Loading...
2017-13194-G (Plans)D cu$gn Emebpe ID: F12CCFAl-G27426E-BA37-A05261256746 RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FORA MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "GEOTECHNICAL INVESTIGATION, PROPOSED OEW6AIE RESIDENCE, 3OIS WILDFLOWER DRIVE, CITY OF ENCINITAS,. PREPARED BV lEAAARKC2FK CJOM560"TS, DATED 9-I4'/6 PROJECT NIL04S SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS, ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. S. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE -CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE -CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: 'THE GRADING UNDER PERMIT NO. 13194-G HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS -GRADED PLAN". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION.. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF. ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION, ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOUSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATERAND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CTTY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL, CHANGE NO.I DESCRIPTION DATE EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT JOE HEISER AT (760) 585-8500, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP/IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP FACILITIES AND/ORTO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP/IMP FACILITY AND/OR THE TURFMNDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP/BMP. 6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIU GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY -APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. OLIVENHAIN WATER DISTRICT NOTES: 1. WATER MAINS; LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS 07 THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). 2. REVIEW OF THIS PLAN BYSAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/ )R ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE. 5. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS. 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18. SCALE AS -BUILT HORIZONTAL: N/A DAME' J. VALDEZ DATE VERTICAL: NIA REV. ENGR. INSPECTOR SR. ENGR I Ym O VIKASARENA UDANI ENDENGAT UST STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTATTES UDANI FAMILY TRUST W-17-15 1304 NUE A4. SpO� o PO BOX 2391 GO, CA 'P�O�`, Oa�Qp , CONCRETE WASHOUT RANCHO SANTA FECA 920fiJ WIL CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE $ 9 DLO WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND 3015 WILDFLOWER DRIVE B " . U S9 ENCIN TAB LVD El VAQEYORF THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING AM 264-091-88 (J CS OE( NO T THE WASHOUT LOCATION. NOTES 1 CONSTRUCTION SITE ACCESS LEGAL DESCRIPTION `t, E �Y gz 4 'gWOHO A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF REMAINDER PARCEL OF PARCEL MAP IN S21 O PY SRO SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3'CRUSHED ROCK ANDIOR CORRUGATED STEEL PANELS/PLATES. 