2010-10756 SGLine: y 150061
May 24, 2011
Glen Sparks
1669 Burgundy Rd.
Encinitas, CA 92024
Re: Permit issuance requirements for:
Application 10756 -SG
Case #: 10.107 CDP
445 Fourth St.
258 - 071 -11
This letter summarizes the requirements for pulling your Engineering Permit for drawing 10756 -SG. Your
approved plan will remain valid for six months. If the permit is not issued within six months from the date
of approval of the drawings, the plans will be subject to review by City staff for compliance with current
codes and regulations before a permit can be issued, and changes to the approved plans as well as
additional fees may be required. Additionally, work covered by an Engineering permit shall commence
within 90 days of the permit issuance or the permit shall become invalid. Engineering permits expire
following 90 days of inactivity on the work covered by the permit.
Please read through this letter carefully and contact the City with any questions you may have. It
contains information about many requirements that may apply to your project and can make the
process clearer and easier for you.
In order to obtain the permits to construct the work shown on your approved plans, you will need to satisfy
the requirements below. All of the items listed below must be submitted to the Engineering front counter
in one complete package at the time the applicant comes in to pull the permit. Partial submittals of any
kind will not be accepted. Your project planchecker will not accept any of the documents listed on behalf
of the Engineering front counter staff; all items must be submitted to the front counter directly together and
at one time. The correct number of each of the requested documents must be provided; copies of
documents submitted to the City during plancheck do not reduce the necessary quantities listed below.
(1) Provide 4 print sets of the approved drawing 10756 -SG
Provide 2 copies of "Limited Geotechnical Investigation" prepared by East County Soil
Consultation and dated April 6, 2011.
Submit 2 copies of the approved, signed (not draft) Resolution of Approval or Notice of Decision
for Planning Case # 10 -107 CDP, to be routed by the City to inspector and file (can be obtained
from the planning department).
(2) Pay non - refundable fees as listed below:
Fee Type Amount
�RNV Construction Permit 10756 -CN $300.00
Perm. Encroachment Permit 10756 -PE $450.00
(3) Provide the name, address, telephone number, state license number, and license type of the
construction contractor. The construction of any improvements within the public
right -of -way or public easements is restricted to qualified contractors possessing the
required state license as listed in the table below. The contractor must also have on file with
the City current evidence of one million dollar liability insurance listing the City of Encinitas as co-
insured. Additional requirements are described in the handout "Requirements for Proof of
Insurance" available at the Engineering front counter.
Type
Description
Work to be Done
A
General Engineering
any & all
C -8
Concrete
apron/curb/gutter/ramp/sidewalk
C -10
Electrical
li htin isi nals
C -12
Grading & Paving
any surface, certain drain -
basins /channels
C -27
Landscaping
planting /irrigation /fencing & other
amenities
C -29
Masonry
retaining walls
C -32
Parking &Highway
Improvement
signage /striping /safety
C -34
Pipeline
sanitary sewer /storm drain
(4) Obtain Right -of -Way Construction Permit 10756 -CN and Permanent Encroachment Permit
10756 -PE from the Engineering Services Department front counter.
Preconstruction Meeting: A preconstruction meeting at the project site is mandatory for all projects.
The preconstruction meeting may not be scheduled until the Engineering permit(s) have been issued, and
the applicant/contractor must give the assigned Engineering inspector a minimum of 48 hours advance
notice prior to the scheduled meeting time.
Right -of -Way Construction Permit: A separate right -of -way construction permit will be required for any
work in the public right -of -way or public easements. Typically, this work may include construction or
reconstruction of a portion of the driveway within the public right -of -way, excavation, backfill, and
resurfacing to install electric, gas, telephone, and cable television lines, or water and sewer connections.
A permit fee of $300.0 0 per application and a site plan, preferably the work order issued by the public
utility, will be required. Contractor license and insurance requirements apply. Permits must be issued at
least 48 hours in advance of the start of work.
Haul Routes, Traffic Control Plans, and Transportation Permits: These separate permits may be
required for your project and are handled by the Traffic Engineering Division. A fee of $250.00 is required
for traffic control plans. For more details, contact Raymond Guarnes, Engineering Technician, at (760)
633 -2704.
Construction Changes: Construction changes prepared by the Engineer of Work will be required for all
changes to the approved plans. Requests for construction change approval should be submitted to the
Engineering Services Department front counter as redlined mark -ups on 2 blueline prints of the approved
Drawing. Changes are subject to approval prior to field implementation. Substantial increases in valuation
due to the proposed changes may be cause for assessment and collection of additional inspection fees
and security deposits. Construction change fees of $200.00 and $350.00 will be assessed for minor and
major construction changes, respectively. Construction changes necessitating a new plan sheet will be
assessed the per -sheet plancheck and NPDES plancheck fees in lieu of the construction change fee.
Construction changes not previously approved and submitted as as -built drawings at the end of the
construction process will be rejected and the securities release will be delayed.
Change of Ownership: If a change of ownership occurs following approval of the drawing(s), the new
owner will be required to submit to the City a construction change revising the title sheet of the plan to
reflect the new ownership. The construction change shall be submitted to the Engineering front counter
as redline mark -ups on two blueline prints of the approved drawing together with two copies of the grant
deed or title report reflecting the new ownership. Construction change fees apply. The current owner will
be required to post new securities to replace those held by the City under the name of the former owner,
and the securities posted by the former owner will be released when the replacement securities have been
received and approved by the City.
Change of Engineer of Work: If a change in engineer of work occurs following the approval of the
drawing(s), a construction change shall be submitted for review and approval by the Engineering
Department. Two copies of the forms for the assumption of responsibility by the new engineer and the
release of responsibility by the former engineer shall be completed and submitted to the City.
Construction change fees apply.
As- builts: Project as -built drawings prepared by the Engineer of Work will be required prior to Final
Grading acceptance by Engineering Services. Changes to the approved plans require a construction
change to be submitted to the City prior to field implementation. Construction changes may not be
submitted as as- builts at the end of the construction process.
This letter does not change owner or successor -in- interest obligations. If there should be a substantial
delay in the start of your project or a change of ownership, please contact the City to request an update.
Should you have questions regarding the posting of securities, please contact Debra Geishart, who
processes all Engineering securities, at (760) 633 -2779.
Should you have any other questions, please contact me at (760) 633 -2867 or visit the Engineering
Counter at the Civic Center to speak with an Engineering Technician.
Sincerely,
Steven Nowak
Assistant Civil Engineer
cc Dan Jensvold, Architect
Debbie Geishart, Engineering Technician
Greg Shields, Senior Civil Engineer
Masih Maher, Senior Civil Engineer
permit/file
Enc Application
Requirements for Proof of Insurance
av L. y LY y y A J
ENGINEERING SERVICES DEPARTMENT
505 S. VULCAN AVE.
ENCINITAS, CA 92024
CONTRACTOR : OWNER /BUILDER
LICENSE NO.:
ENGINEER : DANIEL JENSVOLD
PERMIT ISSUE DATE: 6/15/11
PERMIT /12
INSPECT RON BRADY
----- ----- - - - - -- PERMIT
PHONE NO.: 760 - 633 -4293
LICENSE TYPE:
PHONE NO.: 858- 481 -2212
PERMIT ISSUED BY:
FEES & DEPOSITS ---------------------- - - - - --
1.
GRADING PLAN
PERMIT
NO.: 10756 SG
PARCEL NO.
258- 071 -1100
PLAN NO.:
INSPECTION FEE
JOB SITE ADDRESS:
445 FOURTH ST
CASE NO.:
10107 / CDP
APPLICANT NAME
GLEN SPARKS
.00
6.
MAILING ADDRESS:
1669 BURGUNDY RD
PHONE NO.:
760 - 633 -4293
CITY: ENCINITAS
STATE: CA ZIP:
92024-
.00
CONTRACTOR : OWNER /BUILDER
LICENSE NO.:
ENGINEER : DANIEL JENSVOLD
PERMIT ISSUE DATE: 6/15/11
PERMIT /12
INSPECT RON BRADY
----- ----- - - - - -- PERMIT
PHONE NO.: 760 - 633 -4293
LICENSE TYPE:
PHONE NO.: 858- 481 -2212
PERMIT ISSUED BY:
FEES & DEPOSITS ---------------------- - - - - --
1.
PERMIT FEE
1,800.00
2.
GIS MAP FEE
.00
3.
INSPECTION FEE
.00
4.
INSPECTION DEPOSIT:
.00
5.
NPDES INSPT FEE
.00
6.
SECURITY DEPOSIT
.00
7.
FLOOD CONTROL FE
.00
8.
TRAFFIC FEE
.00
9.
IN -LIEU UNDERGRN
.00
10.IN
-LIEU IMPROVMNT
.00
ll.PLAN
CHECK FEE
.00
12.PLAN
CHECK DEPOSIT:
.00
----- ---------
----- - -- - --
DESCRIPTION
OF
WORK ---- ----------- ----------
- - - - --
PERMIT FOR SIMPLIFIED GRADING PER PLAN 10756 -SG. CONTRACTOR MUST
MAINTAIN TRAFFIC CONTROL AT ALL TIMES PER W.A.T.C.H. STANDARDS OR
APPROVED PLAN.
- - -- INSPECTION ---------- - - - - -- DATE -- - - - - -- INSPECTOR'S SIGNATURE - - --
INITIAL INSPECTION
COMPACTION REPORT RECEIVED
ENGINEER CERT. RECEIVED
ROUGH GRADING INSPECTION
FINAL INSPECTION
I HEREBY ACKNOWLEDGE THAT I HAVE READ THE APPLICATION AND STATE THAT THE
INFORMATION IS CORRECT AND AGREE TO COMPLY WITH ALL CITY ORDINANCES AND STATE
LAWS REGULATING EXCAVATING AND GRADING, AND THE PROVISIONS AND CONDITIONS OF
ANY PERMIT ISSUED PURSUANT TO THIS APPLICATION.
SIGNATURRR
(le N S ri S
PRINT NAME
CIRCLE ONE: 1. OWNER 2. AGENT 3. OTHER
Oww i S �w 1
DATE SIGNED
L� o� (o33 - 421:?
