LDEV-014425-2021 (Plans)PUBLIC IMPROVEMENT PLAN GENERAL RIGHT-OF-WAY NOTES: 1. NO ACCESS OR WORK SHALL BE PERFORMED WITHIN THE CITY RIGHT-OF-WAY WITHOUT THE FULL KNOWLEDGE OF THE ASSIGNED CITY INSPECTOR WHO SHALL BE GIVEN NOT LESS THAN 48 HOURS ADVANCE NOTICE OF THE INITIATION OF PERMITTED USE AT (760) 633-2796 OR 633-2797, OR AS STATED ON THE PERMIT. 2. AT LEAST 48 HOURS PRIOR TO STARTING WORK, UNDERGROUND SERVICE ALERT (USA) SHALL BE NOTIFIED FOR LOCATION OF UNDERGROUND UTILITIES AT 1-800-422-4133. THE PROPOSED DIG AREA MUST BE MARKED IN WHITE PAINT PRIOR TO CONTACTING (USA). 3. ALL WORK COVERED BY THIS PERMIT SHALL BE PERFORMED BY A CONTRACTOR POSSESSING A VALID CALIFORNIA CONTRACTOR'S LICENSE OF THE APPROPRIATE CLASS. 4. ALL TRAFFIC CONTROL WITHIN THE CONSTRUCTION AREA SHALL BE SUBJECT TO AN APPROVED TRAFFIC CONTROL PLAN AND SHALL BE FLAGGED AND BARRICADED TO THE SATISFACTION OF THE CITY INSPECTOR IN COMPLIANCE WITH THE "WORK AREA TRAFFIC CONTROL HANDBOOK" LATEST EDITION PUBLISHED BY BUILDING NEWS INC. IN THE EVENT THAT THE INSPECTOR DETERMINES PROPER TRAFFIC CONTROL IS NOT IN PLACE ALL WORK SHALL CEASE AND PERMITTEE AUTHORIZES THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE TO ORDER, ON THE RENTAL BASIS, SUCH TRAFFIC CONTROL DEVICES AS SHALL BE NECESSARY AND PROPER TO PROTECT THE PUBLIC SAFETY AND FURTHER AGREES TO PAY ANY AND ALL COSTS AND CHARGES THAT THE CITY MAY INCUR IN PROVIDING SAID TRAFFIC CONTROL. 5. APPLICANT AGREES THAT IT SHALL BE HIS RESPONSIBILITY TO PROVIDE THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER AGENT RESPONSIBLE FOR CONSTRUCTION OF PERMITTED WORKS WITHIN THE CITY RIGHT-OF-WAY, WITH A COPY OF THE PERMIT INCLUDING THESE STANDARD CONDITIONS AND A COMPLETE SET OF APPROVED PLANS. THE PERMIT, PLANS AND WORK AREA TRAFFIC CONTROL HANDBOOK SHALL BE AVAILABLE AT THE PERMIT SITE WHENEVER WORK IS IN PROGRESS. 6. PERMITTED WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY SPECIFICATIONS AND APPROVED PLANS, SUBJECT TO INSPECTION AND APPROVAL BY THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. CERTIFICATION FOR ALL MATERIALS AND WORK, INCLUDING COMPACTION TESTS, SHALL BE FURNISHED BY THE APPLICANT UPON REQUEST BY THE CITY INSPECTOR. PAYMENT FOR ANY COMPACTION TESTING SHALL BE BY THE PERMITTEE. CERTIFICATION SHALL BE MADE BY A CERTIFIED TESTING AGENCY OR FIRM ACCEPTABLE TO THE Cm. 7. NO WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS PERMITTED ON SATURDAYS, SUNDAYS, OR HOLIDAYS. ANY DEVIATION FROM THE WORK SCHEDULE PRESENTED IN THESE CONDITIONS MUST RECEIVE PRIOR, WRITTEN APPROVAL OF THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. ANY QUESTIONS REGARDING DAYS CITY HALL IS CLOSED, CALL (760) 633-2770. S. NO WORK ON ANY PUBLIC ROADWAY, EXCLUDING PRIME ARTERIALS AND MAJOR ROADS, SHALL BE STARTED BEFORE 7:30 A.M. OR CONTINUE AFTER 5:00 P.M. ON WEEKDAYS. 9. NO WORK SHALL BEGIN BEFORE 9:00 A.M. OR CONTINUE AFTER 3:00 P.M. ON PRIME ARTERIALS AND OTHER MAJOR ROADS, UNLESS AUTHORIZED ON THE PERMIT BY THE CITY ENGINEER. ALL WORK ON PRIME ARTERIALS AND OTHER MAJOR ROADS, ALL AS SHOWN ON THE CIRCULATION ELEMENT OF THE CITY'S GENERAL PLAN, WILL REQUIRE A TRAFFIC CONTROL PLAN ACCEPTABLE TO THE CITY TRAFFIC ENGINEER WHOSE OFFICE CAN BE CONTACTED AT (760) 633-2704. 10. THE ROADWAY SHALL BE CLEAN AND FREE OF ALL OBSTRUCTIONS AND COMPLETELY OPEN TO TRAFFIC AT THE END OF EACH WORKING DAY. (NO LATER THAN 3:00 P.M. ON MAJOR ROADS, DEFINED HEREIN.) 11. TWO-WAY TRAFFIC SHALL BE MAINTAINED AT ALL TIMES. MINIMUM TRAVEL LANE WIDTH FOR MOTOR VEHICLES SHALL BE 12 FEET. IF STREET WIDTH PREVENTS MAINTAINING TWO-WAY TRAFFIC, PERMITTEE AND DIRECTOR OF ENGINEERING SERVICES SHALL AGREE ON AN ADEQUATE TRAFFIC CONTROL PLAN PRIOR TO STARTING WORK, WHICH SHALL INCLUDE THE USE OF A FULL-TIME FLAGMAN. 12. ALL EXCAVATIONS IN EXISTING PAVEMENT SHALL BE SAW CUT TO NEAT LINES AND AC REPLACEMENT SHALL BE MADE TO THE SATISFACTION OF THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 13. OPEN TRENCH MUST BE BACKFILLED AND CAPPED WITH AT LEAST 2" OF COLD MIX ASPHALT OR METAL PLATED ACCORDING TO CITY SPECIFICATIONS DURING NON -WORKING HOURS. METAL PLATES ARE REQUIRED TO HAVE COLD MIX ASPHALT RAMPS ON ALL (4) SIDES AND MUST BE MAINTAINED. REFER TO THE CITY'S STANDARD DRAWING DATED JULY 31, 1990. 14. NATIVE MATERIAL MAY BE USED UPON APPROVAL OF THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. REFER TO THE CITY'S STANDARD DRAWING DATED SEPTEMBER 30, 1996. 15. NO TUNNELING UNDER CURB AND GUTTER OR OTHER IMPROVEMENTS SHALL BE PERMITTED. IMPROVEMENTS SHALL BE REMOVED AND REPLACED JOINT TO JOINT. 16. TWO SACK SAND -CEMENT SLURRY MIX SHALL BE REQUIRED AS BACKFILL ON ALL LATERAL EXCAVATIONS WITHIN PRIME ARTERIALS, MAJOR ROADS AND COLLECTORS AS WELL AS ALL LOCATIONS WHERE THE INSPECTOR DEEMS THE NATIVE MATERIAL TO BE UNACCEPTABLE FOR USE AS BACKFILL. 