 55.49% $90.11 $40.1166.58%$60.00$30.11157 Building Plan CopyingNew Fee 20$0.00 0.00% $74.21 $74.2167.37%$50.00$24.21b) The current fee for this service is $10,000 plus $500 per lot above 5 lots. The current fee of $12,500 displayed here represents a typical subdivision with 10 lots.d) Deposit fees will be charged at cost, using fully burdened hourly rates.e) This fee represents the City's cost to administer the geotechnical consultant. The City should also charge a fee (actual cost with a deposit of $200) to cover the consultant cost.Page 12 User Fee Study Summary Sheet- Total Program Information -Service TypeRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased Revenue1 Appeals Flat Fee $1,250 5.46% $22,915 $21,665 6.11% $1,400 $1502 Annexation Flat Fee $2,600 40.13% $6,479 $3,879 44.14% $2,860 $2603 Boundary Adjustment Flat Fee $4,500 57.35% $7,847 $3,347 63.08% $4,950 $4504 Certificate of Compliance Flat Fee $6,000 66.44% $9,031 $3,031 70.87% $6,400 $4005 Coastal Development Permit Flat Fee $160,000 73.17% $218,665 $58,665 73.17% $160,000 $06 Commercial Plan Check Flat Fee $9,000 120.63% $7,461 -$1,539 80.42% $6,000 -$3,0007 Single Family Plan Check Flat Fee $50,000 71.68% $69,758 $19,758 71.68% $50,000 $08 Duplex Plan Check Flat Fee $1,400 81.47% $1,718 $318 81.47% $1,400 $09 Multi-Family (3-10 units) Plan Check Flat Fee $3,000 84.55% $3,548 $548 84.55% $3,000 $010 Multi-Family (11+ units) Plan Check Flat Fee $1,200 111.58% $1,076 -$124 74.38% $800 -$40011 Conceptual Review - Admin or Comm Flat Fee $1,200 79.75% $1,505 $305 79.75% $1,200 $012 Design Review - Admin Level Flat Fee $15,000 54.20% $27,676 $12,676 59.62% $16,500 $1,50013 Design Review - Plan Comm (<2500 sq ft) Flat Fee $14,400 62.23% $23,142 $8,742 68.45% $15,840 $1,44014 Design Review - Plan Comm (2501-10k sq ft) Flat Fee $28,800 74.20% $38,814 $10,014 74.20% $28,800 $015 Design Review - Plan Comm (>10k sq ft) Flat Fee $38,400 89.28% $43,009 $4,609 89.28% $38,400 $016 Design Review Modifications - Admin Flat Fee $800 64.15% $1,247 $447 69.77% $870 $7017 Design Review Modifications - Plan Comm Flat Fee $1,800 55.95% $3,217 $1,417 61.54% $1,980 $18018 Comprehensive Initial Study Contract Admin Flat Fee $800 50.71% $1,577 $777 55.78% $880 $8019 Comprehensive Initial Study (in-house) Flat Fee $33,600 59.90% $56,089 $22,489 65.90% $36,960 $3,360d)20 General Plan Amendment (no vote req)Actual Cost$00.00%$0$0N/AN/AN/Ad)21 General Plan Amendment (vote req)Actual Cost$00.00%$0$0N/AN/AN/A22 Major Use PermitFlat Fee$12,000 80.25% $14,953$2,953 80.25% $12,000$023 Minor Use PermitFlat Fee$22,400 50.84% $44,059 $21,659 55.93% $24,640$2,24024 Use Permit Modifications - MajorFlat Fee$12,000 55.92% $21,459$9,459 61.51% $13,200$1,20025 Use Permit Modifications - MinorFlat Fee$1,200 46.78%$2,565$1,365 51.46%$1,320$120Service NameRecommendationsCity of EncinitasPlanning Fees2014/2015Page 13 User Fee Study Summary Sheet- Total Program Information -Service TypeRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased RevenueService NameRecommendationsCity of EncinitasPlanning Fees2014/201526 Comm or Council Interpretation Determination Flat Fee$4,000 89.02%$4,493$493 89.02%$4,000$027 Misc Service RequestsFlat Fee$2,625 63.41%$4,139$1,514 71.02%$2,940$31528 Temporary Sign/Banner PermitFlat Fee$3,000 41.38%$7,251$4,251 44.13%$3,200$20029 Sign ProgramFlat Fee$1,600 69.61%$2,299$699 70.48%$1,620$2030 Sign ReviewFlat Fee$700 64.74%$1,081$381 70.29%$760$60b)31 Tentative Subdivision Maplat Fee + per l$50,000 54.25% $92,172 $42,172 59.67% $55,000$5,00032 Final Subdivision Map Check (5+ lots)Flat Fee$8,000 282.84%$2,828 -$5,172 70.71%$2,000 -$6,00033 Tent Parcel Map Appl or Mod (2-4 lots)Flat Fee$17,500 53.61% $32,643 $15,143 58.97% $19,250$1,75034 Final Parcel Map Check (2-4 lots)Flat Fee$8,000 333.16%$2,401 -$5,599 70.80%$1,700 -$6,30035 Time ExtensionsFlat Fee$800 53.26%$1,502$702 58.59%$880$8036 Variance - AdministrativeFlat Fee$1,200 47.18%$2,544$1,344 51.90%$1,320$12037 Variance - Planning CommissionFlat Fee$6,400 57.55% $11,121$4,721 63.31%$7,040$64038 Substantial Conformance ReviewFlat Fee$3,750 39.01%$9,613$5,863 43.69%$4,200$45039 Affordable Unit PolicyFlat Fee$1,800 62.49%$2,880$1,080 68.74%$1,980$18040 Minor Plan CheckFlat Fee$40,000 54.59% $73,277 $33,277 65.51% $48,000$8,00041 EIR Contract AdminFlat Fee$3,400 44.59%$7,625$4,225 49.05%$3,740$34042 Geotechnical Review Contract AdminFlat Fee$2,400 45.50%$5,274$2,874 50.05%$2,640$24043 Wireless Review Contract AdminFlat Fee$1,500 57.56%$2,606$1,106 64.46%$1,680$18044 Misc Technical Studies Contract AdminFlat Fee$500 47.54%$1,052$552 52.30%$550$50d)47 Zoning Code AmendmentsDeposit$00.00%$0$0N/AN/AN/Ad)48 Specific PlanDeposit$00.00%$0$0N/AN/AN/A50 Variance - Planning Commission SFDFlat Fee$1,600 59.59%$2,685$1,085 65.55%$1,760$160Page 14 User Fee Study Summary Sheet- Total Program Information -Service TypeRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased RevenueService NameRecommendationsCity of EncinitasPlanning Fees2014/201551 Resolution