Loading...
2009-10413 GLine: 31 02 �163A LA COSTA ENGINEERING 1338 FARADAY AVFNUF CARISRAD, CALIFORNIA 92008 111 760 -931 -0390 FAX 430-SZS1 maI1V monzgame,V*Vaheo com CIVIL , STRUCTURAL M F C N A N, AL• RI I RO I L UM October 6, 2011 City of Encinitas Engineering Services Permits 505 South Vulcan Avenue Encinitas, CA 92024 0CT 1 1 2010 RE: Engineer's Final Grading Certification for Grading Permit No. 10413 -G. The grading under permit no. 10413 -G has been performed in substantial conformance with the approved grading plan or as shown on the attached `As Graded' plan. Final grading inspection has demonstrated that lot drainage conforms with the approved grading plan and that swales drain at a minimum of 1% to the street and/or an appropriate drainage system. All the Low Impact Development, Source Control and Treatment Control Best Management Practices as shown on the drawing and required by the Best Management Practice Manual Part II were constructed and are operational, together with thiLlualgrei maintenance covenant(s). Engineer of Record: Martell B. Montgomery Dated: October 6. 2011 a: ti No. 50344 \:&W ,am4v -4. S" � CvfFe Verification by the Engineering Inspector of this fact is done by the Inspector's signature hereon and will take place only after the above is signed and stamped and will not relieve the Engineer of Record of the ultimate responsibility. Engineering Inspector: Dated: M CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT ACTIVITY REPORT STREET LOCATION: OQ DATE: PROJECT NUMBER: PERMIT NUMBER: fE PHONE: r vC7Z j -Z /- /p V1 51r2V 51TE• "9" /czry� 'S4`k L AlU 2 C 4 ski• f 4. Ala--b 7b C,, M CT o w nJt7L /1-6-7 Wk ,GY !O tr � CRP wfi(L fpj *p,Nc:� 23 I ) .D IIIU�� R2J 9123h, &Ci 1 / r_ _ �- 77r7L5 811y/!/ �5 y7 k'y �� fi�l�x ��c 7U /-71ujL A - &") - ( - —r- y Zo - 6 ul1-15 /L¢G, vE-9. Fi,%4,o -t. /q�r -6 c&-nT, Ta tw 6lNe" . m14429 C I T Y OF E N C I N I T A S ENGINEERING SERVICES DEPARTMENT 505 S. VULCAN AVE. ENCINITAS, CA 92024 GRADING PERMIT PERMIT NO.: 10413GI ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- PARCEL NO. JOB SITE ADDRESS: APPLICANT NAME MAILING ADDRESS: CITY: ENCINITAS 259 -451 -0400 747 DORIS ROTSHECK, RYAN 310 ARROYO DRIVE DRIVE STATE: CA ZIP CONTRACTOR : OWNER /BUILDER LICENSE NO.: ENGINEER : LA COSTA ENGINEERING PERMIT ISSUE DATE: 3/10/10 PERMIT EXP. DATE: 3/10/11 PERMIT ISSUED BY INSPECTOR: BEN OLIVER ------------------- - - - - -- PERMIT FEES & DEPOSITS PLAN NO.: 10413G CASE NO.: PHONE NO.: 760- 753 -7750 92024- PHONE NO.: LICENSE TYPE: PHONE ' 1. PERMIT FEE .00 2. GIS MAP FEE .00 3. INSPECTION FEE 1,708.00 4. INSPECTION DEPOSIT: .00 S. NPDES INSPT FEE 341.00 6. SECURITY DEPOSIT 34,168.00 7. FLOOD CONTROL FE .00 8. TRAFFIC FEE .00 9. IN -LIEU UNDERGRN .00 10.IN -LIEU IMPROVMT .00 ll.PLAN CHECK FEE .00 12.PLAN CHECK DEPOSIT: .00 ------------------- - - - - -- DESCRIPTION OF WORK ------ -- ----------------- - - - - -- PERMIT TO GUARANTEE BOTH PERFORMANCE AND LABOR /MATERIALS FOR EARTHWORK, DRAINAGE, PRIVATE IMPROVEMENTS, AND EROSION CONTROL PER APPROVED GRADING PLAN 10413 -G. CONTRACTOR MUST MAINTAIN TRAFFIC CONTROL AT ALL TIMES PER APPROVED TRAFFIC CONTROL PLAN OR PER W.A.T.C.H. STANDARDS. LETTER DATED FEBRUARY 25, 2010 APPLIES. - - -- INSPECTION ---------- - - - - -- DATE -- - - - - -- INSPECTOR'S SIGNATURE - - -- INITIAL INSPECTION COMPACTION REPORT RECEIVED ENGINEER CERT. RECEIVED ROUGH GRADING INSPECTION FINAL INSPECTION I HEREBY ACKNOWLEDGE THAT I HAVE READ THE APPLICATION AND STATE THAT THE INFORMATION IS CORRECT AND AGREE TO COMPLY WITH ALL CITY ORDINANCES AND STATE LAWS REGULATING EXCAVATING AND GRADING, AND THE PROVISIONS AND CONDITIONS OF ANY PERMIT ISSUED PURSUANT TO THIS APPLICATION. SIGNATURE A&.s &i PRAT NAME CIRCLE ONE: (DOWNER 2. AGENT 3. OTHER 3f/O� /C� DATE SIGNED 7 c) - 7,xj-77,�-6 TELEPHONE NUMBER February 25, 2010 Ryan Rotsheck 747 Doris Drive Encinitas, CA 92024 Re: Permit issuance requirements for: Application 10413 -G CDP not applicable 747 Doris Drive 259- 451 -04 This letter summarizes the requirements for pulling your Engineering Permit for drawing 10413 -G. Your approved plan will remain valid for one year. If the permit is not issued within six months from the date of approval of the drawings, the plans will be subject to review by City staff for compliance with current codes and regulations before a permit can be issued, and changes to the approved plans as well as additional fees may be required. Please read through this letter carefully and contact the City with any questions you may have. It contains information about many requirements that may apply to your project and can make the process clearer and easier for you. In order to obtain the permits to construct the work shown on your approved plans, you will need to satisfy the requirements below. All of the items listed.below must be submitted to the Engineering front counter in one complete package at the time the applicant comes in to u I the_permit_Partial submittals of any kind will not be accepted. Your project planchecker will not accept any of the documents listed on behalf of the Engineering front counter staff; all items must be submitted to the front counter directly together and at one time. The correct number of each of the requested documents must be provided; copies of documents submitted to the City during plancheck do not reduce the necessary quantities listed below. (1) Provide 4 print sets of the approved drawing 10413 -G. Soils Report not applicable for this permit. (2) Post Security Deposits to guarantee all of the work shown on your approved drawings. The amounts of security deposits are determined directly from the Approved Engineer's Cost Estimate for bonding purposes dated January 27, 2010 by your engineer according to a set of predetermined unit prices for each kind of work shown on your plans. You will be required to post security deposit(s) as follows: (a) Security Deposit for Grading Permit 10413 -G: in the amount $34.168.00 to guarantee both performance and labor/ materials for earthwork, drainage, private improvements, and erosion control. (b) Security Deposit for Improvement Permit : N/A (c) Security Deposit for Undergrounding of Overhead Utilities: N /A. (d) Security Deposit for Deferred Monumentation: N /A. FiK' A minimum of 20% and up to 100% of the amount listed in item(s) 2(a) must be in the form of cash, certificate of deposit, letter of credit, or an assignment of account. Up to 80% of the amount listed in item 2(a) may be in the form of auto - renewing Performance and Labor and Materials Bonds issued by a State of California licensed surety company. Up to 100% of the amount(s) listed in item(s) 2(b), 2(c), and /or 2(d) may be in the form of auto - renewing Labor and Materials bonds issued by a State of California licensed surety company. Cash, certificates