2001-6745 I (Plans)GENERAL RIGHT-OF-WAY NOTES: 1. NO ACCESS OR WORK SHALL BE PERFORMED WITHIN THE CITY RIGHT-OF-WAY WITHOUT THE FULL KNOWLEDGE OF THE ASSIGNED CITY INSPECTOR WHO SHALL BE GIVEN NOT LESS THAN 48 NOURS ADVANCE NOTICE OF THE INITIATION OF PERMITTED USE AT (760) 633-2796 OR 633-2797, OR AS STATED ON THE PERMIT. 2. AT LEAST 48 HOURS PRIOR TO STARTING WORK, UMoBIOROUO SE ICE ALBR MW SHALL BE NOTIFIED FOR LOCATION OF UNDERGROUND UTILITIES AT 1-800-422-4133. THE PROPOSED DIG AREA MUST BE MARKED IN MITE PAINT PRIOR TO CONTACTING (USA). 3. ALL WORK COVERED BY THIS PERMIT SHALL BE PERFORMED BY A CONTRACTOR POSSESSING A VALID CALIFORNIA CONTRACTOR'S LICENSE OF THE APPROPRIATE CLASS. 4. ALL TRAFFIC CONTROL WITHIN THE CONSTRUCTION AREA SHALL BE SUBJECT TO AN APPROVED TRAFFIC CONTROL PLAN AND SHALL BE FLAGGED AND BARRICADED TO THE SATISFACTION OF THE CITY INSPECTOR IN COMPLIANCE WITH THE "WORK AREA TRAFFIC CONTROL HANDBOOK', LATEST EDITION PUBLISHED BY BUILDING NEWS, INC. IN THE EVENT THAT THE INSPECTOR DETERMINES PROPER TRAFFIC CONTROL IS NOT IN PLACE, ALL WORK SHALL CEASE AND PERMITTEE AUTHORIZES THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE TO ORDER, ON THE RENTAL BASIS, SUCH TRAFFIC CONTROL DEVICES AS SHALL BE NECESSARY AND PROPER TO PROTECT THE PUBLIC SAFETY AND FURTHER AGREES TO PAY ANY AND ALL COSTS AND CHARGES THAT THE CITY MAY INCUR IN PROVIDING SAID TRAFFIC CONTROL. 5. APPLICANT AGREES THAT IT SHALL BE HIS RESPONSIBILITY TO PROVIDE THE CONTRACTOR, SUBCONTRACTOR, OR ANY OTHER AGENT RESPONSIBLE FOR CONSTRUCTION OF PERMITTED WORKS WITHIN THE CITY RIGHT-OF-WAY, WITH A COPY OF THE PERMIT INCLUDING THESE STANDARD CONDITIONS AND A COMPLETE SET OF APPROVED PLANS. THE PERMIT, PLANS AND WORK AREA TRAFFIC CONTROL HANDBOOK SHALL BE AVAILABLE AT THE PERMIT SITE WHENEVER WORK IS IN PROGRESS. 6. PERMITTED WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY SPECIFICATIONS AND APPROVED PLANS, SUBJECT TO INSPECTION AND APPROVAL BY THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. CERTIFICATION FOR ALL MATERIALS AND WORK, INCLUDING COMPACTION TESTS, SHALL BE FURNISHED BY THE APPLICANT UPON REQUEST BY THE CITY INSPECTOR. PAYMENT FOR ANY COMPACTION TESTING SHALL BE BY THE PERMITTEE. CERTIFICATION SHALL BE MADE BY A CERTIFIED TESTING AGENCY OR FIRM ACCEPTABLE TO THE CITY. 7. NO WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS PERMITTED ON SATURDAYS, SUNDAYS, OR HOLIDAYS. ANY DEVIATION FROM THE WORK SCHEDULE PRESENTED IN THESE CONDITIONS MUST RECEIVE PRIOR, WRITTEN APPROVAL OF THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. ANY QUESTIONS REGARDING DAYS CITY HALL IS CLOSED, CALL (760) fi33-2770. 8. NO WORK ON ANY PUBLIC ROADWAY, EXCLUDING PRIME ARTERIALS AND MAJOR ROADS, SHALL BE STARTED BEFORE 7:30 A.M. OR CONTINUE AFTER 5:00 P.M. ON WEEKDAYS. 9. NO WORK SHALL BEGIN BEFORE 9:00 A.M. OR CONTINUE AFTER 3.00 P.M. ON PRIME ARTERIALS AND OTHER MAJOR ROADS. UNLESS AUTHORIZED ON THE PERMIT BY THE CITY ENGINEER. ALL WORK ON PRIME ARTERIALS AND OTHER MAJOR ROADS, ALL AS SHOWN ON THE CIRCULATION ELEMENT OF THE CITYS GENERAL PLAN, WILL REQUIRE A TRAFFIC CONTROL PLAN ACCEPTABLE TO THE CITY TRAFFIC ENGINEER WHOSE OFFICE CAN BE CONTACTED AT (760) fi33-2704. 10. THE ROADWAY SHALL BE CLEAN AND FREE OF ALL OBSTRUCTIONS AND COMPLETELY OPEN TO TRAFFIC AT THE END OF EACH WORKING DAY. (NO LATER THAN 3:00 P.M. ON MAJOR ROADS, DEFINED HEREIN.) 11. TWO-WAY TRAFFIC SHALL BE MAINTAINED AT ALL TIMES. MINIMUM TRAVEL LANE WIDTH FOR MOTOR VEHICLES SHALL BE 12 FEET. IF STREET WIDTH PREVENTS MAINTAINING TWO-WAY TRAFFIC, PERMITTEE AND DIRECTOR OF ENGINEERING SERVICES SHALL AGREE ON AN ADEQUATE TRAFFIC CONTROL PLAN PRIOR TO STARTING WORK, WHICH SHALL INCLUDE THE USE OF A FULL-TIME FLAGMAN. 