AmendmentsFlat Fee$1,000 58.78%$1,701$701 64.66%$1,100$10052 Envtal Review - ExemptionFlat Fee$7,500 47.54% $15,775$8,275 57.05%$9,000$1,50053 Parcel Map Waiver (condo conversion)Flat Fee$9,000 79.99% $11,252$2,252 79.99%$9,000$054 Amendment Authorization by CouncilFlat Fee$500 12.64%$3,955$3,455 13.91%$550$5055 General Plan Update FeeFlat Fee$22,500 22.50% $100,000 $77,500 27.00% $27,000$4,50056 Resubmittal Fee1/2 Orig Fee$00.00%$0$0N/AN/AN/A150 Tentative Map ModificationFlat Fee$10,000 69.21% $14,449$4,449 70.32% $10,160$160e)154 Geotech Letter Report Review - Contract Admin Flat Fee$200 55.49%$360$160 66.58%$240$40157 Building Plan CopyingNew Fee$00.00%$1,484$1,484 67.37%$1,000$1,000Planning User Fees$630,825$1,046,272 $415,447$651,710 $20,885% of Full Cost60.29%100.00% 39.71%62.29%2.00%b) The current fee for this service is $10,000 plus $500 per lot above 5 lots. The current fee of $12,500 displayed here represents a typical subdivision with 10 lots.d) Deposit fees will be charged at cost, using fully burdened hourly rates.e) This fee represents the City's cost to administer the geotechnical consultant. The City should also charge a fee (actual cost with a deposit of $200) to cover the consultant cost.Page 15 Section IIIFire Fees User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy Level57 Fixed Fire Extinguishing System Flat Fee 18 $200.00 39.10% $511.48 $311.48 58.65% $300.00 $211.48c)58 Comm Bldg Plan CheckFee/Sq Ft 120$175.00 46.69% $374.81 $199.8158.70%$220.00$154.81c)59 Comm Bldg InspectionFee/Sq Ft 120$140.00 60.51% $231.36 $91.3664.83%$150.00$81.36c)60 Comm Sprinklered Plan Check - TI's only Fee/Sq Ft 40$140.00 68.48% $204.43 $64.4368.48%$140.00$64.43c)61 Comm Sprinklered Inspection - TI's onlyFee/Sq Ft 40$105.00 39.02% $269.08 $164.0859.46%$160.00$109.08c)62 Comm Sprinklered Inspection - New onlyFee/Sq Ft 5$140.00 27.58% $507.62 $367.6257.13%$290.00$217.6263 Resi Sprinkler Plan Chk & Insp (0-2500 sq ft) Flat Fee 40$250.00 51.32% $487.19 $237.1961.58%$300.00$187.1964 Resi Sprinkler Plan Chk & Insp (2501-5000 sq ft) Flat Fee 44$350.00 57.71% $606.46 $256.4657.71%$350.00$256.4665 Resi Sprinkler Plan Chk & Insp (5001-7000 sq ft) Flat Fee 8$450.00 62.01% $725.72 $275.7262.01%$450.00$275.7266 Resi Sprinkler Plan Chk & Insp (7001-10000 sq ft) Flat Fee 3$550.00 65.09% $844.99 $294.9965.09%$550.00$294.9967 Resi Sprinkler Plan Chk & Insp (over 10000 sq ft) Flat Fee 1$700.00 77.38% $904.63 $204.6377.38%$700.00$204.6368 Resi Sprinkler Inspection Only (0-2500 sq ft) Flat Fee 1$200.00 77.04% $259.61 $59.6177.04%$200.00$59.6169 Resi Sprinkler Inspection Only (2501-5000 sq ft) Flat Fee 1$250.00 78.31% $319.24 $69.2478.31%$250.00$69.2470 Resi Sprinkler Inspection Only (5001-7000 sq ft) Flat Fee 1$300.00 79.18% $378.88 $78.8879.18%$300.00$78.8871 Resi Sprinkler Inspection Only (7001-10000 sq ft) Flat Fee 1$350.00 79.82% $438.51 $88.5179.82%$350.00$88.5172 Resi Sprinkler Inspection Only (over 10000 sq ft) Flat Fee 1$400.00 80.30% $498.15 $98.1580.30%$400.00$98.1573 Inspection Only FeeFlat Fee 6$200.00 50.01% $399.95 $199.9557.51%$230.00$169.9574 Re-Inspection FeeFlat Fee 1$150.00 49.10% $305.51 $155.5158.92%$180.00$125.5175 Update Fire Response MapsFlat Fee 14$200.00 71.60% $279.32 $79.3271.60%$200.00$79.32RecommendationsService NameCity of EncinitasFire Prevention Fees2014/2015Page 16 User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy LevelRecommendationsService NameCity of EncinitasFire Prevention Fees2014/201578 Alarm System Plan CheckFlat Fee 7$200.00 83.84% $238.54 $38.5483.84%$200.00$38.5479 Alarm System InspectionFlat Fee 7$350.00 50.13% $698.12 $348.1257.30%$400.00$298.1280 Resi Bldg Plan CheckNew Fee 250$0.00 0.00% $168.93 $168.9329.60%$50.00$118.9381 Resi Bldg InspectionNew Fee 40$0.00 0.00% $1,908.31 $1,908.312.62%$50.00 $1,858.31143 Sprinkler Monitoring Plan CheckFlat Fee 10$100.00 83.84% $119.27 $19.2783.84%$100.00$19.27144 Sprinkler Monitoring InspectionFlat Fee 10$200.00 62.65% $319.24 $119.2468.91%$220.00$99.24148 Minimum Plan Check Fee - Bldg PlansFlat Fee 1$50.00 83.10% $60.17 $10.1783.10%$50.00$10.17166 Tent/Canopy ApplicationNew Fee 25$0.00 0.00% $46.82 $46.8264.07%$30.00$16.82c) The current fee, full cost, and recommended fees above represent an average fee charged, based on a 3,500 square foot building. The fees per square foot are as follows:Current FeeRecomm FeeComm Bldg Plan Check$0.05 $0.06Comm Bldg Inspection$0.04 $0.04Comm Sprinklered Plan Check - TI's only$0.04 $0.04Comm Sprinklered Inspection - TI's only$0.03 $0.05Comm Sprinklered Inspection - New only$0.04 $0.08Page 17 User Fee Study Summary Sheet- Total Program Information -Service TypeHome DeptRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased Revenue57 Fixed Fire Extinguishing System Flat Fee Fire $3,600 39.10% $9,207 $5,607 58.65% $5,400 $1,80058 Comm Bldg Plan Check Fee/Sq Ft Fire $21,000 46.69% $44,977 $23,977 58.70% $26,400 $5,40059 Comm Bldg Inspection Fee/Sq Ft Fire $16,800 60.51% $27,763 $10,963 64.83% $18,000 $1,20060 Comm Sprinklered Plan