Loading...
LDEV-013567-2020 (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "REQUEST FOR EMERGENCY COASTAL DEVELOPMENT PERMIT, 736 NEPTUNE AVENUE," PREPARED BY TERRACOSTA CONSULTING GROUP, INC, DATED AUGUST 13, 2020, PROJECT #1845-01, SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE -CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE -CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT LDEV-013567-2020 HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS -GRADED PLAN". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE, AND SHALL TAKE REMEDIAL MEASURES TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED, AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATIONS. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE A SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATIONS AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. 18. IF DAMAGE OCCURS TO CITY PROPERTY DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPAIRS. ANY AND ALL REPAIRS SHALL BE MADE TO THE SPECIFICATION OF PARKS & RECREATION. THE CONTRACTOR MUST ENSURE THEY HAVE AND UNDERSTAND THE SPECIFICATIONS BEFORE THEY COMMENCE REPAIRS. THE REPAIR WILL BE INSPECTED AND TESTED, THEN EITHER ACCEPTED OR DENIED BY A PARKS & RECREATION REPRESENTATIVE. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT PAUL MCKEE (JC BALDWIN CONSTRUCTION) AT (760) 809-0679, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP/IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP FACILITIES AND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP/IMP FACILITY AND/OR THE TURF/LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP/BMP. 6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY -APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. �MhluI ECIAr193Mixra:a.]RM[.A.1501[143 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE. mulIrl:92ll&raurr_1[ilk I1AI[211O[11bFo1i161101:1_1:7_49Is] 0RVA011:1►19_1:7_1111114:14I►[HUTIT, I1:1:�9A:ITAIy am 6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS. 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-1 8. STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY- THEY HELP DECREASE EROSION. EReSlepi eE)NT-RE)b PURPE)SES. EReSIE)N 66 1ALL BE PREVENTEB BY PLANTING FAST GRE)WING ANNUAL ANB PERENNIAL WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER, STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436-4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633-2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - LWD 760-753-0155 B. GAS & ELECTRIC - SDGE - (760)-438-6200 C. WATER - SAN DIEGUITO WATER DISTRICT-1-800-227-2600 D. TELEPHONE - SBC BELL - (760)-489-3411 E. CABLE TV - COX COMMUNICATIONS-(760)-806-9809 X-2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)-633-2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 633-2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. 