RIGHT OF WAY NOTE
OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DIVISION AT LEAST 48
HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN
ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE
OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS.
DRAINAGE NOTE
NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER
IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE
CONVEYED TO AN APPROVED DRAINAGE FACILITY.
UTILITY NOTE
ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND.
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF
ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR
REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR
INSPECTION.
2. THE SOILS REPORT TITLED " N/A PREPARED BY N/A DATED
N/A , AND UPDATE DATED NIA PROJECT# N/A SHALL BE
CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE
WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT.
3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY
OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS.
4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING.
5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT
PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE
REPLACED OR REPAIRED TO CONDITION
EXISTING PRIOR TO GRADING.
6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS
DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL
ENGINEER OR A LICENSED LAND
SURVEYOR.
7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING
SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL
SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (1/2) MILE OF A STRUCTURE FOR
HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M.
NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS,
9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE- CONSTRUCTION MEETING HAS BEEN
HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS
ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE
SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING ( 760) 633 -2770.
10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION
SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE
CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL
CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE
HAULING OPERATION.
11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL
GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL
BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO: 14208 -SG HAS BEEN PERFORMED IN
SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADN-G ALAN OR AS SHOWN ON THE
ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND
SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION.
12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER
HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF
FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS
REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF
GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR
UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE
ACCEPTABLE FOR THEIR INTENDED USE.
13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE
DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID
DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL
MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT
DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED.
14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN
ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE
MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS
TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL
GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN
COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS.
15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH
SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL
BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A
NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR
EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE
REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN
ACCORDANCE WITH THE GRADING ORDINANCE.
16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED,
PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE
AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM
UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS
ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL.
17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN
FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY
PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE
PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO
GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE
CITY TREE DRIP LINE AREA ( THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF
THE TREE CANOPY PROJECTION ON THE GROUND) . IF A CITY TREE IS NOT CLEARLY LABELED TO
BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN
CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO
ADDRESS THE TREE REMOVAL.
18. IF ANY ARCHAEOLOGICAL, HISTORICAL, OR PALEONTOGICAL RESOURCES ARE
INADVERTENTLY DISCOVERED GRADING ACTIVITY, THE PROJECT CONTRACTOR SHALL DIVERT,
DIRECT OR TEMPORARILY HALT GROUND - DISTURBING ACTIVITIES IN THE AREA OF DISCOVERY TO
ALLOW EVALUATION OF THE SIGNIFICANCE OF SUCH RESOURCES. THE PROJECT APPLICANT SHALL
IMMEDIATELY NOTIFY DEVELOPMENT SERVICES DEPARTMENT STAFF OF SUCH FINDING AT THE
TIME OF DISCOVERY. THE SIGNIFICANCE OF THE DISCOVERED RESOURCE (S) SHALL BE
DETERMINED BY A QUALIFIED ARCHAEOLOGIST, HISTORIAN, OR PALEOTOLOGIST IN CONSULTATION
WITH THE DEVELOPMENT SERVICES DEPARTMENT AND, FOR ARCHEOLOGICAL RESOURCES, THE
NATIVE AMERICAN COMMUNITY. THE DEVELOPMENT SERVICES DIRECTOR MUST CONCUR WITH THE
EVALUATION PROCEDURES AND ANY NECESSARY DATA RECOVERY SERVICES BEFORE GRADING
ACTIVITIES ARE ALLOWED TO RESUME.