17. CARE SHALL BE EXERCISED TO PREVENT WATER, SOIL AND DEBRIS FROM DEPOSITING IN GUTTERS, STREETS AND STORM DRAINS. NO WASHING OUT OF MIXERS OR CONCRETE PUMPS WILL BE ALLOWED ON CITY STREETS. VIOLATIONS WILL BE REFERRED FOR NPDES ENFORCEMENT AND PENALTIES. 18. ANY ROADWAY STRIPING OR MARKINGS DAMAGED OR REMOVED DURING THE OPERATIONS OF THIS PERMIT SHALL BE MATCHED AND REPLACED BY THE APPLICANT USING THE LATEST EDITION OF STATE DEPARTMENT OF TRANSPORTATION SPECIFICATIONS FOR PAINT OR THERMOPLASTIC, ALL TO THE SATISFACTION OF THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 19. ALL CONCRETE WORK SHALL BE TRANSIT MIXED AND CONFORM TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION, SECTION 201, AND BE APPROVED BY THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 20. TRENCHING FOR INSTALLATIONS ACROSS ANY INTERSECTING ROADWAY OPEN TO TRAFFIC SHALL BE PROGRESSIVE. NOT MORE THAN HALF OF THE WIDTH OF A TRAVELED ROADWAY SHALL BE DISTURBED AT ONE TIME AND THE REMAINING WIDTH SHALL BE KEPT OPEN TO TRAFFIC BY BRIDGING OR BACKFILLING. 21. WHERE STREET DIMENSIONS AND STATE DEPARTMENT OF HEALTH SERVICES REGULATIONS ALLOW, ALL PIPES AND CONDUITS LAID PARALLEL TO THE ROADWAY SHALL BE PLACED AT LEAST FIVE (5) FEET FROM THE EDGE OF THE PAVEMENT OR GRADED TRAVELED ROADWAY, UNLESS OTHERWISE AUTHORIZED IN WRITING BY THE CITY ENGINEER. THE SHALLOWEST PORTION OF ANY PIPELINE OR OTHER FACILITY SHALL BE INSTALLED NOT LESS THAN THIRTY (30) INCHES BELOW THE ROADWAY SURFACE. 21(A). WHERE STREET DIMENSIONS AND STATE DEPARTMENT OF HEALTH SERVICES REGULATIONS ALLOW, ALL PIPES AND CONDUITS LAID PARALLEL TO EXISTING UTILITIES SHALL MAINTAIN A MINIMUM SEPARATION OF THREE (3) FEET MEASURED FROM THE NEAREST EDGE OF THE FACILITY. ANY DEVIATION FROM THIS REQUIREMENT IS NOT ALLOWED UNLESS APPROVED BY THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 22. ALL EXCAVATED MATERIAL SHALL BE CAST AWAY FROM THE IMPROVED PORTION OF THE HIGHWAY. AFTER THE WORK HAS BEEN COMPLETED, ALL EXCESS MATERIAL, INCLUDING TRENCH SPOILS, SHALL BE REMOVED FROM THE RIGHT-OF-WAY. THE ROADWAY SHALL BE LEFT IN NEAT AND ORDERLY CONDITION. 23. ALL ROADSIDE DRAINAGE DITCHES SHALL BE RESTORED TO TRUE GRADES AND THE INTAKE AND OUTLET ENDS AT ALL CULVERTS SHALL BE LEFT FREE FROM ALL EXCESS MATERIALS AND DEBRIS. 24. ALL APPROACHES TO PRIVATE DRIVEWAYS AND INTERSECTING ROADS AND STREETS SHALL BE KEPT OPEN TO TRAFFIC AT ALL TIMES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. 25. CLAY AND EARTH WHICH ADHERE TO THE PAVED SURFACE OF THE ROADWAY SHALL BE REMOVED BY HAND SCRAPING, WASHING AND SWEEPING, OR BY ANY OTHER METHOD WHICH WILL LEAVE A CLEAN NON-SKID SURFACE WITHOUT IMPAIRING, DAMAGING OR LOOSENING THE SURFACE. 26. PERMITTEE SHALL COMPLY WITH ANY AND ALL DIRECTIVES ISSUED BY THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE IN ORDER TO PREVENT DUST OR OTHER MATERIALS FROM BECOMING A NUISANCE OR ANNOYANCE. 27. TEMPORARY PATCHING OF TRENCH IS REQUIRED ON LATERAL CUTS IN SURFACED STREETS IMMEDIATELY AFTER BACKFILLING. AFTER COMPLETION OF THE REFILLING AND COMPACTING OF THE BACKFILL MATERIAL IN THE EXCAVATION, ALL AS SPECIFIED IN THE STANDARD DRAWING DATED SEPTEMBER 30, 1996, AND THE REMOVAL OF OBSTRUCTION(S), THE PERMITTEE SHALL PROMPTLY REPLACE WITH TEMPORARY OR PERMANENT PATCHING MATERIAL, OR REPAIR ANY PORTION OF THE HIGHWAY SURFACE REMOVED OR DAMAGED BY THE EXCAVATION, OBSTRUCTION, OR CONSTRUCTION OPERATIONS, ALL TO THE SATISFACTION OF THE CITY ENGINEER, AND AS SPECIFIED ELSEWHERE HEREIN. THE CITY ENGINEER MAY, AT HIS OPTION, ELECT TO DO THE SURFACING OR REPAIRING HIMSELF; IN SUCH CASE, THE PERMITTEE SHALL BEAR THE COST OF SUCH WORK. TEMPORARY PATCHING MATERIAL MAY BE LEFT IN PLACE FOR UP TO 30 DAYS, BUT MUST BE CONTINUALLY MAINTAINED. 28. WHERE THE PAVEMENT, EXCEPT PORTLAND CONCRETE CEMENT PAVEMENT, OR OTHER TYPE OF SURFACE HAS BEEN REMOVED BY OTHERS THE PERMITTEE SHALL REPLACE IT WITH A STANDARD REPAIR OF FOUR 4 INCHES AC OVER APPROVED BACKFILL OR REPAIR SECTION SHALL BE ONE 1 INCH AC GREATER THAN EXISTING STRUCTURAL SECTION, WHICHEVER IS GREATER. REFER TO THE MOST CURRENT STANDARD DRAWING. REPAIRS PAVEMENT SHALL BE MADE PURSUANT TO THE SPECIFICATIONS OF THE ASSIGNED ENGINEERING INSPECTOR. 29. IF, AFTER THE REFILLING EXCAVATION, THE PERMITTEE FAILS REFUSES TO RESURFACE OR REPAIR THAT PORTION OFF THE ROADWAY SURFACE OF THE ROADWAY DAMAGED D BY HIM, OR IF THE CITY COMPUTED BY THE OF DEVELOPMENT SERVICES DIRECTOR. 30. WHEN SHORING IS REQUIRED, AN ENGINEERED DETAIL DRAWING WILL BE REQUIRED FOR APPROVAL BY THE CITY ENGINEER. ALL OSHA REGULATIONS SHALL BE MET. 31. ALL DIRECTIONAL BORES SHALL BE SUBJECT TO APPROVAL OF THE METHOD IN THE FIELD BY THE ASSIGNED ENGINEERING INSPECTOR, ACTING AS THE DULY AUTHORIZED AGENT OF THE CITY ENGINEER. A THOROUGH EXAMINATION OF THE SUBSURFACE CONDITIONS IS A PREREQUISITE. THE APPLICANT SHALL IDENTIFY THE BORE METHOD ON THE PERMIT APPLICATION EITHER AS AUGER, HAMMER, HYDRAULIC, ETC., AND SHOW THE BORE PITS. GROUTING AND INTERMEDIATE BORE PITS MAY BE REQUIRED. 