of deposit, letters of credit, and assignments of account are also acceptable financial instruments. If a certificate of deposit (CD) will be obtained to secure the entire amount(s) listed in item(s) 2(a) and /or 2(b), two separate CD's for 25% and 75% of the amount(s) listed in item(s) 2(a) and/or 2(b) should be obtained in order to facilitate any future partial release of those securities. CD's posted may be of any term but must be auto - renewing and must specify the City of Encinitas as a certificate holder and include a clause that until the City of Encinitas provides a written request for release of the CD, the balance shall be available to the City upon its sole request. The format of any financial instrument is subject to City approval, may be in the owner's name only, and must list the City of Encinitas as a Certificate Holder. For any guestions regarding how to post securities bonding, or the required format of securities, please-contact Debra Geishart at 760 =633 -2779. (3) Pay non - refundable fees as listed below: Fee Type Amount Grading Inspection _ _ Im rovement Inspection 1708.00 n/a NPDES Inspection (Grading) 341.00 NPDES Inspection (Improvement) n/a Flood Control nla Additional Plancheck Fees Due nla NPDES Plancheck Fees Due nia GIS Mapping Fee (Maps/ PM's only) n/a The grading and improvement inspection fees are calculated based on 5% of first $100,000.00 of the approved Engineer's cost estimate of $34,168.00 dated January, 27, 2010, and 3% of the cost estimate over $100,000.00. The NPDES inspection fee is assessed as 1% of the first $100,000.00 of the approved Engineer's cost estimate and 0.6% of the cost estimate over $100,000.00. The flood control fee is assessed at a rate of $0.21 per square foot of net new impervious surface area for driveway and parking areas as created per the approved plan. (4) Provide the name, address, telephone number, state license number, and license type of the construction contractor. The construction of any improvements within the public right-of-way or public easements is restricted to qualified contractors possessing the required state license as listed in the table below. The contractor must also have on file with the City current evidence of one million dollar liability insurance listing the City of Encinitas as co- insured. Additional requirements are described in the handout "Requirements for Proof of Insurance" available at the Engineering front counter. Type Description Work to be Done A General Engineering any & all C -8 Concrete a ron /curb/ utter /ram /sidewalk C -10 Electrical lighting/signals C -12 Grading 8 Paving any surface, certain drain - basins /channels C -27 Landscaping planting /irrigationMencing & other amenities C -29 Masonry retaining walls C -32 Parking &Highway Improvement signagelstripinglsafety C -34 Pipeline sanitary sewer /storm drain (5) Permits are valid for no more than one year from the date of issuance and may expire earlier due to expirations of letter of credit and/or insurance policies. (6) This project proposes land disturbance in excess of one acre and requires from the Stale, a Storm Water Pollution Prevention Plan (SWPPP). An erosion control plan shall be implemented per the approved grading plan. Preconstruction Meeting: A preconstruction meeting at the project site is mandatory for all projects. The preconstruction meeting may not be scheduled until the Engineering permit(s) have been issued, and the applicant/contractor must give the assigned Engineering inspector a minimum of 48 hours advance notice prior to the scheduled meeting time. Right -of -Way Construction Permit: A separate right -of -way construction permit will be required for any work in the public right -of -way or public easements. Typically, this work may include construction or reconstruction of a portion of the driveway within the public right -of -way, excavation, backfill, and resurfacing to install electric, gas, telephone, and cable television lines, or water and sewer connections. A permit fee of $300.00 per application and a site plan, preferably the work order issued by the public utility, will be required. Contractor license and insurance requirements apply. Permits must be issued at least 48 hours in advance of the start of work. Haul Routes, Traffic Control Plans, and Transportation Permits: These separate permits may be required for your project and are handled by the Traffic Engineering Division. A fee of $250.00 is required for traffic control plans. For more details, contact Raymond Guarnes, Engineering Technician, at (760) 633 -2704. Release of Project Securities: The _partial or complete release of project_ securities _is, initiated automatically by the Qgy_after submission of satisfactory as -built drawings to the City and approval by the project En c iineeri inspector_ Applicant requests cannot be addressed without release approval from the project inspector. The processing and release of securities may take up to 4 weeks after the release process is initiated by the project Engineering inspector. Any cash releases will be mailed to the address on this letter unless the City is otherwise notified, and all letters mailed to a financial institution will be copied to the owner listed hereon. Satisfactory completion of Final Inspection certified by the project Engineering inspector is a prerequisite to full release of the Security Deposit assigned to any Grading Permit. A sum in the amount of 25% of the securities posted for improvement permits will be held for a one -year warranty period, and a release is automatically initialed at the end of that warranty period. Construction Changes: Construction changes prepared by the Engineer of Work will be required for all changes to the approved plans. Requests for construction change approval should be submitted to the Engineering Services Department front counter as redlined mark -ups on 2 blueline prints of the approved Drawing. Changes are subject to approval prior to field implementation. Substantial increases in valuation due to the proposed changes may be cause for assessment and collection of additional inspection fees and security deposits. Construction change fees of $200.00 and $350.00 will be assessed for minor and major construction changes, respectively. Construction changes necessitating a new plan sheet will be assessed the per -sheet plancheck and NPDES plancheck fees in lieu of the construction change fee. Construction changes not previously approved and submitted as as -built drawings at the end of the construction process will be rejected and the securities release will be delayed. Change of Ownership: If a change of ownership occurs following approval of the drawing(s), the new owner will be required to submit to the City a construction change revising the title sheet of the