2016-13126 I (Plans)ENCINITAS SANITARYICARDIFF SANITATION DISTRICT SEWER NOTES: ALL WORK SHALL BE DONE IF ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 'GREENBOOK", (LATEST EDITION), THE SAN DIEGO STANDARD SPECIAL PROVISIONS TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, (ADOPTED BY THE SAN DIEGO REGIONAL STANDARDS COMMITTEE), THE SAN DIEGO REGIONAL STANDARD DRAWINGS (LATEST EDITION) AND THE FOLLOWING SPECIAL PROVISIONS: 1. TRENCH WIDTH SHALL BE PER SDRSD NO. SP-02 UNLESS OTHERWISE NOTED. MINIMUM PIPE SEPARATION PER WAS WI-01, 02, & 03. 2. PIPE AND BEDDING CONDITIONS. (A)ALL PIPE SHALL HAVE 4- MINIMUM OF W CRUSHED ROCK BENEATH THE PIPE. (B)VC P. PIPE BEDDING FROM BOTTOM OF PIPE TO 12" MINIMUM ABOVE THE PIPE SHALL BE SAND, GRAVEL, CRUSHED AGGREGATE, NATIVE FREE -DRAINING GRANOULAR MATERIAL HAVING A SAND EQUIVALENT OR 30 OR BETTER. (C)P.VC. AND A.B.S. SOLID WALL PIPE BEDDING FROM BOTTOM OF PIPE TO 12' MINIMUM ABOVE THE PIPE SHALL BE CRUSHED ROCK, A.B.S. SOLID WALL PIPE MAY BE USED ONLY WHERE PIPE INVERT GRADES ARE 1%OR GREATER- 3. AFTER COMPLETION OF PIPE LAYING, ALL MAIN LINE SEWERS, SEWER SERVICE LATERALS AND STRUCTURES SHALL BE TESTED IN THE PRESENCE OF THE INSPECTOR. AIR PRESSURE TEST SHALL BE USED UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. 4, THE CONSTRUCTION OF P.C.C, SEWER MANHOLE SHALL BE PER SDRSD NO. SM-02. POURED IN PLACE MANHOLE BASES SHALL BE A MONOLITHIC POUR FINISHED COMPLETE AT TIME OF POUR. PRECAST MANHOLE BASES ARE ACCEPTABLE FOR USE WITH 8-INCH COLLECTOR SYSTEMS WITH CITY ENGINEER'S APPROVAL, 5. THE CONSTRUCITON OF 4-INCH SEWER LATERAL PER SDRSD NO'S SS-01 AND SS-02. LATERALS SHALL NOT DISCHARGE DIRECTLY INTO MANHOLE. 8. THE CONSTRUCTION OF CONCRETE CUT-OFF WALLS SHALL BE CONSTRUCTED AS PER SDRSD NO, SP-07. 7. ALL MAINS AND LATERALS SHALL BE A MINIMUM OF 42-INCHES BELOW THE FINISHED GRADE. 8. THE FINAL LOCATION AND ELEVATION OF SEWER AND WATER MAINS AND LATERALS SHALL BE SHOWN ON ORIGINAL AS -BUILT PLANS PRIOR TO ACCEPTANCE OF WORK. 9. FOR SEWER LATERAL TABLE, SEE SHEET_ 10. "AS BUILT" DRAWINGS MUST BE SUBMITTED PRIOR TO FINAL ACCEPTANCE OF THE WORK 11. ALL DESIGN CHANGES OF SEWER MAINS SHALL BE APPROVED BY A CONSTRUCTION CHANGE PRIOR TO ACCEPTANCE FOR PUBLIC USE. 12. FILL AREAS MUST BE COMPACTED TO 90% PRIOR TO PIPE INSTALLATION. 13. THE CONTRACTOR SHALL NOTIFY THE CITYS FIELD OPERATIONS DIVISION 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE FOR PRE -CON AND INSPECTION OF PROJECT. PHONE NO. 760-633-2770. 14. CONTRACTOR SHALL OBTAIN A PERMIT FROM THE CITY'S ENGINEERING SERVICES DEPARTMENT FOR ANY EXCAVATION WITHIN EXISTING CITY RIGHTS -OF -WAY. 15. THE APPLICANT SHALL WARRANTY THE PUBLIC SEWER FOR ONE YEAR FOLLOWING THE APPROVAL OF THE AS-BUILTS. 16, CONTRACTOR SHALL FURNISH AND INSTALL, PER SDRSD SP-01, THE APPROPRIATE BURIED UTILITY WARNING AND IDENTIFICATIN TAPE ABOVE ALL PUBLICE SEWER LINES AND PORTIONS OF SEWER LATERALS LOCATED WITHIN PUBLIC RIGHT-OF-WAY OR EASEMENTS. 17. THE DEVELOPER SHALL PROVIDE EASEMENTS AND ACCESS ROADS OVER PUBLIC SEWERS TO THE SATISFACTION OF THE CITY ENGINEER. THESE ARE TO BE SHOWN ON THIS PLAN. 18. WASTEWATER DISCHARGE PERMITS AND PLUMBING PERMITS ARE REQUIRED PRIOR TO CONNECTION TO THE SANITARY SEWER SYSTEM. 