Loading...
2020-14726 SG - LDEV-012509-2020 (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NO TE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORTS TITLED REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION JAVA HUT SECOND -STORY RESIDENCE ADDITION DATED OCTOBER 23, 2018, AND UPDATE LETTER DATED SEPTEMBER 19, 2019, PREPARED BY GEOTECHNICAL EXPLORATION, INC. SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT OF WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 18. IF ANY ARCHAEOLOGICAL, HISTORICAL, OR PALEONTOGICAL RESOURCES ARE INADVERTENTLY DISCOVERED GRADING ACTIVITY, THE PROJECT CONTRACTOR SHALL DIVERT, DIRET OR TEMPORARILY HALT GROUND -DISTURBING ACTIVITIES IN THE AREA OF DISCOVERY TO ALLOW EVALUATION OF THE SIGNIFICANCE OF SUCH RESOURCES. THE PROJECT APPLICANT SHALL IMMEDIATELY NOTIFY DEVELOPMENT SERVICES DEPARTMENT STAFF OF SUCH FINDING AT THE TIME OF DISCOVERY. THE SIGNIFICANCE OF THE DISCOVERED RESOURCES SHALL BE DETERMINED BY A QUALIFIED ARCHAEOLOGIST, HISTORIAN, OR PAL TOLOGIST IN CONSULTATION WITH THE DEVELOPMENT SERVICES DEPARTMENT AND, FOR ARCHEOLOGICAL RESOURCES, THE NATIVE AMERICAN COMMUNITY. THE DEVELOPMENT SERVICES DIRECTOR MUST CONCUR WITH THE EVALUATION PROCEDURES AND ANY NECESSSARY DATA RECOVERY SERVICES BEFORE GRADING ACTIVITIES ARE ALLOWED TO RESUME. 19. AS SPECIFIED BY CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050.5, IF HUMAN ARE FOUND ON THE PROJECT SITE DURING CONSTRUCTION ACITIVITY, THE PERSON RESPONSIBLE FOR THE EXCAVATION, OR HIS OR HER AUTHORIZED REPRESENTATIVE, SHALL IMMEDIATELY NOTIFY THE SAN DIEGO COUNTY CORONER'S OFFICE BY TELEPHONE. NO FURTHER EXCAVATION OR DISTRUBANCE OF THE DISCOVERY OR ANY NEARBY AREA REASONABLY SUSPECTED TO OVERLIE ADJACENT REMAINS, AS DETERMINED BY A QUALIFIED ARCHAEOLOGIST AND/OR A TRADITIONALLY AND CULTURALLY AFFILIATED (TCA) NATIVE AMERICAN MONITOR, SHALL OCCUR UNTIL THECORONER HAS MADE THE NECESSARY FINDINGS AS TO ORIGIN AND DISPOSITION PURSUANT TO PUBLIC RESOURCES CODE 5097.98. IF SUCH A DISCOVERY OCCURS, A TEMPORARY CONSTRUCTION EXCLUSION ZONE SHALL BE ESTABLISHED SURROUNDING THE AREA OF THE DISCOVERY SO THAT THE AREA WOULD BE PROTETED (AS DETERMINED BY THE QUALIFIED ARCHAEOLOGIST AND/OR THE TCA NATIVE AMERICAN MONITOR), AND CONSULTATION AND TREATMENT COULD OCCUR AS PRESCRIBED BY LAW. AS FURTHER DEFINED BY STATE LAW, THE CORONER WOULD DETERMINE WITHIN TWO WORKING DAYS OF BEING NOTIFIED IF THE REMAINS ARE SUBJECT TO HIS OR HER AUTHORITY. IF THE CORONER RECOGNIZES THE REMAINS TO BE NATIVE AMERICAN, HE OR SHE SHALL CONTACT THE NATIVE AMERICAN HERITAGE COMMISSION (NAHC) WITHIN 24 HOURS. THE NAHC WOULD MAKE A DETERMINATION AS TO THE MOST LIKELY DESCENDENT. IF NATIVE AMERICAN REMAINS ARE DISCOVERED, THE REMAINS SHALL BE KEPT IN SITU ("IN PLACE"), OR IN A SECURE LOCATION IN CLOSE PROXIMITY TO WHERE THEY WERE FOUND, AND THE ANALYSIS OF THE REMAINS SHALL ONLY OCCUR ON -SITE IN THE PRESENCE OF THE TCA NATIVE AMERICAN MONITOR. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFF -SITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO EROSION CONTROL PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT DAVID KAPLAN EXISTING PRIOR TO GRADING. AT (760) 944-8000, 24 HOURS A DAY. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE STANDARDS, LAWS AND REGULATIONS. APPROVAL OF THE ENGINEERING INSPECTOR. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDDUCTTED BETWEEN WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. RUN-OFF PRODUCING RAINFALL. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE -CONSTRUCTION 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. AND PERMITTEE. THE PRE -CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2770. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL OR ARE POTENTIALLY UNSAFE. SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS PLAN SHALL BE INCORPORATED HEREON. AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. PRIOR TO FINAL GRADING APPROVAL AND OR gOR FINAL RELEASE OF SECURITY, ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END AN "AS GRADED CERTIFICATION" SHALL BEE PROVIDED STATING: "THE GRADING 9. EACH WORKING DAY WHEN THE FIVE 5 UNDER PERMIT 14726-SG HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCEOF ( ) DAY RAIN PROBABILITY FORECAST WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AS -GRADED PLAN". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND AFTER EACH RAINFALL. SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS STORMWATER POLLUTION CONTROL POST ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE CONSTRUCTION BMP/IMP NOTES EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE AND/OR INTO THE PUBLIC STORM DRAIN SYSTEM. ACCEPTABLE FOR THEIR INTENDED USE. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CON 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL FACILITIES AND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOV MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWA TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE THE APPROVED BMP/IMP FACILITY AND/OR THE TURF/LANDSCAPED AREAS. BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION. IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQU ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE IMP/BMP. REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP A FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP/BMP. SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO 6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE ALTERED WITHOUT A PERMIT FROM THE CITY. WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PE OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND BE OBTAINED. TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPL AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCK TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS GRADING ORDINANCE. HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHA A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS THROUGH A CITY -APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PU ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A