TELEPHONE NUMBER
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
(619) 258 -7901
Fax 258 -7902
Mr. Glen Sparks
1669 Burgundy Road
Encinitas, California 92024
Subject: Report of Field Density Tests
Proposed Single - Family Residence
445 4th Street
Encinitas, California 92024
July 27, 2011
Project No. 11- 1147137
Reference: "Limited Geotechnical Investigation, Proposed Single - Family Residence, 445 4h
Street, Encinitas, California 92024 ", Project No. 11- 1147B7, Prepared by East
County Soil Consultation and Engineering, Inc., Dated April 6, 2011.
Dear Mr. Sparks:
This is to present the results of field density tests performed on the building pads for the
proposed single - family residence and detached garage at the subject site.
In accordance with your request, in -place field density tests were performed in accordance with
ASTM D1556 (Sand Cone Method). Grading was conducted between June 28 and July 22, 2011
under the observation and testing of a representitive of East County Soil Consultation &
Engineering Inc.
The results of the field density tests are presented on Page T -1 under "Table of Test Results ". The
laboratory determinations of the maximum dry densities and optimum moisture contents of the
fill soils are set forth on Page L -1 under "Laboratory Test Results ". The approximate test
locations are shown on Plate No. 1.
Following clearing and grubbing, i.e. the removal of vegetation and rubbles from the demolition
of the existing house, subgrade soils were overexcavated to depths up to approximately 3 feet
below existing grade into the dense terrace deposits. Prior to the placement of new fill, the
bottom of the excavation was scarified to a depth of approximately 6 inches, moisture
conditioned and compacted.
On -site and imported fill soils consisting of silty sand were placed in thin lifts, moisture
conditioned around optimum and compacted to a minimum of 90 percent relative compaction.
Compaction was achieved with the use of a Caterpillar 312B trackhoe and a sheepsfoot roller.
r
GLEN SPARKS/ 4TH STREET/ ENCINITAS PROJECT NO 11- 113787
Based on our field observations and density test results, it is our opinion that the grading
operation for the proposed residential project was performed in accordance with the referenced
geotechnical report and local grading ordinances.
If we can be of further assistance, please do not hesitate to contact our office.
Pages T -1, L -1 and Plate No. 1 are attached.
Respectfully Submitted,
Mamadou Saliou Diallo, P.E.
RCE 54071, GE 2704
MSD /md
2
GLEN SPARKS/ 4m STREET/ ENCINITAS PROJECT NO. 11-1147B7
PAGE T -1
TABLE OF TEST RESULTS
ASTM D1556
3
. ,.
MAXIMUM
DEPTH
FIELD
DRY
DRY
TEST
SOIL OF FILL
MOISTURE
DENSITY
DENSITY
PERCENT
NO.
TYPE IN FEET
%DRY WT.
P.C.F.
P.C.F
COMPACTION
1
1 1.5
10.2
121.4
128.5
94
2
1 1.5
11.1
124.6
128.5
97
3
1 3
11.2
123.1
128.5
96
4
l 3
11.5
119.1
128.5
93
5
1 2
83
115.4
128.5
90
6
1 1.5
8.7
121.7
128.5
95
7
1 2
8.7
115.5
128.5
90
8
1 2
8.9
119.9
128.5
93
9
1 2
8.5
126.0
128.5
98
10
1 4 FG
9.8
117.2
128.5
91
11
1 4 FG
8.2
122.4
128.5
95
12
1 3 FG
10.1
125.0
128.5
97
13
I 3 FG
8.6
124.5
128.5
97
14
2 2
9.0
124.6
127.0
98
15
2 3 FG
8.5
120.6
127.0
95
-- - - -
-
FG = FINISH
GRADE
- -
3
. ,.
GLEN SPARKS/ 4TH STREET/ ENCINITAS PROJECT NO 11- 1147B7
PAGE L -1
LABORATORY TEST RESULTS
RESULTS OF MAXIMUM DENSITY AND OPTIMUM MOISTURE
The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM
D1557, Procedures A and B which use 25 blows of a 10 -pound slide hammer falling from a height of 18
inches on each of 5 equal layers in a 4 -inch diameter 1/30 cubic foot compaction cylinder and Procedure
C which uses 56 blows of a 10 -pound slide hammer falling from a height of 18 inches on each of 5 equal
layers in a 6 -inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows:
OPTIMUM
MAXIMUM MOISTURE
SOIL TYPE/ DRY DENSITY CONTENT
PROCEDURE DESCRIPTION LB/ CU. FT. % DRY WT.
l/A DARK BROWN SILTY SAND 128.5 8.5
2/A TAN BROWN SILTY SAND 127.0 9.5
(IMPORT)
I I
EAS 7 COON i i SOIL CONSULTA—i lON
& ENGINEERING. INC.
10925 HAR"L'Y R-".. SliIT L SAN 7L CA 92fi I
(60) 258.7901 Fax (619) :59.7902
i
Ii 7�v ,A - .�
Iot���
CI
Iron Mountain Land Surveys
4220 St.James Pl. San Diego, CA 92103
Ph. (619)295 -1665 fx.(619) 955 -8171
CITY OF ENCINITAS
BUILDING DEPARTMENT
RE: 445 FOURTH ST. COUNTY TAX ASSESSOR PARCEL N 258 -071 -11
ENCINITAS,CA
A FIELD SURVEY WAS PERFORMED ON THE ABOVE SITE FOR PAD ELEVATION
VERIFICATION. THE BUILDING PAD IS AT ELEVATION 72.05 PER PLAN.
SINCERELY,
DAVE EISENBERG
v DAVID EISE'*B O
Jvly z3,z -a/
Iron Mountain Land Surveys
4220 St.James Pl. San Diego, CA 92103
Ph. (619)295-1665 (x.(619)955 -8171
CITY OF ENCINITAS
BUILDING DEPARTMENT
RE: 445 FOURTH ST. COUNTY TAX ASSESSOR PARCEL # 258 -071 -11
ENCINITAS,CA
A FIELD SURVEY WAS PERFORMED ON THE ABOVE SITE FOR LAYOUT OF ZONING
SETBACKS PER PLAN. THE FOLLOWING ZONING SETBACK LINES WERE STAKED AT
REQUEST OF THE OWNER.
I. BOTH SIDE YARD ZONING SETBACKS OF 5 FEET WERE STAKED.
2. THE FRONT ZONING SETBACK OF 15 FEET WAS STAKED.
3. THE REAR ZONING SETBACK OF 5 FEET WAS STAKED.
SINCERELY,
DAVE EISENBERG
-P
2
IT1
II
I
I
II
II
I
I
z ��I
w i I
cy)+ I
rn
SURVEY LAYOUT OF ZONING SET BACK LINES
15'
SET BLACK + ON WINDOW SILL + ON CONC• -
5 OFFSET 5ETOFFFSET
x� N83'18147 "E 100.26>
SPIKE
&LATHE
� I
I
I
,SET CON�L T0= ALL —
U, �3 -
/ N83'18' 43 'E
N PER
I SURVEY DISC
+ I R.O.S.1927B
II
I
00.291
0 29 i
SET BLACK + ON
EDGE CONC.DRIVE
I
I
I
,
I
z
0
rn
I
w
D
�
rn
r
m
Ul
o
w
10'`
,
I
,
I
I
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
(619) 258 -7901
Fax 258 -7902
Mr. Glen Sparks
16691 Burgundy Road P
Encinitas, California 92024
Subject: Limited Geotechnical Investigation Vr Proposed Single - Family Residence 445 4th Street
Encinitas, California 92024 k- 1 1 ,
Dear Mr. Sparks:
April 6, 2011
o. 11- 1147B7
DI
In accordance with your request, we have performed a limited geotechnical investigation at the
subject site to discuss the geotechnical aspects of the project and provide recommendations for the
proposed development.
Our investigation has found that the subject site is underlain by topsoil to a depth of approximately
2 feet below existing grade. Dense sandstone of the Terrace Deposits Formation was underlying
the topsoil to the explored depth of 10 feet. It is our opinion that the proposed development is
geotechnically feasible provided the recommendations herein are implemented in the design and
construction.
Should you have any questions with regard to the contents of this report, please do not hesitate to
contact our office.
J D
`
G JUN 1 5 2011
No. E 2704
EXp: z
A
^ tg,,- -,; _ER:NG SERVICES
=l_ ,,,�VGP��P _ CITY GF ENCI'�IIA$
Mamadou Saliou Diallo, P.E.
RCE 54071, GE 2704
MSD\md
GLENSPARKS, 4*STREET, ENCINITASPROJECTNO. 11- 1147B7
TABLE OF CONTENTS
INTRODUCTION................................................................................................................ ..............................3
SCOPE OF SERVICES ........................................................................................................ ..............................3
SITE DESCRIPTION AND PROPOSED CONSTRUCTION .......................................... ..............................3
FIELD INVESTIGATION AND LABORATORY TESTING .......................................... ..............................4
GEOLOGY ............................. ...............................
Geologic Setting ........ ...............................
Site Stratigraphy ........ ...............................
SEISMICITY ............................................. ...............................
Regional Seismicity ...................... ...............................
Seismic Anal ysis .......................... ...............................
2010 CBC Seismic Design Criteria ............................
Geologic Hazard Assessment ....... ...............................
GEOTECHNICAL EVALUATION
Compressible Soils ..............
Expansive Soils ....................
Groundwater ........................
..................................... ............................... 5
...................................... ..............................6
...................................... ..............................6
..................................... ............................... 7
...................................... ..............................7
...................................... ..............................7
CONCLUSIONS AND RECOMMENDATIONS .............................................................. ..............................7
GRADING AND EARTHWORK ........................................................................................ ..............................7
Clearingand Grubbing ............................................................................................ ..............................8
Structural Improvement of Soils .............................................................................. ..............................8
Transitions Between Cut and Fill ........................................................................... ..............................8
Methodand Criteria of Compaction ........................................................................ ..............................8
ErosionControl ........................................................................................................ ..............................9
Standard Grading Guidelines ................................................................................... ..............................9
FOUNDATIONS AND SLABS .......................................................................................... ..............................9
SETTLEMENT.................................................................................................................... .............................10
PRESATURATION OF SLAB SUBGRADE .................................................................... .............................10
TEMPORARYSLOPES ..................................................................................................... .............................10
TRENCHBACKFILL ......................................................................................................... .............................10
DRAINAGE......................................................................................................................... .............................11
- - - FOUNDATION-PLAN- REVIEW-......— .... .....--::..-.—....-.— .................. ............................... 11 -
LIMITATIONS OF INVESTIGATION ........................................................................... ..............................1 I
ADDITIONAL SERVICES ............................................................................................... .............................12
PLATES
Plate I- Location of Exploratory Boreholes
Plate 2 - Summary Sheet (Exploration Borehole Logs)
Plate 3 - USCS Soil Classification Chart
PAGE L -1, LABORATORY TEST RESULTS ................................................................. .............................14
REFERENCES.................................................................................................................... .............................15
2
GLENSPARKS, 4d STREET, ENCINITAS PROJECTNO. 11- 1147B7
INTRODUCTION
This is to present the findings and conclusions of a limited geotechnical investigation for a
proposed two -story, single - family residence with a detached garage to be located at 445 4`h Street,
in the City of Encinitas, California.