plan to reflect the new ownership. The construction change shall be submitted to the Engineering front counter as redline mark -ups on two blueline prints of the approved drawing together with two copies of the grant deed or title report reflecting the new ownership. Construction change fees apply. The current owner will be required to post new securities to replace those held by the City under the name of the former owner, and the securities posted by the former owner will be released when the replacement securities have been received and approved by the City. Change of Engineer of Work: If a change in engineer of work occurs following the approval of the drawing(s), a construction change shall be submitted for review and approval by the Engineering Department. Two copies of the forms for the assumption of responsibility by the new engineer and the release of responsibility by the former engineer shall be completed and submitted to the City. Construction change fees apply. As- builts: Project as -built drawings prepared by the Engineer of Work will be required prior to Final Grading acceptance by Engineering Services. Changes_to the approved plans require a construction change to be submitted to the City prior to field implementation. Construction changes may not be submitted as as- builts at the end of the construction process. This letter does not change owner or successor -in- interest obligations. If there should be a substantial delay in the start of your project or a change of ownership, please contact the City to request an update. Should you have questions regarding the posting of securities, please contact Debra Geishart, who processes all Engineering securities, at (760) 633 -2779. Should you have any other questions, please contact me at (760) 633 -2780 or visit the Engineering Counter at the Civic Center to speak with an Engineering Technician. Sincerely, r�ca1e_ � Ruben Macabitas Assistant Civil Engineer cc La Costa Engineering, Martell Montgomery Debbie Geishart, Engineering Technician Masih Maher, Senior Civil Engineer permit /file Enc Application Requirements for Proof of Insurance Security Obligation Agreements (various) n�8 Associates �.1�i� Plan Review Services, Inc. APPROVAL LETTER Feb 10, 2010 Ruben Macabitas City of Encinitas 505 South Vulcan Avenue Encinitas, CA 92024 -3633 RE: Project Name: ROTSCHECK 747 Doris Dr. Project Number: 10413 -G Dear Mr. Ruben 3569 Filth Ave Suite 100 ben Diego. CA 92103 Phone 619.294 6600 Fex 6 9.294.6600 w.vw emrconsulUngy'OUP corn In response to your request, SMR & Associates Plan Review Services, Inc. has reviewed the documents submitted for the above - referenced project and finds that the documents meet our approval with the following exception: As marked in red on the drawings. We appreciate the opportunity to work with you on this project. If you have any questions, or if we can be of further assistance, please do not hesitate to contact us. Sincerely, SMR & Associates Plan Review Services, Inc Mehdi Rashti, S.E. Principal MR:Vish Enclosures: (1) Revised Calculations dated January 27, 2010 (1) Response to comments (1) Revised Drawings LA COSTAL ENGIINEENtNNG, 2226 FARADAY AVENUE CARLS2AD, CALIFORNIA 92002 TEL 760-971 -0290 FAR /323251 saMma igameryillphoo.con CIVIL • STRUCTURAL M E C N AN ,CA L - PETROLEUM COST ESTIMATE PROJECT: ROTSHECK SITE RETAINING WALLS 747 DORIS DRIVE ENCINITAS, CA 92024 GRADING EXCAVATE AND EXPORT: PRIVATE MISC. RETAINING WALLS: i -uv �� QUANTITY UNIT PRICE 78 C.Y. $27.50/C.Y AMOUNT $ 2,145 980 S.F. $29.65/S.F. $29,057 SILT FENCE: 32 L.F. $1.60 /L.F. $ 51 GRAVEL BAGS: 100 $1.10 /EA. $ 110 GRASS SWALE 110 L.F. $5.50 /L.F. $ 605 4" PVC DRAIN: 110 L.F. $20.00 /L.F. $ 2,200 TOTAL $34,168 ENGINEER: MARTELL B. MONTGOMERY R.C.E. 50344 EXP. 6-30-11 DATE: JANUARY 27, 2010 f `\ iAI Flo LA COSTA ENGINEERING 2226 FARADAY AVENUE CARLSBAD, CALIFORNIA 92605 TEL750-911 4290 FAX4353251 nury_non tyanovRFaOOO.rnn CIVIL - STRUCTURAL M E CNANIC AL - FETRDLFUM yy -�- �\ ,9 cS STRUCTURAL CALCULATIONS PROJECT: ROTSHECK SITE RETAINING WALLS 747 DORIS DRIVE ENCINITAS, CA 92024 ENGINEER: MARTELL B. MONTGOMERY R.C.E. 50344 EXP. 6-30-11 DATE: NOVEMBER 12, 2009 REV. DATE: JANUARY 27, 2010 DESIGN LOADS: 2006 IBC, 2007 CBC t i JL4�"vl _ LA COSTA ENGINEERING _26 FARADA} AVIRNI!E CARLSRAD, CAMFORAIIA 9300E TEL 76x911 -0290 FA7.434.5751 muy_ mon[pamervOgh60.t6n CI V11 • 519 U CT U RAL MECHANICAL- PISROLEUM MIN. SITE RETAINING WALL DESIGN CRITERIA: CL ENT_RYAN ROTSHECK ,oe_747_DORlS DR1YF, ENCINIPAS, CA CALc TEOav_MBM DATE 1/27/10_ SCALE SHEET N010F PER MIN. GEOTECHNICAL STANDARDS OF CBC 2007 SECTIONS: 1610, 1804, 1805, 1806: DRAINED CONDITIONS: ACTIVE PRESSURE: Pa 45 psf APPROX. SOIL UNIT WT.: y 120 pcf PASSIVE PRESSURE: Pp 150 pcf BEARING PRESSURE: Ps Use 1500 psf COEFF. OF FRICTION: µ 0.25 CMU /CONCRETE SPECIFICATIONS: fc = 2500 psi concrete, 28 days fm = 1500 psi, medium weight block fy = 60,000 psi reinforcing steel DESIGN BACKFILL SLOPE CALCS: SM -SC, TABLE 1610.1 SM -SC, TABLE 1804.2 (2000 psf) per SM -SC, TABLE 1804.2 SM -SC, TABLE 1804.2 'Where the surface -slope of the retained earth varies, the design backfill slope shall be obtained by connecting a line from the top of the wall to the highest point on the slope whose limits are with the horizontal distance from the stem equal to the stem height of the wall." In both cases, an initial 2:1 slope at the back of the wall transitions to a level backfill. The "design" backfill slope is thus represented as the line drawn from the wall /earth interface to an intersecting point within the level backfill at a horizontal distance equal to the wall height. 6' -8" WALL: Differential Height from earth /wall interface to level backfill: 1.33' Horiz. Distance equal to retained wall height: 6.33' (6.33'/1.33) : 1 = 4.76: 1 — Use 4.5: 1 Design Backfll Slope 4' -8" WALL: Differential Height from earth /wall interface to level backfill: 1.75' Horiz. Distance equal to retained wall height: 4.33' (4.3371.78) : 1 = 2.47 : 1 — Use 2.5 : 1 Design Backfill Slope iZt>TSf1EcL S \DE `fASZ\`� 26TW1N111Cr \NALL M.T. S. 4.5 � j!jZN: 8.in Mas w/ #4 @ 16.in o/c "oeiv 44 a W'c.c. VERT: 12.in Mas w/ #4 @ 16.in o/c 8' FOOT1T.iC�' 'fV."V6P,qr,l#4 @16.in @Toe bWR1z: (31 =4 ScE`f : (1 i ' "4 LA COSTA ENGINEERING Title 6' -8" Rothsheck Retaining Wall Page. _ Martell B. Montgomery, P.E. Job # 2010004 Dsgnr: MBM Date. JAN 27,2010 2226 Faraday Avenue Description.... Carlsbad, CA 92008 6' -8" Side Yard Retaining Wall (760) 931 -0290 marty_montgomery@yahoo.com This Wall in File: C:IProgram FilesIRP6Vrotscheck grading i Retain Pro 2007 .24-Jul-2008. (c) 1989 -2008 www.retainproxomisupport for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Registration #: RP -1111i RP2007R Criteria 1,259 psf OK Retained Height 6-33 ft Wall height above soil = 0.33 ft Slope