Loading...
2018-14068 G (Plans)RIGHTOFWAYNOTE OWNER ISM OBTAIN A CONSTRUCTION PERMV7FROM THE ENGINEERINGOMSRINAT LEASTO HOURS PRIOR TO WORKING IN THE PUBLICRIGHTOFMY. FAILURE TO CORD WILL RESULT IN ISSUANCE OFA STOP MORKNOTICEAND DOUBLE PERMITFEES ITIS THE RESPONSIBILITY OF THE OWNER TO KNOW M ERE HISMER PROPERTY UNE MS ORAINAGENOTE NO CONCENTRATED OMA14GE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS M DRAIN AWAY FROM STRUCTURES FORA MINIMUM OF 5 FEETAT 2 PERCENT AND BE CONVEYED MANAPPROVED DRAIN4GE FACILITY UTILITYNOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STMOARD DRAWINGS ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY 2. THE SOILS REPORT TITLED "PRELIMINARY GEOTECHN14L INVESTIGATION AND FOUNDATION RECOMMENDATIONS REPORT PREPARED BYENGINEERING DESIGN GROUPDATED OCTOBER24, 2017, SHALL BE CONSIDEREDASA PART OF THIS GRADING PLAN ALL GRADING SHALL BE DONE INACCOROANCE WITH THE RECOMWAINTIONSANOSPECIFMARONS CONTAINEDINSAIDREPORT 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGM--OFWAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTIONYMH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BEOBWNED FORANYORFSIFEGRAOING. B CONTRACTOR SHALL TAKE MYNECESSARYPRECAURONS REQUIRED M PROTECTADJACENTPROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BEREPIACEDORREFWREOTOCONOMONEXISTING PRIORW GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARKWHICH IS DISTURBED OR DESTROYED SHALT. BE REESTABLISHED ANO REPLACED BYA REGISTERED CIVILENGINEER OR A LICENSED LAND SUR✓EY02 7 THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING MALL LOCAL ST IMAND FEDERAL SAFETYAND HEATNSTANDAR0.5, LAWSANDREGUAVONS B. GRADING AND EQUIPMENTOPERATING WITHIN ONE -WI F(M4 MILE OFA STRUCTURE MR HUMAN OCCUPANCYSHALL NOT BE CONDUCTED BETWEEN THE HOURS OFSW P.M AND 730A.M. NOR ON SATURDAYS. SUNOAYSAMOCITYRECOGNIZEDHOUDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE -CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT CITY INSPECTOR, CWIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMTME THE PRE -CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CI7YATLEASTO HOURS INADMNCEBYCALLING(M) 8TBZrM M PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECTTHE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE THE DEVELOPER SHALL COMPLY WITHAL. CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION 11. UPON FINAL COMPLETIONOF THEWORKUNDER THE GRADING PERMIT, BUtPRIORTO FINAL GRAONGAPPROVALANDORFINAL RELEASE OF SECURITY, MAR GRADED CERTIFICATION' SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. 14 HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH MEAPPROVED GRADING PLAN OR AS SHOWN ON ME ATTACHED AS -GRADED PLAN". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES 12 ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECTAND TEST THE EXCAVATION PACEMENTAND COMPACTION OF FILLS AND SACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUSMITSOILS REPORMAS REGIREDAND MLL DETERMINE THE SUITARILINOFANYFILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION ANO MATIN HIS OPINION, ALL EMBMKMENTSAND EXCAUATIONSAREACCEPTABLE FOR THEIR INTENDED USE 13 THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAMMED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONOINGOFWATER. HESHALLCONTROLSURFACEVATERANDAVOIDDAMAGETOAOJOIMNGPROPERDESORFIMSHEDWORKON THE SITE AMC SHALL TAKE REMEDIAL MEASURE M PREVENT EROSION OF FRESHLY GRAVED AREAS UNTIL SUCH TIME AS PERMANENTDPAI NAGEAND EROSIONCONTROL MEASURES HAVE BEEN INSTALLED. 14 ALLAREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION ALL VEGETABLE MATFER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM WTURALGROUND. THEEXPOSED SOILS SHALL BE SCARIFIED TOA DEPTH OF 121NCHESAND THEN COMPACTED TO A MINIMUM OF 90 PERCENT IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WIMSPECIFICATIONS 15 CUTAND FILL SLOPES SHALL BE C07AND TRIMMED TO FIMSH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OFWORKANOLEFTINA NEATAND OROERLYCONDITION ALL STONES ROOTSANO OTHER WASTE MATTER EXPOSEOOR EXCAVATION OR EMBANKMENT SLOPES WHICHARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOEAND TOPOFALL SLOPES SHALL BE ROUNDEDINACCORDANCEMM HEGRADING ORDINANCE 16, ALL TREES, BRUSH, GRASS, AND OTHER06JECTIO44BLE MATERIAL $MEL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR $0 AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS APPROIAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEERAND CITY ENGINEER PRIOR M THEDISPOSAL OFANYSUCHWTERAL. 