The objectives of the investigation were to evaluate the existing soils conditions and provide
recommendations for the proposed development.
SCOPE OF SERVICES
The following services were provided during this investigation:
• Site reconnaissance and review of published geologic, seismological and geotechnical reports
and maps pertinent to the project area
• Subsurface exploration consisting of four (4) boreholes within the limits of the proposed area
of development. The boreholes were logged by our Staff Geologist.
• Collection of representative soil samples at selected depths. The obtained samples were sealed
in moisture - resistant containers and transported to the laboratory for subsequent analysis.
• Laboratory testing of samples representative of the types of soils encountered during the field
investigation
• Geologic and engineering analysis of the field and laboratory data, which provided the basis
for our conclusions and recommendations
• Production of this report, which summarizes the results of the above analysis and presents our
findings and recommendations for the proposed development
SITE DESCRIPTION AND PROPOSED CONSTRUCTION
The subject site is a rectangular- shaped residential lot located on the east side of 4`s Street, in the
City of Encinitas, California. The property, which encompasses an area of approximately 5,000
square feet, includes a one -story house with a detached garage. The site slopes genTy to ffe nort�
Vegetation consisted of a few trees, grass and shrub. Site boundaries include 4`h Street to the west,
an alley to the east and residential parcels to the remaining directions.
The Grading and Drainage Plan prepared by Jensvold Associates of Del Mar, California indicates
that the proposed construction will include a single - family residence with a detached garage. It is
our understanding that the structures will be two -story, wood - framed and founded on continuous
footings with slab -on -grade floors.
GLEN SPARKS, 4"STREET, ENCINITAS PROJECT NO. 11- 1147B7
FIELD INVESTIGATION AND LABORATORY TESTING
On March 23, 2011, four (4) boreholes were excavated to a maximum depth of approximately 10
feet below existing grade with a hand auger. The approximate locations of the boreholes are shown
on the attached Plate No. 1, entitled "Location of Exploratory Boreholes". A continuous log of the
soils encountered was recorded at the time of excavation and is shown on Plate No. 2 entitled
"Summary Sheet ". The soils were visually and texturally classified according to the filed
identification procedures set forth on Plate No. 3 entitled "USCS Soil Classification ".
Following the field exploration, laboratory testing was performed to evaluate the pertinent
engineering properties of the foundation materials. The laboratory- testing program included
moisture and density, maximum dry density and optimum moisture content, particle size analysis
and expansion index tests. These tests were performed in general accordance with ASTM
standards and other accepted methods. Page L -1 and Plate No. 2 provide a summary of the
laboratory test results.
GEOLOGY
Geolo¢ic Settins
The subject site is located within the southern portion of what is known as the Peninsular Ranges
Geomorphic Province of California_ The geologic map pertaining to the area indicates that the site is
underlain by Pleistocene marine terrace deposits (Qt).
Site Stratig auhv
The subsurface descriptions provided are interpreted from conditions exposed during the field
investigation and/or inferred from the geologic literature. Detailed descriptions of the subsurface
materials encountered during the field investigation are presented on the exploration logs provided on
Plate No, 2. The following paragraphs provide general descriptions of the encountered soil types.
Tovsoil
Topsoil is the surficial soil material that mantles the ground, usually containing roots and other organic
materials, which supports vegetation. Topsoil was observed in all boreholes with a thickness of
approximately 2 feet. It consisted of dark brown, silty sand that was most loose and porous il
consistency with some organics (roots and rootlets).
Marine Terrace Deposits (Ot)
Terrace deposits were observed below the topsoil layer. They generally consisted of tan brown, silty
sand that was moist and medium dense to dense in consistency.
4
GLENSPARKS, 4' "STREET, ENCINITASPROJECTNO, 11- 114787
SEISMICITY
Regional Seismicity
Generally, Seismicity within California can be attributed to the regional tectonic movement taking
place along the San Andreas Fault Zone, which includes the San Andreas Fault and most parallel
and subparallel faults within the state. The portion of southern California where the subject site is
located is considered seismically active. Seismic hazards are attributed to groundshaking from
earthquake events along nearby or more distant Quaternary faults. The primary factors in
evaluating the effect an earthquake has on a site are the magnitude of the event, the distance from
the epicenter to the site and the near surface soil profile.
According to the Fault- Rupture Hazard Zones Act of 1994 (revised Alquist- Priolo Special Studies
Zones Act), quaternary faults have been classified as "active" faults, which show apparent surface
rupture during the last 11,000 years (i.e., Holocene time). "Potentially- active" faults are those faults
with evidence of displacing Quaternary sediments between 11,000 to 16,000 years old.
Seismic Analysis
Based on our evaluation, the closest known "active" fault is the Rose Canyon Fault located
approximately 2.5 miles (4 kilometers) to the west. The Rose Canyon Fault is the design fault of the
project due to the predicted credible fault magnitude and ground acceleration.
The Seismicity of the site was evaluated utilizing deterministic methods (Egseach/ Eqfault ver 3.0,
Blake, 2008) for active Quaternary faults within the regional vicinity. The site may be subjected to
a Maximum Probable Earthquake of 6.9 Magnitude along the Rose Canyon fault, with a
corresponding Peak Ground Acceleration of 0.548. The maximum Probable Earthquake is defined
as the maximum earthquake that is considered likely to occur within a 100 -year time period.
The effective ground acceleration at the site is associated with the part of significant ground
motion, which contains repetitive strong - energy shaking, and which may produce structural
deformation. As such, the effective or "free field" ground acceleration is referred to as the
Repeatable High Ground Acceleration (RHGA). It has been determined by Ploessel and Slosson
(1974) that the RHGA is approximately equal to 65 percent of the Peak Ground Acceleration for
_ earthquakes occurring within 20 miles of a site_. Based_ on the above, the calculated Credible
RHGA at the site is 0.358.
2010 CBC Seismic Design Criteria
A review of the active fault maps pertaining to the site indicates the existence of the Rose Canyon
Fault Zone approximately 4 km to the west. Ground shaking from this fault or one of the major
active faults in the region is the most likely happening to affect the site. With respect to this
hazard, the site is comparable to others in the general area. The proposed residential structures
should be designed in accordance with seismic design requirements of the 2010 California Building
Code or the Structural Engineers Association of California using the following seismic design
parameters:
5
GLENSPARa eSTREET, ENCINITAS PROJECT NO. 11- 114787
PARAMETER
VALUE
2007 CBC REFERENCE
Site Class
D
Table 1613.5.2
Mapped Spectral Acceleration For
Short Periods, S,
1.418
Figure 1613.5(3)
Mapped Spectral Acceleration For a
I- Second Period, S,
0.533
Figure 1613.5(4)
Site Coefficient, F.
1.0
Table 1613.5.3(1
Site Coefficient, F.
1.5
Table 1613.5.3(2)
Geologic Hazard Assessment
Ground Rupture
Ground rupture due to active faulting is not considered likely due to the absence of known fault traces
within the vicinity of the project, however, this possibility cannot be completely ruled out. The
unlikely hazard of ground rupture should not preclude consideration of "flexible" design for on -site
utility lines and connections.
Liquefaction
Liquefaction involves the substantial loss of shear strength in saturated soils, usually sandy soils with a
loose consistency when subjected to earthquake shaking. Based on the absence of shallow
groundwater and consistency of the underlying terrace deposits, it is our opinion that the potential for
liquefaction is very low.
Landslidinll
There is no indication that landslides or unstable slope conditions exist on or adjacent to the project
site. There are no obvious geologic hazards related to landsliding to the proposed development or
adjacent properties.
Tsunamis and Seiches
The site is not subject to inundation by tsunamis due to its elevation and distance from the ocean.
The site is also not subject to seiches (waves in confined bodies of water).
GEOTECHNICAL EVALUATION
Based on our investigation and evaluation of the collected information, we conclude that the proposed
construction is feasible from a geotechnical standpoint provided the recommendations provided herein
will be properly implemented during structural development.
Based on the low expansion potential of the granular near - surface soils, it is our opinion that the
building pads may be constructed using the on -site materials. In order to provide a uniform support
for the structures, overexcavation and recompaction of the structural portions of the building pads will
be required. The foundations may consist of reinforced continuous footings with conventional
3
GLEN SPARKS, 4`" STREET, ENCINITAS PROJECT NO. 11- 1147B7
reinforced slabs. Recommendations and criteria for foundation design are provided in the Foundation
and Slab recommendations section of this report.
Compressible Soils
Our field observations and testing indicate low compressibility within the sedimentary bedrock, which
underlies the site. However, loose topsoil was typically encountered to a depth of approximately 2
feet below surface grades. These soils are compressible. Due to the potential for soil compression
upon loading, remedial grading of these near- surface soils (including overexcavation and
recompaction) will be required.
Following implementation of the earthwork recommendations presented herein, the potential for soil
compression resulting from the new development has been estimated to be low. The low - settlement
assessment assumes a well - planned and maintained site drainage system. Recommendations regarding
mitigation by earthwork construction are presented in the Grading and Earthwork recommendations
section of this report.
Expansive Soils
An expansion index test was performed on a representative sample of the formational soils to
determine volumetric change characteristics with change in moisture content. An expansion index
of 0 was obtained which indicates a very low expansion potential for the foundation soils.
Groundwater
Static groundwater was not encountered to the depths of the boreholes. The subject site is located
at an elevation of approximately 70 feet above Mean Sea Level. We do not expect groundwater to
affect the proposed construction. Recommendations to prevent or mitigate the effects of poor
surface drainage are presented in the Drainage section of this report.