19. AS SPECIFIED BY CALIFORNIA HEALTH AND SAFETY CODE SECTION 7050.5, IF HUMAN REMAINS
ARE FOUND ON THE PROJECT SITE DURING CONSTRUCTION ACITIVITY, THE PERSON RESPONSIBLE
FOR THE EXCAVATION, OR HIS OR HER AUTHORIZED REPRESENTATIVE, SHALL IMMEDIATELY NOTIFY
THE SAN DIEGO COUNTY CORONER'S OFFICE BY TELEPHONE. NO FURTHER EXCAVATION OR
DISTURBANCE OF THE DISCOVERY OR ANY NEARBY AREA REASONABLY SUSPECTED TO OVERLIE
ADJACENT REMAINS, AS DETERMINED BY A QUALIFIED ARCHAEOLOGIST AND /OR A TRADITIONALLY
AND CULTURALLY AFFILIATED (TCA) NATIVE AMERICAN MONITOR, SHALL OCCUR UNTIL THE
CORONER HAS MADE THE NECESSARY FINDINGS AS TO ORIGIN AND DISPOSITION PURSUANT TO
PUBLIC RESOURCES CODE 5097.98. IF SUCH A DISCOVERY OCCURS, A TEMPORARY CONSTRUCTION
EXCLUSION ZONE SHALL BE ESTABLISHED SURROUNDING THE AREA OF THE DISCOVERY SO THAT
THE AREA WOULD BE PROTECTED (AS DETERMINED BY THE QUALIFIED ARCHAEOLOGIST AND /OR
THE TCA NATIVE AMERICAN MONITOR) AND CONSULTATION AND TREATMENT COULD OCCUR AS
PRESCRIBED BY LAW. AS FURTHER DEFINED BY STATE LAW, THE CORONER WOULD DETERMINE
WITHIN TWO WORKING DAYS OF BEING NOTIFIED IF THE REMAINS ARE SUBJECT TO HIS OR HER
AUTHORITY. IF THE CORONER RECOGNIZES THE REMAINS TO BE NATIVE AMERICAN, HE OR SHE
SHALL CONTACT THE NATIVE AMERICAN HERITAGE COMMISSION (NAHC) WITHIN 24 HOURS. THE
NAHC WOULD MAKE A DETERMINATION AS TO THE MOST LIKELY DESCENDENT. IF NATIVE AMERICAN
REMAINS ARE DISCOVERED, THE REMAINS SHALL BE KEPT IN SITU (_ IN PLACE_ ) , OR IN A
SECURE LOCATION IN CLOSE PROXIMITY TO WHERE THEY WERE FOUND, AND THE ANALYSIS OF THE
REMAINS SHALL ONLY OCCUR ON -SITE IN THE PRESENCE OF THE TCA NATIVE AMERICAN MONITOR.
EROSION CONTROL
1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT JEFF ZERBONI AT(1858) 342-7960 ,
24 HOURS A DAY.
2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES
DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15) . ALL NECESSARY MATERIALS SHALL BE
STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID
CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT.
3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE
ENGINEERING INSPECTOR.
4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO
THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL.
5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE
REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN
CIRCUMSTANCES WHICH MAY ARISE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO
PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE.
7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE
INCORPORATED HEREON.
8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF
SLOPE AT THE CONCLUSION OF EACH WORK DAY.
9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH
WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT
(40 %) . SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES
1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS
SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS
PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN
SYSTEM.
2, GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL
NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY.
3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES
AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE
FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY
AND /OR THE TURF /LANDSCAPED AREAS.
4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA
UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP.
5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP /BMP AREA OR HAVE
ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE
IT TO AN ADEQUATE IMP /BMP.
6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED
WITHOUT A PERMIT FROM THE CITY.
7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY
REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED.
8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM
WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN
IMPERVIOUS, NON - COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE
ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM
SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE
DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE
AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN
AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES
THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A
CITY - APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER
SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE
REQUIRED FOR THIS STRUCTURE.
STORMWATER POLLUTION_ CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES
CONCRETE WASHOUT
CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE
WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE, IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR,
STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER.
CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION.
CONSTRUCTION SITE ACCESS
A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT
TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED
STEEL PANELS /PLATES,
CONSTRUCTION VEHICLES
A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES
PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE.
EROSION CONTROL
EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE
PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS,
ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX.
NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER.
DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR
SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES.
REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN
PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS
UNNECESSARILY; THEY HELP DECREASE EROSION.
TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR
EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL
GRASSES TO SHIELD AND BIND THE SOIL.
PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE.
WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED.
ON -SITE CONSTRUCTION MATERIAL STORAGE
STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR
SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE
SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM
STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE
BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND
STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND
PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES.