Check - TI's only Fee/Sq Ft Fire $5,600 68.48% $8,177 $2,577 68.48% $5,600 $061 Comm Sprinklered Inspection - TI's only Fee/Sq Ft Fire $4,200 39.02% $10,763 $6,563 59.46% $6,400 $2,20062 Comm Sprinklered Inspection - New only Fee/Sq Ft Fire $700 27.58% $2,538 $1,838 57.13% $1,450 $75063 Resi Sprinkler Plan Chk & Insp (0-2500 sq ft) Flat Fee Fire $10,000 51.32% $19,487 $9,487 61.58% $12,000 $2,00064 Resi Sprinkler Plan Chk & Insp (2501-5000 sq ft) Flat Fee Fire $15,400 57.71% $26,684 $11,284 57.71% $15,400 $065 Resi Sprinkler Plan Chk & Insp (5001-7000 sq ft) Flat Fee Fire $3,600 62.01% $5,806 $2,206 62.01% $3,600 $066 Resi Sprinkler Plan Chk & Insp (7001-10000 sq ft) Flat Fee Fire $1,650 65.09% $2,535 $885 65.09% $1,650 $067 Resi Sprinkler Plan Chk & Insp (over 10000 sq ft) Flat Fee Fire $700 77.38% $905 $205 77.38% $700 $068 Resi Sprinkler Inspection Only (0-2500 sq ft) Flat Fee Fire $200 77.04% $260 $60 77.04% $200 $069 Resi Sprinkler Inspection Only (2501-5000 sq ft) Flat Fee Fire $250 78.31% $319 $69 78.31% $250 $070 Resi Sprinkler Inspection Only (5001-7000 sq ft) Flat Fee Fire $300 79.18% $379 $79 79.18% $300 $071 Resi Sprinkler Inspection Only (7001-10000 sq ft) Flat Fee Fire $350 79.82% $439 $89 79.82% $350 $072 Resi Sprinkler Inspection Only (over 10000 sq ft) Flat Fee Fire $400 80.30% $498 $98 80.30% $400 $073 Inspection Only Fee Flat Fee Fire $1,200 50.01% $2,400 $1,200 57.51% $1,380 $18074 Re-Inspection Fee Flat Fee Fire $150 49.10% $306 $156 58.92% $180 $3075 Update Fire Response Maps Flat Fee Fire $2,800 71.60% $3,911 $1,111 71.60% $2,800 $078 Alarm System Plan Check Flat Fee Fire $1,400 83.84% $1,670 $270 83.84% $1,400 $079 Alarm System Inspection Flat Fee Fire $2,450 50.13% $4,887 $2,437 57.30% $2,800 $35080 Resi Bldg Plan Check New Fee Fire $0 0.00% $42,232 $42,232 29.60% $12,500 $12,50081 Resi Bldg Inspection New Fee Fire $0 0.00% $76,333 $76,333 2.62% $2,000 $2,000143 Sprinkler Monitoring Plan Check Flat Fee Fire $1,000 83.84% $1,193 $193 83.84% $1,000 $0144 Sprinkler Monitoring Inspection Flat Fee Fire $2,000 62.65% $3,192 $1,192 68.91% $2,200 $200148 Minimum Plan Check Fee - Bldg Plans Flat Fee Fire $50 83.10% $60 $10 83.10% $50 $0166 Tent/Canopy Application New Fee Fire $0 0.00% $1,171 $1,171 64.07% $750 $750Fire User Fees$95,800 $298,090 $202,290 $125,160 $29,360% of Full Cost32.14% 100.00% 67.86% 41.99% 9.85%Service NameRecommendationsCity of EncinitasFire Prevention Fees2014/2015Page 18 Section IVEngineering Fees User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy Level83 Building Permit New/Addition 0 to 500 SF Flat Fee 87 $150.00 57.47% $261.02 $111.02 65.13% $170.00 $91.0284 Building Permit New/Addition 500 to 2000 SF Flat Fee 50 $250.00 51.86% $482.09 $232.09 58.08% $280.00 $202.0985 Building Permit New/Addition 2000 to 5000 SF Flat Fee 25 $450.00 59.52% $756.11 $306.11 66.13% $500.00 $256.1186 Building Permit New/Addition >= 5000 SF Flat Fee 5 $600.00 59.30% $1,011.81 $411.81 65.23% $660.00 $351.8187 Bldg Permit - Pool Flat Fee 35 $250.00 83.74% $298.53 $48.53 83.74% $250.00 $48.5388 Bldg Permit , Commercial, Remodel, TI Flat Fee 35 $300.00 74.45% $402.93 $102.93 74.45% $300.00 $102.9389 Certificate of Correction Flat Fee 4 $110.00 60.82% $180.86 $70.86 66.35% $120.00 $60.8690 Constr Plan Chg - Minor - Over the Counter Flat Fee 15 $200.00 53.96% $370.64 $170.64 59.36% $220.00 $150.6491 Constr Plan Chg - Major - Submitted for Pln Chk Flat Fee 35 $350.00 45.00% $777.82 $427.82 50.14% $390.00 $387.8292 Final Parcel Map - Sheet Per Sheet 15 $2,000.00 71.08% $2,813.74 $813.74 71.08% $2,000.00 $813.7493 Final Map - Sheet Per Sheet 15 $1,600.00 57.61% $2,777.32 $1,177.32 63.37% $1,760.00 $1,017.3294 Simplified Grading Permit Flat Fee 18 $1,800.00 45.45% $3,960.07 $2,160.07 50.00% $1,980.00 $1,980.0795 Grading Plan Check - Sheet Per Sheet 207 $1,450.00 47.83% $3,031.59 $1,581.59 52.78% $1,600.00 $1,431.5996 NPDES Plan Check - Sheet Per Sheet 85 $125.00 50.85% $245.82 $120.82 56.95% $140.00 $105.8297 Structural Plan Check - New Sheet Per Sheet 24 $240.00 56.73% $423.05 $183.05 61.46% $260.00 $163.0598 Erosion Plan Check - Sheet Per Sheet 85 $175.00 61.43% $284.85 $109.85 66.70% $190.00 $94.8599 GIS Map Fee Flat Fee 33 $375.00 64.14% $584.64 $209.64 70.13% $410.00 $174.64100 Temporary Encroachment Permit Flat Fee 27 $150.00 50.53% $296.85 $146.85 57.27% $170.00 $126.85101 Permanent Encroachment Flat Fee 22 $290.00 51.42% $564.01 $274.01 56.74% $320.00 $244.01102 Landsc/Irr Pln Check - Private Per Sheet 28 $130.00 33.71% $385.62 $255.62 36.31% $140.00 $245.62a)103 Landsc/Irr Pln Check - PublicPer Sheet 0$260.00 58.24% $446.44 $186.4464.96%$290.00$156.44104 ROW Constr Permit & Insp - MinorFlat Fee 74$300.00 61.79% $485.54 $185.5467.97%$330.00$155.54105 ROW Constr Permit & Insp - MajorFlat Fee 16$900.00 80.32% $1,120.47 $220.4780.32%$900.00$220.47106 Utility Constr PermitsFlat Fee 123$250.00 64.14% $389.76 $139.7671.84%$280.00$109.76107 Beach Encroachment PermitFlat Fee 2$1,500.00 70.22% $2,136.22 $636.2271.15% $1,520.00$616.22RecommendationsService