2020-14709-G - LDEV-014893-2020 (Plans)R
a
RIGHT OF WAY NOTE
OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DIVISION AT LEAST 48
HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN
ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE
OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS.
DRAINAGE NOTE
NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER
IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE
CONVEYED TO AN APPROVED DRAINAGE FACILITY.
UTILITY NOTE
ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND.
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF
ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR
REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR
INSPECTION.
BY CHRISTIAN WHEELER ENGINEERING DATED APRIL 17, 2019, PROJECT# 2190077.01 SHALL BE
CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE
WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT.
3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY
OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS.
:n7ai::L�/a.��a:��IL.xyw.�y:eT��axrya:Tlaa �su:>.a.ceuyxyLLxaa,� n.re
5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT
PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE
REPLACED OR REPAIRED TO CONDITION
EXISTING PRIOR TO GRADING.
6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS
DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL
ENGINEER OR A LICENSED LAND
SURVEYOR.
7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING
SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL
SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
8. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE FOR HUMAN
OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A M. NOR ON
SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS.
9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRECONSTRUCTIONMEETING HAS BEEN
HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS
ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE -CONSTRUCTION MEETING SHALL BE
SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2770,
10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION
SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE
CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL
CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE
HAULING OPERATION.
11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL
GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY, AN 'AS GRADED CERTIFICATION" SHALL
BE PROVIDED STATING: THE GRADING UNDER PERMIT NO: 14709-13 HAS BEEN PERFORMED IN
SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE
ATTACHED AS -GRADED PLAN'. THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND
SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION.
12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER
HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF
FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS
REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF
GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR
UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE
ACCEPTABLE FOR THEIR INTENDED USE.
13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE
DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID
DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL
MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT
DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED.
14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN
ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE
MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS
TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL
GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN
COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS.
15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH
SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL
BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A
NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR
EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE
REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN
ACCORDANCE WITH THE GRADING ORDINANCE.
16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED,
PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE
AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM
UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS
ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL,
17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN
FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY
PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE
PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO
GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE
CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF
THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE
REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT
WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE
TREE REMOVAL.
18. IF ANY ARCHAEOLOGICAL, HISTORICAL, OR PALEONTOGICAL RESOURCES ARE
INADVERTENTLY DISCOVERED GRADING ACTIVITY, THE PROJECT CONTRACTOR SHALL DIVERT,
DIRECT OR TEMPORARILY HALT GROUND -DISTURBING ACTIVITIES IN THE AREA OF DISCOVERY TO
ALLOW EVALUATION OF THE SIGNIFICANCE OF SUCH RESOURCES. THE PROJECT APPLICANT SHALL
IMMEDIATELY NOTIFY DEVELOPMENT SERVICES DEPARTMENT STAFF OF SUCH FINDING AT THE
TIME OF DISCOVERY. THE SIGNIFICANCE OF THE DISCOVERED RESOURCE(S) SHALL BE
DETERMINED BY A QUALIFIED ARCHAEOLOGIST, HISTORIAN, OR PALEOTOLOGIST IN CONSULTATION
WITH THE DEVELOPMENT SERVICES DEPARTMENT AND, FOR ARCHEOLOGICAL RESOURCES, THE
NATIVE AMERICAN COMMUNITY. THE DEVELOPMENT SERVICES DIRECTOR MUST CONCUR WITH THE
EVALUATION PROCEDURES AND ANY NECESSARY DATA RECOVERY SERVICES BEFORE GRADING
ACTIVITIES ARE ALLOWED TO RESUME,
NO.I DESCRIPTION I APPROVED I DATE
19. AS SPECIFIED BY CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050.5, IF HUMAN REMAINS
ARE FOUND ON THE PROJECT SITE DURING CONSTRUCTION ACITIVITY, THE PERSON RESPONSIBLE
