Loading...
2009-10375 GLine: 6 I � As 3c (e - T Y O F E N C I N I T 7 A.- 4INEERING SERVICES DEPARTML_.2 505 S. VULCAN AVE. ENCINITAS, CA 92024 GRADING PERMIT PERMIT NO.: 10375GI PARCEL NO. : 257 -501 -0800 JOB SITE ADDRESS: 1010 N EL CAMINO REAL APPLICANT NAME TARGET CORPORATION MAILING ADDRESS: 1000 NICOLLET MALL CITY: MINNEAPOLIS STATE: MN ZIP CONTRACTOR : WHITING- TURNER CONTRACTING LICENSE NO.: 311107 ENGINEER : PACIFIC LAND SERVICES /KRISTEN HANSON PERMIT ISSUE DATE: 10 /11 /10 PERMIT TE: 8 11 PERMIT ISSUED BY INS T RON BRADY ------------------- - - - - -- PERMIT FEES & DEPOSITS PLAN NO.: CASE NO.: 08161 / CDP PHONE NO.: 612- 761 -7289 55403- PHONE NO.: 858- 792 -0600 LICENSE TYPE: A/B PHONE NO.: 925- 680 -6406 �Z 1. PERMIT FEE .00 2. GIS MAP FEE .00 3. INSPECTION FEE 11,760.61 4. INSPECTION DEPOSIT: .00 5. NPDES INSPT FEE 2,352.12 6. SECURITY DEPOSIT 325,353.70 7. FLOOD CONTROL FE .00 8. TRAFFIC FEE .00 9. IN -LIEU UNDERGRN .00 10.IN -LIEU IMPROVMT .00 ll.PLAN CHECK FEE .00 12.PLAN CHECK DEPOSIT: .00 ----- ----- --------- - - - - -- DESCRIPTION OF WORK -------- ----------------- - -- - -- PERMIT TO GUARANTEE BOTH PERFORMANCE AND LABOR /MATERIALS, FOR EARTHWORK, DRAINAGE, PRIVATE IMPROVEMENTS AND EROSION CONTROL. CONTRACTOR MUST MAINTAIN TRAFFIC CONTROL AT ALL TIMES PER W.A.T.C.H. STANDARDS OR APPROVED PLAN. LETTER DATED MAY 11, 2010 APPLIES. - - -- INSPECTION ---------- - - - - -- DATE -- - - - - -- INSPECTOR'S.SIGNATURE - - -- INITIAL INSPECTION 1c)-(( — 10 COMPACTION REPORT RECEIVED .� ENGINEER CERT. RECEIVED ROUGH GRADING INSPECTION FINAL INSPECTION I HEREBY ACKNOWLEDGE THAT I HAVE READ THE APPLICATION AND STATE THAT THE INFORMATION IS CORRECT AND AGREE TO COMPLY WITH ALL CITY ORDINANCES AND STATE LAWS REGULATING EXCAVATING AND GRADING, AND THE PROVISIONS AND CONDITIONS OF ANY PERMIT ISSUED PURSUANT TO THIS APPLICATION. SIGNATURE DA S GNED o�nas J� k�6� �s /, T59- 79.2 - 06 00 PRINT NAME TELEPHONE NUMBER CIRCLE ONE: 1. OWNER 2. AGENT 3. OTHER May 11, 2010 Encinitas Town Center Associates I, LLC. 1010 N. El Camino Real Encinitas, CA 92024 Re: Permit issuance requirements for: Application 10375 -G Case #: 08 -161 DR/CDP Site Address: 1010 N. El Camino Real APN: 257 - 501 -08 This letter summarizes the requirements for pulling your Engineering Permit for drawing 10375 -G. Your approved plan will remain valid for one year. If the permit is not issued within six months from the date of approval of the drawings, the plans will be subject to review by City staff for compliance with current codes and regulations before a permit can be issued, and changes to the approved plans as well as additional fees may be required. Please read through this letter carefully and contact the City with any questions you may have. It contains information about many requirements that may apply to your project and can make the process clearer and easier for you. In order to obtain the permits to construct the work shown on your approved plans, you will need to satisfy the requirements below. All of the items listed below must be submitted to the Engineering front counter kind will not be accepted. Your project planchecker will not accept any of the documents listed on behalf of the Engineering front counter staff; all items must be submitted to the front counter directly together and at one time. The correct number of each of the requested documents must be provided; copies of documents submitted to the City during plancheck do not reduce the necessary quantities listed below. (1) Provide 4 print sets of the approved drawing 10375 -G. Provide 2 copies of "Geotechnical Exploration Report" prepared by PSI, Inc. dated March 29, 2005 and 2 copies of update letter dated June 26, 2009. Submit 2 copies of the approved, signed (not draft) Resolution of Approval or Notice of Decision for Planning Case # 08 -161 CDP /DR, to be routed by the City to inspector and file. (2) Post Security Deposits to guarantee all of the work shown on your approved drawings. The amounts of security deposits are determined directly from the Approved Engineer's Cost Estimate generated by your engineer according to a set of predetermined unit prices for each kind of work shown on your plans. You will be required to post security deposit(s) as follows: (a) Security Deposit for Grading Permit 10375 -G: in the amount $325.353.70 to guarantee both performance and labor/ materials for earthwork, drainage, private improvements, and erosion control. (b) N/A (c) N/A (d) N/A A minimum of 20% and up to 100% of the amount listed in item(s) 2(a) must be in the form of cash, certificate of deposit, letter of credit, or an assignment of account. Up to 80% of the amount listed in item 2(a) may be in the form of auto- renewing Performance and Labor and Materials Bonds issued by a State of California licensed surety company. Up to 100% of the amount(s) listed in item(s) 2(b), 2(c), and /or 2(d) may be in the form of auto - renewing Labor and Materials bonds issued by a State of California licensed surety company. Cash, certificates of deposit, letters of credit, and assignments of account are also acceptable financial instruments. If a certificate of deposit (CD) will be obtained to secure the entire amount(s) listed in item(s) 2(a) and /or 2(b), two separate CD's for 25% and 75% of the amount(s) listed in item(s) 2(a) and /or 2(b) should be obtained in order to facilitate any future partial release of those securities. CD's posted may be of any term but must be auto - renewing and must specify the City of Encinitas as a certificate holder and include a clause that until the City of Encinitas provides a written request for release of the CD, the balance shall be available to the City upon its sole request. The format of any financial instrument is subject to City approval, may be in the owner's name only, and must list the City of Encinitas as a Certificate Holder. For any questions regarding how to post securities, bonding, or the required format of securities. please contact Debra Geishart at 760- 633 -2779. (3) Pay non - refundable fees as listed below: Fee T e _ Amount Grading Inspection $11,760.61 NPDES Inspection (Grading) $2,352.12 The grading and improvement inspection fees are calculated based on 5% of first $100,000.00 of the approved Engineer's cost estimate dated March 17, 2010 and 3% of the cost estimate over $100,000.00. The NPDES inspection fee is assessed as 1% of the first $100,000.00 of the approved Engineer's cost estimate and 0.6% of the cost estimate over $100,000.00. The flood control fee is assessed at a rate of $0.21 per square foot of net new impervious surface area for driveway and parking areas as created per the approved plan. (4) Provide the name, address, telephone number, state license number, and license type of the construction contractor. The construction of any imorovements within the public right -of -way or public easements is restricted to qualified contractors possessing the required state license as listed in the table below. The contractor must also have on file with the City current evidence of one million dollar liability insurance listing the City of Encinitas as co- insured. Additional requirements are described in the handout "Requirements for Proof of Insurance" available at the Engineering front counter. Type Description Work to be Done A General Engineering any & all C -8 Concrete apron/curb/gutter/ramp/sidewalk C -10 Electrical lighting/signals C -12 Grading 8 Paving any surface, certain drain - basins /channels C -27 Landscaping plantinglirrigationffencing & other amenities C -29 Masonry retaining walls C -32 Parking &Highway Improvement signage /striping /safety C -34 Pipeline sanitary sewer /storm drain (5) Permits are valid for no more than one year from the date of issuance and may expire earlier due to expirations of letter of credit and/or insurance policies. (6) This project does not propose land disturbance in excess of one acre and is exempt from the State Storm Water Pollution Prevention Plan (SWPPP) requirement. An erosion control plan shall be implemented per the approved grading plan. Preconstruction Meeting: A preconstruction meeting at the project site is mandatory for all projects. The preconstruction meeting may not be scheduled until the Engineering permit(s) have been issued, and the applicant/contractor must give the assigned Engineering inspector a minimum of 48 hours advance notice prior to the scheduled meeting time. Right -of -Way Construction Permit: A separate right -of -way construction permit will be required for any work in the public right -of -way or public easements. Typically, this work may include construction or reconstruction of a portion of the driveway within the public right -of -way, excavation, backfill, and resurfacing to install electric, gas, telephone, and cable television lines, or water and sewer connections. A permit fee of $300.00 per application and a site plan, preferably the work order issued by the public utility, will be required. Contractor license and insurance requirements apply. Permits must be issued at least 48 hours in advance of the start of work. Haul Routes, Traffic Control Plans, and Transportation Permits: These separate permits may be required for your project and are handled by the Traffic Engineering Division. A fee of $250.00 is required for traffic control plans. For more details, contact Raymond Guarnes, Engineering Technician, at (760) 633 -2704. Release of Project Securities: The partial or complete release of oroiect securities is initiated automatically by the City after submission of satisfactory as -built drawings to the City and approval by the oroiect Engineerino inspector. Applicant requests cannot be addressed without release approval from the proiect inspector. The processing and release of securities may take up to 4 weeks after the release process is initiated by the project Engineering inspector. Any cash releases will be mailed to the address on this letter unless the City is otherwise notified, and all letters mailed to a financial institution will be copied to the owner listed hereon. Satisfactory completion of Final Inspection certified by the project Engineering inspector is a prerequisite to full release of the Security Deposit assigned to any Grading Permit. A sum in the amount of 25% of the securities posted for improvement permits will be held for a one -year warranty period, and a release is automatically initiated at the end of that warranty period. Construction Changes: Construction changes prepared by the Engineer of Work will be required for all changes to the approved plans. Requests for construction change approval should be submitted to the Engineering Services Department front counter as redlined mark -ups on 2 blueline prints of the approved Drawing. Changes are subject to approval prior to field implementation. Substantial increases in valuation due to the proposed changes may be cause for assessment and collection of additional inspection fees and security deposits. Construction change fees of $200.00 and $350.00 will be assessed for minor and major construction changes, respectively. Construction changes necessitating a new plan sheet will be assessed the per -sheet plancheck and NPDES plancheck fees in lieu of the construction change fee. Construction changes not previously approved and submitted as as -built drawings at the end of the construction process will be rejected and the securities release will be delayed. Change of Ownership: If a change of ownership occurs following approval of the drawing(s), the new owner will be required to submit to the City a construction change revising the title sheet of the plan to reflect the new ownership. The construction change shall be submitted to the Engineering front counter as redline mark -ups on two blueline prints of the approved drawing together with two copies of the grant deed or title report reflecting the new ownership. Construction change fees apply. The current owner will be required to post new securities to replace those held by the City under the name of the former owner, and the securities posted by the former owner will be released when the replacement securities have been received and approved by the City. Change of Engineer of Work: If a change in engineer of work occurs following the approval of the drawing(s), a construction change shall be submitted for review and approval by the Engineering Department. Two copies of the forms for the assumption of responsibility by the new engineer and the release of responsibility by the former engineer shall be completed and submitted to the City. Construction change fees apply. As- builts: Project as -built drawings prepared by the Engineer of Work will be required prior to Final Grading acceptance by Engineering Services. Changes to the approved plans require a construction change to be submitted to the City prior to field implementation. Construction changes may not be submitted as as- builts at the end of the construction process. This letter does not change owner or successor -in- interest obligations. If there should be a substantial delay in the start of your project or a change of ownership, please contact the City to request an update. Should you have questions regarding the posting of securities, please contact Debra Geishart, who processes all Engineering securities, at (760) 633 -2779. Should you have any other questions, please contact me at (760) 633 -2867 or visit the Engineering Counter at the Civic Center to speak with an Engineering Technician. Sincerely, Steven Nowak Assistant Civil Engineer cc John Warren, Pacific Land Services Debbie Geishart, Engineering Technician Greg Shields, Senior Civil Engineer Masih Maher, Senior Civil Engineer permit/file Enc Application Requirements for Proof of Insurance Security Obligation Information ��� , Information L/'��ff .ToBuild On Engineering • Consultlng • TesHng June 26, 2009 Target Corporation 1000 Nicollet Mall, TPN -12G Minneapolis, MN 55403 Attention: Mr. David Henry Subject: Additional Engineering Services R Recommendations Percolation Testing & Pavement Recommendations Proposed Additions to Target Store T -1029 1010 N. El Camino Real, Encinitas, California PSI Project No. 875 -55052 (0056131) NOV 5 2oog References: Professional Service Industries, Inc. (PSI), 2008, Update of Seismic Design Parameters, Proposed Additions to Target Store T -1029, 1010 N. El Camino Real, Encinitas, California, PSI Project No. 873- 85076, dated October 15, 2008. Professional Service Industries, Inc. (PSI), 2005, Geotechnical Exploration Report, Proposed Expansion of Target Store T -1029, 1010 North El Camino Real, Encinitas, California, dated March 29, 2005. Dear Mr. Henry: Professional Service Industries, Inc. (PSI) performed a site - specific geotechnical exploration for the proposed expansion of the subject Target store, T -1029, the results of which are presented in the referenced Geotechnical Exploration Report and subsequent addendum, dated March 29, 2005 and October 5, 2008, respectively. The information and recommendations presented in these referenced submittals remain valid, unless superseded herein. Most recently, in accordance with your request and subsequent authorization, PSI performed two (2) field percolation tests at the subject site at the approximate locations indicated in Figure 1. The results indicate the area of the subject site that was tested has a field percolation ranging between 1.4 and 1.5 minutes per inch (MPI). Based on information provided to PSI by Pacific Land Services, PSI understands that the governing City agency is requiring that pervious pavement be incorporated into the project to the maximum extent practicable in areas of pavement that are to be added or replaced. Thus, PSI was also requested to provide geotechnical recommendations applicable to such pavement. Pervious concrete pavement in conjunction with permeable subsurface materials and conditions captures stormwater and allows it to seep into the subsurface, thereby recharging groundwater, reducing stormwater runoff, and assisting in the meeting of U.S. Environmental Protection Agency (EPA) stormwater regulations. Pervious concrete has controlled proportions of water and cementitious materials that create a paste that forms a thick coating around aggregate particles. A specialty contractor will need to provide specific design and construction parameters in addition to those presented herein. Based on our Geotechnical Exploration Report, PSI for preliminary purposes has assumed traffic indices of TI =5.0 for parking areas. These assumed traffic indices should be verified by the project civil engineer prior to construction. For preliminary purposes, we have assumed an R- PSI • 3960 Gilman Street • Long Beach, Califomia • 90815 • 562- 597 -3977 • Fax 562- 597-8459 • www.psiusa.mm value of 30 for the near - surface soils within pavement areas Since an evaluation of the characteristics of the actual soils at pavement subgrade can only be provided at the completion of grading, the following pavement sections should be used for planning purposes only. Final pavement designs should be evaluated after R -value tests have been performed on the actual subgrade material. It should be noted that additional earthwork and/or ground improvement efforts may be required during grading on the actual subgrade material, in order to achieve the aforementioned design parameters and assumptions. Pavement Loading Assumed Traffic Preliminary Pavement Conditions Index Section Parking Areas 5.0 3.0 inches A.C. over 6.0 inches Class 2 Aggregate Base The base for pervious pavement is recommended to consist of permeable subbase consisting of either 1 -inch maximum -size aggregate, or a natural subgrade soil that is predominantly sandy with moderate amounts of silt, clay, and poorly - graded soil. If expansive material is encountered in areas to receive pervious pavement, additional recommendations will apply. A representative of our office should be consulted regarding this condition. Additional corrosion testing, including but not limited to sulfate testing should be performed during construction on actual subgrade material where slabs on grade and pavement are proposed at the site since concrete and pervious pavement is susceptible to attack by corrosive agents in soil and water unless precautions are taken. In addition the ACI 201 regarding water -to- cement ratio and material types /proportions should be followed strictly We appreciate the opportunity to provide this additional information and look forward to continued participation during the design and construction phases of this project Should you have any questions after reviewing this letter, please contact the undersigned at your convenience. Respectfully submitted, S PROFESSIONAL SERVICE �•r /. co 2 i y2 0 LU m � C m E Riutort. RCE ¢ Exp. a Senior Engineer RCE 58623 Exp. 12/31/10 SrgT CIVIL P�\P F OF CAt tF0 Attachment Figure 1. Test Location Map pit 8 Environmental PROJECT NAME ABM �� Geotechnical Construction TARGET T -1029 Gnwftln! • Erylnserins • Teat/n!, 3960 Gilman Street PROPOSED EXPANSION & Long Beach, CA 90815 ASSOCIATED IMPROVEMENTS 562/597 -3977 Fax 562/597-8459 1010 N. El Camino Real Encinitas, Califomia " :7iC �• PROJECT NO. 875 -55052 0056131 �� .srtr:s.•� •I i � 1 `• mr, rFw o I t I TARGET T -1029 121031 BF (EX) wo.no eX mnatne®) � 4 FF031.10t r �} 8 Environmental PROJECT NAME ABM �� Geotechnical Construction TARGET T -1029 Gnwftln! • Erylnserins • Teat/n!, 3960 Gilman Street PROPOSED EXPANSION & Long Beach, CA 90815 ASSOCIATED IMPROVEMENTS 562/597 -3977 Fax 562/597-8459 1010 N. El Camino Real Encinitas, Califomia PROJECT NO. 875 -55052 0056131 1 11 X�' 1 /J "srscra. � *Approximate Test FIGURE 1 Location TEST N LOCATION MAP GEOTECHNICAL EXPLORATION REPORT PROPOSED STORE EXPANSION AND ASSOCIATED IMPROVEMENTS TARGET STORE T -1029 1010 NORTH CAMINO REAL ENCINITAS, CALIFORNIA GEOTECHNICAL EXPLORATION REPORT Proposed Store Expansion and Associated Improvements Target Store T -1029 1010 North El Camino Real, California PSI File No. 875 -55052 PREPARED FOR Target Corporation 1000 Nicollet Mall, TPN -12H Minneapolis, MN 55403 March 29, 2005 m PROFESSIONAL SERVICE INDUSTRIES, INC. 3960 GILMAN STREET LONG BEACH, CALIFORNIA 90815 F t i Infonwfion N�� .To Build On Is"wa».rww • Carmoftv • tr nq March 29, 2005 Mr. David Henry Target Corporation 1000 Nicollet Mall, TPN -12H Minneapolis, MN 55403 Subject: Geotechnical Exploration Report Proposed Expansion of Target Store T -1029 1010 North Camino Real, Encinitas, California PSI Project No. 875 -55052 Dear Mr. Henry: Professional Service Industries, Inc. (PSI) is pleased to transmit our Geotechnical Exploration Report for the above - referenced project in Encinitas, California. This report includes the results of field and laboratory testing, geotechnical recommendations for foundation design, as well as general site development. We appreciate the opportunity to perform this Geotechnical Study and look forward to continued participation during the design and construction phases of this project. If you have any questions pertaining to this report, or if we may be of further service, please contact our office. Respectfully submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. ��'�", Step nie Montgomery ery Staff Geologist Reviewed By: James W. Niehoff Principle Consultant (3 copies submitted) End Riutort, RCE PROFess,o D rict anager �o E A Nq 8623 Exp. 12/31/0 u2Q\oJ 9iGO�c � C����'% m a s T9 CNIL OF CALIFCP c''- „nc�onal Serv,;.e irM.Sff' »s. Inc. 3960 OA rW Stroo • Log Bach, CA 90815 • Phwo 583/597 -3977 • F3x 582$97$659 ' TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY .......................................................... ..............................1 2.0 PROJECT INFORMATION ....................................................... ..............................2 2.1 Project Authorization ..................................................... ............................... 2 • 2.2 Site Location and Description ........................................ ............................... 2 3.0 SUBSURFACE EXPLORATION .............................................. ............................... 3 • 3.1 Subsurface Conditions .................................................. ............................... 3 3.2 Groundwater ................................................................... ..............................4 3.3 Laboratory Evaluation .................................................... ............................... 4 4.0 SEISMIC CONSIDERATIONS ................................................. ............................... 5 • 4.1 Regional Seismicity ....................................................... ............................... 5 4.2 Seismic Analysis ............................................................ ............................... 5 4.3 Hazard Assessment ...................................................... ............................... 6 4.4 Earthquake Design Parameters ..................................... ............................... 7 5.0 CONCLUSIONS AND RECOMMENDATIONS ........................ ............................... 8 • 5.1 Site Preparation ............................................................. ............................... 8 5.2 Engineered Fill ............................................................... ............................... 9 5.3 Excavations .................................................................... ..............................9 5.3.1 Excavations / Slopes ........................................... ..............................9 5.3.2 Trench Backfill ................................................ ............................... 10 5.4 Foundation Support ..................................................... ............................... 11 5.5 Settlement ................................................................... ............................... 11 5.6 Corrosivity ...................................................................... .............................12 • 5.7 Drainage Considerations ............................................. ............................... 12 5.8 Floor Slab Support ....................................................... ............................... 12 • 5.9 Pavement Recommendations ...................................... ............................... 13 5.10 Construction Monitoring ............................................. ............................... 13 6.0 GENERAL ................................................................................ .............................14 • 6.1 Use of Report .............................................................. ............................... 14 6.2 Limitations ................................................................... ............................... 