12. ALL EXCAVATIONS IN EXISTING PAVEMENT SHALL BE SAW CUT TO NEAT LINES AND AC REPLACEMENT SHALL BE MADE TO THE SATISFACTION OF THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 13. OPEN TRENCH MUST BE BACKFILLED AND CAPPED WITH AT LEAST 2" OF COLD MIX ASPHALT OR METAL PLATED ACCORDING TO CITY SPECIFICATIONS DURING NON -WORKING HOURS. METAL PLATES ARE REQUIRED TO HAVE COLD MIX ASPHALT RAMPS ON ALL (4) SIDES AND MUST BE MAINTAINED. REFER TO THE CITYS STANDARD DRAWING DATED JULY 31, 1990. 14. NATIVE MATERIAL MAY BE USED UPON APPROVAL OF THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. REFER TO THE CITYS STANDARD DRAWING DATED SEPTEMBER 30, 1996. 15. NO TUNNELING UNDER CURB AND GUTTER OR OTHER IMPROVEMENTS SHALL BE PERMITTED. IMPROVEMENTS SHALL BE REMOVED AND REPLACED JOINT TO JOINT. 16. TWO SACK SAND -CEMENT SLURRY MIX SHALL BE REQUIRED AS BACKFILL ON ALL LATERAL EXCAVATIONS WITHIN PRIME ARTERIALS, MAJOR ROADS AND COLLECTORS AS WELL. AS ALL LOCATIONS WHERE THE INSPECTOR DEEMS THE NATIVE MATERIAL TO BE UNACCEPTABLE FOR USE AS BACKFILL. 17. CARE SHALL BE EXERCISED TO PREVENT WATER, SOIL AND DEBRIS FROM DEPOSITING IN GUTTERS, STREETS AND STORM DRAINS. NO WASHING OUT OF MIXERS OR CONCRETE PUMPS WILL BE ALLOWED ON CITY STREETS. VIOLATIONS WILL BE REFERRED FOR NPDES ENFORCEMENT AND PENALTIES. 18. ANY ROADWAY STRIPING OR MARKINGS DAMAGED OR REMOVED DURING THE OPERATIONS OF THIS PERMIT SHALL BE MATCHED AND REPLACED BY THE APPLICANT USING THE LATEST EDITION OF STATE DEPARTMENT OF TRANSPORTATION SPECIFICATIONS FOR PAINT OR THERMOPLASTIC, ALL TO THE SATISFACTION OF THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 19. ALL CONCRETE WORK SHALL BE TRANSIT MIXED AND CONFORM TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION, SECTION 201, AND BE APPROVED BY THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 20. TRENCHING FOR INSTALLATIONS ACROSS ANY INTERSECTING ROADWAY OPEN TO TRAFFIC SHALL BE PROGRESSIVE. NOT MORE THAN HALF OF THE WIDTH OF A TRAVELED ROADWAY SHALL BE DISTURBED AT ONE TIME AND THE REMAINING WIDTH SHALL BE KEPT OPEN TO TRAFFIC BY BRIDGING OR BACKFILUNG. (CONTINUED ON SHEET 2-NOTES) NO. I DESCRIPTION :0:8I R 11111917M'a PANS FOR THE CONSTRUCTION OF ENCINITAS BEACH RESORT SEWER AND WATER IMPROVEMENTS IN THE CITY OF ENCINITAS ml ' 1 I f f S 4 i I � x \• SHEET 3 U \ SHEET OWNERS CERTIFIC I HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. I HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITYS OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS. LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OWNER OR OWNERS AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS. OR REPRESENTATIVES FOR ANY AND ALL WORK OR CONSTRUCTION COVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR APPROVED PLANS WITHIN THE PRIVATE PROPERTY OR PUBLIC EASEMENTS. SIGNATURE: DATE: E II ITAS BEACH TEL VENTURE, LLC SOIIS ENGINEERS CERTIFICATE I, WILLIAM D. OLSON A REGISTERED CIVIL ENGINEER IN THE STATE OF DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, H [�}ZtA9:iIF�'{�S/<_h b1Y�7:a_1:�N90dI�ga SIGNED: 6 � A PE 45283'"/yWI/I/tAM D. TOLLSON SIGNED: CEG 2457 MICHAS. D. JENSEN LEIGHTON CONSULTING INC. Ywc°"`,, Dryly 3934 MURPHY CANYON ROAD, SUITE B-205\.os c s 4 SAN DIEGO, CA 92123 (858) 292-8030 "SAND UPDATE LETTER DATED JUNE 18, 1018AND RESPONSE LETTER DATED AU OUST 51,2018 PUBLIC WORKS PLANNING AND BUILDING (4�"��`' ,TmR PROPERTY LINE. .... _ -1�.. RIGHT-OF-WAY..... -R/W� SEWER. ..... - S WATER. ........ _W,_ SHEET INDEX. .... STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEERS TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY .FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM .PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. SIGNATURE: DATE: ARK L. HENNING. R.C.E. 58007 &I HALE �D f N01 NFE R1N G HALE ENGINEERING AND SURVEYING, INC. II _ 7910 CONVOY CT. SAN DIEGO, CA 92111 (858) 715-1420 n d C°YIL yy �UF CAISU`� PARKS AND RECREATION IS � aJayia 1-21-19 )ATE VA FIL SIGN DATE SCALE AS -BUILT HMO By. I PLANS PREPARE. HORIZONTAL: N/A� /DwCG vsrzt CLINTON E.HALE DATE . VERTICAL VA", „.,, ,,. LEGEND IMPROVEMENT STD, DRAWING NO, SYMBOL PROPERTY LINE .................................... .. _ -$- EXISTING CONTOUR_ ............... ....... _---SG_____- PROPOSED CONTOUR. .............. ....... ...... �- EXISTING CLEANOUT.................................... EXISTING SEWER. .............................. I ... I . I S EXISTING STORM DRAIN ........... - - - - EXISTING WATER. .......... .............. .... . yy_. TRENCH RESURFACING. .... ......SDRSD G-24.. ..... C"'^ SEWER 8" PVC SEWER MAIN. ........... LWD S-11,. S-12 SEWER MANHOLE .. . SDRSD SM-01, 03-05, M-3 SEWER CLEANOUT .. .. .... LWD S 8,.S-9 . ........ WATER 2" BLOW OFF. ..... WAS WB-01 WC-171 WB O6 CONCRETE THRUST BLOCK ... WAS WIT-01 GATE VALVE (SIZE AS NOTED). .. , WAS WV-02 .. ... FIRE HYDRANT ASSEMBLY (INDUSTRIAL) WAS _WF 01 WF-04 6" FIRE SERVICE I . , ... I .... WAS WF 05 ........... . � 2" MANUAL AIR VALVE (MAR).... WAS WA-01, WA-07, WC 17 ...... -------- 11 8"/12" PVC WATER MAIN...... WAS WP-01. _ . _ .... W R.P. BACKFLOW DEVICE .... WAS WR 01 ,WR_ 02 ......... (3) 2" WATER SERVICE 'WAS WS-02 WC-17 .. f 2" IRRIGATION SERVICE. ....... WAS WS702 . WC.17 .. . SHEET INDEX TITLE SHEET ........................................ SHEET i NOTES AND DETAILS ............................. SHEET 2 PLAN AND PROFILE ............................... SHEET 3 PLAN AND PROFILE ............................... SHEET 4 NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - LEUCADIA WASTEWATER DISTRICT (LWD) - (760) 753-0155 B. GAS & ELECTRIC - SDGE - (760)-438-6200 C. WATER - SAN DIEGUITO WATER DISTRICT-1-800-227-2600 D. TELEPHONE - SEC BELL - (760)-489-3411 E. CABLE TV - COX COMMUNICATIONS-(760)-806-9809 X-2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)-633-2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633-2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. OWNER ENCINITAS BEACH HOTEL VENTURE, LLC 12250 EL CAMINO REAL, SUITE 160 SAN DIEGO, CA 92130 PHONE: 858-350-4800 SITE ADDRESS 2100 NORTH COAST HIGHWAY ENCINITAS, CA ASSESSOR'S PARCEL NUN �4[:IIS16'IIIdR: PARCEL 1 OF PARCEL MAP NO. 18587 IN THE CITY OF ENCINITAS, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE MAP THEREOF, RECORDED NOVEMBER 21, 2000 AS FILE NO. 2000-0635224, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. `o �y 7 BATIQUITOS LAGOON 5 PROJECT rc z NRW pVE' w O 'o 0 i Q y u+. VICINITY MAP N.T.S. BMP PROJECT STATUS Lcul AU1A "AJ I CYYA I CR DISTRICT SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT PRIORITY STORMWATER TREATMENT FACILITIES TO BE MAINTAINED BY OWNER IN ACCORDANCE WITH "MAINTENANCE AGREEMENT FOR PRIVATE STORMWATER TREATMENT AND STORMWATER POLLUTION CONTROL FACILITIES" RECORDED ON AS DOC. f: PUBLIC SEWER SYSTEM APPROVAL AP V D B - LVRD DISTRICT ENGINEER C33692 Z 1'ICk W17.0w /3� Z�I„ /19 JYINiyi( f�l /(i//'' J�110 hi DEXTER S. MLSON, P.E. RCE DATE DEXTER WISON ENGINEERING. INC 6/30/2020 SIGN DATE SIGN DATE RM EXP. DATE ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. H