4. A PARKS & RECREATION REPRESENTATIVE MUST BE NOTIFIED OF WHEN CONSTRUCTION WILL OCCUR PRIOR TO ANY GROUNDBREAKING. A PARKS & RECREATION REPRESENTATIVE MAY BE PRESENT ON SITE AT TIMES DURING CONSTRUCTION, CONDUCTING INSPECTIONS. IMPERVIOUS AREA IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 4,420 SQFT IMPERVIOUS AREA AFTER CONSTRUCTION: 4,420 SQFT DECREASE IN IMPERVIOUS AREA: 0 SQFT IMPERVIOUS AREA REPLACED: 0 SQFT FIELD OPERATIONS John Ugrob 1/13/2021 SIGN DATE PLANNING DIVISION KCrt A. C ocLv� 1!14!,21 IDL`\11 OWNER LESLIE C. BURG TESTAMENTARY TRUST, JUNE 1, 2001 AND PATRICIA J. BURG 2003 REVOCABLE LIVING TRUST, PATRICIA J. BURG, TRUSTEE (BOTH TRUSTS) 3666 LONGRIDGE AVENUE, SHERMAN OAKS, CA 91423 PHONE: (818) 788-3319 SITE ADDRESS 736 NEPTUNE AVENUE, ENCINITAS, CA APN: 256-021-07-00 LEGAL DESCRIPTION NORTH 50 FEET OF LOT TWO, BLOCK 11, SOUTH COAST PARK NO ACCORDING TO MAP THEREOF NO. 1859, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, SEPTEMBER 2 1925. ALSO THAT PORTION OF BLOCK "D" OF SOUTH COAST PARK NO. IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 1859, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, SEPTEMBER 2 1925, LYING WESTERLY OF SAID LOT 2 BETWEEN THE WESTERLY PROLONGATION OF THE NORTH LINE OF LOT 2 AND THE SOUTH LINE OF THE NORTH 50 FEET OF LOT 2, EXTENDED TO THE MEAN HIGH TIDE LINE OF THE PACIFIC OCEAN. EXCEPTING THEREFROP THAT PORTION, IF ANY, HERETOFORE OR NOW LYING BELOW THI MEAN HIGH TIDE LINE OF THE PACIFIC OCEAN. OWNER'S CERTIFICATE HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEC BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING P ADVISE ON THE COMPACTWN AND STABILITY OF THE SITE. SIGNATURE: DDATE: 01-12-2021 PATRICIA J. B , TRUSTEE VICINITY MAP N.T.S. SOILS ENGINEER'S CERTIFICATE I, WALTER F. CRAMPTON, A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON JUNE 1, 2020. ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN THE r oADZIG PLANS AND SPECIFICATIONS. SIGNED: J RCE NO.: 23792 EXP. DATE: 12-31-2021 DATE: 01-12-2021J V JOB #:1845-01 TERRACOSTA CONSULTING GROUP, INC. 3890 MURPHY CANYON ROAD, SUITE 200, SAN DIEGO, CA 92123 (858)573-6900 STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE ED BY THE ENGINEER. SIGNED: DATE: 01-12-2021 WAL F CRAMPTON TERRACOSTA CONSULTING GROUP, INC. 3890 MURPHY CANYON ROAD, SUITE 200, SAN DIEGO, CA 92123 (858)573-6900 RCE EXPIRES: 12-31-2021 EARTHWORK DATA STEEPEST EXISTING NATURAL SLOPE ON -SITE = 0.7 H : 1 V MAXIMUM VERTICAL DEPTH OF CUT = N/A MAXIMUM VERTICAL DEPTH OF FILL = N/A CUT = 0 C.Y. FILL = 0 C.Y. IMPORT = 0 C.Y. REMEDIAL = 0 C.Y. (0 ' REMOVAL AND RECOMPACTION UNDER AND 0 ' OUTSIDE OF BUILDING AREAS) THIS PROJECT SHALL COMPLY WITH THE 2019 CALIFORNIA BUILDING CODE, WHICH ADOPTS THE 2018 IBC SHEET INDEX SHT NO. DESCRIPTION 1 GRADING NOTES 2 SITE PLAN & CROSS SECTIONS 3 TECCO MESH PROFILE & CONSTRUCTION SEQUENCE 4 TECCO MESH DETAILS PARKS AND RECREATION 1 /14/21 SIGN DATE QROFESS/pN9l O F. C C 9 F w � 792 k��xp�2/31 /21 F pF C A0F�/ BMP PROJECT STATUS