FOR THE EXCAVATION, OR HIS OR HER AUTHORIZED REPRESENTATIVE, SHALL IMMEDIATELY NOTIFY
THE SAN DIEGO COUNTY CORONER'S OFFICE BY TELEPHONE. NO FURTHER EXCAVATION OR
DISTURBANCE OF THE DISCOVERY OR ANY NEARBY AREA REASONABLY SUSPECTED TO OVERLIE
ADJACENT REMAINS, AS DETERMINED BY A QUALIFIED ARCHAEOLOGIST AND/OR A TRADITIONALLY
AND CULTURALLY AFFILIATED (TCA) NATIVE AMERICAN MONITOR, SHALL OCCUR UNTIL THE
CORONER HAS MADE THE NECESSARY FINDINGS AS TO ORIGIN AND DISPOSITION PURSUANT TO
PUBLIC RESOURCES CODE 5097.98. IF SUCH A DISCOVERY OCCURS, A TEMPORARY CONSTRUCTION
EXCLUSION ZONE SHALL BE ESTABLISHED SURROUNDING THE AREA OF THE DISCOVERY SO THAT
THE AREA WOULD BE PROTECTED (AS DETERMINED BY THE QUALIFIED ARCHAEOLOGIST AND/OR
THE TCA NATIVE AMERICAN MONITOR), AND CONSULTATION AND TREATMENT COULD OCCUR AS
PRESCRIBED BY LAW. AS FURTHER DEFINED BY STATE LAW, THE CORONER WOULD DETERMINE
WITHIN TWO WORKING DAYS OF BEING NOTIFIED IF THE REMAINS ARE SUBJECT TO HIS OR HER
AUTHORITY. IF THE CORONER RECOGNIZES THE REMAINS TO BE NATIVE AMERICAN, HE OR SHE
SHALL CONTACT THE NATIVE AMERICAN HERITAGE COMMISSION (NAHC) WITHIN 24 HOURS. THE
NAHC WOULD MAKE A DETERMINATION AS TO THE MOST LIKELY DESCENDENT. IF NATIVE AMERICAN
REMAINS ARE DISCOVERED, THE REMAINS SHALL BE KEPT IN SITU (-IN PLACE"), OR IN A SECURE
LOCATION IN CLOSE PROXIMITY TO WHERE THEY WERE FOUND, AND THE ANALYSIS OF THE
REMAINS SHALL ONLY OCCUR ON -SITE IN THE PRESENCE OF THE TCA NATIVE AMERICAN MONITOR.
EROSION CONTROL
1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT FRED FRANKE CONSTRUCTION AT X858) 518-
4711124 HOURS A DAY.
2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES
DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE
STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID
CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT.
3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE
ENGINEERING INSPECTOR.
4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO
THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL.
5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE
REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN
CIRCUMSTANCES WHICH MAY ARISE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO
PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE.
7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE
INCORPORATED HEREON,
8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF
SLOPE AT THE CONCLUSION OF EACH WORK DAY.
9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH
WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT
(40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS
SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS
PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM DRAIN
SYSTEM.
2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL
NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY.
3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP FACILITIES
AND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE
FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP/IMP FACILITY
AND/OR THE TURF/LANDSCAPED AREAS.
4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA
UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP.
5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVE
ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE
IT TO AN ADEQUATE IMP/BMP.
6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED
WITHOUT A PERMIT FROM THE CITY.
7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY
REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED.
8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM
WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN
IMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE
ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM
SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE
DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE
AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN
AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES
THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A
CITY -APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER
SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE
REQUIRED FOR THIS STRUCTURE.
SAN DIEGUITO WATER DISTRICT NOTES
1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE
STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASCL
2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE
REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR
NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS
PROJECT.
3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE
PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED
UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON
IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN
WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT.
4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANY
EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS
AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER
AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS,
THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE.
5. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES.
6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN
DIEGO GAS AND ELECTRIC VAULTS.
7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED
WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING.
8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN
THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1 2010. IN
COMPLIANCE WITH THIS LAW THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS
PARTS.
9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED
WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18.
ELEVATIONS SHOWN HEREON ARE BASED
ON 2.5" BRASS DISC STAMPED'ENC-31 LS
7322" FOUND AT THE NORTHWEST CORNER
OF STORM DRAIN INLET ON THE NORTH
SIDE OF ENCINITAS BOULEVARD, AS
SHOWN ON RECORD OF SURVEY 18416 AS
POINT NUMBER 1031. ELEV: 182.995.