CONCLUSIONS AND RECOMMENDATIONS
The following conclusions and recommendations are based upon the analysis of the data and
information obtained from our soil investigation. This includes site reconnaissance; field
__investigation; laboratory testing and our general knowledge of the soils native to the site. The site is
suitable for the proposed residential development provided the recommendations set forth are
implemented during construction.
GRADING AND EARTHWORK
Based upon the proposed construction and the information obtained during the field investigation, we
anticipate that the proposed structures will be founded on continuous footings, which are supported by
properly compacted fill. The following grading and earthwork recommendations are based upon the
limited geotechnical investigation performed, and should be verified during construction by our field
representative.
7
GLENSPARKS, 4" STREET, ENCINITASPROJECTNO. 11- 114787
Clearing and Grubbing
All areas to be graded or to receive fill and/or structures should be cleared of vegetation. Vegetation
and the debris from the clearing operation should be properly disposed of off -site. The area should be
thoroughly inspected for any possible buried objects, which need to be rerouted or removed prior to
the inception of, or during grading. All holes, trenches, or pockets left by the removal of these objects
should be properly backfilled with compacted fill materials as recommended in the Method and
Criteria of Compaction section of this report.
Structural Improvement of Soils
Information obtained from our field and laboratory analysis indicates that loose topsoil covers the site
to a depth of approximately 2 feet below existing grade. These surficial soils are susceptible to
settlement upon loading. Based upon the soil characteristics, we recommend the following:
* All topsoil and other loose natural soils should be completely removed from areas, which are
planned to receive compacted fills and/or structural improvements. The bottom of the removal
area should expose competent materials as approved by ECSC &E geotechnical representative.
Prior to the placement of new fill, the bottom of the removal area should be scarified a
minimum depth of 6 inches, moisture - conditioned within 2 percent above the optimum
moisture content, and then recompacted to at least 90 percent relative compaction (ASTM
D1557 test method).
* Overexcavation should be completed for the structural building pads to a minimum depth of
3 feet below finish pad grades. The limit of the required areas of overexcavation should be
extended a minimum of 5 feet laterally beyond the perimeter footings (building footprints).
* Soils utilized as fill should be moisture- conditioned and recompacted in conformance with the
following Method and Criteria of Compaction section of this report. The depth and extent of
any overexcavation and recompaction should be evaluated in the field by a representative of
ECSC &E.
Transitions Between Cut and Fill
The proposed structures are anticipated to be founded entirely in properly compacted fill. Cut to fill
transitions Tx�ow ff proposed structures - should be - completely eitimnaled- -&uring the earthwork
construction as required in the previous section.
Method and Criteria of Compaction
Compacted fills should consist of approved soil material, free of trash debris, roots, vegetation or other
deleterious materials. Fill soils should be compacted by suitable compaction equipment in uniform
loose lifts of 6 to 8 inches. Unless otherwise specified, all soils subjected to recompaction should be
moisture - conditioned within 2 percent over the optimum moisture content and compacted to at least
90 percent relative compaction per ASTM test method D 1557.
8
GLENSPARKS, 4"STREET, ENCINITAS PROJECT NO. 11- 1147B7
The on -site granular and non - expansive soils, after being processed to delete the aforementioned
deleterious materials, may be used for recompaction purposes. Should any importation of fill be
planned, the intended import source(s) should be evaluated and approved by ECSCE prior to delivery
to the site. Care should be taken to ensure that these soils are not detrimentally expansive.
Erosion Control
Due to the granular characteristics of the on -site soils, areas of recent grading or exposed ground may
be subject to erosion. During construction, surface water should be controlled via berms, gravel/
sandbags, silt fences, straw wattles, siltation basins, positive surface grades or other method to avoid
damage to the finish work or adjoining properties. All site entrances and exits must have coarse
gravel or steel shaker plates to minimize offsite sediment tracking. Best Management Practices
(BMPs) must be used to protect storm drains and minimize pollution. The contractor should take
measures to prevent erosion of graded areas until such time as permanent drainage and erosion control
measures have been installed. After completion of grading, all excavated surfaces should exhibit
positive drainage and eliminate areas where water might pond.
Standard Grading Guidelines
Grading and earthwork should be conducted in accordance with the standard -of- practice methods for
this local, the guidelines of the current edition of the Uniform Building Code, and the requirements of
the jurisdictional agency. Where the information provided in the geotechnical report differs from the
Standard Grading Guidelines, the requirements outlined in the report shall govem.
FOUNDATIONS AND SLABS
a. Continuous and spread footings are suitable for use and should extend to a minimum depth of 18
inches below the lowest adjacent grade for the proposed two -story structures into the properly
compacted fill soils. Continuous footings should be at least 15 inches in width and reinforced with
four #4 steel bars; two bars placed near the top of the footings and the other two bars placed near
the bottom of the footings. Isolated or spread footings should have a minimum width of 24 inches.
Their reinforcement should consist of a minimum of #4 bars spaced 12 inches on center (each way)
and placed horizontally near the bottom.
_ b. Interior concrete floor slabs should be a minimum 5 inches thick. Reinforcement should consist
of #4 bars placed at 18 inches on center each way within the middle third of the slabs by supporting
the steel on chairs or concrete blocks "dobies ". The slabs should be underlain by 2 inches of clean
sand over a 10 -mil visqueen moisture barrier. The effect of concrete shrinkage will result in cracks
in virtually all- concrete slabs. To reduce the extent of shrinkage, the concrete should be placed at a
maximum of 4 -inch slump. The minimum steel recommended is not intended to prevent shrinkage
cracks.
c. Where moisture sensitive floor coverings are anticipated over the slabs, the 10 -mil plastic
moisture barrier should be underlain by a capillary break at least 2 inches thick, consisting of
coarse sand, gravel or crushed rock not exceeding 3/4 inch in size with no more than 5 percent
passing the #200 sieve.
GLEN SPARKS, 4`" STREET, ENCINITAS PROJECT NO. 11- 114787
b. An allowable soil bearing value of 2,000 pounds per square foot may be used for the design of
continuous and spread footings at least 12 inches wide and founded a minimum of 12 inches into
properly compacted fill soils or the dense sandstone of the Terrace Deposits Formation as set forth
in the 2010 California Building Code, Table 1804.2. This value may be increased by 400 psf for
each additional foot of depth or width to a maximum value of 4,000 lb /ft2.
e. Lateral resistance to horizontal movement may be provided by the soil passive pressure and the
friction of concrete to soil. An allowable passive pressure of 250 pounds per square foot per foot
of depth may be used. A coefficient of friction of 0.35 is recommended. The soils passive pressure
as well as the bearing value may be increased by 1/3 for wind and seismic loading.
SETTLEMENT
Settlement of compacted fill soils is normal and should be anticipated. Because of the type and
minor thickness of the fill soils anticipated under the proposed footings and the light building loads,
total and differential settlements should be within acceptable limits.
PRESATURATION OF SLAB SUBGRADE
Because of the granular characteristics of the existing soils, presoaking of the subgrade prior to
concrete pour is not required. However, subgrade soils in areas receiving concrete should be
watered prior to concrete placement to mitigate any drying shrinkage, which may occur following
site grading.
TEMPORARY SLOPES
For the excavation of foundations and utility trenches, temporary vertical cuts to a maximum height of
4 feet may be constructed in fill or natural soil. Any temporary cuts beyond the above height
constraints should be shored or further laid back following a 1:1 (horizontal to vertical) slope ratio.
OSHA guidelines for trench excavation safety should be implemented during construction.
TRENCH BACKFILL
Excavations for utility lines, which extend under structural areas should be properly backflled and
compacted. Utilities should be bedded and backflled with clean sand or approved granular soil to
a depth of at least one foot over the pipe. This backfill should be uniformly watered and
compacted to a firm condition for pipe support. The remainder of the backfill should be on -site
soils or non - expansive imported soils, which should be placed in thin lifts, moisture- conditioned
and compacted to at least 90% relative compaction.
IN
GLENSPARKS, 4 "STREET. ENCINITAS PROJECT NO. 11- 114787
DRAINAGE
Adequate measures should be undertaken to properly finish grade the site after the structures and
other improvements are in place, such that the drainage water within the site and adjacent
properties is directed away from the foundations, footings, floor slabs and the tops of slopes via
rain gutters, downspouts, surface swales and subsurface drains towards the natural drainage for this
area. A minimum gradient of 1 percent is recommended in hardscape areas. For earth areas, a
minimum gradient of 5 percent away from the structures for a distance of at least 5 feet should be
provided. Earth swales should have a minimum gradient of 2 percent. Drainage should be directed
to approved drainage facilities. Proper surface and subsurface drainage will be required to
minimize the potential of water seeking the level of the bearing soils under the foundations,
footings and floor slabs, which may otherwise result in undermining and differential settlement of
the structures and other improvements.
FOUNDATION PLAN REVIEW
Our firm should review the foundation plans during the design phase to assure conformance with the
intent of this report. During construction, foundation excavations should be observed by our
representative prior to the placement of forms, reinforcement or concrete for conformance with the
plans and specifications.
LIMITATIONS OF INVESTIGATION
Our investigation was performed using the skill and degree of care ordinarily exercised, under similar
circumstances, by reputable soils engineers and geologists practicing in this or similar localities. No
other warranty, expressed or implied, is made as to the conclusions and professional advice included in
this report. This report is prepared for the sole use of our client and may not be assigned to others
without the written consent of the client and ECSC &E, Inc.
The samples collected and used for testing, and the observations made, are believed representative of
site conditions; however, soil and geologic conditions can vary significantly between exploration
trenches, boreholes and surface exposures. As in most major projects, conditions revealed by
construction excavations may vary with preliminary findings. If this occurs, the changed conditions
must be evaluated by a representative of ECSC &E and designs adjusted as required or alternate
_ designs recommended.
This report is issued with the understanding that it is the responsibility of the owner, or of his
representative to ensure that the information and recommendations contained herein are brought to the
attention of the project architect and engineer. Appropriate recommendations should be incorporated
into the structural plans. The necessary steps should be taken to see that the contractor and
subcontractors cant' out such recommendations in the field.