14 Figures Figure 1: Site Vicinity Map Figure 2: Boring Location Map Appendices A — References B — Exploration Logs C — Laboratory Test Results D — Seismic Analysis - Computer Output E — Standard Guidelines For Grading Projects Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Pace 1 1.0 EXECUTIVE SUMMARY Professional Service Industries, Inc. (PSI) has conducted a geotechnical evaluation for the proposed store addition to the existing Target Store T -1029 in the City of Encinitas, California. The location of the site is presented on Figure 1. In order to evaluate soil conditions at the site, two (2) soil borings were advanced using a truck - mounted, hollow -stem auger drill rig. The borings were advanced adjacent to the proposed addition on the north and west sides of the existing Target store. The borings were drilled within existing asphalt -paved parking and drive areas to depths ranging between 20 and 50 feet below ground surface. Locations of the soil borings, as well as the proposed store addition, are shown on Figure 2. The logs of the soil borings are presented in Appendix B. The native soils encountered in our borings consist primarily of mottled brown, yellow, and grey silty sands and sands. Bedrock was not encountered in our borings to a maximum depth explored of approximately 50 feet below ground surface. Groundwater was encountered in one of the exploratory borings at an approximate depth of 30 feet below ground surface. Based on the results obtained from our exploration and analysis, the proposed building addition may be supported on shallow footings founded in properly compacted fill soils. The foundations should bear on a minimum of 18 inches of properly placed and compacted engineering fill in accordance with our recommendations. The recommended allowable bearing capacity is 2,000 pounds per square foot, which may be increased by one -third for wind and seismic loading. The recommended lateral bearing capacity is 300 psf per foot of depth below a depth of 1 foot, with a friction coefficient of 0.25 at the concrete -soil interface. The on -site soils are considered to have a low expansion potential. The owner /designer should not rely solely on this Executive Summary and must read and evaluate the entire contents of this report prior to utilizing our engineering recommendations in preparation of design /construction documents. Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Paae 2 2.0 PROJECT INFORMATION 2.1 Project Authorization Professional Service Industries, Inc. (PSI) is pleased to submit our Geotechnical Exploration Report for the proposed addition to the existing Target Store T -1029. Our evaluation was completed in general accordance with the scope of work as outlined in our Proposal Number 875 - 550128, dated March 8, 2005. Authorization was provided by David Henry of the Target Corporation on March 8, 2005. 2.2 Site Location and Description The subject site is located at 1010 North El Camino Real, in Encinitas, California (see Figure 1). The subject site is located within existing commercial /retail and residential areas and is bounded by Via Cantebria to the east, residential areas to the south, commercial buildings to the west, and parking and drive areas to the north (see Figure 2). The site is relatively level, at an elevation (estimated from the Encinitas, California USGS topographic map) of approximately 180 feet above mean sea level. 2.3 Project Understanding PSI understands that the proposed construction will include the expansion of the existing store on the east side of the building (Figure 1). Specific structural loads were not provided; however, based on the Target Developer Guide, we anticipate individual columns and bearing wall loads of approximately 40 to 140 kips and 2 to 4 kips per linear foot, respectively. The finished floor elevation of the building was not furnished to us, but for the purposes of this report, we have assumed that cuts and fills will not exceed 2 feet. Any changes to the project from that stated above will need to be addressed at the time the information becomes available. Additional site development may include utility trenching and concrete flatwork. 2.4 Purpose and Scope of Services The purpose of our geotechnical evaluation was to assess the subsurface soil conditions at the site in order to provide appropriate recommendations for site preparation and foundation design. Our evaluation was in general accordance with the scope of work outlined in our Proposal Number 875- 550128, dated March 8, 2005. Our scope of services included a total of two (2) hollow -stem auger borings which were drilled to approximate depths between 20 and 50 feet below ground surface (adjacent to the proposed store expansion area), laboratory testing, and the preparation of this Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 3 geotechnical report. This report briefly outlines the testing procedures, presents available project information, describes the site and subsurface conditions, and presents geotechnical recommendations regarding the following: • Foundation soil preparation requirements. • Foundation types, depths, allowable bearing capacities, and an estimate of potential settlement. • Concrete slab on grade construction. • UBC soil profile type and seismic zone coefficients for use in seismic design (UBC 1997). • Pavement design recommendations. • Comments regarding factors that may impact construction and performance of the proposed construction. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic materials in the soil, bedrock, surface water, groundwater, or air on or below, or around this site. Any statements in this report or on the boring logs regarding odors, colors, and unusual or suspicious items or conditions are strictly for information purposes only. 3.0 SUBSURFACE EXPLORATION 3.1 Subsurface Conditions In order to evaluate soil conditions at the site, two (2) soil borings were advanced using a truck - mounted, hollow -stem, flight auger drill rig. The borings were advanced adjacent to the proposed addition on the east side of the existing Target store. The borings were drilled within existing asphalt -paved parking and drive areas to depths ranging between approximately 20 and 50 feet below ground surface. The locations of the soil borings, as well as the proposed store addition, are shown on Figure 2. The logs of the soil borings are presented in Appendix B. During the sampling procedure, Standard Penetration Tests (SPT) were performed and relatively undisturbed samples were obtained utilizing a 3 -inch diameter California split - spoon sampler. The SPT for soil borings is performed by driving a 2 -inch, O.D. split - spoon sampler into the undisturbed formation located at the bottom of the advanced borehole with repeated blows of a 140 -pound hammer falling a vertical distance of 30 inches. The number of blows required to drive the sampler the last 12 inches of an 18- inch penetration depth is a measure of the soil consistency (see Appendix B). The blow count obtained from the California sampler (indicated on the logs as SS) should be Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Paae 4 reduced by approximately 37 % to obtain a rough correlation to SPT blow counts (N- value). Samples were identified in the field, placed in sealed containers and transported to the laboratory for further classification and testing. In the areas explored, the site is surfaced with approximately 4 inches of asphalt with approximately 3 inches of aggregate base. Beneath this pavement section, the material encountered consisted of approximately 30 feet of fill material underlain by alluvial material. The fill material consisted of mottled brown, yellow, and grey silty sands and sands. It is our understanding that the existing engineered fill was placed by others. The alluvial material consisted of silty sands. The consistency of the fill and alluvial materials were observed to range from medium dense to very dense in terms of the standard penetration tests performed. Bedrock was not encountered within the boring to the maximum explored depth of approximately 50 feet below ground surface. Groundwater was encountered in one exploratory boring at an approximate depth of 30 feet below ground surface. The above subsurface description is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The boring logs, included in Appendix B, should be reviewed for specific information at the boring locations. These records include soil descriptions, stratification, penetration resistance, locations of the samples and laboratory test data. The stratification shown on the boring log represents the conditions only at the actual boring location at the time of our exploration. Variations may occur and should be expected between locations. The stratification that represents the approximate boundary between subsurface materials and the actual transition may be gradual. The samples that were not altered by laboratory testing will be retained for 30 days from the date of this report and will then be discarded. 3.2 Groundwater Groundwater was encountered in one of the exploratory borings at an approximate depth of 30 feet below ground surface. It is possible that transient, over - saturated ground conditions at shallower depths could develop due to periods of heavy precipitation, landscape watering, leaking water lines, or other unforeseen causes. Variations in groundwater levels should be expected seasonally, annually, and from location to location. Groundwater is not expected to impact the proposed construction. 3.3 Laboratory Evaluation Selected samples of the subsurface soils encountered were returned to our laboratory for further evaluation to aid in classification of the materials, and to help assess their strength and compressibility characteristics. The laboratory evaluation consisted of Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Paoe 5 visual and textural examinations, moisture, and density testing. A brief discussion of the laboratory tests and the results of our testing are presented in Appendix C. 4.0 SEISMIC CONSIDERATIONS 4.1 Regional Seismicity Generally, seismicity within California can be attributed to faulting due to regional tectonic movement. This includes the San Andreas Fault, and most parallel and subparallel faulting within the State. The portion of California which includes the subject site is considered seismically active. The subject site is situated in UBC Seismic Zone 4. Seismic hazards within the site can be attributed to potential ground shaking resulting from earthquake events along nearby or more distant faulting. According to regional geologic literature (Blake, 2000), the closest known late Quaternary fault is the Rose Canyon Fault, located approximately 4.6 to 5 miles (7.4 to 8 km) from the site. Several potentially active and pre - Quaternary faults also occur within the regional vicinity. Currently, the seismological literature presents varying opinions regarding seismicity for nearby potentially active and pre - Quaternary faults. As such, the following Seismic Analysis only considers the effects of active faulting as determined by the 1997 Uniform Building Code. 4.2 Seismic Analysis The seismicity of the site was evaluated utilizing deterministic methods for active Quaternary faults within the regional vicinity. According to the Alquist - Priolo Special Studies Zones Act of 1972 (revised 1994), Quaternary faults have been classified as active faults which show apparent surface rupture during the last 11,000 years (i.e., Holocene time). This site is currently not within a mapped Earthquake Fault Zone (CDMG, 1982). Deterministic Analysis - Deterministic seismicity at the site was evaluated with the Eqfault computer program (Blake, 1989- 2000), which utilizes an updated digitized map (1998) of known late Quaternary earthquake faults, a catalog of the estimated credible and potential earthquakes for each fault, and a user - specified attenuation relationship (Campbell & Bozorgnia, 1994/1997). Output from the Eqfault program is presented in Appendix D. Based on our analysis, 50 late- Quaternary faults were located within a 100 -mile radius of the site. The site is subject to a Maximum Magnitude Event of 6.9 Magnitude along the Rose Canyon Fault, located approximately 4.6 to 5 miles (7.4 to 8 km) from the site, Proposed Addition to Target Store T -1029 P51 Project No. 875 -55052 March 29, 2005 Page 6 with corresponding median Peak Ground Accelerations of 0.41g, and 84th percentile PGA of 0.61g. The Maximum Magnitude Event is defined as the maximum earthquake that appears capable of occurring under the presently known tectonic framework. The Deterministic Site Parameters are presented in Appendix D. Probabilistic Determination - Ground motions representing a 10% probability of exceedance in 50 years are based on analysis by the California Geologic Survey (CGS). The probabilistic ground motion values for alluvium, expressed as the acceleration due to gravity (g), would be: PGA = Peak Ground Acceleration PE = Probabilistic Exceedance SA = Spectral Acceleration period length 4.3 Hazard Assessment Seismically- Induced Settlement of Soils — Within the depths of our exploration, the materials comprising the subsurface soils were observed to have significant fines content. Based on the anticipated earthquake effect and the stratigraphy of the site, relatively minor seismically- induced settlement is likely to occur. Such settlement will probably affect relatively large areas so that differential settlements over short distances are likely to be very small. Liquefaction — Liquefaction and seismically induced settlement typically occur in loose granular soils with groundwater near the ground surface. During an earthquake, ground shaking causes the soil to collapse and the groundwater to rapidly rise to the surface, resulting in a sudden loss of soil bearing strength. Fine - grained soils are not generally susceptible to liquefaction or to short-term settlement due to seismic loads. Liquefaction potential has been found to be the greatest where the ground water level is within a depth of 50 feet or less and loose fine sands occur within that depth. The liquefaction potential decreases with increasing grain size and clay and gravel content, but increases as the ground acceleration and duration of shaking increases. Groundwater was encountered in one of the exploratory borings at an approximate depth of 30 feet below ground surface. Based on site - specific information, it is our opinion that 10 %PE in 50 yr PGA 0.322 0.2 sec SA 0.776 1.0 sec SA 0.389 PGA = Peak Ground Acceleration PE = Probabilistic Exceedance SA = Spectral Acceleration period length 4.3 Hazard Assessment Seismically- Induced Settlement of Soils — Within the depths of our exploration, the materials comprising the subsurface soils were observed to have significant fines content. Based on the anticipated earthquake effect and the stratigraphy of the site, relatively minor seismically- induced settlement is likely to occur. Such settlement will probably affect relatively large areas so that differential settlements over short distances are likely to be very small. Liquefaction — Liquefaction and seismically induced settlement typically occur in loose granular soils with groundwater near the ground surface. During an earthquake, ground shaking causes the soil to collapse and the groundwater to rapidly rise to the surface, resulting in a sudden loss of soil bearing strength. Fine - grained soils are not generally susceptible to liquefaction or to short-term settlement due to seismic loads. Liquefaction potential has been found to be the greatest where the ground water level is within a depth of 50 feet or less and loose fine sands occur within that depth. The liquefaction potential decreases with increasing grain size and clay and gravel content, but increases as the ground acceleration and duration of shaking increases. Groundwater was encountered in one of the exploratory borings at an approximate depth of 30 feet below ground surface. Based on site - specific information, it is our opinion that Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 7 the site is considered to have a low risk potential for soil liquefaction. However, a comprehensive liquefaction analysis was beyond our current scope of work. Lurching and Shallow Ground Rupture — Evidence of active fault rupture was not observed within the explored areas of the site at the time of our subsurface exploration. However, due to the active seismicity of California, this possibility cannot be completely ruled out. In this light, the unlikely hazard of lurching or ground rupture should not preclude consideration of (flexible) design for on site utility lines and connections. Tsunamis and Seiches — Inundation by tsunamis (seismic or "tidal waves ") or seiches ( "tidal waves" in confined bodies of water) are not considered to be a significant threat to the subject site due to the absence of proximal large bodies of water. 4.4 Earthquake Design Parameters In accordance with the evaluation summarized in the Seismic Analysis section of this report, the Peak Ground Acceleration at the site due to the Maximum Magnitude Event is estimated to be 0.41g and 84th percentile PGA of 0.61g. In conjunction with the soil classifications provided in Table 16 -J of the 1997 Uniform Building Code (UBC), based on our field observations and on Standard Penetration Test values obtained from the borings, the subsurface soils at the subject site can be characterized as soil profile type Sp. According to the 1997 edition of the UBC, the site is located within Seismic Zone 4. The proposed structural improvements should be designed in accordance with seismic design requirements of the UBC 1997 edition, Volume II, Chapter 16, utilizing the following criteria: UBC Chapter 16 Seismic Parameter Value Table 16 -1 Seismic Zone Factor, Z 0.40 Table 16 -J Soil Profile Type Sp Table 16-Q Seismic Coefficient, Ca 0.44 Table 16 -R Seismic Coefficient, G, 0.71 Table 16 -S Near Source Factor, Na 1.0 Table 16 -T Near Source Factor, N„ 1.1 Table 16 -U Seismic Source Type B If site - dependent earthquake response spectra or other specific design parameters are deemed necessary by the project structural engineer, or are required by the local governmental agency who has jurisdiction over the project, the geotechnical engineer Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 8 should be promptly informed for further evaluation. In addition, design of structures should comply with the requirements of the governing jurisdiction's building codes and standard practices of the Structural Engineers Association of California. 5.0 CONCLUSIONS AND RECOMMENDATIONS The near surface soils at the site consist of medium dense silty sands and clayey sands. Based on the results obtained from our exploration and analysis, the proposed building expansion may be supported on shallow footings founded in properly compacted fill soils. The proposed construction at the site should be performed in accordance with the following recommendations. Our recommendations have been developed on the basis of the previously described project characteristics and subsurface conditions encountered. If there are any changes in these project criteria, including project location on the site, a review should be made by PSI to determine if modifications to the recommendations are warranted. Once final design plans and specifications are available, a general review by PSI is recommended as a means to check that the evaluations made in preparation of this report are correct and that earthwork and foundation recommendations are properly interpreted and implemented. 5.1 Site Preparation Prior to construction, the location of any existing underground utility lines within the construction area should be established. Provisions should be made to relocate any interfering utility lines within the construction area to appropriate locations. The site should also be cleared of surface vegetation. As a minimum, it is recommended the clearing operations extend at least five feet beyond the development perimeters except where the addition abuts the existing store. The near - surface soil conditions at the site are somewhat variable in composition and consistency. It is recommended that these soils be removed to a depth of approximately 18 inches below the bottom of footings and replaced as uniformly compacted fill. Soils exposed at the bottom of the excavations should be scarified to a minimum depth of 6 inches, moisture conditioned to 110 percent of optimum moisture content and recompacted to a minimum 90 percent relative compaction (based on ASTM Test Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 9 Method D1557). This earthwork should extend a minimum 5 feet beyond the proposed building footprints except where the addition abuts the existing store. All grading operations should be performed in accordance with the requirements of the 1997 UBC, and local governmental standards which have jurisdiction over this project. 5.2 Engineered Fill Fill materials, including both native and import soil, should be free of organic or other deleterious materials, have a maximum particle size of 3 inches or less, have a liquid limit of less than 45 and a plasticity index of less than 20. Structural fill should be moisture conditioned and compacted to at least 90 percent of the maximum dry density as determined by ASTM Designation D1557. Fill should be placed in maximum loose lifts of S inches and should be moisture conditioned and compacted at 110 percent of the optimum moisture content. If water must be added, it should be uniformly applied and thoroughly mixed into the soil by disking or scarifying. Each lift of compacted, engineered fill should be tested by a representative of the geotechnical engineer prior to placement of subsequent lifts. The edges of compacted fill should extend 5 feet beyond the edges of buildings prior to sloping. We recommend that at the time of initial site stripping and grading, that PSI be retained to observe the subgrade conditions to verify that no potentially deleterious soils are present in the site fill soils encountered near the surface in our borings. 5.3 Excavations Excavation and construction operations may expose the on -site soils to inclement weather conditions. The stability of exposed soils may rapidly deteriorate due to precipitation or the action of heavy or repeated construction traffic. Accordingly, foundation area excavations should be adequately protected from the elements, and from the action of repetitive or heavy construction loading. 5.3.1 Excavations/Slopes Temporary earth slopes may be cut near vertical to heights of 4 feet. Excavations deeper than 4 feet should be sloped back at 1:1 (horizontal to vertical) or shored for safety. Excavations extending below a 1Yz:1 (horizontal to vertical) plane extending down from any adjacent footings should be shored for safety. All excavations should be inspected by a representative of the geotechnical engineer during construction to allow any modifications to be made due to variation in the soil types. All work should be Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 10 performed in accordance with Department of Labor Occupational Safety and Health Administration (OSHA) guidelines. Job site safety is the responsibility of the project contractor. In Federal Register, Volume 54, No. 209 (October 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, subpart P ". This document was issued to better insure the safety of personnel entering trenches or excavations. It is mandated by this federal regulation that excavations, whether they be utility trenches, basement excavations, or footing excavations, be constructed in accordance with the new OSHA guidelines. It is our understanding that these regulations are being strictly enforced and, if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's "responsible person ", as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal state regulations. We are providing this information solely as a service to our client. PSI does not assume responsibility for construction site safety or the contractor's or other parties' compliance with local, state, and federal safety or other regulations. 5.3.2 Trench Backfill Except where extending perpendicular under proposed foundations, utility trenches should be constructed outside a 1:1 projection from the base -of- foundations. Trench excavations for utility lines, which extend under structural areas should be properly backfilled and compacted. Utilities should be bedded and backfilled with clean sand or approved granular soil to a depth of at least 1 foot over the pipe. This backfill should be uniformly watered and compacted to a firm condition for pipe support. All required trench backfill should be mechanically compacted in layers to at least 95% of maximum dry density based on ASTM D1557. Flooding should not be permitted. The remainder of the backfill shall be typical on -site soil or imported soil which should be placed in lifts not exceeding 8 inches in thickness, watered or aerated to 0 to 3 Proposed Addition to Target Store T -1029 PSI Pmjmt No. 875 -55052 March 29, 2005 Paqe 11 percent above the optimum moisture content, and mechanically compacted to at least 90 percent of maximum dry density (based on ASTM D1557). Some settlement of the backfill may be expected and any utilities within the trenches or concrete walks supported on the trench backfill should be designed to accept these differential movements. 5.4 Foundation Support Based on the results of our geotechnical investigation, it is our opinion that the proposed building expansion may be supported on a conventional shallow foundation at least 18 inches deep, at least 15 inches wide, bearing on at least 18 inches of properly compacted, engineered fill below bottom of footings. The foundation may be designed for a maximum allowable soil bearing pressure of 2,000 psf. This value may be increased by 20% per additional foot of depth, to a maximum value of 4,000 psf, for both spread or continuous footings. The allowable soil bearing pressure may be increased by one -third for short-term wind or seismic load considerations. Lateral loads may be resisted by any rational method that incorporates sliding friction and /or passive earth pressure. The design may incorporate an allowable passive earth pressure of 300 psf per foot of depth below a depth of 1 foot, provided that the footing concrete is poured tightly against properly compacted fill materials. This value may be increased by 250 psf for each additional foot of depth, to a maximum of 3,700 psf. An allowable friction coefficient of 0.25 may be used at the concrete -soil interface. No reductions are necessary when combining the frictional and passive resistance of the soils to determine the total lateral resistance. When considering seismic loading, one or the other should be reduced by one -half. Appropriate foundation reinforcement should be provided to withstand the low expansion potential of the on -site soils, in accordance with the Structural Engineer's recommendations and 1997 Uniform Building Code. 5.5 Settlement We anticipate that properly designed and constructed foundations, supported on compacted fill materials in accordance with the above recommendations, should experience maximum total and differential static settlements of less than 1 -inch and ' /2- inch, respectively. This estimate includes any ground movement due to soil expansion as well as settlement. The total settlement during construction is not expected to exceed /2 inch. Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Paae 12 The total expected settlement may be slightly reduced by a design reduction in the allowable soil bearing pressure. Differential settlement is expected not to exceed' /] inch between the existing and proposed foundations, based on our recommendations for proposed footings. 5.6 Corrosivitv A representative sample of onsite soils was tested in our laboratory for sulfate content. Results of testing indicate that the onsite soils may have "negligible" sulfate content with respect to concrete corrosion. For preliminary design purposes, we recommend a minimum of Type II cement and a maximum water- cement ratio of 0.50, for concrete in contact with on -site soils. Final concrete mix design should be evaluated after sulfate tests have been performed on the actual subgrade material. Special protection for underground cast iron pipe or ductile iron pipe is recommended. Cathodic protection should be designed by an engineer specialized in corrosion. Testing for corrosivity of the fill soils should be conducted after site grading to verify our recommendations. 5.7 Drainage Considerations Water should not be allowed to collect in the foundation excavation or on prepared subgrades of the construction area either during or after construction. Undercut or excavated areas should be sloped toward one corner to facilitate removal of any collected rainwater, or positive runoff. The onsite soils are susceptible to erosion. The contractor should exercise care in creating drainage paths for water during the construction phase of the project. Curbing adjacent to landscaped areas should be designed deep enough to act as a barrier between the landscape irrigation and the subgrade soil. Surface run -off from roofs, parking areas, etc., should be tightlined to the storm sewer or other approved disposal areas. 5.8 Floor Slab Support The floor slab should be supported on properly placed and compacted engineered fill. If the slab is to be supported by fill derived from onsite soils, then the slab section may be designed by the structural engineer using a coefficient of subgrade reaction of 90 pci and assuming a low expansion potential (UBC 18 -2). The structural engineer should design appropriate reinforcement for the slabs to withstand a low expansion potential (Chapter 18 of the 1997 Uniform Building Code). Care should be taken by the contractor to ensure that the reinforcement is placed and maintained at slab midheight. Floor slabs should be Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 13 suitably reinforced and jointed so that a small amount of independent movement can occur without causing damage. Slabs should be underlain by a capillary break at least 4 inches thick, consisting of clean sand or gravel. In moisture - sensitive flooring areas, such as carpeted or linoleum covered areas, a 6 -mil visqueen moisture barrier the slab should be placed midheight within the capillary break material. The visqueen sheet should be sealed along the edges to prevent lateral migration of soil moisture from adjacent non - visqueen areas. Prior to placement of clean sand and slab -on- grade, the visqueen sheet should be thoroughly inspected for cracks, punctures, tears, and holes. If necessary, the visqueen should be replaced or patched to assure a fully functional entity. The allowable friction coefficient is 0.15 for slabs over the capillary break with plastic sheet vapor barrier. Some minor cracking of slabs can be expected due to shrinkage. The potential for this slab cracking can be reduced by careful control of water /cement ratios in the concrete. The contractor should take appropriate curing precautions during the pouring of concrete in hot weather to minimize the cracking of slabs. We recommend that a slipsheet (or equivalent) be utilized if grouted fill, tile, or other floor sensitive floor covering is planned directly on concrete slabs. All slabs should be designed in accordance with structural considerations. The floor slab should be liberally jointed in accordance with ACI guidelines to help control cracking, resulting from differential movement and concrete shrinkage. The footings may be connected to the slab in accordance with the structural engineer's recommendations. We suggest that, where practical, the floor slab not be rigidly connected to columns, walls or foundations. Semi - flexible doweling connections are preferred. 5.9 Pavement Recommendations During construction, some of the existing pavement areas may be removed or damaged. Where it is necessary, we recommend matching the existing pavement. 5.10 Construction Monitoring It is recommended that PSI be retained to examine and identify soil exposures created during project construction in order to verify that soil conditions are as anticipated. We further recommend that any structural fills be continuously observed and tested by our representative in order to evaluate the thoroughness and uniformity of their compaction. If possible, samples of fill materials should be submitted to our laboratory for evaluation prior to placement of fills on site. Costs for the recommended observations during construction are beyond the scope of this current consultation. Proposed Addition to Target Store T -1029 PSI Project No. 875 -55052 March 29, 2005 Page 14 6.0 GENERAL Our conclusions and recommendations described in this report are subject to the following general conditions: 6.1 Use of Report This report is for the exclusive use of the Target Corporation and their representatives to use for the design of the proposed structure described herein and preparation of construction documents. The data, analyses, and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. In the absence of our written approval, we make no representation and assume no responsibility to other parties regarding this report. 6.2 Limitations The recommendations contained in this report are based on the available subsurface information obtained by PSI, and design details furnished for the proposed project. If there are any revisions to the plans for this project, or if deviations from the subsurface conditions noted in this report are encountered during construction. PSI must be notified immediately to determine if changes in the foundation recommendations are required. If PSI is not retained to perform these functions, PSI will not be responsible for the impact of those conditions on the project. Services performed by PSI for this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this area. No warranty, expressed or implied, is made. FIGURES i r •0 1, 7 �� r 1 �� r i��. . • ` { r is f • � • �., _ 1 \ ti �fjCf. 4'a fo a: J ,ttl it ..m� �'• ;.� `''' :A TARS ;T -109 de [41 Y t l 1 �i - 1 do tj ICI •I � 6 � .ifl Lf � _ '_t _ ^ ier III tq.yW4 �'eridHC VN [.L�nrYan►. H61�11 Sanrl� 1'.trs r - -,nf1 iil C1� IW'.ISI [,r'tYGM PROJECT NAME f Environmental SITE VICINITY MAP A1� Geotechnical TARGET T -1029 Figure 1 Mme, Construction PROPOSED EXPANSION & Consulting• Engineering• Testing ASSOCIATED IMPROVEMENTS Map: ' 3960 Gilman Street Encinitas, California Long Beach, CA 90815 1010 N. El Camino Real Quadrangle 562/597 -3977 Encinitas, Califomia Fax 562/597 -8459 PROJECT NO. 875 -55052 7.5' USGS Topographic Map T � • • • •B1 LI f ii ,VS 1 I 1 1 l fpy t +i iii iir. fit III j Environmental PROJECT NAME BORING Approximate AAS Ge•technical a7/ TARGET T -1029 LOCATION MAP Boring Location Construction i-TesTesting Cwnunlns • Ery(neeitns • Test(ns PROPOSED EXPANSION & Figure 2 3960 Gilman Street ASSOCIATED IMPROVEMENTS Long Beach, CA 90815 Not to scale 562/597 -3977 1010 N. El Camino Real Fax 5621597 -8459 Encinitas, California PROJECT NO. 875-55052 APPENDIX A REFERENCES REFERENCES 1. Blake, T.F., 1989 -2000, Documentation For Eqfault Version 3.00 Update, Thomas F. Blake Computer Services and Software, Newbury Park, California. 2. California Division of Mines and Geology (CDMG), 1994 (revised 1997 and 1999), "Fault- Rupture Hazard Zones in California," Special Publication 42. 3. California Division of Mines and Geology (CDMG), 1997, Seismic Hazard Official Map, Encinitas Quadrangle, Scale: 1:24,000. 4. California Geological Survey (CGS), April, 2002, "California Geomorphic Provinces' http: / /www. consrv. ca.gov /cgs /information /p ubl i cations /cgs_notes /note_36 /note_36. p df (web document). 5. California Geologic Survey (CGS), 2004, Alquist - Priolo and Probabilistic Seismic Hazard Assessment (PSHA) Maps, available at http: / /www.consrv.ca.gov /CGS /. 6. Campbell, K.W. and Bozorgnia, Y., 1994/1997, Near - Surface Attenuation of Peak Horizontal Acceleration From Worldwide Accelerograms, Proceedings, Fifth U.S. National Conference on Earthquake Engineering, Vol III, Earthquake Engineering Research Institute. 7. Jennings, C.W., 1994, Fault Activity Map of California and Adjacent Areas, Scale 1:750,000, California Division of Mines and Geology. 8. US Geological Survey, Encinitas Quadrangle, California, United States Department of the Interior, Scale: 1:24,000, 1964 (photo- revised 1981). APPENDIX B EXPLORATION LOGS BORING B1 CLIENT: Target Corporation PSI PROJECT NO.: 875 -55052 PROJECT: Target - Encinitas BORING TYPE: CME 75 LOCATION: 101014. El Camino Real, Encinitas, CA ELEVATION: DATE DRILLED: 0311112005 LOGGED BY: SM $ Standard Shelby V Water Level Split Spoon Tube ATD m . c m E Modified Bulk � Static Water B ® J~ Field Notes 2 California Sample Table m E o Z (7 N V O SOIL DESCRIPTION and CLASSIFICATION USCS Asphalt: 4 inches Base:3inches BULK: Silty SAND (SM),yellow brown, slightly moist, medium grained sand. 20 Artificial Fill 15 13.6 1102 Gravelly Silty SAND (SP),yellow brown, moist, medium dense, 5 fine to medium grained sand, fine subrounded gravel. 10 Silty SAND (SM),yellow brown, slightly moist, medium dense, 20 20.8 104.7 medium grained sand, silty pockets with iron oxidation. Silty SAND (SM),mottled yellow brown and light brown, 25 30 17.3 119.7 slightly moist, very dense, medium rained sand, silty g y ry g ty pockets 50/8• with iron oxidation, iron oxidation also present of individual sand 10 grains. 45 5015 1.2 108.9 SAND (SP), mottled grey brown and pale yellow brown, moist, very dense, medium grained sand, iron oxidation present on individual grains. s SAND (SP), mottled grey and orange brown, moist, very 35 dense, fine to medium grained sand, iron oxidation present on 5018' individual grains, small pockets of grey silt. 20 SAND (SP), mottled dark brown, grey and orange brown, ss moist, very dense, fine to medium grained sand, iron oxidation 40 present on individual grains, small pockets of grey silt. Total Depth: 21.5 Ft Groundwater was not encountered to the maximum depth explored. Boring was backfilled with soil cuttings and patched with asphalt. hjnnnlltirm FIGURE NO. LM�a TIBuildOn ngi„e.,my • C. w e,—dow • ft BORING B2 CLIENT: Target Corporation PSI PROJECT NO.: 875 -55052 PROJECT: Target - Encinitas BORING TYPE: CME 75 LOCATION: 1010 N. El Camino Real, Encinitas, CA ELEVATION: DATE DRILLED: 03/1112005 LOGGED BY: SM Standard Shelby Water Level ' $ split Spoon Tube ATD E a% . c B Modified ® Bulk static Water 5 m $ Field Notes m° E California Sample Table m M t Z U n U ❑ SOIL DESCRIPTION and CLASSIFICATION (USCS Asphalt: 4 inches Base: 3 inches BULK: Silty SAND (SM), yellow bronw, slightly moist, medium grained sand. 30 13.7 114. Artificial Fill SAND (SP), yellow brown, slightly moist, very dense, fine to 5 medium grained sand, iron oxide on individual grains, trace 20 pockets of grey silt and fine sand, few scattered manganese 25 13.8 120.8 blebs. SAND (SP), yellow brown, slightly moist, medium dense, fine 535 15.0 115.6 to medium grained sand, iron oxide on individual grains, trace pockets of grey silt and fine sand, few scattered manganese 10 ` blebs. SAND (SP), mottled pale pink brown and yellow brown, slightly 50/5• jig 1 t0.s moist, very dense, fine to medium grained sand, iron oxide in patches, few grey silt laminea throughout. SAND (SP), mottled pale pink brown and yellow brown, slightly moist, very dense, fine to medium grained sand, iron oxide in 15 patches, few grey silt laminea throughout. SAND (SP), mottled light brown, grey, pale yellow brown, a0 slightly moist, very dense, medium grained sand, scattered 5016" pockets of grey silt, iron oxide in individual sand grains. za SAND (SP), mottled dark brown, rusty brown and grey, moist, 40 very dense, medium grained sand, iron oxide in patches, some sots• grey silt in pockets, some fine grained sand. 25 SAND (SP), mottled dark brown, rusty brown and grey, moist, 30 very dense, medium grained sand, iron oxide in patches, some 40 grey silt in pockets, some fine grained sand. 30 Alluvium - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 Geogdd was Silty SAND (SM), brown, slightly moist, very dense, fine to 50/6• brought to medium grained sand, iron oxide on individual grains. surtace 35- Silty SAND (SM), brown, wet, very dense, fine to medium 15 grained sand, iron oxide on individual grains, increase in silt 30 V; content compared to sample at 30 feet. I c I lnf7nnntirm pii�I To Build On n,y,,....y • c.../r • w.rr FIGURE NO. BORING B2 CLIENT: Target Corporation PSI PROJECT NO.: 875 -55052 PROJECT: Target - Encinitas BORING TYPE: CME 75 LOCATION: 1010 N. El Camino Real, Encinitas, CA ELEVATION: DATE DRILLED: 03 /11/2005 LOGGED BY: SM Standard Shelby Y Water Level $ Split Spoon Tube ATD m O n n e Modihad ® Bulk Static Water 0 o g � � d Field Notes ry E California Sample Table CO- M 5 2• 0 N U O SOIL DESCRIPTION and CLASSIFICATION (USCS Silty SAND (SM),brown, wet, dense, fine to medium grained sand, sparse iron oxide on individual grains. 1s 20 Silty SAND (SM),dark brown, wet, dense, fine to medium 10 grained sand, sparse iron oxide on individual grains. 18 50 Silty SAND (SM),mottled dark brown, grey and yellow brown, wet, dense, fine to medium grained sand, sparse iron oxide on 25 individual grains. Total Depth: 21.5 Ft Groundwater was not encountered to the maximum depth explored. Boring was backfilled with soil cuttings and patched with asphalt. SCI 110777IRhOrI FIGURE NO. ToftildOn n,v„».,«.r • ce,wr,� •wry APPENDIX C LABORATORY TEST RESULTS LABORATORY TEST RESULTS Laboratory Testina Proaram Laboratory tests were performed on representative soil samples to determine their relative engineering properties. Tests were performed in general accordance with test methods of the American Society for Testing Materials or other accepted standards. The following presents a brief description of the various test methods used. Classification - Soils were classified visually according to the Unified Soil Classification System. Visual classifications were supplemented by laboratory testing of selected samples in general accordance with ASTM D2487. The soil classifications are shown on the Exploration Logs. In -Situ Moisture /Density - The in -place moisture content and dry unit weight of selected samples were determined using relatively undisturbed samples from the linear rings of a 2.38 inch I.D. modified California Sampler. The dry unit weight and moisture content are shown on the Exploration Logs. Particle Size Analysis - Particle Size Analyses were performed on selected representative samples in general accordance with ASTM D422. For determination of percent fines, a representative sample is dried, weighed, then soaked in water until individual soil particles are separated, and washed on the No. 200 sieve. Direct Shear Tests - Consolidated, drained, direct shear tests were performed on undisturbed samples in general accordance with ASTM D -3080. The undisturbed samples were tested in a saturated condition using normal loads of 1 ksf, 2 ksf, and 4 ksf. Resheared tests were performed under the same conditions on samples previously tested by direct shear. Soluble Sulfate Test - In order to estimate the concrete degradation potential of soils, the content of soluble sulfates was determined in general accordance with Cal Test Method 417A. SUMMARY OF LABORATORY TEST RESU RESULTS OF DIRECT SHEAR TEST (ASTM D 3080) SAMPLE LOCATION COHESION I PHI ANGLE 131 @ 5 ft 201 psf 34 degrees RESULTS OF SULFATE TEST (CAL 417A) SAMPLE LOCATION I B1 @0 -3ft SOLUBLE SULFATE 0.003% by weight (Degree of Attack — Negligible) DIRECT SHEAR TEST REGRESSION ANALYSIS CURVE FfT BY LEAST SQUARES METHOD PROJECT: Target Encinitas PROJECT NO.: 875 -55052 DATE: 3/18/2005 DATA POINTS X (ksf) Y (ksf) 0.60 0.60 1.05 0.93 BORING NO.: B I DEPTH: 5ft SAMPLE TYPE: Undisturbed RESULTS Angle phi = 34 degrees Cohesion = 201 Ih/sq ft 1.70 I. Direct Shear Test Data Plot 5.00 4.50 4.00 3.50 3.00 °cl 2.50 • Test Data � 2 —Curve Fit oa A 1.50 C2 1.00 0.50 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Normal Stress (ksf) r��� i In forntation L/'��N .To Build 0 n SIEVE ANALYSIS PROJECT: Target Encinitas PROJECT NO.: 875 -55052 DATE: 3/17/2005 RESULTS: BORING NO. DEPTH % COARSE % FINES CLASSIFICATION B2 15ft 66.6% 33.4% Silty SAND (SM) B2 40 ft 80.1% 19.9% Silty SAND (SM) B2 50ft 78.7% 21.3% Silty SAND (SM) ��i Infomw ion � .T � Build On s gr .rg • Corm&ddm • Tj~ APPENDIX D SEISMIC ANALYSIS - COMPUTER OUTPUT 1100 1000 m m 700 .11 500 400 300 200 100 C] -100 -400 CALIFORNIA FAULT MAP Target - Encinitas -300 -200 -100 0 100 200 300 400 500 600 875 - 550502 TARGETENCINITAS #kfi it it * *hhA #hrthh4irrt # *hrt# # h ' E Q F A U L T ' h 4 * version 3.00 * rt DETERMINISTIC ESTIMATION OF PEAK ACCELERATION FROM DIGITIZED FAULTS JOB NUMBER: 875 -55052 DATE: 03 -16 -2005 JOB NAME: Target - Encinitas CALCULATION NAME: Test Run Analysis FAULT - DATA -FILE NAME: CDMGFLTE.DAT SITE COORDINATES: SITE LATITUDE: 33.0626 SITE LONGITUDE: 117.2650 SEARCH RADIUS: 100 mi ATTENUATION RELATION: 14) Campbell & Bozorgnia (1997 Rev.) - Alluvium UNCERTAINTY (M= Median, S= Sigma): M Number of Sigmas: 0.0 DISTANCE MEASURE: Cdist SCOND: 0 Basement Depth: 5.00 km Campbell SSR: 0 Campbell SHR: 0 COMPUTE PEAK HORIZONTAL ACCELERATION FAULT -DATA FILE USED: CDMGFLTE.DAT MINIMUM DEPTH VALUE (km): 3.0 Page 1 Page 1 ABBREVIATED FAULT NAME 875 - 550502 TARGETENCINITAS --- ------------ EQFAULT SUMMARY ----------------------------- DETERMINISTIC SITE PARAMETERS ----- --- -------- --- ---- - - ---- ROSE CANYON NEWPORT- INGLEWOOD (offshore) CORONADO BANK ELSINORE - TEMECULA ELSINORE- JULIAN EARTHQUAKE VALLEY ELSINORE -GLEN IVY PALOS VERDES SAN JACINTO -ANZA SAN JACINTO -SAN JACINTO VALLEY SAN JACINTO- COYOTE CREEK ELSINORE - COYOTE MOUNTAIN NEWPORT- INGLEWOOD (L.A.Basin) CHINO- CENTRAL AVE. (Elsinore) WHITTIER SAN JACINTO - BORREGO COMPTON THRUST SAN JACINTO -SAN BERNARDINO ELYSIAN PARK THRUST SAN ANDREAS - San Bernardino SAN ANDREAS - Southern SAN ANDREAS - Coachella PINTO MOUNTAIN SAN JOSE SUPERSTITION MTN. (San Jacinto) SIERRA MADRE BURNT MTN. CUCAMONGA ELMORE RANCH NORTH FRONTAL FAULT ZONE (West) EUREKA PEAK SUPERSTITION HILLS (San Jacinto) LAGUNA SALADA CLEGHORN NORTH FRONTAL FAULT ZONE (East) SAN ANDREAS - 1857 Rupture SAN ANDREAS - Mojave RAYMOND CLAMSHELL- SAWPIT LANDERS APPROXIMATE DISTANCE mi (km) 5 11 19 26 26 40 40 41 49 51 51 52 53 55 58 62 63 65 66 69 69 75 75 76 77 79 79 79 81 81 82 82 83 83 84 87 87 88 89 90 0( 8 6( 18 6( 31 2( 42 2( 42 5( 6S 9( 67 0( 78 0( 82 6( 83 8( 84 6( 86 2( 88 8( 94 8( 101 3( 101 9( 106 4( 106 0( 111 0( 111 2( 121 6( 121 1( 122 9( 125 7( 128 8( 128 9( 128 7( 131 7( 131 5( 132 7( 133 4( 134 8( 134 8( 136 6( 141 6( 141 0( 141 7( 144 5( 145 Page 2 0) 7) 6) 2) 2) 1) 5) 8) 1) 1) 9) ESTIMATED MAX. EARTHQUAKE EVENT ----------------- -- -- --- ------ MAXIMUM I PEAK JEST. SITE EARTHQUAKE) SITE JINTENSITY MAG.(MW) I ACCEL. g IMOD.MERC. 6.9 1 0.411 1 X 6.9 1 0.241 J IX 7.4 1 0.203 VIII 6.8 0.092 vii 7.1 0.118 VII 6.S 0.041 V 6.8 0.053 VI 7.1 0.066 VI 7.2 0.059 vI 6.9 0.043 VI 6.8 0.039 V 6.8 0.038 V 6.9 I 0.040 V 6.7 I 0.032 I V 6.8 0.033 V 6.6 0.025 V 6.8 0.029 V 6.7 I 0.026 V 6.7 I 0.025 V 7.3 0.041 v 7.4 0.045 VI 7.1 0.031 I V 7.0 0.028 1 V 6.5 1 0.017 I IV 6.6 I 0.019 1 Iv 7.0 I 0.024 V 6.4 1 0.015 IV 7.0 1 0.024 I V 6.6 1 0.018 IV 7.0 1 0.023 IV 6.4 1 0.015 IV 6.6 1 0.018 IV 7.0 0.025 V 6.5 0.016 IV 6.7 0.017 IV 7.8 0.047 VI 7.1 0.025 V 6.5 0.014 IV 6.5 0.014 I III 7.3 0.029 I V Page 2 -------------- --- - --- -- ABBREVIATED FAULT NAME 875- 550502 TARGETENCINITAS ----------------------------- DETERMINISTIC SITE PARAMETERS ---- -- --- ------ ------ -- - - - - -- -------------------------------------------------- (ESTIMATED MAX. EARTHQUAKE EVENT APPROXIMATE ------------------ DISTANCE MAXIMUM 1 PEAK JEST. SITE I mi (km) IEARTHQUAKEI SITE (INTENSITY I I MAG.(Mw) 1 ACCEL. g 1MOD.MERC. VERDUGO 1 90.7( + 146.0)1 version 6.7 1 0.016 f BRAWLEY SEISMIC ZONE 1 92.3( 148.6)1 6.4 1 0.013 HOLLYWOOD 1 92.5( 148.9)1 6.4 1 0.012 HELENDALE - S. LOCKHARDT 1 93.3( 150.1)1 7.1 1 0.023 LENWOOD - LOCKHART -OLD WOMAN SPRGSI 96.4( 155.1)1 7.3 1 0.027 SANTA MONICA 1 97.1( 156.3)1 6.6 1 0.013 EMERSON So. - COPPER MTN. 1 98.1( 157.9)1 6.9 1 0.018 IMPERIAL 1 98.9( 159.1)1 7.0 1 0.020 JOHNSON VALLEY (Northern) 1 98.9( 159.1)1 6.7 1 0.015 MALIBU COAST 1 99.6 ( 160.3)1 6.7 1 0.014 ' k+++ ff+ Rf++ X4+ h++::+ f+ 4+ 4+ H' sffCffff++ f++ Aff+ ++ +rt +Rff + +f + + + + + >+ff +fffff -END OF SEARCH- 50 FAULTS FOUND WITHIN THE SPECIFIED SEARCH RADIUS. THE ROSE CANYON FAULT IS CLOSEST TO THE SITE. IT IS ABOUT 5.0 MILES (8.0 km) AWAY. LARGEST MAXIMUM- EARTHQUAKE SITE ACCELERATION: 0.4108 g + + + + + + + + + + + + + + + + + + + + + ++ ^' E Q F A U L T + + f version 3.00 + f DETERMINISTIC ESTIMATION OF PEAK ACCELERATION FROM DIGITIZED FAULTS JOB NUMBER: 875 -55052 DATE: 03 -16 -2005 JOB NAME: Target - Encinitas CALCULATION NAME: Test Run Analysis FAULT - DATA -FILE NAME: CDMGFLTE.DAT SITE COORDINATES: SITE LATITUDE: 33.0626 SITE LONGITUDE: 117.2650 SEARCH RADIUS: 100 mi ATTENUATION RELATION: 14) Campbell & Bozorgnia (1997 Rev.) - Alluvium UNCERTAINTY (M= Median, S= Sigma): S Number of Sigmas: 1.0 Page 3 IV III III IV V III IV IV IV IV ffffffffrt 875- 550502 TARGETENCINITAS DISTANCE MEASURE: Cdist SCOND: 0 Basement Depth: 5.00 km Campbell SSR: 0 COMPUTE PEAK HORIZONTAL ACCELERATION FAULT -DATA FILE USED: CDMGFLTE.DAT MINIMUM DEPTH VALUE (km): 3.0 --------------- EQFAULT SUMMARY ------- -- - ----- Campbell SHR: 0 ----------------------------- DETERMINISTIC SITE PARAMETERS Page 1 -------------------------- - - - - -- ABBREVIATED FAULT NAME ROSE CANYON NEWPORT- INGLEWOOD (offshore) CORONADO BANK ELSINORE- TEMECULA ELSINORE- JULIAN EARTHQUAKE VALLEY ELSINORE -GLEN IVY PALOS VERDES SAN JACINTO-ANZA SAN JACINTO -SAN JACINTO VALLEY SAN JACINTO- COYOTE CREEK ELSINORE- COYOTE MOUNTAIN APPROXIMATE DISTANCE mi (km) 1ESTIMATED I MAXIMUM 1EARTHQUAKE MAG.(Mw) 5.0( 8.0)1 6.9 11.6( 18.7)1 6.9 19.6( 31.6)1 7.4 26.2( 42.2)1 6.8 26.2( 42.2)1 7.1 40.5( 65.1)1 6.5 40.5( 65.1)1 6.8 41.9( 67.5)1 7.1 49.0( 78.8)1 7.2 51.0( 82.1)1 6.9 51.6( 83.1)1 6.8 S2.8( 84.9)1 6.8 Page 4 1AX. EARTHQI PEAK SITE ACCEL. g = - -0 607 0.356 0.302 0.153 0.189 0.071 0.092 0.114 0.102 0.075 0.067 0.065 JAKE EVENT EST. SITE INTENSITY MOD.MERC. IX IX VIII VIII VI VII VII VII VII VI VI 875- 550502 NEWPORT - INGLEWOOD (L.A.Basin) J 53.6( EARTHQUAKEI CHINO- CENTRAL AVE. (Elsinore) 1 55.2( 6.9 WHITTIER J 58.8( 1 SAN JACINTO - BORREGO I 62.8( 6.4 1 COMPTON THRUST 1 63.3( 1 0.055 SAN JACINTO -SAN BERNARDINO I 65.9( 94.6)1 ELYSIAN PARK THRUST I 66.4( 7.3 SAN ANDREAS - San Bernardino 1 69.0( VI SAN ANDREAS - Southern 1 69.0( 6.6 SAN ANDREAS - Coachella J 75.2( 1 PINTO MOUNTAIN 1 75.6( 6.7 1 SAN JOSE 76.1( 1 0.049 SUPERSTITION MTN. (San Jacinto) 77.9( 106.1)1 SIERRA MADRE 79.7( BURNT MTN. 79.8( VI CUCAMONGA 79.9( 6.7 ELMORE RANCH 81.7( 1 NORTH FRONTAL FAULT ZONE (West) 81.7( EUREKA PEAK 82.S( 1 0.072 SUPERSTITION HILLS (San Jacinto)I 82.7( 111.1)1 LAGUNA SALADA 1 83.4( CLEGHORN 1 83.8( VII NORTH FRONTAL FAULT ZONE (East) 84.8( 7.1 SAN ANDREAS - 1857 Rupture 87.6( 1 SAN ANDREAS - Mojave 87.6( RAYMOND 1 88.0( 1 0.049 CLAMSHELL - SAWPIT 89.7( 122.5)1 LANDERS 90.5( TARGETENCINITAS PEAK JEST. SITE EARTHQUAKEI 86.3)1 JINTENSITY 6.9 ACCEL. g 1 0.070 1 VI 88.9)1 6.4 1 6.7 1 IV 1 0.055 1 VI 94.6)1 0.041 6.8 7.3 1 0.057 I VI 101.0)1 IV 6.6 0.032 1 0.044 1 vI 101.8)1 6.7 1 6.8 V 1 0.049 1 VI 106.1)1 6.7 1 0.045 1 VI 106.8)1 6.7 1 0.043 1 vi 111.1)1 7.3 1 0.072 1 vi 111.1)1 7.4 1 0.078 1 VII 121.0)1 7.1 1 0.054 1 vi 121.7)1 7.0 1 0.049 1 VI 122.5)1 6.5 1 0.030 1 V 125.4)1 6.6 1 0.033 1 V 128.3)1 7.0 1 0.042 1 VI 128.4)1 6.4 1 0.027 1 V 128.6)1 7.0 1 0.042 1 vI 131.5)1 6.6 1 0.031 1 V 131.5)1 7.0 1 0.040 1 v 132.8)1 6.4 1 0.025 1 V 133.1)1 6.6 1 0.030 1 V 134.3)1 7.0 1 0.043 1 vi 134.8)1 6.5 1 0.027 1 V 136.4)1 6.7 1 0.030 1 V 141.0)1 7.8 1 0.082 1 VII 141.0)1 7.1 1 0.044 1 vi 141.7)1 6.5 1 0.024 1 V 144.3)1 6.5 1 0.024 1 IV 145.7)1 7.3 1 0.050 1 vI ----------------------------- DETERMINISTIC SITE PARAMETERS Page 2 -------------------------------------------------------- ------------ -- --- - - - - -- ABBREVIATED FAULT NAME VERDUGO BRAWLEY SEISMIC ZONE HOLLYWOOD HELENDALE - S. LOCKHARDT LENWOOD - LOCKHART -OLD WOMAN SPRGS SANTA MONICA EMERSON SO. - COPPER MTN. IMPERIAL JOHNSON VALLEY (Northern) MALIBU COAST APPROXI DISTA mi 90.7( 92.3( 92.5( 93.3( 96.4( 97.1( 98.1( 98.9( 98.9( 99.6 r * * * * * * ** ESTIMATED MAX. EARTHQUAKE EVENT MAXIMUM I PEAK JEST. SITE EARTHQUAKEI SITE JINTENSITY MAG.