32. ALL SUBSURFACE UTILITIES SHALL BE ACCURATELY SHOWN ON THE APPLICANT'S SITE PLAN FOR THOSE EXCAVATIONS IN EXCESS OF 250 LINEAR FEET, TRAVERSING SIGNALIZED INTERSECTIONS, CROSSING INTERCONNECT WIRES, OR OTHERWISE WHERE THE CITY ENGINEER HAS A SPECIAL CONCERN. 33. PAVEMENT CUTS IN STREETS REHABILITATED OR NEWLY CONSTRUCTED WITHIN THE PAST TWO YEARS SHALL BE CATEGORICALLY DENIED. 34. THE DEVELOPER SMALL BE RESPONSIBLE THATANV MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 35. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE, NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. 36. THE TRAFFIC LOOPS SHALL BE REPLACED WITHIN 3 DAYS OF COMPLETING WORK IN THE AREA TO CURRENT CALTRANS STANDARD TO DETECT BICYCLES PER TRAFFIC OPERATIONS POLICY DIRECTIVE 09-06 AT NO COST TO THE CITY. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT PETER LAGASSE AT (760-213-1165), 24 HOURS A DAY. 2, EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUNOFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED IMPROVEMENT PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWER - LEUCADIA WASTEWATER DISTRICT - (760) 753-0155 B. GAS & ELECTRIC - SDGE - (760) 438-6200 C. WATER- SAN DIEGUITO WATER DISTRICT-(760)-633-2650 D. TELEPHONE - SEC BELL -(760)489-3411 E. CABLE TV - COX COMMUNICATIONS- (760) 806-9809 X-2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760) 633-2770. 3. CONTRACTOR SHALL NOTIFY THE LEUCADIA WASTEWATER DISTRICT 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE NUMBER (760) 753.0155 EXTENSION 30D2. 4. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 753-0155. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. 5. SEPARATE TRAFFIC CONTROL PERMIT REQUIRED. APPLICANT TO APPLY FOR TRAFFIC PERMIT THROUGH THE CITY'S CUSTOMER SELF SERVICE (CSS) PORTAL. ENCINITAS FIRE DEPARTMENT SIGN DATE DESCRIPTION APPROVED DATE BENCHMARK DESCRIPTION: ENC-25. 2.5" BRP LOCATION: INTERSECTION OF S. E PARKS AND RECREATION PLANNING DIVISION e/2/214ft�gust 91 2021 SIGN DATE silU D AS -BUILT APPROVALS RECORD FROM: ROS 18416 ELEVATION: 60.601 DATUM: NAAV 88 PUBLIC WORKS LAWRENCE W. WALSH DATE PLANNING REVIEWER SENIOR ENGINEER DATE INSPECTOR CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3' CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES. A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING VEHICLE REFUELING AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. 2 DJ: (N9/A 11612 FI I oIH 9_11 N "524 R711I Y•-E1:7 �A I [4�d I q I7111:71 NCPJI AWP/ 1A 1 s 111 DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY: THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. ME%f4 iT1;9dHA3�71111.100]11f0i]IE.q:040 7:11LI1711IT, 1Y44 ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE, CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS, DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 43"151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DIVISION, CITY OF ENCINITAS AT (760) 633-2770. OWNER/APPLICANT PETER LAGASSE 3424 CAMINO CORTE, CARLSBAD, CA 92009 760-213-1165 SITE ADDRESS ORPHEUS AVENUE & SUNSET DRIVE APN: 256-314-53 LEGAL DESCRIPTION UNION DR. ORPHEUS AVENUE AND SUNSET DRIVE RIGHT OF WAY \ Q OWNER'S CERTIFICATE A SITE R I (WE) WE HEREBY CERTIFY THAT REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN ORWILL RETAINED TO SUPERVISE OVER ALL 0 my GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY A O 2 OF THE SITE. m wZ I(WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND P LEUCADIA WASTEWATER DISTRICT AND THEIR OFFICERS, OFFICIALS, O y N EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND y sA ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, p n A y 'y ARISING OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR C INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OWNER OR OWNER'S 9 AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, 9L OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORK OR CONSTRUCTION COVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR APPROVED PLANS WITHIN THE PRIVATE PROPERTY OR PUBLIC EASEMENTS. VICINITY MAP � / 6 � LV-%� NOT TO SCALE SIGNATURE: DATE: PETER LAGASSE THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS AND LEUCADIA WASTEWATER DISTRICT, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS AND LEUCADIA WASTEWATER DISTRICT IN THEIR CAPACITIES AS PUBLIC ENTITIES FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OR LEUCADIA WASTEWATER DISTRICT OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND LEUCADIA WASTEWATER DISTRICT AND THEIR OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH SIGNATURE: "/'- G11+121 �G/RENCE W. WALSH DATE WALSH ENGINEERING & SURVEYING, INC. 607 ALDWYCH ROAD, EL