DATE: W7/17 R.C.E. NO.: 58007 \ I ENCINITAS BEACH RESORT �II SEWER AND WATER IMPROVEMENTS APN: 216-041-26 a I n LL 0 N 6745-I 'z o n WOO Iwo., SHEET OF imp EXP.: CASE NO: TPM-89-014 CHANGE NO. GENERAL RIGHT-OF-WAY NOTES CONTINUED (CONTINUED FROM SHEET 1) 21. WHERE STREET DIMENSIONS AND STATE DEPARTMENT OF HEALTH SERVICES REGULATIONS ALLOW, ALL PIPES AND CONDUITS LAID PARALLEL TO THE ROADWAY SHALL BE PLACED AT LEAST FIVE (5) FEET FROM THE EDGE OF THE PAVEMENT OR GRADED TRAVELED ROADWAY, UNLESS OTHERWISE AUTHORIZED IN WRITING BY THE CITY ENGINEER. THE SHALLOWEST PORTION OF ANY PIPELINE OR OTHER FACILITY SHALL BE INSTALLED NOT LESS THAN THIRTY (30) INCHES BELOW THE ROADWAY SURFACE. 21 (A). WHERE STREET DIMENSIONS AND STATE DEPARTMENT OF HEALTH SERVICES REGULATIONS ALLOW, ALL PIPES AND CONDUITS LAID PARALLEL TO EXISTING UTILITIES SHALL MAINTAIN A MINIMUM SEPARATION OF THREE (3) FEET MEASURED FROM THE NEAREST EDGE OF THE FACIUTY. ANY DEVIATION FROM THIS REQUIREMENT IS NOT ALLOWED UNLESS APPROVED BY THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE. 22. ALL EXCAVATED MATERIAL SHALL BE CAST AWAY FROM THE IMPROVED PORTION OF THE HIGHWAY. AFTER THE WORK HAS BEEN COMPLETED, ALL EXCESS MATERIAL, INCLUDING TRENCH SPOILS, SHALL BE REMOVED FROM THE RIGHT-OF-WAY. THE ROADWAY SHALL BE LEFT IN NEAT AND ORDERLY CONDITION. 23. ALL ROADSIDE DRAINAGE DITCHES SHALL BE RESTORED TO TRUE GRADES AND THE INTAKE AND OUTLET ENDS AT ALL CULVERTS SHALL BE LEFT FREE FROM ALL EXCESS MATERIALS AND DEBRIS. 24. ALL APPROACHES TO PRIVATE DRIVEWAYS AND INTERSECTING ROADS AND STREETS SHALL BE KEPT OPEN TO TRAFFIC AT ALL TIMES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. 25. CLAY AND EARTH WHICH ADHERE TO THE PAVED SURFACE OF THE ROADWAY SHALL BE REMOVED BY HAND SCRAPING, WASHING AND SWEEPING, OR BY ANY OTHER METHOD WHICH WILL LEAVE A CLEAN NON-SKID SURFACE WITHOUT IMPAIRING, DAMAGING OR LOOSENING THE SURFACE. 26. PERMITTEE SHALL COMPLY WITH ANY AND ALL DIRECTIVES ISSUED BY THE CITY ENGINEER OR HIS DULY AUTHORIZED REPRESENTATIVE IN ORDER TO PREVENT DUST OR OTHER MATERIALS FROM BECOMING A NUISANCE OR ANNOYANCE. 27. TEMPORARY PATCHING OF TRENCH IS REQUIRED ON LATERAL CUTS IN SURFACED STREETS IMMEDIATELY AFTER BACKFILLING. AFTER COMPLETION OF THE REFILLING AND COMPACTING OF THE BACKFILL MATERIAL IN THE EXCAVATION, ALL AS SPECIFIED IN THE STANDARD DRAWING DATED SEPTEMBER 30, 1996, AND THE REMOVAL OF OBSTRUCTION(S), THE PERMITTEE SHALL PROMPTLY REPLACE WITH TEMPORARY OR PERMANENT PATCHING MATERIAL, OR REPAIR ANY PORTION OF THE HIGHWAY SURFACE REMOVED OR DAMAGED BY THE EXCAVATION, OBSTRUCTION, OR CONSTRUCTION OPERATIONS, ALL TO THE SATISFACTION OF THE CITY ENGINEER, AND AS SPECIFIED ELSEWHERE HEREIN. THE CITY ENGINEER MAY, AT HIS OPTION, ELECT TO DO THE SURFACING OR REPAIRING HIMSELF; IN SUCH CASE, THE PERMITTEE SHALL BEAR THE COST OF SUCH WORK. TEMPORARY PATCHING MATERIAL MAY BE LEFT IN PLACE FOR UP TO 30 DAYS, BUT MUST BE CONTINUALLY MAINTAINED. 28. WHERE THE PAVEMENT, EXCEPT PORTLAND CONCRETE CEMENT PAVEMENT, OR OTHER TYPE OF SURFACE HAS BEEN REMOVED BY OTHERS, THE PERMITTEE SHALL REPLACE IT WITH A STANDARD REPAIR OF FOUR (4) INCHES AC OVER APPROVED BACKFILL OR REPAIR SECTION SHALL BE ONE (1) INCH AC GREATER THAN EXISTING STRUCTURAL SECTION, WHICHEVER IS GREATER. REFER TO THE MOST CURRENT STANDARD DRAWING. REPAIRS TO PCC PAVEMENT SHALL BE MADE PURSUANT TO THE SPECIFICATIONS OF THE ASSIGNED ENGINEERING INSPECTOR. 