(Mw) I ACCEL. g JMOD.MERC. 6.7 1 0.027 1 V 6.4 1 0.022 1 IV 6.4 1 0.021 I IV 7.1 1 0.041 1 V 7.3 0.046 1 vI 6.6 0.023 IV 6.9 0.032 V 7.0 1 0.034 V 6.7 1 0.026 V 6.7 0.024 IV -END OF SEARCH- SO FAULTS FOUND WITHIN THE SPECIFIED SEARCH RADIUS. THE ROSE CANYON FAULT IS CLOSEST TO THE SITE. IT IS ABOUT 5.0 MILES (8.0 km) AWAY. LARGEST MAXIMUM- EARTHQUAKE SITE ACCELERATION: 0.6068 g Page 5 EARTHQUAKE MAGNITUDES & DISTANCES 7.75 7.50 7.25 a� c 7.00 rn c� 6.75 lj Target - Encinitas .1 1 10 100 Distance (mi) C 0 c� L CD U U 2 MAXIMUM EARTHQUAKES Target - Encinitas .01 001 .1 1 10 100 Distance (mi) DIP -SLIP FAULTS 14) Campbell & Bozorgnia (1997 Rev.) - Alluvium 1 v� 0 c� a� a� U U Q .01 K1 M =5 M =6 M =7 M =8 1 10 100 Distance [adist] (km) STRIKE -SLIP FAULTS 14) Campbell & Bozorgnia (1997 Rev.) - Alluvium 1 Q) 0 0 Q .01 001 M =5 M =6 M =7 M =8 1 10 100 Distance jadistj (km) 0 ca L Q) 0 0 Q .01 001 M =5 M =6 M =7 M =8 1 10 100 Distance jadistj (km) BLIND- THRUST FAULTS 14) Campbell & Bozorgnia (1997 Rev.) - Alluvium 1 rn 0 m a� (D U U Q .01 .001 M =5 M =6 M =7 M =8 1 10 100 Distance [adist] (km) TARGETENCINITAS.OUT 44tr4444444444#44444444# 4 U B C S E I 5 ° * * version 1.03 # * COMPUTATION OF 1997 UNIFORM BUILDING CODE SEISMIC DESIGN PARAMETERS JOB NUMBER: 87S -55052 JOB NAME: Target - Encini FAULT - DATA -FILE NAME: CDMGUBCR.DAT SITE COORDINATES: SITE LATITUDE: 33.0626 SITE LONGITUDE: 117.2650 UBC SEISMIC ZONE: 0.4 UBC SOIL PROFILE TYPE: SO NEAREST TYPE A FAULT: NAME: ELSINORE- JULIAN DISTANCE: 42.1 km NEAREST TYPE B FAULT: NAME: ROSE CANYON DISTANCE: 7.4 km NEAREST TYPE C FAULT: NAME: DISTANCE: 99999.0 km SELECTED UBC SEISMIC COEFFICIENTS: Na: 1.0 NV: 1.1 Ca: 0.44 Cv: 0.71 Ts: 0.642 TO: 0.128 DATE: 03 -16 -2005 Rf# RRRRRRftr# f# Rftrf* fff4' etr4RRRRRRRRRR# RRRR #R #RR #R #RRRRR4RRRRk *3RRRR'sf CAUTION: The digitized data points used to model faults are ° * limited in number and have been digitized from small- scale maps (e.g., 1:750,000 scale). Consequently, ° R the estimated fault- site - distances may be in error by # several kilometers. Therefore, it is important that tr the distances be carefully checked for accuracy and 4 * adjusted as needed, before they are used in design. # RR*** RR* 4**** 444trf' kRRRR# R? 44'. r# 444k# RRRfRRhRR4RRRRfRRRRirArtRlAfffRRR4 - - - - _ - - - - - -- Page 1 TARGETENCINITAS.OUT SUMMARY OF FAULT PARAMETERS Page 1 - ----------- --- ---- ----- - - -- -- ABBREVIATED FAULT NAME ROSE CANYON NEWPORT - INGLEWOOD (Offshore) CORONADO BANK ELSINORE- JULIAN ELSINORE - TEMECULA ELSINORE -GLEN IVY EARTHQUAKE VALLEY PALOS VERDES SAN JACINTO -ANZA SAN JACINTO -SAN JACINTO VALLEY SAN JACINTO- COYOTE CREEK ELSINORE - COYOTE MOUNTAIN NEWPORT- INGLEWOOD (L.A.Basin) CHINO_ CENTRAL AVE. (Elsinore) ELSINORE - WHITTIER SAN JACINTO - BORREGO SAN JACINTO -SAN BERNARDINO SAN ANDREAS - Southern SAN JOSE PINTO MOUNTAIN SUPERSTITION MTN. (San Jacinto) CUCAMONGA SIERRA MADRE (Central) BURNT MTN. ELMORE RANCH NORTH FRONTAL FAULT ZONE (West) EUREKA PEAK SUPERSTITION HILLS CSan Jacinto) ELSINORE - LAGUNA SALADA CLEGHORN NORTH FRONTAL FAULT ZONE (East) RAYMOND SAN ANDREAS - 1857 Rupture CLAMSHELL - SAWPIT VERDUGO LANDERS HOLLYWOOD BRAWLEY SEISMIC ZONE HELENDALE - S. LOCKHARDT LENWOOD - LOCKHART -OLD WOMAN SPRGS SANTA MONICA EMERSON SO. - COPPER MTN. IMPERIAL JOHNSON VALLEY (Northern) MALIBU COAST SIERRA MADRE (San Fernando) APPROX.ISOURCE DISTANCEI TYPE (km) I(A,B,C)1 z 7.4 1 B MAX. I MAG. (Mw) 1 6.9 I SLIP I RATE I (mm /yr) I FAULT I TYPE I(SS,DS,BT) I 1.50 I� 55 18.5 I B I 6.9 I 1.50 1 55 31.4 1 B I 7.4 I 3.00 I SS 42.1 I A I 7.1 1 5.00 I SS 42.1 I B I 6.8 I 5.00 I 5S 65.0 I B I 6.8 I 5.00 I SS 65.1 I B I 6.5 2.00 I SS 67.3 I B I 7.1 3.00 I 55 78.8 I A I 7.2 12.00 I SS 82.0 I B I 6.9 12.00 I 55 83.1 I B I 6.8 I 4.00 I 55 84.8 I B I 6.8 I 4.00 I SS 86.1 I B I 6.9 I 1.00 I SS 88.3 I B I 6.7 I 1.00 I DS 94.6 I B I 6.8 I 2.50 I SS 101.0 I B I 6.6 1 4.00 I SS 106.1 I B I 6.7 I 12.00 1 SS 111.1 I A 7.4 I 24.00 1 SS 121.6 I s I 6.5 I 0.50 1 DS 121.7 I B I 7.0 I 2.50 1 SS 125.4 1 e I 6.6 I 5.00 I 55 125.6 I A I 7.0 I 5.00 I DS 125.9 1 B I 7.0 I 3.00 1 DS 128.4 I e 6.5 I 0.60 I 5S 131.5 I e II 6.6 I 1.00 I SS 132.4 I B I 7.0 I 1.00 I DS 132.8 I B 6.5 I 0.60 1 SS 133.1 I B 1 6.6 I 4.00 I 55 134.2 I B I 7.0 I 3.50 1 55 134.8 1 B I 6.5 I 3.00 I SS 138.4 I B 1 6.7 1 0.50 I DS 140.8 I B I 6.5 I 0.50 I DS 140.9 I A I 7.8 I 34.00 1 SS 141.2 I B I 6.5 I 0.50 I DS 144.8 I B I 6.7 I 0.50 I DS 145.7 I B I 7.3 I 0.60 I SS 148.0 I B I 6.5 I 1.00 I DS 148.6 I B I 6.5 I 25.00 I 55 150.0 I B I 7.1 I 0.60 I 55 155.1 I B I 7.3 I 0.60 I 5S 155.5 I B I 6.6 I 1.00 1 DS 157.9 I B I 6.9 I 0.60 1 55 158.9 I A I 7.0 I 20.00 1 SS 159.0 I B I 6.7 I 0.60 1 55 159.8 I B I 6.7 I 0.30 I DS 165.7 I B I 6.7 I 2.00 I DS --------------------------- SUMMARY OF FAULT PARAMETERS -------- --- --- --- ---- -- ---- Page 2 TARGETENCINITAS.OUT Page 2 ------------------------------------------------------------------------------- ABBREVIATED FAULT NAME PISGAH - BULLION MTN.- MESQUITE LK I APPROX.ISOURCE IDISTANCEI TYPE I (km) ICA,B,C)I I = =__= I =__= I 167.3 I B I MAX. I I MAG. I (Mw) I I == I SLIP RATE (mm /yr) ------= I FAULT I TYPE I(SS,DS,BT) I I 7.1 I 0.60 I SS ANACAPA -DUME I 168.1 I B I 7.3 I 3.00 I DS SAN GABRIEL I 168.6 I B I 7.0 I 1.00 I SS CALICO - HIDALGO I 171.7 I B I 7.1 I 0.60 I SS SANTA SUSANA I 181.2 I B I 6.6 I 5.00 I DS HOLSER I 190.1 I B I 6.5 I 0.40 I DS SIMI -SANTA ROSA I 197.6 I B I 6.7 I 1.00 I DS OAK RIDGE (Onshore) I 198.4 I B I 6.9 I 4.00 I DS GRAVEL HILLS - HARPER LAKE I 203.8 I B I 6.9 I 0.60 I SS SAN CAYETANO I 206.9 I B I 6.8 I 6.00 I DS BLACKWATER I 219.3 I B I 6.9 I 0.60 I SS VENTURA - PITAS POINT I 225.6 I B I 6.8 I 1.00 I DS SANTA YNEZ (East) I 226.6 I B I 7.0 I 2.00 I SS SANTA CRUZ ISLAND I 233.7 I B I 6.8 I 1.00 I DS M.RIDGE- ARROYO PARIDA -SANTA ANA I 236.4 I B I 6.7 I 0.40 I DS RED MOUNTAIN I 239.6 I B I 6.8 I 2.00 I DS GARLOCK (West) I 242.8 I A I 7.1 I 6.00 I SS PLEITO THRUST I 248.3 I B I 6.8 I 2.00 I DS BIG PINE I 254.1 I B I 6.7 I 0.80 I SS GARLOCK (East) I 257.0 I A I 7.3 1 7.00 I SS SANTA ROSA ISLAND I 268.4 I B I 6.9 I 1.00 I DS WHITE WOLF I 268.8 I B I 7.2 I 2.00 I DS SANTA YNEZ (West) 271.4 I B I 6.9 I 2.00 I SS So. SIERRA NEVADA 281.3 I B I 7.1 I 0.10 I DS OWL LAKE I 285.2 I B I 6.5 I 2.00 I SS PANAMINT VALLEY I 285.4 I B I 7.2 I 2.SO I SS LITTLE LAKE I 285.5 I B I 6.7 I 0.70 I SS TANK CANYON I 286.8 I B I 6.5 I 1.00 I DS DEATH VALLEY (South) 293.3 I B I 6.9 I 4.00 I SS LOS ALAMOS -W. BASELINE 313.5 I B I 6.8 I 0.70 I DS LIONS HEAD 331.1 I B I 6.6 I 0.02 I DS DEATH VALLEY (Graben) 335.5 I B I 6.9 I 4.00 I DS SAN LUIS RANGE (S. Margin) 340.9 I B 7.0 I 0.20 I DS SAN JUAN 341.8 I B 7.0 I 1.00 I SS CASMALIA (Orcutt Frontal Fault) 349.2 I 8 6.5 I 0.25 I DS OWENS VALLEY 354.2 I B 7.6 1 1.S0 I SS LOS OSOS 371.0 I B I 6.8 I 0.50 I DS HOSGRI 376.8 I B I 7.3 I 2.50 I SS HUNTER MTN. - SALINE VALLEY I 380.0 I B I 7.0 2.50 I SS DEATH VALLEY (Northern) 389.1 I A I 7.2 5.00 1 SS INDEPENDENCE 390.1 I B I 6.9 I 0.20 1 DS RINCONADA 1 392.1 I B I 7.3 1 1.00 I SS BIRCH CREEK I 446.5 I B I 6.5 I 0.70 I DS SAN ANDREAS (Creeping) I 448.5 I B I S.0 I 34.00 I SS WHITE MOUNTAINS I 450.9 I B I 7.1 I 1.00 I SS DEEP SPRINGS I 469.3 I B I 6.6 1 0.80 I DS --------------------------- SUMMARY OF FAULT PARAMETERS Page 3 ---------------------------------------------------------------------------- I APPROX.ISOURCE I MAX. I SLIP I FAULT Page 3 TARGETENCINITAS.OUT ABBREVIATED FAULT NAME DEATH VALLEY (N. of CUCamongo) IDISTANCEI I (km) I 474.1 TYPE I I(A,B,C)I I A I MAG. (Mw) 7.0 I RATE I (mm/yr) I TYPE I(SS,DS,BT) I SS I 5.00 ROUND VALLEY (E. of S.N.MtnS.) I 481.7 B I 6.8 I 1.00 I DS FISH SLOUGH I 489.4 B I 6.6 I 0.20 I DS HILTON CREEK I 507.8 1 B 1 6.7 1 2.50 I DS HARTLEY SPRINGS I 532.2 I B I 6.6 I 0.50 I DS ORTIGALITA I 532.9 I e I 6.9 I 1.00 I SS CALAVERAS (So.of CalaveraS Res) I 538.4 B I 6.2 I 15.00 I SS MONTEREY BAY - TULARCITOS I 541.0 B I 7.1 I 0.50 I DS PALO COLORADO - SUR I 542.0 B I 7.0 I 3.00 I SS QUIEN SABE I 551.7 I B I 6.5 1.00 I SS MONO LAKE I 568.2 I B I 6.6 2.50 DS ZAYANTE- VERGELES I 570.2 I B I 6.8 0.10 I SS SAN ANDREAS (1906) I 575.4 I A I 7.9 24.00 I SS SARGENT I 575.5 I s I 6.8 1 3.00 I SS ROBINSON CREEK I 599.5 I e I 6.5 I 0.50 I OS SAN GREGORIO I 616.4 I A I 7.3 5.00 I SS GREENVILLE I 625.3 I s I 6.9 I 2.00 SS MONTE VISTA - SHANNON I 625.7 I B I 6.5 I 0.40 DS HAYWARD (SE Extension) I 625.7 I B 1 6.5 I 3.00 SS ANTELOPE VALLEY I 639.9 I B 6.7 I 0.80 OS HAYWARD (Total Length) I 645.5 I A I 7.1 9.00 I SS CALAVERAS (No.of CalaveraS Res) I 645.5 I B I 6.8 6.00 I SS GENOA I 665.3 I B I 6.9 1.00 I DS CONCORD - GREEN VALLEY I 693.2 I B I 6.9 1 6.00 I ss RODGERS CREEK I 732.0 I A I 7.0 1 9.00 I SS WEST NAPA I 732.9 I B I 6.5 1 1.00 I SS POINT REYES I 750.9 I B I 6.8 1 0.30 I DS HUNTING CREEK - BERRYESSA I 755.4 I B I 6.9 I 6.00 I SS MAACAMA (south) 794.8 B 6.9 I 9.00 SS COLLAYOMI 811.7 B 1 6.5 I 0.60 I SS BARTLETT SPRINGS I 815.2 I A 1 7.1 I 6.00 SS MAACAMA (Central) I 836.4 I A 1 7.1 1 9.00 I Ss MAACAMA (North) I 896.0 I A 1 7.1 1 9.00 I SS ROUND VALLEY (N. S.F.Bay) I 902.1 I B 1 6.8 I 6.00 1 SS BATTLE CREEK I 925.4 I B 1 6.5 I 0.50 DS LAKE MOUNTAIN I 960.6 I B 1 6.7 I 6.00 SS GARBERVILLE - BRICELAND I 977.7 I B I 6.9 I 9.00 SS MENDOCINO FAULT ZONE 1 1034.0 I A 7.4 I 35.00 DS LITTLE SALMON (Onshore) 1 1040.6 I A 7.0 5.00 DS MAD RIVER 1 1043.5 I B I 7.1 I 0.70 DS CASCADIA SUBDUCTION ZONE 1 1047.7 I A I 8.3 I 35.00 DS MCKINLEYVILLE 1 1053.9 I e I 7.0 I 0.60 DS TRINIDAD 1 1055.4 I B 7.3 I 2.50 DS FICKLE HILL 1 1055.8 I B I 6.9 1 0.60 1 DS TABLE BLUFF 1 1061.3 1 e 1 7.0 1 0.60 1 DS LITTLE SALMON (offshore) 1 1074.6 1 B 1 7.1 1 1.00 1 DS Page 4 --------------------------- SUMMARY OF FAULT PARAMETERS I MAX. I SLIP ABBREVIATED IDISTANCEISTYPEE I MAG. I RATE I FAULT TYPE FAULT NAME I (km) I(A,B,C)1 (Mw) I (mm/yr) I(SS,DS,BT) Page 4 TARGETENCINITAS.OUT BIG LAGOON - BALD MTN.FLT.ZONE 1092.3 B 7.3 0.50 DS Page 5 DESIGN RESPONSE SPECTRUM Seismic Zone: 0.4 Soil Profile: SD 2.50 2.25 2.00 m 1.75 0 cu 1.50 1.25 U Q 1.00 0.75 U a 0.50 0.25 0.00 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 Period Seconds APPENDIX E STANDARD GUIDELINES FOR GRADING PROJECTS Standard Guidelines For Grading Projects STANDARD GUIDELINES FOR GRADING PROJECTS Presented By: Professional Service Industries, Inc. Standard Guidelines For Grading Projects TABLE OF CONTENT GENERAL................................................................................................_.._.......... ._.._.............._.......SG-i DEFINITION OF TERMS .......................................................................................... ........................_...... I OBLIGATIONSOF PARTIES ................................................................................ ..................._..._._..._. 5 SITEPREPARATION ................................................................................................. ...................._.......... 5 SITEPROTECTION .................................................................................................... ............................... 6 EXCAVATIONS........................................................................................................... ............................... 7 UnsuitableMaterials ................................................................................................. ............................... 7 CutSlopes ................................................................................................................... ............................... 7 PadAreas ..................................... ................................ .. .......................................................................... 8 COMPACTEDFILL .......................................... . ............... _........................................................................ 8 Placement.................................. » .................................................................... ............ ....... .................... 8 Moisture................................................................................................................... ............................... 10 FillMaterial ............................................................................................................. ............................... 10 FillSlopes .......... _ ...... ............ ............ _ ................................................................... ............................... 12 Off -Site Fill .................................. » ....... _................................................................................................. 13 DRAINAGE.......... »_ ................................................................................................... ............................... 13 STAKING.................................................................................................................... ............................... 14 SLOPE MAINTENANCE ............ _ .... ...................................................................................................... 14 Landscape Plants ....................................... _........................................................................................... 14 Irrigation ...................................................................................._............................ ............................... 14 Maintenance............................................................................................................. ............................... 15 Repairs...................................................................................................................... ............................... 15 TRENCHBACKFILL ............................................... ............... ............................................................... 15 STATUSOF GRADI NG ............................................................................................. ............................... 16 Standard Guidelines For Grading Projects GENERAL The guidelines contained herein and the standard details attached hereto represent this firm's standard recommendation for grading and other associated operations on construction projects. These guidelines should be considered a portion of the project specifications. All plates attached hereto shall be considered as part of these guidelines. The Contractor should not vary from these guidelines without prior recommendation by the Geotechnical Consultant and the approval of the Client or his authorized representative. Recommendation by the Geotechnical Consultant and/or Client should not be considered to preclude requirements for the approval by the controlling agency prior to the execution of any changes. These Standard Grading Guidelines and Standard Details may be modified and/or superseded by recommendations contained in the text of the preliminary Geotechnical Report and/or subsequent reports. If disputes arise out of the interpretation of these grading guidelines or standard details, the Geotechnical Consultant shall provide the governing interpretation. DEFINITION OF TERMS ALLUVIUM — Unconsolidated soil deposits resulting from flow of water, including sediments deposited in river beds, canyons, flood plains, lakes, fans and estuaries. AS- GRADED (AS- BUILT) — The surface and subsurface conditions at completion of grading. BACKCUT — A temporary construction slope at the rear of earth retaining structures such as buttresses, shear keys, stabilization fills or retaining walls. BACKDRAIN — Generally a pipe and gravel or similar drainage system placed behind earth retaining structures such buttresses, stabilization fills, and retaining walls. BEDROCK — Relatively undisturbed formational rock, more or less solid, either at the surface or beneath superficial deposits of soil. BENCH — A relatively level step and near vertical rise excavated into sloping ground on which fill is to be placed. !FIfCxF71 BORROW (Import) — Any fill material hauled to the project site from off -site SG -1 Standard Guidelines For Grading Projects BUTTRESS FILL — A fill mass, the configuration of which is designed by engineering calculations to retain slope conditions containing adverse geologic features. A buttress is generally specified by minimum key width and depth and by maximum backcut angle. A buttress normally contains a back - drainage system. CIVIL ENGINEER — The Registered Civil Engineer or consulting firm responsible for preparation of the grading plans, surveying and verifying as- graded topographic conditions. CLIENT — The Developer or his authorized representative who is chiefly in charge of the project. He shall have the responsibility of reviewing the findings and recommendations made by the Geotechnical Consultant and shall authorize the Contractor and/or other consultants to perform work and/or provide services. COLLUVIUM — Generally loose deposits usually found near the base of slopes and brought there chiefly by gravity through slow continuous downhill creep (also see Slope Wash). COMPACTION — Densification of man- placed fill by mechanical means. CONTRACTOR — A person or company under contract or otherwise retained by the Client to perform demolition, grading and other site improvements. DEBRIS — All products of clearing, grubbing, demolition, and contaminated soil materials unsuitable for reuse as compacted fill, and/or any other material so designated by the Geotechnical Consultant. ENGINEERING GEOLOGIST — A Geologist holding a valid certificate of registration in the specialty of Engineering Geology. ENGINEERED FILL — A fill of which the Geotechnical Consultant or his representative, during grading, has made sufficient tests to enable him to conclude that the fill has been placed in substantial compliance with the recommendations of the Geotechnical Consultant and the governing agency requirements. EROSION - The wearing away of ground surface as a result of the movement of wind, water, and/or ice. EXCAVATION — The mechanical removal of earth materials. EXISTING GRADE — The ground surface configuration prior to grading. FILL — Any deposits of soil, rock, soil -rock blends or other similar materials placed by man. SG -2 Standard Guidelines For Grading Projects FINISH GRADE — The ground surface configuration at which time the surface elevations conform to the approved plan. GEOFABRIC — Any engineering textile utilized in geotechnical applications including subgrade stabilization and filtering. GEOLOGIST — A representative of the Geotechnical Consultant educated and trained in the field of geology. GEOTECHNICAL CONSULTANT — The Geotechnical Engineering and Engineering Geology consulting firm retained to provide technical services for the project. For the purpose of these specifications, observations by the Geotechnical Consultant include observations by the Soil Engineer, Geotechnical Engineer, Engineering Geologist and those performed by persons employed by and responsible to the Geotechnical Consultants. GEOTECHNICAL ENGINEER — A licensed Geotechnical Engineer or Civil Engineer who applies scientific methods, engineering principles and professional experience to the acquisition, interpretation and use of knowledge of materials of the earth's crust for the evaluation of engineering problems. Geotechnical Engineering encompasses many of the engineering aspects of soil mechanics, rock mechanics, geology, geophysics, hydrology and related sciences. GRADING — Any operation consisting of excavation, filling or combinations thereof and associated operations. LANDSIDE DEBRIS — Material, generally porous and of low density, produced from instability of natural or man-made slopes. MAXIMUM DENSITY — Standard laboratory test for maximum dry unit weight. Unless otherwise specified, the maximum dry unity weight shall be determined in accordance with ASTM Method of Test D 1557 -91. OPTIMUM MOISTURE — Soil moisture content at the test maximum density. RELATIVE COMPACTION — The degree of compaction (expressed as a percentage) of dry unit weight of a material as compared to the maximum dry unit weight of the material. ROUGH GRADE — The ground surface configuration at which time the surface elevations approximately conform to the approved plan. SITE - The particular parcel of land where grading is being performed. SG -3 Standard Guidelines For Grading Projects SHEAR KEY — Similar to buttress, however, it is generally constructed by excavating a slot within a natural slope, in order to stabilize the upper portion of the slope without grading encroaching into the lower portion of the slope. SLOPE — An inclined ground surface, the steepness of which is generally specified as a ration of horizontal:vertical (e.g., 2:1) SLOPE WASH — Soil and/or rock material that has been transported down a slope by action of gravity assisted by runoff water not confined by channels (also see Colluvium). SOIL — Naturally occurring deposits of sand, silt, clay, etc., or combinations thereof. SOIL ENGINEER — Licensed Geotechnical Engineer or Civil Engineer experienced in soil mechanics (also see Geotechnical Engineer). STABILIZATION FILL — A fill mass, the configuration of which is typically related to slope height and specified by the standards of practice for enhancing the stability of locally adverse conditions. A stabilization fill is normally specified by minimum key width and depth and by maximum backcut angle. A stabilization fill may or may not have a backdrainage system specified. SUBDRAIN — Generally a pipe and gravel or similar drainage system placed beneath a fill in the alignment of canyons or formed drainage channels. SLOUGH — Loose, non - compacted fill material generated during grading operations. TAILINGS — Non - engineered fill which accumulates on or adjacent to equipment haul -roads. TERRACE — Relatively level step constructed in the face of a graded slope surface for drainage control and maintenance purposes. TOPSOIL — The presumable fertile upper zone of soil, which is usually darker in color and loose. WINDROW — A string of large rocks buried within engineered fill in accordance with guidelines set forth by the Geotechnical Consultant. SG -4 Standard Guidelines For Grading Projects OBLIGATIONS OF PARTIES The Geotechnical Consultant should provide observation and testing services and should make evaluations in order to advise the Client on Geotechnical matters. The Geotechnical Consultant should report his findings and recommendations to the Client or his authorized representative. The client should be chiefly responsible for all aspects of the project. He or his authorized representative has the responsibility of reviewing the findings and recommendations of the Geotechnical Consultant. He shall authorize or cause to have authorized the Contractor and/or other consultants to perform work and/or provide services. During grading the Client or his authorized representative should remain on- site or should remain reasonably accessible to all concerned parties in order to make decisions necessary to maintain the flow of the project. The Contractor should he responsible for the safety of the project and satisfactory completion of all grading and other associated operations on construction projects, including but not limited to, earthwork in accordance with the project plans, specifications and controlling agency requirements. During grading, the Contractor or his authorized representative should remain on -site. Overnight and on days off, the Contractor should remain accessible. SITE PREPARATION The Client, prior to any site preparation or grading, should arrange and attend a meeting among the Grading Contractor, the Design Engineer, the Geotechnical Consultant, representatives of the appropriate governing authorities as well as any other concerned parties. All parties should be given at least 48 hours notice. Clearing and grubbing should consist of the removal of vegetation such as brush, grass, woods, stumps, trees, roots of trees and otherwise deleterious natural materials from the areas to be graded. Clearing and grubbing should extend to the outside of all proposed excavation and fill areas. Demolition should include removal of buildings, structures, foundations, reservoirs, utilities (including underground pipelines, septic tanks, leach fields, seepage pits, cisterns, mining shafts, tunnels, etc.) and man-made surface and subsurface improvements from the areas to be graded. Demolition of utilities should include proper capping and/or re- routing pipelines at the project perimeter and cutoff and capping of wells in accordance with the requirements of the governing authorities and the recommendations of the Geotechnical Consultant at the time of the demolition. Trees, plants or man -made improvements not planned to be removed or demolished should be protected by the Contractor from damage or injury. SG - S Standard Guidelines For Grading Projects Debris generated during clearing, grubbing and/or demolition operations should be wasted from areas to be graded and disposed off -site. Clearing, grubbing and demolition operations should be performed under the observation of the Geotechnical Consultant. The Client or Contractor should obtain the required approvals for the controlling authorities for the project prior, during and/or after demolition, site preparation and removals, etc. The appropriate approvals should be obtained prior to proceeding with grading operations. SITE PROTECTION Protection of the site during the period of grading should be the responsibility of the Contractor. Unless other provisions are made in writing and agreed upon among the concerned parties, completion of a portion of the project should not be considered to preclude that portion or adjacent areas from the requirements for site protection until such time as the entire project is complete as identified by the Geotechnical Consultant, the Client and the regulating agencies. The Contractor should be responsible for the stability of all temporary excavations. Recommendations by the Geotechnical Consultant pertaining to temporary excavations (e.g., backcuts) are made in consideration of stability of the completed project and therefore, should not be considered to preclude the responsibilities