NameCity of EncinitasEngineering Fees2014/2015Page 19 User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy LevelRecommendationsService NameCity of EncinitasEngineering Fees2014/2015108 Street Vacation ApplFlat Fee 6$3,500.00 68.86% $5,083.06 $1,583.0671.02% $3,610.00 $1,473.06109 Street Name Change ApplFlat Fee 1$3,500.00 66.24% $5,284.08 $1,784.0870.78% $3,740.00 $1,544.08110 Grading & Improvement Inspection% of ACE 1 $234,895.00 50.20% $467,942.53 $233,047.5355.22% $258,380.00 $209,562.53111 NPDES Inspection% of ACE 1 $41,900.00 39.82% $105,229.36 $63,329.3643.80% $46,090.00 $59,139.36112 Impr Plan Checks - SheetPer Sheet 30 $1,700.00 50.66% $3,355.89 $1,655.8955.72% $1,870.00 $1,485.89115 Traffic Control PermitFlat Fee 110$250.00 63.16% $395.81 $145.8163.16%$250.00$145.81116 SWPPP Project Disturbing >1 AcreFlat Fee 0.5$750.00 50.38% $1,488.74 $738.7455.75%$830.00$658.74117 Transportation PermitNon-Fee 0.5$0.00 0.00% $200.17 $200.17N/AN/AN/A118 Bldg Permit Comm New/Add 0 to 500 SFFlat Fee 11$150.00 44.59% $336.36 $186.3650.54%$170.00$166.36119 Bldg Permit Comm New/Add 500 to 2000 SF Flat Fee 7$250.00 44.61% $560.48 $310.4849.96%$280.00$280.48120 Bldg Permit Comm New/Add 2000 to 10000 SF Flat Fee 3$550.00 62.70% $877.22 $327.2269.54%$610.00$267.22121 Bldg Permit Comm New/Add >= 10000 SF Flat Fee 3$750.00 60.75% $1,234.50 $484.5067.23%$830.00$404.50122 Wastewater Discharge Permit Proc FeeFlat Fee 18$40.00 52.39% $76.35 $36.3552.39%$40.00$36.35123 Sewer Lateral Construction PermitFlat Fee 9$400.00 60.95% $656.28 $256.2867.04%$440.00$216.28124 Permanent Encr Permit w/ ConstructionFlat Fee 28$450.00 55.73% $807.48 $357.4861.92%$500.00$307.48125 Misc. Building PermitFlat Fee 350$30.00 61.58% $48.72 $18.7261.58%$30.00$18.72126 Minor Traffic Control PlanFlat Fee 10$50.00 60.64% $82.46 $32.4672.76%$60.00$22.46149 Demo Building PermitFlat Fee 15$75.00 54.33% $138.04 $63.0457.95%$80.00$58.04151 Storm Wtr Cont Simulation Model Rev - Minor New Fee 1$0.00 0.00% $1,632.93 $1,632.9371.04% $1,160.00$472.93152 Storm Wtr Cont Simulation Model Rev - Major New Fee 1$0.00 0.00% $3,265.86 $3,265.8671.34% $2,330.00$935.86153 Newsrack Operations PermitFlat Fee 10$290.00 90.12% $321.78 $31.7890.12%$290.00$31.78154 Geotech Letter Report Review - Contract Admin Flat Fee 4$50.00 55.49% $90.11 $40.1166.58%$60.00$30.11a)155 Grading - Constr Chgs New SheetPer Sheet 1$1,450.00 72.87% $1,989.89 $539.8972.87% $1,450.00$539.89Page 20 User Fee Study Summary Sheet- Per Unit Information -Service TypeAnnual VolumeCurrent Fee % of Full Cost100% of Full CostCurrent SubsidyCost Recovery Policy Level (%)Fee @ Policy LevelSubsidy @ Policy LevelRecommendationsService NameCity of EncinitasEngineering Fees2014/2015156 Major Utility - Trenching% of ACE 1$5,500.00 53.76% $10,231.22 $4,731.2259.13% $6,050.00 $4,181.22157 Building Plan CopyingNew Fee 20$0.00 0.00% $74.21 $74.2167.37%$50.00$24.21158 Sidewalk CaféFlat Fee 5$220.00 46.21% $476.13 $256.1350.41%$240.00$236.13159 Sidewalk Café Renewal with ViolationFlat Fee 3$160.00 66.13% $241.96 $81.9670.26%$170.00$71.96160 Sidewalk Café RenewalFlat Fee 17$80.00 55.04% $145.34 $65.3461.92%$90.00$55.34161 FEMA CLOMARNew Fee 1$0.00 0.00% $1,957.26 $1,957.2671.02% $1,390.00$567.26162 FEMA LOMARNew Fee 1$0.00 0.00% $644.36 $644.3671.39%$460.00$184.36163 FEMA LOMAR/Elev CertificateNew Fee 4$0.00 0.00% $644.36 $644.3671.39%$460.00$184.36164 Tree Removal PermitNew Fee 10$0.00 0.00% $865.77 $865.7770.46%$610.00$255.77165 Sewer Reimb DistrictNew Fee 1$0.00 0.00% $4,282.35 $4,282.3571.22% $3,050.00 $1,232.35166 Tent/Canopy ApplicationNew Fee 25$0.00 0.00% $46.82 $46.8264.07%$30.00$16.82167 Misc Engineering ApprovalNew Fee 290$0.00 0.00% $43.85 $43.8568.42%$30.00$13.85a) Activity for these services is too infrequent to project revenues. Annual volume is displayed as "1" in order to calculate costs, but revenue projections are set to "0".Page 21 User Fee Study Summary Sheet- Total Program Information -Service TypeRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased Revenue83 Building Permit New/Addition 0 to 500 SF Flat Fee $13,050 57.47% $22,709 $9,659 65.13% $14,790 $1,74084 Building Permit New/Addition 500 to 2000 SF Flat Fee $12,500 51.86% $24,105 $11,605 58.08% $14,000 $1,50085 Building Permit New/Addition 2000 to 5000 SF Flat Fee $11,250 59.52% $18,903 $7,653 66.13% $12,500 $1,25086 Building Permit New/Addition >= 5000 SF Flat Fee $3,000 59.30% $5,059 $2,059 65.23% $3,300 $30087 Bldg Permit - Pool Flat Fee $8,750 83.74% $10,449 $1,699 83.74% $8,750 $088 Bldg Permit , Commercial, Remodel, TI Flat Fee $10,500 74.45% $14,103 $3,603 74.45% $10,500 $089 Certificate of Correction Flat Fee $440 60.82% $723 $283 66.35% $480 $4090 Constr Plan Chg - Minor - Over the Counter Flat Fee $3,000 53.96% $5,560 $2,560 59.36% $3,300 $30091 Constr Plan Chg - Major - Submitted for Pln Chk Flat Fee $12,250 45.00% $27,224 $14,974 50.14% $13,650 $1,40092 Final Parcel Map - Sheet Per Sheet $30,000 71.08% $42,206 $12,206 71.08% $30,000 $093 Final Map - Sheet Per Sheet $24,000 57.61% $41,660 $17,660 63.37% $26,400 $2,40094 Simplified Grading Permit Flat Fee $32,400 45.45% $71,281 $38,881 50.00% $35,640 $3,24095 Grading Plan Check - Sheet Per Sheet $300,150 47.83% $627,540 $327,390 52.78% $331,200 $31,05096 NPDES Plan Check - Sheet Per Sheet $10,625 50.85% $20,895 $10,270 56.95% $11,900 $1,27597 Structural Plan Check - New Sheet Per Sheet $5,760 56.73% $10,153 $4,393 61.46% $6,240 $48098 Erosion Plan Check - Sheet Per Sheet $14,875 61.43% $24,213 $9,338 66.70% $16,150 $1,27599 GIS Map Fee Flat Fee $12,375 64.14% $19,293 $6,918 70.13% $13,530 $1,155100 Temporary Encroachment Permit Flat Fee $4,050 50.53% $8,015 $3,965 57.27% $4,590 $540101 Permanent Encroachment Flat Fee $6,380 51.42% $12,408 $6,028 56.74% $7,040 $660102 Landsc/Irr Pln Check - Private Per Sheet $3,640 33.71% $10,797 $7,157 36.31% $3,920 $280a)103 Landsc/Irr Pln Check - PublicPer Sheet$00.00%$0$0 64.96%$0$0104 ROW Constr Permit & Insp - MinorFlat Fee$22,200 61.79% $35,930 $13,730 67.97% $24,420$2,220105 ROW Constr Permit & Insp - MajorFlat Fee$14,400 80.32% $17,928$3,528 80.32% $14,400$0106 Utility Constr PermitsFlat Fee$30,750 64.14% $47,941 $17,191 71.84% $34,440$3,690107 Beach Encroachment PermitFlat Fee$3,000 70.22%$4,272$1,272 71.15%$3,040$40Service NameRecommendationsCity of EncinitasEngineering Fees2014/2015Page 22 User Fee Study Summary Sheet- Total Program Information -Service TypeRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased RevenueService NameRecommendationsCity of EncinitasEngineering Fees2014/2015108 Street Vacation ApplFlat Fee$21,000 68.86% $30,498$9,498 71.02% $21,660$660109 Street Name Change ApplFlat Fee$3,500 66.24%$5,284$1,784 70.78%$3,740$240110 Grading & Improvement Inspection% of ACE $234,895 50.20% $467,943 $233,048 55.22% $258,380 $23,485111 NPDES Inspection% of ACE$41,900 39.82% $105,229 $63,329 43.80% $46,090$4,190112 Impr Plan Checks - SheetPer Sheet$51,000 50.66% $100,677 $49,677 55.72% $56,100$5,100115 Traffic Control PermitFlat Fee$27,500 63.16% $43,539 $16,039 63.16% $27,500$0116 SWPPP Project Disturbing >1 AcreFlat Fee$375 50.38%$744$369 55.75%$415$40118 Bldg Permit Comm New/Add 0 to 500 SFFlat Fee$1,650 44.59%$3,700$2,050 50.54%$1,870$220119 Bldg Permit Comm New/Add 500 to 2000 SF Flat Fee$1,750 44.61%$3,923$2,173 49.96%$1,960$210120 Bldg Permit Comm New/Add 2000 to 10000 SF Flat Fee$1,650 62.70%$2,632$982 69.54%$1,830$180121 Bldg Permit Comm New/Add >= 10000 SF Flat Fee$2,250 60.75%$3,704$1,454 67.23%$2,490$240122 Wastewater Discharge Permit Proc FeeFlat Fee$720 52.39%$1,374$654 52.39%$720$0123 Sewer Lateral Construction PermitFlat Fee$3,600 60.95%$5,907$2,307 67.04%$3,960$360124 Permanent Encr Permit w/ ConstructionFlat Fee$12,600 55.73% $22,609 $10,009 61.92% $14,000$1,400125 Misc. Building PermitFlat Fee$10,500 61.58% $17,052$6,552 61.58% $10,500$0126 Minor Traffic Control PlanFlat Fee$500 60.64%$825$325 72.76%$600$100149 Demo Building PermitFlat Fee$1,125 54.33%$2,071$946 57.95%$1,200$75151 Storm Wtr Cont Simulation Model Rev - Minor New Fee$00.00%$1,633$1,633 71.04%$1,160$1,160152 Storm Wtr Cont Simulation Model Rev - Major New Fee$00.00%$3,266$3,266 71.34%$2,330$2,330153 Newsrack Operations PermitFlat Fee$2,900 90.12%$3,218$318 90.12%$2,900$0154 Geotech Letter Report Review - Contract Admin Flat Fee$200 55.49%$360$160 66.58%$240$40a)155 Grading - Constr Chgs New SheetPer Sheet$00.00%$0$0 72.87%$0$0Page 23 User Fee Study Summary Sheet- Total Program Information -Service TypeRevenue @ Current Fee% of Full CostRevenue @ 100% Full CostCurrent SubsidyCost Recovery Policy Level (%)Revenue @ Policy LevelIncreased RevenueService NameRecommendationsCity of EncinitasEngineering Fees2014/2015156 Major Utility - Trenching% of ACE$5,500 53.76% $10,231$4,731 59.13%$6,050$550157 Building Plan CopyingNew Fee$00.00%$1,484$1,484 67.37%$1,000$1,000158 Sidewalk CaféFlat Fee$1,100 46.21%$2,381$1,281 50.41%$1,200$100159 Sidewalk Café Renewal with ViolationFlat Fee$480 66.13%$726$246 70.26%$510$30160 Sidewalk Café RenewalFlat Fee$1,360 55.04%$2,471$1,111 61.92%$1,530$170161 FEMA CLOMARNew Fee$00.00%$1,957$1,957 71.02%$1,390$1,390162 FEMA LOMARNew Fee$00.00%$644$644 71.39%$460$460163 FEMA LOMAR/Elev CertificateNew Fee$00.00%$2,577$2,577 71.39%$1,840$1,840164 Tree Removal PermitNew Fee$00.00%$8,658$8,658 70.46%$6,100$6,100165 Sewer Reimb DistrictNew Fee$00.00%$4,282$4,282 71.22%$3,050$3,050166 Tent/Canopy ApplicationNew Fee$00.00%$1,171$1,171 64.07%$750$750167 Misc Engineering ApprovalNew Fee$00.00% $12,716 $12,716 68.42%$8,700$8,700Engineering User Fees$1,017,200$1,995,836 $978,636$1,134,415 $117,215% of Full Cost50.97%100.00% 49.03%56.84%5.87%a) Activity for these services is too infrequent to project revenues. Annual volume is displayed as "1" in order to calculate costs, but revenue projections are set to "0".Page 24 Section VFully Burdened Hourly Rates AnnualPosition Salary Salary Benefits Overhead Total1 Code Enf Mgr 96,754$ 53.75$ 21.53$ 37.64$ 112.92$ 2 Code Enf Officer III 80,934$ 44.96$ 18.01$ 