STANDARD SAN DIEGUITO WATER DISTRICT I ENCINITAS FIRE DEPARTMENT 01/13/2021 SIGN DATE SIGN DATE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT "`�""""' 6r: """""'" ar: ` ""'""' 6r: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS -DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. WFC RF WFC AS -BUILT S►RN 3118121 DESCRIPTION: SET 2.5" BRASS DISC ENC-37 LOCATION: 220 FT. NORTH OF MANCHESTER AVE. AND 85 FT. WEST OF TRABERT RANCH RD. HORIZONTAL: NTS VERTICAL: NTS PLANS PREPARED UNDER SUPERVISION OF DATE: 01-12-2021 R.C.E. NO.: 23792 WALTER F. CRAMPTON ENGINEER'S NAME EXP.: 12-31-2021 RECOMMENDED: APPROVED: SteveiNowak/ � „ � , 2{,m.., STEVE NOWAK EDWARD J. WIMMER CITY ENGINEER 1/15/2021 ll/5110001 DATE DATE GRADING PLAN FOR: 736 NEPTUNE AVENUE APN 258-172-19-00 CALIFORNIA COASTAL COMMISSION Emergency Permit No. G-6-20-0042 LDEV-013567-2020 WALTER F. CRAMPTON StelverNowak, 3118121 RECORD FROM: RECORD OF SURVEY NO. 18416 ELEVATION: 55.569 DATUM: NAVD 88 SENIOR ENGINEER 1 SHEET 1 OF 4 CD J to N N 6 rn U a� O� �) � Z o C1, H a> cn N Z o O° U� Q` o r T c O Ls a� 0 W rn Hn AS -BUILT NFp rvH qlhuhq� l OF SCALE; I - 10 EXIST/NG 736 co °o 0 5 10 2 0 3 0 BRICK PAT/O FA/LED POST& NEPTUNE FEET \ J 0O BOARD WALL SEE "EMERGENCY \ ' REPAIR" THIS SHEET i AVE. wAPPROX. I FA/LURE _ LIMITS 12' WIDE x 30' LONG EASEMENT , 80 _ _ -- TERRACE DEPOSITS OVERLY//VG PER MAP 1859, GRANTED TO LU \ - - _-_ THE TERT/ARYAGE SAAMIAGO SOG&E FORMAT/O/V W/THA SLIDEPLA/VE - EST/MATED NEAR SEA LEVEL 70 736 PROPERTY L/NE EX/ST//VG SLOPE — — , NEPTUNE Q -z I 60 AVE. = = EXISTING I 50- CROSS SECTION q SCALE: 1"=10' (HORIZ. & VERTJ I A I EXIST//VG BALCONY 4� I EXIST/NG BRICK PAT/O I EXIST/NG STAIRWAY FA/LED POST & FROM BALCONY BOARD WALLS LIMITS OF TEMPORARYSLOPE F STAB/L/TYMESH. MESH TO BE 95 APPLIED OVER EXIST/NG WALLS HATCH /ND/CATES APPROX/MATEAREA OF -- _ TEMPORARY ERGS/ON EXISTING WOODEN DECK CONTROL MESH w go — ("A APPROX/MATE SLOPE- FA/LURE LIMITS �.�) 85— APPROX/MATE LOCAT/ON OF ARROWS INDICATE - 1 PROPOSED ANCHOR (TYP.) DIRECTION OF FA/LURE I APPROX/MATE PROPERTY -_ _ 14 LINE (TYPICAL) _ - (TYP) I 0. 80 700 BLOCK LANDSLIDE 75 I 6 Z_ EX/ST/NG WOODEN STAIRWAY EMERGENCY REPAIR o I I � APPROX/MATE PROPERTY I SCALE 1 " = 5' W LINE (TYPICAL) Z_ REFERENCE: � J NOTE. QROFESS/ON l N SITE PLAN I PRIOR TO THE CONTRACTOR REQUESTING A BUILDING DEPARTMENT INSPECTION, D F 9 Z BASE PHOTO REPRODUCED THE SOILS ENGINEER SHALL ADVISE THE BUILDING OFFICIAL IN WRITING THAT: � Rq F� SCALE: 1"-10' FROM GOGGLE EARTH PHOTO, z SONIMAGERY DATE. 2014 A) ANY TRENCHES HAVE BEEN PROPERLY BACKFILLED AND COMPACTED, AND 792 N B) ANY EXCAVATIONS COMPLY WITH THE INTENT OF THE SOILS REPORT. * xp. 2/31/21 * O U F OF w CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT DESIGNED BY: DRAWN BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. ~ WFC RF WFC AS -BUILT S12N 3118121 DESCRIPTION: SET2.5" BRASS DISC ENC-37 PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: APPROVED: SITE PLAN AND CROSS SECTIONS FOR: LOCATION: 220 FT. NORTH OF MANCHESTER AVE. HORIZONTAL: NTS 4;L_DATE: 01-12-2021 SteveiNowak/ �c�,azcL , 2flm "', 736 NEPTUNE AVENUE AND 85 FT. WEST OF TRABERT RANCH RD. WALTER F. CRAMPTON LDEV-013567-2020 STEVE NOWAK EDWARD J. WIMMER RECORD FROM: RECORD OF SURVEY NO. 18416 VERTICAL: NTS R.C.E. NO.: 23792 APN 258-172-19-00 WALTER F. CRAMPTON CITY ENGINEER ELEVATION: 55.569 SteverNO��JGtk, 3118121 111512021 /ll5lZOZ/ CALIFORNIA COASTAL COMMISSION Emergency Permit No. G-6-20-0042 DATUM: NAVD 88 SENIOR ENGINEER ENGINEER'S NAME EXP.: 12-31-2021 DATE DATE SHEET 2 OF 4 AS=BUILT 0 0 0) I r` Ln R to N N 0) CD U 0 0 0 U) 0 0 N N V) APPROXIMATE LENGTH OF TECCO MESH = 30' APPROXIMATE UPPER LIMIT OF TECCOO MESH I I ANCHOR SCHEMATIC - SEE NOTES THIS SHEET I I I I I IvOrEs: A MINIMUM OF 1 ANCHOR SHALL BE INSTALLED PER 48 SQUARE FEET OF WIRE— — —— — — —�— — — — — — MESH, STAGGERED. ADDITIONAL ANCHORS WILL BE REQUIRED LOCALLY AND ALONG THE EDGES AS PART OF TENSIONING CLEAR EXISTING VEGETATION WITHIN PROPOSED LIMITS OF WORK EXISTING SLOPE - HATCH INDICATES APPROXIMATE CUT & CLEAR "-ft. "-ft". PROFILE - TECCO MESH FABRIC SCALE: I"=5' "-.ft "_ft� APPROXIMATE FINISHED SLOPE SURFACE INSTALL TECC00 MESH SLOPE FACE AND TEN, INSTALL SOIL NAILS PER \ _i- I- MANUFACTURERS SPECIFICATIONS & GUIDELINES STEP 1 CLEAR EXISTING VEGETATION. REMOVE LOOSE TALUS AND DEBRIS FROM SLOPE AND SHAPE AS NECESSARY. INSTALL ANCHORS FOR SLOPE STABILITY MESH. NOTE: ALL VEGETATION, SPOILS, CONSTRUCTION DEBRIS, AND ANY OTHER MATERIALS SHALL BE HAULED LANDWARD FROM THE CONSTRUCTION AREA. NO SUCH MATERIAL SHALL BE REMOVED WITHOUT A PERMIT. '—Ilil.-lip ; III - SLOPE STABILITY MESH NOTES: I. THE PROPOSED SLOPE STABILITY MESH SHALL CONSIST OF A GEOBRUGG TECCO® G65/3 SLOPE STABILIZATION SYSTEM, OR AN ENGINEER APPROVED EQUAL. 2. CONTRACTOR SHALL INSPECT AND FIELD VERIFY AREA TO BE COVERED PRIOR TO ORDERING MATERIALS. 3. CONTRACTOR SHALL COORDINATE WITH OWNER AND ENGINEER OF RECORD ANY CHANGES PRIOR TO BEGINNING CONSTRUCTION. 4. THE TOTAL NUMBER OF ANCHORS SHOWN ON THE PROFILE ARE GRAPHICAL ONLY. THE QUANTITY OF NAILS TO BE INSTALLED SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE ENGINEER OF RECORD. ® STEP 2 OVER GEOMAT INSTALL TECC00 MESH. ATTACH PLATES TO NAIL HEADS AND TENSION (SEE DETAILS SHEET C-5). PLACE LANDLOK 450 GEOMAT AND ANCHOR AS NECESSARY TO MAINTAIN LAPS AND SPLICES. CONSTRUCTION SEQUENCE NOT TO SCALE 8' % `-X 8' MAX. -� - • CD 4' X -�- GENERALIZED ANCHOR SPACING DETAIL NOT TO SCALE NOTES: A MINIMUM OF 1 ANCHOR SHALL BE INSTALLED PER 48 SQUARE FEET OF WIRE MESH, STAGGERED. ADDITIONAL ANCHORS WILL BE REQUIRED LOCALLY AND ALONG THE EDGES AS PART OF TENSIONING STATEMENT OF SPECIAL INSPECTION REQUIRED VERIFICATION AND INSPECTION OF SOIL NAIL INSTALLATION: From CBC Table 1705.8 CONTINUOUSLY PERIODICALLY VERIFICATION & INSPECTION TASK DURING TASK LISTED DURING TASK LISTED 1. INSPECTION OF SOIL