of the Contractor. Recommendations by the Geotechnical Consultant should not be considered to preclude more restrictive requirements by the regulating agencies. Precautions should be taken during the performance of site clearing, excavations and grading to protect the work site from flooding, ponding, or inundation by poor or improper surface drainage. Temporary provisions should be made during the rainy season to adequately direct surface drainage away from and off the work site. Where low areas can not be avoided, pumps should be kept on hand to continually remove water during periods of rainfall. During periods of rainfall, plastic sheeting should be kept reasonably accessible to prevent unprotected slopes from becoming saturated. Where necessary during periods of rainfall, the Contractor should install check -dams de- silting basins, rip -rap, sandbags or other devices or methods necessary to control erosion and provide safe conditions. During periods of rainfall, the Geotechnical Consultant should be kept informed by the Contractor as to the nature of remedial or preventative work being performed (e.g., pumping, placement of sandbags or plastic sheeting, other labor, dozing, etc.). Following periods of rainfall, the Contractor should contact the Geotechnical Consultant and arrange a walk -over of the site in order to visually assess rain related damage. The Geotechnical Consultant may also recommend excavations and testing in order to aid in his assessments. At the request of the Geotechnical Consultant, the Contractor shall make excavations in order to evaluate the extent of rain related damage. SG -6 Standard Guidelines For Grading Projects Rain- related damage should be considered to include, but may not be limited to, erosion, silting, saturation, swelling, structural distress and other adverse conditions identified by the Geotechnical Consultant. Soil adversely affected should be classified as Unsuitable Materials and should be subject to overexcavation and replaced with compacted fill or other remedial grading as recommended by the Geotechnical Consultant. Relatively level areas, where saturated soils and/or erosion gullies exist to depths greater then 1 foot, should be overexcavated to unaffected, competent material. Where less than 1 foot in depth, unsuitable materials may be processed in -place to achieve near optimum moisture conditions, then thoroughly recompacted in accordance with the applicable specifications. If the desired results are not achieved, the affected materials should be overexcavated then replaced in accordance with the applicable specifications. In slope areas, where saturated soil and/or erosion gullies exist to depths of greater than 1 foot, should be over - excavated to unaffected, competent material. Where affected materials exist to depths of 1 foot or less below proposed finished grade, remedial grading by moisture conditioning in- place, followed by thorough recompaction in accordance with the applicable grading guidelines herein may be attempted. If the desired results are not achieved, all affected materials should be overexcavated and replaced as compacted fill in accordance with the slope repair recommendations herein. As field conditions dictate, other slope repair procedures may be recommended by the Geotechnical Consultant. EXCAVATIONS Unsuitable Materials Materials which are unsuitable should be excavated under observation and recommendations of the Geotechnical Consultant. Unsuitable materials include, but may not be limited to dry, loose, soft, wet, organic compressible natural soils and fractured, weathered, soft, bedrock and nonengineered or otherwise deleterious fill materials. Materials identified by the Geotechnical Consultant as unsatisfactory due to its moisture conditions should be overexcavated, watered or dried, as needed, and thoroughly blended to uniform near optimum moisture condition (per Moisture guidelines presented herein) prior to placement as compacted fill. Cut Slopes Unless otherwise recommended by the Geotechnical Consultant and approved by the regulating agencies, permanent cut slopes should not be steeper than 2:1 (horizontal: vertical). If excavations for cut slopes expose loose, cohesionless, significantly fractured or otherwise suitable material, overexcavation and replacement of the unsuitable materials SG -7 Standard Guidelines For Grading Projects with a compacted stabilization fill should be accomplished as recommended by the Geotechnical Consultant. Unless otherwise specified by the Geotechnical Consultant, stabilization fill construction should conform to the requirements of the Standard Details. The Geotechnical Consultant should review cut slopes during excavation. The Geotechnical Consultant should be notified by the contractor prior to beginning slope excavations. If during the course of grading, adverse or potentially adverse geotechnical conditions are encountered which were not anticipated in the preliminary report, the Geotechnical Consultant should explore, analyze and make recommendations to treat these problems. When cuts slopes are made in the direction of the prevailing drainage, a non- erodible diversion swale (brow ditch) should be provided at the top -of -cut. Pad Areas All lot pad areas, including side yard terraces, above stabilization fills or buttresses should be over - excavated to provide for a minimum of 3 -feet (refer to Standard Details) of compacted fill over the entire pad area. Pad areas with both fill and cut materials exposed and pad areas containing both very shallow (less than 3 -feet) and deeper fill should be over - thickness (refer to Standard Details). Cut areas exposing significantly varying material types should also be overexcavated to provide for at least a 3 -foot thick compacted fill blanket. Geotechnical conditions may require greater depth of overexcavation. The actual depth should be delineated by the Geotechnical Consultant during grading. For pad areas created above cut or natural slopes, positive drainage should be established away from the top -of- slope. This may be accomplished utilizing a berm and/or an appropriate pad gradient. A gradient in soil areas away from the top -of -slope of 2 percent or greater is recommended. COMPACTED FILL All fill materials should be compacted as specified below or by other methods specifically recommended by the Geotechnical Consultant. Unless otherwise specified, the minimum degree of compaction (relative compaction) should be 90 percent of the laboratory maximum density. Placement Prior to placement of compacted fill, the Contractor should request a review by the Geotechnical Consultant of the exposed ground surface. Unless otherwise recommended, the exposed ground surface should then be scarified (6- inches minimum), watered or dried as needed, thoroughly blended to achieve near optimum moisture SG -8 Standard Guidelines For Grading Projects conditions, then thoroughly compacted to a minimum of 90 percent of the maximum density. The review by the Geotechnical Consultants should not be considered to preclude requirements of inspection and approval by the governing agency. Compacted fill should be placed in thin horizontal lifts not exceeding 8- inches in loose thickness prior to compaction. Each lift should be watered or dried as needed, thoroughly blended to achieve near optimum moisture conditions then thoroughly compacted by mechanical methods to a minimum of 90 percent of laboratory maximum dry density. Each lift should be treated in a like [Wanner until the desired finished grades are achieved. The Contractor should have suitable and sufficient mechanical compaction equipment and watering apparatus on the job site to handle the amount of fill being placed in consideration of moisture retention properties of the materials. If necessary, excavation equipment should be "shut down' temporarily in order to permit proper compaction of fills. Earth moving equipment should only be considered a supplement and not substituted for conventional compaction equipment. When placing fill in horizontal lifts adjacent to areas sloping steeper than 5:1 (horizontal: vertical), horizontal keys and vertical benches should be excavated into the adjacent slope area. Keying and benching should be sufficient to provide at least 6 -foot wide benches and minimum of 4 -feet of vertical bench height within the firm natural ground, firm bedrock or engineered compacted fill. No compacted fill should be placed in an area subsequent to keying and benching until the area has been reviewed by the Geotechnical Consultant. Material generated by the benching operation should be moved sufficiently away from the bench area to allow for the recommended review of the horizontal bench prior to placement of fill. Typical keying and benching details have been included within the accompanying Standard Details. Within a single fill area where grading procedures dictate two or more separate fills, temporary slopes (false slopes) may be created. When placing fill adjacent to a false slope, benching should be conducted in the same manner as above described. At least a 3 -foot vertical bench should be established within the firm core of adjacent approved compacted fill prior to placement of additional fill. Benching should proceed in at least 3 -foot vertical increments until the desired finished grades are achieved. Fill should be tested for compliance with the recommended relative compaction and moisture conditions. Field density testing should conform to ASTM Method of Testing D 1556 -64, D 2922 -78 and/or D2937 -71. Tests should be provided for about every 2 vertical feet or 1,000 cubic yards of fill placed. Actual test intervals may vary as field conditions dictate. Fill found not to be in conformance with the grading recommendations should be removed or otherwise handled as recommended by the Geotechnical Consultant. SG -9 Standard Guidelines For Grading Projects The Contractor should assist the Geotechnical Consultant and/or his representative by digging test pits for removal determinations and/or for testing compacted fill. As recommended by the Geotechnical Consultant, the Contractor should "shutdown" or remove any grading equipment from an area being tested. The Geotechnical Consultant should maintain a plan with estimated locations of field tests. Unless the client provides for actual surveying of test locations, by the Geotechnical Consultant should only be considered rough estimates and should not be utilized for the purpose of preparing cross sections showing test locations or in any case for the purpose of after -the -fact evaluating of the sequence of fill placement. Moisture For field testing purposes, "near optimum" moisture will vary with material type and other factors including compaction procedures. "Near optimum" may be specifically recommended in Preliminary Investigation Reports and/or may be evaluated during grading. Prior to placement of additional compacted fill following an overnight or other grading delay, the exposed surface of previously compacted fill should be processed by scarification, watered or dried as needed, thoroughly blended to near- optimum moisture conditions, then recompacted to a minimum of 90 percent of laboratory maximum dry density. Where wet or other dry or other unsuitable materials exist to depths of greater than one foot, the unsuitable materials should be overexcavated. Following a period of flooding, rainfall or overwatering by other means, no additional fill should be placed until damage assessments have been made and remedial grading performed as described herein. Fill Material Excavated on -site materials which are acceptable to the Geotechnical Consultant may be utilized as compacted fill, provided trash, vegetation and other deleterious materials are removed prior to placement. Where import materials are required for use on -site, the Geotechnical Consultant should be notified at least 72 hours in advance of importing, in order to sample and test materials from proposed borrow sites. No import materials should be delivered for use on -site without prior sampling and testing by Geotechnical Consultant. Where oversized rock or similar irreducible material is generated during grading, it is recommended, where practical, to waste such material off -site or on -site in areas designated as "nonstructural rock disposal areas ". Rock placed in disposal areas should be placed with sufficient fines to fill voids. The rock should be compacted in lifts to an SG - 10 Standard Guidelines For Grading Projects unyielding condition. The disposal area should be covered with at least 3 -feet of compacted fill, which is free of oversized material. The upper 3 -feet should be placed in accordance with the guidelines for compacted fill herein. Rocks 12 inches in maximum dimension and smaller may be utilized within the compacted fill, provided they are placed in such a manner that nesting of the rock in avoided. Fill should be placed and thoroughly compacted over and around all rock. The amount of rock should not exceed 40 percent by dry weight passing the' /. -inch sieve size. The 12 -inch and 40 percent recommendations herein may vary as field conditions dictate. During the course of grading operations, rocks or similar irreducible materials greater than 12 -inch maximum dimension (oversized material) may be generated. These rocks should not be placed within the compacted fill unless placed as recommended by the Geotechnical Consultant. Where rocks or similar irreducible materials of greater that 12- inches but less than 4 -feet of maximum dimension are generated during grading, or otherwise desired to be placed within an engineered fill, special handling in accordance with the accompanying Standard Details is recommended. Rocks greater than 4 feet should be broken down or disposed off -sire. Rocks up to 4 -feet maximum dimension should be placed below the upper 10 -feet of any fill and should not be closer than 20 -feet to any slope face. These recommendations could vary as locations of improvements dictate. Where practical, oversized material should not be placed below areas where structures of deep utilities are proposes. Oversized material should be placed in windrows on a clean, overexcavated or unyielding compacted fill or firm natural ground surface. Select native or imported granular soil (S.E. 30 or higher) should be placed and thoroughly flooded over and around all windrowed rock, such that voids are filled. Windrows of oversized material should be staggered so that successive strata of oversized material are not in the same vertical plane. It may be possible to dispose of individual larger rock as field conditions dictate and as recommended by the Geotechnical Consultant at time of placement. Material that is considered unsuitable by the Geotechnical Consultant should not be utilized in the compacted fill. During grading operations, placing and mixing the materials from the cut and/or borrow areas may result in soil mixtures which possess unique physical properties. Testing may be required of samples obtained directly from the fill areas in order to verify conformance with the specifications. Processing of these additional samples may take two or more working days. The Contractor may elect to move the operation to other areas within the project, or may continue placing compacted fill pending laboratory and field test results. Should he elect the second alternative, fill placed is done so at the Contractor's risk. SG- 11 Standard Guidelines For Grading Projects Any fill placed in areas not previously reviewed and evaluated by the Geotechnical Consultant, and/or in other areas, without prior notification to the Geotechnical Consultant may require removal and recompaction at the Contractor's expense. Determination of overexcavations should be made upon review of field conditions by the Geotechnical Consultant. Fill Slopes Unless otherwise recommended by the Geotechnical Consultant and approved by the regulating agencies, permanent fill slopes should not be steeper than 2:1 (horizontal to vertical). Except as specifically recommended otherwise or as otherwise provided for in these grading guidelines (Reference Fill Materials), compacted fill slopes should be overbuilt and cut back to grade, exposing the firm, compacted fill inner core. The actual amount of overbuilding may vary as field conditions dictate. If the desired results are not achieved, the existing slopes should be overexcavated and reconstructed under the guidelines of the Geotechnical Consultant. The degree of overbuilding shall be increased until the desired compacted slope surface condition is achieved. Care should be taken by the Contractor to provide thorough mechanical compaction to the outer edge of the overbuilt slope surface. Although no construction procedure produces a slope free from risk of future movement, overfilling and cutting back of slope to a compacted inner core is, given no other constraints, the most desirable procedure. Other constraints, however, must often be considered. These constraints may include property line situations, access, the critical nature of the development, and cost. Where such constraints are identified, slope face compaction may be attempted by conventional construction procedures including backrolling techniques upon specific recommendations by the Geotechnical Consultant. As a second best alternative for slopes of 2:1 (horizontal to vertical) or flatter, slope construction may be attempted as outlined herein. Fill placement should proceed in thin lifts, (i.e., 6 to 8 inch loose thickness). Each lift should be moisture conditioned and thoroughly compacted. The desired moisture condition should be maintained and/or reestablished, where necessary, during the period between successive lifts. Selected lifts should be tested to ascertain that desired compaction is being achieved. Care should be taken to extend compactive effort to the outer edge of the slope. Each lift should extend horizontally to the desired finished slope surface or more as needed to ultimately establish desired grades. Grade during construction should not be allowed to roll off at the edge of the slope. It may be helpful to elevate slightly the outer edge of the slope. Slough resulting from the placement of individual lifts should not be allowed to drift down over previous lifts. At intervals not exceeding 4 -feet in vertical slope height or the capability of available equipment, whichever is less, fill slopes should be thoroughly backrolled utilizing a conventional sheepsfoot -type roller. Care should be taken to maintain the desired moisture conditions and/or reestablishing same as needed prior to backrolling. Upon achieving final grade, the slopes should again be moisture conditioned SG - 12 Standard Guidelines For Grading Projects and thoroughly backrolled. The use of a side -boom roller will probably be necessary and vibratory methods are strongly recommended. Without delay, so as to avoid (if possible) further moisture conditioning, the slopes should then be grid - rolled to achieve a relatively smooth surface and uniformly compact condition. In order to monitor slope construction procedures, moisture and density tests will be taken at regular intervals. Failure to achieve the desired results will likely result in a recommendation by the Geotechnical Consultant to overexcavate the slope surfaces followed by reconstruction of the slopes utilizing overfilling and cutting back procedures and/or further attempt at the conventional backrolling approach. Other recommendations may also be provided which would be commensurate with field conditions. Where placement of fill above a natural slope or above a cut slope is proposed, the fill slope configuration as presented in the accompanying standard Details should be adopted. For pad areas above fill slopes, positive drainage should be established away from the top -of- slope. This may be accomplished utilizing a berm and pad gradients of at least 2- percent in soil area. Off -Site Fill Off -site fill should be treated in the same manner as recommended in these specifications for site preparation, excavation, drains, compaction, etc. Off -site canyon fill should be placed in preparation for future additional fill, as shown in the accompanying Standard Details. Off -site fill subdrains temporarily terminated (up canyon) should be surveyed for future relocation and connection. DRAINAGE Canyon sub -drain systems specified by the Geotechnical Consultant should be installed in accordance with the Standard Details. Typical sub - drains for compacted fill buttresses, slope stabilization or sidehill masses, should be installed in accordance with the specifications of the accompanying Standard Details. Roof, pad and slope drainage should be directed away from slopes and areas of structures to suitable disposal areas via non - erodible devices (i.e., gutters, downspouts, concrete swales). For drainage over soil areas immediately away from structures (i.e., within 4- feet), a minimum of 4 percent gradient should be maintained. Pad drainage of at least 2 percent should be maintained over soil areas. Pad drainage may be reduced to at least 1 SG - 13 Standard Guidelines For Grading Projects percent for projects where no slopes exist, either natural or man -made, or greater than 10- feet in height and where no slopes are planned, either natural or man-made, steeper than 2:1 (horizontal to vertical slope ratio). Drainage patterns established at the time of fine grading should be maintained throughout the fife of the project. Property owners should be made aware that altering drainage patterns can be detrimental to slope stability and foundation performance. STAKING In all fill areas, the fill should be compacted prior to the placement of the stakes. This particularly is important on fill slopes. Slope stakes should not be placed until the slope is thoroughly compacted (backrolled). If stakes must be placed prior to the completion of compaction procedures, it must be recognized that they will be removed and/or demolished at such time as compaction procedures resume. In order to allow for remedial grading operations, which could include overexcavations or slope stabilization, appropriate staking offsets should be provided. For finished slope and stabilization backcut areas, we recommend at least 10 -feet setback from proposed toes and tops -of -cut. SLOPE MAINTENANCE Landscape Plants In order to enhance superficial slope stability, slope planting should be accomplished at the completion of grading. Slope planting should consist of deep - rooting vegetation requiring little watering. Plants native to the Southern California area and plants relative to native plants are generally desirable. Plants native to other semi- arid and and areas may also be appropriate. A Landscape Architect would be the best patty to consult regarding actual types of plants and planting configuration. Irrigation Irrigation pipes should be anchored to slope faces, not placed in trenches excavated into slope faces. Slope irrigation should be minimized. If automatic timing devices are utilized on irrigation systems, provisions should be made for interrupting normal irrigation during periods of rainfall. Though not a requirement, consideration should be give to the installation of near- surface moisture monitoring control devices. Such devices can aid in the maintenance of relatively uniform and reasonably constant moisture conditions. SG - 14 Standard Guidelines For Grading Projects Property owners should be made aware that overwatering of slopes is detrimental to slope stability. Maintenance Periodic inspections of landscaped slope areas should be planned and appropriate measures should be taken to control weeds and enhance growth of the landscape plants. Some areas may require occasional replanting and/or reseeding. Terrace drains and downdrains should be periodically inspected and maintained free of debris. Damage to drainage improvements should be repaired immediately. Property owners should be made aware that burrowing animals can be detrimental to slope stability. A preventative program should be established to control burrowing animals. As a precautionary measure, plastic sheeting should be readily available, or kept on hand, to protect all slope areas from saturation by periods of heavy or prolonged rainfall. This measure is strongly recommended, beginning with the period of time prior to landscape planting. Repairs If slope failures occur, the Geotechnical Consultant should be contacted for a field review of site conditions and development of recommendations for evaluation and repair. If slope failure occurs as a result of exposure to periods of heavy rainfall, the failure areas and currently unaffected areas should be covered with plastic sheeting to protect against additional saturation. In the accompanying Standard Details, appropriate repair procedures are illustrated for superficial slope failures (i.e., occurring typically within the outer 1 foot to 3 feet of a slope face). TRENCH BACKFILL Utility trench backfrll should, unless otherwise recommended, be compacted by mechanical means. Unless otherwise recommended, the degree of compaction should be a minimum of 90 percent of the laboratory maximum density. As an alternative, granular material (sand equivalent greater than 30) may be thoroughly jetted in- place. Jetting should only be considered to apply to trenches no greater than 2 -feet in width and 4 -feet in depth. Following jetting operations, trench backfill should be thoroughly mechanically compacted and/or wheel - rolled from the surface. SG -15 Standard Guidelines For Grading Projects Backfill of exterior and interior trenches extending below a 1:1 projection from the outer edge of foundations should be mechanically compacted to a minimum of 90 percent of the laboratory maximum density. Within slab areas, but outside the influence of foundations, trenches up to 1 foot wide and 2 feet deep may be backfilled with sand and consolidated by jetting, flooding or by mechanical means. If on -site materials are utilized, they should be wheel- rolled, tamped or otherwise compacted to a firm condition. For minor interior trenches, density testing may be deleted or spot testing may be elected if deemed necessary, based on review of back -fill operations during construction. If utility contractors indicate that it is undesirable to use compaction equipment in close proximity to a buried conduit, the Contractor may elect the utilization of light weight compaction equipment and/or shading of the conduit with clean, granular material, which should be thoroughly jetted in -place above the conduit, prior to initiating mechanical compaction procedures. Other methods of utility trench compaction may also be appropriate, upon review by the Geotechnical Consultant at the time of construction. In cases where clean granular materials are proposed for use in lieu of native materials or where flooding or jetting is proposed, the procedures should be considered subject to review by the Geotechnical Consultant. Clean Granular backfill and/or bedding are not recommended in slope areas unless provisions are made for a drainage system to mitigate the potential build -up of seepage forces. STATUS OF GR ADING Prior to proceeding with any grading operation, the Geotechnical Consultant should be notified at least two working days in advance in order to schedule the necessary observation and testing services. Prior to any significant expansion of cut back in the grading operation, the Geotechnical Consultant should be provided with adequate notice (i.e., two days) in order to make appropriate adjustments in observation and testing services. Following completion of grading operations and/or between phases of a grading operation, the Geotechnical Consultant should be provided with at least two working days notice in advance of commencement of additional grading operations. SG - 16 4" DMAIVER I PIPE 4' DIAMETER NON- PEWORATED PIPE LATERAL DRAM SLOPE PER Pdr:1 20l H/2 -PRDNDE 84CKDAA11V PER 84CKORNN DETAIL. AN ADLVT70M4L 84CKORAM AT MID -SCOPE WILL BE REWIRED FOR SLOP£ W EXCESS OF 00 FEET HffW KEY -DIMENSION PER SOILS ENGW££R (GENERALLY 112 SLOPE H£-GHT 15' NIWMW..) BENCHING �To guild orz GSOTBNICAL , 3Mn MES . n TYPICAL STABILIZATION A FILL DETAIL 4. 