Behind Wall = 4.50:1 Height of Soil over Toe = 8.00 in Water height over heel = 0.0 it Wind on Stem = 0.0 psf Vertical component of active lateral soil pressure options: NOT USED for Soil Pressure. NOT USED for Sliding Resistance. NOT USED for Overturning Resistance Surcharge Loads 1,259 psf OK Surcharge Over Heel - 0.0 psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0 psf Used for Sliding & Overturning ACI Factored @ Toe = Axial Load Applied to Stem Axial Dead Load = 0.0 Iles Axial Live Load = 0.0 Ibs Axial Load Eccentricity = 0.0 in Design Summary 75.0 psi Wall Stability Ratios Lateral Sliding Force = Overturning = 2.15 OK Sliding = 1.50 OK Total Bearing Load = 2.685 Ibs ...resultant ecc. = 8.45 in Soil Pressure @ Toe = 1,259 psf OK Soil Pressure @ Heel = 4 psf OK Allowable = 1.500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,414 psf ACI Factored @ Heel = 5 psf Footing Shear @ Toe = 13.1 psi OK Footing Shear @ Heel = 5.5 psi OK Allowable = 75.0 psi Sliding Cales (Vertical Component NOT Used) Lateral Sliding Force = 1,245.7 lbs less 100% Passive Force= " 1,200.0 Ibs less 100% Friction Force = - 671.2 Ibs Added Force Req'd 0.0 Ibs OK ....for 1.5 : 1 Stability = 0.0 Ibs OK Load Factors Edge Building Code CBC 207 Dead Load 1.20 Live Load 1.600 Earth, H 1.600 Wind, W 1.300 Seismic, E 1.00 Soil Data Allow Soil Bearing = 1,500.0 psi Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 psf /ft Toe Active Pressure = 45.0 psf /ft Passive Pressure = 150.0 psf /ft Soil Density, Heel = 120.00 pcf Soil Density, Toe 120.00 pcf FcotingllSoil Friction = 0.250 Soil height to ignore 14.0 in for passive pressure = 0.0 in Lateral Load Applied to Stem Lateral Load = 0.0 #/ft ...Height to Top = 0.00 It ...Height to Bottom = 0.00 ft Footing Dimensions & Strengths Toe Width = 2.50 It Heel Width = 1.75 Total Footing Width = 4.25 Footing Thickness = 14.0 in Key Width = 14.00 in Key Depth = 26.0 in Key Distance from Toe = 1.33 It rc = 2,500 psi Fy = 60,00 psi Footing Concrete Density = 150.00 pcf Min. As % = 0.0018 Cover @ Top = 2.00 in @ Btm.= 3.00 in Adjacent Footing Load Top djacent Footing Load = 0.0 fbs Footing Width = 0.00 It Eccentricity = 0.00 in Wall to Ftg CL Dist = 0.00 ft Footing Type Line Load Base Above/Below Soil = at Back of Wall 0.0 h Poisson's Ratio = 0.300 Stem Construction Top Stem 2nd Stem. S Design Height Above Ftg ft = 0 0.0 Wall Material Above "HC = Masonry Masonry Thickness = 8.0 12.0 Rebar Size = # 4 # 4 Rebar Spacing = 16.00 16.00 Rebar Placed at = Edge Edge Design Data fb /FB +fa/Fa = 0.510 0.910 Total Force @ Section Ibis = 421.9 891.6 Moment ... .Actual ft-#= 608.9 1,900.0 Moment..... Allowable ft-#= 1,193.2 2,087.8 Shear..... Actual psi = 7.3 8.9 Shear..... Allowable psi = 38.7 38.7 Wall Weight psf= 78.0 124.0 Reber Depth 'd' in= 5.25 9.0 LAP SPLICE IF ABOVE in= 24.00 36.0 LAP SPLICE IF BELOW in = 24.00 HOOK EMBED INTO FTG in= 6.00 Masonry Data Pm psi = 1,500 1,50 Fs psi= 20,000 20,000 Solid Grouting = Yes Yes Modular Ration' Short Tenn Factor Equiv. Solid Thick. Masonry Block Type Masonry Design Method Concrete Data rc Fy = 21.48 21.48 1.000 1.000 in= 7.60 11.60 = Medium Weight = ASD PSI = PSI = LA COSTA ENGINEERING Title V -8' Rothsheck Retaining Wall Page: Martell B. Montgomery, P.E. Job # 2010004 Dsgnr: MBM Date: JAN 27,2010 2226 Faraday Avenue Description.... Carlsbad, CA 92008 6'$' Side Yard Retaining Wall (760) 931.0290 marty_montgomery@yahoo.com This Wall in File: C:lProgram Files\RP61rotscheck grading I Retain Pro 2007.24 - Jul- 2008,(c)1989 -2008 www.retainpro.com/support for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Registratlon # : RP- 1162635 RP2007 -R Footing Design Results 1.25 250.0 611.5 Tae Heel 173.2 Factored Pressure = 1,414 5 psi 2.13 Mu' : Upward = 4,197 58 ft-# 725.5 Mu': Downward = 1,157 565 ft-# Mu: Design = 3,039 508 ft-# Actual 1 -Way Shear = 13.12 5.46 psi Allow 1 -Way Shear = 75.00 75.00 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 16.00 in Toe: Not req'd, Mu < S' Fr Heel Reinforcing = None Spec'd Heel: Not req'd, Mu < S' Fr Key Reinforcing = None Spec'd Key: Not req'd, Mu < S ' Fr Summary of Overturning & Resisting Forces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item IDs It ft-# Ibs ft ft-# Heel Active Pressure Surcharge over Heel Toe Active Pressure Surcharge Over Toe Adjacent Footing Load Added Lateral Load = 1,321.4 2.55 3,375.3 Soil Over Heel = 569.7 3.88 2.207.6 Sloped Soil Over Heel = 7.5 4.00 30.0 _ -75.6 0.61 -46.2 Surcharge Over Heel = = Adjacent Footing Load = A>val Dead Load on Stem = Load @ Stem Above Soil = Total = 1,245.7 O.T.M. = 3,329.1 Resisting /Overtuming Ratio = 2.15 Vertical Loads used for Soil Pressure = 2,684.8 Ibs Vertical component of active pressure NOT used for soil pressure DESIGNER NOTES: Axial Live Load on Stem = Soil Over Toe = Surcharge Over Toe = Stem Weight(s) _ Earth @ Stem Transitions = Footing Weight = Key Weight = Vert. Component = 200.0 1.25 250.0 611.5 2.90 1,773.9 173.2 3.33 577.3 743.8 2.13 1,580.5 379.2 1.91 725.5 Total = 2.684.8 Ibs R.M = 7,144.7 Axial live load NOT Included in total displayed, or used for overturning resistance, but is included for soil pressure calculation. STEM, \JEIZ—N 1 8.in Mas w/ #4 @ 16.in o/c Solid Grout "v?)Z: 44 e Ifo"o.c FoOT�t�G r� TRAgAyE2St! #4 @16.in @Toe "4W \-L (2'�-#4 t<r-(I (0-a4 2�TSl1EGL REAR KA4eD RE-TAitJ1t, G WALL N.T.S. 2.5 4 "T 4'4" 4' -B" 1101 3" 1• -7 u LA COSTA ENGINEERING Martell B. Montgomery, P.E. 2226 Faraday Avenue Carlsbad, CA 92008 (760) 931.0290 marty_montgomery@yahoo.com Title 4'•8' Rotscheck Rear Retaining Wall Page. Job # 2010004 Dsgnr MBM Date: JAN 27,2010 Description.... 4'.8" Rear Retaining Wall This Wall in File: C:1Program Files1RP61rotscheck www.retslnpro.com/support for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Reglstrationi: RP•1182635 RP2007 -R Criteria 1,342 psi OK Retained Height 4.33 ft Wall height above soil = 0.33 It Slope Behind Wall = 2.50: 1 Height of Soil over Toe = 4.00 in Water height over heel = 0.0 it Wind on Stem = 0.0 psi Vertical component of active lateral soil pressure options: NOT USED for Soil Pressure. NOT USED for Sliding Resistance. NOT USED for Overturning Resistance Surcharge Loads 1,342 psi OK Surcharge Over Heel - 0.0 psf NOT Used To Resist Sliding 8 Overturning Surcharge Over Toe = 0.0 psf Used for Sliding 8 Overturning 1,610 psf Axial Load Applied to Stem Axial Dead Load = 0.01bs Axial Live Load = 0.0 the Axial Load Eccentricity = 0.0 in Design Summary Sliding Cal" (Vertical Component NOT Used) Wall Stability Ratios 823.6 lbs Overturning = 2.61 OK Sliding = 1.50 OK Total Bearing Load = 2,389 lbs ...resultant ecc. = 6.76 in Soil Pressure @ Toe = 1,342 psi OK Soil Pressure @ Heel = 23 psi OK Allowable = 1.500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,610 psf ACI Factored @ Heel = 28 psi Footing