17. THE REMOVAL OFANYAWALL CITY TREES SHALL BE CONSISTENT WITH TIE CITYS URBAN FOREST MANAGEMENTPROGRAM. TREES LOCATED WITHIN CITYSTREET RIGHT-OF-WAY, ON CITYPROPERTY, OR WITHIN CITY EASEMENISAREREFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLYAPPROVED OTHERWISE NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OFA TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE EVEN IFAPPROVED IMPROVEMENTS ARE IN CONFLICT MTHA CITY MEE, IT MOIST NOTES DISTURBED UNLESS THE PLAN IS REVISED MAODRESS THE TREE REMOV. - 18.IFANYARCH4EOLOGICAL, HISTORICAL, OR PALEONWGICAL RESOURCES ARE INADVERTENTLYDISCOVERED GRADING ACTIVITY THE PROJECT CONTRACTOR SHALL DIVERT, DIRECT OR TEMPORARILY HALT GROUNODISTURSING ACTINPES IN THE AREA OF DISCOVERY TO ALLOW EVALUATION OF THE SIGNIFICANCE OF SUCH RESOURCES. THE PROJECTAPPLIANT SHALL IMMEDIATELY NOTIFYDEVELOPMENTSERVICES DEPARTMENTSTAFFOFSDOHFINDINGATTHHTIMEOFDISCOVERY THESIGNIFICANCEOFTHE DISCOVERED RESOURCE(S) SHALL BE DETERMINED BY A QUALIFIED ARCHAEOLOGIST HISTORIAN, OR RAEOTOLOGIST IN CONSULTATION WITH THE DEVELOPMENT SERVICES DEPARTMENT AND, FOR ARCHEOLOGICAL RESOURCES THE NATIVE AMERICANCOMMUNITY. THE DEVELOPMENT SERVICES DIRECTOR MUST CONCUR WITH THE EVALUATION PROCEDURES ANOMY 19AS SPECIFIED BY CALIFORNA HEALTH AND SAFETY CODE SECTION 70505, IF HUMAN REMAINS ARE FOUND ON THE PROJECT SITE DURING CONSTRUCTION ACITIVITY, THE PERSON RESPONSIBLE FOR THE EXCAVATION, OR HIS OR HER VAUTHORLED REPRESENTATIVE SHALL IMMEDATELY NOTIFY THE SAN DIEGO COUNTY CORONERS OFFICE BY TELEPHONE NO FURTHER EXCAVATION OR DISTURBANCE OF THE DISCOVERY OR ANY NEARBY AREA REASONABLY SUSPECTED M OVERLIE ADJACENT REMAINS, AS DETERMINED BYA QWVIRE)ARCHAEOLOGISTANDIORA TRAOITIONALLYAND CULTURALLYAFFILATED (TCAS NATIVE AMERICAN MONITOR, SHALL OCCUR UNTIL THE CORONER HAS MADE THE NECESSARY FINDINGS AS TO ORIGIN AND DISPOSITION PURSUANT TO PUBLIC RESOURCES CODE 5097.96 IFSUCHA DISCOVERY OCCURS A TEMPORARY CONSTRUCTION EXCLUSION ZONE SHALL BE ESTABLISHED SURROUNDING THEAREA OF THE DISCOVERY SO THAT THEAREA WOULD BE PROTECTED (AS DETERMINED BY THE QUALIFIED ARCHAEOLOGISTANDNR THE ICA NATIVE AMERICAN MONITOR), AND CONSULTATION AND TREATMENT COULD OCCUR AS PRESCRIBED BY LAW. AS FURTHER DEFINED BY STATE LAW, THE CORONER WOULD DETERMINE MTHIN TWO WORKING DAYS OF BEING NOTIFIED IF THE REMAINS ARE SUBJECT TO HIS OR HER AUTHORITY. IF THE CORONER RECOGNIZES THE REMAINS M BE NATIVE AMEROAN HE OR SHE SHALL CONTACTTHE NATIVEAMERICAN HERITAGE COMMISSION (NAHC)WITHIN 24 HOURS. THE NAHC WOULD MAKEA DETERMIA14TIONAS TO THE MOSTLIKELY DESCENDENT IF M4TIVEAMERICAN REMAINSARE DISCOVERED, THE REMAINS SHALL BE KEPTJN SlW(7N PLACE7, OR INA SECURE LOCATION IN CLOSE PROXIMITY TO WHERE THEY WERE FOUND, AND THEANALYSIS OF THE REMAINS SHALL ONLY OCCUR ONS/TE IN THE PRESENCE OF THE TfANATNEAMERICAN MONITOR EROSIONCONTROL Q SHAWN BENSON AT (619) 804-4446 1. INCASEEMERGENCYWORKISREQUIREO CO CT 24 HOU SA DAY 2 EQUIPMENTAND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 MAPRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 ATCOVEMENTLOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT 3 DEVICES SHOWN ON PLANS SHALL N076E MOVED OR MODIFIED MTHOURHEAPPR()AL OF THEENGINEERING INSPECTOR 4. THE CONTRACTOR SHALL RESMREALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITYENGINEERAFTER EACH RUNOFFPRODUCING RAINFALL 5 THE CONTRACTORSHALL INSTALLADDITION41. EROSIONCOMROL MEASURESAS MAYBE REQUIREDBYTHECITYENGINEER DUE TOM INCOMPLETE GRADING OPERATION OR UNFORESEENCIRCUMSTANCES VVKHMAYARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLEAND SHALL TAKE NECESSARY PRECAUTIONS M PREVENT PUBLIC TRESPASS ONTOAREASTHATAREUNSAFEORAREPOTENTAUYUNSAFE. 7. ALL EROSIONCONTROL MEASURES PROVIDED PER THEAPPROWD GRADING PLANSWU BEINCOPORATEDHEREON 8 GRADEDARFASAROUNO THE PROJECTPERIMETER MUSTDRAINAWAY FROM THE FACE OFSLOPEAT THE CONCLUSION OF EACH WORKDAY. 9 ALL REMO✓ABLEPROTECTAE DEVICES SHOWNSHALL BE IN PLACEAT THEEND OFEACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECASTEXCEEDS FORTYPEROENT(40%). SILTAND OTHER DEBRIS SHALL BE REMOVEDAFTER EACH RAINFALL 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AMC LANDSCAPE AREAS PRIOR TO COLLECTIONAND DISCHARGE ONTO THE STREET AND/OR INTO THEPUBUC STORM DRAINSYSMM 2. GRASSAND LANOSCAPEAREASDESIGNATEDFORSMRM MI ER POLLUTIONCONTROLSHALL NOTBEMOOIRED WITHOUTA PERMIT FROM THE CITY. 3. ALL IMPERVIOUSAREAS WITHIN THE SITE SHALL DRAIN TOAPPROVED 6MPAMPFAGLMESANWR TO TURFOR LANDSCAPED AREAS WTHADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THEAPPROVED BMPWMP FACILITYANDNR THE TURFMNOSCAPEOME45. 4. NO DRAINS SHALL BE INSTALLED IN HAROSCAPE, DRIVEWAYS, ORANY OTHER IMPERVIOU$AREA UNLESS THE FLOLA'FROM THE DRAIN DISCHARGES TO MADEQUAM IMPBMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMPBMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFFAND DISCHARGE ITM MAOEQU4M IMPASMP 6. ALL STORMWAMR IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED MTHOUTA PERMIT FROM THE CITY. 7. THE INSTALLATION OFAODITIINAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLR' BE REVISED OR TH TA SEPAPATE ENGINEERINGPERMITBEOBTAINED. 8. ALL EXISTINGAND PROPOSED TRASH ENCLOSURES SHALL BEFITTED M COMPLYWITH STORM WATER BESTMAftAGEMENT PRACTICE REQUIREMENTS, THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NONCOMBUSTIBLE ROOF THAT MLL NOT ALLOWRAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BELOCKABLEANO LOCKED WHENNOT MUSE A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD W ANY LIQUIDS THAT ESCAPE FROM THE OUMPSTER AND TO PREVENTANY FLOWOFSTORM WATER THROUGH THE TRASH ENCLOSUREAREA THE BERM CAN BE CONSTRUCTED WIDEAND FLAT MALLOW ROLLINGOFTHEDUMPSTERINANDOUT THE ENCLOSURESHALL SESELFCONFAINEDORMAYHAVEA DRAIN MATDISCHARGES THWUG MADEQUATELYSIZEDOIUGREASESEPARATORANDISTHENFILTEREOTHROUGHACITY-APPROVEDHYDROC4RBON FILTERAND OISCHARGEO INTO THE PUBLIC SANITARY SEWER SYSTEM, MOTTO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BEREQIIIREDFORTHIS STRUCTURE. 