The findings of this report are valid as of this present date. However, changes in the conditions of a
property can occur with the passage of time, whether they are due to natural processes or the works of
man on this or adjacent properties. In addition, changes in applicable or appropriate standards may
occur from legislation or the broadening of knowledge. Accordingly, the findings of this report may
11
GLENSPARKS, 4' "STREET, ENCINITASPROJECTNO. 11- 1147B7
be invalidated wholly or partially by changes outside of our control. Therefore, this report is subject to
review and should be updated after a period of two years.
ADDITIONAL SERVICES
The review of plans and specifications, field observations and testing under our direction are integral
parts of the recommendations made in this report. If East County Soil Consultation and Engineering,
Inc. is not retained for these services, the client agrees to assume our responsibility for any potential
claims that may arise during construction. Observation and testing are additional services, which are
provided by our firm, and should be budgeted within the cost of development.
Plates No. I through 3, Page L -1 and References are parts of this report
12
GLENSPARKS, 4"STREET, ENCINITAS PROJECT NO. 11- 1147B7
PLATE NO. 2
SUMMARY SHEET
BOREHOLE NO. 1
DEPTH SOIL DESCRIPTION
Surface
TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
1.5'
TERRACE DEPOSITS FORMATION (Qt)
tan brown, moist, medium dense to dense, silty sand
3.0'
becomes dense
6.0'
bottom of borehole, no caving, no groundwater
10.0'
borehole backfilled 3123/11
BOREHOLE NO.2
DEPTH SOIL DESCRIPTION
Surface
TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
2.0'
TERRACE DEPOSITS FORMATION (Qt)
tan brown, moist, medium dense to dense, silty sand
3.5'
becomes dense
4.0'
,. .< ,< « «
10.0'
bottom of borehole, no caving, no groundwater
borehole backfilled 3/23/11
BOREHOLE NO.3
DEPTH SOIL DESCRIPTION
Surface TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
1.5' TERRACE DEPOSITS FORMATION (Qt)
tan brown, moist, medium dense to dense, silty sand
3.5' becomes dense
4.0' bottom of borehole, no caving, no groundwater
borehole backfilled 3/23/11
BOREHOLE NO. 4
DEPTH SOIL DESCRIPTION
Surface TOPSOIL
dark brown, moist, loose, porous, silty sand with rootlets
1.0' « ,< «
1.5' TERRACE DEPOSITS FORMATION (Qt)
tan brown, moist, medium dense to dense, silty sand
3.5' becomes dense
4.0' bottom of borehole, no caving, no groundwater
borehole backfilled 323111
Y = DRY DENSITY IN PCF
13
Y M
Y M
116.4 7.8
124.2 8.9
Y M
Y — M
100.2 8.0
M = MOISTURE CONTENT IN %
MAJOR DIVISIONS
SYMBOL
DESCRIPTION
GRAIN SIZE IN
GW
SIEVE SIZE
MILLIMETERS
BOULDERS
Above 12 Inches
WELL GRADED GRAVELS OR GRAVEL -SAND
COBBLES
1 12 Inches To 3 Inches
305 To 76.2
MIXTURES, LITTLE OR NO FINES
GP
76.2 to 4.76
Coarse
GRAVELS
76.2 to 19.1
(MORE THAN ,K
'% Inch to No. 4
POORLY GRADED GRAVELS OR GRAVEL -SAND
SAND
OF COARSE
4.76 to 0.074
MIXTURES, LITTLE OR NO FINES
GM
SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES
Medium
FRACTION
>NO.4 SIEVE
2.00 to 0.420
SIZE)
No. 40 to No. 200
0.420 to 0.0 74
GC
Below No. 200
COARSE
GRAINED SOILS
CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES
(MORE THAN K OF SOIL
SW
> NO. 200 SIEVE SIZE)
WELL GRADED SANDS OR GRAVELLY SANDS,
LITTLE OR NO FINES
SP
SANDS
(MORE THANK
POORLY GRADED SANDS OR GRAVELLY SANDS,
OF COARSE
LITTLE OR NO FINES
SM
SILTY SANDS, SILT -SAND MIXTURES
FRACTION
< NO. 4 SIEVE
SIZE)
SC
CLAYEY SANDS, SAND-CLAY MIXTURES
ML
INORGANIC SILTS AND VERY FINE SANDS, ROCK
FLOUR SILTY OR CLAYEY FINE SANDS OR CLAYEY
SILTS &
SILTS WITH SLIGHT PLASTICITY
CLAYS
CL
INORGANIC CLAYS OF LOW TO MEDIUM
LIQUID LIMIT
PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS,
<50
SILTY CLAYS, LEAN CLAYS
OL
FINE GRAINED
ORGANIC SILTS ORGANIC Y CLAYS OF
SOILS
LO P
(MORE THAN f, OF SOIL
�,
<NO. 200 SIEVE SIZE)
INORGANIC SITS, MICACEOUS OR DIATOMACEOUS
SILTS &
FINE SANDY OR SILTY SOILS. ELASTIC SILTS
CH
CLAYS
LIQUID LIMIT
INORGANIC CLAYS OF HIGH PLASTICITY, FAT
> 50
CLAYS
OH
ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY,
ORGANIC SILTY CLAYS, ORGANIC SILTS
HIGHLY ORGANIC SOILS
Pt
I
PEAT AND OTHER HIGHLY ORGANIC SOILS
CLASSIFICATION CHART (UNIFIED SOIL CLASSIFICATION SYSTEM)
CLASSIFICATION
RAINGE OF GRAVi SIZES
U.S. STANDARD
GRAIN SIZE IN
SIEVE SIZE
MILLIMETERS
BOULDERS
Above 12 Inches
Above 305
COBBLES
1 12 Inches To 3 Inches
305 To 76.2
GRAVEL
3 Inches m No. 4
76.2 to 4.76
Coarse
3 Inches to' /, Inch
76.2 to 19.1
Fine
'% Inch to No. 4
19.1 to 4.76
SAND
No. 4 to No. 200
4.76 to 0.074
Coarse
No. 4 to No. 10
4.76 to 2.00
Medium
No. 10 to No. 40
2.00 to 0.420
Fine
No. 40 to No. 200
0.420 to 0.0 74
SILT AND CLAY
Below No. 200
Below 0.074
GRAIN SIZE CHART
EAST COUNTY SOIL CONSULTATION
AND ENGINEERING, INC.
10925 HARTLEY ROAD, SUITE "I"
SANTEE, CALIFORNIA 92071
SOIL CLASSIFICATION
PLASTICITY CHART
GLEN SPARKS/ 4th STREET PROJECT
PROJECT NO. 11- 1147B7
PLATE NO. 3
APRIL 6, 2011
GLEN SPARKS, 4'"STREET. ENCINITAS PROJECT NO. 11- 1147B7
PAGE L-I
LABORATORY TEST RESULTS
MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT (ASTM D1557)
The maximum dry density and optimum moisture content of the fill materials as determined by ASTM
D1557, Procedures A and B which use 25 blows of a 10 -pound slide hammer falling from a height of 18
inches on each of 5 equal layers in a 4 -inch diameter 1/30 cubic foot compaction cylinder and Procedure C
which uses 56 blows of a 10 -pound slide hammer falling from a height of 18 inches on each of 5 equal
layers in a 6 -inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows:
OPTIMUM
MAXIMUM MOISTURE
SOIL TYPE/ DRY DENSITY CONTENT
PROCEDURE DESCRIPTION (PCF) ( %) LOCATION
1/A TAN BROWN SILTY SAND 129.0 8.2 BH -1 @ 2.0'
EXPANSION INDEX TEST (ASTM D4829)
INITIAL SATURATED INITIAL DRY
MOISTURE MOISTURE DENSITY EXPANSION
CONTENT( %) CONTENT( %) (PCF) INDEX LOCATION
8.5
15.1
112.6
PARTICLE SIZE ANALYSIS (ASTM D422)
BH -1 @ 2.0'
U.S. Standard
Sieve Size
Percent Passing
BH -2 @ 1.0'
Topsoil
Percent Passing
BH -1 @ 10'
Terrace Deposits
Percent Passing
BH -2 @ 6.0'
Terrace Deposits
F,
1 /2"
3/8"
#4
#8
-
-
-
#16
100
100
100
#30
88
87
88
#50
40
34
31
#100
21
15
13
#200
16
11
9
USCS
SM
SP -SM
SP -SM
14
GLEN SPARKS, 4" STREET, ENCINITAS PROJECT NO. 11- 1147B7
REFERENCES
1. "2010 California Building Code, California Code of Regulations, Title 24, Part 2, Volume 2 of 2 ",
Published by International Code Council.
2. "Limited Geotechnical Investigation, Proposed Single - Family Residence and Accessory Unit, 820
Orpheus Avenue, City of Encinitas, California", Project No. 10-1147134, Prepared by East County
Soil Consultation and Engineering, Inc., Dated November 10, 2010.
3. "Limited Geotechnical Investigation, Proposed Garage and Deck Extension, 1030 Stratford Drive,
City of Encinitas, California ", Project No. 10- 1167C1, Prepared by East County Soil Consultation
and Engineering, Inc., Dated September 28, 2010.
4. "Egfaultt Eqsearch, Version 3.0 ", by Blake, T.F., 2000, Updated 2008.
5. "Limited Geotechnical Investigation, Proposed Single- Family Residence, 1521 Neptune Avenue,
APN 254 - 030 -29, City of Encinitas, California 92024 ", Project No. 08- 1147A3(2), Prepared by East
County Soil Consultation and Engineering, Inc., Dated December 23, 2008.
6. "Limited Geotechnical Investigation, Proposed Single - Family Residence, 808 Clark Avenue, City of
Encinitas, California ", Project No. 07- 1147C4, Prepared by East County Soil Consultation and
Engineering, Inc., Dated December 11, 2007.
7. " Geotechnical and Foundation Engineering: Design and Construction ", by Robert W. Day, 1999.
8. "1997 Uniform Building Code, Volume 2, Structural Engineering Design Provisions ", Published by
International Conference of Building Officials
9. "Maps of Known Active Fault Near- Source Zones in California and Adjacent Portions of Nevada to
be used with the 1997 Uniform Building Code ", Published by International Conference of Building
Officials.
10. "Geologic Maps of the Northwestern Part of San Diego County, California", Department of
Conservation, Division of Mines and Geology, by Siang S. Tan and Michael P. Kennedy, 1996.