Shear @ Toe = 8.0 psi OK Footing Shear @ Heel = 6.6 psi OK Allowable = 75.0 psi Sliding Cal" (Vertical Component NOT Used) Lateral Sliding Force = 823.6 lbs less 100% Passive Force= - 638.2 lbs less 100% Friction Force = - 597.3 the Added Force Req'd = 0.0 Ibs OK ....for 1.5 : 1 Stability = 0.0 Ibs OK Soil Data Allow Soil Bearing = 1,500.0 psi Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 psf /ft Toe Active Pressure = 45.0 psf /ft Passive Pressure = 150.0 psf/ft Soil Density, Heel = 120.00 pcf Soil Density, Toe 120.00 pcf FoofingiSoil Friction = 0.250 Soil height to ignore 12.00 in for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 0.0 #/ft ...Height to Top = 0.00 It ...Height to Bottom = 0.00 ft Footing Dimensions & Strengths Toe Width = 0.67 ft Heel Width - 2.83 Total Footing Width = 3.50 Footing Thickness = 12.00 in Key Width = 12.00 in Key Depth = 19.00 in Key Distance from Toe = 0.67 it fc = 2.500 psi Fy = 60,000 psi Footing Concrete Density = 150.00 pof Min. As % = 0.0018 Cover @ Top = 2.00 in @ Bbn.= 3.00 In Adjacent Footing Load Top stem Adjacent Footing Load = 0.0 lbs Footing Width = 0.00 It Eccentricity = 0.00 in Wall to Fig CL Dist = 0.00 It Footing Type Line Load Base AboveBelow Soil 8.00 = at Back of Wall 0.0 it Poisson's Ratio = 0.300 Stem Construction Top stem Stem OK Design Height Above Ftf it = 0.00 Wall Material Above "Ht" = Masonry Thickness = 8.00 Reber Size = # 4 Reber Spacing = 16.00 Reber Placed at = Edge Design Data Medium Weight Wind, W 1.300 Masonry Design Method Po /FB +fa/Fa = 0.510 Total Force @ Section lbs = 419.4 Moment.... Actual it-#= 608.6 Moment..... Allowable = 1,193.2 Shear..... Actual psi= 7.3 Shear..... Allowable psi = 38.7 Wall Weight = 78.0 Reber Depth 'd' in = 5.25 LAP SPLICE IF ABOVE in = 24.00 LAP SPLICE IF BELOW in = HOOK EMBED INTO FTG in = 6.00 Masonry Data fm psi= 1,500 Fs psi= 20,000 Solid Grouting = Yes Lead Factors Building Code CSC 2007 Modular Ration' = 21.48 Dead Load 1.200 Short Term Factor = 1.000 Live Load 1.600 Equiv. Solid Thick. in= 7.60 Earth, H 1.600 Masonry Block Type = Medium Weight Wind, W 1.300 Masonry Design Method = ASO Seismic, E 1.000 Concrete Data fc psl= Fy psl = LA CCSTA ENGINEERING Title 4' -8" Rotscheck Rear Retaining Wall Page -. __ _ Martell B. Montgomery, P.E. Job # : 2010004 Dsgnr MBM Date: JAN 27,2010 2226 Faraday Avenue Description_.. Carlsbad, CA 92008 4' -0" Rear Retaining Wall (760) 931 -0290 marty_montgomery@yahoo.com This Wall in File: C:1Program FileslRP6lroischeck grading tetain Pro 2007 , 24-Jul -2008, (c) 1989 -2008 r . retalnpro .comlwpponforlatestrelease Cantilevered Retaining Wall Design Code: CBC 2007 Footing Design Results Toe Heel Factored Pressure = 1,610 28 psf Mu': Upward = 519 0 ft-# Mu': Downward = 80 0 ft-# Mu: Design = 440 974 ft-# Actual 1 -Way Shear = 7.98 6.62 psi Allow 1 -Way Shear = 75.00 75.00 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 16.00 in Toe: Not req'd, Mu < S' Fr Heel Reinforcing = None Spec'd Heel: Not req'd. Mu < S' Fr Key Reinforcing = # 4 @ 12.00 in Key: Not req d, Mu < S " Fr Summary of Overturning & Resisting Forces & Moments ..... OVERTURNING ..... .....RESISTING..... Force Distance Moment Force Distance Moment Rem Ibs R ft-# Ibs ft ft-# Heel Active Pressure = 863.6 2.07 1,783.4 Soil Over Heel = 1,124.1 2.42 2,718.4 Surcharge over Heel = Sloped Soil Over Hee! = 112.3 2.78 312.1 Toe Active Pressure = -40.0 0.44 -17.8 Surcharge Over Heel = Surcharge Over Toe = Adjacent Footing Load = Adjacent Footing Load = Axial Dead Load on Stem = Added Lateral Load = ' Axial Live Load on Stem = Load @ Stem Above Soil = Soil Over Toe = 26.8 0.34 9.0 Surcharge Over Toe = Stem Weight(s) = 363.5 1.00 364.7 Earth @ Stem Transitions= Total = 823.6 O.T.M. = 1.765.6 Footing Weighl = 525.0 1.75 918.8 Resisting /Overturning Ratio = 2.61 Key Weight = 237.6 1.17 277.9 Vertical Loads used for Soil Pressure = 2,389.2 Ibs Vert. Component = Vertical component of active pressure NOT used for soil pressure Total = 2,3891 Ibs R.M.= 4,600.8 Axial live load NOT included in total displayed, or used for overturning resistance, but is included for soil pressure calrulation. DESIGNER NOTES: P_s•rA \ WA. WAN), \\ N.N.s . :s 2� 2. SZt1� y�c 8.in Mas w/ #4 @ 16.in o/c Solid Grout 2 3,4 CAD" I SRC'- 12.in Mas w/ #4 @ 16.in o/c Solid Grout i - ,. / 8 „- - ielvJ�iJS2_%; #4 @16.in @Toe N�Z' �3i-MR KE`t Aa Ke i 4'-6' ,' 2'.a• ,•-a• C-C I 944 v __t 6• '-o• 2 -3' VES�lpNq MON l Fy 4 m 3._Ir �' N0. 50344 LA COSTA ENGINEERING Title : 6'-8" Rothsheck Retaining Wall Page: Martell B. Montgomery, P.E. Job # ...New... Dsgnr: Date: OCT 22,2009 2226 Faraday Avenue Description.... Carlsbad, CA 92008 6' -8" Side Yard Retaining Wall (760) 931 -0290 marty_monlgomery@yahoo.com This Wall in File: C:1Program Files1RPMrotscheck grading 1 Retain Pro 2007 24 -Jul -2008, (c) 1989 -2008 w . retalnpro .comfsupport for latestrelease Cantilevered Retaining Wall Design Code: CBC 2007 Registration 1i RP- 1182635 RP2007 -R Criteria 1,483 psf OK Retained Height = 6.33 ft Wall height above soil = 0.33 ft Slope Behind Wall = 2.00: 1 Height of Soil over Toe = 8.00 in Water height over heel = 0.0 R Wind on Stem = 0.0 psf Vertical component of active lateral soil pressure options: USED for Soil Pressure, NOT USED for Sliding Resistance. USED for Overturning Resistance. Surcharge Loads Surcharge Over Heel - 0.0 Psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0 psf Used for Sliding & Overtuming Axial Load Applied to Stem Axial Dead Load Axial Live Load = 0.0 Ibs Axial Load Eccentricity = 0.0 in Design Summary Wall Stability Ratios Overturning = 2.33 OK Sliding = 1.51 OK Total Bearing Load = 3,375 Ibs ...resultant ecc. = 4.86 in Soil Pressure @ Toe = 1,483 psf OK Soil Pressure @ Heel = 317 psf OK Allowable = 1.500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,313 psf ACI Factored @ Heel = 281 psf Footing Shear @ Toe = 11.7 psi OK Footing Shear @ Heel = 17.5 psi OK Allowable = 67.1 psi Sliding Calcs (Vertical Component NOT Used) Lateral Sliding Force = 1.361.3 lbs less 100% Passive Force = - 1,125.0 lb s less 100% Friction Force = - 932.2 Ibs Added Force Req'd = 0.0 Ibs OK ....for 1.5: 1 Stability = 0.0 Ibs OK Load Factors - Building Code Dead Load Live Load Earth. H Wind, W Seismic, E CBC 2007 1.200 1.600 1.600 1.300 1.000 Soil Data Allow Soil Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 psf1ft Toe Active Pressure = 45.0 psf /ft Passive Pressure = 250.0 psf/ft Soil Density, Heel = 120.00 pcf Soil Density, Toe 120.00 pcf FootingliSoll Friction = 0.350 Soil height to ignore Allowable for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 0.0 #/ft ...Height to ToP = 0.00 It ...Height to Bottom = 0.00 ft Stem Construction Design Height Above Ftt It = Wall Material Above "Ht" _ Thickness = Rebar Size = Reber Spacing = Reber Placed at = Design Data fb /FB r fa/Fa = Total Force @ Section Ibs = Moment.... Actual ft-#= Moment..... Allowable ft-#= Shear..... Actual psi = Shear..... Allowable psi = Wall Weight psf= Rebar Depth 'd' in = LAP SPLICE IF ABOVE in= LAP SPLICE IF BELOW in= HOOK EMBED INTO FTG in = Masonry Data fm psi= Fs psi = Solid Grouting = Modular Ration' Short Term Factor Equiv. Solid Thick. Masonry Block Type Masonry Design Method Concrete Data fc Fy ip Stem Footing Dimensions & Strengths Toe Width = 1.50 It Heel Width - 2.25 Total Footing Width = 175 Footing Thickness = 12.00 in Key Width = 12.00 in Key Depth = 16.00 in Key Distance from Toe = 0.50 ft fc = 2,000 psi Fy = 60,000 psi Footing Concrete Density = 150.00 pcf Min. As % = 0.0018 Cover @ Top = 2.00 in @ Btm.