31.49$ 94.46$ 3 Dept Coordinator 62,673$ 34.82$ 13.95$ 24.38$ 73.15$ 4 Dept Director III 149,910$ 83.28$ 33.36$ 58.32$ 174.96$ 5 Deputy Director 119,972$ 66.65$ 26.69$ 46.67$ 140.02$ 7 Management Analyst III 91,890$ 51.05$ 20.45$ 35.75$ 107.24$ 8 Mgmt Analyst I Housing 54,943$ 30.52$ 12.23$ 21.37$ 64.12$ 9 Planner IV 83,929$ 46.63$ 18.67$ 32.65$ 97.95$ 10 Principal Planner I 121,107$ 67.28$ 26.95$ 47.11$ 141.34$ 11 Prog Coordinator Housing 62,673$ 34.82$ 13.95$ 24.38$ 73.15$ 13 Program Asst III 53,550$ 29.75$ 11.92$ 20.83$ 62.50$ 14 Senior Planner I 102,846$ 57.14$ 22.88$ 40.01$ 120.03$ 15 Senior Planner II 110,151$ 61.20$ 24.51$ 42.85$ 128.56$ Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours.Hourly benefit rate of 40.05% is applied to hourly salary rate.Hourly adjusted overhead rate of 50% is applied to hourly salary plus benefits.HourlyCity of EncinitasFiscal Year 2014/2015Planning & BuildingFull Cost Hourly RatesPage 25 AnnualPosition Salary Salary Benefits Overhead Total1 Dept Director 173,540$ 96.41$ 36.72$ 66.57$ 199.70$ 3 Senior Engineer 125,971$ 69.98$ 26.66$ 48.32$ 144.96$ 4 Engineer II 104,429$ 58.02$ 22.10$ 40.06$ 120.17$ 5 Engr Spec II / III 79,074$ 43.93$ 16.73$ 30.33$ 90.99$ 6 Dept Coordinator 62,373$ 34.65$ 13.20$ 23.93$ 71.78$ 7 Sr Management Analyst 96,754$ 53.75$ 20.47$ 37.11$ 111.34$ 8 Program Assistant III 55,368$ 30.76$ 11.72$ 21.24$ 63.72$ 9 Environmental Project Manager 102,846$ 57.14$ 21.76$ 39.45$ 118.35$ 10 Stormwater Specialist III 80,934$ 44.96$ 17.13$ 31.04$ 93.13$ Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours.Hourly benefit rate of 38.09% is applied to hourly salary rate.Hourly adjusted overhead rate of 50% is applied to hourly salary plus benefits.HourlyCity of EncinitasFiscal Year 2014/2015EngineeringFull Cost Hourly RatesPage 26 AnnualPosition Salary Salary Benefits Overhead Total1 Deputy Fire Marshal I 54,943$ 30.52$ 14.30$ 22.41$ 67.23$ 2 Deputy Fire Marshal II 69,913$ 38.84$ 18.19$ 28.52$ 85.55$ 3 Sr Deputy Fire Marshal 87,514$ 48.62$ 22.77$ 35.70$ 107.09$ 4 Fire Marshal 101,458$ 56.37$ 26.40$ 41.38$ 124.15$ 5 Program Assistant III 57,808$ 32.12$ 15.04$ 23.58$ 70.74$ Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours.Hourly benefit rate of 46.84% is applied to hourly salary rate.Hourly adjusted overhead rate of 50% is applied to hourly salary plus benefits.HourlyCity of EncinitasFiscal Year 2014/2015Fire Loss Prevention/PlanningFull Cost Hourly RatesPage 27 AnnualPosition Salary Salary Benefits Overhead Total1 Asst District Manager 132,063$ 73.37$ 29.87$ 37.81$ 141.05$ 2 Deputy City Manager 147,799$ 82.11$ 33.43$ 42.31$ 157.85$ 3 Department Director IV 173,540$ 96.41$ 39.26$ 49.68$ 185.35$ 4 Deputy Director Public Works 116,243$ 64.58$ 26.30$ 33.28$ 124.15$ 5 Engineer I 80,582$ 44.77$ 18.23$ 23.07$ 86.06$ 6 Equipment Mechanic II 59,760$ 33.20$ 13.52$ 17.11$ 63.83$ 7 Facilities Specialist 62,673$ 34.82$ 14.18$ 17.94$ 66.94$ 8 Finance Analyst I 70,123$ 38.96$ 15.86$ 20.07$ 74.89$ 9 Finance Technician II 56,431$ 31.35$ 12.77$ 16.15$ 60.27$ 10 Fleet Maintenance Supervisor 80,934$ 44.96$ 18.31$ 23.17$ 86.44$ 11 Management Analyst III 91,890$ 51.05$ 20.79$ 26.30$ 98.14$ 12 Program Assistant II 48,008$ 26.67$ 10.86$ 13.74$ 51.27$ 13 Program Coordinator 62,673$ 34.82$ 14.18$ 17.94$ 66.94$ 14 Senior Engineer 125,971$ 69.98$ 28.50$ 36.06$ 134.54$ 15 Senior Management Analyst 116,243$ 64.58$ 26.30$ 33.28$ 124.15$ 16 Superintendent 107,528$ 59.74$ 24.32$ 30.78$ 114.84$ 17 Utility & Maint Field Specialist 77,171$ 42.87$ 17.46$ 22.09$ 82.42$ 18 Utility & Maint Specialist I72,460$ 40.26$ 16.39$ 20.74$ 77.39$ 19 Utility & Maint Specialist II79,649$ 44.25$ 18.02$ 22.80$ 85.07$ 20 Utility & Maint Supervisor I87,025$ 48.35$ 19.69$ 24.91$ 92.94$ 21 Utility & Maint Supervisor II110,151$ 61.20$ 24.92$ 31.53$ 117.64$ 22 Utility & Maint Technician I47,633$ 26.46$ 10.78$ 13.64$ 50.87$ 23 Utility & Maint Technician II54,807$ 30.45$ 12.40$ 15.69$ 58.54$ 24 Utility & Maint Technician III61,181$ 33.99$ 13.84$ 17.51$ 65.34$ 25 Utility & Maint Technician IV66,733$ 37.07$ 15.10$ 19.10$ 71.27$ 26 Water Conservation Specialist II73,629$ 40.90$ 16.66$ 21.08$ 78.64$ Hourly salary rate is calculated by dividing annual salary by 1,800 productive hours.Hourly benefit rate of 40.72% is applied to hourly salary rate.Hourly overhead rate of 36.62% is applied to hourly salary plus benefits.HourlyCity of EncinitasFiscal Year 2014/2015Public WorksFull Cost Hourly RatesPage 28 Section VIFee Comparison Survey PLANNING FEESEncinitas ‐ Current FeeEncinitas ‐ Proposed FeeCarlsbad Escondido La MesaNational CitySanteeSolana BeachVistaAppeal$250.00$280.00$564.00By affected resident = $1,415Other = $1,740Arts & Crafts Permit = $1,090$100.00 $3,710.00$309$516 w/ eng. ConditionsResident = $1,063Others = $2,658$500.00Minor Use Permit$1,600.00 $1,760.00$751.00$2,175.00Residential ‐ 1‐3 dwelling units/Non‐residential <2,500 sq ft = $1,958$7,890max w/ $1,972.50 deposit$774.00$2,327.00$2,036.00Major Use Permit$6,000.00 $6,000.00$4,484.00$4,915.00Residential ‐ 4 or more dwelling units/Non‐residential >=2,500 sq ft = $3,876$7,890max w/ $1,972.50 deposit$5,000$6,000 w/ Eng. Conditions$9,300.00Minor Variance$1,200.00 $1,320.00$2,827.00Single Family = $1,825Residential ‐ 1‐3 dwelling units/Non‐residential <2,500 sq ft = $1,958$8,020 max w/ $2,005 depositResidential (existing, developed property) = $774$2,163.00$2,196.00Major Variance$3,200.00 $3,520.00$2,827.00All other cases = $2,030Residential ‐ 4 or more dwelling units/Non‐residential >=2,500 sq ft = $3,850$8,020 max w/ $2,005 depositNon‐residential or new residential construction = $2,500$2,163.00$2,196.00Certificate of Compliance$600.00$640.00$1,044.00$815.00$1,367.00$2,690 max w/ $672.50 deposit$1,387.00$597.00Tentative Parcel Map$3,500.00 $3,850.00$3,804.00$2,635.00$5,473.00$6,500 max w/ $1,625 deposit$4,002.00$3,138.00Boundary Adjustment$900.00$990.00$1,287.00$1,070.00$2,117.00$1,191.00ENGINEERING FEESEncinitasEncinitas ‐ Proposed FeeCarlsbad Escondido La MesaNational CitySanteeSolana BeachVistaBuilding Permit ‐ Pool$250.00$250.00As determined by Building Permit fee table, using $48.80 per sf as a valuation multiplier.Gunite Master Plan Coord‐Prod. Unit ‐ up to 800 sq. ft. = $475, each addl 100 sq. ft. = $39Comm'l Gunite ‐ up to 800 sq. ft. = $564, each addl 100 sq. ft. = $39Certificate of Correction$110.00$120.00$812.00$403.00Minor Construction Change$200.00$220.00$486+$155 per sheetMajor Construction Change$350.00$390.00$685+$245 per sheetFinal Parcel Map Sheets$2,000.00 $2,000.00 $3,356 Plus $23+$32 per sheet$2,834 + $275 per lot$4,002 per mapFinal Map Sheets$1,600.00 $1,760.00 $7,476 Plus $23+$32 per sheet$5,777 per mapSimplified Grading Permit$1,800.00 $1,980.00Grading Plan Check Sheets$1,450.00 $1,600.00100 Cubic Yards or less: $423101 to 1k CY: $847 for the 1st 100 CY + $120 for ea add'l 100 CY 1k to 10k CY: $2,534 for the 1st 1k CY + $120 for ea add'l 1k CY 10k to 100k CY: $3,989  for the 1st 10k CY + $180 for ea add'l 10k CY 100k to 200k CY: $6,083 for the 1st 100k CY + $285 for ea add'l 10k CY 200k CY or more: $9,759 for the 1st 200k CY + $130 for ea add'l 100k CY1st 2 sheets = $1,159 + $504 ea add'l sheetConst. Valuation Min Fee: $1,020$0 ‐ $20,000 = 5%$20,001 ‐ $80,000 = 4.5%$80,001 ‐ $400,000 = 4%Over $400,000 = 3%Single Family Residence = $1,189Small Subdivision/Commercial/Industrial = $3,261Medium Subdivision/Commercial/Industrial = $9,843Large Subdivision/Commercial/Industrial = $15,434Improvement Plan Check Sheets$1,700.00 $1,870.00ACE ‐ $0 to $20k: $1,353 + 5% of ACEACE ‐ $20k to $50k: $1,727 + 4% of ACEACE ‐ $50k to $100k: $2,228 + 3% of ACE ACE ‐ $100k to $250k: $2,501 + 2.5% of ACEACE ‐ $250k to $500k: $7,564 + 2% of ACE ACE ‐ $500k to $1.0m: $13,368 + 1.5% of ACE ACE ‐ Over $1.0m: $13,664 + 0.75% of ACE$442 minimum or 4% eng estConst. Valuation Min Fee: $1,020$0 ‐ $20,000 = 5%$20,001 ‐ $80,000 = 4.5%$80,001 ‐ $400,000 = 4%Over $400,000 = 3%Small (1‐5 sheets) = $3,544Medium (6‐15 sheets) = $9,875Large (16+ sheets) = $15,8662015 COMPARISON SURVEY FOR THE CITY OF ENCINITASPage 29 2015 COMPARISON SURVEY FOR THE CITY OF ENCINITASENGINEERING FEESEncinitasEncinitas ‐ Proposed FeeCarlsbad Escondido La MesaNational CitySanteeSolana BeachVistaErosion Control Plan Check Sheets$175.00$190.00Landscape/Irrigation Private Sheets $130.00$140.00Landscape/Irrigation Public Sheets$260.00$290.00GIS Map Fee$375.00$410.00Temp Encroachment Permit (TE)$150.00$170.00Standard = $261Street cut = $611$2,051.00Permanent Encroachment Permit (PE) $290.00$320.00$390 + $600 or 100% cost of construction as depositStandard = $261Street cut = $611$2,051.00Minor ROW Const. Permit (CN)$300.00$330.00Major ROW Const. Permit (CN/CJ)$900.00$900.00Utility Const. Permit (EX)$250.00$280.00Beach Encroachment Permit (TB)$1,500.00 $1,520.00Street Vacation Application$3,500.00 $3,610.00$3,340.00$2,271 + appraisal fee & preliminary report$8,900 max w/ $2,225 deposit$4,705.00Street Name Change Application$3,500.00 $3,740.00$1,634.00SWPPP Review$750.00$830.00Grading InspectionACE<=$100,000 = 5% of ACEACE>$100,000 = $5,000 + 3% of ACEACE=Approved Cost EstimateACE<=$100,000 = 5% of ACEACE>$100,000 = $5,000 + 3% of ACEACE=Approved Cost Estimate100 Cubic Yards or less: $423101 to 1k CY: $49 for the 1st 100 CY + $65 for ea add'l 100 CY 1k to 10k CY: $1,203 for the 1st 1k CY + $65 for ea add'l 1k CY 10k to 100k CY: $1,989  for the 1st 10k CY + $130 for ea add'l 10k CY 100k to 200k CY: $3,486 for the 1st 100k CY + $130 for ea add'l 10k CY 200k to 400k CY: $5,147 for the 1st 200k CY + $195 for ea add'l 100k CY400k to 1.0m CY: $10,216for the 1st 400k CY + $985 for ea add'l 100k CY$1.0m or more CY: 17,825 for the 1st 1.0m CY + $710 for ea add'l 100k CY$1,067 min or 10% of eng estConst. Valuation Min Fee: $1,020$0 ‐ $20,000 = 5%$20,001 ‐ $80,000 = 4.5%$80,001 ‐ $400,000 = 4%Over $400,000 = 3%Single Family Residence = $1,822Small Subdivision/Commercial/Industrial = $2,834Medium Subdivision/Commercial/Industrial = $4,345Large Subdivision/Commercial/Industrial = $8,594Improvement