CAJON, CA 92020 619-588-6747 RCE EXPIRES 12-31-22 SHEETINDEX SHEET DESCRIPTION 1 TITLE SHEET 2 NOTES 3 SEWER IN ORPHEUS AVENUE 4 SEWER IN ORPHEUS AVENUE 5 SEWER IN SUNSET DRIVE LEUCADIA WASTEWATER DISTRICT PUBLIC SEWER SYSTEM APPROVAL APPROVED BY: LWD DISTRICT ENGINEER C33692 6/15/2021 SAN DIEGUITO WATER DISTRICT PUBLIC WORKS DEXTER S. WILSON, PE RCE DATE DEXTER WILSON ENGINEERING, INC. 6/30/2022 FIRM EXP. DATE John Ugrob 7/22/2021 07/26/2021 SIGN DATE BMP PROJECT STATUS STANDARD SIGN DATE D BY. 1 DRAWN BY7 1 CHECKED eY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. S DREPARED UNDER SUPERVISION DATE: (0 14 21 OF RE C APPROVED: g-zrra-.Gz. IMPROVEMENT PLAN FOR: 8" SEWER IN ORPHEUS AVENUE LDEV-014425-2021 R.C.E. NO.: 46316 S f OW K JILL T. BANKSTON AC IINZ' CITY ENGINEER AND SUNSET DRIVE E W. WALSH EXP.: 12-31-22 82321 DATE DATE PLANNING CASE NO: 4275-2020 MULTI SHEET 1 OF 5 w V L\PROJECTS 30\201206-LAGASSE\PRODUCTION DRANINGS\201206-E49NEERING BASEDWG June 15, 2021 - 10:24am w2I51A mv2A A210)1=K IYLIJtl3[Il sli 1160y 1. LWD APPROVAL OF THESE PLANS DOES NOT RELIEVE THE APPLICANT, PRIVATE ENGINEER OF WORK, OR CONTRACTOR FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING OR AFTER CONSTRUCTION. 2. ALL DESIGN, MATERIALS, AND CONSTRUCTION WORK SHALL CONFORM TO THE LEUCADIA WASTEWATER 3. OSHA SAFETY ORDERS AND OSHA CONFINED SPACE ENTRY REQUIREMENTS SHALL BE FOLLOWED AT ALL TIMES WITHOUT EXCEPTION. 4. THE CONTRACTOR SHALL HAVE A COPY OF THE SEWER NOTES 2. & 3. DOCUMENTS ON THE JOB SITE AT ALL TIMES. S. THE CONTRACTOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE OF FINAL ACCEPTANCE BY LWD AND SHALL REPAIR OR REPLACE ANY WORK THAT MAY PROVE DEFECTIVE IN WORKMANSHIP ANDIOR MATERIALS WITHIN THE ONE YEAR PERIOD WITHOUT EXPENSE WHATSOEVER TO LWD. 6. QUANTITIES SHOWN HEREON ARE FOR BOND ESTIMATE PURPOSES ONLY. NEITHER THE PRIVATE ENGINEER 7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS REPRESENTING ALL MATERIALS AND SUPPLIES SATISFACTORY TO ONE. WORK SHALL NOT COMMENCE UNTIL SUCH MATERIALS ARE APPROVED BY LWD. 8. PRIOR TO BEGINNING SEWER WORK, THE LWD INSPECTOR SHALL BE FURNISHED A SETS OF CUT SHEETS AND THE CONTRACTOR SHALL COMPLY WITH LWD STANDARD SPEC SURVEY REQUIREMENTS. 9. PRIOR TO START OF WORK, CONTRACTOR SHALL SECURE A LWD PERMIT FOR CONSTRUCTION, SUBMIT SHOP DRAWINGS FOR ALL MATERIALS FOR REVIEW & APPROVAL, SCHEDULE AND ATTEND A PRECONSTRUCTION MEETING PER APPENDIX V OF STD SPEC, PROVIDE 3-WEEK LOOK AHEAD SCHEDULE(S) FOR ALL SEWER WORK 10. NO WORK SHALL BE COMMENCED UNTIL ALL RIGHT-OF-WAY AND OTHER REQUIRED PERMITS HAVE BEEN OBTAINED FROM THE JURISDICTIONAL CITY, COUNTY, AND/OR OTHER APPROPRIATE AGENCIES. 11. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL PLAN TO THE DISTRICT ENGINEER SHOWING THE DESIGN OF SHORING, BRACING, SLOPING, OR OTHER PROVISIONS TO BE MADE FOR PROTECTION OF WORKERS FROM THE HAZARD OF CAVING GROUND DURING TRENCH EXCAVATION AND PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET OR MORE IN DEPTH. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8, CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE LWD INSPECTOR PRIOR TO EXCAVATION. 12. ALL SEWER FACILITIES SHALL BE INSTALLED IN DRY EXCAVATIONS AND TRENCHES. CONTRACTOR SHALL DEWATER AND MAINTAIN DEWATERING CONTINUOUSLY UNTIL THE WORK IS COMPLETED INCLUDING PLACEMENT AND COMPACTION OF BACKFILL MATERIALS IN A DRY STATE. ALL PIPE ZONE MATERIAL LOCATED IN WET OR AREAS SUSPECTED TO BE WET IN THE FUTURE SHALL BE ENCASED IN GEOTEXTILE MATERIAL. SUITABLE GEOTEXTILE MATERIAL SHALL BE SUBMITTED TO THE DISTRICT ENGINEER FOR REVIEW AND APPROVAL. CONTRACTOR SHALL OBTAIN DEWATERING PERMITS AS NECESSARY AND RETURN OF GROUNDWATER TO THE SEWER SHALL NOT BE ALLOWED. 13. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES SHOWN ON THESE PLANS WAS OBTAINED BY AVAILABLE RECORDS SEARCH BY THE PRIVATE ENGINEER. TO THE BEST OF THE PRIVATE ENGINEER'S KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. ATTENTION IS CALLEDTO THE POSSIBLE EXISTENCE OF OTHER UTILITIES OR STRUCTURES NOT SHOWN, OR IN ADIFFERENT LOCATION FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR SHALL TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. 14. APPROVAL OF THIS PLAN BY LWD DOES NOT CONSTITUTE A REPRESENTATION OF THE ACCURACY OF THE LOCATION OF, OR THE EXISTENCE OR NONEXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE, OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 16. CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (800) 4224133, AS REQUIRED BY STATE LAW. ALL UTILITY CROSSINGS SHALL BE POT HOLED PRIOR TO TRENCHING. 16. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL LOCAL, STATE, AND FEDERAL SAFETY REGULATIONS INCLUDING, BUT NOT LIMITED TO, TRENCH SAFETY AND CONFINED SPACE ENTRY 17. SOILS REPORTS SHALL BE SUBMITTED TO LWD BY A QUALIFIED SOILS ENGINEER WHICH CERTIFIES THAT TRENCH BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS ENGINEER IN ACCORDANCE WITH ON SITE EARTHWORK SPECIFICATIONS AND THE LWD STANDARD SPEC. 18, SEWER ELEVATIONS SHOWN ARE INVERT ELEVATION(I.E.), INSIDE BOTTOM OF PIPE. SEWER LENGTHS SHOWN ARE FROM CENTER OF MANHOLE TO CENTER OF MANHOLE. 19. ALL REVISIONS TO DRAWINGS SHALL BE APPROVED BY THE LWD DISTRICT ENGINEER AS CONSTRUCTION CHANGES TO THE ORIGINAL MYLAR DWGS. WITH INITIALED APPROVAL ON THE MYLARS. 20. CONTRACTOR IS RESPONSIBLE FOR KEEPING COMPLETE RECORD OF CHANGES AND SHALL MAKE SUCH RECORD AVAILABLE TO THE PRIVATE ENGINEER. THE PRIVATE ENGINEER SHALL PROVIDE A&BUILT DRAWINGS TO LWD FOR REVIEW AND APPROVAL PRIOR TO FINAL ACCEPTANCE OF THE PROJECT. 21. LENGTH OF OPEN TRENCH SHALL BE LIMITED TO 350 FEET, INCLUDING COLLECTORS AND LATERALS, UNLESS OTHERWISE APPROVED IN WRITING BY THE DISTRICT. TRENCH SHALL BE BACKFILLED OR PLATED AT THE CONCLUSION OF EACH DAY OF WORK. 22. THE CONTRACTOR SHALL PROTECT ALL SURVEY MONUMENTATION. IF ANY SURVEY MONUMENTS ARE DISTURBED OR DESTROYED, THE CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR TO REESTABLISH AND RECORD THE MONUMENT CHANGE PER STATE LAW. 23. AMINIMUM OF 12-INCHES OF VERTICAL CLEARANCE SHALL BE PROVED BETWEEN THE SEWER PIPE AND ANY OTHER UTILITIES. EXIST. SEWER CROSSED WITHIN 3-FT VERTICAL ABOVE OR BELOW SHALL BE CCTV INSPECTED BOTH BEFORE AND AFTER THE CROSSING WORK IS COMPLETED FOR LWD REVIEW, APPROVAL, & RETENTION OF DIGITAL VIDEO FILES. ANY DAMAGED LWD FACILITIES SHALL BE REPAIRED TO ONO SATISFACTION AT NO COST TO LWD INCLUDING ADDITIONAL CCTV INSPECTION. 24. SEPARATION OF SEWER I WATER AND SEWER I RECLAIMED WATER SHALL COMPLY WITH LWD STD DWG S-2 AND WITH ALL COUNTY AND STATE HEALTH DEPT REGULATIONS 25. CONNECTIONS TO EXISTING SEWER PIPE OR MANHOLES SHALL ONLY BE DONE IN THE DIRECT PRESENCE OF THE LWD INSPECTOR. NEW SEWER SHALL NOT BE CONNECTED OR ALLOWED TO FLOW TO EXISTING SEWER UNTIL AFTER FINAL ACCEPTANCE OF ALL UPSTREAM WORK BY THE LWD INSPECTOR. OR AS APPROVED BY DISTRICT ENGINEER. 26. ALL SERVICE LATERALS SHALL BE LOCATED AT RIGHT ANGLES TO THE SEWER MAIN UNLESS OTHERWISE SHOWN AS APPROVED BY LWD ON THE PLANS. 27. A2-INCH HIGH "S" SHALL BE INSCRIBED ON THE CURB FACE AT EACH LATERAL LOCATION BY THE CONTRACTOR. 28. ALL PIPE SHALL BE HANDLED AND INSTALLED SO AS TO PROTECT PIPE, JOINTS, LINING, AND COATING. THE PIPE SHALL BE CAREFULLY BEDDED TO PROVIDE CONTINUOUS BEARING AND PREVENT UNEVEN SETTLEMENT. PIPE SHALL BE PROTECTED AGAINST FLOTATION AT ALL TIMES. OPEN ENDS OF PIPE SHALL BE SEALED AT ALL TIMES WHEN CONSTRUCTION IS NOT IN PROGRESS. 29, PIPE JOINTS SHALL NOT BE DEFLECTED UNLESS SO DESIGNED AND SHALL THEN BE LIMITED TO LESS THAN ONE-HALF OF THE ANGLE RECOMMENDED BY THE PIPE MANUFACTURER. 30. SEWER PIPE ZONE AND TRENCH BACKFILL SHALL BE PER THE LWD SEWER STANDARDS. WATER JETTING SHALL NOT BE ALLOWED. 31. ALL LATERALS SHALL BE CONSTRUCTED CLEAR OF DRIVEWAYS. 33. MANHOLE BASES SHALL BE MONOLITHICALLY PLACED, FINISHED, AND COMPLETED AT TIME OF PLACEMENT. GPK PRODUCTS, INC., OR APPROVED EQUAL, MANHOLE ADAPTERS SHALL BE SET IN THE BASE FOR EACH PIPE CONNECTION. SETTING OF MH RINGS SHALL NOT BE ALLOWED FOR 48 HOURS AFTER CONCRETE PLACEMENT. PRECAST MANHOLE BASES ARE ACCEPTABLE FOR USE WITH DISTRICT APPROVAL. 34. JOINTS BETWEEN MH BASE, SHAFTING, CONE SECTIONS, AND RING SHALL HAVE A 2" BY 2" BUTYL RUBBER GASKET PLACED WITHIN THE FULL CIRCUMFERENCE. GASKET SHALL BE CPS-210 BY PRESS -SEAL GASKET CORP., OR APPROVED EQUAL. 35. ALL MANHOLES SHALL BE VACUUM TESTED 1) BEFORE BACKFILL, 2) AFTER BACKFILL, AND 3) SUBSEQUENT TO ANY SUSPECTED MOVEMENT OR DAMAGE AFTER BACKFILL. 36. ALL SEWERS AND LATERALS SHALL BE WAYNE BALLED OR JETTED, LOW PRESSURE AIR TESTED, AND TELEVISED AT THE APPLICANT/CONTRACTORS EXPENSE PRIOR TO CONSIDERATION FOR FINAL ACCEPTANCE BY LWD. AIR TEST SHALL BE DONE AFTER CONSTRUCTION OF ALL OTHER UTILITIES AND UTILITY LATERALS. 37. ALL SEWERS AND LATERALS SHALL BE IN PLACE AND SHALL HAVE FINAL APPROVAL BY THE LWD INSPECTOR PRIOR TO BACKFILL. 38. MANHOLES SHALL BE 4FEET DIAMETER FOR PIPE UP TO 15-INCH DIAMETER PER LWD SITE DWG S-3. MANHOLES SHALL BE 5-FEET DIAMETER FOR PIPE 18-INCHES AND LARGER OR 12-FEET OR GREATER DEPTH PER LWD STD DWG S4. 39. ALL NEW MH SHAFTS AND PRECAST MH BASES SHALL BE LINED WITH AN INTEGRALLY LOCKING PVC (T-LOCK) PROTECTIVE LINING SYSTEM. ALL EXISTING MH'S WITH MODIFICATIONS AND NEW CAST -IN -PLACE MH BASES SHALL BE PROVIDED WITH EPDXY LINING SYSTEM. LINING SYSTEM TO MATCH EXISTING LINING, IF ANY. T-LOCK, EPDXY LINING SYSTEMS SHALL BE PER SECT 500-2 OF THE GREENBOOK. A MINIMUM OF FIFTEEN PERCENT (15%) OF MANHOLES AND NOT LESS THAN ONE (1) WITH EPDXY LINERS SHALL SUCCESSFULLY PASS PULL -TEST AND BE REPAIRED UNTIL PASSING. 40. MAXIMUM DEPTH OF SEWER FOR SDR 35 PVC PIPE IS 15'. C900 PIPE IS REQUIRED FOR DEPTH OF COVER OVER 15'. 