BENCHMARK
DESCRIPTION: 2.5" BRASS DISK "ENC-31 LS 7322
LOCATION: NW CORNER S.D. INLET, N. SIDE OF
ENCINITAS BLVD.
RECORD FROM: RECORD OF SURVEY 18416
ELEVATION: 182.995' DATUM: NAVD88
AS -BUILT APPROVALS
PLANNING
REVIEWER
CONCRETE WASHOUT
CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE
WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR,
STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER.
CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION.
CONSTRUCTION SITE ACCESS
A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT
TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND/OR CORRUGATED
STEEL PANELS/PLATES.
CONSTRUCTION VEHICLES
A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES
PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE.
EROSION CONTROL
EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE
PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS,
ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX.
NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER
DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR
SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES.
REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN
PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS
UNNECESSARILY; THEY HELP DECREASE EROSION.
TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR
EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL
GRASSES TO SHIELD AND BIND THE SOIL.
PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE
WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED.
ON -SITE CONSTRUCTION MATERIAL STORAGE
STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR
SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE
SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM
STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE
BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND
STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND
PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES.
TRAINING
CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE
FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS, THESE BMP NOTES SHALL
BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM
SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES.
WASTE MANAGEMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION
MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE
CONVEYANCE SYSTEM IS STRICTLY PROHIBITED.
NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED
AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR
LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN
STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY
TRASH MATERIAL.
MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT
AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN
TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF
HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ON
LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 4364151.
POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND
THE SITE.
PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL
PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS
SURFACES.
ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST
ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE
FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT
THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633-2770.
NOTIFICATIONS
1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE
OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES
EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO
ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK:
A. SEWERS - CSD/ESD - (760).633-2770 LWD 760-753-0155
B. GAS S ELECTRIC - SDGE - (760)-438-6200
C. WATER-SAN DIEGUITO WATER DISTRICT-1-800-227-2600
D. TELEPHONE - SEC BELL - (760)3893411
E. CABLE TV - COX COMMUNICATIONS-(760F806-9809 X-2233
2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS
PROJECT. PHONE:(760)-633-2T70.
3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633-2770. ALL WORK
PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL.
EARTHWORK DATA
STEEPEST EXISTING NATURAL SLOPE ON -SITE = 5 H : 1 V
MAXIMUM VERTICAL DEPTH OF CUT =1.9
MAXIMUM VERTICAL DEPTH OF FILL =3.0'
CUT =35 C.Y. FILL =252 C.Y.
EX/IMPORT = 217 C.V. IMPORT
REMEDIAL = 173 C.V. 4' REMOVAL AND RECOMPACTION UNDER AND 3' OUTSIDE OF BUILDING AREAS
DISTURBED AREA = 36,172 S.F.
IMPERVIOUS AREA
IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 67,937 SOFT
IMPERVIOUS AREA AFTER CONSTRUCTION: 63,000 SOFT
DECREASE IN IMPERVIOUS AREA: 4,358 SOFT
REMOVED/REPLACED IMPERVIOUS = 3,110 SOFT
REQUIRED TREATABLE AREA: 3,110 SOFT'.04 =125 SOFT
OWNER
ST. ANDREWS EPISCOPAL CHURCH
890 BALOUR DRIVE, ENCINITAS, CA 92024
760.753.3017
v
SITE ADDRESS
➢FI
DRIVE, ENCINITAS, CA 92024
:?
259 110-27
259-110-27
(1
O
LEGAL DESCRIPTION `
PORTION OF THE NORTH HALF OF THE SOUTHEAST
QUARTER OF THE NORTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 14, TOWNSHIP 13
SOUTH, RANGE 4 WEST, SAN BERNARDINO BASE AND
MERIDIAN, IN THE COUNTY OF SAN DIEGO, STATE OF
CALIFORNIA, ACCORDING TO THE OFFICIAL PLAT OF SAID
LAND FILED IN THE DISTRICT LAND OFFICE JULY 18, 1881.