TRAINING
CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE
FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL
BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER (S) AND THE PRIME CONTRACTOR MUST
INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES.
WASTE MANAGEMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION
MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE
CONVEYANCE SYSTEM IS STRICTLY PROHIBITED.
NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED
AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR
LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN
STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY
TRASH MATERIAL.
MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT
AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON - RECYCLABLE MATERIALS MUST BE TAKEN
TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF
HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT ( 800) 714 -1195. FOR INFORMATION ON
LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT ( 760) 436 -4151.
POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND
THE SITE.
PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL
PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS
SURFACES.
ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST
ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE
FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT
THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT ( 760) 633 -2770.
NOTIFICATIONS
1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE
OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES
EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO
ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK:
A. SEWERS - CSD /ESD - ( 760) - 633 -2770 LWD 760 - 753 -0155
B. GAS & ELECTRIC - SDGE - ( 760) -438 -6200
C. WATER - OMWD - 760 - 753 -6466
D. TELEPHONE - SBC BELL - ( 760) - 489 -3411
E. CABLE TV - COX COMMUNICATIONS- ( 760) - 806 -9809 X -2233
2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS
PROJECT. PHONE: ( 760) - 633 -2770.
3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: ( 760) 633 -2770. ALL WORK
PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL.
EARTHWORK DATA
STEEPEST EXISTING NATURAL SLOPE ON -SITE = 1 H: 1 V
MAXIMUM VERTICAL DEPTH OF CUT= 0 '
MAXIMUM VERTICAL DEPTH OF FILL = 0
CUT = 25.5 C.Y. FILL = 0 C.Y.
EXPORT C.Y.
REMEDIAL = C.Y. ( 'REMOVAL AND RECOMPACTION UNDER AND 'OUTSIDE OF BUILDING AREAS)
DISTURBED AREA = 1,876 SQ. FT. = 0.043 AC.
IMPERVIOUS AREA
IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 4,539.49 SOFT
IMPERVIOUS AREA AFTER CONSTRUCTION: 4,539.49SQFT
INCREASE IN IMPERVIOUS AREA: 0 SQFT
IMPERVIOUS AREA REPLACED: 0 SOFT
OWNER
SITE
APPROVED
JE HO CAPITAL LLC
BENCHMARK
AS -BUILT APPROVALS
4241 JUTLAND DRIVE #205 SAN DIEGO, CA 92117
DRAWN BY:
CHECKED BY:
858 -342 -7960
CITY OF ENCINITAS
- DEVELOPMENT SERVICES DEPARTMENT
FM
JSM
SITE ADDRESS
2 60 L� ONE JACK ROAD ENCINITAS, CA 92024
o
cY
APN: 264- 173 -19
INT.
DATE
P ANS PRE ARED UNDER SUPERVISION OF
DATE: 6/24/19
R.C.E. NO.: 20604
GARIO R. PE EZ EXP.: 9/30/2019
RECD APPROV_
OWAK E WARD J MMER
CITY E IG ER
r,
` Z 20
DATE DATE
L14i
LONE JACK
o
LEGAL DESCRIPTION
"
THAT PORTION OF BLOCK 76 OF THE OLIVEHAIN v
PER MAP NO. 326. �r°�
DEL NORTE
MACARIO R. PEREZ DATE
z EL
C AMINO
N;
DEl 107t
OWNER'S CERTIFICATE o
RECORD FROM: CITY OR ENCINITAS SURVEY
CONTROL NETWORK, RS 18416.
U
I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR
GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL
GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF
ELEVATION: 120564 DATUM: NAVD88
SENIOR ENGINEER DATE
THE SITE.
VICINITY MAP
I (WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITY'S
N.T.S.
OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST
ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES,
DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING
OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY
ACTS OR OMISSIONS OF OWNER OR OWNER'S AGENTS, EMPLOYEES,
CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES
FOR ANY AND ALL R
WO K OR CONSTRUCTION COVERED IN THE PERMIT OR
CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR APPROVED PLANS
WITHIN THE PRIVATE PROPS TY OR PUBLIC EASEMENTS.