1. MIER MAINS, LATERALSANDAPPURTENWCES SHALL BE CONSTRUCTEDACCOROING MTHE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCI ES' STANDARDS COMMITTEE (VASC). 2. REWEWOF THIS PLANBYSAN DIEGUITO WATER DISTRICTDOES NOT CONSTITUTE REPRESENTATIONAS TO THEACCURACY OF THE LOCATION OF OR THE EXISTENCE OR NONEXISTENCE OF ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, LE, LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTIONSMLL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEETOFPROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENTPLANS. ELECTRICALAND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN 4 CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATEMOVORADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANOARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEYSHALL BE UPGRADED TO CURRENTSW4DARDSATTHEOVVNER$ EKPENSE. B UTILITIES TO MAWTAINMINIMUM 5-FOOT$EPARATION MEN PARALLELING WITERSERNCES. 6 MINIMUMHORIZONTAL SEPARATION OF IGFEETREQUIREO SETMENFIREHYDPANTSMO SAN DIEGO GASAND ELECTRIC VAULTS. 7 ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYSANDALL OTHER TRAVELED MAYS WATER METERS MUST REIN FRONTOF THE PARCEL THEYARESERONG. B. CALIFORNIA STATE LAWASSEMBLY BILL AB-1953IS REQUIRING THAT NO-LEAO BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, XIO.. IN COMPLUWCE MTH THIS LAW, THE DISTRICT SHALL REQUIREALL MATERIALS TO BE NO{EAD SR45S PARTS. 9. ALL COPPER TURING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED MTH CATHODIC PROTECTION INACCORDANCE MTH AL770R W,L78 10 DISTRICT TO UPGRADE TO DUAL METERATOWNERS EXPENSE. IMPERVIW8ARE4 IMPERVIOUSAREAPRIOR CONSTRUCTI N. SOFT 1 AAFTER IMPERVIOUIN REASETERCONSTRUSAR SQFT 11,315 FT INCREASEMIMRRRERLAR SQFT 3,224 SO FT O IMPERMOUSAREA REPM 'SZBBSQFT TOT .� SQFT 9,492 SOFT DESCRIPTION I APPROVED DATE I BENCHMARK ANISE OWNER INFORMATION, DWG No., JOO 6/28/2021 OLJYR�rnvn. Pi. rvO. ivaa CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISHAND USEMAOEQWTELYSIZEO CONCRETE WASHOUTAREA TO CONTAIN M ISHOUTWASTES ON SITE ITIS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO PLASTERANO THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM ORANY RECEIVING WATER. CONTRACTOR SHALL POSTA SIGN DESIGA14TING THE tM' S CUTLOCATION. CONSTRUCTION SITEACCESS A STABILIZED CONSTRUCTION SITEACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRTOFF SITE THISSHALL INCLUDE USING MATERIAL SUCHAST CRUSHED ROCKMO/GRCORRUGAM)SMEL PANELSPIATES. CONSTRUCTION VEHICLES A SPECIFIC AREAAWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE ALL MAJOR RERNRS SHALL REMADE OFFSITE EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANTSURFACES SUCHAS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION AND BONDED FIBER MATRIX II[ �( 19.'lIL1fPId1IHK.l]NLH.'[NIL IIf Y� LIIU5744CIj ` S'1i1v311.• DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFFAROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROMCTOHANNELSAGAINST EROSION USING PERMANENTAND TEMPORARYEROSION CONTROL MEASURES REMOVE EXISTING VEGETATION. ONLY WHEN ABSOLUTELY NECESSARY LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. 00 NOT REMOVE TREES OR SHRUBS UNNECESSARILY,' THEYHELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROMNGANNUALAND PERENNAL GRASSES M SHIELDAND BIND ME SOIL. PLANTPERM4NENTVEGETATIONAS SOONAS POSSIBLE, ONCE EXCAATIONANDGPADINGACTIOTIESARE COMPLETE WATER USAGE FOR OUST CONTROL SHALL BE MINIMIZED STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY MEL STAY DRY OUTOFTHERAIN. CONTWACTORSHALL PRONOESECONDARYCONTAINMENTFORALL FUEL STORED ONSRE ELIMINATEOR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL PARING MATERIALS, ASPHALT CONCRETE AGGREGATE BASE, ETC STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWAMR STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED MTHA TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETERATALL TIMES TRAIN= CONTRACTORS' EMPLOYEES ENO PERFORM CONSTRUCTION IN THE CITY OFENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OFENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE SUP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNERS) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWffER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTEAND UNUSED CONSTRUCTION MATERIALS DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRYTHEMINTO THE CONVEYANCESYSTEM IS STRICTLYPROHIBITED NO SEEMGE FRDMMYCUMPSMR SPo L BE DISCIARGEO INTOOMRMMATER. BERMSOIKES SHALL BE PLACED AROUND ALL DUMPSTERS M DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT MTHANY TRASH94MRIAL. rl.. MANY CONSTRUCTION MATERIALS,INCLUDING SOLVENTS WATER -BASED PLANTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED NONRECYCLASLE MATERIALS MUSTSE TAKEN TO ANAPPROPRIATE LANDFILL OR DISPOSED OFAS HAZARDOUS WASTE FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (SEES 714-110.. FOR INFORMATION ON LANDFIUSANO TO ORDER DUMPSTERS CALL