(MORE FULLY DESCRIBED IN GRANT DEED RECORDED IN THE
OFFICE OF THE SAN DIEGO COUNTY RECORDER AS
DOCUMENT NO. 2005-0053105)
I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR
GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL
GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF
THE SITE.
I (WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITY'S
OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST
ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES,
DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING
OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY
ACTS OR OMISSIONS OF OWNER OR OWNER'S AGENTS, EMPLOYEES,
CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES
FOR ANY AND ALL WORK OR CONSTRUCTION COVERED IN THE PERMIT OR
CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR APPROVED PLANS
WITHIN THE PRIVATE PROPERTY OR PUBLIC EASEMENTS.
SIGNATURE: (L/ - --- '� ( DATE: 03.24.2021
SITE
VICINITY MAP
N.T.S.
I, DANIEL ALDER A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN
THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL
CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON 04-17-19 AND FOR
AN UPDATE ON N/A . ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY
RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE
REVIEWED THESE GRADING PANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS
REPORT FOR THIS PROJEC AVE BEEN INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS.
SIGNED: /
RCE NO.: 36037 I%% opROFE53/0�
EXP. DATE: 06-30-2022
C 38037
JOB#: 21900T7.01 EXp,06/30/22
CHRISTIAN WHEELER ENGINEERING
3980 HOME AVENUE
SAN DIEGO, CALIFORNIA 92105 F A
619.550.1700
THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH
THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE
ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE
RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER
CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY
THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS
NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE
PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS
OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS
THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY
INJURY ARISING SOLELY FROM TT1E NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER
AGENTS OR EMPLOYEES ACTINGG WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND
ARISING OUT OF THE WOQK"PE) O HE NGINEER
SIGNATURE:
858.605.0056
RICE EXPIRES 06.2022
�EBSi
K
No. RCE 72599
A
EMP. 6 .1U ZIIII
Ci it
P
v
O
DATE: 03.24.2021
BMP PROJECT STATUS
STANDARD
PUBLIC WORKS
PLANNING DIVISION
PARKS AND RECREATION
SAN DIEGUITO WATER DISTRICT
ENCINITAS DEPARTMENT
4/6/21
vy
��FIIRE
�i u "" e 312) I � ZI
John Ugrob
3-30-21
April 6, 2021
\ 03/29/2021
SIGN
DATE
SIGN
DATE
SIGN
DATE
SIGN DATE
SIGN
DATE
BY: DRAWN BY:
CHECKED BY:
E GINEERING DIVISION
APPROVALS
CITY OF ENCINITAS
- DEVELOPMENT SERVICES
DEPARTMENT
DRAWING NO.
ZP
REP RED U
SUPERVISION OF
RECOMM
APPROVED:
GRADING PUN FOR:
DRIVE
DATE: 03.24.21
R.C.E. NO.:72599
mer
ST. ANDREWS EPISCOPAL CHURCH
RE S EPISCLOUROPAL
14709-G
S I
DW ARDJ. IMMER
EDWARD J. WIMMER
CITY ENGINEER
APN: 259-110-27
EXP.: Ofi/2022
4-8-21
4-8-21
v
LDEV-014893-2020
Maxr«Dx - 1� jAC"KHIORL
C. RID HERRINGBONE
PAVER IN O $ 89, OR 9 AGGREGATE
e.nab.a wrrm. ERRINGBONE PATTERN IN OPENINGS
BUILDING EXTERIOR 3 I/8" (80 NUM)