SIGNATURE: rr w DATE: O1c�
SOILS ENGINEER'S CERTIFICATE
I, N/A A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS
iff7RE7FFE_L_D70_T APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL
CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON N/A AND FOR
AN UPDATE ON N/A . ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS, WITH MY
RECOMMENDATIO@T-RA7 BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE
REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS
REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS.
SIGNED:
RCE NO.: N/A
EXP. DATE: N/A
JOB #: N/A
COMPANY
ADDRESS
PHONE
STATEMENT OF ENGINEER OF WORK
THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH
THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE
ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE
RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER
CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY
THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS
NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE
PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS
OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS
THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY
INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER
AGENTS OR EMP YEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND
ARISING OUT OF E WORK [FOR NGINEER.
SIGNATURE: DATE: 6/24/19
J &B ENGINEERS, SURVEYORS
13670 DANIELSON STREET SUITE G POWAY, CA 92068
858 - 513 -1741
RCE EXPIRES 9/30/2019
SHEETINDEX
TITLE SHEET 1
SIMPLIFIED /MINOR GRADING PLAN 2
NOTE
THE INTENT OF THIS GRADING PLAN /PERMIT IS TO REMOVE UNDOCUMENTED FILL AND
RETURN THE SITE TO ITS PREEXISTING NATURAL CONDITION SO SATISFY AND ACTIVE
CODE ENFORCEMENT VIOLATION. ALL DISTURBED AREAS SHALL BE REVEGETATED AND
TEMPORARILY IRRIGATED UNTIL VEGETATION IS ESTABLISHED.
BMP PROJECT STATUS 1
4
•
I PUBLIC WORKS I PLANNING DIVISION I ENCINITAS FIRE DEPARTMENT IS
S DATE SIGNI DATE
CHANGE NO.
DESCRIPTION
APPROVED
DATE
BENCHMARK
AS -BUILT APPROVALS
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ENGINEERING DIVISION APPRO LS
CITY OF ENCINITAS
- DEVELOPMENT SERVICES DEPARTMENT
FM
JSM
JS
DESCRIPTION: 2.5" BRASS DISC ENC -20
LOCATION: SW OF CONC. PEDESTAL FOR FH.
E OF RANCHO STA_FE RD.. 100' S EL CAMINO
INT.
DATE
P ANS PRE ARED UNDER SUPERVISION OF
DATE: 6/24/19
R.C.E. NO.: 20604
GARIO R. PE EZ EXP.: 9/30/2019
RECD APPROV_
OWAK E WARD J MMER
CITY E IG ER
r,
` Z 20
DATE DATE
TITLE SHEET:
2760 LONE JACK ROAD
ENCINITAS CA 92024
APN: 264 -173-19
PLANNING CASE NO: �/ /�} TPM /TM /CDP /DR/MUPlMIN /EIA, etc.
ADRAWING
PUBLIC WORKS
DEL NORTE
MACARIO R. PEREZ DATE
PLANNING
RECORD FROM: CITY OR ENCINITAS SURVEY
CONTROL NETWORK, RS 18416.
REVIEWER
ELEVATION: 120564 DATUM: NAVD88
SENIOR ENGINEER DATE
INSPECTOR
v.
0
rn
U �
3
C) Lo
a
k e
0
L a
y _ a
Z `F
to q
z zo
rn
°o
m
OD
v
rn
N
N
'3
25'
i
c 25' F
o° RETAINING WALL PER i , .� rh , w I
SEPARATE PERMIT, �Z
a
_ O � a.
FF
i o �4 Q Q o
IF F/ v .viii ,�r, j � x } �,2 ! �a O cli
Cl) % EXISTING RESIDENCE r ;, 3 _ °
z 5 v a �� �Q/ ° w
��
fLu
EXIST. BLOCK z
WALL
�U 4 w
LEGEND
DESCRIPTION DETAIL OR STD. DWG SYMBOL
PROPERTY LINE .........................................................
- - - - -_-
LOTLINE ........................ ...............................
ROAD CENTERLINE ....................... ...............................
- -- -
EXISTING BUILDING ...................... ...............................
p
EXISTING BLOCK WALL
?