EDCOAT(7W) 4W4151, POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANSAND RECYCLING RECEPACLESAROUNO THE SITE PORTABLE TOILET$ MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT ANO LOCATE PORTABLE TOILETS AWAY FROM S TORMORAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPTAVAY FROM THE STREET, GUTTER, AND SMRMDRAIN. CONTRACTOR MUST ROUTINELYCHECKAND CLEAN UP MATERIAL THAT MAY HAVE TRAVELEDAWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON SMRMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT j760) M2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. M THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE ITIS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OFSAIO UTILITIES OR STRUCTURES PRIOR M ANYEXCAVATION, FOR VERIFICATIONAND LOCATION OF UTILMESANONOTIFICA77ON OFCOMMENCEMEYTOFWARK A. SEWERS -LEUCADA WASTEWATER DISTRICT-(7BJS-7530IO B GAS & ELECTRIC -SOLE-CM)dT88200 C. WATER- SAN DIEGUITO WATER DISTRICT{7 X33-050 O.TELEPHONE - SEC BELL -(MO)4B9NII E. CABLE TV- COX COMMUMCATIONSI760AXLE4YG X MI3 2 CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 46 HOURS PRIOR M BEGINAIMANY WORK ON THIS PROJECT PHONE'(761)IX =.. 3 THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE' (7B))-5S27RL ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION MLL BE SUBJECT TO REJECTIONAND REMOVAL OWNER JEREMY AND JENNIFER CABALLERO 1433AP�1- 415 FRANKLIN PARKWAY yAVC0r SAN MATEO, CA 94403 Q 1 SITEAUDRESS 710 WOOD DRIVE APN: 254413 IB:XO LEGAL DESCRIPTION MATPORPON OFLOTS SLOCKJ OFSOUTH COASTANNEX IN THE CITYOFENCINITAS, COUNTYOFSANDIEGO, STATE OFCAUFORNK ACCORDING TO MAPTHEREOFN0. 17M,, _ FILED IN THE OFFICE OF ME COUNTY RECORDER OF SAN DIEGO COUNTY,, MARCH 29, 1924 OWNER'SCERTIRCATE / I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGISTHAS BEEN OR WILL BE RETAINED M SUPERVISE OVER ALL GRADING ACTIVRYAND ADVISE ON THE COMPACUONAND STABILITY OFTHE SITE. I (WE) HEREBYAGREE TO INDEMNIFY, DEFENDANO HOLD CITYAND CRYS OFFICERS, OFFICALS, EMPLOYEES, ANDAGENTS HARMLESS FROM, ANDAGAINSTANYAND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF ARISING OUT OF OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY MTH ANY ACTS OR OMISSIONS OF OWNER OR ON/NERSAGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORK OR CONSTROPON C9ZREO INS$E SIGNATURELCA_, DATE: IO13 Ify 2Q I HER LEVENGER SIGNATURE:Al"' �' DATE: 1013 2019 _ASdAM*-R, CLEVENGER VICINITY MAP N.T.S JEREMY CABALLERO JENNIFER CABALLERO 1, ERIN E RIST A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THATA SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON OCTOBER 24, 20/ZONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, MTN MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN THE GRADING PLMSANOSPECI TK)NS-- SIGNED' YaTE C RCE ND,; (.BIY4. � �,, 1H t'�Sy F� EXP.OATE' cy C 65122 '. JOB ITS8e! uq > 2 4 ENGINEERING DESIGN G G S G OUP 9 GfVV P NGft o. I t CA (7 0 MONTIEL 9-73Q2 ROAD SAN MARCOS CA 92039 - z (7B0) 839-7302 STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEERS TRADE OR PROFESSION THE ENGINEER FURTHER AGREES THAT THE MIRK PERFORMED HEREIN SHALL BE IN ACCORDANCE MTH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS TO THE WENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THEENGINEERAGREES THATANYPLANCHECK OR REWEWPERFORMEO BY THE CITY OFENCINDAS IN ITS CAPACITYASA PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOTA DETERMINATION BY THE CITY OFENCINITAS OF THE TECHNICAL SUFFICIENCYORAOEOUACY OF THE PLANS OR DESIGNAND IT THEREFORE DOES NOTRELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON THE ENGINEER AGREES TO WDEMNIFYAND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY IWURY ARISING SOLELY FROM ME NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND WISHER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCYAND EMPLOYMENT ARISING OUT OF THE WORK PERFORMED BYTHE ENGINEER. SIGNATURE' DATE' Ov7.11 BRIANMAROOLINO PASCO LARETSUITER &ASSOCIATES RpOF ESS/YL,. 535NHIGHWAY101 �/„O Al CL ,WC SOLANABE4CH,QA9075 (M) 2SIL8212 y RCE EXPIRES 12-31-19 " m No. 71651 o m w Exp 12/31/yi z EARTRWORKDATM {T t1 t? STEEPESTEMSTINGNATURALSLOPEONSRE= 02 H: I V `� C/yll �p MAXIMUM VERTICAL DEPTH OFCUF= S2 4jF--CA1-1F MA((MUMVERPCALDEPMOFFILL= 49 CUT= SW O.Y FILL= 1,3M Cy IMPORT= 870 Cy. REMEDIAL= 1&2 C.Y( 5KS 'REMOVALMORECOMPACTIONUNDERAND 4 'OUTSIDEOFSUILDINGAREASS DISTURBEOAREA= 0.93AC BMP PROJECT STATUS STANDARD a- PRIORITYS7iAS !DOC BE MAINTAI HOA/HOME04M'ER /AGEENAyyGGEEAA REEMEMFOR PR9ATE SMRYGOLLURONCONTROLFACIUTIES" N I LEUCADIA WASTEWATER DISTRICT I PUBLIC WORKS I PLANNING DIVISION I PARKS AND RECREATION I SAN DIEGUITO WATER DISTRICT I ENCINITAS FIRE DEPARTMENT 1 cewlx 4 oA `I1,` 01 AS -BUILT APPROVALS UcOierU01v uwv�vHm: Unecrtcue INT. DATE PLANS PREPARED UNDER SUPERVISION C BRIAN M. ARDOLINO DATE PUBLIC WORKS DATE:_ PLANNING R.G.E. NO.: 71851 SA.'ENGINEER DATE REVIEWER INSPECTOR BRIAN M.AR OLIIO EXP: 12-31-1N 1 S'-21-I - •i iE GN DATE DATE SIGN DATE ISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. APPROVED: GRADING PLAN FOR: THE BROWN RESIDENCE 710 WOOD DRIVE 4 44068 G rTWARD J. WIMMER APN: 256-122-3000 LDEV-011364-201 U/II 1/F CASE NO: 18-118 TPM/CDP Q O N bon boo rc¢w btu II+IOx x w F Q g Qa Qm ISv2 an0 IRONPIN REMAIN EXIS77NG BUILDING APPROXIMATE LDCAITON PAC PdOPOdEDPOI $- PERSEPARATE PERMIT / RVSS I Ns' rr-IA. -1--� PA 174.LG D � 1 \ 0 V i \\ FF,74.OJ --- 1��ii1�11 `� ,1,DECK M '•J!