29. IF, AFTER THE REFILLING OF AN EXCAVATION, THE PERMITTEE FAILS OR REFUSES TO RESURFACE OR REPAIR THAT PORTION OF THE SURFACE OF THE ROADWAY DAMAGED BY HIM, OR IF THE CITY ENGINEER HAS ELECTED TO DO SUCH RESURFACING OR REPAIRING, THE CITY ENGINEER SHALL CAUSE THE REPAIR TO OCCUR; AND THE PERMITTEE SHALL BE CHARGED NTH THE COST THEREOF COMPUTED BY THE DIRECTOR OF ENGINEERING SERVICES. 30. WHEN SHORING IS REQUIRED, AN ENGINEERED DETAIL DRAWING WILL BE REQUIRED FOR APPROVAL BY THE CITY ENGINEER. ALL OSHA REGULATIONS SHALL BE MET. 31. ALL DIRECTIONAL BORES SHALL BE SUBJECT TO APPROVAL OF THE METHOD IN THE FIELD BY THE ASSIGNED ENGINEERING INSPECTOR, ACTING AS THE DULY AUTHORIZED AGENT OF THE CITY ENGINEER. A THOROUGH EXAMINATION OF THE SUBSURFACE CONDITIONS IS A PREREQUISITE. THE APPLICANT SHALL IDENTIFY THE BORE METHOD ON THE PERMIT APPUCATION EITHER AS AUGER, HAMMER, HYDRAULIC, ETC., AND SHOW THE BORE PITS. GROUTING AND INTERMEDIATE BORE PITS MAY BE REQUIRED. 32. ALL SUBSURFACE UTILITIES SHALL BE ACCURATELY SHOWN ON THE APPLICANT'S SITE PLAN FOR THOSE EXCAVATIONS IN EXCESS OF 250 LINEAR FEET, TRAVERSING SIGNALIZED INTERSECTIONS, CROSSING INTERCONNECT WIRES. OR OTHERWISE WHERE THE CITY ENGINEER HAS A SPECIAL CONCERN. 33. PAVEMENT CUTS IN STREETS REHABILITATED OR NEWLY CONSTRUCTED WITHIN THE PAST TWO YEARS SHALL BE CATEGORICALLY DENIED. 34. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 35. THE REMOVAL OF ANY AND ALL CITY TREES SHALLBE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT NTH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. 36. THE TRAFFIC LOOPS SHALL BE REPLACED WITHIN 3 DAYS OF COMPLETING WORK IN THE AREA TO CURRENT CALTRANS STANDARD TO DETECT BICYCLES PER TRAFFIC OPERATIONS POUCY DIRECTIVE 09-06 AT NO COST TO THE CITY. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT WILUAM DODDS AT (619) 522-8171., 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED IMPROVEMENT PLAN SHALL BE INCORPORATED HEREON. B. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. FIRE DEPARTMENT NOTES: 1. PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING CONSTRUCTION MATERIALS TO THE PROJECT SITE, ALL OF THE FOLLOWING CONDITIONS SHALL BE COMPLETED TO THE SATISFACTION OF THE FIRE DEPARTMENT: • ALL WET AND DRY UTILITIES SHALL BE INSTALLED AND APPROVED BY THE APPROPRIATE INSPECTING DEPARTMENT OR AGENCY; • AS A MINIMUM, THE FIRST LIFT OF ASPHALT PAVING SHALL BE IN PLACE TO PROVIDE A PERMANENT ALL-WEATHER SURFACE FOR EMERGENCY VEHICLES; AND • ALL FIRE HYDRANTS SHALL BE INSTALLED, IN SERVICE, AND ACCEPTED BY THE FIRE DEPARTMENT AND APPLICABLE WATER DISTRICT. 2. ALL GATES AND OTHER DEVICES WHICH COULD OBSTRUCT FIRE ACCESS OR HINDER EMERGENCY OPERATIONS ARE PROHIBITED UNLESS THEY MEET FIRE DEPARTMENT STANDARDS. DESCRIPTION I APPROVED I DATE HORIZONTAL: Na VERTICAL: V. STORMWATER POLLUTION CONTROL BMP CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SUE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SUE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TAADUNG CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE SUP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBIUTIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436-4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND .CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE. FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DIVISION, CITY OF. ENCINITAS AT (760) 633-2770. SAN DIEGUITO WATER DISTRICT NOTES 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). THE CONTRACTOR SHALL AND HEREBY DOES GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE OF ACCEPTANCE, 2. THE CONTRACTOR SHALL. NOTIFY THE DISTRICTS INSPECTION DEPARTMENT 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE FOR INSPECTION OF PROJECT. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 633-2709. ALL WORK PREFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND AN DIEGUITO WATER DISTRICT 12. THE DISTRICT REQUIRES THAT COMPACTION TESTS BE TAKEN WHERE WATER LINES ARE INSTALLED WITHIN EXISTING COUNTY RIGHTS -OF -WAY, CITY OF ENCINITAS RIGHTS -OF -WAY, OR PRIVATE EASEMENTS, AND THE RESULTS APPROVED BY THE CITY OF ENCINITAS, BEFORE THE WATER UNES ARE ACCEPTED AND A COPY SENT TO THE SAN DIEGUITO WATER DISTRICT OFFICE. 13. PRIOR TO AWARDING WATER UNE CONTRACT. OWNER SHALL ADVISE PROSPECTIVE CONTRACTORS TO OBTAIN AND REVIEW CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) SPECIFICATIONS. 14. FILL AREAS MUST BE COMPACTED TO 90R, PRIOR TO PIPE INSTALLATION. 15. APPROVAL OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE A REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 16. ALL EXISTING FACILITIES WHICH MAY EFFECT FINAL DESIGN, I.E., LINE CROSSINGS, LINE PARALLELING. OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR CROSSINGS WITHIN 10 FEET OF ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNULH WAILK MAINS UNLE55 GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 17. WATER CONNECTIONS TO COMMERCIAL DEVELOPMENTS SHALL HAVE AN APPROVED BACKFLOW DEVICE INSTALLED TO THE DISTRICTS SATISFACTION AND CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. BACKFLOW DEVICES ARE TO BE INSTALLED DIRECTLY OUTSIDE CITY OR. COUNTY RIGHT-OF-WAY OR OUTSIDE WATER DISTRICT EASEMENT. REPAIR, MAINTENANCE AND. ANNUAL TESTING OF BACKFLOW DEVICE ARE RESPONSIBILITY OF OWNER. 18. MINIMUM HORIZONTAL SEPARATION OF 10 FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 19. UTILITIES TO MAINTAIN. MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 20. CONTRACTOR AND DEVELOPER ARE RESPONSIBLE TO RELOCATE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) THAT ARE EFFECTED BY THEIR PROJECT. 21, CONTRACTOR TO SUPPLY DOCUMENTATION SHOWING THAT ANY ASBESTOS WATER PIPES REMOVED FROM THE GROUND WERE DISPOSED OF IN A MANNER ACCEPTABLE TO THE SAN DIEGO COUNTY WASTE DIVISION. 22. USE THE FOLLOWING VARIOUS COMBINATIONS OF PLAIN END PIPE LENGTHS WITH HIGH DEFLECTION COUPUNGS AND INTEGRAL BELL END PIPE FOR CURVED ALIGNMENTS IN BOTH HORIZONTAL AND VERTICAL DIRECTIONS. DO NOT BEND PIPE BETWEEN COUPLINGS. SAW CUT INTEGRAL BELL END OF STANDARD PIPE AND BEVEL END FOR USE WITH DEFLECTION COUPLINGS. USE 9.5-FOOT PLAIN END PIPE LENGTHS WITH DEFLECTION COUPUNGS FOR ALL RADII BETWEEN 140 FEET TO 27D FEET. USE 19-FOOT PIPE LENGTHS WITH DEFLECTION COUPUNGS FOR ALL RADII BETWEEN 270 FEET TO 560 FEET. USE AND INTEGRAL BELL END PIPE LENGTH JOINED TOGETHER WITH A 19-FOOT PLAIN END PIPE LENGTH TO FORM A CHORD. USE DEFLECTION COUPLINGS ON EACH END OF THE CHORD AND CONTINUE THIS COMBINATION THROUGH THE CURVED ALIGNMENT FOR ALL RADII BETWEEN 560 FEET TO 1,150 FEET. PIPE LENGTHS SHORTER THAN 9 FEET WILL NOT BE USED UNLESS SPECIFICALLY AUTHORIZED THE BY THE DISTRICTS REPRESENTATIVE. 1. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LED BRASS BE USED IN CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LED BRASS PARTS. 2. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18. 