11. "Bearing Capacity of Soils, Technical Engineering and Design Guides as Adapted from the US
Army Corps of Engineers, No. 7 ", Published by ASCE Press, 1994.
12. "Foundations and Earth Structures, Design Manual 7.2 ", by Department of Navy Naval Facilities
Engineering Command, May 1982, Revalidated by Change 1 September 1986.
13. "Ground Motions and Soil Liquefaction during Earthquakes ", by H.B. Seed and I.M. Idriss, 1982.
15
'41' Lawyers Title Insurance Corporation
POLICY NO.: 39325416
HOMEOWNER'S POLICY OF TITLE INSURANCE
FOR A ONE -TO -FOUR FAMILY RESIDENCE
Issued by
7PEC La wyers Title Insurance Corporation OWNER'S INFORMATION SHEET 3 0 2010
Your Title insurance Policy is a legal contract between You and Us.
It applies only to a one - to-four family residence and only if each insured named in Schedule A is a Natural Person. 1ffte
Land described in Schedule A of the Policy is not an improved residential lot on which there is located a one- to-four family
residence, or if each insured named in Schedule A is not a Natural Person, contact Us immediately.
The Policy insures You against actual loss resulting from certain Covered Risks. These Covered Risks are listed beginning
on page 3 of the Policy. The Policy is limited by:
Provisions of Schedule A
• Exceptions in Schedule B
• Our Duty To Defend Against Legal Actions On Page 6
• Exclusions on page 9
• Conditions on pages 10. H. 12. 13 and 14.
You should keep the Policy even if You transfer Your Title to the Land. It may protect against claims made against You by
someone else after You transfer Your Title.
IF YOU WANT TO MAKE A CLAIM, SEE SECTION 3 UNDER CONDITIONS ON PAGE 10.
The premium for this Policy is paid once. No additional premium is owed for the Policy.
This sheet is not Your insurance Policy. It is only a brief outline of some of the important Policy features. The Policy
explains in detail Your rights and obligations and Our rights and obligations. Since the Policy — and not this sheet — is the
legal document,
82217
YOU SHOULD READ THE POLICY VERY CAREFULLY.
If You have any questions about Your Policy, contact:
Lawyers Title Insurance Corporation, P.O. Box 45023, Jacksonville, FL 32232 -5023
ALTA Homeowner's Policy of Title Insurance
Copyright 20062009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA
members in good standing as of the date of use. All other uses are prohibited. Reprinted under license fran the American Land Title Association. -
HOMEOWNER'S POLICY OF TITLE INSURANCE
FOR A ONE -TO -FOUR FAMILY RESIDENCE
Issued By
Lawyers Title Insurance Corporation
TABLE OF CONTENTS
PAGE
OWNER'S COVERAGE STATEMENT
COVERED RISKS
OUR DUTY TO DEFEND AGAINST LEGAL ACTIONS
EXCLUSIONS
y
CONDITIONS
1.
Definitions
10
2.
Continuation of Coverage
10
3.
How to Make a Claim
10
4.
Our Choices When We Learn of a Claim
11
5.
Handling a Claim or Legal Action
12
6.
Limitation of Our Liability
12
7.
Transfer of Your Rights to Us
13
8.
This Policy is the Entire Contract
13
9.
Increased Policy Amount
13
10.
Severability
13
11.
Arbitration
13
12.
Choice of Law
14
SCHEDULE A
Policy Number, Premium, Date and Time and Amount
Deductible Amounts and Maximum Dollar Limits of Liability
Street Address of the Land
1. Name of Insured
2. Interest in Land Covered
3. Description of the Land
SCHEDULE B — EXCEPTIONS
ALTA Homeowner's Policy of Title Insurance (1 /1 /08)
Copyright 20062008 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA li ensees and ALTA
members in good standing as of the date of use. All other uses are prohibited. Reprinted under license fmm the American Land TOO Association, C -,
HOMEOWNER'S POLICY OF TITLE INSURANCE
FOR A ONE -TO -FOUR FAMILY
Issued By
Lawyers Title Insurance Corporation
As soon as You Know of anything that might be covered by this Policy, You must notify Us promptly in writing at the
address shown in Section 3 of the Conditions.
OWNER'S COVERAGE STATEMENT
This Policy insures You against actual loss, including any costs, attorneys' fees and expenses provided under this Policy.
The loss must result from one or more of the Covered Risks set forth below. This Policy covers only Land that is an
improved residential lot on which there is located a one- to-four family residence and only when each insured named in
Schedule A is a Natural Person.
Your insurance is effective on the Policy Date. This Policy covers Your actual loss from any risk described under Covered
Risks if the event creating the risk exists on the Policy Date or, to the extent expressly stated in Covered Risks, after the
Policy Date.
Your insurance is limited by all of the following:
• The Policy Amount
• For Covered Risk 16, 18, 19 and 21, Your Deductible Amount and Our Maximum Dollar Limit of Liability
shown in Schedule A
• The Exceptions in Schedule B
• Our Duty To Defend Against Legal Actions
• The Exclusions on page 9
The Conditions on pages 10. 11, 12. 13 and 14.
COVERED RISKS
The Covered Risks are:
1. Someone else owns an interest in Your Title.
2. Someone else has rights affecting Your Tide because of leases, contracts, or options.
3. Someone else claims to have rights affecting Your Title because of forgery or impersonation.
4. Someone else has an easement on the Land.
5. Someone else has a right to limit Your use of the land.
6. Your Title is defective. Some of these defects are:
a. Someone else's failure to have authorized a transfer or conveyance of your Title.
b. Someone else's faihue to create a valid document by electronic means.
C. A document upon which Your Title is based is invalid because it was not properly signed, sealed,
acknowledged, delivered or recorded.
ALTA Homeowner's Policy of Title Insurance (1/1/08)
Copyright 20062009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA
members in good standing as of the date of use All other uses are prohibded. Reprinted under license from the American Lard Tde Association. c�
F-
d. A document upon which Your Title is based was signed using a falsified, expired, or otherwise invalid
power of attorney.
e. A document upon which Your Title is based was not properly filed, recorded, or indexed in the Public
Records.
f. A defective judicial or administrative proceeding.
7. Any of Covered Risks 1 through 6 occurring after the Policy Date.
8. Someone else has a lien on Your Title, including a:
a. lien of real estate taxes or assessments imposed on Your Title by a governmental authority that are due or
payable, but unpaid;
b. Mortgage;
C. judgment, state or federal tax lien;
d. charge by a homeowner's or condominium association; or
e. lien, occurring before or after the Policy Date, for labor and material furnished before the Policy Date.
Someone else has an encumbrance on Your Title.
10. Someone else claims to have rights affecting Your Title because of fraud, duress, incompetency or incapacity.
11. You do not have actual vehicular and pedestrian access to and from the Land, based upon a legal right.
12. You are forced to correct or remove an existing violation of any covenant, condition or restriction affecting the
Land, even if the covenant, condition or restriction is excepted in Schedule B. However, You are not covered for
any violation that relates to:
a. any obligation to perform maintenance or repair on the Land; or
b. environmental protection of any kind, including hazardous or toxic conditions or substances
unless there is a notice recorded in the Public Records, describing any part of the Land, claiming a violation exists.
Our liability for this Covered Risk is limited to the extent of the violation stated in that notice.
13. Your Title is lost or taken because of a violation of any covenant, condition or restriction, which occurred before
You acquired Your Title, even if the covenant, condition or restriction is excepted in Schedule B.
14. The violation or enforcement of those portions of any law or government regulation concerning:
a. building;
b. zoning;
C. land use;
d. improvements on the Land;
e. land division; or
f. environmental protection,
if there is a notice recorded in the Public Records, describing any part of the Land, claiming a violation exists or
declaring the intention to enforce the law or regulation. Our liability for this Covered Risk is limited to the extent of
the violation or enforcement stated in that notice.
15. An enforcement action based on the exercise of a governmental police power not covered by Covered Risk 14 if
there is a notice recorded in the Public Records, describing any part of the Land, of the enforcement action or
intention to bring an enforcement action. Our liability for this Covered Risk is limited to the extent of the
enforcement action stated in that notice.
16. Because of an existing violation of a subdivision law or regulation affecting the Land:
a. You are unable to obtain a building permit;
ALTA Homeowner's Policy of Title Insurance (1/1/08)
Copyright 200 6-2009 American Land Title Association. All rights reserved. The use of INS Form is restricted to ALTA licensees and ALTA ar_
members in good standing as of the date of use All other uses are prohibited. Reported under license from the American Land Title Association. --
It. You are required to correct or remove the violation; or
C. someone else has a legal right to, and does, refuse to perform a contract to purchase the Land, lease it or
make a Mortgage loan on it.
The amount of Your insurance for this Covered Risk is subject to Your Deductible Amount and Our Maximum
Dollar Limit of Liability shown in Schedule A.
17. You lose Your Title to any part of the Land because of the right to take the Land by condemning it, if
a. there is a notice of the exercise of the right recorded in the Public Records and the notice describes any part
of the Land; or
b. the taking happened before the Policy Date and is binding on You if You bought the Land without
Knowing of the taking.
18. You are forced to remove or remedy Your existing structures, or any part of them - other than boundary walls or
fences - because any portion was built without obtaining a building permit from the proper government office. The
amount of Your insurance for this Covered Risk is subject to Your Deductible Amount and Our Maximum Dollar
Limit of Liability shown in Schedule A.
19. You are forced to remove or remedy Your existing structures, or any part of them, because they violate an existing
zoning law or zoning regulation. If You are required to remedy any portion of Your existing structures, the amount
of Your insurance for this Covered Risk is subject to Your Deductible Amount and Our Maximum Dollar Limit of
Liability shown in Schedule A.
20. You cannot use the Land because use as a single- family residence violates an existing zoning law or zoning
regulation.
21. You are forced to remove Your existing structures because they encroach onto Your neighbor's land. If the
encroaching structures are boundary walls or fences, the amount of Your insurance for this Covered Risk is subject
to Your Deductible Amount and Our Maximum Dollar Limit of Liability shown in Schedule A.
22. Someone else has a legal right to, and does, refuse to perform a contract to purchase the Land, lease it or make a
Mortgage loan on it because Your neighbor's existing structures encroach onto the Land.