4- DIAMETER AOV- PERFORI TED PIPE LATERAL DRAIN SLOPE PER 2. OX 15' -0* �MN /NUN H/Z PROWDE 84CKLWNN PER 64CKDRAIN DETAIL. AN AD 1770A L 94CKD2411V AT AYO -SLCWE mu W RELuRED FAR SLOPE IN EXLXSS OF 40 FEET HIGH KEY- DIMENSION PER SOILS ENGINEER ^dgmb jF l" /°"Yafion / "Om = " To Build On TYPICAL BUTTRESS FILL p...w,. • GomosdMw .. «w I DETAIL r-TRUMMAMI GEOITCENICIL SRAYNtS a+ro rn.en sv..r tang sz/r, Cs 7-M 20' FINAL LMTT OF OAYLA:HT / £XCA VAT /ON L NF FW)SH i / / EDUIPMENT W/DTH / 15' VNIMUM BASE / 2 MWMUM i OVERBURDEN (CREEP- PRUMEJ S' AND REPLACE WITH COMPACTED RLL / / / / / • � i • i �i • iii • ii • i �i � i • i• i • ii • i� i • iiii • i • viii •�•ii�iiii•�•ii�ii�i•�•i•�•ii r r•r TIP /CAL BENCH /NC PROVIDE BACKDRAIN PER 84CKDRAIN DETAIL. LOCATION OF B4CKOR4W AND OUTLETES PER SGYLS ENCWEER AND /OR EN6WEERIAG GEOLOGIST DURNG GRADING 4( GrOMCBMa" IA on SCRYICdS DAYLIGHT SHEAR KEY DETAIL fibsbewom • Comm~ • r"mbg ° , ", W , ; °°°„ MATURAL GROM i.d PRONG£ SAOMMUN PER HAC(DRAM DETAA.- AN ACU77OW 9ACKbMIN Ai AYO —SLOPE WU &F REOUNM FOR 0AC( SLOPES W EXCESS OF 40 FEET HAW LOCAPONS OF KDRA/NS AND OUTLETS PER SCLS ENCNED? AND OR ENGIA!EEAlNC CFOCOCS DLOMC QWWVC. COAbWT£0 PKL w. 7!o sa 'oar► I TYPICAL SHEAR KEY awbm r • esonm . • n,~ I DETAIL 1.5 FA '9ME Cr' &ISF WIDTH w' DEIERWNED BY SCLS LNCNLLR U Nf L,Qorl'EYKidd6 TOE OF SLOPE SHOWN ON GRAD /NC PLAN LIMAS ON \ FINAL fXCA ✓AVON FINAL NATURAL 7 i i i � 1 A1E RIAL N ABLE / - - -- - - -- 1 U05LM i MINIMUM J T DOWNSL OPE KEY DEPTH Q, Information To Build On i 5x 15' N/NIMUN L34SE KEY WIDTH TYPYCAL BENCH WIDTH VARYES COMPETENT EARTH M4TERML TYPA^AL BENCH HERY? PROVIDE 84CK0RVN AS RE00RED PER RECOMMEND477CNS OF SaLS ENGWEER OUR/NG GR90WG WHERE M71 RAL SLOPE IS 5:1 OR BEiV mw /S Atli NECESSARY, HOWEVER, FILL IS NOT R7 UE PLACED ON COMPRESSIBLE OR UNSUITABLE MATERIAL. FILL SLOPE ABOVE Vr07rCJff7CAL Srfi"CrS .AVSO cw... sv..r s NATURAL GROUND DETAIL I ("X) CUVRU CONTACT SHOW ON AS -BUKT N4TURAL TLPOA7APNY� � � ' / CUT SLOP£ zz TRANVTAON i i i r 15' AYNWVM / fYL ' CAS i 4' TYPIC4L i NOTE CUT SIOOF PORIXW SWLL 9E A410E PRA7R 70 PLAC8#V4'T OF FILL FINISH SURFACE J FT z MININUM PER LINEAL FOOT OPEN GR40ED AGGREG47E" TAPE AND SEAL AT CONTACT 4' MINWNUAI DIAMETER SOLID OUTIET PIPE SPACED PER 50k EAGM REOULREN£NTS 12" N/N /MUM COVER a AF7 Information To Buiid On maser . ►.sew, 2% myv/m GRADIENT A DETAIL A -A c0l"CMD 84W7LL COMPACTED FILL SUPAC S -P FABRIC OR APPROVED EOi4Y 4' MINIMUM APPROVED PERFORATED PIPE (PERFORATION S DOWNNI aI/NUCM 2X ISS TO OUTLET aENCN INCLWED r0AARD CRAIN TYPICAL BENCHNNG TENPOFWtY FILL LEVEL 4" MINIMUM DLAMETER APPROVED 5OLID OUTLET PIPE •ROTE' AGWECxArE 70 MEET TVLLOIYWG SPE0Fr-477OMS OR APPROVED EOLHL: BACiKDRAIN DETAIL uarrcericAC seRncrs (GEQFABRIC) .SIEVE .SIZE PERCENTAGE PASSING 1z' unviNta4 100 1' 5 -40 J /4" 0 -17 J /8' 0 -7 NO. 200 0 -J BACiKDRAIN DETAIL uarrcericAC seRncrs (GEQFABRIC) FWISH SURFACE S FT.'S MINIMUM PER LINEAL FOOT APPROVED FILTER ROOM 4' MINIMUM D/ANETER S041D OLME7 PIPE SPACED PER SOIL £NCWEER REQUIREMENTS DURING 2X N/NIMUM I GRAD /ENT DETAIL A -A CGNI/i4CTED B4CKFILL 12' MIN/LIUM COVER COMPACTED FAL 4' MNMUM APPROVED PERFORATED PIPE-- VNIWM ATX VOS DOWN 1/M /NUfI 2X GRA TO OUTLET 9ENOY INCLINED TOWARD SLOPE TYPICAL BENCHING TEMPORARY FILL LEVEL 4' MINIMUM OIANET£R APPROVED SOLID OUTLET PIPE RUER ROCK "47ERNL TO MEET FOLLOWING SPECA7CATION OR APPROVED EOLW -, �� Ar ]T3J0177t4'1O71 pi t`—a To Build tor' TYPICAL BACKDRAIN DETAIL AV . CoAsafaft " 7LAMy PERCENTAGE 100 510- 100 40 -100 25 -40 5 -15 0 -7 0 -3 C90MU MCAL BRAVICPS L.na f► LVlbnf" AO 15 (AAt) YJ_mJJ SIEYE SIZE 12' M/NIAR/M 3/4" J /B" "APPROVED PIPE TYPE' NO. 4 SCHEDULE 40 POLYVMYL CHLORIDE NO. 30 (P. V. C) OR APPROVED £OU4L. MINIMUM CRUSH 57RENGTH 1000 PSL NO 50 NO 200 �� Ar ]T3J0177t4'1O71 pi t`—a To Build tor' TYPICAL BACKDRAIN DETAIL AV . CoAsafaft " 7LAMy PERCENTAGE 100 510- 100 40 -100 25 -40 5 -15 0 -7 0 -3 C90MU MCAL BRAVICPS L.na f► LVlbnf" AO 15 (AAt) YJ_mJJ SURFACE OF FIRM EARTH - - _ - - - - \ / \ COWACIFD FILL / \ dREMOVE UNSU/TABL£ TER/AL 7YP /C6L BFNCH/NC SEE DETAILS OI �/,VaMF FOMARD none, TRENCH DETAIL OPTIONAL V -DITCH DETAIL SUPAC B -P FABRC OR APPROVED EQUAL 6' MINIMUM OVERLAP 24" MINIMUM 6" MINIMUM 012FL4P MMIMW 9 FTJ PER LINE4L FDOT OF APPROVED ARNN MAfEAW SUPAC 3 -P FABRIC LW APPROVED £DUAL 24' MWINUM M/NIMUM 9 FTJ PER LINEAL FWT CF APPROVED DRAIN M4 TER14L y ..l DRNN MATERW rO MEET FIXLOWING SPECIFIC477ON OR APPROVED EQUAL: ADD MM/NUM 4' DGMET£R APPROVED PERFORATED PIPE MIEN 69AD/ENT /5 SIEVE SIZE RfR0ENrAGf PASSING LESS WW 2R f -f 12" BB -f00 I" 5 -40 APPROVED PIPE TO BE SICNED�)UL£ 40 3/4' 0-17 App V£0 q(LL4YL.NIMCHLDE J�, 0 -7 fNC pr/. NO.:209 0 -3 Q A Jn tivn 6IOMWNICAL SERUM Build On GEOFABRIC SUBDRAIN DETAIL ..�+s • c.•..+w • sr.�s sw sa»sn BENCHING FILL OVER NATURAL SURFACE OF f7MA EARTH U47LMAL FILL SLOP£ .7' ,WAWUM to' 7YPr& 10' MYX ML'LIJED 2T INTO M.OfV BENCHING FILL OVER CUT SUMMALE ac Fidl/ EARTH AN7EMAL i7iW5/1 FiLL SLOP£ — �fE ^0 U.ISU(fA81F� 4. 7Y3M,AL RN/SH CUr SYOPE — — } — f0' 7YPIO4L IS' N/N/N/AI OR S7AWJrY £OLIVAIENr PER SOIL VIOWEMW 6NLYAV£D 2i MWNNM /N7o SLOPE) �' O71a Z I BENCHING FOR COMPACTED 7b Budfd On Mwd--+. ' a&—M+w. ' gym. FILL DETAIL BUILDING CLEAR AREA FAR FOUNDATION UTURES too AND SWIW,7VG POOLS 0 SLOPE FACE O CD CD a C) -4 STREET WINDROW 3' OR MZOW DEPTH OF offpfsr unury MEWH TYPICAL WINDROW DETAIL (EDGE VIEW) GRANULAR SOIL FLOOVED—, TO f7ZL V005 HORIZONTALLY PLACED C046W77ON RI PROFILE VIE 7 7 sygrfus- ROCK DISPOSAL DETAIL I �m "t5 (w) M M, SURFACE OF FIRM EARTN \ COMPACTED RLL / \ / REMOVE UAW ABLE MATERIAL TTP/C4L BEl1CFYAG MINIKA SEE DETAK.S O I `WCUN£ TOWARD DR4W TRENCH DETAIL If" N/N/MUN V 4" DIAMETER APPROVED ?ATED PIPE (PERFLXW770VS nUER MATERIAL REDOING FILTER AI47E04L TO MEET FOUOWING SP£Clf7CA7/ON OR MPROVEO EQUAC: APPROVED PIPE 70 RE ,SCHEDULE 40 POLY- VWYL- CFILORIDf (P ✓.C. OR APPROVED EQUAL MIA /MUN CRUS 5 07H 1000 ReL SIEVE SIZE PERCEN7AGE PIPE DIAMETER TO MEET THE FOLLOWWC CRIMRl4. 1" 100 SUBJECT TO FIELD RENEW RASED ON ACnIAL J /I" 90 -100 GEOTECHNICAL CONDITIONS ENCOWERED OURWG 318" 40-100 &WAOAG. 10VOTH OF RUN PIPE OAA10ER NO. 4 75 -40 UPPER 500' 4. NO. JO 5-76 NO. 50 0-7 NEXT 1000' 6- AD. 707 0-3 > 1500' 8' �-- W lnfOrma "y CBOTBCdNTCAL SOUTCBS �/`� °�To Build On TYPICAL CANYON $UBDRAIN i- ."--++ • c.�n�� • �►.a.. DETAIL cur Lor I• ♦ ♦ I gomoj curlMu LOT (IAANS/AON) i COMPACTED F7CC i i i � LMHEATH£RED HEL15iOCK TOP SOIL C17LUAAVM AND i WEATHERED BEDROCK wQi Iry�a» nation W ro Build on TRANSITION LOT DETAIL mWoII/IM LLMomwr • r"Mw GROUND OR /CINAL ' � EROUND i 5• OWREXCAYATE AND REQWIDE crorrcencAL srxvicrs rseu sn -s♦n IM000 -G, T, I STING JL t I t I t \ T REMAIN I t ZEX15TI INS PALM5\ (NrYi) EXISTING PALM MllAE To— 0 MATCH WHERE SHOWN EXISTING WHERE TO E 5TONN MOW CONTINUE EX15TINr, 0 EEL EXISTINC, PALMS T TO WHERE SAT 0 BE OC HaYiN EXISTING TURF TO REMAIN 0a. "A EXPAN. AREA 344 SF CONCRETE MOWING STRIP . . ... —� TREE PLANTING Pc PLANT LEGLNO C 0, COPAN — NAME/ 51. COMMON NAME NA ATA-IAL — L _EEl fa I t 1 .7 —Ll��-TIA IAAI L"ITIA 4 t CA _ N ALM E—T-I IAl.5 ---A-- A A. E- EX15TINr, PALMS RELO CATE TO T C, TO NHEFE, SHOWN i—M—P A—AN OMMOW el. E -- - �f-EXPAN. AREA 1,435 SF -G, T, I STING JL t I t I t \ T REMAIN I t ZEX15TI INS PALM5\ (NrYi) EXISTING PALM MllAE To— 0 MATCH WHERE SHOWN EXISTING WHERE TO E 5TONN MOW CONTINUE EX15TINr, 0 EEL EXISTINC, PALMS T TO WHERE SAT 0 BE OC HaYiN EXISTING TURF TO REMAIN 0a. "A EXPAN. AREA 344 SF CONCRETE MOWING STRIP . . ... —� TREE PLANTING Pc PLANT LEGLNO C COPAN — NAME/ 51. COMMON NAME NA ATA-IAL — L _EEl 1 .7 —Ll��-TIA IAAI L"ITIA CA _ N ALM E—T-I IAl.5 ---A-- A A. E- A—AN OMMOW el. E -- - -T ELII 1 1 ,-A— 1 1 5 12 5 — .I_. AA R 111-P—M Ea s vAR E E6Arco U-1 01 N 11 5 OAL —AHII-EP � DALLMINA 0 OAL gTgDTZAAR,%NAE IE Z 1 11 EAL 'HAI. OLEIII HAITITIG ElAl- =�'Al HAIAly I A N , _�EAI .—T Z-11— LAK— TO —AIN TO —I N E — 10 EKIOTIN —AIN VA910U5 6IC-5 — 51— Lu LANDSCAPE AREA ANALYSIS EXSIfNC SIZE I-ANDS(APF ARLA: 3 37,011 SF CONTRACTOR 70 REPAIR ANY DAMAGE DONE TO THE CX1571N& LANDSCAPE 1111 N LrL 7 J,�, L—Alljl' ry2 "AI NI L T�H.E --Y _T 0 6 PL_ o AN —1— A 4� 41 nAZ AN5 =1I Lf--= I- 11 l-ZlAlZ OEALI AT A z Lg, _ATE ANN TOIE �7__ T, I Lu M OP_ 1=1-1 CL A or 0 a W as U) a 2 j a< O Z z. GRAPHIC SCAN.' ()paU Jai G ONNEOT 70 EX ISTING RR­A71ON It It I t .......... . . ' 77 0 7— EXPAN. AREA 1,435 SF EXPAMAREA 344 SF (:� TARGET T -1029 124,631 SF (EX.) 140,870 SF (PROPOSED) �Tj N;\TO JRRIOATIJ 5­TEM LAWN ui uj I. ­NNE­ 1 0 EX�571N� RRSGA TION 515TT- REMOTE CONTROL VALVE Ci tz EXISTING LANL SCApE TO REMAIN �rGATI.S7N,LLE'S Nl=ZAT­n ­�N6 A UAZIZ��AZ`ZNI AZ&r- ONNE.T TO EXISTING A� 1­1 A71ON =WZA sy5Tz', lgnl W =0- -1-1.111- — ANI T N7'R'lV%2JM­ 12 4 ­R T, III—L-1 woR <rvrtry C 'Ifl NG 're LANO5CAPC TO REMAIN ­TA A71A'��­ z iL 'L z z �0N I A 'A- z N-11-1 jr Cal ­A­ 'L IA­ ­5 A- �IIIVIN. cc O 1-11N. ­Y ­47 �j.­FZR TR z rl Z. CRAP M SCALE A T 11 reore.,re 0 T 03 ............ MA!N 4" v rare on =1' lN=l'4=_—=L NIAL-1 ow 'Alm, 1 IT" Lkllj 1—T 11 ­11—MAIN IPII .. _- _101111- "". 'Tl- Zl A=. �Tj N;\TO JRRIOATIJ 5­TEM LAWN ui uj I. ­NNE­ 1 0 EX�571N� RRSGA TION 515TT- REMOTE CONTROL VALVE Ci tz EXISTING LANL SCApE TO REMAIN �rGATI.S7N,LLE'S Nl=ZAT­n ­�N6 A UAZIZ��AZ`ZNI AZ&r- ONNE.T TO EXISTING A� 1­1 A71ON =WZA sy5Tz', lgnl W =0- -1-1.111- — ANI T N7'R'lV%2JM­ 12 4 ­R T, III—L-1 woR <rvrtry C 'Ifl NG 're LANO5CAPC TO REMAIN ­TA A71A'��­ z iL 'L z z �0N I A 'A- z N-11-1 jr Cal ­A­ 'L IA­ ­5 A- �IIIVIN. cc O 1-11N. ­Y ­47 �j.­FZR TR z rl Z. CRAP M SCALE Memorandum - Phone Notes Date: January 29'h, 2010 From: Chris Long Project No.: City File No. 10375 -G , PLS File No. 5075 Project Name: Encinitas Town Center Subject: Offsite Catch Basin Telephone Steve Nowak Conversation with: Fred Sena, PE Chns Long, RLA John Warren, AICP The following are our notes from our phone conversation. If there are any errors or omissions of substance, please notify Pacific Land Services in writing immediately. Discussion: • The city requested letter and maintenance agreement for the BMP that was proposed to be installed in offsite catch basin behind the Target store • PLS requested the option of upsizing the nearby Filterra Unit to treat an area equivalent to the area that would have been treated by the BMP proposed for the offsite catch basin. • The city agreed to the above option. BMP calculations will be revised to reflect this change. CC: Steve Nowak File ENTITLEMENT ENGINEERING LANDSCAPE ARCHITECTURE 2151 Salvio Street • Suite S • Concord, California • 94520 • (925) 680 -6406 • Fax (925) 660 -640 ENGINEER'S BOND ESTIMATE PREPARED By TARGET T -1029 1010 N. EL CAMINO REAL F ENCINITAS, CA LAST UPDATED'. 317712010 1. GRADING Quanf# 1LnR Unit Pr TgPl 1.1 Excavate & Fill 171 CY 11.50 1,966.50 1.2 Remove and Recwmpact 1,066 CY 7.00 7,462.00 1.3 Export 67 CY 22.00 1,474.00 2. BMP'S Quanft Unit Una Prire Tel 2.1 Fiber Rolls 2,000 LF 2.25 4,500.00 2.2 Inlet Protection 10 EA 150.00 1,500.00 2.3 Misc SWPPP Items 1 LS 1,500.00 1,500.00 3. DRAINAGE Quanto Una Unu!!! N Total 3.1 4" PVC Storm Drain 5 LF 20.00 100.00 3.2 Filterra Unit - 6'x 8' 1 EA 20,000.00 20,000.00 3.3 SO Inlet Filters 4 EA 500.00 2,000.00 3.4 SO Infiltration Wells 3 EA 40,000.00 120,000.00 4. WATER Quanta Und Pr2e Total 4.1 Relocate Fire Hydrant 1 EA 2,200.00 2,200.00 5. CURB & GUTTER 5.1 Curb & Gutter Removal 1,720 LF 3.00 5,160.00 5.2 6" Curb (per G -1) 800 LF 12.00 9,600.00 5.3 6" Curb & Gutter (per G -2) 300 LF 20.00 6,000.00 5.4 Valley Gutter 25 LF 20.00 500.00 6. PAVEMENT ouanN UM Un- Price Total 6.1 AC Pavement Removal 28,250 SF 2.00 56,500.00 6.2 AC Pavement - 3" Depth 4,600 SF 1.30 5,980.00 6.3 AC Pavement -4 "Depth 17,000 SF 1.75 29,750.00 6.4 Paving Subgrade Preparation 21,600 SF 0.50 6.5 Aggregate Base - 6" Depth 4,600 SF 1.00 4,600.00 6.6 Aggregate Base - 8" Depth 17,000 SF 1.00 17,000.00 6.7 Aggregate Base at Curbs - 6" 450 SF 1.00 450.00 6.8 Aggregate Base at Walks -4" 1,240 SF 1.00 1,240.00 6.9 Aggregate Base at Crosswalk -6" 2,360 SF 1.00 2,360.00 7. RAMPS & SIDEWALKS Quantk Una UnN Total 7.1 Concrete Crosswalk 2,360 SF 6.00 14,160.00 7.2 Concrete Sidewalk (per G -7) 1,240 SF 5.00 6,200.00 8. LANDSCAPING & IRRIGATION Ouantdv URN Und Total 8.1 Slope Planting (Ground Cover) 6,565 SF 0.48 3,151.20 GRAND TOTAL, IMPROVEMENTS - TARGET 5 325,353.70 MAR 1 8 2010 ILu- J \5075\Estsmates\Bond Estimate 2010-03- 17.xts 3/1712010. 12:11 PM STORMWATER BMP SIZING CALCULATIONS T -1029 ENCINITAS TARGET PLS PROJECT NO. 5075 C15752 Exp. 06130/11 DISTURBED SURFACE AREAS BUILDING AREA 16,260 SF CONCRETE PAVEMENT 11,225 SF ASPHALT PAVEMENT 23,397 SF TOTAL AREA REQUIRING TREATMENT 50,882 SF TREATMENT AREAS AREA #1 - FILTERRA 18,672 SF AREA #2 - INFILTRATION SYSTEM 11,620 SF AREA #3 - INFILTRATION SYSTEM 12,290 SF AREA #4 - INFILTRATION SYSTEM 13,310 SF TOTAL AREA REQUIRING TREATMENT 55,892 SF TREATMENT AREA #1 REQUIRED TREATMENT FLOW RATE Tributary Catchment Area ( A ) 15,945 sf = 0.366 AC Add area draining to offsite curb inlet 2,727 sf = 0.063 AC Total Area 18,672 sf = 0.429 AC Runoff Coefficient ( C) 1.00 Intensity ( I ) 0.20 in (per City BMP Manual) Required Treatment Flow 0.086 cfs (Q =CIA) FILTERRA SIZE AND CAPACITY Filterra 6'x8' Unit max.capacity area = 0.65 AC (C =0 85) (per Filterra Sizing Table) max treatment flow = 0 13 cfs (C =0.85) capacity area adjustment for C =1.0 = 0.85 Adjusted Capacity Area = (0.85'0.65) = 0.55 AC = OK Adjusted Treatment Flow = 0.11 cfs = OK TREATMENT AREA #2 INFILTRATION RATE Infiltration rate 1.5 min/in = 0.67 in /min = 0.00093 ft/sec: FLOW RATE Tributary Catchment Area 11,620 sf = 0.27 AC Runoff Coefficient = 0.95 Intensity for treatment = 0.20 Whir Treatment Flow Rate Q = CIA = 0.05068 ft' /sec REQUIRED SURFACE AREA A (sf) x 0.00093 ft/sec = 0.05068 ft'/sec A (sf) = 54.74 sf EFFECTIVE SURFACE AREA Use area of sides Width of trench 7.0 ft (7'x2') +(7'x2') = 28 sf Length of trench 7.0 ft (7'x2') +(7'x2') = 28 sf Depth of trench 2.0 ft total = r--5-61 sf REQUIRED TREATMENT VOLUME Intensity for 24 -hr period 0.6 in (per city BMP manual) Tributary Catchment Area 11,620 sf 11,620 sf x 0.6 in x 1 ft/12in = 581 ft' TREATMENT VOLUME 24 hrs Treatment/Infiltration Rate = 0.05068 ft3lsec 24 hr = 86400 sec treatment volume = 4379 ft' TREATMENT AREA #3 INFILTRATION RATE Infiltration rate 1.5 min /in. = 0.67 in /min = 0.00093 ft/sec FLOW RATE Tributary Catchment Area 12,290 sf = 0.28 AC Runoff Coefficient = 0.95 Intensity for treatment = 0.20 in /hr Treatment Flow Rate Q = CIA = 0.05361 ft3 /sec REQUIRED SURFACE AREA A (sf) x 0 00093 ft/sec = 0.05361 ft' /sec A (sf) = 57.90 sf EFFECTIVE SURFACE AREA Use area of sides Width of trench 7.0 ft (7'x2') +(7'x2') = 28 sf Length of trench 8.0 ft (8'x2') +(8'x2') = 32 sf Depth of trench 2.0 ft total = ®sf REQUIRED TREATMENT VOLUME Intensity for 24 -hr period 0.6 in (per city BMP manual) Tributary Catchment Area 12,290 sf 11,620 sf x 0.6 in x 1 ft/12in = F 614.5 ft' TREATMENT VOLUME 24 hrs Treatment/Infiltration Rate = 0.05361 ft3 /sec 24 hr = 86400 sec treatment volume = 4632 ft' TREATMENT AREA #4 INFILTRATION RATE Infiltration rate 1.5 min /in. = 0.67 in /min = 0.00093 ft/sec FLOW RATE Tributary Catchment Area 13,310 sf = 0.31 AC Runoff Coefficient = 0.95 Intensity for treatment = 0.20 n /hr Treatment Flow Rate Q = CIA = 0.05806 ft3lsec REQUIRED SURFACE AREA A (sf) x 0.00093 ft/sec = 0.05806 ft3lsec A (sf) = r---6-2-7-01 sf EFFECTIVE SURFACE AREA Use area of sides Width of trench 8 0 ft (8'x2') +(8'x2') = 32 sf Length of trench 8.0 ft (8'x2') +(8'x2') = 32 sf Depth of trench 2 0 ft total = F-76-541 sf REQUIRED TREATMENT VOLUME Intensity for 24 -hr period 0.6 in (per city BMP manual) Tributary Catchment Area 13,310 sf 11,620 sf x 0.6 in x 1 fl/12in = 665.5 ft' TREATMENT VOLUME 24 hrs Treatment/Infiltration Rate = 0.05806 ft3lsec 24 hr = 86400 sec treatment volume = 5016 ft' CLTA Preliminary Report Form ( Rev. 11/06) Order Number: 3409307 (60) Page Number: 1 First American Title Company 520 North Central Avenue Glendale, CA 91203 Sheri Cassell Pacific Land Services 2151 Salvio Street Suite 250 Concord, CA 94520 Phone: Fax: Customer Reference: Order Number: Title Officer: Phone: Fax No.: E -Mail: Buyer: Owner: Property: FEB-32010 Dayton Hudson Corp 3409307(60) Michelle Pascual (800)328 -2652 (866)878 -7977 mpascual@firstam.com Encinitas Town Center Associates I, LLC 1010 North El Camino Real Encinitas, CA PRELIMINARY REPORT In response to the above referenced application for a policy of title insurance, this company hereby reports that it is prepared to issue, or cause to be issued, as of the date hereof, a Polley or Policies of Title Insurance describing the land and the estate or Interest therein hereinafter set forth, insuring against loss which may be sustained by reason of any defect, lien or encumbrance not shown or referred to as an Exception below or not excluded from coverage pursuant to the printed Schedules, Conditions and stipulations of said Policy forms. The printed Exceptions and Exclusions from the coverage and Limitations on Covered Risks of said policy or policies are set forth in Exhibit A attached. The policy to be issued may contain an arbitration clause. When, the Amount of Insurance is less Nan that set forth in the arbitration clause, all arblbable matters shall be arbitrated at the option of either the Company or Me Insured as the exdusive remedy of the parries. Limitations on Covered Risks applicable to the CLTA and ALTA Homeowner's Policies of Title Insurance which establish a Deductible Amount and a Maximum Dollar Limit of Liability for certain coverages are also set forth in Exhibit A. Copies of the policy forms should be read. They are available from the office which issued this report. Please read the exceptions shown or referred to below and the exceptions and exclusions set forth in Exhibit A of this report carefully. The exceptions and exclusions are meant to provide you with notice of matters which are not covered under the terms of the title insurance policy and should be carefully considered. It is important to note that this preliminary report is not a written representation as to the condition of title and may not list all liens, defects, and encumbrances affecting title to the land. First American Title Order Number: 3409307 (60) Page Number: 2 This report (and any supplements or amendments hereto) is issued solely for the purpose of facilitating the issuance of a policy of title insurance and no liability is assumed hereby. If it is desired that liability be assumed prior to the issuance of a policy of title insurance, a Binder or Commitment should be requested. first American Title Order Number: 3409307 (60) Page Number: 3 Dated as of December 16, 2009 at 7:30 A.M. The form of Policy of title insurance contemplated by this report is: ALTA Extended Owner Policy - 2006 ALTA Standard Loan Policy - 2006 A specific request should be made if another form or additional coverage is desired. Title to said estate or interest at the date hereof is vested in: ENCINITAS TOWN CENTER ASSOCIATES I, LLC, A DELAWARE LIMITED LIABILITY COMPANY The estate or interest in the land hereinafter described or referred to covered by this Report is: A fee as to Parcel(s) A, an easement as to Parcel(s) B and C. The Land referred to herein is described as follows: (See attached Legal Description) At the date hereof exceptions to coverage in addition to the printed Exceptions and Exclusions in said policy form would be as follows: 1 General and special taxes and assessments for the fiscal year 2009 -2010. First Installment: Penalty: Second Installment: Penalty: Tax Rate Area: A. P. No.: $88,606.81, PAID $0.00 $88,606.81, PAYABLE $0.00 19411 257 - 501 -08 -00 2. Supplemental taxes for the year 2008 -2009 assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. First Installment: Penalty: Second Installment: Penalty: Tax Rate Area: A. P. No.: $43,628.50, PAID $0.00 $43,628.50, DUE $0.00 19411 900 - 001 -55 -00 first American Title Order Number: 3409307 (60) Page Number: 4 Assessment liens, if applicable, collected with the general and special taxes, including but not limited to those disclosed by the reflection of the following of the tax roll: Community Facilities District # 1 Encinitas. The lien of supplemental taxes, if any, assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. 5. An easement for existing irrigation pipe lines and electric power lines; the right, privilege and easement of erecting, maintaining or causing to be erected and maintained upon the land hereby conveyed, telegraph and telephone pole lines with their usual equipment; electric power and light pole lines and their usual equipment and of operating the same; and a right -of -way over said land to install and maintain necessary irrigation pipe lines and ditches for the distribution of water over said La Costa Acres and to operate the same, together with the right to enter upon said land for the purpose of installing, repairing and replacing or improving any of said works and incidental purposes, recorded September 5, 1929 in Book 1660 of Deeds, Page 476. In Favor of: La Costa Acres Corporation, a Corporation Affects: As described therein The location of the easement cannot be determined from record information. An easement for irrigation pipelines and electric power lines together with the right of ingress and egress and incidental purposes, recorded September 5, 1929 in Book 1688 of Deeds, Page 2. In Favor of: La Costa Acres Corporation Affects: As described therein The location of the easement cannot be determined from record information. An easement for either or both pole lines, underground conduits, together with the right of ingress and egress and incidental purposes, recorded December 21, 1948 in Book 3056, Page 245 of Official Records. In Favor of: San Diego Gas and Electric Company Affects: As described therein 8. An easement for either or both pole lines, underground conduits, together with the right of ingress and egress and incidental purposes, recorded April 19, 1956 in Book 6066, Page 370 of Official Records. In Favor of: San Diego Gas and Electric Company Affects: As described therein 9. The fact that the land lies within the boundaries of the San Dieguito Reorganization Redevelopment Project Area, as disclosed by the document recorded September 5, 1986 as Instrument No. 86- 390249 of Official Records. First American Title Order Number: 3409307 (60) Page Number: 5 10. Deed Restriction dated October 26, 1988 executed by Paul Ecke Ranch, a California Corporation, Carltas Company, a California Limited Partnership, Paul Jr. and Elisabeth K. Ecke, Co- Trustees under Trust Agreement dated March 7, 1983, Paul Ecke III, Paul Ecke Sr., Trustee of the Paul Ecke Sr. Trust dated September 8, 1983 and the California Coastal Commission subjected to the terms and conditions contained therein recorded February 16, 1989 as Instrument No. 89 -82586 of Official Records. 11. The terms and provisions contained in the document entitled "Land Development and Reimbursement Agreement' recorded December 9, 1994 as Instrument No. 94- 705385 of Official Records. 12. The terms and provisions contained in the document entitled "Agreement for Annexation of Property to the Leucadia County Water District and for Provision of Sewer Service Thereto" recorded May 30, 1995 as Instrument No. 95- 225327 of Official Records. 13. Resolution No. 95 -39 of the City Council of the City of Encinitas, California ordering territory designated as Encinitas Ranch annexed to the City of Encinitas was recorded June 16, 1995 as Instrument No. 95- 254447 of Official Records. 