MATERIAL. SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK CITY OF ENCINITAS BENCHMARK ENC-32 2" SD. ENG. DEPT. BRASS DISC MARKED "HORIZ CTRL El TC 2." LOCATED IN TOP OF CURB EAST SIDE OF AVENUE, 200 FT. NORTH OF E. STREET AND 2.5' OF THE DRIVEWAY INTO THE CITY OF ENCINITAS ADMINISTRATION OFFICES PER R.O.S. 18416. ELEVATION = 92.004' DATUM = NAVD88 TROL ER RD ATE REA OR PLAN RMIT Y T ABLE TO FLOW RGES BLIC STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT: CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS: A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND/OR CORRUGATED STEEL PANELS/PLATES. CONSTRUCTION VEHICLES: A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL: EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING: CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT: CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON -RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714-1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL E CO AT (760) 436-4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633-2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - ESD - (760)-633-2840 B. GAS & ELECTRIC - SDGE - (760)-438-6200 C. WATER - SAN DIEGUITO WATER DISTRICT-1-800-227-2600 D. TELEPHONE - SBC BELL - (760)-489-3411 E. CABLE TV - COX COMMUNICATIO S-(760)-806-9809 X-2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)-633-2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633-2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. PUBLIC WORKS COASTAL LAND SOLUTIONS, INC. 577 SECOND STREET ENCINITAS, CA 92024 PH (760) 230-6025 FAX (760) 230-6026 CLS#1495ENG AS -BUILT APPROVALS SIG DATE INT. I DATE PLANS PREPARED PUBLIC WORKS PLANNING REVIEWER STEVEN R INSPECTOR G SAN DIEGUITO WATER DISTRICT NOTES 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE. 5. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS. 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18. 0 WNERS CERTIFICATE I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. I (WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITY'S OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OWNER OR OWNER'S AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORK OR CONSTR CTION COVERW IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO TVQ PERMIT OR PROVED PLANS WITHIN THE PRIVATE PROPERTY OR PUBLIC EASFIN NTS. t i SIGNATURE: DA°VID B. KAPLAIV TRUSTEE DATE: f_f-1 _ Zd SIGNATURE: _____ _ _ _______ DATE: THEI KAPLAN FAMILY TRUST U/D/T/ DATED FEB. 9, 2006 SOILS ENGINEER'S CERTIFICATE I, JAIME A. CERROS, A REGISTERED GEOTECHNICAL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON OCTOBER 23, 2018 ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEEER, FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE B CORPORATED IN THE GRADING PLANS AND SPECIFICATIONS. SIGNED:QQ,OFESSjp� EXP. DATE: ------------------------- ti 7P z ,;; GE 002007 m Joe#: ------------------------ `� Exp. 9/30/21 GEOTECHNICAL EXPLORATION, INC. � 7420 TRADE STREET `rT9 �OTECP CV 1NZ P SAN DIEGO CA 92121 OF CA�ZF� 858-549-7222 STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFOMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN, AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBUITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. QROFESSIn BY: 8-6-20 �Q�� �li� R `70� C�`� STEVEN- R. JONES DATE ti RCE 65124 rn � N0. 