&:lee ieb«SR" DROUGHT IOEWT PLANTS mix STONES (SEE ARCH. PLANS)
PER LANDWAPE PUN -STONE AQUA VIA I 1.5' WASHED
RUNDFr vOwuE EMERGENIX 6PILLWAY COR PER ARCHITECT BEDDING
MAX. EL 32J49 (SPILLWAY) R: 327.49
A TM N0.8
PARKNG AREA n' DEPTH EX, G'aNc. 4' OF IN MINUS ROCK
area b.mn 2° WRMNIOD MUCH SPILLWAY 0° CONC.ESTRA CURB
IloruSFR ° ° ^ EDGE RESTRAINT AT CHOKER LATER
Toe a elope t*nee bemin PLAN tT o • • o o • o ° a' J,000 PSI GONCRDE BUILDING
1 e /a lwrs le' Ox c¢mER ucx 3000 PSI MINIMUM 3- PERFORATED HOPE PIPE
WAY
DEPTH TO BOTTOM OF
TEMPORARY LINEAR SEDIMENT BARRIER (TYPE SANDBAG) IMPER"ff GEOLINR or \\� ROCK LAYER
AROUND SDES (OPEN AmOM) OF NEW 6' CLASS 2
PRO WMIL BORW MOTH (VNiIES) NOTES 2T MIN
WINNER MINIMUM, R 32Z16 COMPACTED TO 95%
6' SOt ttPW WASHED AGGREGATE RASE
EMrnxG SUBGRADE. WMPACnON a� PAOP05ED PEAFOFATED MIN. SOL MEDA - REFER TO AEON PER
REPORT FOR FURTHER DETALS/RECCOMENDAPONS
PREPeFAUON Me SU MI N SURROUNDED SANDY LOAN SEE MIX wax - OVEREXCAVATION PER CEO7ECHNICAL REPORT. NEW
PER GEOTENNIG. REPORT Or 4' OF r GRAVEL NO MORE THAN 5% CLAY CONTENT. - PLACEMENT OF WEAKENED PLANE CONG/JOINTS PER ACT SPECIFICATIONS IMPERMEABLE COMPACTED
EL 32M MIX SHALL GOIBMN 5M-6M SOO NEW MIRAH
PM 2M-NE COMPORT OR HARDxnoD MULCH. 60OX OR EQUAL ALONG
LINER ON SIDES SUBGRADE (95R)
1 , AND 20%J0z TOPWIL GONG. EDGE RESTRAINT (OPEN BOTTOM) SEE NOTE 1.
NOTES:
1. REMEDIAL GRADING TO SUBGRADE PER GEOTECHNICAL REPORTNFIELD ENGINEER
STATE Or CALIrwNIA 2. SLOPE SUBGRADE i0 PERFORATED PIPE IN All INSTANCES
DEPARTMENT or TRANSPORTATION NOTES 4. SEE GEOTECHNICAL REPORT, MANUFACTURERS SPECIFICATIONS FOR FURTHER
TEMPORARY LINEAR SEDIMENT BARRIER 1, Eomtrunt III LiWth of .,In rInch NO that the mania io ben. REQUIREMENTS.
(TYPE SANDBAG) lumriire1/n `b° l r1,Nochair e reach length exceed 60 m.5. ABOVE SECTION IS FOR PEDESTRIAN WALKWAYS ONLY.
NO SCALE 2. PI... WARN III n BIOSWALE BMP W/ LEVEL SPREADER PROFILE VIEW 12 C ONTE FLATWORK
IONS ARD IN . Ulmen6nn may .a it told ...diuon. SCALE: RTs. u � . NTs.
uluwereP"s°imlz"m mxERnsE OHOWN 4. Andbett neefi.. shell be a minimum of a battle Mien. n PERMEABLE PAVER SECTION
6. Me end of Ne baffler .Mall be turned up elope. V
E. Crean barnow Wall be ° mm of 1/2 ead . max of 2/0 the IN of �' ' MS
a. Sma lap MA Ana I.Nern anal be ebxgered to ehni Rap.. Crushed aggregate greater than 75 mm
LEGEND snb.ee .epee Ise. nine sl (3 in) but smaller than 150 mm (6 in)
PROPOSED
Omummx OF vlMn GRAVEL BAGS PROPOSED
Filter fabric (6E-6) SILT FENCE ° rvarmvra 324.e41Irvanthan4Ero4•a uPD
stop< po, fa b4en.r O O O Oradeal SP�SF (SE-1 `- __---_ - PROPOSED
IEe. no}. a
9
m m . iAARl x __ - CONCRETE
a" 300 Lim (12 in) Min, unless otherwise I` I I $& - J2OO WASHOUT
specified by a soils engineer h ll
J 44
1 ij`L II � _• 2LAZEi- '
/xJm tT
—� —B a i PROP. BMP 1D
SECTION B j -- TEMPORARY J ��f .. N
I SERVE AS DON.319"
NIS1 1 I % - MATERIAL
DEMON A -A / BASIN DURING
CONSTRUCTION 1 I � ' -
NOTE:
e1°r• f 1 \ A,4Ec MST NTRANCEO(TRN 1)
Construct sediment barrier
2 and channelize runoff to 1 o-
� o sediment trapping device PROPOSED
} r
�TIO
.� 3 6� // B ex
1 I YE.d2 i"_�JJh'
SECTION B-B QO \ r II 1 / ---= L�
'rv• of o 0 0 0 o Wldth as 1 ,32
m.P. w I re wired to I r --
g 1 \I i L.. xUr.EM
n EROSION GRAVEIJSAND BAG DETAIL END DETACH a o accomodale /; tl a -
scale: Nrs. a anticipated
0 0 0 1 traffic 1 banner E
¢naeeee al "1 C1 O �.