18642, IN THE CITY OF ENCI N ITAS, COUNTY F �m dSITE OF SAN DIEGO, STATE OF CALIFORNIA, G �G CONSTRUCTION VEHICLESil OF TO MAP THEREOF, FILED IN THE A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE OFFICE OF THE COUNTY RECORDER OF SAN REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. DIEGO COUNTY, FEBRUARY 28, 2001 VICINITY MAP EROSION CONTROL OWNER'S CERTIFICATE N.T.S. EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, I (WE) HEREBY CERTIFY THAT REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO AND BONDED FIBER MATRIX SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. I (WE) HEREBY AGREE TO INOEMN IFY, DEFEND, AND HOLD CITY AND CITY'S OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT COSTS OF DEFENSE THEREOF, ARISING OUT OF, OR I N ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY ACTS OR CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. OMISSIONS OF OWNER OR OWNER'S AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORK OR CONSTRUCTION COVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDI RECTLY TO REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID THE PERM �NT.WRIMVf T5. UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP ,7 10/1/2021 DECREASE EROSION. - SIGNATU DATE: TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION VIK OR SARENA UDANI CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND DEVELOP TS OF THE MOST RECENT STATE WATER BIND THE SOIL. RESOURCES CONTROL BOARD (SWRCB) ORDER, WASTE WATER DISCHARGE REQUIREMENTS FOR DISCHARGES OF STORMWATER RUNOFF ASSOCIATED WITH CONSTRUCTION ACTVITY. IN ACCORDANCE WITH SAID PERMIT, A PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) AND A MONITORING PROGRAM PLAN SHALL BE DEVELOPED AND IMPLEMENTED CONCURRENT WITH THE COMMENCEMENT OF GRADING ACTIVITIES , AND A COMPLETE AND ACCURATE WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. NOTICE OF INTENT (NOI) SHALL BE FILED WITH THE SWRCB. A COPY OF THIS PROJECT SWPPP SHALL BE FILED WITH THE CRY OF ON -SITE CONSTRUCTION MATERIAL STORAGE ENCINITAS; FURTHER, A COPY OF THE COMPLETED NOR FROM THE SWRCB SHOWING THE PERMIT NUMBER FOR THIS STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE PROJECT SHALL BE FILED WITH THE CITY OF ENCINITAS WHEN RECEIVED. THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY IN ADDITION, THE UNDERSIGNED AND SUBSEQUENT OWNERS) OF ANY PORTION OF THE PROPERTY COVERED INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM BY THIS GRADING PLAN NO.(}IQV-G AND BY SWRCB NO.R9-2009-0001 AND ANY SUBSEQUENT AMENDMENTS CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH THERETO SHALL COMPLY WITH THE SPECIAL PROVISION AS SET FORTH IN SECTION C.7 OF SWRCB NO. 119.2009-0001, SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING maic w L.1DLO: 937C"S7cf757 CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE SIGNATURE /% OAJE 10/1/2021 CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNERS) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER TY OWNER_ REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. VIK OR SARENA UDANI WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF SOILS ENGINEER'S CERTIFICATE UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. I, MATTHEW H. MARQUEZ, A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINGIPALLY DOING BUSINESS IN THE FIELD OF APPI SOIL MECHANICS, HEREBY CERTIFY THAT I HAVE REVIEWED THE SAMPLING AND STUDY OF THE SOIL NO SEEPAGE FROM. ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMSIDIKES SHALL BE PLACED AROUND ALL CONDITIONS PREVALENT WITHIN THIS SITE PERFORMED BY MATTHEW H. MARQUEZ (PE 70072) OR UNDER HIS DIRECTION ON DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL SEPTEMBER 14.2016. ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MATTHEW H REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR MARQUI RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE. I HAVE COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. REVIEWED THESE GRADING PLANS AND CERTIFY THIS THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT; 3R THIS PROJECT HAVE BEEANIp1CORPppRATE N THE GRADING PLANS AND SPECIFICATIONS. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR SIGNED: T/ 004 DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FORINFORMATIONON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) PE NO.: 70072 Wy4�p, f,W MPS/ H ti M POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANSAND RECYCLING RECEPTACLES AROUND THE SITE. EXP. DATE: 9/302018 70072 ,�pp PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE JOB IF 16045 ; Nnces 05/3My� SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES.TERRA PACIFIC INC s% CIVIL ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY 4010 MORENA BOULEVARD, SUITE 108 4jf OF CRUFOP� CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE SAN DIEGO, CA 92117 FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING STATEMENT OF ENGINEER OF WORK DEPARTMENT, CITY OF ENCINITAS AT (760) 633-2770 THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY NOTIFICATIONS ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION, THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED Bl i HE CITY OF 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS PUBLIC ENTITY FOR THE PLANS PREPARED PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR BY THE ENGINEER 15 NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS COMMENCEMENT OF WORK: OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, A. SEWERS -CSD-(760)­633-2770 ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES.ACTING WITHIN THE COURSE AND SCOPE OF B. GAS S ELECTRIC - SEGE - (760)4386200 SUCH AGENCY AND EMPLOYMENTAND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. C. WATER-OLIVENHAIN MUNICIPAL WATER DISTRICT -(/60)753-6466 Q,#CSS/q� D.TELEPHONE - SEC BELL -(MI E. CABLE TV- COX COMMUNICATIONS-(760)F806-9809 X-2233 SIGNATURE: - DATE: D J. VALDEZ o 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT, PHONE: No. C07801 4 (760)633-2770. - COFFEY ENGINEERING, INC. 9666 BUSINESSPARK AVENUE, SUITE 210 CIVIV ,mac 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: 1760)633-2770. ALL WORK PERFORMED WITHOUT SAN DIEGO, CA 92131-1646 1 PH (858)B31-0111 1 FAX (858)831-0179 'lp SEOA- BENEFITOFINSPECTIONWILLBESUBJECTTOREJEECTION AND REMOVAL. RCEEXPIRES: JUNE302018 or CAI DRAWING INDEX TITLE SHEET ................................ I GRADING PLAN ............................ 2 GRADING DETAILS ........................ 