65124 PLANNING DIVISION cT j%oso 010/z0 SIGN DATE THE SUPERVISION OF DATE: 8-6-20 R.C.E. N0. 65124 EXP. 9-30-21 VICINITY MAP NOT TO SCALE 0 WNER/PERMITTEE DAVE KAPLAN SURFDOG, INC. 1126 S. COAST HWY 101 ENCINITAS, CA 92024 SITE ADDRESS 1126 S. COAST HWY 101 ENCINITAS, CA 92024 APN# 258-316-04 LEGAL DESCRIPTION LOT 4, BLOCK 11, MAP NO. 148 EARTHWORK DATA STEEPEST EXISTING SLOPE ON -SITE = 2H : 1V MAXIMUM VERTICAL DEPTH OF CUT = 1.5 FEET MAXIMUM VERTICAL DEPTH OF FILL = 0 FEET 100 C.Y. CUT 0 C.Y. FILL 0 C.Y. REMEDIAL EXPORT: 100 C.Y. DISTURBED AREA: 5,010 SF QUANTITIES SHOWN DO NOT REFLECT ANY SHRINKAGE AND SWELL FACTORS 045401 4 o _ . 11412f., . IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 3,950 SF IMPERVIOUS AREA AFTER CONSTRUCTION: 3,556 SF INCREASED IMPERVIOUS AREA: 0 SF IMPERVIOUS AREA REPLACED: 3,556 SF SHEET INDEX SHEET NO. 1 TITLE SHEET SHEET NO. 2 SIMPLIFIED GRADING AND DRAINAGE PLAN SHEET NO. 3 EROSION CONTROL PLAN PREPARED BY.• COASTAL LAND SOLUTIONS, INC. 577 SECOND STREET ENCINITAS, CA 92024 760-230-6025 DATE OF SURVEY: AUGUST 2018 BY COASTAL ALND SOLUTIONS, INC. BMP PROJECT STATUS STANDARD PARKS AND RECREATION I SAN DIEGUITO WATER DISTRICT I ENCINITAS FIRE DEPARTMENT Annette Saul c A Q; �,� 0 /03/2020 / 2,6('4 I' T )2n20 SIGN DATE I SIGN DATE I SIGN DATE ENGINEERING DIVISION APPROVALS RECOMMENDED APPROVED Stever Noma kl Ed wcwdlj. W e SIGNATURE EXPIRES 2 YEARS AFTER DATE CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMEN71 DRAWING NO. DA VE KAPLAN, S URFDOG INC. 14 7,26 - SG 1126 S. COAST HWY 101 ENCINITAS, CA 92024 LDEV-012509-2020 PLANNING CASE NO: 17-216 CDP A.P.N. #258-316-04 SHEET 1 OF 3 ri G STEVEN R. JONES SENIOR ENGINEER STEVE NOWAK 9 0 2020 DATE EDWARD J. WIMMER 9 0 2020 DATE J:\CLS1495 Surfdoa SGP 8-6-20 v2 .oro,_____ MINOR GRADING AND DRAINAGE PLAN i Fm GRAPHIC SCALE 1"=10' S.D.R.S.D. = SAN DIEGO REGIONAL STANDARD DRAWINGS PROPERTY BOUNDARY 0 10 20 30 ENCUMBRANCES: EXISTING EASEMENT EXISTING ENCUMBRANCES LISTED BELOW ARE PER A PRELIMINARY TITLE PROPOSED CONTOURS 255 REPORT PREPARED BY FIDELITY NATIONAL TITLE COMPANY DATED JULY 5, 2017 AS ORDER NO 997-25010699-1MB. EXISTING CONTOURS 255 AN EASEMENT FOR PUBLIC HIGHWAY PURPOSES IN THE DOCUMENT EXISTING EDGE OF PAVEMENT EX TC=77.65 \\ O RECORDED IN BOOK 513, PAGE 279 OF O.R. / CENTERLINE - / EX FL=77.10 \ v ` / / EX=7777-\ J I \ �� # . EXISTING WATER MAIN WW :I . • ! \ EXISTING SEWER MAIN S S 1 I EXISTING EMAINBRICK SIDEWALK (PROTEC IIN TOPLACE) -'' ' ' •{'_�. 