<AI � Y T ' PARCEL INVERT AT MAIN IE LENGTH OF LATERAL DROP TO MAIN INVERT ATCO SLOPE A, GROUND ELEV. AT CO DEPTH BELOW CO PAD EL EV FT. UPSTREAM MH RIM ELEV. BACKWATER VALVE REND REMARKS 2 173.76 182' 6.5- 130.6 2.1% 1 187.6 7.0' 174.0 191.1 1 4" PVC FORCE MAIN NU In: PANUEL I senveU 6Y LAI61 WU saweR LAI ERAL. cam nnu LUOAl1ON UNKNOWN, CONTRACTOR TO VERIFY LOCATION, PROTECT IN PLACE & INSTALL CLEANOUT PER LWD 5-25, "PRIVATE PUMP STATION FORCE MAIN DESIGN TO INCLUDE CHECK VALVE. A I WOOD FENCE -HEDGES TO REU4IN GRADING PLAN SKFTiT � I m `3 - 4•PVC SETT IRDNPIPEI'E 4000' ^ SETYIR RFE, _ 101 4001 # EXISTING SHE r.= ITS. _ S _ TO SE REMO D I APPROXIMATE LOCATIOM EXISTINGBUILOING =1 IC' SYSB z EXISTINGRESIDENCETI\ CO ' y TO REMPAVERS I p \ �� SEWER CO PER UIO� \� STODWGS94 \ \ SEi1'IRON RPE� 4' SEWER LATERAL PER LWDS.,45.'B(li'PE2) IE 17d761 EX. SMHGfJ06. RIM 186& \ JE IN 1787E 3"GRI/NJDA1Q OVERLAY EXISTING BUILDING APPROX. LOCA770 \ -APPROXIMATELOC4RON-- 6"PVCSEWERUNEPERR D 8A74 -- — -- — PL PROPOSED PROPOSED PROPOSED R4!WDEACE PROPOSED GAR GE 1ANDSWIAG CONCRETE COVEREDPATIO FF•174.75 LANDSCAPING FIRM /3 STAIRS PAD=174W PA0=174DO PR -4 RETAINING -- s c.4REiA30NVAINc LANDSCAPING _\� LL \ �l�.l \�\\\\�'%�\\\�L 1 \�' \ a\ \, NI 1 vvtip i\ v �-. AFC'' a°PvcsroRM A afL,n�L. ` ��:A�, VA' \ DRAIN _A ` 3 N �Axyo�vv .� �� � SECTIONAWESTPROPERTYLINEWEASTPROPERTYLIWE TRESIDENCEI NOTTOSCALE Iry1LL.j1Y..ji�'ljl.`WW PCC PATIO PCC PATIO RESIDENCEADDITION N \' ACC\ 6 FA / / / / / / / / r / r / / / / D'STRICT TO INSTALL RESICENML EH PER V/PSWr 41ATOWNER'S EXPENSE EX.1"YIATER METERS xe� PROTEFTINEVICE - " \� ± FA 1"RATERMEIER\ 1.1 PAWRS BY BELGARD INRC17DEMMEDE UIVVTOU3 GR CITYAPPROVED EOMV VQDDLLER urmum pKIR) BEODINGCWRSE-Y IHIGILOF M"ro3•B• AGGREGgTE1N SONS (NO.NAGGREGAIE e•X I6'PCC RUMI rX Ir PCCRUSH CURB RS CIWI.ER COURSE-4'iHICNOF 3S'ro IIZ' (N0.5I)CRUIHEOROL% MN5•TWCKOFY4'CRUSHEDROCK SEEMED SOIL SUBGRAOE _ )WINUFACTURERBS SPECS FOR THICKNESS - BIOREIENRON - - — -� FOR FIREAPPARAlUS (N10)LOAU'NG-P AREA APPLOMIKE A0TE3: -ALLAGGRBAIEMRTEE CIEWNASTIEOAND FREE OF RI (SANG AT,, ETC) -RER94ERSSNN1 NOTRESIAIFD ONCE THE MD RI1ERINS BEENADDED -FAOTLOWSESIWLBEMARAiDRYGUl1!ACTED BEWREPIACEMENTOEIEXiLd/RSE \., -%ONAFEM4pISUNERORRLiER FANtIC15roBE USED \ U3EWNGTNYEXMMSIVESOIL SUBOR4INWYBE �RECORLLlWPROVLLREpMCDRN REWIRED 1{ -&iPBdfrA&fLXlFPERC£G1EOI&'AL RECgMNENDAi10N REOLYREOATB01RAf OF34' \���`�\\�� OcLGHEDlKX3(DIER WEN WIMNSOF31RLC1LRE SLOPELMHTAVAYFRCMSTRLCILOTE CCfMTRUCIDNNOtE: - PAPERs ro �'wPE�aFM FrmTECTEO DuaNG CON9IRULIR)N PERVIOUS PAVER DETAIL NOTTOSCALE PL PERMEABLE PAVER PATIO TROCKPCC PAVING STORES LANDSCAPING 1 PERARCH YI OVER3"TMCK3'4' r / 1 ROCK LEGEND � � PROPERTYLINE — — — — RIGHT-pF-WAYUNE --------175------ EXISTING CONTOUR LINE - - PROF\03EB SETBACKS PROPOSES BUILDING FOOTPRINT .:::.:.:.:.:.:.:...........,:,:,:,:� PRCPOSESPERMANENTBMPAREA, SEE DETAIL SHEET2 PROPOSED IMPERVIOUS FCC PROPOSED PERVIOUS PAVERS — — — — PROPOSED EASEMENT 38 PROPOSED CONTOUR LINE r- PROPOSED STORM BRAIN INLET PROPOSED STORM DRAIN PROPOSED S' PCC CURB HID DER W/ SECORATI VE RIP RAP COBBLE PROPOSED RETAINING WALL B" OVERFLOW PIPEWI ATTRIUM GRATE DROUGHTTOLERTII /_PLANTS(TYP) - CONSTRUCT C4MASONRY RETAINING WALL PER SDRSD DOD MULCW GRASS OR CITYAPPROVED EQUIVALENT IE OU 1650- "SEE NOTE BELOW SCARIFY BOTTOM PRIOR TO WSINCON9 CTI BOLE RIP 'PERF PVC SUBORAI 8b",S" 1 OR LESS PVC OUTLETPIPE IE PER PLAN E TNGINEERED SOIL'DYER SHALL BEMIMMUN 18'DEEP'SANDYLOAMSOILMIXARHNOMOREINOR CIAYCONTENT THE NLT SHALL CONTAIN 65%SAND,15% COMPOSITOR HARDHORD MULCH, AND 20%10PSALFREEOF STONES, SIMAPS,ROOTS, ORSMILAWOBA'CTS,ANDALSOFREEOFNCUR NEE0.V. - W4'CRWWDROCILIAYERSMLLWAMNMW4 O'BUTM9YWDEE WD RT mGREASE THE Bff1LiRATITWANO SMMGEABILINY MEME ILTHEEFFECRVEAREA MEMUNWLLBELEVELANOSMLLBESIZED WON CALCULATION. BIORETENTION AREA DETAIL PARCEL 2 NOTTOSCALE OVERFLOW PIPE, S' PVC IL 2- HARDWOOD MULCW GRASS WI ATTRIUM GRATE COVER OR CITIAPPROVP.D DROUGHTTOLERANT EQUIVALENT PLANTS(TYP.) it CC HEADWALL WITH -R FG 1751 DECORATIVE RIP RAP i DISSIPATOR WE 4w c B /z 1%Mm 2 LAYER OF 318'GRAVEL 12'LAYER OF 31C GRAVEL 10" LAYER ENGINEERED SOIL "SEE NOTE BELOW 'SEE NOTE BELOW BOTTOM 1 fc L -SCARIFY BOTTOM PRIOR TO BASIN CONSTRUCTION - 4' PERF PVC SUBORAIN & 4" PVC OUTLET PIPE IE PER PLAN ' BIORETENTR)N TWINEERED SOIL' LAYER SHALL BE MINIMUM IB' DEEP WMOYLOAM SOIL MIX HITS NOMCAE RAN BE CLAY CONTENT. ME MIX SMALL CONTAIN 0%SAND. 15% COMPOSITOR NARDNOORD MULCH, AND 20%RARSI FREE OF STONES, STAIRS. R00T5, OR SIMILAR ORJECTS, ANOALSO FREE DEMOPOLIS HEEDS -314- CRUSHED ROCK DYER SHALL BEA MNIMUN OF S' BUTWY BE DEEPENED TO INCREASE THE INFILTRAIIONAIO STORAGEABILI/YOF THE DETAIL THE EFFECRVEAREA OF ME WIN SHALL W LEVEL AND $HA L BE SIZED RIVED ON CALCULATION. BIORETENTION AREA DETAIL PARCEL 1 MOTTOSCI SPECW.SMPINSPECROWN0113: SPIS M. INSPECTION