NAIL INSTALLATION, INCLUDING DRILLING, GROUTING AND TESTING. X SPECIAL INSPECTION NOTE: I. THE OWNER SHALL EMPLOY A REGISTERED DESIGN PROFESSIONAL TO PERFORM STRUCTURAL OBSERVATIONS. DEFICIENCIES SHALL BE REPORTED IN WRITING TO THE OWNER AND THE BUILDING OFFICIAL. AT THE CONCLUSION OF THE WORK INCLUDED IN THE PERMIT, THE STRUCTURAL OBSERVER SHALL SUBMIT TO THE BUILDING OFFICIAL A WRITTEN STATEMENT THAT THE SITE VISITS HAVE BEEN MADE AND IDENTIFY ANY REPORTED DEFICIENCIES WHICH, TO THE BEST OF THE STRUCTURAL OBSERVER'S KNOWLEDGE, HAVE NOT BEEN RESOLVED. STRUCTURAL SPECIAL INSPECTION REPORT PREPARED BY TERRACOSTA CONSULTING GROUP DATED MARCH 10, 2021 ON FILE WITH --------------- ENGINEERING DIVISION STRUCTURAL REVIEW PERFORMED BY ESGIL, A SAFEBUILT COMPANY, AS PLAN CHECK 2020-LDEV-013567-2020.e DATED DECEMBER 22, 2020 QROFESS/� q k*xp�2/31 /2CVIL 9TF of C AV CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT "`' 6r: """RF ar: ` "�`'"C 6r: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. WFC FC RF WFC AS -BUILT S►ZN 3118121 DESCRIPTION: SET 2.5" BRASS DISC ENC-37 LOCATION: 220 FT. NORTH OF MANCHESTER AVE. AND 85 FT. WEST OF TRABERT RANCH RD. HORIZONTAL: NTS VERTICAL: NTS PLANS PREPARED UNDER SUPERVISION OF DATE: 01-12-2021 R.C.E. NO.: 23792 WALTER F. CRAMPTON ENGINEER'S NAME EXP.: 12-31-2021 RECOMMENDED: APPROVED: Steve, Nowak/ �c�,azcL , 2fJ,m "', STEVE NOWAK EDWARD J. WIMMER CITY ENGINEER 1/15/2021 ll/5/ZOZ/ DATE DATE TECCO MESH PROFILE & CONSTRUCTION SEQUENCE FOR: 736 NEPTUNE AVENUE APN 258-172-19-00 CALIFORNIA COASTAL COMMISSION Emergency Permit No. G-6-20-0042 LDEV-013567-2020 WALTER F. CRAMPTON Ste�verNOiaJaly 3/18/21 RECORD FROM: RECORD OF SURVEY NO. 18416 ELEVATION: 55.569 DATUM: NAVD 88 SENIOR ENGINEER 1 SHEET 3 OF 4 co co J N N C.� 0) Z� U AS -BUILT DETAILS SHOWN ARE PROVIDED BY THE MANUFACTURER AND ARE FOR INFORMATIONAL PURPOSES ONLY. NOT ALL DETAILS MAY BE NECESSARY FOR THIS APPLICATION SLOPE OVERVI EW CO DEPRESSI AROUND THE NAIL DRILLING' THROUG TECCOC STABILIZATION TUBE (OPTIONAL) Miy TENSIONING THE TECCO® MESH 1a INSTALLATION DETAILS NOT TO SCALE LOAD TABLE NAIL TYPE Required Torque M GEWI GR 75 D=1 —1 /4—INCH 150 ft—Ibs CONVEX SLOPE TOP CONCAVE SLOPE 7F_ MIN. 1 p MESH TC) P MIN. 1 p MESH ---JL- B OTTO M OVERLAP DETAILS NOT TO SCALE WIRE TENSIONING DETAILS NOT TO SCALE -q I IUAL UUNNEU I IUN THE MESH SHEETS ORMALLY WITHOUT OVERLAP) BOTTOM CONNECTION CLIP T3 (TWO CLIPS PER MESH) VERTICAL CONNECTION DETAIL NOT TO SCALE THE BOUNDARY ROPES MUST BE FASTENED TO THE CORRESPONDING ROPE ANCHORS AS PER THE SKETCH BELOW. THE FIRST WIRE ROPE CLIP IS POSITIONED IMMEDIATELY AT THE CABLE EYE THIMBLE. THE WIRE ROPE CLIPS MUST BE POSITIONED AT INTERVALS SO THAT A FREE SPACE OF MINIMUM THE WIDTH t OF ONE WIRE ROPE CLIP REMAINS BETWEEN EACH OF THEM. THE U-BOLTS MUST ALWAYS BE PLACED ON THE ROPE END WHICH IS NOT TENSIONED ("NEVER SADDLE A DEAD HORSE"). EXPOSED FORMATIONAL I00 SLOPE FACE J PROVIDE RECESS CONE AT EACH ANCHOR TO ALLOW FOR TENSIONING OF WIRE MESH (TYP.) NUT ANCHOR PLATE - —o TECCO® 65 MESH, / BORE HOLE NAIL - #8 BAR GALVANIZED — A <�NcTti. 