1 EXISTING SEWER LATERAL S _r ALLEY CONCRETE PANELS - SHALL BE REPLACED TO Chi •. '� NEXT JOINT (6" MIN.) I V EXISTING CURB GUTTER EXISTING WATER SERVICE n LEAD AND DISC MARKED IS 7959" LEAD AND DISC MARKED AND SEPARATED SIDEWALK I : Z - j� -!. (PROTECT IN PLACE) LS 7959" - PROTECT IN TO REMAIN (PROTECT IN PLACE) 1n . •• DISTRICT TO INSTALL 1-1/2" WATER METER PER WAS WS-02, PLACE I �\ EXISTING JOINT POLE ,: : • • I►"' WC-17 AT OWNERS EXPENSE. CONTRACTOR TO INSTALL BACKFLOW PREVENTOR PER WAS WR-O. FROM WATER METER R "LIA� TO BACKFLOW, INSTALL LATERA IN KCASING IN CONCRETE. SDWD AREA DRAIN ✓ FS=77.77 I \ EXISTING WATER METER INSPECTION REQUIRED. 77 D ' DISTRICT TO INSTALL 4" INCHI 1 3.85' ^ \ . rn EG 76. 00 FS=77.60 I ' '' FIRE LINE PER WAS WF-05. EX=77.46 .� D - '' _ CONTRACTOR TO INSTALL „ ' \ TC=77.52 \ Oc BUILDING STEM WALL 3S E 98.13 EXISTING BUILDING BACK FLOW PREVENTOR PER EL= 77.60 PI84� r 2 \ = 6.94 \ -A \ WAS WR-02 FS=77.55 1N EX=77.50 PERMEABLE EX=75.60 EX=77.20 N PAVERS \ \ 4- DO -° EXISTING HARDSCAPE • . • p � FS=75.40 � � - - '• 1SPOUT (TYP. \ \ O ja'EX=77.70 \ \ EX�74.93\`�. ---'\ FS=77.60 \ \ �� EXISTING FENCE X X t EX=75.55 . -113,L I . • .�•• G ' EX.33. • 4 i 4 AREA DRAIN FS=77.55 - \ 8'x21' PARKING \ A _ - EX' SSM{- . ' _, ` . TG=75.33 \ f+ _.'\ 5' y DRAIN TO BUILDING STEM WALL 1% FS=77.50 \ \ EXISTING BLOCK WALL SANITARY SEWER FS=75.65 EL= 77.60 Z Z EX PP '`I, �: WI,� ASPHALT ,/ FS=75.40 FS 76 6 �T7• O '-Fs=7s.7o 5� Fs=77so JA \\ � NEW WATER METER .�,�.- -DEEPEND FOOTING F -76• / (n PROVIDE 5' SEPARATION 1 zx FS=77.55 00\ \ •� BELGARD PERMEABLE PAVING STONE OR EQUAL � BETWEEN SSMH AND I 7''29' 0 2X 6" WITH 1' WIDE OPE ING FS .9 WATER SERVICES (TYP.) / : '•;�• ' ` : Wm F 7537 Ft PLANTS ,; 1R Tw-nao sW� _ - - \ 8 \ NEW BACKFLOW PREVENTOR tp "' ' TENANT LAN R STRIP FS=76.98 TW-7 ' FS=77,O0 DOWNSPOUT O E IS11NG'SI.B I H'w� R BIOR noN 9 BUILDING \ 2" HICK N0.8 AGGREGATE AREA= SF = FF=77.60 L» \ \ 0 4 HICK N0.57 AGGREGATE---_ as 4 M TER E.AB NDO SPACE=7sao PAD=77.10 \BUILDING FOOTPRINT DISTRI ti AT• ( JIER o FS--76.28 DECK \ \ in FS=76.90 _ 1% FS=77.50 _, \ 6" THICK 3/4" CRUSHED ROCK BUILDING .. I I '- EX 7 �0 FS=75.00\ FF=77.00 m A : • .. �� - _-- 1.8% FS=75.Ss �AD=76. FS=76.90 1% FS=77.50 \ N \ DRAINAGE DIRECTION _, I. . ,:. ,.. s.W.C.O _4 Fs=Ss.7556 FLOWLINE SWALE E DOWNSPOUT �_ •80 \ DOWNSPOUT (TYP.) _i, 8'x21' PARKING \ y� TENANT \ -. -')! :..: PARKING a 12"x12" RISER \ �.. •� SPACE N FS=75.58 FS=78.50 TG=77.25 . 7 S.W.C.O _- -- IE=74.95 \ EX37 .10 " FS-76.80 TW=77.00 DOWNSPOUT (TYP.) \ \ PE;RIVMABLE PAVER DETAII. PROPOSED 6" PCC DRIVEWAY r : f;' •;. -i q\ . zr D 1 s=76.90 1 \ \ AND 4 PCC WALKWAYS ftl.1 4 oas PLANTER STRIP 1 RAISED PLANTER \ \ PER GEOTECHNICAL RECOMMENDATIONS 20' AREAS 37TI \ =77.60 Ex=77.so 1 a, \ PROPOSED 4" HMA DRIVEWAY BIORETENTI P RMEABLE PAVERS N I Fs=75.60 = 7.60 1 OVER 12" CLASS II BASE - EX=74.63 _ PARKING 1 FS=78.90 \ EX=75.10 / ' • -' . '' SPACE 1 AREA DRAIN EXISTING STREET TREE TC=75.70 \ _ MEXICAN FAN PALM) \ TG=75.90 IE=74.80 1R SH \ iz IN .. Fs=7aso PAVERSB� (PROTECT IN PLACE)A \ PROPOSED PERVIOUS PAVERS ' SAW' qT-tIN (130 � DOWNSPOUT (TYP.) 81 ix 77 _ --- FS=77.50 •60-\ e \ BRICKS TO F =�0 FS=77.30 77 J ~ = ` % 2% FS=75.77 135 1� - DEEPEND FOOTING 7 i.