19. ALL NEW SEWER MAINS SHALL BE INSPECTED BY CLOSED CIRCUIT TELEVISION AFTER COMPLETION OF TRENCHING BACKFILL AND FINISHED GRADING BUT PRIOR TO PLACEMENT OF PAVEMENT OR PERMANENT TRENCH RESURFACING. CONTRACTOR SHALL PROVIDE FOR TELEVISION INSPECTION. (SEE 500-1.1.5) 20. SEWER MANHOLE LINING'. (A)NEW MANHOLES WITH 8-10" DIAMETER SEWER MAINS: THE INSIDE OF THE SEWER MANHOLES SHALL BE COATED WITH AN EPDXY PROTECTIVE LINING SYSTEM PER SECTION 500-2.7 OF THE GREENBOOK. (B)NEW MANHOLES WITH 12- DIAMETER AND GREATER SEWER MAINS: THE INSIDE OF THE SEWER MANHOLES SHALL BE PROVIDED WITH INTEGRALLY LOCKING PVC LINING PER SECTION 500-2.5 OF THE GREENBOOK (C)EXISTING MANHOLES: ALL EXISTING MANHOLES WITH NEW CONNECTIONS SHALL BE INSPECTED AND REPAIRED, AS NEEDED, WITH THE LINING SYSTEM THAT MATCHES THE EXISTING LINING FOR THAT MANHOLE; FOR MANHOLES WITHOUT ANY EXISTING LINING, THE INSIDE OF THE SEWER MANHOLES SHALL BE COATED WITH AN EPDXY PROTECTIVE LINING SYSTEM PER SECTION 500-2.7 OF THE GREENBOOK. EXCEPTIONS OR VARIATIONS TO THESE MANHOLE LINING REQUIREMENTS MAY BE CONSIDERED ON A SPECIFIC CASE -BY -CASE BASIS BY THE CITY ENGINEER. 21. NO ADDITIONAL LATERALS SHALL BE PERMITTED WITHOUT PAYING SEWER CAPACITY FEES, PROCESSING A CONSTRUCTION CHANGE, AND JOINING THE SEWER REIMBURSEMENT DISTRICT, IF CREATED, 22. MANHOLE FRAMES AND COVERS SHALL BE MADE IN THE USA OF HEAVY DUTY CAST-IRON TYPE WITH A 364NCH OPENING. MANHOLE COVER INSERTS SHALL BE 24-INCH DIAMETER WITH LETTERING "CITY OF ENCINITAS" AND'SEWER" SIMILAR TO WHAT IS INDICATED ON SDRSD M-1. DESCRIPTION I APPROVED I DATE I BENCHMARK STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION, CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE, EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. - DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENTAND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. ' WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO T DIVERT 1 NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FRE QUENTLY FOR LEAKS: DUMPSTER LIDS SHALL TIMES. REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 7141195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 4364151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES, PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE. TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS, CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DIVISION, CITY OF ENCINITAS AT(760) 633-2770. EROSION CONTROL 1, IN CASE. EMERGENCY WORK IS REQUIRED, CONTACT MARCO LUIS AT (858) 254-0814 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. ,3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. S. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL. EROSION CONTROL MEASURES PROVIDED PER THE APPROVED IMPROVEMENT PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY 9, ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - CSDIESD - (760)-633-2770 B. GAS & ELECTRIC - SDGE - (760)-03M200 C. WATER-SAN DIEGUITO WATER DISTRICT-"00-227-2600 D. TELEPHONE - SBC BELL - (760)-089J411 E. CABLE TV - COX COMMUNICATIONS-(760)-806-9809 X-2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE. (760)-633-2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE(760)633-2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. FIELD OPERATIONS v: 1n^ IRON PIPE IN CDNO. MON 25 FT W/0 PLANS PREPARED UNDER SUPERVISION OF N ELUOAVE ON PROLONGATION OF Cl OF HORIZONTAL 1_12 DATE: SU 201 'DR MARKED BY STEEL FENCE. MACARIO R. PEREZ DATE FROM. COUNTY OF SAN DIEGO VERTICAL'. 