w Temporary pipe culvert B 8 Q ig tl _ - `J
as needed JJ____-
8ee .me h STATE a TRANSPORTA J
DEPARTMENT
NEA 6 m.xsPotr.nw
r..m.nw TEMPORARY LINEAR SEDIMENT BARRIER 15 m Min _ 3 �s aq t ° ExisBng Preschool T,u S
SECTOR C-C (TYPE SANDBAG) or four times the circumference TTT
n0 SCALE of the largest construction vehicle tire, _
Match whichever is greater AI (IM ' / [;/ �`m '4=`' ob
CROSS BARRIER DETAIL ARE Dluaxmure AM IN 1 1� / I m
Mn NUEM DNmw Dm MOE ORD" _
Max reach -mom (see Mae q n Grade Existing PLAN I III .. S nquary8
� _ (N I I i __i AdditiOnlReno. ______ e - — — _ __ .{_ \Ql NO
°Reath. aeteD 1/ I lif
a'.m : ' I rr /
Cmle. bertier 28 m /'/ '
pti melnLeomoe I - - `I ,Ira
Ise. I 1
h rabrm CONSTRUCTION ENIiRANCE DETAIL t -
aLa.e '
nob lC) f rebeD 1&tTwle 41 Ahem section ak Izl ` / 2-� %1 I n I- - I II
7 SCALE,.
N rdw
sbE, Ise. new a. a / I I„ '1 Mu: Jn s.
COO
Fiate°
E t ` 1 _ INV.OUi 6'1 31650
ASCCraw ban! — — — — P Fie
® --
roe na aloe° PUN n Fell 1�Mnew s e a) ` EL°r` e J ` % � / I s s s s s PROP. 52 L£ 6' PEAR HOPE � 0 15S �.
i erle seethe A .� / RIM 3,M.63 J6 '® E%I6P�Ad Hall I.
: INN IN 6. J35.I0
Po `N
aope Ise. now a a m 12) ` /� �,., — -- .ITN IN 6. J35.70 _____ nSf J. 9
TEMPORARY LINEAR SEDIMENT BARRIER (TYPE SILT FENCE) — (4 i
ens eebil a A r y '.
JOINING SECTION DETAIL (TOP VIEW) i_ �L}+ �u���� 'INY.OUT 6°: 335I0 r
s e$elml \ — —
/ fR0A0 . 6 HOPE IPIPE 01.OR ® _ PROP 43 LF 6" ffPNRATE) xDFE PPE @ OM �J
_ p,l, sut le Fora °Fork, 'F V / I _ _ 1 SD IN01 -
1�/ _ $ (BOO, note a ii.: there "lei febre /'� - �.. �/ OR
�J
taD rNpn � ac2o�Ad
ale
HOMO END STAKE DETAIL (TOP VIEW) e \ i - -��\ yyg/, PROP 13 LE 6' PEF TED 1DPE PIPE 0 HAS 02-
SECTION A -A - / }�' S
i. mmwm u.. m em ...m .° m.t m. m..e. ° Max am Mae. _-_ SDM x3JJ5PJ a
ZING ro R`°11 .e� ...`�. e`em�'imi-xe... u. JJ>.� 'I___ RIM 33104 _ __ Jil51 3J
. - ' _ TWIN 6. DS 5 -' ° ° - w'3941 �36SA i I rJJ9.