• 75.33 - FS=76.20 FS= 15 �.: EX= 4.90:.. LEAD AND DISC MARKED BUILDING STEM WALL LS 7959" - PROTECT IN \ \ 3 r PROTECT BUILDING \ \ PLACE '23�E 99.99' AREA DRAIN LANDSCAPE IE=74.60 N84'0� IE=74.78 \ \ CONCRETE CURB - V, ' . - TC= 440. TC=75.70 I \ P/ RETENTION BASIN SHALL BE PROPOSED LANDSCAPE AREA/SWALE SEX=y4:j�1\ EX. 07 \ FS=74.50 LEVEL AND DEPRESSED A EX=74.85 /� THE - _ l� \ MINIMUM OF 6" FROM .ul• :• BIORETENTION PLANTER SURROUNDING GRADE 3' EXISTING BUILDING -t , ) " • •• LEAD AND DISC MARKED BIORETENnON HATCHED AREA REPRESENTS LANDSCAPED AREA=60 SF - \ .y -' ,• `` IS 7959" -PROTECT IN :•' • ' PLACE 6" PCC CURB 3' DEEP TREATEMENT AREA FOR BEST MANAGEMENT EX=74.82 COAST LAW GROUP B \ 6" '-':.' -20' ,.•' (BUILDING ON PROPERTY LINE) 6" PCC CURB 3' DEEP PRACTICE TO BE CONSTRUCTED TO - ' J \ PARKING - -I SPECIFICATIONS OF BIORETENTION DETAILS j• '.J : ,.'_ ' }J - - -I FOOTING APPROXIMATE APPENDIX C-3 OF THE ENCINITAS STORMWATER MANUAL. • I - rTII1I1h�I11J1 rTI 1J11�=IL�I1I_I FS=74.50 AREA NOT TO BE MODIFIED WITHOUT PERMIT FROM THE CITY. .. �I•i _L. III -III -I I I �I - -111=III= 11=III-III=III-III-III= ENCROACHMENT MAINTENANCE AND 2"-3" HARDWOOD MULCH- I11=1 11M I - EXISTING 1 /2 REBAR TO BE PROTECTED O REMOVAL AGREEMENT RECORDED IN PLACE --------------, 2020 AS DOC. 12" MIN. ENGINEERED SOIL*- N0. OF O.R. / PLACE 20 MIL LINER AT 2"- 3/8" GRAVEL ------ RAVEL I I-III-111�1�SIDE FOOTING TO BUILDING TOIS BEG SURVEY PROTECTED M N UMENT PLACE LS7959 ❑ 12" - 3/4" CRUSHED ROCK**� GENERAL NOTES: 6" PCC CURB WITH 1' R/W 1. ANY EXISTING IMPROVEMENTS THAT ARE DAMAGED DURING ED TO PLANTER D COAST HIGHWAY 101 OPENING OVERFLOW SECTION C - BIORETENTION BASIN THE SSATISFACTION TRUCTION AOF LL BTHE RCT CITY ENGINEER RED OPRIOR TO C FINAL PL R/W BIORETENTION NOTTO SCALE APPROVAL. 20' ALLEY PLANTER SEE 2. THE EXISTING SURVEY MONUMENTS SHALL BE PROTECTED DETAIL EXISTING GRADE IN PLACE AS EXISTED IN THE FIELD PRIOR TO CONSTRUCTION 3' 1% FF=77.60 - - - - 2% TC=77.41 AS NOTED. IF ANY MONUMENTS IS DISTURBED OR EX=75.33 EX=75.18 EX=75.18 2% FF=77.00 DECK FS=76.90 , _-- DESTROYED IT SHALL BE REPLACED BY A LICENSE LAND _ - SURVEYOR WITH THE APPROPRIATE RECORD BEING FILED -20 MIL LINER AT SIDE WITH THE COUNTY OF SAN DIEGO. 6%16" FLUSH CURB NEXT TO FOOTING 3. ALL SERVICE LINES TO THE SUBJECT BUILDING SHALL BE BELGARD PERMEABLE PAVERS CONSTRUCTED UNDERGROUND. SEE DETAIL THIS SHEET SECTION A BIORETENTION NOTES SCALE: 1 "=10' BIORETENTION "ENGINEERED SOIL" LAYER SHALL BE MINIMUM 12" BUILDING WALL 6" WIDE x 3' HIGH PCC BUILDING WALL DEEP "SANDY LOAM" SOIL MIX WITH NO MORE THAN 5% CLAY PLANTER WALL WITH CONTENT. THE MIX SHALL CONTAIN 65% SAND, 15% COMPOST 3-#4 BARS HORIZONTAL VARIES FS=77.60 OR HARDWOOD MULCH, AND 20% TOPSOIL FF=77.00 2%, FS=76.90 **3/4" CRUSHED ROCK LAYER SHALL BE MINIMUM OF 12" BUT MAY - BE DEEPENED TO INCREASE THE INFILTRATION AND STORAGE P/L P/L =111=III-II. . '7 �2--3'OOD MULCH ABILITY OF THE BASIN. EXISTING BUILDING -1 - 1= I- I I -III -III- l FS=75.60 AT PROPERTY LINE 12" MIN. ENGINEERED SOIL* =11 =1=1 I -I 1--I I III i ' , ' PLACE 20 MIL LINER AT SIDE OF BASIN NEXT TO BUILDING FOOTING 5. 