= 3.00 in 'Adjacent Footing Load Adjacent Footing Load = 0.0 Ibs Footing Width = 0.00 It Eccentricity = 0.00 in Wall to Ftg CL Dist = 0.00 ft Footing Type Line Load Base Above/Below Soil = at Back of Wall 0.0 It Poisson's Ratio = 0.300 Stem OK 2.00 Masonry 8.00 # 4 16.00 Edge 2nd Stem OK 0.00 Masonry 12.00 # 4 16.00 Edge 0.510 0.910 421.9 891.6 608.9 1,900.0 1,193.2 2,087.8 7.3 8.9 38.7 38.7 78.0 124.0 5.25 9.00 24.00 36.00 24.00 6.26 1,500 1,500 20,000 20,000 Yes Yes = 21.48 21.48 1.000 1.000 in = 7.60 11.60 = Medium Weight = ASO PSI = psi = LA COSTA ENGINEERING Title : 6' -8" Rothsheck Retaining Wall Page: Martell B. Montgomery, P.E. Job # ....New... Dsgnr Date: OCT 22,2009 2226 Faraday Avenue Description.... Carlsbad, CA 92008 6' -8" Side Yard Retaining Wall (760) 931.0290 marty_montgomery@yahoo.com Thi. w =u i.. Fire r4D,nn nie.tDDat...."..r . ew ...�.r.... www.retainpro.comisupport for latest release Cantilevered Retaining Wall Design Code: Csc 2007 Registration # : RP- 1182635 RP2007 -R Footing Design Results 2.65 3,775.6 Soil Over Heel = 949.5 Toe Heel Surcharge over Heel = Factored Pressure = 1,313 281 psi 3.33 Mu' : Upward = 1,765 471 it-# Surcharge Over Heel = Mu': Downward = 423 2.698 ft-# Surcharge Over Toe = Mu: Design = 1,342 2,227 ft-# Actual 1 -Way Shear = 11.74 17.48 psi Axial Dead Load on Stem = Allow 1 -Way Shear = 67.08 67.08 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 16.00 in Toe: Not req'd, Mu < S • Fr Heel Reinforcing = None Spec'd Heel: Not req'd, Mu < S' Fr Key Reinforcing = None Spec'd 90.0 Key: Not req'd. Mu < S' Fr Summary of Overturning & Resisting Forces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item Ibs it ft-# Ibs ft ftal Heel Active Pressure = 1,423.8 2.65 3,775.6 Soil Over Heel = 949.5 3.13 2,967.2 Surcharge over Heel = Sloped Soil Over Heel = 46.9 3.33 156.3 Toe Active Pressure = -62.5 0.56 -34.7 Surcharge Over Heel = Surcharge Over Toe = Adjacent Footing Load = Adjacent Footing Load = Axial Dead Load on Stem = Added Lateral Load = • Axial Live Load on Stem = Load @ Stem Above Soil = Soil Over Toe = 120.0 0.75 90.0 Surcharge Over Toe = Stem Weight(s) = 611.5 1.90 1,162.4 Earth @ Stem Transitions= 173.2 2.33 404.1 Total = 1,361.3 O.T.M. = 3,740.8 Footing Weight = 562.5 1.88 1,054.7 Resisting /Overturning Ratio = 2.33 Key Weight = 200.0 1.00 200.0 Vertical Loads used for Soil Pressure = 3,375.1 Ibs Vert. Component = 711.6 3.75 2,668.3 Vertical component of active pressure used for soil pressure Totals 3,375.1 Ibs R.M. = 8.703.0 • Axial live load NOT included in total displayed, or used for overturning resistance, but is included for soil pressure calculation. DESIGNER NOTES r #4@16.ir @Toe ,?t`�A,N1tJ4 wr'hL CAa - srt-tA LOCANIOO9 8.in Mas w /#4 @16.in o/c 1' -]Solid Grout 1 23.4 12.in Mas w/ #4 @ 16.in o/c Solid Grout -.0 3" 9 a No. 50344 . LA COSTA ENGINEERING Title Rotsheck Alt. Side Retaining Wall Page: Martell B. Montgomery, P.E. Jab # : 2009046 Dsgnr: MBM Date: NOV 12,2009 2226 Faraday Avenue Description.... Carlsbad, CA 92008 6'$' Side Yard Retaining Wall (760) 931.0290 marty_montgomery@yahoo.com This Wall in File: C:1Program Files%RP6lrotscheck grading Retain Pro 2007 ,24- Jul- 2008,(c)1989 -2008 w .retalnpro.coMSUppon for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Registratftat •: RP•11e2WS RP2007•R Criteria 1,057 psf OK Retained Height = 6.33 ft Wall height above soil = 0.33 ft Slope Behind Wall = 2.00: 1 Height of Soil over Toe = 8.00 in Water height over heel = 0.0 ft Wind on Stem = 0.0 psf Vertical component of active lateral soll pressure options: USED for Soil Pressure. NOT USED for Sliding Resistance. USED for Overturning Resistance. Surcharge Loads Surcharge Over Heel - 0.0 psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0 psf Used for Sliding & Overturning Axial Load Applied to Stem Axial Dead Load = 0.0 lbs Axial Live Load = 0.0 lbs Axial Load Eccentricity = 0.0 in Design Summary Wall Stability Ratios Overturning = 2.18 OK Sliding = 1.52 OK Total Bearing Load = 2,371 lbs ...resultant ecc. = 5.04 in Soil Pressure @ Toe = 1,057 psf OK Soil Pressure @ Heel = 208 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 853 psf ACI Factored @ Heel = 168 psf Footing Shear @ Toe = 7.9 psi OK Footing Shear @ Heel = 0.0 psi OK Allowable = 67.1 psi Sliding Cellos (Vertical Component NOT Used) Lateral Sliding Force = 1,146.4 lbs less 100% Passive Force = - 1.125.0 lbs less 100% Friction Force = - 618.5 lbs Added Force Req'd = 0.0 lbs OK ....for 1.5 : 1 Stability = 0.0 lbs OK Load Factors = 120.00 pcf Building Code CBC 2007 Dead Load 1.200 Live Load 1.600 Earth, H 1.600 Wind, W 1.300 Seismic, E 1.000 Soil Data Allow Soil Bearing = 1,500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 psf /ft Toe Active Pressure = 45.0 psf/ft Passive Pressure = 250.0 psf /ft Soil Density, Heel = 120.00 pcf Soil Density, Toe 120.00 pcf FoobngIlSoil Friction = 0.350 Soil height to ignore = for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 0.0 #rft ...Height to Top = 0.00 It ...Height to Bottom = 0.00 it Stem Construction 2.75 If Design Height Above Ftg ft= Wall Material Above "Ht" _ Thickness = Reber Size = Rebar Spacing = Rebar Placed at = Design Data 60,000 psi fb /FB + fa/Fa = Total Force @ Section lbs = Moment.... Actual ft-#= Moment..... Allowable ft-#= Shear..... Actual psi= Shear..... Allowable psi= Wall Weight psf= Reber Depth 'd' in = LAP SPLICE IF ABOVE in= LAP SPLICE IF BELOW in = HOOK EMBED INTO FTG in = Masonry Data fm psi = Fs psi = Solid Grouting = Modular Ratio 'n' Short Term Factor Equiv. Solid Thick. Masonry Block Type Masonry Design Method Concrete Data fc Fy Footing Dimensions & Strengths Toe Width = 2.75 If Heel Width = 1.00 Total Footing Width = 3.75 Footing Thickness = 12.00 in Key Width = 12.00 in Key Depth = 16.00 in Key Distance from Toe = 0.50 it fc = 2,000 psi Fy = 60,000 psi Footing Concrete Density = 150.00 pcf Min. As % = 0.0018 Cover @ Top = 2.00 in @ Btm.