14. The terms and provisions contained in the document entitled "Open Space Deed Restriction" recorded June 30, 1995 as Instrument No. 95- 279362 of Official Records. 15. The terms and provisions contained in the document entitled "Memorandum of Allocation and Indemnity Agreement' recorded December 11, 1995 as Instrument No. 95- 561223 of Official Records. 16. The terms and provisions contained in the document entitled "Agreement Regarding to Improve Development -Water Facilities" recorded January 29, 1996 as Instrument No. 96 -42342 of Official Records. 17. An unrecorded lease dated August 16, 1995, executed by Encinitas Town Center Associates, LLC, a Delaware Limited Liability Company as lessor and Dayton Hudson Corporation, a Minnesota Corporation, D /B /A Target Stores as lessee, as disclosed by a Memorandum of Ground Lease recorded April 11, 1996 as Instrument No. 96- 178747 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 18. An easement shown or dedicated on the Map as referred to in the legal description For: Pedestrian access and incidental purposes. 19. An easement shown or dedicated on the Map as referred to in the legal description For: Drainage and incidental purposes. 20. An easement shown or dedicated on the Map as referred to in the legal description For: Sewer pipelines and incidental purposes. First American Title Order Number: 3409307 (60) Page Number: 6 21. An easement for water pipelines, access and incidental purposes in favor of San Dieguito Water District as delineated and designated on Map No. 13333, subject to any terms and conditions contained therein. 22. An easement for public utilities and incidental purposes, recorded May 13, 1996 as Instrument No. 96- 241945 of Official Records. In Favor of: San Diego Gas & Electric Company, a Corporation Affects: As described therein 23. An easement for underground communication facilities and incidental purposes, recorded July 11, 1996 as Instrument No. 96- 347515 of Official Records. In Favor of: Pacific Bell, a California Corporation Affects: As described therein The location of the easement cannot be determined from record information. 24. An unrecorded lease dated October 10, 1995 as amended by Amendment No. 1 to Lease, dated May 28, 1996, executed by Zelman Development Co., a California Limited Partnership as lessor and Office Depot, Inc., a Delaware Corporation as lessee, as disclosed by a Memorandum of Lease recorded August 13, 1996 as Instrument No. 96- 409040 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 25. The terms and provisions contained in the document entitled "Agreement Regarding Improvement of Subdivision Sewers" recorded September 9, 1996 as Instrument No. 96- 456801 of Official Records. 26. The terms and provisions contained in the document entitled "License Agreement" recorded September 9, 1996 as Instrument No. 96- 456802 of Official Records. 27. The terms and provisions contained in the document entitled "Covenant Regarding Encroachment Permit No. 014" recorded October 21, 1996 as Instrument No. 96- 531208 of Official Records. 28. The terms and provisions contained in the document entitled "Covenant Regarding Real Property: Major Use Permit and Coastal Development Permit for On Site Consumption of Alcoholic Beverages for an Eating and Drinking Establishment Proposed to be Located at 1042 Suite "J -5" N. El Camino Real in the Encinitas Ranch Town Center" recorded November 18, 1996 as Instrument No. 96- 582368 of Official Records. 29. An easement for meter access and incidental purposes, recorded December 20, 1996 as Instrument No. 96- 638080 of Official Records. In Favor of: San Diego Gas & Electric Company, a California Corporation Affects: As described therein The location of the easement cannot be determined from record information. First American Ttle Order Number: 3409307 (60) Page Number: 7 30. An unrecorded lease dated (not shown), executed by Encinitas Town Center Associates, a Delaware Limited Liability Company as lessor and Payless Shoesource, Inc., a Missouri Corporation as lessee, as disclosed by a Memorandum of Lease recorded January 3, 1997 as Instrument No. 97 -3336 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 31. An unrecorded lease dated June 20, 1996, executed by Encinitas Town Center Associates, LLC, a Delaware Limited Liability Company as lessor and Pier 1 Imports (U.S.), Inc., a Delaware Corporation as lessee, as disclosed by a Memorandum of Lease recorded February 11, 1997 as Instrument No. 97 -63739 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 32. An unrecorded lease dated May 22, 1996, executed by Encinitas Town Center Associates, LLC, a Delaware Limited Liability Company as lessor and Stellar Enterprises, LLC, a California Limited Liability Company as lessee, as disclosed by a Memorandum of Lease recorded March 28, 1997 as Instrument No. 97- 141238 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 33. The terms and provisions contained in the document entitled "Covenant Regarding Encroachment Permit No. 015" recorded May 27, 1997 as Instrument No. 97- 244649 of Official Records. 34. An unrecorded lease dated December 20, 1996, executed by Encinitas Town Center Associates, LLC, a Delaware Limited Liability Company as lessor and The Sports Authority, Inc., a Delaware Corporation as lessee, as disclosed by a Memorandum of Lease recorded July 24, 1997 as Instrument No. 97- 354005 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 35. A deed of trust to secure an original indebtedness of $64,300,000.00 recorded November 10, 2005 as Instrument No. 05- 978494 of Official Records. Dated: November 8, 2005 Trustor: Encinitas Town Center Associates I, LLC, a Delaware Limited Liability Company Trustee: First American Title Insurance Company Beneficiary: New York Life Insurance Company, a New York Mutual Insurance Company Affects: The land and other property. The terms and provisions contained in the document entitled "Subordination of Management Agreement' recorded November 10, 2005 as Instrument No. 05- 978495 of Official Records. First American Title Order Number: 3409307 (60) Page Number: 8 A document entitled Assignment of Leases, Rents, Income and Cash Collateral recorded November 10, 2005 as Instrument No. 05- 978496 of Official Records, as additional security for the payment of the indebtedness secured by the deed of trust. The terms and provisions contained in the document entitled "Subordination, Nondisturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22111 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22112 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22113 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22114 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22115 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22116 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22117 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22118 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22119 of Official Records. The terms and provisions contained in the document entitled 'Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22120 of Official Records. The terms and provisions contained in the document entitled 'Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22121 of Official Records. First American Title Order Number: 3409307 (60) Page Number: 9 The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement" recorded January 11, 2006 as Instrument No. 06 -22122 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement" recorded January 11, 2006 as Instrument No. 06 -22123 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement" recorded January 11, 2006 as Instrument No. 06 -22124 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22125 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22126 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22127 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22128 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance & Attornment Agreement" recorded January 11, 2006 as Instrument No. 06 -22129 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22130 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22131 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22132 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement' recorded January 11, 2006 as Instrument No. 06 -22134 of Official Records. First American Title Order Number: 3409307 (60) Page Number: 10 The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement" recorded January 11, 2006 as Instrument No. 06 -22135 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement" recorded January 11, 2006 as Instrument No. 06 -22137 of Official Records. The terms and provisions contained in the document entitled "Subordination, Non - disturbance and Attornment Agreement" recorded January 11, 2006 as Instrument No. 06-22886 of Official Records, 36. An unrecorded lease dated July 24, 2007, executed by Encinitas Town Center Associates I, LLC, a Delaware Limited Liability Company as lessor and Best Buy Stores, L.P., a Virginia Limited Partnership as lessee, as disclosed by a Memorandum of Lease Agreement recorded November 24, 2009 as Instrument No. 09- 656417 of Official Records. Defects, liens, encumbrances or other matters affecting the leasehold estate, whether or not shown by the public records. 37. Any facts, rights, interests or claims which would be disclosed by a correct ALTA /ACSM survey. 38. Rights of parties in possession. Prior to the issuance of any policy of title insurance, the Company will require: 39. An ALTA /ACSM survey of recent date which complies with the current minimum standard detail requirements for ALTA /ACSM land title surveys. 40. With respect to Encinitas Town Center Associates I, LLC, a limited liability company: a. A copy of its operating agreement and any amendments thereto; b. If it is a California limited liability company, that a certified copy of its articles of organization (LLC-1) and any certificate of correction (LLC -11), certificate of amendment (LLC -2), or restatement of articles of organization (LLC -10) be recorded in the public records; c. If it is a foreign limited liability company, that a certified copy of its application for registration (LLC -5) be recorded in the public records; d. With respect to any deed, deed of trust, lease, subordination agreement or other document or instrument executed by such limited liability company and presented for recordation by the Company or upon which the Company is asked to rely, that such document or instrument be executed in accordance with one of the following, as appropriate: (i) If the limited liability company properly operates through officers appointed or elected pursuant to the terms of a written operating agreement, such document must be executed by at least two duly elected or appointed officers, as follows: the chairman of the board, the president or any vice president, and any secretary, assistant secretary, the chief financial officer or any assistant treasurer; (ii) If the limited liability company properly operates through a manager or managers identified in the articles of organization and /or duly elected pursuant to the terms of a written operating agreement, such document must be executed by at least two such managers or by one manager if the limited liability company properly operates with the existence of only one manager. e. Other requirements which the Company may impose following its review of the material required herein and other information which the Company may require First American Title Order Number: 3409307 (60) Page Number: 11 INFORMATIONAL NOTES Note: The policy to be issued may contain an arbitration clause. When the Amount of Insurance is less than the certain dollar amount set forth in any applicable arbitration clause, all arbitrable matters shall be arbitrated at the option of either the Company or the Insured as the exclusive remedy of the parties. If you desire to review the terms of the polity, including any arbitration clause that may be included, contact the office that issued this Commitment or Report to obtain a sample of the policy jacket for the policy that is to be issued in connection with your transaction. The map attached, if any, may or may not be a survey of the land depicted hereon. First American expressly disclaims any liability for loss or damage which may result from reliance on this map except to the extent coverage for such loss or damage is expressly provided by the terms and provisions of the title insurance policy, if any, to which this map is attached. According to the latest available equalized assessment roll in the office of the county tax assessor, there is located on the land a(n) Commercial Structure known as 1010 North El Camino Real, Encinitas, California, 92024. 2. According to the public records, there has been no conveyance of the land within a period of twenty-four months prior to the date of this report, except as follows: None FirstAmerican Title Order Number: 3409307 (60) Page Number: 12 WIRE INSTRUCTIONS for First American Title Company, Demand/ Draft Sub- Escrow Deposits Ventura County, California First American Trust, FSB 5 First American Way Santa Ana, CA 92707 Banking Services: (877) 600 -9473 ABA 122241255 Credit to First American Title Company Account No. 3013360000 Reference Title Order Number 3409307 and Title Officer Michelle Pascual Please wire the day before recording. FirstAmerican Title Order Number: 3409307 (60) Page Number: 13 LEGAL DESCRIPTION Real property in the City of Encinitas, County of San Diego, State of California, described as follows: PARCEL A LOT 34 OF AMENDED MAP OF ENCINITAS MAP NO. 13258, CITY OF ENCINITAS TRACT NO. 94- 066, UNITS I, II AND III, IN THE CITY OF ENCINITAS, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 13333, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, JUNE 3, 1996. PARCEL B: NON - EXCLUSIVE EASEMENTS OVER AND ACROSS THE COMMON AREA, AS CONVEYED, SET FORTH AND DESCRIBED IN THAT CERTAIN "OPERATION AND EASEMENT AGREEMENT' DATED DECEMBER 21, 1995, EXECUTED BY AND BETWEEN ZELMAN DEVELOPMENT CO., A CALIFORNIA LIMITED PARTNERSHIP AND DAYTON HUDSON CORPORATION, A MINNESOTA CORPORATION, RECORDED DECEMBER 28, 1995 AS INSTRUMENT NO. 95- 594913 AND AS AMENDED BY AMENDMENT TO OPERATIONS AND EASEMENT AGREEMENT RECORDED APRIL 11, 1996 AS INSTRUMENT NO. 96- 178748 AND SECOND AMENDMENT TO OPERATION AND EASEMENT AGREEMENT RECORDED SEPTEMBER 13, 1996 AS INSTRUMENT NO. 96- 467755 ALL OF OFFICIAL RECORDS, IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. PARCEL C: NON - EXCLUSIVE EASEMENTS OVER AND ACROSS THE COMMON AREA, AS CONVEYED, SET FORTH AND DESCRIBED IN THAT CERTAIN "CONSTRUCTION OPERATION AND EASEMENT AGREEMENT' DATED MAY 10, 1996, EXECUTED BY AND BETWEEN ENCINITAS TOWN CENTER ASSOCIATES, LLC, A DELAWARE LIMITED LIABILITY COMPANY AND THE C/W GROUP, RECORDED JUNE 14, 1996 AS INSTRUMENT NO. 96- 298695 OF OFFICIAL RECORDS, IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. APN: 257 - 501 -08 -00 FirstAmeiicdn Title Order Number: 3409307 (60) Page Number: 14 i470iKe 4 Section 12413.1 of the California Insurance Code, effective January 1, 1990, requires that any title insurance company, underwritten title company, or controlled escrow company handling funds in an escrow or sub - escrow capacity, wait a specified number of days after depositing funds, before recording any documents in connection with the transaction or disbursing funds. This statute allows for funds deposited by wire transfer to be disbursed the same day as deposit. In the case of cashier's checks or certified checks, funds may be disbursed the next day after deposit. In order to avoid unnecessary delays of three to seven days, or more, please use wire transfer, cashier's checks, or certified checks whenever possible. If you have any questions about the effect of this new law, please contact your local First American Office for more details. FirstAmerican Title Order Number: 3409307 (60) Page Number: 15 EXHIBIT A LIST OF PRINTED EXCEPTIONS AND EXCLUSIONS (BY POLICY TYPE) 1. CALIFORNIA LAND TITLE ASSOCIATION STANDARD COVERAGE POLICY - 1990 SCHEDULE B EXCEPTIONS FROM COVERAGE This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. Proceedings by a public agency which may result in taxes or assessments, or notice of such proceedings, whether or not shown try the records of such agency or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of the land or which may be asserted by persons in possession thereof. 3. Easements, liens or encumbrances, or claims thereof, which are not shown by the public records. 4. Discrepandes, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by the public records. 5. (a) Unpatented mining daims; (b) reservations or exceptions in patents or in Aar authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the public records. EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attomeys' fees or expenses which arise by reason of: I. (a) Any law, ordinance or governmental regulation (including but riot limited to building and zoning Laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the land; (ii) the character, dimensions or location of any improvement now, or hereafter erected on the land; (iii) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. (b) Any governmental police power not exduded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Dare of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would be binding on the rights of a purchaser for value without knowledge. 3. Defects, liens, encumbrances, adverse claims or other matters: (a) whether or not recorded in the public records at Date of Policy, but created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured daimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy; or (e) resulting in Im or damage which would not have been sustained if the insured claimant had paid value for the insured mortgage or for the estate or interest insured by this policy. 4. Unenforceability of the lien of the insured mortgage because of the inability or failure of the Insured at Date of Policy, or the inability or failure of any subsequent owner of the indebtedness, to comply with applicable "doing business" laws of the state In which the land is situated. 5. Invalidity or unenforceability of the lien of the insured mortgage, or daim thereof, which arises out of the transaction evidenced by the insured mortgage and is based upon usury or any consumer credit protection or truth in lending law. 6. Any claim, which arises out of the transaction vesting in the insured the estate or interest insured by their policy or the transaction creating the interest of the insured lender, by reason of the operation of federal bankruptcy, state Insolvency or similar creditors' rights laws 2. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY FORM B - 1970 SCHEDULE OF EXCLUSIONS FROM COVERAGE Any law, ordinance or governmental regulation (including but not limited to building and zoning ordinances) restricting or regulating or prohibiting the occupancy, use or enjoyment of the land, or regulating the character, dimensions or location of any improvement now or hereafter erected on the land, or prohibiting a separation in ownership or a reduction in the dimensions of area of the land, or the effect of any violation of any such law, ordinance or governmental regulation. Rights of eminent domain or governmental rights of police paver unless notice of the exercise of such rights appears in the public records at Date of Policy. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company and not shown by the public records but known to the insured claimant either at Date of Policy or at the date such claimant acquired an estate or interest insured by this policy and not disclosed in writing by the insured claimant to the Company prior to the date such insured claimant became an insured hereunder; (c) resulting In no loss or damage to the insured claimant; (d) attaching or FirstAmerican Title Order Number: 3409307 (60) Page Number: 16 created subsequent to Date of Policy; or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the estate or interest insured by this policy. 3. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY FORM B - 1970 WITH REGIONAL EXCEPTIONS When the American Land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 2 above are used and the following exceptions to coverage appear in the policy. SCHEDULE 6 This policy does not insure against loss or damage by reason of the matters shown in parts one and two following: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the pubic records. 2. Any fads, rights, interests, or claims which are not shown by the public records but which could be ascertained by an Inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown try the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other fads which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in Ads authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by law and not shown by the public records. 4. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1970 WITH A.L.T.A. ENDORSEMENT FORM 1 COVERAGE SCHEDULE OF EXCLUSIONS FROM COVERAGE 1. Any law, ordinance or govemmental regulation (including but not limited to building and zoning ordinances) restricting or regulating or prohibiting the occupancy, use or enjoyment of the land, or regulating the character, dimensions or location of any improvement now or hereafter erected on the land, or prohibiting a separation in ownership or a reduction in the dimensions or area of the land, or the effect of any violation of any such law ordinance or governmental regulation. 2. Rights of eminent domain or governmental rights of police power unless notice of the exercise of such rights appears in the public records at Date of Policy. 3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed or agreed to by the Insured claimant, (b) rat known to the Company and not shown by the public records but known to the insured claimant either at Date of Policy or at the date such claimant acquired an estate or interest insured by this policy or acquired the insured mortgage and not disclosed in writing by the insured claimant to the Company prior to the date such insured claimant became an insured hereunder, (c) resulting in no loss or damage to the insured caiman; (d) attaching or created subsequent to Date of Policy (except to the extent insurance is afforded herein as to any statutory lien for labor or material or to the extent insurance is afforded herein as to assessments for street improvements under construction or completed at Date of Policy). 4. Unenforceability of the lien of the insured mortgage because of failure of the insured at Date of Policy or of any subsequent owner of the indebtedness to comply with applicable "doing business" laws of the state in which the land is situated. S. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1970 WITH REGIONAL EXCEPTIONS When the American Land Title Association Lenders Policy Is used as a Standard Coverage Policy and not as an Extended Coverage Policy, the exclusions set forth in paragraph 4 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage by reason of the matters shown In parts one and two following: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any fads, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown by the public records. 4. Discrepancies, conflicts In boundary (Ines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions In patents or In Acts authorizing the issuance thereof; water rights, claims or title to water. G Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. First American Title Order Number: 3409307 (60) Page Number: 17 6. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1992 WITH A.L.T.A. ENDORSEMENT FORM 1 COVERAGE EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: I. (a) Any law, ordinance or governmental regulation (including but not limited to building and zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the land; (ii) the character, dimensions or location of any improvement now or hereafter erected on the land; (iii) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy; (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded in the public records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would be binding on the rights of a purchaser for value without knowledge. 3. Defects, liens, encumbrances, adverse claims, or other matters: (a) whether or not recorded in the public records at Date of Policy, but created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured claimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy (except to the extent that this policy insures the priority of the lien of the insured mortgage over any statutory lien for services, labor or material or the extent insurance is afforded herein as to assessments for street improvements under construction or completed at date of policy); or (e) resulting In loss or damage which would not have been sustained I the insured claimant had paid value for the insured mortgage. 4. Unenforceability of the lien of the Insured mortgage because of the inability or failure of the insured at Date of Policy, or the Inability or failure of any subsequent owner of the indebtedness, to comply with the applicable "doing business" laws of the state In which the lard is situated. 5. Invalidity or unenforceability of the lien of the insured mortgage, or claim thereof, which arises out of the transaction evidenced by the insured mortgage and is based upon usury or any consumer credit protection or truth in Lending law. 6. Any statutory lien for services, labor or materials (or the claim of priority of any statutory lien for services, labor or materials over the lien of the insured mortgage) arising from an improvement or work related to the land which is contracted for and commenced subsequent to Date of Policy and is not financed in whole or in part by proceeds of the indebtedness secured by the insured mortgage which at Date of Policy the insured has advanced or is obligated to advance. 