41. FINAL APPROVAL OF PLANS BY DISTRICT ENGINEER IS VALID FORA PERIOD OF TIME NOT TO EXCEED ONE YEAR FROM APPROVAL DATE TO START OF CONSTRUCTION. IF THE ONE YEAR TIME LIMIT IS EXPIRED PRIOR TO START OF CONSTRUCTION THE DEVELOPER SHALL RESUBMIT THE PLAN CHECK TO THE DISTRICT ENGINEER FOR AN UPDATED REVIEW AND APPROVAL. ANY CHANGES REQUIRED TO THE PLANS SHALL BE MADE AT THE DEVELOPERS EXPENSE AND APPROVED BY THE LWD DISTRICT ENGINEER PRIOR TO THE START OF CONSTRUCTION. 42. WHEN CONNECTION TO AN EXISTING MANHOLE IS NECESSARY AND SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL CONNECT TO EXISTING MANHOLE STRUCTURES AND CONSTRUCT THE NEW FLOW -THROUGH CHANNELS IN EACH MANHOLE BASE TO ACCOMMODATE THE NEW SEWER LINES AS REQUIRED. SMOOTH TRANSITIONS SHALL BE INSTALLED FROM THE INVERTS OF NEWLY INSTALLED PIPES TO THE EXISTING MANHOLE STRUCTURES. MANHOLES SHALL BE CORE DRILLED AND MANHOLE CONNECTION FITTINGS SHALL BE CONNECTED TO THE CORE DRILLED HOLE BY LINK -SEAL, OR APPROVED EQUAL. THE FIRST FLEXIBLE JOINT SHALL BE LOCATED WITHIN ONE -FOOT OF THE MANHOLE BASE. JACK HAMMERING SHALL NOT BE ALLOWED. 43. ALL NEW CONNECTIONS TO EXISTING SEWER SHALL BE MADE TO EXISTING WYES OR SHALL BE MADE BY INSTALLING NEW MANUFACTURED WYES. FOR INSTALLING NEW MANUFACTURED WYES, STANDARD BELL AND SPIGOT OR PLAIN END WYES AND PLAIN END PIPE SPOOLS MATCHING THE ADJACENT EXISTING PIPE MAY BE USED FOR INSERTING WYES INTO AN EXISTING SEWER. GASKETED PVC SADDLE WYES MAY BE USED FOR EXISTING SEWER MAINS 12-INCHES AND LARGER. ALL CONNECTIONS NOT MADE TO EXISTING WYES MUST BE IN ACCORDANCE WITH LWD STANDARD DRAWING 5-32. Q4. IF NECESSARY DURING THE LATERAL CONNECTION WORK, UPSTREAM FLOW IN THE EXISTING SEWER SHALL BE TEMPORARILY PLUGGED AND BY-PASSED. A BY-PASS PLAN IN ACCORDANCE WITH LWD STANDARD DRAWING 5-32 MUST BE REVIEWED AND APPROVED BY THE LWD DISTRICT ENGINEER PRIOR TO INSTALLING THE TEMPORARY PLUG 45. FOR CONNECTION OF PLAIN END TO PLAIN END PVC SEWER, REPAIR COUPLINGS SHALL BE MADE OF PVC MATERIAL MEETING THE SAME MATERIAL REQUIREMENTS AS THE PIPE BEING REPAIRED. PVC SEWER REPAIR COUPLINGS SHALL BE RUBBER GASKETED WITH NO CENTER STOP. PIPE ENDS SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF THE REPAIR COUPLING(S). THE REPAIR COUPLING SHALL BE SLIPPED TWO PLAIN END PIPES. PVC SEWER REPAIR COUPLINGS SHALL BE AS MANUFACTURED BY PW PIPE OR EQUAL APPROVED BY THE LWD DISTRICT ENGINEER. 46. PVC OR VITRIFIED CLAY PIPE (VCR) SEWER PIPE AND WYES MAY BE USED TO TIE-IN TO EXISTING VCR. FOR CONNECTION OR REPAIR OF PLAIN END VCR TO VCR OR VCR TO PVC A FERNCO SERIES 5000 COUPLING OR APPROVED EQUAL SHALL BE USED 47. FOR CONNECTION OF NEW LATERALS TO EXISTING PIPE GREATER THAN 8-INCH DIAMETER CONTRACTOR SHALL CUT IN A NEW ME PER ABOVE OR MAY USE A SUITABLY SIZED SEWER SADDLE ME PER STD. DWG. 5-32. 48. CONTRACTOR SHALL BE AWARE THAT LWD FACILITIES PROVIDE WASTEWATER CONVEYANCE, TREATMENT, AND DISPOSAL TO THE PUBLIC 24 HOURS A DAY. 365 DAYS A YEAR. THEREFORE. LWD OR THEIR (DURING CONSTRUCTION AND AT THE END OF EACH CONSTRUCTION DAY) AND SHALL NOT HINDER AND WOULD BE EXPECTED TO ASSIST WITH ACCESS WHILE WORKING AROUND LWD FACILITIES. 49. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT LWD FACILITIES AND STRUCTURES DURING CONSTRUCTION. SHOULD THE CONTRACTOR AT ANY TIME DAMAGE LWD OR PRIVATE SEWER LATERAL FACILITIES, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, NOTIFY LWD, MINIMIZE AND CONTROL ANY SEWAGE SPILL, AND REPAIR DAMAGED FACILITIES TO THE SATISFACTION OF THE LWD ENGINEER AT NO COST TO LWD INCLUDING INSPECTION AND ANY BYPASSING REQUIRED. DAMAGE CAUSED TO SEWER FACILITIES SHALL BE REPAIRED IN ACCORDANCE WITH ALL APPLICABLE LWD STANDARD SPECIFICATIONS AND DRAWINGS. SUBMIT FOR LWD APPROVAL PRIOR TO REPAIR. W. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PREVENTING SEWAGE SPILLS; CONTAINING ANY SEWAGE SPILLS: RECOVERY AND LEGAL DISPOSAL OF ANY SPILLED SEWAGE ARISING FROM ANY WORK PENALTIES ASSESSED TO THE DISTRICT ASA RESULT OF A SEWAGE SPILL CAUSED BY THE CONTRACTOR. 51. CONTRACTOR SHALL NOTIFY LWD A WEEK IN ADVANCE OF PLANNED CONSTRUCTION ACTIVITIES IN THE AREA OF WORK POTENTIALLY AFFECTING LWD SEWER FACILITIES. 52, CONTRACTOR SHALL NOTIFY LWD 48 HOURS PRIOR TO EXCAVATION OF SEWER UNDER CROSSINGS, OVER CROSSINGS, OR PARALLEL INSTALLATIONS WHERE SEWER MAY BE EXPOSED. 53. PLANS APPROVED ON THE CONDITION THAT THE PROPERTY IS ANNEXED INTO THE LEUCADIA WASTEWATER DISTRICT PRIOR TO THE CONNECTION OF THE PROPOSED SEWER TO THE LWD SYSTEM. 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). THE CONTRACTOR SHALL AND HEREBY DOES GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE OF ACCEPTANCE. 2. THE CONTRACTOR SHALL NOTIFY THE DISTRICTS INSPECTION DEPARTMENT 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE FOR INSPECTION OF PROJECT. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 633-2709. ALL WORK PREFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. 3. THE CONTRACTOR WILL BE REQUIRED TO SCHEDULE A MANDATORY PRE -CONSTRUCTION CONFERENCE WITH THE SAN DIEGUITO WATER DISTRICT INSPECTOR PRIOR TO COMMENCEMENT OF WORK ON WATER IMPROVEMENTS. PHONE:(760)633-2709. 4. UNLESS OTHERWISE NOTED, ALL CONNECTIONS TO EXISTING MAINS WILL BE MADE BY THE CONTRACTOR, UNDER THE SUPERVISION OF SAN DIEGUITO WATER DISTRICT, AFTER PAYMENT OF THE ESTIMATED COST BY THE DEVELOPER. 5. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN PROFILE, TOP OF PIPE PROFILE IS 48 INCHES BELOW CENTERLINE FINISH GRADE OF STREET. 6. ALL SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS. 7. CONTRACTOR TO FURNISH ONE INCH COPPER WATER SERVICE AND METER BOX FOR EACH RESIDENTIAL LOT. 8. CONTRACTORS SHALL ACQUIRE A TRENCHING PERMIT FROM THE CALIFORNIA DIVISION OF SAFETY FOR ALL TRENCH WORK. 9. INSTALL FIRE HYDRANTS 2.5 FEET FROM FACE OF CURB, IF NO SIDEWALK EXISTS, OR 7 FEET FROM FACE OF CURB WHERE SIDEWALK EXISTS OR WILL BE CONSTRUCTED. 10. PROVIDE AIR RELEASE ASSEMBLIES AT ALL HIGH POINTS IN WATER MAIN. 11. CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE CITY OF ENCINITAS FOR ANY EXCAVATION WITHIN EXISTING CITY RIGHTS -OF -WAY. 12. THE DISTRICT REQUIRES THAT COMPACTION TESTS BE TAKEN WHERE WATER LINES ARE INSTALLED WITHIN EXISTING COUNTY RIGHTS -OF -WAY, CITY OF ENCINITAS RIGHTS-ORWAY, OR PRIVATE EASEMENTS, AND THE RESULTS APPROVED BY THE CITY OF ENCINITAS, BEFORE THE WATER LINES ARE ACCEPTED AND A COPY SENT TO THE SAN DIEGUITO WATER DISTRICT OFFICE. 13, PRIOR TO AWARDING WATER LINE CONTRACT, OWNER SHALL ADVISE PROSPECTIVE CONTRACTORS TO OBTAIN AND REVIEW CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) SPECIFICATIONS. 14. FILL AREAS MUST BE COMPACTED TO 90%, PRIOR TO PIPE INSTALLATION. 15. APPROVAL OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE A REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 16. ALL EXISTING FACILITIES WHICH MAY EFFECT FINAL DESIGN, I.E., LINE CROSSINGS, LINE PARALLELING, OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSINGS WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 17, WATER CONNECTIONS TO COMMERCIAL DEVELOPMENTS SHALL HAVE AN APPROVED BACKFLOW DEVICE INSTALLED TO THE DISTRICTS SATISFACTION AND CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. BACKFLOW DEVICES ARE TO BE INSTALLED DIRECTLY OUTSIDE CITY OR COUNTY RIGHT-OF-WAY OR OUTSIDE WATER DISTRICT EASEMENT. REPAIR, MAINTENANCE AND ANNUAL TESTING OF 18, MINIMUM HORIZONTAL SEPARATION OF 10 FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 19. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 20. CONTRACTOR AND DEVELOPER ARE RESPONSIBLE TO RELOCATE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) THAT ARE EFFECTED BY THEIR PROJECT. 21. CONTRACTOR TO SUPPLY DOCUMENTATION SHOWING THAT ANY ASBESTOS WATER PIPES REMOVED FROM THE GROUND WERE DISPOSED OF IN A MANNER ACCEPTABLE TO THE SAN DIEGO COUNTY WASTE DIVISION. 22. USE THE FOLLOWING VARIOUS COMBINATIONS OF PLAIN END PIPE LENGTHS WITH HIGH DEFLECTION COUPLINGS AND INTEGRAL BELL END PIPE FOR CURVED ALIGNMENTS IN BOTH HORIZONTAL AND VERTICAL DIRECTIONS. DO NOT BEND PIPE BETWEEN COUPLINGS. SAW CUT INTEGRAL BELL END OF STANDARD PIPE AND BEVEL END FOR USE WITH DEFLECTION COUPLINGS. USE 95-FOOT PLAIN END PIPE LENGTHS WITH DEFLECTION COUPLINGS FOR ALL RADII BETWEEN 140 FEET TO 270 FEET. USE 19-FOOT PIPE LENGTHS WITH DEFLECTION COUPLINGS FOR ALL RADII BETWEEN 270 FEET TO 560 FEET. USE AND INTEGRAL BELL END PIPE LENGTH JOINED TOGETHER WITH A 19-FOOT PLAIN END PIPE LENGTH TO FORM A CHORD. USE DEFLECTION COUPLINGS ON EACH END OF THE CHORD AND CONTINUE THIS COMBINATION THROUGH THE CURVED ALIGNMENT FOR ALL RADII BETWEEN 560 FEET TO 1,150 FEET. PIPE LENGTHS SHORTER THAN 9 FEET WILL NOT BE USED UNLESS SPECIFICALLY AUTHORIZED THE BY THE DISTRICTS REPRESENTATIVE. 1. CALIFORN IA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECT JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS. 2. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18. 3. WATER SERVICES TO BE ABANDONED THAT ARE CONNECTED TO PIPELINES THAT WILL REMAIN IN SERVICE SHALL BE DISCONNECTED AT THE CORPORATION STOP, SHALL HAVE THE CORPORATION STOP REMOVED AND SHALL HAVE A BRASS PLUG INSTALLED; OR BE ABANDONED AS DIRECTED BY THE SDWD INSPECTOR. THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE ACCORDING TO THESE PLANS AND THE LEUCADIA WASTEWATER DISTRICT STANDARD SPECIFICATIONS AND PROCEDURES DATED MAY 2019 AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK) CURRENT EDITION, AS MODIFIED BY LWD. LEGEND ITEM STD. DWG. SYMBOL 8' PVC SEWER MAIN SDR35 5-11, 5-12 ' AND TRENCH RESURFACING PER CITY OF ENCINITAS ENGINEERING DESIGN MANUAL, PAGE 450 SEWER MANHOLE S-3, S-31, S-33 lT 4" PVC SEWER LATERAL 5-17, 5-25 MANHOLE ID NUMBER UPS MH