DEALP0.9TCON311TUCTION BNP BASINS, STRUCTURES, ETC. BY THE ENGINEER OF RECORD NAR DI NER LICENSED CARL ENGINEER REQMREOAT RE FOLLOWING BIASES, PROGRESS PICTURES SNALL BE IAIQ'NAND PROVIDED TO THE CIIYATTHE FOLLOMMNG STAGES: I. BASIN EXCAVATION 2. PLACEMENTOF PIPES, OURETSIRUCTURE, ETC 3, PUACEWNiOF LLFAN CRUSHED ROCK DYER 4, PLACEMENTOFGRAVELDYER E PLACEMENTOF ENGINEERED SOIL DYER 6 FINAL BASIN GRADING I FINAL COMPLETE WIN MTH MULCHAND VEGETATION SEESPECIAL INSPECDONREMWR EPAREDBYPASCODRETSWER&MSOLMTESMMD ^_ ON FILE M TN ENGINEERBIG MM910N MIORTOECALINSPE, MkIINSMCO PRIOITTGOCCUPANCY,RWLINSPECTION, T, THEEGI SECURITIES,AS-BISHALI FIELD GRAMNG WR) SIGNOFF, IMNCHEWR TMME FIRST, THEEMGINEERO WN IGD SHALL Sa SURVEYAND VTWEVITTTHELOVSTRUCTEDMPERMOUSSIMDO EWI THAN FIE SFASIGN IF STAMPED INSPECR0. SSRFAH OBEPROA,E i11EECTSWRKFIELDI MDAPR. RITY SFOROO NT ERVIOUFORFACEISCREAIED,MMTEECTSIN BECONSIDERESA LGRY DEVELOPMENTPRUECTFOR THE PR ESDF3TRDAIVATEROIIALRYTRDTMENTANDSHALL CC4JE INTO FULL COMPLIANCE N1TI1 THE PROVA410N9 OF RIE NPDE3 MY4 PERAN 7AN0IIE" OTYOF \�\\ ,\1�;\\.\ \CT i .�'� \\ yn i.1 `\ �L\\ �\�'a\ 'C4: J I \1. LANDSCAPING \\�i ,,.�!- i \ ✓. �\ \\\� \\}s:'C\�� ��\]\\1\S �v\ \ fi{r ``\a `� '\i ''•\i\\�\ I\ P 1 t \�a\ �- \�\U \\ 1-.�\\ \J>;r G\�\, 1 \\� \� _ \\ \S/?\ .\ �� �.. i \�1 i\i�1\ PERMEABLE RAVER LANDSCAPING '> �\ 1 \ 1 \\, F \ as \ a � DRIVEWAY • 20 ,D 9 20 40 BG SECTION 3 PRIVATE DRIVEWAY NOTTOSCALE MOTTO SCALE SCALE: 1' 2D' CHANGE NO. DESCRIPTION APPROVED PATE BENCHMARK AS -BUILT APPROVALS DESIGNED BY*. DRAWN Bv: CHECKED BY ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. 1 rPARCEL 2 JQO 6/26/2021 INT. DATE PLANS PREPARED UNDER SUPERVISION OF RE EN V D: GRADING PLAN FOR: HOUSE FOOTPRINT, CHANGE GRADING, SHIFT WALLSS DESCRIPTION: PT NO. 1024 THE BROWN RESIDENCE tLDE; LOCATION: ADIA^ DISK IN SIDE US AVE. S.E. PUBLIC WORKS DATE: ID•7 11 [ .' d�ADD HYDRANT, CHANGE DWG No. BRIAN M.ARDOLINO DATE �LVpy��_����/±QUAD. LEUCADW 8LVD80RPHEU3 AYE. 3T PLANNING � T1O WOOD DRIVE�'�'8E'TRECOR FROM: AFFIC SIGNAL R.C.E. NO.: 71551 JE OWENS WARD J. WIMMERRECORD FROM: R.O.S.18418 REVIEWER APN: 256-122-3000 V-077364-2079 G .ENGINEER DATE BRIAT 1.A DOLINO �O �ry 10/11/11 ELEVATION: 178.543 DATUM: NAVDBB - INSPECTOR -__ EXP.: 12-31-fall DATE DATE CASE 11118-118 TPWCDP H T OF LWD LATERAL NOTES 1. UIOAPPROAL OFTHESE PLANS DOES NOTRELIEVE THEAPPUCANT, PRIMTEENGINEEROF WORK, OR CONTRACTOR FROM RESPONSIBILINFOR THE CORRECTIONOFERRORSANDOMISSIONS DASCOWREDWRINGORAFTERCONSTRUCRON. 2. ALL DESIGNS,MATERIALS,ANOCONSTRUCTIONWORKSHALL CONFORMTOTHELELCADIAV✓ASTEJATERDISTRICTLWDSEWER STANDARDSANO TO THE REQUIREMENTS OF THE STANDARD SPECIRCATIONISFORPUBLIC WORKSCONSTRUCTION(GREENBOOIQAND TMEREGIONAI. STANDARD DRAMWS, MOSTCURREW EDITIONS. INTMEEWW OFCOWLICTTI ELWD SEWER STANDARpBGOVERN S OSHA SAFETY OROERSAND OSHA CONFINED SPACE ENTRYREQUIREMENTSSMALL BEFOLLOWEDATALL TIMES WTHOUT EXCEPTION. 4. THE CONTRACTOR SHALL MAVEA COPY OFTHEDOCUMENTS SPECIFIEDINSEKERNOTES2&30NTHEJOSSUEATALL7IMES. 5 THECONTRACTOR SHALL GLWRANTEEALL KORKFORA PERIOD OF ONE YEARAFTERTiEDATEOFFINALACCEPTANCESYUM3 AND SMALL REPAIR OR REPLACE ANY WORK THAT MAY PROVE DEFECTIVE IN WORKMANSHIPAWIOR MATERALS WITHIN THE ONE YEAR PERIOD WITHOUT EXPENSE WHATSOEVER TO LAD B PRIOR TO BEGINNING SEWER WORK CONTRACTOR SHALL SECUREALND PERMITFOR CONSTRUCTONAND SHALL PROVIDEA MINIMUM OF 72 HOURS NOTICE TO LWO PRIOR TO CONSTRUCTION. 7. APPROVAL OF THIS PLAN BYLWD DOES NOTCONSTRUTEA REPRESENTATION OF TREACCURACYOF THELOCATIONOF, OR THE EXISMWEOR NONEXISTENCE OF,ANYUNDERGWUND UTIUTY, PIPE, OR SMXTVREDITHINTHELIMITSOFTHIS PROJECT 3 ALL REVISIONS TO DRAWINGS SHALL BEAPPROVED BY THELADDISTRICTENGINEERIN WRMNG PRIOR TO CONSTRUCTION 9. CONNECTIOMMERSTINGSEWERPIPEORMANHOLES$HALLONLYBEDONEINTHEDIRECTPRESENCEOFMELWDINSPECTOR NEWSEWER SHALL NOT SE CONNECTED ORALLOWED TO FLOW TO EXISTING SEWER UNTILAFTERRN4LACCEPTANCEOFALL UPSTREAM WORK SYTHE LIM INSPECTOR, ORASAPPROVED BYMTRICT ENGINEER. 10. ALLSERWCELATERAL$SHALLBELOCATEDATRIGHTANGLESTOTMESEWERMNNUNLESS07HERWSESHOWNASAPPROVED SYLWDONTHEPIANS. 11. A24 CHHIGH"S"SHALL BEINSCRIBED ON THE CURB FACEATEACHLATERAL LOCATION BYTHECONTRACTOR 12. ALL LATERALS SHALL BE CONSTRUCTED CLEAR OFDRfVEMYS 12. ALLSEWERSANDIATERALSSWLLLBEKWYWMLLEDORJETTEO,LOWPRESSUREAIRTESTEOANDTELENSEDATME APPLICANT/CONTRACTORS EXPENSE PRIOR TO CONSIDERATION FOR FIWLACCEPTANCEBY LAD. AIR TESTSHALL BE DONEAFTER CONSTRUCT/ON OFALL OTHER UTILMESAND URUTY LATERALS, 14. ALL SEAERSAND LATERALS SHALL BE IN PLACEANO SHALL H4VE FINAL APPROVL BY THE LAD INSPECTOR PRIOR TO SACKFILL 15. ALL NEWCONNECTIONS TO EXISTING SEWER SHALL BEM40ETO EXISTING WYES ORSH4LL BEMADEBYINSBULMG NEW 1114NUFACTUREDWYES. FOR INSTALLING NEWMANUFACTURED WYES STANOARDBELLANOSPIOOTORPIA)NEND WYESANOPLAN END PIPSPOOLS MATCHING THEADJACENTEVSTING PIPEMAYBEUSEDFOR INSERTING WYES INTOAN EXISTINGSEWER. GASKETED PVC SADDLE WYES MAYBE USED FOR EXISTING SEWER MOMS 124NCHESANOLARGER. ALL CONNECTIONS NOTMAOEM EXISRNG WYES MUST BE IN ACCORDANCE INTH LWD STANDARD DRAMNG S-M le. FOR CONNECTION OF NEWLATERALS W EXISTING PIPE GREATER THANSINCHDIAMETER CONTRACTORSHN.L CUTINANEW AYE PERABOVE OR MAY USEASUITABLYSIZED SEWER SADDLE WYE PER STD DAG. 5S2. 