3 CONSTRUCTION BMP PLAN......... 4 FIELD OPERATION$ N r_10I.' M V :1 :F_v(a II] EARTHWORK NOTE CUT= 1,500 C.Y. FILL= 360 C.Y. BMP PROJECT STATUS TOTAL AREA OF LAND DISTURBANCE: IMPORT= 1,140 C.V. 56,50D F72 (1.30 ACRES) 1,200 C.Y. OVER EXCAVATION AND RE -COMPACTION PRIORITY STORMWATER TREATMENT FACILITIES TO BE MAINTAINED BY (30-DEPTH- 5 FT OUTSIDE STRUCTURE) HOMEOWNER IN ACCORDANCE WITH"MAINTENANCE AGREE AENT FOR IMPERVIOUS AREA PRIVATE STORMWATER TREATMENT AND STORMWATER POLLUTION IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 0. SO FT MAXIMUM VERTICAL DEPTH OF CUT= 5.25' CONTROL FACILITIES" IMPERVIOUS AREA AFTER CONSTRUCTION: li-256 50 ET MAXIMUM VERTICAL DEPTH OF FILL = 5.0' RECORDED ON 30IJC I2 ;LOI'7 INCREASE IN IMPERVIOUS AREA: 18,256 SO FT (PER GEOTECHNICAL REPORT 'xOI�-OiS3S34 IMPERVIOUS AREA REPLACED: 0 SOFT RECOMMENDATION OF ALTERNATIVE 2) AS DOC.#: PLANNING AND BUILDING I PARKS AND RECREATION OLIVENHAIN MUNICIPAL WATER I ENCINITAS FIRE DEPARTMENT S bD I 5• -I Q .9.f SIGN I DATE SIG DATE S14N U DATE CHECKED BY: ENGINEERING DF.PARTMENT APPROVALS CITY OF ENCINITAS - ENGINEERING SERVICES DATE R.C.E. NO.; 76074 VALDEZ EXP.6 30 18 3015 WILDFLOWER DRIVE DENGATE RESIDENCE (APN: 264-091-88) DRAWING NO. 1394-G Docuegn Emebp ID: M"FA1-G27426E-BAe7-AD52612 746 EX. SURVEY MONUMENT TO BE PROTECTED LEGEND SCALE: 1 "=20' \_ \ \ ,� \ PER SHEET 3 JGO' FRONT YARD SETBACK EX. SURVEY MONUMENT TO BE PROTECTED IN PLACE 15.0' SIDE YARD 5 FIRE eel SECONDARY DRIVEWAY PER II%����.�,!•�� �ij.���j��il�s,��. :r r rr dA►„ 15.0, SIDE YARD 5 NOTE: SPECIAL INSPECTION OF ALL POST CONSTRUCTION BIORETENTION BASINS BY THE ENGINEER OF RECORD OR ANOTHER LICENSED CIVIL ENGINEER REQUIRED AT THE FOLLOWING STAGES. PROGRESS PICTURES OF BIORETEN77ON BASIN CONSTRUCTION SHALL BE TAKEN AND PROVIDED TO THE CITY AT THE FOLLOWING STAGES: 1. BASIN EXCAVATION 2. PLACEMENT OF PERFORATED PA 3. PLACEMENT OF GRAVEL LAYER 4. PLACEMENT OF ENGINEERED SC 5. FINAL BASIN GRADING 6. FINAL COMPLETED BASIN WITH RIM r I 1 I pBI0f7LION AREA A2 IA 907 FTr TOP 278.00 TTOM=27Z00 S B4 \ 3 v \ Y b A♦ V /� � � O ♦Vn' 7,h/ 27 e /♦ I 94'TO NEIGHBORING RETAINING PER RAl 90 GARAGE FF=278.42 PAD=277.72 i4�, e♦y , 3E NOTES PERMANENT BMPs ARE TO BE PRIVATELY MAINTAINED AND ME FACILITIES NOT MODIFIED OR REMOVED WITHOUT A 1. ALL MAIN DRAW LINES SHOWN TO BE 6' PVC 0 1% MINIMUM SLOPE UNLESS OTHERWISE NOTED. PERMIT FROM THE CITY 2. ALL CATCH BASIN LEADS TO BE 4" PVC 0 2% MINIMUM SLOPE UNLESS OTHERWISE NOTED. MONUMENTATION NOTE J HARDSCAPE GRADES TO BE 1% MINIMUM TO DRAINS AND AWAY FROM STRUCTURE. 4. SOFTSCAPE GRADES TO BE 2% MINIMUM TO DRAINS (I% WHERE FLOW IS CONCENTRATED) AND 2% MINIMUM THE IXWIRACIO17 SHALL BE RESPONSIBLE FOR SURVEY MONUMENTS AND/Q7 VERTICAL CONIRIX BENCIMIIWS INCH ARE AWAY FROM STRUCTURE. DISTURBED OR DESIROIED BY CONSIRUCTIOV, A LAND SURVEYOR MUST FIELD LOCATE REFERENCE ANO/GR PRESERVE ALL 5. SOIL COVER ABOVE DRAB) LINES SHALL BE 12" MINIMUM UNLESS OTHERWISE NOTED. HISTORICAL OR CONTROLLING MONUMENTS PRIOR TO ANY EARTHM.. IF DESIROYID, A LAND SURVEYOR SHALL REPLACE SUCH 6. N077FY CIVIL ENGINEER IF ANY NON -DRAINING SUMP CONDITIONS BECOME APPARANT WRING CONSIRUCON. MONUMENTS WTIH APPROPRL47E MONUMENTS A CORNER RECORD OR RECORD OF SURVEY,, AS APPROPRIATE SHALL BE BLED AS REWIRED BY THE PROFES90NAL LAND SURVEYORS ACT, SECTION 8771 OF THE BUSNE5S AND PROFESSIONS CODE OF THE STATE \NGE NO. DESCRIPTION APPROVED DATE I BENCHMARK SCALE AS -BUILT 61.SV. C lrgV woLdC I &AAJ 1 7.11-1 AW0Vc0ill JSE _. DESCRIPTION: 25- IMSK STAMPED CI E-012 LOCATION:AE ON AT SHY OUP UAME AZ & 9& L RNA/ HORIZONTAL: DANIEL J. VALDEZ -- RECORD FROM: CITY CP oyawA5 - FlAFFr Na f010 REV. ENGR. INSPECTOR ELEVATION: _203.16 VERTICAL DATUM: RAwee DATE N RESIDENCE 284.92 70=283 00 121 TO NEIGHBORING STRUCTURE - 5117EYARD SETBACK a �0 0 d) 1,RETi 0 f PER BW 27225 TW 2B30 7W=27385 �� ✓ BW 2830 r�BW=27225 �♦♦ TW=20 283. BW=251.81.0 RETAINING PER C-1 �:-' TW=2BJ.0 l j 8141�283.0 ' w N t ' 1 LAWN EARTHEN SWALE PER DETAIL , 1 ZRr 3 1 POOL well � tf . SPA y ✓ i yf rf 0 L HOUSE =28333 { �N \ STEEP SLOPE PRESERS�V/Fj10N ' OPEN SPACE EAM€M€IJZ,y PER DoC NO. 20j1d ¢}tL083TJ ,/ ✓�f �jf/ ram''/,r SIDE YARD SETBACK- r. - ':.. 