3. WATER SERVICES TO BE ABANDONED THAT ARE CONNECTED TO PIPELINES THAT WILL REMAIN IN SERVICE SHALL BE DISCONNECTED AT THE CORPORATION STOP, SHALL HAVE CORPORATION STOP REMOVED AND SHALL HAVE A BRASS PLUG INSTALLED; OR BE ABANDONED AS DIRECTED BY THE SON) INSPECTOR. I LEUCADIA WASTEWATER DISTRICT NOTES 1. ALL WORK AND MATERIALS RELATED TO LWD SEWER DESIGN, MATERIALS, AND CONSTRUCTION SHALL CONFORM TO THE LWD--SEWERSTANDARDSPEC AVAILABLE ON THE LWD WEBSITE AT HTTP-//WWWLWWDORG/DEVELOPERS/STANDARD/SPECS AND TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK) AND THE REGIONAL STANDARD DRAWINGS. MOST CURRENT EDITIONS. IN THE EVENT OF CONFUCT. THE 2. CONTRACTOR SHALL CCTV INTERNALLY INSPECT ALL GRAVITY SEWER FACILITIES CROSSED OVER OR UNDER, BOTH BEFORE AND AFTER NEW IMPROVEMENTS ARE CONSTRUCTED. HIGH QUALITY DIGITAL CCTV VIDEO SHALL BE PROVIDED TO LWD FOR REVIEW AND RECORD PURPOSES PRIOR TO COMMENCING NEW WORK AND FOLLOWING COMPLETION OF NEW WORK. THE CCTV DOCUMENTATION WILL BE SUBMITTED TO THE DISTRICT 15 CALENDAR DAYS PRIOR TO COMMENCEMENT OF WORK THAT WILL CROSS A GRAVITY SEWER. 3. CONTRACTOR SHALL BE AWARE THAT LWD FACILITIES PROVIDE WASTEWATER CONVEYANCE, TREATMENT, AND DISPOSAL TO THE PUBUC 24 HOURS A DAY, 365 DAYS A YEAR. THEREFORE, LWD OR THEIR CONTRACTORS MAY NEED ACCESS TO FACILITIES FOR OPERATIONS, MAINTENANCE, OR EMERGENCY REPAIR AT ANY TIME. THE CONTRACTOR WILL ENSURE THAT ACCESS TO THE FACILITIES IS MAINTAINED AT ALL TIMES (DURING CONSTRUCTION AND AT THE END OF EACH CONSTRUCTION DAY) AND SHALL NOT HINDER AND WOULD BE EXPECTED TO ASSIST WITH ACCESS WHILE WORKING AROUND LWD FACILITIES. 4. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT LOUD FACIUTES AND STRUCTURES DURING CONSTRUCTION. SHOULD THE CONTRACTOR AT ANY TIME DAMAGE LWD OR PRIVATE SEWER LATERAL FACILITIES. THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, NOTIFY LWD, MINIMIZE AND CONTROL ANY SEWAGE SPILL AND REPAIR DAMAGED FACILITIES TO THE SATISFACTION OF THE LWD ENGINEER AT NO COST TO LWD INCLUDING INSPECTION. AND ANY BYPASSING REWIRED TO SEWER FACILTY OPERATIONS. DAMAGE CAUSED TO SEWER FACILITIES SHALL BE REPAIRED IN ACCORDANCE WITH ALL APPLICABLE LWD STANDARD SPECIFICATIONS AND DRAWINGS. SUBMIT FOR LWD APPROVAL PRIOR TO REPAIR. 5. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PREVENTING SEWAGE SPILLS; CONTAINING AND SEWAGE SPILLS: RECOVERY AND LEGAL DISPOSAL OF ANY SPILLED SEWAGE ARISING FROM ANY WORK ADJACENT TO LWD FACILITIES OR ALLOWING A SEWAGE SPILL OR FAILURE TO PREVENT A SEWAGE SPILL WHILE PERFORMING THE WORK. CONTRACTOR WILL BE RESPONSIBLE FOR ALL CLEAN UP COSTS AND PENALTIES ASSESSED TO THE DISTRICT AS A RESULT OF A SEWAGE SPILL CAUSED BY THE CONTRACTOR. 6. CONTRACTOR SHALL NOTIFY LWD A WEEK IN ADVANCE OF PLANNED CONSTRUCTION ACTIVITIES IN THE AREA OF WORK POTENTIALLY AFFECTING LWD SEWER FACILITIES. 7. CONTRACTOR SHALL NOTIFY LWD WITH 48 HOURS PRIOR TO EXCAVATION OF SEWER UNDERCROSSINGS. OVERCROSSINGS, OR PARALLEL INSTALLATIONS WHERE SEWER MAY BE EXPOSED. 8. COORDINATION, SUBMITTALS, AND NOTIFICATIONS SHALL BE MADE BY TELEPHONE AND EMAIL TO MR. IAN RIFFEL AT 760-753-0155 / IRIFFELOLWWD.ORG EMERGENCY CONTACT CAN BE MADE AFTER HOURS AT LWD AT 760-753-0155. 3. THE CONTRACTOR WILL BE REQUIRED TO SCHEDULE A MANDATORY PRE -CONSTRUCTION CONFERENCE WITH THE SAN DIEGUITO WATER DISTRICT INSPECTOR PRIOR TO COMMENCEMENT OF WORK ON WATER IMPROVEMENTS. PHONE: (760) 633-2709. 4, UNLESS OTHERWISE NOTED, ALL CONNECTIONS TO EXISTING MAINS WILL BE MADE BY THE CONTRACTOR, UNDER THE SUPERVISION OF SAN DIEGUITO WATER DISTRICT, AFTER PAYMENT OF THE ESTIMATED COST BY THE DEVELOPER. 5. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN PROFILE, TOP OF PIPE PROFILE IS 48 INCHES BELOW CENTERLINE FINISH GRADE OF STREET. 6. ALL SERVCES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS. 7. CONTRACTOR TO FURNISH ONE INCH COPPER WATER SERVICE AND METER BOX FOR EACH RESIDENTIAL LOT. 8. CONTRACTORS SHALL ACQUIRE A TRENCHING PERMIT FROM THE CALIFORNIA DIVISION OF SAFETY FOR ALL TRENCH WORK. 9. INSTALL FIRE HYDRANTS 2.5 FEET FROM FACE OF CURB, IF NO SIDEWALK EXISTS, OR 7 FEET FROM FACE OF CURB WHERE SIDEWALK EXISTS OR WILL BE CONSTRUCTED. 