17. IFNECESUW DURINCTHELATERALCONNECTONWDRK UPSTREAl4ROWINTHEEXI VW SEWERSHNI BETEMMMRILY PLUGGEDAND BY-PASSED ABY-PASS PLAN WACCORDANCE WITH LW'D 87ANEARDDRAWNG S,VMUSTBEREVIEAEOAND APPROVED BY THE LWO DISTRICT ENGINEER PRIOR TO INSTALLING THE TEMPORARYPLUG. 18, FOR CONNECTION OF PWNEND TO PLAIN END P✓C$EVER, REPAIR COUPLINGS SWILLBE MADE OFPVC MATERIAL MEETING THE SAME MATERIAL REQUIREMENTSA$ THE PIPE BEING REPAIRED. PVC SEWER REPNR COUPIJNGSSIALL BERUBBER GASKETED MPH NOCENTERSTOP PIPE ENDS SMALL BE THOROUGHLYCLEANED PRIOR TO INSTALLATION OFTHEREPAIR COUPLING($). THEREPAIR COUPLING SHALL BE SUPPEDALL THE WWYON TO ONE PLAINEND PIPE, THEN THEPIPEANDAWOMIKI PIPESSHALL SEAUGNEO TOGETHERAND THE REPAIR COUPLING SLIPPED BACK IN10A POSTNONEQUALLYSPACED 917WEN THE TWO PWNEND PIPES. PVC SEWER REPAIR COUPLINGS SMALL HERS MANUFACTURED BY PWPIPEOR EQLLALAPPROVED BYTHE LAD OISTRICTENGINEER. 19. PVC OR VITRIFIED CLAYPIPE(VCP) SEWER MEMO WYES MAYUEU54D TO TIE-IN TO EXISTING VCP. FORCONNEC770NOR REPAIR OFPLAIN END VCP TO OPOR VCP TO PVCAFERNCOSERIES50MCOUPLING ORAPPROVED EQWILSH BEUSEO 20. FINALAPPROML OFPLANS BYDISTRICTENGINEER IS VALID FORAPERIOO DFTMENOTTO EXCEED ONEYEAR FROMAPPROAL GATETOSTARTOFCONSTRUCTION IFTHEONEYFARTMELIMTOWIREDPRIORMSTARTOFCONSTRUCTIONTHEOEVELOPER SHALL RESUSMITTHE PLAN CHECK TO THE DISTRICTENGINEER FORANUPQATEDREVIEWANOAPPROAL. ANYCH4NGESREQUIRED TO THE PLANS SHALL BE MADEATTHEDEVELOPERS EXPENSEANDAPPROVEDBY THEUIODISTRICTENGINFER PRIOR TO THESTART OFCONSTRUCTION. 21. CONTRACTOR$HALL BEAWWRE TNATLWD FACIL17TES PROVIDE WASTEWATER CONVEYANCE, TREATMENTANDDISPOSLL TO THE PUBLIC24HOURSADAY,S65DAYSAYFAR. THEREFORE, L14D OR THEIR CONTRACTORS M4YNEEDACCESS TOFACIUTIES FOR OPERATIONS MAINTENANCE, OREMERGENCYREPAVRATAWTIME, THE CONTRACTOR MLLENSURETH47ACCESS TO THEFACKITES IS MAINTAMEDATALL TIMES (DURING CONSTRUCTIONANDATTHEENOOFE4CHCONSTRLgTONOAY)ANDSHALL NOTHINDERANO WOULD BE EXPECTED TO ASSIST MTHACCESS WHILE WORKINGAROUND LAD FACILITIES. 21. CONTRACTOR SHALL TAKEALL PRECAUTION4RYMEMURES NECESSARYTO PROTECTLWOFACILITIESANO STRUCTURES DURING CONSTRUCTION, SHOULD THE CONTRACTORATANYTME DAMAGE LWD OR PRIMMSEWERLATERAL FACILITIES, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, NOTIFYLWD, MINIMIZEAND CONTROLANY SEWAGESPILLAND RERNRDAMAGED AICILITIES TO THE SATISFACTION OFTHELWDENGINEERATW OOSTTO UND INCLUOIW INSPECTK)NANDANYBYRASSINGREQUIREO. DAMAGE C41/5ED M SEWER FACILITIES SHALL BE REPAIREOINACCOROANCEWTTHALLAPWLABI.ELMST KWV SPECIRG UONSAN0 DRAWINGS. SUBMIT FORDO APPROVAL PRIOR TO REFINR M THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PREVENTING SEWAGE SPILLS, COWAINNGANY SEWAGE SPILLS: RECOVERYAND LEGAL DISPOSAL OFANY SPILLED SEWAGEARISING FROMANY WORXADJACENTM LW)FACIUOES ORALLOMNGA SEWAGE WILL OR FAILURE TO PREVENTA SEWAGE SPILL MILE PERFORMNG THE WORK CONTRACTOR DILL BE RESPONSIBLE FOR ALL CLEAN-UP COSTSANO PENALTESASSESSED TO THE DISTRICTASA RESULTOFA STAGE SPILL CAUSED BY THE CONTRACTOR 24. CONTRACTOR$HALLNOTIFYLWDAWEEKINAOVANCEOFPLANNEOCONSTRUCRONACTVIOESINTIEAREAOFWORK POTENTWLLYAFFECTING LWD SEWER FACIU71ES, 25. CONTRACTOR SMALL NOTFYLWD 48 HOURS PRIOR TO EXCAMTIONOFSEMR UNDER CROSSINGS, OVERCROSSINGS, OR MNALLEL INSTALLATIONS WHERE SEWER MAY BE EXPOSED. ITIS REQUIRED BYLWD THATTHE PUMPSTATIONSHALL. 1. COMPLY WITH CALIFORNIA PLUMBING CODECHAPTER 7SECTION 71110 2 HAVSDUALPUMPS 3 HAVEAHIGH-LEVELAIARM 4. HAVEAPUMPFAILUREAIARM SHAVE A SYSTEM WHEREBY THE ABOVE ALARMS ARE. NOTICEABLE FROM THE RESIDENCE (AVOID, VISUAL SERVICE ETC) RIB RECOMMENDED BYUOTWITTHEPUMPSTATNJNHAS 1. ACHOPPERORGWNDERPUMP 2 ASERVICEDONTRACT 3 ANALARMSERVICECONTACTRESPONSE Iwssz'w'e nrv' PERTYUME �- �.�.�. 'CONSTRUCTION Mom `II, . LENTIMMLEFYI ' PfOl(oSEO$T!rrlrE f /!--__-_____--_-_ A EROSION CONTROL PLAN \ / HYOft08EEONOTEB 1. HYDROSEEDING$HAL BEAPPLIED TOALL SLOPES THATARE GRADEDE7(HORIZONTAL TO VEHIICAL) OR STEEPER WHEN THEYAREA: A. THREE FEET OR MORE IN HEIGHT IN FILLAREAS B. FIVE FEETOR MORE IN HEIGHTINCUTAREM UNLESS SLOPEIS NOTSUBJECTTO EROSIONDUE TOTHEEROSIONRESIMWCWA CTEROFTHEVATERW.AS APPROVEDSYTHECITY ENGINEER 2 IPRIGATIONSHALL MAINTAIN THE MOISTURE LEVEL OFTHESOILATTHEOPTIMUMLEVELFOR THE GROWTH OF THE HYDROSEEDED GROWTH 3. HYDROSEEDING MIX SHALL COMOTOFALL THE FOLLOWING: A. SEED MIX SHALL CONWSTOFNO LESS THAN 1. 20 LBS PERACREOFROSE CLOVER 2 0 LBS PERACRE OFZORRO FESCUE 3 3 LBS PERACRE OF E SCHOOL CA CALIFORMCA 4. 4LBS PERACRE OFACHILLEA MILLEFOLIA 5. 3 LBS PERACRE OFALYSSUM (CARPET OF SNOW] B. 12 LB PERACREOFOIMORPHOLECA Z ITEMS C, QEAMIFOF THIS SUBSECTIONMAYSEOMTTEOONLOCATIONS WHERETHEAREA BEING )fYOROSEEDEO IS NOTOSISLEFROMEITHERAPUBUC STREETORRESIDENTIAL STRUCTURES. 8. ITEMAOF THIS SUBSECTIONMUST BE INOCULATED WITHANDROGENFWNG R4CTERAAND APPLIED DRYEITHERBYORIWNG ORSROADCASPMGSEFORE WROSEEDING. 9. ALL SEED WTERALS SHALL BE TRANSPORTED TO THE JOBSITEIN UNOPENEp CONTNNERS WITH THE CALIFORNADEPARTMENTOFFOODANOAGR[CULTURE CERRFILATONTAG ATTACHEDTO, OR PRINTEDONSNOCONTANERS. 