= 3.00 in Adjacent Footing Load Adjacent Footing Load = 0.0 lbs Footing Width = 0.00 ft Eccentricity = 0.00 in Wall to Fig CL Dist = 0.00 It Footing Type Line Load Base Above/Below Soil = at Back of wan 0.0 ft Poisson's Ratio = 0.300 Sp tem Stem OK 2.00 Masonry 6.00 # 4 16.00 Edge 2nd Stem OK 0.00 Masonry 12.00 # 4 16.00 Edge 0.510 0.810 421.9 891.6 608.9 1,900.0 1,193.2 2,087.8 7.3 8.9 38.7 38.7 78.0 124.0 5.25 9.00 24.00 36.00 24.00 6.26 1,500 1,500 20,000 20,000 Yes Yes 2148 21.48 = 1.000 1.000 in= 7.60 11.60 • Medium Weight • ASO Psi = psi = . LA COSTA ENGINEERING Title Rotsheck Alt. Side Retaining Wall Page: Martell B. Montgomery, P.E. Job # 2009046 Dsgnc MBM Date NOV 12,2009 2226 Faraday Avenue Description.... Carlsbad, CA 92008 8'-8' Side Yard Retaining Wall (760) 931 -0290 marty_montgomery@yahoo.com This Wall In File: C:113rogram Files1RPMrotscheck grading Retain Pro 2007 , 24 -Jul -2008, (c) 1989 -2008 www.retainpro.com/support for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Registration # : RP- 1182635 RP2007 -R Footing Design Results 1.38 302.5 Toe Heel 3.15 Factored Pressure = 853 168 psf 3.58 Mu': Upward = 3,015 0 ft-# 1.88 Mu': Downward = 1,242 0 ft-# 1.00 Mu: Design = 1,773 0 ft-# 3.75 Actual 1 -Way Shear = 7.91 0.00 psi Allow 1 -Way Shear = 67.08 0.00 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 16.00 in Toe: Not req'd, Mu < S ' Fr Heel Reinforcing = None Specd Heel: Not req'd, Mu < S ' Fr Key Reinforcing = None Spec'd Key: Not req'd, Mu < S ' Fr FS—Ummary of Overturning & Resisting Forces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Item Ibs ft ft-# Ibs it ft-# Heel Active Pressure Surcharge over Heel Toe Active Pressure Surcharge Over Toe Adjacent Footing Load Added Lateral Load 1,208.9 2.44 2,953.7 Soil Over Heel = Sloped Soil Over Heel = -62.5 0.56 -34.7 Surcharge Over Heel = = Adjacent Footing Load = Axial Dead Load on Stem = Load @ Stem Above Soil = Total = 1,146.4 O.T.M. = 2,919.0 Resisting /Overturning Ratio = 2.18 Vertical Loads used for Soil Pressure = 2,371.3 Ibs Vertical component of active pressure used for soil pressure DESIGNER NOTES: Axial Live Load on Stem = Soil Over Toe = Surcharge Over Toe = Stem Weight(s) _ Earth @ Stem Transitions= Footing Weight = Key Weight = Vert. Component = 3.75 3.75 220.0 1.38 302.5 611.5 3.15 1,926.7 173.2 3.58 620.6 562.5 1.88 1,054.7 200.0 1.00 200.0 604.1 3.75 2,265.5 Total a 2,371.3 Ibs R.M 2 6,370.1 Axial live load NOT included in total displayed or used for overtumirg resistance, but is included for soil pressure calculation. SAM 8.in Mas w/ #4 @ 16.in o/ Solid Grout F'�Q�2'• �C�b "o•c Fes` If�C #4@16.in @Toe W�Q.�z' CZ•�-'►'i ?—MSA C Wc6k YARD MN.S. Ya LA COSTA ENGINEERING Title : Rotscheck Rear Retaining Wall Page: Martell B. Montgomery, P.E. Job # : 2009039 Dsgnr MBM Dale: OCT 15,2009 2226 Faraday Avenue Description.... Carlsbad, CA 92008 V -8" Rear Retaining Wall (760) 931 -0290 marty_montgomery@yahoo.com nod. W =u in pu. eno......�.., www.retainpro.cum/support for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Reglsfrallonif: RP- 1181635 RP2007 -R Criteria 1,469 psf OK Retained Heigh = 4.33 ft Wall height above soil = 0.33 ft Slope Behind Wall = 2.00: 1 Height of Soil over Toe = 4.00 in Water height over heel = 0.0 ft Wind on Stem = 0.0 psf Vertical component of active lateral soil pressure options: USED for Soil Pressure. NOT USED for Sliding Resistance. USED for Overturning Resistance. Surcharge Loads Surcharge Over Heel - 0.0 psf Used To Resist Sliding 8 Overturning Surcharge Over Toe = 0.0 psf Used for Sliding 8 Overturning Axial Load Applied to Stem A>oal Dead Load = 0.0 Ibs Abal Live Load = 0.0 lbs A>aal Load Eccentricity = 0.0 in Design Summary Wall Stability Ratios Overturning = 2.28 OK Sliding = 1.51 OK Total Bearing Load = 2,199 Ibs ...resultant eoc. = 4.61 in Soil Pressure @ Toe = 1,469 psf OK Soil Pressure @ Heel = 130 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 1,425 psf ACI Factored @ Heel = 126 psf Footing Shear @ Toe = 52 psi OK Footing Shear @ Heel = 10.9 psi OK Allowable = 67.1 psi Sliding Calcs (Vertical Component NOT Used) Lateral Sliding Force = 803.2 Ibs less 100% Passive Force = - 586.8 Ibs less 100% Friction Force = - 622.0 Ibs Added Force Req d = 0.0 Ibs OK ....for 1.5: 1 Stability = 0.0 Ibs OK Load Factors = Building Code CBC 2007 Dead Load 1.200 Live Load 1.600 Earth, H 1.600 Wind, W 1.300 Seismic, E 1.000 Soil Data Allow Soil Bearing = 1.500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 psf/ft Toe Active Pressure = 45.0 psf/ft Passive Pressure = 250.0 psf/ft Soil Density, Heel = 120.00 pcf Soil Density, Toe 120.00 pd FootingIlSoil Friction = 0.350 Soil height to ignore = for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 0.0 #/ft ...Height to Top = 0.00 ft ...Height to Bottom = 0.00 ft Stem Construction 0.50ft Design Height Above Fit ft = Wall Material Above "Ht" _ Thickness = Rebar Size = Reber Spacing = Rebar Placed at = Design Data 60,000 psi Footing Concrete Density = fb /FB + fa/Fa = Total Force @ Section Ibs = Moment.... Actual ft-#= Moment ..... Allowable = Shear..... Actual psi= Shear..... Allowable psi = Wall Weight = Reber Depth 'd' in = LAP SPLICE IF ABOVE in = LAP SPLICE IF BELOW In = HOOK EMBED INTO FTG In = Masonry Data I'm psi = Fs psi = Solid Grouting = Modular Ration' _ Short Term Factor = Equiv. Solid Thick. in = Masonry Block Type = Masonry Design Method = ASD Concrete Data f c psi = Fy psi= Footing Dimensions &Strengths Toe Width = 0.50ft Heel Width 2.25 Total Footing Width = 2.75 Footing Thickness = 12.00 in Key Width = 8.00 in Key Depth = 10.00 in Key Distance from Toe = 0.50 ft fc = 2,000 psi Fy = 60,000 psi Footing Concrete Density = 150.00 pd Min. As % = 0.0018 Cover @ Top = 2.00 in @ Bbn.= 3.00 in Adjacent Footing Load A Adjacent Footing Load = 0.0 Ibs Footing Width = 0.00 ft Eccentricity = 0.00 in Wall to Fig CL Dist = 0.00 it Footing Type Line Load Base Above/Below Soil = at Back of Wall 0.0 ft Poisson's Ratio = 0.300 Stem OK 0.00 Masonry 8.00 # 4 16.00 Edge 0.510 419.4 608.6 1,193.2 7.3 38.7 78.0 5.25 24.00 X4111 _ 1,500 20,000 Yes 21.48 1.000 7.60 Medium Weight LA COSTA ENGINEERING Title Rotscheck Rear Retaining Wall Page: Martell B. Montgomery, P.E. Job IF 2009039 Dsgnr MBM Date: OCT 15,2009 2228 Faraday Avenue Description.... Carlsbad, CA 92008 4' -8" Rear Retaining Wall (760) 931 -0290 ma tv montgomery @yahoo com This Wall in File: C:1Program FilesIRP6 \rotscheck grading 1 Retain Pro 2007 . 