7. Any claim, which arises out of the transaction creating the interest of the mortgagee insured by this policy, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors rights laws, that is based on: (i) the transaction creating the interest of the insured mortgagee being deemed a fraudulent conveyance or fraudulent transfer; or (Ii) the subordination of the interest of the insured mortgagee as a result of the application of the doctrine of equitable subordination; or (lid) the transaction creating the Interest of the insured mortgagee being deemed a preferential transfer except where the preferential transfer results from the failure: (a) to timely record the instrument of transfer; or (b) of such recordation to impart notice to a purchaser for value or a judgment or lien creditor. 7. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 1992 WITH REGIONAL EXCEPTIONS When the American Land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 6 above are used and the following exceptions to coverage appear in the policy. SCHEDULE 8 This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. 2. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an Inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, daims of easement a encumbrances which are not shown by the public records. 4. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. S. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. 9. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY - 1992 First American Title Order Number: 3409307 (60) Page Number: 18 EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: I. (a) Any law, ordinance or governmental regulation (including but not limited to building and zoning laws, ordinances, or regulations) restricting, regulating, prohibiting or relating to (i) the occupancy, use, or enjoyment of the land; (11) the character, dimensions or location of any Improvement now or hereafter erected on the land; (iii) a separation in ownership or a change in the dimensions or area of the land or any parcel of which the land is or was a part; or (iv) environmental protection, or the effect of any violation of these laws, ordinances or governmental regulations, except to the extent that a notice of the enforcement thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded in the public records at Date of Policy. (b) Any governmental police power not excluded by (a) above, except to the extent that a notice of the exercise thereof or a notice of a defect, lien or encumbrance resulting from a violation or alleged violation affecting the land has been recorded In the public records at Date of Policy. 2. Rights of eminent domain unless notice of the exercise thereof has been recorded In the public records at Date of Policy, but not excluding from coverage any taking which has occurred prior to Date of Policy which would be binding on the rights of a purchaser for value without knowledge. 3. Defects, liens, encumbrances, adverse claims, or other matters: (a) created, suffered, assumed or agreed to by the insured claimant; (b) not known to the Company, not recorded in the public records at Date of Policy, but known to the insured claimant and not disclosed in writing to the Company by the insured claimant prior to the date the insured claimant became an insured under this policy; (c) resulting in no loss or damage to the insured claimant; (d) attaching or created subsequent to Date of Policy; or (e) resulting in loss or damage which would not have been sustained if the insured claimant had paid value for the estate or Interest insured by this policy. 4. Any claim, which arises out of the transaction vesting in the insured the estate or interest insured by this policy, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights laws, that is based on: (t) the transaction creating the estate or interest insured by this policy being deemed a fraudulent conveyance or fraudulent transfer; or (II) the transaction creating the estate or interest insured by this policy being deemed a preferential transfer except where the preferential transfer results from the failure: (a) to timely record the instrument of transfer; or (b) of such recordation to impart notice to a purchaser for value or a judgment or lien creditor. 9. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY - 1992 WITH REGIONAL EXCEPTIONS When the American Land Title Assocation policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 8 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: I. Taxes or assessments which are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the public records. _. Any facts, rights, interests, or claims which are not shown by the public records but which could be ascertained by an inspection of said land or by making inquiry of persons in possession thereof. 3. Easements, claims of easement or encumbrances which are not shown by the public records. a. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any other facts which a correct survey would disclose, and which are not shown by public records. 5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof; water rights, claims or title to water. 6. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown by the public records. 10. AMERICAN LAND TITLE ASSOCIATION RESIDENTIAL TITLE INSURANCE POLICY - 1987 EXCLUSIONS In addition to the Exceptions in Schedule B, you are not insured against loss, costs, attorneys' fees and expenses resulting from: 1. Governmental police power, and the existence or violation of any law or government regulation. This includes building and zoning ordinances and also laws and regulations concerning: • land use • land division • improvements on the land • environmental protection This exclusion does not apply to violations or the enforcement of these matters which appear In the public records at Policy Date. This exclusion does not limit the zoning coverage described in items 12 and 13 of Covered Title Risks. The riqht to take the land by condemning it, unless: First American Title Order Number: 3409307 (60) Page Number: 19 • a notice of exercising the right appears in the public records on the Policy Date • the taking happened prior to the Policy Date and is binding on you if you bought the land without knowing of the taking. 3. Tile Risks: • that are created, allowed, or agreed to by you • that are known to you, but not to us, on the Policy Date - unless they appeared in the public records • that result in no loss to you • that first affect your title after the Policy Date - this does not limit the labor and material lien coverage In Item 8 of Covered Title Risks 4. Failure to pay value for your title. 5. Lack of a right: • to any land outside the area specifically described and referred to in Item 3 of Schedule A, or • in streets, alleys, or waterways that touch your land This exclusion does not limit the access coverage in Item 5 of Covered Title Risks. 11. EAGLE PROTECTION OWNER'S POLICY CLTA HOMEOWNER'S POLICY OF TITLE INSURANCE - 2008 ALTA HOMEOWNER'S POLICY OF TITLE INSURANCE - 2008 Covered Risks 16 (Subdivision Law Violation). 18 (Building Permit). 19 (Zoning) and 21 (Encroachment of boundary walls or fences) are subject to Deductible Amounts and Maximum Dollar Limits of Liability EXCLUSIONS In addition to the Exceptions in Schedule 8, You are not insured against loss, costs, attorneys' fees, and expenses resulting from: 1. Governmental police power, and the existence or violation of those portions of any law or government regulation concerning: a. building b. zoning c. land use d. improvements on the land e. land division f. environmental protection This Exclusion does not limit the coverage described in Covered Risk 8.a., 14, 15, 16, 18, 19, 20, 23 or 27. 2. The failure of Your existing structures, or any part of them, to be constructed in accordance with applicable building codes. This Exclusion does not limit the coverage described in Covered Risk 14 or 15. 3. The right to take the Land by condemning it. This Exclusion does not limit the coverage described in Covered Risk 17. 4. Risks: a. that are created, allowed, or agreed to by You, whether or not they are recorded in the Public Records; b. that are Known to You at the Policy Date, but not to Us, unless they are recorded in the Public Records at the policy Date; c. that result in no loss to You; or d. that first occur after the Policy Date - this does not limit the coverage described in Covered Risk 7, B.e., 25, 26, 27 or 28. 5. Failure to pay value for Your Title. 6. Lack of a right: a. to any land outside the area specifically described and referred to in paragraph 3 of Schedule A; and b. in streets, alleys, or waterways that touch the Land. This Exclusion does not limit the coverage described in Covered Risk 11 or 21 LIMITATIONS ON COVERED RISKS Your insurance for the following Covered Risks is limited on the Owner's Coverage Statement as follows: Covered Risk 16, 18, 19 and 21, Your Deductible Amount and Our Maximum Dollar Limit of Liability shown In Schedule A. The deductible amounts and maximum dollar limits shown on Schedule A are as follows: Your Deductible Amount Our Maximum Dollar Limit of Liabilitv Covered Risk 16: 1% of Policy Amount or $5,000.00 (whichever is less) $10,000.00 Covered Risk 18: 1% of Policy Amount or $5,000.00 (whichever is less) $25,000.00 Covered Risk 19: 1% of Policy Amount or $5,000.00 (whichever is less) $25,000.00 Covered Risk 21: 1% of Policy Amount or $2,500.00 (whichever is less) $5,000.00 12. THIRD GENERATION EAGLE LOAN POLICY AMERICAN LAND TITLE ASSOCIATION EXPANDED COVERAGE RESIDENTIAL LOAN POLICY (1/01/08) First American Title Order Number: 3409307 (60) Page Number: 20 EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: 1. (a) Any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) restricting, regulating, prohibiting, or relating to (i) the occupancy, use, or enjoyment of the Land; (ii) the character, dimensions, or location of any improvement erected on the Land; (iii) the subdivision of land; or(ly) environmental protection; or the effect of any violation of these laws, ordinances, or governmental regulations. This Exclusion 1(a) does not modify or limit the coverage provided under Covered Risk 5, 6, 13(c), 13(d), 14 or 16. (b)Any governmental police power. This Exclusion 1(b) does not modify or limit the coverage provided under Covered Risk 5, 6, 13(c), 13(d), 14 or 16. 2. Rights of eminent domain. This Exclusion does not modify or limit the coverage provided under Covered Risk 7 or 8. 3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed or agreed to by the Insured Claimant; (b) not Known to the Company, not recorded in the Public Records at Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; (c) resulting in no loss or damage to the Insured Claimant; (d) attaching or created subsequent to Date of Policy (however, this does not modify or limit the coverage provided under Covered Risk 11, 16, 17, 18, 19, 20, 21, 22, 23, 24, 27 or 28); or (e) resulting in loss or damage which would not have been sustained if the Insured Claimant had paid value for the Insured Mortgage. 4. Unenforceability of the lien of the Insured Mortgage because of the inability or failure of an Insured to comply with applicable doing business laws of the state where the Land is situated. 5. Invalidity or unenforceability in whole or In part of the lien of the Insured Mortgage that arises out of the transaction evidenced by the Insured Mortgage and is based upon usury, or any consumer credit protection or truth -in- lending law. This Exclusion does not modify or limit the coverage provided in Covered Risk 26. 6. Any clalm of invalidity, unenforceability or lack of priority of the lien of the Insured Mortgage as to Advances or modifications made after the Insured has Knowledge that the vestee shown In Schedule A is no longer the owner of the estate or interest covered by this pollcy. This Exclusion does not modify or limit the coverage provided in Covered Risk 11. 7. Any lien on the Title for real estate taxes or assessments Imposed by governmental authority and created or attaching subsequent to Date of Policy. This Exclusion does not modify or limit the coverage provided in Covered Risk 11(b) or 25. 8. The (allure of the residential structure, or any portion of it to have been constructed before, on or after Date of Policy in accordance with applicable building coda. This Exclusion does not modify or limit the coverage provided in Covered Risk 5 or 6. 13. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 2006 EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy, and the Company will not pay loss or damage, costs, attorneys' fees, or expenses that arise by reason of: 1. (a) Any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) restricting, regulating, prohibiting, or relating to (I) the occupancy, use, or enjoyment of the Lard; (li) the character, dimensions, or location of any Improvement erected on the Land; (iii) the subdivision of lard; or (Iv) environmental protection; or the effect of any violation of these laws, ordinances, or governmental regulations. This Exclusion 1(a) does not modify or limit the coverage provided under Covered Risk 5. (b) Any governmental police power. This Exclusion 1(b) does not modify or limit the coverage provided under Covered Risk 6. 2. Rights of eminent domain. This Exclusion does not modify or limit the coverage provided under Covered Risk 7 or 8. 3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed, or agreed to by the Insured Claimant (b) not Known to the Company, not recorded in the Public Records at Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; (c) resuting in no less or damage to the Insured Claimant; (d) attaching or created subsequent to Date of Policy (however, this does not modify or limit the coverage provided under Covered Risk 11, 13, or 14); or (e) resulting in loss or damage that would not have been sustained if the Insured Claimant had paid value for the Insured Mortgage. 4. Unenforceability of the lien of the Insured Mortgage because of the inability or failure of an Insured to comply with applicable doing - business laws of the state where the Land is situated. 5. Invalidity or unenforceability in whole or in part of the lien of the Insured Mortgage that arises out of the transaction evidenced by the Insured Mortgage and is based upon usury or any consumer credit protection or truth -in- lending law. 6. Any claim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors' rights laws, that the transaction creating the lien of the Insured Mortgage, is First American Title Order Number: 3409307 (60) Page Number: 21 (a) a fraudulent conveyance or fraudulent transfer, or (b) a preferential transfer for any reason not stated in Covered Risk 13(b) of this policy. Any lien on the Title for real estate taxes or assessments imposed by governmental authority and created or attaching between Date of Policy and the date of recording of the Insured Mortgage in the Public Records. This Exclusion does not modify or limit the coverage provided under Covered Risk 11(b). 14. AMERICAN LAND TITLE ASSOCIATION LOAN POLICY - 2006 WITH REGIONAL EXCEPTIONS When the American land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 13 above are used and the following exceptions to coverage appear in the policy. SCHEDULE 6 This policy does not insure against loss or damage (and the Company will not pay costs, attomeys' fees or expenses) which arise by reason of: 1. (a) Taxes or assessments that are rat shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. 2. Any facts, rights, Interests, or claims that are not shown by the Public Records but that could be ascertained by an inspection of the Land or that may be asserted by persons in possession of the Land. 3. Easements, liens or encumbrances, or daims thereof, not shown by the Public Records. 4. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Ttle that would be disclosed by an accurate and complete land survey of the Land and not shown by the Public Records. 5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the Public Records. 15. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY - 2006 EXCLUSIONS FROM COVERAGE The following matters are expressly excluded from the coverage of this policy and the Company will not pay loss or damage, costs, attorneys' fees or expenses which arise by reason of: 1. (a) Any law, ordinance, permit, or governmental regulation (including those relating to building and zoning) restricting, regulating, prohibiting, or relating to (1) the occupancy, use, or enjoyment of the Land; (ii) the character, dimensions, or location of any improvement erected on the Land; (iii) the subdivision of land; or (iv) environmental protectlon;or the effect of any violation of these laws, ordinances, or governmental regulations. This Exdusion 1(a) does not modify or limit the coverage provided under Covered Risk 5. (b) Any governmental police power. This Exdusion 1(b) does not modify or limit the coverage provided under Covered Risk 6. 2. Rights of eminent domain. This Exclusion does not modify or limit the coverage provided under Covered Risk 7 or 8. 3. Defects, liens, encumbrances, adverse claims, or other matters (a) created, suffered, assumed, or agreed to by the Insured Claimant; (b) not Known W the Company, not recorded in the Public Records at Date of Policy, but Known to the Insured Claimant and not disclosed in writing to the Company by the Insured Claimant prior to the date the Insured Claimant became an Insured under this policy; (c) resulting in no loss or damage to the Insured Claimant; (d) attaching or created subsequent to Date of Policy (however, this does not modify or limit the coverage provided under Covered Risks 9 and 10); or (e) resulting in loss or damage that would not have been sustained if the Insured Claimant had paid value for the Title. 4. Any daim, by reason of the operation of federal bankruptcy, state insolvency, or similar creditors? rights laws, that the transaction vesting the Title as shown in Schedule A, is (a) a fraudulent conveyance or fraudulent transfer; or (b) a preferential transfer for any reason not stated in Covered Risk 9 of this policy. 5. Any lien on the Title for real estate taxes or assessments Imposed by governmental authority and created or attaching between Date of Policy and the date of recording of the deed or other Instrument of transfer in the Public Records that vests Title as shown in Schedule A. 16. AMERICAN LAND TITLE ASSOCIATION OWNER'S POLICY - 2006 WITH REGIONAL EXCEPTIONS First American Title When the American Land Title Association policy is used as a Standard Coverage Policy and not as an Extended Coverage Policy the exclusions set forth in paragraph 15 above are used and the following exceptions to coverage appear in the policy. SCHEDULE B This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing authority that levies taxes or assessments on real property or by the Public Records; (b) proceedings by a public agency that may result in taxes or assessments, or notices of such proceedings, whether or not shown by the records of such agency or by the Public Records. 2. Any facts, rights, interests, or claims that are not shown by the Public Records but that could be ascertained by an inspection of the Land or that may be asserted by persons in possession of the land. 3. Easements, liens or encumbrances, or claims thereof, not shown by the Public Records. 4. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be disclosed by an accurate and complete land survey of the Lanai and not shown by the Public Records. 5. (a) Unpatented mining claims; (b) reservations or exceptions in patents or in Acts authorizing the issuance thereof; (c) water rights, claims or title to water, whether or not the matters excepted under (a), (b), or (c) are shown by the Public Records. FirstAmerican Title PRIVACY POLICY We Are Committed to safeguarding Customer Information In order to better serve your needs now and in the future, we may ask you to provide us with certain information. We understand that you may be concerned about what we will do with such information — particularly any personal or financial information. We agree that you have a right to know how we will utilize the personal information you provide to us. Therefore, together with our parent company, The First American Corporation, we have adopted this Privacy Policy to govern the use and handling of your personal information. Applicability This Privacy Policy governs our use of the information which you provide to us. It does not govern the manner in which we may use information we have obtained from an other source, such as information obtained from a public record or from another person or entity. First American has also adopted broader guidelines that govern our use of personal information regardless of its source. First American calls these guidelines its Fairinformadon Values, a copy of which can be found on our website at www.firstam.com. Types of Information Depending upon which of our services you are utilizing, the types of nonpublic personal information that we may collect include: • Information we receive from you on applications, forms and in other communications to us, whether in writing, in person, by telephone or any other means; • Information about your transactions with us, our affiliated companies, or others; and • Information we receive from a consumer reporting agency. Use of Information We request information from you for our own legitimate business purposes and not for the benefit of any nonaffiliated party. Therefore, we will not release your information to nonaffiliated parties except: (1) as necessary for us to provide the product or service you have requested of us; or (2) as permitted by law. We may, however, store such information indefinitely, including the period after which any customer relationship has ceased. Such information may be used for any internal purpose, such as quality control efforts or customer analysis. We may also provide all of the types of nonpublic personal information listed above to one or more of our affiliated companies. Such affiliated companies include financial service providers, such as title insurers, property and casualty insurers, and trust and investment advisory companies, or companies involved in real estate services, such as appraisal companies, home warranty companies, and escrow companies. Furthermore, we may also provide all the information we collect, as described above, to companies that perform marketing services on our behalf, on behalf of our affiliated companies, or to other financial institutions with whom we or our affiliated companies have joint marketing agreements. Former Customers Even if you are no longer our customer, our Privacy Policy will continue to apply to you. Confidentiality and security We will use our best efforts to ensure that no unauthorized parties have access to any of your information. We restrict access to nonpublic personal information about you to those individuals and entities who need to know that information to provide products or services to you. We will use our best efforts to train and oversee our employees and agents to ensure that your information will be handled responsibly and in accordance with this Privacy Policy and First American's Fair Information Values We currently maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. m 2001 The First American Corporation • All Rights Reserved � r File #: 3409307 Title Officer: Michelle Pascual Property Address: 1010 North El Camino Real, Encinitas, CA 92024 APN #: 257 - 501 -08 -00 PRELIMINARY REPORT OVERVIEW Created December 28, 2009 Date of Prelim: December 16, 2009 Prelim Vesting: ENCINITAS TOWN CENTER ASSOCIATES I, LLC, A DELAWARE LIMITED LIABILITY COMPANY Taxes: 1st Half Taxes: X paid open 2nd Half Taxes: paid X open Supplemental Taxes Due: no X yes Delinquent /Defaulted Taxes Due: X no yes Comments: • Deeds of Trust of Record: • Any Requirements: Item #: 35 Item #: 39, 40 DISCLAIMER THE TTTLEINFORMATTON CONTAINED HEREIN IS SUPPLIED AS A COURTESY ONLYAND IS NOT INTENDED TO SUPPLEMENT OR TO EXTEND THE COVERAGE OF THE UNDERLYING TITLE REPORT REFERENCE SHOULD BE MADE TO THE TITLE REPORT FOR ALL QUESTIONS CONCERNING THE STATUS OF THE TITLE TO THE SUBIECT PROPERTY. FIRST AMERICAN ACCEPTS NO LL48ILITYFOR THE INFORMATION CONTAINED HERETN REFERENCE SHOULD BE MADE TO THE UNDERLYING TTTLE REPORT FOR ALL QLIE577ONS CONCERNING THE TTTLE STATUS OF THE PROPERTY. EXHIBIT 'A' Date: December 29, 2009 PARCEL A: File No.: 3409307 ( 60) LOT 34 OF AMENDED MAP OF ENCINITAS MAP NO. 13258, CITY OF ENCINITAS TRACT NO. 94 -066, UNITS I, II AND III, IN THE CITY OF ENCINITAS, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 13333, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, JUNE 3, 1996. PARCEL B: NON - EXCLUSIVE EASEMENTS OVER AND ACROSS THE COMMON AREA, AS CONVEYED, SET FORTH AND DESCRIBED IN THAT CERTAIN "OPERATION AND EASEMENT AGREEMENT" DATED DECEMBER 21, 1995, EXECUTED BY AND BETWEEN ZELMAN DEVELOPMENT CO., A CALIFORNIA LIMITED PARTNERSHIP AND DAYTON HUDSON CORPORATION, A MINNESOTA CORPORATION, RECORDED DECEMBER 28, 1995 AS INSTRUMENT NO. 95- 594913 AND AS AMENDED BY AMENDMENT TO OPERATIONS AND EASEMENT AGREEMENT RECORDED APRIL 11, 1996 AS INSTRUMENT NO. 96- 178748 AND SECOND AMENDMENT TO OPERATION AND EASEMENT AGREEMENT RECORDED SEPTEMBER 13, 1996 AS INSTRUMENT NO. 96- 467755 ALL OF OFFICIAL RECORDS, IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. 17_1:1214tIA NON - EXCLUSIVE EASEMENTS OVER AND ACROSS THE COMMON AREA, AS CONVEYED, SET FORTH AND DESCRIBED IN THAT CERTAIN "CONSTRUCTION OPERATION AND EASEMENT AGREEMENT" DATED MAY 10, 1996, EXECUTED BY AND BETWEEN ENCINITAS TOWN CENTER ASSOCIATES, LLC, A DELAWARE LIMITED LIABILITY COMPANY AND THE C/W GROUP, RECORDED JUNE 14, 1996 AS INSTRUMENT NO. 96- 298695 OF OFFICIAL RECORDS, IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. A.P.N. 257 - 501 -08 -00 Page I of I