139 •EX. SURVEY MONUMENT 55'441N 147.1J" EX, SURVEY MONUMENT 'TO BE PROTECTED `';.�' 3 .. "`' TO BE PROTECTED 'IN PLACE IN PLACE PLANNING & BUILDING "" ov ueY: u DV nY: unc DVun /71I � PLANS PREPARED UNDER SUPERVISION C fI30 1/ DATE S/Z PRINT: DATE R.C.E. NO.: 760748074 DANIEL J. VALDff EXP.: 6 30 18 SLOPES TO BE :HED R KEYED GEOTECHNICAL 25.0' YARD SETBACK RVEY MONUMENT PROTECTED E DESCRIPTION REFERENCE smao N4504545"W PROPERTY LINE �R--------- ROW CENTERLINE ------ BUILDING FOOTPRINT EXISTING CONTOUR 'll:----"-- PROPOSED CONTOUR -90 EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION " 6"LANDSCAPE/HARDSCAPE DRAIN CATCH BASIN DIRECTION OF FLOW -� 6" PVC DRAIN LINE SDR 35 (U.N.O.) ----------- PERFORATED UNDERDRAIN RETAINING WALL SDRSD C 1; C-2; C-6 PERMEABLE PAVERS DETAIL 'E' - SHEET J BIOFILTRATION AREA DETAILS 'A', B', 'D' - SHEET 3 ON PPM IPE STIC O LAP"LS 4306RPER �8642 3/4" X 18" IRON PIPE All DISK ❑ LLS 4306" PER PM 18642 SEWER LATERAL WATER LATERAL V EXISTING OA40 WATER MAIN - A— EXIS71NG OA40 SEWER MAIN - : ---------- UTILITY NOTE 1. THE LOCATIONS OF UTILITIES, IF ANY, SHOWN ON THIS PLAN ARE GENERATED FROM RECORDS PROVIDED BY U77LITY/GOVERNING AGENCIES AND/OR FIELD DATA COLLECTED DURING THE SURVEY. THE PLOTTING OF UTILITIES ON THIS PLAN DOES NOT CONSTITUTE A GUARANTEE OF THEIR LOCATION, DEPTH, SIZE OR TYPE. DRAIN STRUCTURES PIPE TABLE ID TYPE RIM IE PIPE SIZE/TYPE SLOPE LENGTH (CENTER TO CENTER) A 6" ATRIUM GRATE 28J.00 281.48 B 6" ATRIUM GRATE 283.00 281.37 A-B 6" PVC Pipe 1.00% 10.84 C 3'x3' RIPRAP W/6" CUTOFFWALL 28101 27999 B-C 6" PVC Pipe L00% 38.10 D-E. 6" PVC Pipe 1.00% 21.20 D 6" ATRIUM GRATE 283.00 281.48 E-F 6" PVC Pipe 1.00% 23.92 E 6" ATRIUM GRATE 283.00 281.27 F 6" ATRIUM GRATE 283.00 281.03 F-G 6" PVC Pipe 1.00% 29.38 G 6" ATRIUM GRATE 283.00 280.74 G-H 6" PVC Pipe 1.94% 12.65 G1 6" ATRIUM GRATE 283.00 280.14 GI-H1 6" PVC Pipe 1.00% 1748 H 6" ATRIUM GRATE 28300 280.49 H-1 6" PVC Pipe 28.9J% 12.28 H1 3'x3' RIPRAP W/6" CO70FFWALL 280.98 279.97 J-K fi" PVC Pipe 0.62% 36.95 J1-KI 6" PVC, Pipe 1.01% 19.43 I 3'xJ' RIPRAP W/6" CUTOFFWALL 277.96 276.94 K-L 6" PVC Pipe 0.54% 60.72 J 12K12 GRATED INLET 278.52 27Z50 KI-L1 6" PVC Pipe 1.00% 33.08 J7 OVERFLOW STRUCTURE 28283 278.67 L1-M1 6" PVC Pipe 0.99% 32.42 K 12x12 GRATED INLET 278.30 27Z27 MI-T 6" PVC Pipe 1.00% 95.76 K1 CLEANOUT 283.03 278.47 N-0 6" PVC Pipe 3.35% 20.90 L W/6" CUTOFFWALL 3'x3' RIPRAP 277.96 276.94 P-0 12" PVC Pipe 200% 40.35 LI CLEANOUT 28302 278. 