COORDINATES PIPE LENGTH (FT) PIPE DIA. (IN) PIPE MATERIAL SLOPE (%) LOCATION OF MANHOLE (ADDRESS) MH RIM EL. (FT) MH INVERT EL. (FT) MH DEPTH (FT) MANHOLE TYPE (ANG,STD,DE,DRP,SMT) MH LINING NOTES: UPS DWN UPSTREAM DOWNSTREAM X Y ADDRESS DESCRIPTION ADDRESS DESCRIPTIONq74 WN UPS OWN UPS OWN UPS DWN UPS DWN 01-0075 TO 01 -0076 6,241,5181,965,466 101.22 g" PVC 3.82 377 SUNSET DR. STREET 399 SUNSET DR. STREET .65106.44102.73 8. STD STD STD IPvc aR EPx IPvc oR EPx 01-0076 TO 01-0077 6,241,4791,965,559 68.56 g" PVC 8.49 399 SUNSET DR. STREET 396 ORPHEUS AVE. STREET 6.18 102.48 97.00 8.02 9.18 STD STD Ipvc OR EPx Ipvc OR EPx 01-0077 TO 01-0078 6,241,416 1,965.586 239.03 g" PVC 8.46 396 ORPHEUS AVE. STREET 34o ORPHEUS AVE, STREET .45 96.66 76.84 9.52 12.61 STD STD IPVC OR EPx IPVC OR EPx 01-0078 TO 01-0079 5,241,331 1,965,362 177.07 g" PVC 4.89 340 ORPHEUS AVE. STREET 322 ORPHEUS AVE. STREET .94 76.62 68.18 12.83 11.76 STD STD IPvc aR EPx IPvc aR EPx 01-0079 TO 01-0080 6,241,2681,965,197 223.99 8" PVC 1.45 322 ORPHEUS AVE, STREET 04-6 ORPHEUS AVT. STREET .30 68.05 64.86 11.89 9.44 STD DE IPVC OR EPx EPX 810 OF 5 EA 2 EA 32, JOB MIXING OF CONCRETE IS NOT ALLOWED WITHOUT EXCEPTION. CONCRETE TESTING BY LWD WILL BEAT CONTRACTOR EXPENSE. CHANGE NO DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT APPROVALS DESIGNED BY DRAWN BY: CHECKED DY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT ENC-2s z.s' BRASS DISC IN WELL MON. INTERSECOON OF S EL PORTAL & LA MESA 100' N ALONG SE CURB OF EL PORTAL INT. DATE PLANS PREPARED UNDER SUPERVISIO OF DATE: G I4 21 Alm-��/� R.C.E. NO.: 46316 WRENCE W. WALSH EXP.: 12-31-22 RE D: APPROVED: �e',TZb.tn.AVENUE STEVE NOWAK JILT T. BANKSTONRECORD ACTING CITY ENGINEER 8-23-21 &28121 DATE DATE IMPROVEMENT PLAN FORLOCATION: H" SEWER IN ORPHEUS AVENUE AND SUNSET DRIVE PLANNING CASE N0: 4275-2020 MULTI JDRAWINGDESCRIPTION: PUBLIC WORKS FROM: ROS 18416 ELEVATION: 60.601 DATUM: NAVD88 LAWRENCE W. WALSH DATE PLANNING REVIEWER SENIOR ENGINEER DATE INcocrTnP L\PROJECTS 30\201206-LAGASSE\PRODUCTION DRAWINGS\201206-ENGNEERING BASEDWG June 15, 2021 - 10:25am L\PROJECTS 3D\201206—UCASSE\PRODUCTION DRAWINGS\201206—ENGINEERING BASEDWG June 15, 2021 — 10:26mn 100 •1 am 70 RIM 106.18 MANNULL Z3---- PER LWD 16+40.011 LATERAL. DEPTH NOT KNOWN. CONTRACTOR TO POTHOLE PRIOR LATERAL. DEE TH NOT KNOWN CONTRACTOR T POTHOLE PRI R APPROXIMATE LOCATION OF GNS TO CONTRACTOR T POTHOLE PRIOP COW TRUCTION m o � m w - - a APPRO IMATE LOCATIO OF WATER o / LATERAL. DEPTH NO KNOWN. CONSTRUCTIO 9 APPqOXIMATE AT OF WATER.yg 0 s W LATERAL. n L DEPTH OT KNOWN. / 2ON P JOUC f x TO CONSTR CTION n m a m m r Q6 n w w B pVC ®A8g 7 Bur SE P o � m m w w ��nn a�nn s�nn a�nn Ilk ;P. 2S6\ a00 lip—�- 4M_; IN APN: 256-400-43 CL .w F �•y, eR5F9 c; fa APN: 256-300-13 R/w OH� :D 8" PVC SEWER DATA TABLE Line # Length Direction Description < 177.08' N20'S1'35"E 8` PVC SDR-35 Q 239.03' N20'S1'35"E 8' PVC SDR-35 / V. i=a' H:1"=20' m O O O O ' �+ e 0 Y� s� f APN: 256-300-12 / rt ORPHEUS AVENUE DESCRIPTION APPROVED DATE I BENCHMARK AS -BUILT APPROVALS DESCRIPTION: ENC-25 2.5" BRASS DISC IN WELL MON. LOCATION: INTERSECTION OF S. EL PORTAL & LA MESA PUBUC & RKS AVENUE, 100' N. ALONG SE CURB EL PQRTAL.100' N. AL�G SE CURB OF EL PORTAL. LAWRENCE W. WALSH DATE PLANNING RECORD FROM: ROS 18416 REVIEWER ELEVATION: 60.601 DATUM: NAVD88 SENIOR ENGINEER DATE .�„�..r..., T W - � 20 R/W APN: 256-400-44 z n zz OLc 0o zw im m OQUMOA O O w w z zam�zN oue0'�� s 0 wx < iM 0 W ww f w APN: 256-300-11 £ a APN: 256-300-30 I L APN: 256-400-39 2 20' 10, 0 20' 40' 60' SCALE: 1"=20' _ � I ENGINEERING DIVISION APPROVALS PLANS PREPARED UNDER SUPERVISON OF RE APPROVED: DATE: (D14 2I ga,78,✓.z., �i R.C.E. NO.: 46316 STEVE N21 JILT T. BANCITY ENON GINEER WW WW�Mw^�_ 82921 ACTING CITY ENGINEER 9!ENCE W. WALSHW. WALSH 12-31-22 ATE EXP.: DATE DATE 100 17ID1167. CONTRACTOR TO VERIFY EXACT LOCATION AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES PRIOR TO START OF CONSTRUCTION. HE ENGINEER OF WORK SHALL BE NOTIFIED OF ANY DISCREPANCIES WITH THESE PLANS. 90 CONTRACTOR TO HAVE SHORING SYSTEM IN PLACE PER OSHA REQUIREMENTS. IF ANY MONUMENT IS DISTURBED OR DESTROYED IT SHALL BE REPLACED BY A LICENSED LAND SURVEYOR AND A CORNER RECORD SHALL BE FILED WITH THE COUNTY PRIOR TO RELEASE OF SECURITIES. 80 TRENCH RESURFACING PER CITY OF ENCINITAS ENGINEERING DESIGN MANUAL, PAGE 450. 70 'I I \ \ "x \ O P 0 m YyFS /' / PpN� cai O z w¢ o NO SUNSET DRIVE �w SEE SHEET 5 w 0 _u� U } m z31 wow w X<4 30 CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. IMPROVEMENT PLAN FOR: 8" SEWER IN ORPHEUS AVENUE LDEV-014425-2021 PLANNING CASE N0: 4275-2020 MULTI SHEET 4 OF 5 L\PROJECTS 3D\201206-LAGASSEVRODUCTION DRAWNGS\201206-ENGINEERING BASE.DWG June 15, 2021 - 10:27am L:\PROJECTS 3D\201206-IAGASSE\PRODUC110N DRAWINGS\201206-ENGINEERING BASEDWG June 15, 2021 - 10:29om