EXISTING UTILITIES ...................... ...............................
EXISTING FENCE ........................ ...............................
EXISTING EDGE OF PAVEMENT ... .. .................. ...............
__-
EXISTING SPOT ELEVATION ............. ...............................
X 83 . 3
EXISTING CONTOUR ...... ....... ......... ...........................
EXISTING A.C. PAVEMENT ............... ...............................
EXISTING BRICK PAVERS ............... ...............................
EXISTING TREES
............................. ................
.........
PROPOSEDIMPROVEMENTS
PROPOSED CONTOUR .................... ...............................
70
DAYLIGHT .............................. ...............................
SILT FENCE .......................... PER
.... ..SC -1 .............................
ENTRANCE /OUTLET TIRE WASH .. ..PER. TC 73 .... . ...............
. ...
CONSTRUCTION NOTES
1O EXISTING AC DRIVEWAY WILL BE RESURFACED AND IS NOT TO BE REMOVED AND REPLACED.
2OREMOVE EXISTING FILL AND RESTORE TO ITS NATURAL CONDITION AND REVEGETATED. USE
NATIVE HYDROSEED MIX WITH BFM AND TEMPORARY IRRIGATION.
OINSTALL SILT FENCE PER SC -1.
4O INSTALL ENTRANCE /OUTLET TIRE WASH PER TC -3.
NOTE
THE INTENT OF THIS GRADING PLAN /PERMIT IS TO REMOVE UNDOCUMENTED FILL AND
RETURN THE SITE TO ITS PREEXISTING NATURAL CONDITION SO SATISFY AND ACTIVE
CODE ENFORCEMENT VIOLATION. ALL DISTURBED AREAS SHALL BE REVEGETATED AND
TEMPORARILY IRRIGATED UNTIL VEGETATION IS ESTABLISHED.
i
4
3
F-� O
to
j EXIST DAMAGED
PAVERS TO _ @E W
j REPLACED BY NEW EXI T. DRAINAGE DITCH
D
PAVER
r '<
�- E7A"f, !BRICK WALL
i - 4 ,
1
a
w „
� 171 I
� RETAINING WALL PER
SEPARATE PERMIT
1�I �
5
6
.. 1� 3-j
All
,
r
r
r
�►� r - i �, a s� i
as
�r N73 °46'18'
44-03 .
i
-„?�� TINE r � � - _ �.
--
- EXIST R; 1
WAT�
METE 0`IR�AAIN
w u R T`
nilG. �
a
I GRAPHIC SCALE
I
10 0 5 10 20
j
f ( IN FEET) 1
1 inch = 10 ft.
CHANGE NO. DESCRIPTION APPROVED DATE DESIGNED BY: DRAWN BY: CHECKED BY:
BENCHMARK AS -BUILT APPROVALS FM JSM JS ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. I
DESCRIPTION: 2.5 BRASS DISC,_ENC 20 INT. DATE AN S PR PARED NDER SUPERVISION OF RECO APOV�D'
E OF RANCHO STA. FE RD. _100 S EL CAMINO SIMPLIFIED / MINOR GRADING PLAN FOR:
LOCATION. SW OF CONC. PEDESTAL FOR PUBLIC WORKS DATE: 6/24/19 C %sJI�.� L--- -� 2760 LONE JACK ROAD
DE<NORTE NO MACARIO R. PEREZ DATE — 14208 -SG
PLANNING ENOWAK EDWARD J.W MER ENCINITAS CA 92024
RECORD FROM: CITY OR ENCINITAS SURVEY_ R.C.E. NO.: 20604 CITY GIN s
CONTROL NETWORK RS_18416. ___ REVIEWER •� APN: 264 - 173 -19
ELEVATION 120.564 DATUM: NAVD88 SENIOR ENGINEER DATE INSPECTOR MACARIO R. PEREZ EXP.: 9/30/2019 DATE DAT PLANNING CASE NO: AIM TPM /TM /CDP /DR/MUP /MIN /EIA, etc. SHEET 2 OF 2
N
U d'
7
3�
2�
ro
a�
k e
0
Z � y
�aw