23. You are forced to remove Your existing structures which encroach onto an easement or over a building set -back
line, even if the easement or building set -back tine is excepted in Schedule B.
24. Your existing structures are damaged because of the exercise of a right to maintain or use any easement affecting the
Land, even if the easement is excepted in Schedule B.
25. Your existing improvements (or a replacement or modification made to them after the Policy Date), including lawns,
shrubbery or trees, are damaged because of the future exercise of a right to use the surface of the Land for the
extraction or development of minerals, water or any other substance, even if those rights are excepted or reserved
from the description of the Land or excepted in Schedule B.
26. Someone else tries to enforce a discriminatory covenant, condition or restriction that they claim affects Your Title
which is based upon race, color, religion, sex, handicap, familial status, or national origin.
27. A taxing authority assesses supplemental real estate taxes not previously assessed against the land for any period
before the Policy Date because of construction or a change of ownership or use that occurred before the Policy Date.
28. Your neighbor builds any structures after the Policy Date - other than boundary walls or fences - which encroach
onto the Land.
29. Your Title is unmarketable, which allows someone else to refuse to perform a contract to purchase the Land, lease it
or make a Mortgage loan on it.
30. Someone else owns an interest in Your Title because a court order invalidates a prior transfer of the tide under
federal bankruptcy, state insolvency, or similar creditors' rights laws.
31. The residence with the address shown in Schedule A is not located on the Land at the Policy Date.
32. The map, if any, attached to this Policy does not show the correct location of the Iand according to the Public
Records.
ALTA Homeowner's Policy of Title Insurance
121)(16-2009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA
in good slandirg as of the date of use. All other uses are prottlbHed Reprimed under license from the American Land Title Association.
OUR DUTY TO DEFEND AGAINST LEGAL ACTIONS
We will defend Your Title in any legal action only as to that part of the action which is based on a Covered Risk and which is
not excepted or excluded from coverage in this Policy. We will pay the costs, attorneys' fees, and expenses We incur in that
defense.
We will not pay for any part of the legal action which is not based on a Covered Risk or which is excepted or excluded from
coverage in this Policy.
We can end Our duty to defend Your Title under Section 4 of the Conditions.
THIS POLICY IS NOT COMPLETE WITHOUT SCHEDULES A AND B.
IN WITNESS WHEREOF, Lawyers Title Insurance Corporation has caused this policy to be signed and sealed by its duly
authorized officers.
Lawyers Title Insurance Corporation
Attest: d
�ePMr f
WSEAL By:
'`s
) �
Secretary
.'''
��
President
ALTA Homeowner's Policy of Title Insurance (1 /1 /08)
Copyright 20062009 American Land Title Association. All rights reserved. The use of this Form Is restricted to ALTA licensees and ALTA MENEEMEN
members in good standing as of the date of use. All other uses are prohibited. Repnnted under license from the American Land Title Association. A.
EXCLUSIONS
In addition to the Exceptions in Schedule B, You are not insured against loss, costs, attorneys' fees, and expenses resulting
from:
Governmental police power, and the existence or violation of those portions of any law or government regulation
concerning:
a. building;
b. zoning;
C. land use;
d. improvements on the Land;
e. land division; and
f. environmental protection.
This Exclusion does not limit the coverage described in Covered Risk 8.a., 14, 15, 16, 18, 19, 20, 23 or 27.
2. The failure of Your existing structures, or any part of them, to be constructed in accordance with applicable building
codes. This Exclusion does not limit the coverage described in Covered Risk 14 or 15.
3. The right to take the Land by condemning it. This Exclusion does not limit the coverage described in Covered Risk
17.
4. Risks:
a. that are created, allowed, or agreed to by You, whether or not they are recorded in the Public Records;
b. that are Known to You at the Policy Date, but not to Us, unless they are recorded in the Public Records at
the Policy Date;
C. that result in no loss to You; or
d. that fast occur after the Policy Date - this does not limit the coverage described in Covered Risk 7, 8.e., 25,
26, 27 or 28.
5. Failure to pay value for Your Title.
6. Lack of a right:
a. to any land outside the area specifically described and referred to in paragraph 3 of Schedule A; and
b. in streets, alleys, or waterways that touch the Land.
This Exclusion does not limit the coverage described in Covered Risk 11 or 21.
ALTA Homeowner's Policy of Title Insurance (1/1/08)
Copyright 20062009 American Land Title Association. All rights reserved. The use of itds Form is restricted to ALTA licensees and 00111iiiino
members in good standing as of the date of use All odor uses are prottlbiled. Reprinted under ficense hom the American Land Title Ass ~
o�
HOMEOWNER'S POLICY OF TITLE INSURANCE
FOR A ONE -TO -FOUR FAMILY RESIDENCE
Issued By
Lawyers Title Insurance Corporation
CONDITIONS
DEFINITIONS
a. Easement - the right of someone else to use the Land for a special purpose.
b. Known - things about which You have actual knowledge. The words "Know' and "Knowing" have the same meaning a
Known.
C. Land - the land or condominium unit described in paragraph 3 of Schedule A and any improvements on the Land which are rel
property-
d. Mortgage - a mortgage, deed of trust, trust deed or other security instrument.
e. Natural Person - a human being, not a commercial or legal organization or entity. Natural Person includes a trustee of a Tru:
even if the trustee is not a human being.
£ Policy Date - the date and time shown in Schedule A. If the insured named in Schedule A first acquires the interest shown i
Schedule A by an instrument recorded in the Public Records later than the date and time shown in Schedule A, the Policy Dal
is the date and time the instrument is recorded.
g. Public Records - records that give constructive notice of matters affecting Your Title, according to the state statutes where th
Land is located.
It. Title - the ownership of Your interest in the Land, as shown in Schedule A.
i. Trust - a living trust established by a human being for estate planning.
j. We/OuT/Us - Lawyers Title Insurance Corporation.
k. You/Your - the insured named in Schedule A and also those identified in Section 2.b. of these Conditions.
CONTINUATION OF COVERAGE
a. This Policy insures You forever, even after You no longer have Your Title. You cannot assign this Policy to anyone else.
b. This Policy also insures:
(1) anyone who inherits Your Title because of Your death;
(2) Your spouse who receives Your Title because of dissolution of Your marriage;
(3) the trustee or successor trustee of a Trust to whom You transfer Your Title after the Policy Date; or
(4) the beneficiaries of Your Trust upon Your death.
C. We may assert against the insureds identified in Section 2,b. any rights and defenses that We have against any previous insure
under this Policy.
HOW TO MAKE A CLAIM
a. Prompt Notice Of Your Claim
(1) As soon as You Know of anything that might be covered by this Policy, You must notify Us promptly in writing.
(2) Send Your notice to Lawyers Title Insurance Corporation, Attention: Claims Department, P.O. Box 4502'
Jacksonville, FL 32232 -5023. Please include the Policy munber shown in Schedule A, and the county and state when
the Land is located. Please enclose a copy of Your policy, if available.
(3) If You do not give Us prompt notice, Your coverage will be reduced or ended, but only to the extent Your failm
affects Our ability to resolve the claim or defend You.
b. Proof Of Your Loss
(1) We may require You to give Us a written statement signed by You describing Your loss which includes:
(a) the basis of Your claim;
(b) the Covered Risks which resulted in Your loss;
(c) the dollar amount of Your loss; and
(d) the method You used to compute the amount of Your loss.
(2) We may require You to make available to Us records, checks, letters, contracts, insurance policies and other paper
which relate to Your claim. We may make copies of these papers.
(3) We may require You to answer questions about Your claim under oath.
(4) If you fail or refuse to give Us a statement of loss, answer Our questions under oath, or make available to Us the paper
We request, Your coverage will be reduced or ended, but only to the extent Your failure or refusal affects Our ability t
resolve the claim or defend You.
OUR CHOICES WHEN WE LEARN OF A CLAIM
a. After We receive Your notice, or otherwise learn, of a claim that is covered by this Policy, Our choices include one or more c
the following:
(1) Pay the claim;
(2) Negotiate a settlement;
(3) Bring or defend a legal action related to the claim;
(4) Pay You the amount required by this Policy;
(5) End the coverage of this Policy for the claim by paying You Your actual loss resulting from the Covered Risk an
those costs, attorneys' fees and expenses incurred up to that time which We are obligated to pay;
(6) End the coverage described in Covered Risk 16, 18, 19 or 21 by paying You the amount of Your insurance then i
force for the particular Covered Risk and those costs, attorneys' fees and expenses incurred up to that time which W
are obligated to pay;
(7) End all coverage of this Policy by paying You the Policy Amount then in force, and those costs, attorneys' fees an
expenses incurred up to that time which We are obligated to pay;
(8) Take other appropriate action.
b. When We choose the options in Sections 4.a. (5), (6) or (7), all Our obligations for the claim end, including Our obligation t
defend, or continue to defend, any legal action.
C. Even if We do not think that the Policy covers the claim, We may choose one or more of the options above. By doing so, We d
not give up any rights.
HANDLING A CLAIM OR LEGAL ACTION
a. You must cooperate with Us in handling any claim or legal action and give Us all relevant information.
b. If You fail or refuse to cooperate with Us, Your coverage will be reduced or ended, but only to the extent Your failure or refuse
affects Our ability to resolve the claim or defend You.
C. We are required to repay You only for those settlement costs, attorneys' fees and expenses that We approve in advance.
d. We have the right to choose the attorney when We bring or defend a legal action on Your behalf. We can appeal any decision t
the highest level. We do not have to pay Your claim until the legal action is finally decided.
e. Whether or not We agree there is coverage, We can bring or defend a legal action, or take other appropriate action under thi
Policy. By doing so, We do not give up any rights.
LIMITATION OF OUR LIABILITY
a After subtracting Your Deductible Amount if it applies, We will pay no more than the least of
(1) Your actual loss;
(2) Our Maximum Dollar Limit of Liability then in force for the particular Covered Risk for claims covered only undo
Covered Risk 16, 18, 19 or 21; or
(3) the Policy Amount then in force.
and any costs, attorneys' fees and expenses that We are obligated to pay under this Policy.
b. If We pursue Our rights under Sections 4.a.(3) and 5.e. of these Conditions and are unsuccessful in establishing the Title, t
insured:
(1) the Policy Amount then in force will be increased by 10% of the Policy Amount shown in Schedule A, and
(2) You shall have the right to have the actual loss determined on either the date the claim was made by You or the date
is settled and paid.