14 p-R 72" PVC Pipe B. 12$ 59.87 M1 CLEANOUT 283.00 277.82 R-S 12" PVC Pipe 11.01% 1/9.97 N 12xI2 BROOKS INLET 278.66 27Z64 T-R 12" PVC Pipe 4.20% 119.08 0 3'xJ' RIPRAP W/6" CUTOFFWALL 27796 276.94 nrNCO7�GWO704 P OVERFLOW STRUCTURE 278.18 273.67 Q 6" ATRIUM GRATE 277.92 272.86 R 6" ATRIUM GRATE 269.02 268.00 S ROCK LINED CONCRETE SPILLWAY 254.77 254.80 T OVERFLOW STRUCTURE 281.83 273.00 :RING DEIPARTMENTAPPROVALS1 CITY OF ENCINITAS -ENGINEERING SERVICES DEPARTMENT O M ED: GRADING PLAN FOR: 3015 WILDFLOWER DRIVE Moak o DENGATE RESIDENCE 7 DATEj ��.61 /1 i 18-138 MIN (APN: 264-091-88) 13194-G 4 Docuftn Emebp ID: M"FA1-G27426E-BABRADU612 746 DIMENSIONS PER DETAIL 0 OVERFLOW INLET PER DIMENSIONS PER PIP I 2" FREE BOARD *DC17AIL 'C' OVERFLOW lo' DETAIL '0' CONTROL GALLON - CAREXp;• Ip1P[/Lylpyt TUMICOIA -FOOTHILL STRUCTURE �jzNCC PVC PIE SEDGE AT 24" O.C. I � MIN. 4" DIA w Ly)�„"" IS MIN. 2" FREEBOAR01 iR MIN. _( 1 1 1 0" PERFORATED_ UNDERDRAIN MIN. 6" 3 ISp 3 0.4i' AI1N• IHyERawr ENGINEERED SOIL FLANGE &ORIFICE, LypER 'C' uroER L8 f `(SEE DETAIL 'A) �' PLATE CONNECTION i. I GALLON - GV2EX NMICOlA - FOOTHILL SEDGE AT 24" O.C. 6. ORIFICE CONTROL PER DETAIL �� 8 , - - - (SEE NOTE 1) 2. GROUND COVER: 3" OF FINELY SHREDDED HARDWOOD ORIFICE DIAMETERS: MULCH OR APPROPRIATE SOD IMP A.1 = 0.25" pf,lEy�� tt o °°° J. 4" PERFORATED UNDERDRAIN-LEVEL IMP A2 = 0,32" 0000a000o 0000�°00°090°0°0°0°°° 3/4" CRUSHED �T 4. 18" SOIL MEDIA -LOAMY SAND W/ IMP B.I = 0.43" T ROCK MINIMUM 5%HR PERCOLATION+ 4" PERFORATED PVC CATCH BASIN 5. 8' OF i' CRUSHED ROCK HOLES DOWN �-%I"/G� SIZE PER PLAN 21PE ' CLEADERDRAIN, RANCE AROUND PIE SOIL MIX PER ` DETAIL 'A' A' -TYPICAL SEC7ION- I.Tp�p)FyN11A� BELGARD ECO DUBLIN PAVERS Wl- PERMEABLE JOINTS 5"WIDEx 9" HIGH PCC CURB 2E4 x 14 REBAR BEDDING LAYER, 2"_ ASTM NO. 8 STONE 6" DRAINAGE AGGREGATE JOINT CHIPS/STONE AS SPEC'D BY BELGARD ,f WIDTH PER NATIVE MATERIAL COMPACTED TOE 95K BEL COMPACTION BASE LAYER, MIN. 6" ASTM NO. 2 STONE (MAY BE SUBSTITUTED WITH /3 OR /4 STONE) BASE LAYER 4" ASTM NO. 57 STONE DETAIL 'E'-DRIVEWAY W/BELGARD PERMEABLE PAVWG NOT TO SCALE *ENGINEERED SOIL" LAYER SHALL BE MINIMUM 6" DEEP SWDY LGIA"SOIL DETAIL 'B'-TYPICAL SECTION MIX X-60X .WJO 200-JRE OX COMPoCST OR WOOD THE D 20-0% BIOFILTRA77ON W/PARTIAL RETENTION TOPSOIL. NOT TO SCALE 6"WIDEx 9" HIGH PCC CURB PVC I I r-2EA x /4 RE64R MIN. DENSE GRADED AGGREGATE 84SE EMENDS BEYOND CURB TO PROVIDE WORKING PLATFORMFOR INSTALLATION (ii 6106' CONCRETE CUTOFF WALL ®10' O.C. (TYP.) BELGARD ECO DUBLIN PAVERS W/ PERMEABLE JOINTS 4" PERE PVC - BENCH SUBGRADE WHERE DRIVEWAY SLOPE EXCEEDS 5% EMBED CUTOFF �'6' MIN.ASTM NO. 2 ALL 5" MIN, INTO STONE (OR SUB.) ON NATIVE LEVEL GROUND BASE LAYER 4" ASN NO. 57 STONE BEDDING LAYER, 2" ASTM NO. 8 STONE SECTION VIEW Adl' W 2' 5' AT TOE OF SLOPE 50 MIN $SMUENT TO ACCUMULATE FILTER STAKE FABRIC 8• MIN SEDIMENT INSTALLATION DUSTING GROUND L�ELE REMAINING 84CKRLL GRAVEL, BAGS GRAVEL FLOW OUTFLOW PIPE / LCLOSEO MESH GRATE SIZE PER PLAN PLAN N.LS CLOSED MESH GRATE SIZE PER PLAN 1 ORIFICE PLATE SEE DETAIL BELOW PIPE PERFORATED UNDERDRAIN SECTION N.LS ORIFICE PLATE: MIN SQUARE DIMENSIONS 1.0 FT GREATER THAN MIN. 6" (TYP.) PIPE DIA. HOT DIP GALVANIZED PLATE AFTER HOLES 3" (TY) r HAVE BEEN DRILLED ° o INFLOW PIPE NOTE 112" M ORIFICE DIAMETER DIA.) 1. ORIFICE & FLANGE CONNECTION TO CONCRETE SIZE PER DETAIL 'A' SHALL BE FILLED WITH 3/B' DIA. 30 DUROMETER NEOPRENE RING HOLE (TYR) FLOW CONTROL ORIFICE PLATE N.T.S DETAIL 'C' CATCHBASIN ORIFICE PLATE NO SCALE 290 M!, BIOFIL TRAT ION AREA A. I 2.5' (MIN. 4" GRASS) DETAIL 'F' - EARTHEN SWALE NOT TO SCALE B'OFILTRATION AREA A.2 EMBEDDED IN WITHIN R.O.W. EX. DETAIL 'G' PCCSPILLWAY