6 5, 11-I I LI. 1 1- 1 1-1 2"- 3/8" GRAVEL FL=77.52 FS=76.60 -III- THE EFFECTIVE AREA OF THE BASIN SHALL BE FLAT AND LEVEL. FS=77.50 III -I 12" - 3/4" CRUSHED ROCK** EX=77.73 - FS=77.40 6" SOLID PVC, s=1% '• • •• •'. TYPICALLY, THE SURFACE AREA OF THE BIORETENTION BASIN IS 4% 2 . - - - - - - - - - FF=77.60 2 - PLACE 20 MIL LINER AT OF THE IMPERVIOUS AREA. " SIDE NEAR BUILDING S=1%RIEOR 5TEOD0 PVC FOOTING PROPOSED IMPERVIOUS SURFACE = 3,556 SF (DOES NOT INCLUDE PERVIOUS PAVERS/ CONCRETE) REQUIRED BIORETENTION AREA = 3,556 SF X 4% = 142 SF SECTION B SECTION D - BIORETENTION PLANTERS TOTAL PROPOSED AREA = 205 SF Quo �N FRss1-oq� SCALE: 1"=10' NOT TO SCALE c COASTAL LAND SOLUTIONS, INC. rn � NO . 65124 L ENC SECOND STREET sTq CIVI\ ��P ENCINITAS, CA 92024 i� PH (760) 230-6025 TF CF CA`ZFpP 1� FAX (760) 230-6026 CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT APPROVALS sR JDESIUNEDRAWN Y: I CHECKETY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. CITY OF ENCINITAS BENCHMARK ENC-32 2" SD. CO. INT. DATE PLANS PREPARED U E THE SUPERVISION OF RECOMMENDED APPROVED GRADING PLAN FOR: ENG. DEPT. BRASS DISC MARKED "HORIZ CTRL ENC � 7' ` -• AVENUE, LOCATED IN NORTH OF E. STREET SIDE OF AND 2..5' NORTH PUBLIC WORKS 8-6-20 Stewel Nowak EcUW d1 W !✓ply DA VE KAPLAN, S URFDOG INC. OF HE DRIVEWAY INTO HE CITY OF ENCINITAS PLANNING DATE' ` I 1126 S. COAST HWY 101 14'726-SG ADMINISTRATION OFFICES PER R.O.S. 18416. STEVE NOWAK EDWARD J. WIMMER STEVEN R. JWNES DATE R.C.E. N0. 65124 ELEVATION = 92.004' REVIEWER STEVEN R. 9/1W2020 9 10 2020 ENCINITAS, CA 92024 LDEV-012509-2020 DATUM = NAVD88 SENIOR ENGINEER DATE INSPECTOR EXP. 9-30-21 DATE DATE PLANNING CASE NO: 17-216 CDP A.P.N. #258-316-04 SHEET 2 OF 3 EROSION CONTROL PLAN LEGEND 1. SET POSTS AND EXCAVATE A 4BY4IN (10BY10CM) TRENCH UPSLOPE FPOM AND ALONG THE LINE OF POSTS. 2. STAPLE WIPE FENCING TO THE POSTS. SAND/GRAVEL BAGS (2 HIGH) SILT FENCE DESILTING BASIN 00000000 X X— O le 3. ATTACH THE FILTER FABRIC TO THE WIPE FENCE AND EXTEND IT INTO THE TRENCH. 4 IN (10 CM) 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. FILTER FABRIC II /, /� _ WIPE DETAIL SILT FENCE RUNOFF GAP BETWEEN BAGS ACTS AS SPILLWAY TWO LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED DETAIL GRAVEL BAGS NTS GRAPHIC SCALE 1"=10' 0 10 20 30 NTS NOTE: CONSTRUCT SEDIMENT BARRIER AND CHANNELIZE RUNOFF TO SEDIMENT TRAPPING DEVICE COARSE AGGREGATE I \ FI L TER I FABRIC ORIGINAL GRADE \ a ••{• 1, •�•_� \ d \ 1.1' MIN., UNLESS OTHERWISE SPECIFIED BY A SOILS ENGINEER SECTION A —A A "•�' /:-. / , .. \ SILT FENCE SEE \ \ ' • J jJ.-/: •-1 DETAIL THIS SHEET a° a cd iJ 1 '.+•./- 1 -- \ •.-.•V' \ a d ° ° Q ° a ''•. \ ° ° d < WIDTH AS REQUIRED .-.G' \ \ W J A a ° TO ACCOMODATE Q d d a ° d ANTICIPATED TRAFFIC J / J ` — _ — — ^\ \ \ < C d a •I a O Ji 4' RADIUS A J/ MIN. 20, l GRAVEL BAGS SEE J DETAIL THIS SHEET \ \ 4' •• :, •:.::: - \ CONSTRUCTION ENTRANCE _ ,' . .J ,I -/'BRAVEi:pA . S E. \ NTS 16ETM4 THIS. SHEET tuJ '--1.~. _IN .