1=10' RC.E,NO.: 20604 )N' 9.969 MACARIO R. PEREZ IAvnm -. REVIEWER INSPECTOR SENIORENGINEER EXP: 09 30 17 OWNER OWME R NAM E GA'ROlfG L. rbWW MomgVS Lid ADDRESS: 2341 CAMBRIDGE AVENUE,. ENCINITAS, CA 92007 SITE ADDRESS PROJECT ADDRESS: 2341 CAMBRIDGE AVENUE ENCINITAS/CARDIFF CA 92007 APIN 261-094-07 LEGAL DESCRIPTION LOTS 37, 38 AND 391N BLOCK 12, OF CARDIFF, IN. THE CITY OF ENCINITAS, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE MAP THEREOF NO. 1298, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID SAN DIEGO COUNTY, NOVEMBER 14, 1910. OWNER'S CERTIFICATE. - 1(WE) HEREBY CERTIFY THAT REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. I (WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITY'S OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING OUT OF. OR IN ANY AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORK OR CONSTRUCTION COVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR APPROVED PLANS WTHIN THE PRIVATE PROPERTY OR PUBLIC EASEMENTS, SIGNATURE: DATE: ✓F %% 4 A'... IATi'Ib.WNOnQS LJO . THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. ' �QY.G'ESW`. R04 SIGNATURE: DATE: S/AS 7 ZO! {: ZOBO4 MACARIO R. PEREZ I ED' W7q J&B ENGINEERS & SURVEYORS 13670 DANIELSON ST., SUITE G, POWAY CA 92064 PHONE: (858) 513-1741 FAX (858) 5134744 RCE NO, 20604 EXPIRES: 0913012017 SHEETINDEX SHEET DESCRIPTION i TIRE SHEET 2 SEWER IMPROVEMENT PLAN h R f DNIL r OFCN T VICINITY MAP N'. NOT TO SCALE BMP PROJECT STATUS STANDARD PLANNING AND BUILDING PARKS AND RECREATION SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT �7 6-13-1.7 -t /� GATE SIGN DATE IGN DATE IGN DATE ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS • PUBLIC WORKS DEPARTMENT DRAWING NO. 0 APPROVED: TITLE FOR rd s�� PUBLIC SEWER MAIN EXTENSION 13126-I ism "612341 CAMBRIDGE AVENUE ENCINITAS CA 92007 �., APN: 261-094-07 & 261-094-32 DAB PLANNING CASE NO 1641h CDP SNFFTI nrI LDEV-011751-2016 NOTE: I. CONTRACTOR TO POTHOLE AND VERIFY EXACT LOCA770M OF EVS77NO MAINS PRIOR 10 WORK AND TO THE SARSFACRON OF SDWD. PLAN VIEW SCALE: 1 "=10' LEGEND DESCRIPTION DETAIL OR STD. DWG SYNBOL PROPERTY LINE .................................................. — LOT LINE .................................................. - ROAD CENTERLINE ............................................... — PROPOSED 48" SEWER MANHOLE ... ..... .SDRSD SM-02....... O PROPOSED CLEANOUT ....WAS SC-01 TYPE B .. O PROPOSED 8• SEWER MAIN ............... STD. SP-02 ........ S EXISTING SEWER MAIN ........................................... S EXISTING 12" ACP WATER MAIN .................................. W SEWER DATA TABLE NO. DELTA/BEARING LENGTH DESCRIPTION iO N30°50'32'W 103.68' 8-PVC SEWER MAIN PER SP-02 ' CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS•BUILT ENGINEERING DIVISION APPROVALS /-- FW,�F 1G�11T�S - P T DRAWING NO. 1 NEW ADDRESS & APN. ASBUILT 10/13/2020 SRN SO-21-20 DESCRIPTION: 112-IRON PIPE / PLANS PREPARED UNDER SUPERVISION OF RPC:(TMMFMOFDn APPRfT1fFD PROVEMENT PLAN FOR: HORIZONTAL: 1'=10' RECORD FROM: COUNTY OF SAN DIEGO VERTICAL: 1=10' ELEVATION: 57%9 DATE: I� R.C.E. NO.: 20604 EXP.: 09 30 17 k1 CAMBRIDGE AVENUE ENCINITAS CA 92007(�� 2335 & 2339 APN: //11 3126 261-094-51 & 261-094-52 CD CA) 1 co LDEV-011751-2016