InspectionACE<=$100,000 = 5% of ACEACE>$100,000 = $5,000 + 3% of ACEACE=Approved Cost EstimateACE<=$100,000 = 5% of ACEACE>$100,000 = $5,000 + 3% of ACEACE=Approved Cost EstimateACE = $0 to $20k: $5.5% of ACE, $375 minACE = $20k to $50k: $1,682 for the 1st $20k + $250 for ea add'l $10kACE = $50k to $100k: $3,370 for the 1st $50k + $125 for ea add'l $10kACE = $100k to $250k: $4,212 for the 1st $100k + $100 for ea add'l $10kACE = $250k to $500k:  $6,238 for the 1st $250k + $105 for ea add'l $10kACE = $500k to $1.0m: $10,127 for the 1st $500k + $105 for ea add'l $10kACE = $1.0m or more: $16,154 for the 1st $1.0m + $105 for ea add'l $10kConst. Valuation Min Fee: $1,020$0 ‐ $20,000 = 5%$20,001 ‐ $80,000 = 4.5%$80,001 ‐ $400,000 = 4%Over $400,000 = 3%Per Application.  Based on construction valuation.  This is a tiered fee that is calculated based on the valuation at each tier.  Example:  $100,000 valuation = ($20,000X .05) + ($60,000 X .45) + ($20,000 X .04) = $4,200Small (1‐5 sheets) = $1,378Medium (6‐15 sheets) = $4,589Large (16+ sheets) = $7,597NPDES InspectionACE<=$100,000 = 1.0% of ACEACE>$100,000 = 0.6% of ACEACE=Approved Cost EstimateACE<=$100,000 = 1.1% of ACEACE>$100,000 = 0.66% of ACEACE=Approved Cost Estimate$132 or 4% eng estSewer Lateral Const. Permit$400.00$440.00Demo Building Permit$75.00$80.00$118.00Sidewalk Café Permit$220.00$240.00$1,200.00Page 30 2015 COMPARISON SURVEY FOR THE CITY OF ENCINITASFIRE FEESEncinitasEncinitas ‐ Proposed FeeCarlsbad Escondido La MesaNational CitySanteeSolana BeachVistaCommercial Bldg Plan Check  (3500 sq ft)$175.00$220.00May need to call30% Bldg Permit Plan Check FeeNot initiated by Bldg Dept or not specifically identified in list of fees = Full cost hourly rate19% of Building Plan Check FeeCommercial Bldg Inspection   (3500 sq ft)$140.00$150.00760‐839‐5400"Large commercial building inspection" =  $219Commercial Sprinkler Plan Check – Tenant Improvement  (3500 sq ft)$140.00$140.00Based upon the # of heads installed:1‐4 heads = $1165‐20 heads = $20321‐50 heads = $27551‐100 heads = $449101‐500 heads = $536each addl 500 or part = $536<20,000 sf = $70020,001‐45,000 sf  = $90045,001‐80,000 sf = $1,30080,001‐100,000 sf = $1,500>100,000 sf = $2,5001‐10 heads = $4511‐50 heads = $13551+ heads = $270Commercial Sprinkler Inspection – Tenant Improvement   (3500 sq ft)$105.00$160.001‐10 heads = $7011‐50 heads = $30051+ heads = $600Commercial Sprinkler Inspection – NEW Building or NEW Addition (3500)$140.00$290.001‐10 heads = $7011‐50 heads = $30051+ heads = $600Residential Bldg Plan CheckNO FEE$50.00$70.0030% Bldg Permit Plan Check FeeNot initiated by Bldg Dept or not specifically identified in list of fees = Full cost hourly rate$70.00Residential Sprinkler Plan Check & Inspection (0 – 2500 sq ft)$250.00$300.00Residential Sprinkler Plan Check & Inspection (2501 – 5000 sq ft)$350.00$350.00Residential Sprinkler Plan Check & Inspection (5001 – 7000 sq ft)$450.00$450.00Residential Sprinkler Plan Check & Inspection (7001 – 10000 sq ft)$550.00$550.00Residential Sprinkler Plan Check & Inspection (over 10001 sq ft)$700.00$700.00Residential Sprinkler Inspection Only (0 – 2500 sq ft)$200.00$200.00Residential Sprinkler Inspection Only (2501 – 5000 sq ft)$250.00$250.00Residential Sprinkler Inspection Only (5001 – 7000 sq ft)$300.00$300.00Residential Sprinkler Inspection Only (7001 – 10000 sq ft)$350.00$350.00Residential Sprinkler Inspection Only (over 10001 sq ft)$400.00$400.00Fixed Fire Extinguishing System Plan Check & Inspection$200.00$300.00< 20,000 sf = $70020,001 ‐ 45,000 sf = $90045,000 ‐ 80,000 sf = $1,30080,001 ‐ 100,000 = $1,800> 100,000 sf = $2,500Fire Alarm System Plan Check  (1 hr) $200.00$200.001‐25 devices $6526+ devices $108< 20,000 sf = $80020,001 ‐ 45,000 sf = $1,00045,000 ‐ 80,000 sf = $1,30080,001 ‐ 100,000 = $1,500> 100,000 sf = $2,0001‐10 devices = $4511‐50 devices = $27051+ devices = $400Fire Alarm System Inspection    (3 hr) $350.00$400.00Based upon # of devices in system:1‐5 = $586‐25 = $145each addl 50 or part = $1451‐10 devices = $7011‐50 devices = $13551+ devices = $200Sprinkler Monitoring Plan Check$100.00$100.00Sprinkler Monitoring Inspection$200.00$220.00Inspection ONLY Fee$200.00$230.00$122.50$70.00Re‐Inspection Fee$150.00$180.00$70.00$94.00$251.00Update Fire Response Map$200.00$200.00Based upon the # of heads installed:1‐4 heads = $1165‐20 heads = $20321‐50 heads = $27551‐100 heads = $449101‐500 heads = $536each addl 500 or part = $536Based upon the # of units:2‐14 units = $14815‐50 units = $23251‐100 units = $333101‐150 units = $401151‐200 units = $468201‐250 units = $536251‐300 units = $603Above 300 units ‐ for addl increment of 1‐50 units = $67< 20,000 sf = $70020,001 ‐ 45,000 sf = $90045,000 ‐ 80,000 sf = $1,30080,001 ‐ 100,000 = $1,800> 100,000 sf = $2,500*NEW*: < 20,000 sf = $99520,001 ‐ 45,000 sf = $1,00445,000 ‐ 80,000 sf = $1,80780,001 ‐ 100,000 = $2,510> 100,000 sf = $3,2131‐10 heads = $45 +  $7011‐50 heads = $135 + $30051+ heads = $270 + $6001‐10 heads = $7011‐50 heads = $30051+ heads = $600Page 31