10. NOMPHYTPTOXICWE7INGAGENTS MAYBEADOEDTOTHEHYDROSEEDSWRRYATTW DISCRETIONOFTHECONIRACTOR. B. TYPE 1 MULCHAPPLIEDAT THERATE OF NO LESS TH02,000LSS PERACRE TYPEBMULCH (STRAW) MAYBE SUBSTITUTED, ALL OR RUM, FOR WDRAULKNLYAPPLIEDFIBER MATERIAL. WHENSTRAWISUSEDITMUSTBEANCHOREOTOTHESLOPEBYM 94AUQLLLYPUNCHINGNO LESS TH4N50% OFTHESTRAWINIO THESOIL C. FERTILIZER CONSISTING OFAMMONIUM PHOSPHATESULFATE, 132Q AIM 15%SULFUB APPLIEDAT THE RATE OF 5LO LBS PERACRE 4. ARE4$TOBEHYDROSEEDEDSHALLBEPRERWEDPRIORMHYDROSEEOINGBY. A. ROUGHENING THE SURFACE TO BE PLANTED SYANYORA COMBINOVIONOF 1. TRACKWWLKING SLOPESSTEEPER THANBi. 2 RIPPINGAREAS THATMLL NOT SREAKUPUSINGTTEM /ABOVE. B. CONDITIONING THESOILS SO TH4TITISSUIMBLEFOR PLANTING BY 1. ADJUSTING THE SURFACESOIL MOISTURE TO PROVIDEADAMPBWNOT SATURATED SEED BED 2. THEADDITON OF SOILAMENDMENTS, PHAOJUSTMENT LEACHING OR COVERING SALINE SOILS TO PROVIDE VIABLE CONDITIONS FOR GROWTH 5. HYDROSEEDEDAREM SHALL BE MAINTAINED TO PROIADEA VIGOROUS GROWTH UNTIL THE PROJECT IS PERMANENTYLANOSCAPEO OR, FORAREAS WHERE HYDROSEEOING IS THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETEDANDALL SECURITYIS RELEASED. PL r LANDSCAPING I PLANTER PER 1 I OTHERS PftOPoSEDADD1710N 1 WOODOECK I �F=/8807� Fo-lAex - PATIO r LANDSCAPING 1. ROUTINE INSPECTION TO GUARDAGAINSTRUAOFFANDEROSIONAND TODETECTWWTOR IRRIGATION SYSTEM FAILURE 2. REPLACEMENT OF DEAD DYINGAND DISEASED VEGETATION 3. ERADICATION OF INASIVESPEGES 4. REPAIRING THE IRRIGATION SYSTEMAND ITS COMPONENTS MIEN REQUIRED 5. REPLENISHING MICHAS NEEDED 8. SOILAMENDMENTWHEN NECESSARY TO SUPPORTANDMNNDVNHEALTHYPLAWGROWM 7 FERTILIZING PRUNING ANTI WEEDINGAND MNNTAINMGTURFAREAS S MAINTENANCETOAVOIDOSSTRUC770NOFMOTORIBTSWEW5 9. OWNER WILL BE RESPONSIRLEFORMNNTENWE 10 USE OFA TIMING DEVISE TO RUNALL IRRIGARON(KMITERYBACKUP) ii. MOUNTAIN ME SYSTEM CONSISTENT WITH MAWA(M4XAPPUED WATERALLOWWCE) 12. REPLACEMENT OF VEGETATION TO BE CONSISTENT WITH PLANTS"HYDROZONE" 13 MAINTAIN THE IRRIGATION SYSTEM TO NOTEXCEED MAIM(MAKAPPUED WATER ALLOWANCE) ADOITIOMALN07ES 1, EROSION CONTROL MEASURES (E.G. BONDED FIBER MITRIK VEGETATIVE COVER JUTE,M4nMA MUSTBE IMPLEMENTED VMEREAPPUCASLE TO PREVENTSOIL EROSION ON SITE SEDIMENT CONTROL MEASURES (E.G. SILTFENCING, FIBER ROLLS, GRAVEL 84GS) MUSTBE IN PLACE TO PREWNTERODED SOIL FROM LEAVING SITE M4TERWS MIMWEMENTBMPWISTALSO BE FOLLOWED TO ENSURE NO CONTACT OF RAINWATER WITH MATERIALS THATMAYCOWRISUTE TO WATER QUALITY DEGRADATION DOWNSTREAM(EG. CONCRETE OR STUCCO NASHOUTAREAS, COVERED STORAGE AREAS FOR HAZARDOUS MATERIALS, PLACEMENT OFPORTARLE TOILETS OVER APERVIOUS SURFACE. 2 NO DIRECTLY CONNECTED IMPERVIOUSAREMUICIA) SHALL SEALLOWED. OCWMFANS STORM RUNOFF GENERATEDAND CONVEYED VIA IMPERVIOUSAREM SUCHAS ROOF, ROOF DRAIN DRIVEWAY, AND STREET. 3 ALL PARCELSARE SUBJECT TOARCHITECTURAL DESIGN GUIDELINES FOR FUTURE SINGLE-FAMILY RESIDENTIAL DEVELOPMENT THESE GUIDELINESAREA2LABLEATCITYNALL(MI5S. VULCANAVE ENCINITAS, CA92024)ANDAREAPPROVEDASPERFCRES. X06,27. PE PROPOSED FIBER ROLLS PROPOSED HIORETENRON AREA DESILTWG BASIN NOTE: BIORETENTION BASINS SHALL BE EXCAATED AND USED AS DESILTING BASINS DURING CONSTRUCTION. THE SILT SHALL BE COMPLETELY REMOVED AND THE BIOFILTRATION BASINS COMPLETED ONCE FINAL SITE STABILIZATION IS ACHIEVED, PRIOR TO OCCUPANCYAND/OR FINAL. 1. SET POSTS AND EXCAVATE A 2. STAPLE EXTRA STRENGTH SILT FENCE TO 4 BY 4 IN (10 BY 10 CM) THE POSTS. POSTS ARE TO BE SPACED TRENCH UPSLOPE FROMAND CLOSER THAN STANDARD ALONG THE LINE OF POSTS. PRE -MANUFACTURED SILT FENCE PRODUCTS. BIN (15 CM) 3. ATTACH THE FILTER FABRIC TO 4. BACKRUAND COMPACT THE THE POSTS AND EXTEND IT EXCAVATED SOIL. INTO THE TRENCH. nrvw or N_-- I - �4"PVC STORM OCCURATDISCRARGEPOINT9 THIS IS COMMON WHENRETURNNGFROMACATION q^pO STORM DRAIN ORNN SEC77ONC NORTH PROPERTY NE TO SOU NOT TO SCALE 10. DESCRIPTION APPROVED DATE DESIGNED BY: DRAWN BY: CHECKED BY: BENCHMARK AS -BUILT APPROVALS BMA ENGINEERING DIVISION APPROVALS CHANGE DWG No. JQO 6/28/2021 DESCRIPTION: PT. NO. 1024 INr. DATE PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: LOCATION: FD. 2.5" DISK IN SIDEWALK IN S.E. PUBLIC WORKS DATE: 10•l' I1 BRIANM.ARDOLINO DATE EASTERLYLEUUADIAF TRAFFIC BLVD 8 0RPHEUS AVE. 3T .nA+w-- PLANNING JE E ENS /�y,� qR0 J. WINNER EASTERLY OF TRAFFIC SIGNAL R.C.E. NO.: 71851 RECORD FROM: R.O.S.18418 G .ENGINEER DATE REVIEWER SR RDOLINO ��fl�i Io/lL/%�J ELEVATION: 178.543 DATUM:NAVD88 INSPECTOR EXP.: 12a1-1911 OATEN DATE FILTER FABRIC ( - DETAIL 3/4- COURSE AGGREGATE FILTER / FABRIC 1.1' MIN., UNLESS OTHERWISE SPECIFIED BYA SOILS ENGINEER SECTIONA-A NOTE: CONTRACTOR TO MODIFIY CONSRUCTION ENTRANCE IN THE FIELDAS NECESSARY CONSTRUCT SEDIMENT BARRIERAND DITCH CHANNELIZE RUNOFF TO SEDIMENT TRAPPING DEVICE A-7 - WIDTH AS REQUIRED $ TOACCOMODATE IT ANTICIPATED TRAFFIC K LL ro U 19' RADIUS MIN -_ 50' MIN CONSTRUCTION ENTRANCE DETAIL GRAVEL BAGS OVERLAP ONTOC ONTO CURB 6 O 0 RUNOFF WITH ENDS OVERLAPPED <c„ INLET PROTECTION n 5 ~ TWO LAYERS OF GRAVEL BAGS w 5Qm Uu Z mean RUNOFF ,G / WIT AOVERLAPPEDYERS OF GRAVEL GAP BETWEENBAGS) ACTS AS SPILLWAY GRAVEL BAG DETAIL CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT GOING PLAN FOR:THE BROWN RESIDENCE Q710 WOOD DRIVEAPN: 256-122-3000 NO: 18-118 TPNVCDP