10. PROVIDE AIR RELEASE ASSEMBLIES AT ALL HIGH POINTS IN WATER MAIN. 11. CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FROM THE CITY OF ENCINITAS FOR ANY EXCAVATION WITHIN EXISTING CITY RIGHTS -OF -WAY. AS-BUILTwmm ENGINEERING DIVISION APPROVALS H rr /�J/ Ae G•/a 2J9/21 PLANS PREPARED UNDER SUPERVISION OF DATE: Z/?, R.C.E. NO.: 58007 REC K : TI STEVEN NWTKI- APPROVED: ED MER I. HALE DATE EXP.: 06/30/20 DATE I DATE 10-21 99 Z rN-NCF micocr C CITY OF ENCINITAS - DEVELOPMENT SERVICES ENCINITAS BEACH RESORT SEWER AND WATER IMPROVEMENTS APN: 216-041-26 PLANNING CASE NO: a N n gip)( New p¢ Quo d.N ?o= DRAWING NO. Woo wcn 6745-1 z N WOW SHEET2OF4 wp„ <�k PRIVATE WATER DATA TABLE BEARING/DELTA RADIUS LENGTH NOTE C1 16' 2T 38" 214.W 61.49 8' PVC CL-305 C-900 C2 0' 5i loft 212.00' 3.52' 8' PVC CL-305 C-900 L1 N14' 49' 21'W -- 46.71' 8" PVC CL-305 C-900 L2 N89' 26' 01 -- 128.45' 8" PVC CL-305 C-900 L3 S124 58' WE -- 273.04' 8' PVC CL-305'C-900 0 OW 42.45' 8PVC CL-305 C-900 US46 ---- 15.38 8" PVC CL-305 C-900 28.92' TIP PVC CL-305 C-90D 42.88' 8" PVC CL-305 C-900 FIRE DEPARTMENT NOTES: 1. ALL FIRE DEPARTMENT CONNECTIONS SHALL BE MOUNTED AT THE FOLLOWING HEIGHT(S): 36 TO 42 INCHES ABOVE FINISHED GRADE TO THE TOP OF THE CONNECTION. 2. INSTALL TWO-SIDED "BLUE DOT" REFLECTIVE FIRE HYDRANT MARKERS 4" TO 6" FROM CENTER LINE OF HYDRANT SIDE. 3. INSTALL "GREEN DOT" REFLECTIVE FIRE DEPARTMENT CONNECTION MARKER 4" TO 6' FROM CENTER LINE ON FDC SIDE. WATER EASEMENT PER - DOC NO. 2019-001043D DATED JAN. 10, 2019 sz DWG. �A .PEN Dwc. 6394- 16 PVC CL 305 C-900 CASING PER WAS / WP-04 W/ SPACERS AND END SEALS i - STORM DRAIN PER PREOSE 1- 4+ GRADING DWG 14083-G \m �S \ Moll Lu '1' , it i• /% m T8+00 4. _ + p ~9 s — -�(CINCH INLINE GV .-- - - y } ,F PER WAS WV-02 c� I 40W DRAIN PER DI 6394-1 +T R=28' s P NO. 2019-00104 D JAN. 10. 2019 AS -BUILT ENGINEERING DIVISION APPROVALS -A,— ////�AJ�/�_- f PLANS PREPARED UNDER SUPERVISION OF RECO MENpED: APPROVED- AI4 "Ae� 2/9121 DATE: 2 7 �L CLINTON E. HALE DATE R.C.E. NO.: 58007 STEVEN MOWpK (S -( 1 ED§TID 3L ER 2-10-21 MARK L. HENNING EXP.: O6/30/20 DATE GATE In a luc TFFM/ANCFM BLOCK TABLE fR' STATION TI EICM OF PPE TYPE OF MOCK TYPE OF APPIIIIBICNKE Twr TOTAL TM IST A8911® SOIL CAPACITY AREA OR VOLUME OF BLOCK PiIBIBUE 16+46.81 PVC/8' THRUST ANG. PT 250 IB/IN' 16,131 IB 2,000 IB/FT2 12.1 FT2 16+62.19 PVC/8" THRUST ANG. PT 250 IB/IN' 16,082 IB 2.000 IB/FT2 12.1 FT' 16+80.63 PVC/8" THRUST TEE (FH) 250 IB/IN2 16,131 18 2,000 IB/FT' 12.1 FP 17+04.63 PVC/8' THRUST ANG. PT 250 IB/IN' 16,082 IB 2,D00 IB/FT' 12.1 FT' 19+35.99 PVC/8" THRUST TEE (FH) 250 IB/IN' 16.082 IB 2,000 IB/FT' 12.1 FT' 19+28.28 PVC/8' THRUST ANG. PT 250 IB/IN' 16,082 IS 2,000 IB/FT' 12.1 FT' 19+77.68 PVC/8' THRUST ANG. PT 250 IB/IN' 16,082 IB 2,000 IB/FT' 12.1 FF 21+06.13 PVC/8' THRUST AND. PT 250 IBAN' 16,082 IB 2,000 IB/FT' 12.1 FT' 21+52.84 PVC/8" THRUST AND. PT 250 IB/IN' 16,002 IB 2,000 IB/TT' 12.1 FT' 2- MAR PER WA-07 (TYP.) DOSTING 6" ACP WATER PROPOSED 8" PVC WATER /// 1N W 8" WGV RDU _GcPO 8-i6- FLG)PO REDUCER PROP. 6' PVC WATER JOINT RESTRAINT SYSTEN / TRANSITION COUPLING QQAL; CON ECipN TO EXISTING 6' ACP WATER LIPS NTS N f rt S�ALe: zwr r _20. w W 20 0 20 40 60 W_m w o x mz� SCALE 1" = 20' a� o KN CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. i o ER AND WATER PLAN AND PROFILE FOR: w> W ENCINITAS BEACH RESORT 6745-1 SEWER AND WATER IMPROVEMENTS APN: 216-041-26 wozm ow m INNING CASE NO: TPM-89-014 SHEET 4 OF 4 - w o .