n...u° A e, b °a ..° awe
r s.hm \ ` _ a. W m Im.. a. e. w�°w �p mw. I tar
a hm.. e�e.n...... ... �AI. e....n in ma nmee -- `�— �r _ ------
A
,m ^ offrof n� .cataract, --,n � � - b "� Fe eta.. IS A CONSTRUCTION BMP SCHEDULE _ i g 1�
ei11 86. m••mam and
ERm1oN C-cFabric
_ =
a a... mwm"^bK° . °.An. m fail �.A .1.M- Caass BARRIER DETAIL, eln tame a x> m n CASOA. MAINTENANCE/ '
he fall Mil�e DESCRIPTION INSTALLATION _ f14t�
.. 0-...Lin A. ew..° Linea menu" rm vmmt vw.� DESIGNATION INSPECTION — —"— — — Y aza43:� ° EU-M— —v— —+— —r— —"— —"— — — —•—
halbewen °e wih wire 1mm. Iw AR NTIONAo . _ M • O
46 _ JJ9
For ue wakNEW .Inn..n.N n .n.Aw°VAN ..11 TEMPORARY LIRNEAR mSEDIMENT BARRIER E°a °"° T SE-1 SILT FENCING PRIOR TO GROUND WEEKLY ✓ __w_ - _ _ _ _ _ _ _ _ IN _ _ —Mr— _ _ _ _"_ _
hi If whpe DISTURBANCE X
°°`eal4 i °°° °`°r`° °"" ` reach (TYPE SILT FENCE) °` _ BHLC Q IVE N _
Io. AWWr '` r e-�no. wlWrion 10 INN .
..m.•. n In nn NO SCALE SE-6 GRAVEL BAGS PRIOR TO GROUND WEEKLY VAAES a Not°zrap°e t2 toWsO°4z
"lot aEns et.xe S.wb.En (z-Man niEnl DPdMV % o LE
Lim 0 a v Y DISTURBANCE _ _ ___ ORCA
11 °.•°•.v °WNW Lim be °a.rr....e i° ° When m We minim wawa onAM ORION �+ _ _ _ _ _ _ LORD " _ _ _ _ _ _ _ _ _ _
OF rim".. wNd b+led IN A. wW mew, END DETAIL OPTIONAL MAINTENANCE OPENING RETAIL SE-7 STREET SWEEPING PRIOR TO GROUND DAILY — --
13 ,em w.XCEED.mm� RAN or . m :n ,. SEE NOTE LL) DISTURBANCE EROSION CONTROL PLAN
xeaelMD n SILT FENCE DETAIL I TR-1 COAST. ENTRANCE/EXIT PRIOR TO GROUND WEEKLY
JIM mgpP. ee.,.me O SG4E: Ni B. DISTURBANCE
SCALE 1 "=30'
1 accurnew Ad flow
CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT APPROVALS DESIGNED BV: DRV Br Cl BV: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS we DEVELOPMENT SERVICES DEPARTMENT DRAWING NO.
DESCRIPTION: 2.5" BRASS DISK "ENC-31 LS 7322 TNT. DATE PLANS PREP RED UN SUPERVISION OF RECOMM APPROVED: GRADING PLAN FOR: 890 BALOUR DRIVE
LOCATION: NW CORNER S.D. INLET, N. SIDE OF PUBLIC WORKS DATE: O8.24.21 'FGt'W[drdj -Wraf iner
ENCINITAS BLVD. ZUBIN PATRAWALA, P.E. DATE PLANNING R.C.E. NO.: 72599 S 1 EDWARD J. WIMMER ST. ANDREWS EPISCOPAL CHURCH 14709-G
RECORD FROM: RECORD OF SURVEY 18416 REVIEWER EXR: 06/2022 4-8-21 CITY ENGINEER APN: 259-110-27
Tw 4-8-21
ELEVATION: 182.995' DATUM: NAVD86 SENIOR ENGINEERlucoormo nATF nATF SHEET 3 OF 3
IMA
AAW
n
0
LDEV-014893-2020