•'•y I LLLLLLL LLLLL \\ `\ EROSION CONTROL L L - �J' •- :'''.: :• L L \ 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT - 1• •: t, r - L BAGS I .; \\ \\ DAVID KAPLAN AT 760-944-8000 ./,. ` ut '.:: I• .: • , 3' .:'•: ) \ \ 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE d' — —_ -- — - \ \ AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL �- ' .. . • NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT _. •� \ \ CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF -•DESILTING BASIN Slfa+ . NCI= SEE' TEMPORARY DEVICES WHEN RAIN IS IMMINENT. % DET THI SHEET ; :. .: - \ \ 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED �•-1' .. •'` _r, ,: _,'. ...' ' - - _-�- \ \ WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES Lo' • • . I \ TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER i • : AFTER EACH RUN OFF PRODUCING RAINFALL. -: / • 1 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL _I .. ,•- '+ :' "�I'+ • ''° MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHEN IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. DESILTING BASIN NOTE. ALL PLAN PNTROL ER 7 GRADING EE ASURES NCORPORAOTED VIDED HEREON. THE APPROVED BIORETENTION BASINS SHALL BE EXCAVATED AND USED 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY AS DESILTING BASINS DURING CONSTRUCION. THE SILT FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK SHALL BE COMPLETELY REMOVED AND THE BIORETENTION DAY. BASINS COMPLETED ONCE FINAL SITE STABILIZATION IS ACHIEVED, PRIOR TO OCCUPANCY AND/OR FINAL. OFESSIT DEVICES "PLACE �Nq� 9REMOVABLE Q\P�\ B(5) DAY AT THEE END OF CHWORKINGDAY WHEN THE FIVE RAIN �p R • EACH PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. co N c-' No. 65124 rn 10. SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE LAND SOLUTIONS, INC. LIJCOASTAL EFFECTIVE COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED WITH 577 SECOND STREET PUNCHED STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 C �� ENCINITAS, CA 92024 S'T CIVI\- ��P OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE STATE qTF PH (760) 230-6025 OF CA\ZF�P OF CALIFORNIA DEPARTMENT OF CONSERVATION. FAX (760) 230-6026 CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT APPROVALS AW CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. SR J CITY OF ENCINITAS BENCHMARK ENC-32 2" SD. CO. ENG. DEPT. BRASS DISC MARKED "HORIZ CTRL ENC INT. DATE PLANS PREPARED THE SUPERVISION OF RECOMMENDED APPROVED EROSION CONTROL PLAN FOR: AVENUE, 00 FT. NORTH NORTH OF EN TOP OF . STREET ANDRB EAST 2..5' NOOF LRTH CAN PUBLIC WORKS DATE: 8-6-20 7' St -eve, NO-wak EcUw d1 W DA VE KAPLAN, SURFDOG INC. 14'726-SG OF THE DRIVEWAY INTO THE CITY OF ENCINITAS PLANNING `j STEVE NOWAK EDWARD J. WIMMER 1126 S. COAST HWY 101 ADMINISTRATION OFFICES PER R.O.S. 18416. STEVEN R. JONES DATE REVIEWER R.C.E. N0. 65124 9/10/2020 9 IO 20Z0 ENCINITAS, CA 92024 LDEV-012509-2020 ELEVATION = 92.004' STEVEN R S DATUM = NAVD88 SENIOR ENGINEER DATE INSPECTOR EXP. 9-30-21 DATE DATE PLANNING CASE NO: 17-216 CDP A.P.N. #258-316-04 SHEET 3 OF 3