ALTA Homeowner's Policy of Title Insurance
3"right 20062009 American Land Title Association. All rights reserved. The use of this Form is restricted to ALTA licensees and ALTA
C. (1) If We remove the cause of the claim with reasonable diligence after receiving notice of it, all Our obligations for th
claim end, including any obligation for loss You had while We were removing the cause of the claim.
(2) Regardless of 6.c.(1) above, if You cannot use the Land because of a claim covered by this Policy:
(a) You may rent a reasonably equivalent substitute residence and We will repay You for the actual rent You pad
until the earlier of:
(i) the cause of the claim is removed; or
(ii) We pay You the amount required by this Policy. If Your claim is covered only under Covered Ris
16, 18, 19 or 21, that payment is the amount of Your insurance then in force for the particub
Covered Risk.
(b) We will pay reasonable costs You pay to relocate any personal property You have the right to remove frot
the Land, including transportation of that personal property for up to twenty -five (25) miles from the Lam
and repair of any damage to that personal property because of the relocation. The amount We will pay Yo
under this paragraph is limited to the value of the personal property before You relocate it.
d. All payments We make under this Policy reduce the Policy Amount then in force except for costs, attorneys' fees and expense:
All payments We make for claims which are covered only under Covered Risk 16, 18, 19 or 21 also reduce Our Maximm
Dollar Limit of Liability for the particular Covered Risk, except for costs, attorneys' fees and expenses.
e. If We issue, or have issued, a Policy to the owner of a Mortgage that is on Your Title and We have not given You any coverag
against the Mortgage, then:
(1) We have the right to pay any amount due You under this Policy to the owner of the Mortgage, and any amount pai
shall be treated as a payment to You under this Policy, including under Section 4.a. of these Conditions;
(2) Any amount paid to the owner of the Mortgage shall be subtracted from the Policy Amount then in force; and
(3) If Your claim is covered only under Covered Risk 16, 18, 19 or 21, any amount paid to the owner of the Mortgage sha
also be subtracted from Our Maximum Dollar Limit of Liability for the particular Covered Risk.
f. If You do anything to affect any right of recovery You may have against someone else, We can subtract from Our liability th
amount by which You reduced the value of that right.
TRANSFER OF YOUR RIGHTS TO US
a. When We settle Your claim, We have all the rights and remedies You have against any person or property related to the clain
You must not do anything to affect these rights and remedies. When We ask, You must execute documents to evidence th
transfer to Us of these rights and remedies. You must let Us use Your name in enforcing these rights and remedies.
b. We will not be liable to You if We do not pursue these rights and remedies or if We do not recover any amount that might b
recoverable.
C. We will pay any money We collect from enforcing these rights and remedies in the following order:
(1) to Us for the costs, attorneys' fees and expenses We paid to enforce these rights and remedies;
(2) to You for Your loss that You have not already collected;
(3) to Us for any money We paid out under this Policy on account of Your claim; and
(4) to You whatever is left.
d. If You have rights and remedies under contracts (such as indemnities, guaranties, bonds or other policies of insurance) t
recover all or part of Your loss, then We have all of those rights and remedies, even if those contracts provide that thos
obligated have all of Your rights and remedies under this Policy.
THIS POLICY IS THE ENTIRE CONTRACT
his Policy, with any endorsements, is the entire contract between You and Us. To determine the meaning of any part of this Policy, You mu:
;ad the entire Policy and any endorsements. Any changes to this Policy must be agreed to in writing by Us. Any claim You make against U
lust be made under this Policy and is subject to its terms.
INCREASED POLICY AMOUNT
'he Policy Amount then in force will increase by ten percent (10%) of the Policy Amount shown in Schedule A each year for the first five year
allowing the Policy Date shown in Schedule A, up to one hundred fifty percent (150 1/6) of the Policy Amount shown in Schedule A. The increa,
sch year will happen on the anniversary of the Policy Date shown in Schedule A.
111009TWO0. 16
If any part of this Policy is held to be legally unenforceable, both You and We can still enforce the rest of this Policy.
ALTA Homeowner's Policy of Title Insurance
t 200 6-2009 American Land Title Association. All rights reserved. The use of ties Form is restdcled to ALTA licensees and ALTA
.n nnM NeMim—'(N Ae,n M•yea EII nib. —a.n '-. —li --"-1, a-4—. oM TM "MCAN
ARBITRATION
a. If permitted in the state where the Land is located, You or We may demand arbitration.
b. The law used in the arbitration is the law of the state where the Land is located.
C. The arbitration shall be under the Title Insurance Arbitration Rules of the American Land Tide Association ( "Rules "). You ca
get a copy of the Rules from Us.
d. Except as provided in the Rules, You cannot join or consolidate Your claim or controversy with claims or controversies of odic
persons.
C. The arbitration shall be binding on both You and Us. The arbitration shall decide any matter in dispute between You and Us.
f. The arbitration award may be entered as a judgment in the proper court.
2. CHOICE OF LAW
The law of the state where the Land is located shall apply to this policy.
ALTA Homeowner's Policy of Title Insurance (I /I /OE
opyright 20062009 American Land Title Association. All rights reserved. The rue of this Form is restricted to ALTA licensees and ALTA
.....b.� :........w .+.,..n..... �.. ..r.b n.we ..r .e en .....e. re� _� ..........nen oe......en ...ne, r...e....e w.,m .re e...e.:..�.. r _..w r..re e�......�r.... ururoe
CLTA /ALTA HOMEOWNER'S POLICY OF TITLE INSURANCE
FOR A ONE -TO -FOUR FAMILY RESIDENCE
Issued By
Lawyers Title Insurance Corporation
SCHEDULE A
Name and Address of Title Insurance Company: Lawyers Title - SD
5898 Copley Drive, 3rd Floor
San Diego, CA 92111
Policy /File No.: 39325416
Policy Amount: $880,000.00
Endorsement Fee: $50.00
Policy Date and Time: April 23, 2010 at 8:00AM
Deductible Amounts and Maximum Dollar Limits of Liability
For Covered Risk 16, 18, 19 & 21:
Your Deductible Amount
Covered Risk 16:
1% of Policy Amount Shown in Schedule A
or $2,500.00
(whichever is less)
Covered Risk 18:
1% of Policy Amount Shown in Schedule A
or $5,000.00
(whichever is less)
Covered Risk 19:
1% of Policy Amount Shown in Schedule A
or $5,000.00
(whichever is less)
Covered Risk 21:
1% of Policy Amount Shown in Schedule A
or $2,500.00
(whichever is less)
Street address of the Land:
445 4th Street, City of Encinitas, California
1. Name of Insured:
Glen E. Sparks, a single man
2. Your interest in the Land covered by this Policy is:
A FEE
3. The Land referred to in this Policy is described as:
See Exhibit A attached hereto and made a part hereof.
Premium: $2,168.00
Our Maximum Dollar Limit of Liability
$10,000.00
$25,000.00
$25,000.00
$5,000.00
File No. 39325416
EXHIBIT "A"
All that certain real property situated in the County of San Diego, State of California, described as
follows:
Lot 11 of Block 28 of Encinitas, in the County of San Diego, State of California, according to Map
thereof No. 148, filed in the Office of the County Recorder of San Diego County on June 12, 1883.
Assessor's Parcel Number: 258- 071 -11
File No. 39325416
SCHEDULEB
EXCEPTIONS FROM COVERAGE
IN ADDITION TO THE EXCLUSIONS, YOU ARE NOT INSURED AGAINST LOSS, COSTS, ATTORNEY'S
FEES AND EXPENSES RESULTING FROM:
A. Property taxes, including general and special taxes, personal property taxes, if any, and any
assessments collected with taxes, to be levied for the fiscal year 2010 - 2011 which are a lien not yet
payable.
B. Supplemental or escaped assessments of property taxes, if any, assessed pursuant to the Revenue
and Taxation Code of the State of California.
1. Water rights, claims or title to water, whether or not shown by the public records.
2. Any easements not disclosed by those public records which impart constructive notice and which are not
visible and apparent from an inspection of the surface of said land.
3. A deed of trust to secure an indebtedness in the amount shown below, and any other obligations
secured thereby.
Amount:
$528,000.00
Dated:
April 19, 2010
Trustor:
Glen E. Sparks, a single man
Trustee:
Lawyers Title Company
Beneficiary:
Mortgage Electronic Registration Systems, Inc., ( "MERS "), solely as
nominee for Pacific Mercantile Bank, its successors and /or assigns
Recorded:
April 23, 2010 as Instrument No. 2010-0201764, Official Records
Loan No.:
15060036
END OF SCHEDULE B
Endorsements: NONE
1- 8334 — __....-._L_
00-343-7 -- - -3_._ �ew�nooriww
I ��I L
THIRD 3T
h
N
IFOURTH ST ova
� E
u
eo
p g '1i
V
C s ° W
y I
t MOONLI a7a
10 9
MDONFr��6FF�,s1 __� I _ 1 k 1 C 1 1
K8 pP°� cu° FIFTH ST
---------------------- .� --� r
- 1 �
° I I
I OCEAN I� I
PACIFIC j
�� - -- -- -- -- -- --- - -- _ '--- ---1
1 . JA yt11
j 1 �
MAIM
I
W
hq O
mgm
}
i
m
o
w 3
i F� 8
i
t4P�ti�
N
IFOURTH ST ova
� E
u
eo
p g '1i
V
C s ° W
y I
t MOONLI a7a
10 9
MDONFr��6FF�,s1 __� I _ 1 k 1 C 1 1
K8 pP°� cu° FIFTH ST
---------------------- .� --� r
- 1 �
° I I
I OCEAN I� I
PACIFIC j
�� - -- -- -- -- -- --- - -- _ '--- ---1
1 . JA yt11
j 1 �
mgm
Ego
m
SUN
N
IFOURTH ST ova
� E
u
eo
p g '1i
V
C s ° W
y I
t MOONLI a7a
10 9
MDONFr��6FF�,s1 __� I _ 1 k 1 C 1 1
K8 pP°� cu° FIFTH ST
---------------------- .� --� r
- 1 �
° I I
I OCEAN I� I
PACIFIC j
�� - -- -- -- -- -- --- - -- _ '--- ---1
1 . JA yt11
j 1 