NO SCALE BIOFILTRATIONAREA B.I —8" PCC CURB/SPILLWAY —EXISTING DRAIN LINE ROLLED PER PLAN \ cuRe PAN SOPE PER PLAN SECTIONA-A I -I ME-2011Mi &° g REMAINING I I� I-L-I I II I_II I -I 1„ec ° T L� STAKE 4'-6" - _ PROVIDE APPROPRIATE TRANSITION =,11- GAP BETWEEN CS GRAVEL STONE SHALL BE f-3 IDHES BETWEEN AND PAVED SCONSIRURFACE CTS AS SPILL ENTRANCE AND PAVED SURFACE - FILTER FABRIC - - HAY n r1 II DETAIL S' _ DETAIL 'V' DALE _ _ =i STABILIZED CONSTRUCTION ENTRANCE /PVT/ GRAVEL BAGS BARRIER 1 BACK FILL SCALE NO SCALE 111 =] -1 11I=liW — 1�u STRENGTHENING 10 mB WOOD FRAME 1 I-11 - - PLASTIC - SECURELY FASTENED ll- -III=1 BIFFY GRAVEL BAGS AROUND ENTIRE II-111� (T- OVERLAP ONTO ID PERIMETER KEY IN FILTER FABRIC A TWO LEVELS OF CURB OR SIDE M CURB OR SIDE W/TWO STAKES MINIMUM OF 6' BELOW STAKE SAND OR GRAVEL OF TRAVELWAY TWO -STACKED SECTION I THE GROUND SURFACE - Q BAGS ONE BELOW 2x10 ROUGH W000 AND 6" ACROSS, THEN 11111 VISOUEEN, ONE FRAME BACKFlLL WITH DIRT OR ////// ABOVE GRAVEL FILTER (TO CONTAIN f STAKE FABRIC - DOCONTAIN -------- VARIES / FT MIN. (4' MIN) RUNOFF ESSI ID-mll PLASTIC 1F11 111-11 -I ., i= GAP BETWEEN BAGS LINING WOOD STAKE TYP ���F'L JVgC C VISOUEEN ACTS AS SPILLWAY �6' ( ) l ll��l BACK FlLL �' SKIRT THREE ENDS LAYERS GRAVEL BAGS _ TOP VIEW No. C07 a DETAIL 'RDETAIL 'T DETAIL 'W' DETAIL Z' SILT FENCE INSTALLATION SANITARY TOILET (BIFFY) PROTECTION GRAVEL BAGS ON TRAVEL WAYS CONCRETE WASHOUT- ABOVE GROUND �' of DAO e DETAILS NO SCALE NO SCALE NO SCALE - NO SCALE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT .PLANNING 8 BUILDING DESIGNED BY. DRAvv BY: CHECKED BY: ENGINEERINGDEPARTMENT APPROVALS CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT DRAWING NO. rn VV Dv DESCRI PLANS PREPARED UNDER SUPERVISION OF REC O ME ED: GRADING PLAN FOR: LOCATIP DDIT"DISK WDa c &D1 3015 WILDFLOWER DRIVE RECORD F K M: Te OF ENGI ILK JOCK A La L FNGI HORIZONTAL: _ DANIEL J. VALDEZ DATE fly 1 ///jjj... ��/ DATE I 13194-G RECORD FROM: OF €N;XMras -mNr rp._1o1D REV. ENGR. INSPECTOR SR. ENGR SIBVFFLIOW 7C DENGATE RESIDENCE ELEVATION. 203.16 VERTICAL: PRINT: DATE R.C.E. NO. 76 74 S DATUM: FAAL47 DANIEL J. LD¢ EXP : s 3D 18 nATF �� l� DA EIT 1 ( lb-IWMIN (APN: 264-091-88) SHEET 3 OF 4 Docu$gn Emebp lIM"FA1-IN27426E-BAB]-Aa5261 i56]C6 LEGEND m SCALE., 1 "=20' :7 BIOFLTRATION \, y -SILT FENCE PER -SE--1 R,71 I. DMA A.2 I INLET PROTECTION PER SE-10 (TYP.)' - A. sc-fia 6TI ® ' - BIOFILTRATION AREA B. >t A=1,447 FI IURDING DMA 8 i V, - L• p SC-6 q SD-4 DESCRIPTION STD DWG* SYMBOL PROPERTY LINE 6—N45'45`45•W_ DRAINAGE MANAGEMENT AREA (DMA) LIMITS ID®gggggg ggV SILT FENCE SE-1 STABILIZED CONSTRUCTION ENTRANCE TR-1 0 C O O 001 0 HYDRAULIC MULCH/HYDROSEED EC-3, EC-4 (SLOPE PROTECTION) \ GRAVEL BAG BERM/BARRIER SE-6 DIRECTION/COURSE OF FLOW —y ✓ y I, 1'Ij WM-8 MI HAZARDOUS AND CONCRETE WM-6, WM-8 WI WASTE MANAGEMENT SANITARY WASTE WI WM-9 Iv (PORTABLE TOILET) v INLET PROTECTION 5E-10 ti III MATERIALS DELIVERY AND STORAGE AREA WM-7 WM-1 TEMPORARY TRASH/SOLID WASTE WM-5 WM-5 .I\\\ �` F"'•y`i' STREET SWEEPING SE-7 (NO SYMBOL) STANDARD DRAWINGS (SE-5, WM-5, ETC.) CAN BE FOUND AT THE CALIFORNIA STORMWATER DUALITY ASSOCIATION (CAS(W) WEBSITE https://www.casga.org/resources/bmp—handbooks/construction Der ~ m B/OFIL TRATION AREA — MAINTENANCE �`'� • ACCESS OF STRUCTURAL