25 �R 75 �•�„ TGO�RUT ANCHOR SCHEMATIC - #8GR75 NO SCALE NOTE: PRIOR TO THE CONTRACTOR REQUESTING A BUILDING DEPARTMENT INSPECTION, THE SOILS ENGINEER SHALL ADVISE THE BUILDING OFFICIAL IN WRITING THAT: A) ANY TRENCHES HAVE BEEN PROPERLY BACKFILLED AND COMPACTED, AND B) ANY EXCAVATIONS COMPLY WITH THE INTENT OF THE SOILS REPORT. ANCHOR GROUT SPECIFICATIONS C. ANCHORAGE & SHEATHING ENCAPSULATION GROUT 1) GROUT SHALL CONFORM TO SECTION 201 —1 OF THE SSPWC EXCEPT AS MODIFIED BELOW. 2) GROUT SHALL CONSIST OF A CEMENT —WATER MIXTURE OR SAND —CEMENT— WATER MIXTURE AND SHALL HAVE A MINIMUM 28—DAY COMPRESSIVE STRENGTH OF 2,250 PSI. CONTRACTOR SHALL SELECT MIXTURES SUITABLE FOR THE ANCHOR RODS, SHEATHING, AND GROUT INSTALLATION EQUIPMENT AND PROCEDURES TO BE USED. PROPORTIONS SHALL BE BASED ON TESTS MADE ON THE GROUT BEFORE GROUTING IS TO BEGIN, OR MAY BE SELECTED BASED ON PRIOR DOCUMENTED EXPERIENCE WITH SIMILAR MATERIALS AND EQUIPMENT AND UNDER COMPARABLE FIELD CONDITIONS (WEATHER, TEMPERATURE, ETC). 3) CEMENT SHALL CONFORM TO ASTM C150 TYPE V. 4) WATER CONTENT SHALL BE THE MINIMUM NECESSARY FOR PROPER PLACEMENT BUT THE WATER —CEMENT RATIO SHALL NOT EXCEED 0.45. 5) A NONSHRINK OR EXPANSIVE ADMIXTURE MAY BE USED TO ELIMINATE SHRINKAGE OF THE ANCHORAGE ZONE GROUT. OTHER ADMIXTURES, CONFORMING TO ASTM C494, MAY BE USED TO REDUCE THE WATER CONTENT, IMPROVE THE PUMPABILITY, OR ACCELERATE THE STRENGTH OF THE GROUT. CALCIUM CHLORIDE, AND ADMIXTURES CONTAINING CHLORIDE IONS IN EXCESS OF .06% BY WEIGHT SHALL NOT BE USED. IF MORE THAN ONE ADMIXTURE IS USED, SAID ADMIXTURES SHALL BE COMPATIBLE WITH EACH OTHER SO THAT THE DESIRABLE EFFECTS OF ALL ADMIXTURES USED WILL BE REALIZED. ADMIXTURES SHALL NOT BE USED IN GREATER DOSAGES THAN THOSE RECOMMENDED BY THE MANUFACTURER. QROFESS BOUNDARY NOT TO SCALE CABLE ATTACHMENT DETAIL W * xp. 2 79/21 `P CIVIL 9TF OF C A\-\F CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT DESIGNED BY: DRAWN BY: 7CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. WFC RF WFC AS -BUILT S12N 3118121 DESCRIPTION: SET2.5" BRASS DISC ENC-37 LOCATION: 220 FT. NORTH OF MANCHESTER AVE. AND 85 FT. WEST OF TRABERT RANCH RD. HORIZONTAL: NTS VERTICAL: NTS PLANS PREPARED UNDER SUPERVISION OF DATE: 01-12-2021 R.C.E. NO.: 23792 WALTER F. CRAMPTON ENGINEER'S NAME EXP.: 12-31-2021 RECOMMENDED: StewelNowak/ STEVE NOWAK 1/15/2021 DATE APPROVED: �c�,azcL , 2flm "', EDWARD J. WIMMER CITY ENGINEER 1115/ZoZ/ DATE TECCO MESH DETAILS FOR: 736 NEPTUNE AVENUE APN 258-172-19-00 CALIFORNIA COASTAL COMMISSION Emergency Permit No. G-6-20-0042 LDEV-013567-2020 WALTER F. CRAMPTON Steve-1 Nowak/ 3118121 RECORD FROM: RECORD OF SURVEY NO. 18416 ELEVATION: 55.569 DATUM: NAVD 88 SENIOR ENGINEER I SHEET 4 OF 4 N a 0 ° O� � o Z N Ha) Vn z o O° U� 0 0 T r � Vi U O s a O Lu �00 AS -BUILT