FOR INSPEC77ON AND MAINTENANCE. see A.1 THE BIO—F—52ON BMPS CONSIST OF THREE (E) VEGETATED AREAS: l IMP —525 FT' \\ ••• IMP A.2 —907 FT• vv \ 1 , ��, �,, � ) ••• IMP B.1 — 1,447 FT' \\�\ --_:\ �' `I •• A 1.5'X1.5'CONCRETE INLET WILL BE INSTALLED WITHIN EACH BMP WITH ITS RIM t `(, ELEVATED 10-ABOVE THE SURFACE. THE TOTAL DEPTH OF EACH INLET WILL k �t BE APPROXIMATELY 3'. \\S` ,?4 `� 11 ��, / •• THE INLET WILL BE VISIBLE FROM THE SURFACE AND CAN BE ACCESSED THROUGH THE GRATE. v J n THE DEPTH WILL NOT REQUIRE A LADDER TO ACCESS THE FULL EXTENT OF T N j THE INLET. }I I •• THE BIOFILTRATION BASINS ARE ACCESSIBLE FROM THE FRONT AND BACK YARD -- I OF THE PRIVATE RESIDENCE. • MAINTENANCE THRESHOLDS •• ANY GRASSES WITHIN THE BIOFILTRATION AREA SHALL BE CUT WHEN IN EXCESS OF 4" TALL. •. DEBRIS & SEDIMENT SHALL BE CLEARED FROM THE BASIN WHEN 2' HAVE ACCUMULATED. •• ANY AMOUNT SEDIMENT OR DEBRIS ACCUMULATION OBSERVED WITHIN THE OVERFLOW INLET SHALL BE REMOVED WHEN SEEN. •• DURING ROUTINE LANDSCAPE MAINTENANCE ACTIVITIES, IF BARE AREAS OR EROSION ARE OBSERVED THEY SHALL BE RE —SEEDED. •• IF STANDING WATER IS OBSERVED FOR LONGER THAN 24—HOURS THE SOIL MEDIA SHALL BE INSPECTED FOR CLOGGING AND CLEANED. • BIORETENTION SOIL MEDIA REPLACEMENT •• SOIL MEDIA WITHIN THE BIORETENTION AREA SHALL BE REPLACED WHEN THE FILTRATION RATE DROPS BELOW 501HOUR IF REGULAR MAINTENANCE CANNOT RESTORE THIS RATE. • RECOMMENDED MAINTENANCE EQUIPMENT ••• EQUIPMENT NEEDED FOR MAINTENANCE WILL TYPICALLY INCLUDE THOSE NEEDED FOR ROUTINE LANDSCAPE MAINTENANCEHAND SHOVELS • WHEEL BARROWS • LAWN MOWER • HEDGE CLIPPERS • OTHER • SPECIAL TRAINING as MAINTENANCE AND INSPECTION ACTIVITIES REQUIRED ARE TYPICAL FOR ROUTINE LANDSCAPE MAINTENANCE. NO SPECIAL TRAINING REQUIRED. SITE DESIGN BMPS SOURCE CONTROL BMPS PERMANENT BMP NOTE MAINTAIN NATURAL DRAINAGE & HYDROLOGIC FEATURES SD—T PREVENT ILLICIT DISCHARGES INTO THE M54 SC-1 4ppFFSSI CONSERVE NATURAL AREAS, SOILS, VEGETATION SO-2 PROTECT TRASH STORAGE AREAS SC-5 PERMANENT BMPS ARE TO BE PRIVATELY MAINTAINED AND THE FACILITIES NOT MODIFIED OR REMOVED ONSITE STORM GRAIN INLETS WITHOUT A PERMIT FROM THE CRY SC-6A MINIMIZE IMPERVIOUS AREAS SD-3 LANDSCAPE/OUTDOOR PESTICIDE USE [SSC­—_6Ifl No. C076074 MINIMIZE SOIL COMPACTION SD-4 POOLS, SPAS, ETC, SC-6 IMPERVIOUS AREA DISPERSION — DIRECTLY CONNECTED IMPERVIOUS SD-5 REFUSE AREAS SC-6 ell AREAS NOT ALLOWED FIRE SPRINKLER TEST WATER SC-60 or LANDSCAPING WITH NATIVE OR DROUGHT TOLERANT SPECIES SO O CONSTRUCTION 6 POST-CONSTRUCTIONI PLAN MISCELLANEOUS DRAIN OR WASH WATER SC-6P DESIGNED BY. DRAWN BY. CHECKED BV: D CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT PLANNING &BUILDING Dv DV Dv - ENGINEERING PARTMENT APPROVALS CITY OF ENCINITAS -ENGINEERING SERVICES DEPARTMENT DRAWING NO. PLANS PREPARED UNDER SUPERVISION OF REC D:WnAT ED: GRADING PLAN FOR: LOOATIDESCRIPTIDN:cw IV- 5TANFPD d. &M 3015 WILDFLOWER DRIVE LOCATION:I�E (ni KT AY OLYD L(A1E .AOlB LCC LPoAL HORIZONTAL: DANIEL J. VALDEZ DATED DATE 5( - _ 13194•V RECORD FROM: 011'OF ETq'MAS-F1Y,VT NO. 1010- -tlIT/ te�Eu K uo DENGATE RESIDENCE REV. ENGR. INSPECTOR SR. ENGR ELEVATION: 20J.16 VERTICAL: PRINT. ATE R.C.E. NO. 76074 DATUM: LNVL198 DANIEL VALDEZ P 6/30/16 nA� 1O-(� I 18-taeMlN (APN: 264-091-66) SHEET 4 OF 4 LL Zs Lu W i Z_ Zw U Luw= LL LL - 0 LLnJJ' [i7