24Jul -2008, (c) 1989 -2008 www.retainpro.com/support for latest release Cantilevered Retaining Wall Design Code: cec 2007 Registration #: 1182635 RP2007 -R Footing Design Results I 567.2 Key Weight = 83.3 0.83 Toe Heel Vert. Component = 421.4 2.75 Factored Pressure = 1,425 126 psf 3,881.6 Mu' : Upward = 293 0 ft-# Mu' : Downward = 51 0 fl Mu: Design = 243 974 ft-# Actual 1 -Way Shear = 5.21 10.92 psi Allow 1 -Way Shear = 67.08 67.08 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 16.00 in Toe: Not read, Mu < S' Fr Heel Reinforcing = None Spec'd Heel: Not reg'd, Mu < S' Fr Key Reinforcing = # 4 @ 12.00 in Key: Not rei Mu < S' Fr Summary of Overturning & Resisting Forces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Hem Ibs It ft-# flits R ft-# Heel Active Pressure Surcharge over Heel Toe Active Pressure Surcharge Over Toe Adjacent Footing Load Added Lateral Load = 843.2 2.04 1,720.6 Soil Over Heel Sloped Soil Over Heel FDA =rx_7 Load @ Stem Above Soil = -17.8 Total = 803.2 O.T.M. = 1,702.8 ReslstinglOvertuming Ratio = 2.28 Vertical Loads used for Soil Pressure = 2,198.6 Ibs Vertical component of active pressure used for soil pressure DESIGNER NOTES: Surcharge Over Heel = Adjacent Footing Load = Axial Dead Load on Stem = Axial Live Load on Stem = Soil Over Toe = Surcharge Over Toe = Stem Welght(s) _ Earth @ Stem Transitions= 822.7 1.96 1,611.1 75.2 2.22 167.1 20.0 0.25 5.0 363.5 0.83 302.9 Footing Weight = 412.5 1.38 567.2 Key Weight = 83.3 0.83 69.4 Vert. Component = 421.4 2.75 1,158.8 Total. 2,198.6 be R.M.- 3,881.6 ' Axial live load NOT included In total displayed or used for overturning resistance, but is included for soil pressure calculation. 8.in Mas #4 @16.in @Toe �ZE7CSt4�c.Y� R��1D. `iRa -D CAL,. STetA wc/tT1�� ,LA COSTA ENGINEERING Martell B. Montgomery, P.E. 2226 Faraday Avenue Carlsbad, CA 92008 (760) 931 -0290 marty_montgomery@yahoo.com Title . Rotsheck Alt. Rear Retaining Wall Page: Job # 2009046 Dsgnr: MSM Date: NOV 12,2009 Description.... 4' -8" Rear Yard Retaining Wall This Wall in File: C:1Program FileslRP6 \rotscheck www.retampro.comrsupport for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Registration lit : RP- 1182635 RP2007 -R Criteria 767 psf OK Retained Height 4.33 It Wall height above soil = 0.33 It Slope Behind Wall = 2.00: 1 Height of Soil over Toe = 4.00 in Water height over heel = 0.0 ft Wind on Stem = 0.0 psf Vertical component of active lateral soil pressure options: USED for Soil Pressure, NOT USED for Sliding Resistance. USED for Overturning Resistance. Surcharge Loads Surcharge Over Heel - 0.0 psf Used To Resist Sliding & Overturning Surcharge Over Toe = 0.0 psi Used for Sliding & Overturning Axial Load Applied to Stem Axial Dead Load = 0.0 Ibs Axial Live Load = 0.0 Ibs Axial Load Eccentricity = 0.0 in [Desililn Summary Wail Stability Ratios Overturning = 2.25 OK Sliding = 1.53 OK Total Bearing Load = 1,307 Ibs ...resultant am. = 3.37 In Soil Pressure @ Toe = 767 psf OK Soil Pressure @ Heel = 184 psf OK Allowable = 1,500 psf Soil Pressure Less Than Allowable ACI Factored @ Toe = 692 psi ACI Factored @ Heel = 166 psi Footing Shear @ Toe = 5.0 psi OK Footing Shear @ Heel = 5.0 psi OK Allowable = 67.1 psi Sliding Calcs (Vertical Component NOT Used) Lateral Sliding Force = 609.2 Ibs less 100% Passive Force= - 586.8 lb less 100% Friction Force = - 344.0 IN Added Force Req'd = 0.0 Ibs OK ....for 1.5 : 1 Stability = 0.0 Ibs OK Load Factors 608.6 Building Code CBC 2007 Dead Load 1.200 Live Load 1.600 Earth. H 1.600 Wind, W 1.300 Seismic, E 1.000 Soil Data Allow Soil Bearing = 1.500.0 psf Equivalent Fluid Pressure Method Heel Active Pressure = 45.0 psf/ft Toe Active Pressure = 45.0 psf/ft Passive Pressure = 250.0 psf/ft Soil Density, Heel = 120.00 pcf Soil Density, Toe 120.00 pcf FootingljSoil Friction = 0.350 Soil height to ignore Footing Thickness = for passive pressure = 0.00 in Lateral Load Applied to Stem Lateral Load = 0.0 #/ft ...Height to Tor = 0.00 ft ...Height to Bottom = 0.00 ft $telil Construction Top Stem Stem OK Footing Dimensions & Strengths Toe Width = 2.00 It Heel Width - 0.75 Total Footing Width = 2.75 Footing Thickness = 12.00 in Key Width = 8.00 in Key Depth = 10.00 In Key Distance from Toe = 0.50 ft fc = 2,000 psi Fy = 60.000 psi Footing Concrete Density = 150.00 pcf Min. As % = 0.0018 Cover @ Top = 2.00 in @ Btm.= 3.00 in Adjacent Footing Load ft= Adjacent Footing Load 0.0 IbS Footing Width = 0.00 It Eccentricity = 0.00 in Wall to Fig CL Dist = 0.00 It Footing Type Line Load Base Above/Below Soil = = at Back of Wall 0.0 it Poisson's Ratio = 0.300 Design Height Above Fit ft= 0.00 Wall Material Above "Ht" = Masonry Thickness = 8.00 Reber Size = # 4 Rebar Spacing = 16.00 Reber Placed at = Edge Design Data ib/FB i fa/Fa = 0.510 Total Force @ Section Ibs = 419.4 Moment.... Actual ft-#= 608.6 Moment..... Allowable = 1,193.2 Shear..... Actual psi = 7.3 Shear ..... Allowable psi = 38.7 Wall Weight = 78.0 Reber Depth 'd' in = 5.25 LAP SPLICE IF ABOVE in = 24.00 LAP SPLICE IF BELOW in = HOOK EMBED INTO FTG in = 6.00 Masonry Data I'm psi = 1,500 Fs psi = 20,000 Solid Grouting = Yes Modular Ration' = 21.48 Short Term Factor = 1.000 Equiv. Solid Thick. in= 7.60 Masonry Block Type = Medium Weight Masonry Design Method = ASD Concrete Data fc psi = Fy psi = -A COSTA ENGINEERING Title Rotsheck AIL Rear Retaining Wall Page: Martell B. Montgomery, P.E. Job # : 2009046 Dsgnr. MBM Date: NOV 12,2009 2226 Faraday Avenue Description.... Carlsbad, CA 92008 4' -8' Rear Yard Retaining Wall (760) 931 -0290 marty_montgomery@yahoo.com This Wall in File: C:1Program Files1RP61rotscheck grading I Retaln Pro 2007, 24-Jul -2008, (c) 1989 -2008 www.retalnpro.comisupport for latest release Cantilevered Retaining Wall Design Code: CBC 2007 Reglstration # : RP- 1182635 RP2007 -R Footina Desian Results Summary of Overturnina & Reslatina Forces & Moments Toe Heel Factored Pressure = 692 166 psf Mu' : Upward = 1,300 6 it-# Distance Mu': Downward = 535 68 ft-# Ills Mu: Design = 765 63 ft-# Soil Over Heel = Actual t -Way Shear = 5.03 5.02 psi Surcharge over Heel = Allow 1 -way Shear = 67.08 67.08 psi Other Acceptable Sizes & Spacings Toe Reinforcing = # 4 @ 16.00 in Toe: Not req'd, Mu < S' Fr Heel Reinforcing = None Spec'd Adjacent Footing Load = Heel: Not req'd, Mu < S' Fr Key Reinforcing = # 4 @ 12.00 in Adjacent Footing Load = Key: Not req'd, Mu < S' Fr Summary of Overturnina & Reslatina Forces & Moments .....OVERTURNING..... .....RESISTING..... Force Distance Moment Force Distance Moment Rem Ibs ft ft-# Ills It ft-# Heel Active Pressure = 649.2 1.79 1,162.5 Soil Over Heel = 43.3 2.71 117.3 Surcharge over Heel = Sloped Soil Over Heel = 0.2 2.72 0.6 Toe Active Pressure = -40.0 0.44 -17.8 Surcharge Over Heel = Surcharge Over Toe = Adjacent Footing Load = Adjacent Footing Load = Axial Dead Load on Stem = Added Lateral Load = ' Axial Live Load on Stem = Load @ Stem Above Soil = Soil Over Toe = 80.0 1.00 80.0 Surcharge Over Toe = Stem Weight(s) = 363.5 2.33 848.1 Earth @ Stem Transitions = Total = 609.2 O.T.M. = 1,144.7 Footing Weighl = 412.5 1.38 567.2 Resisting /Overturning Ratio = 2.25 Key Weight = 83.3 0.83 69.4 Vertical Loads used for Soil Pressure = 1,307.3 Ibs Vert. Component = 324.4 2.75 892.2 Vertical component of active pressure used for soil pressure Total = 1,307.3 Ibs R.M.= 2,574.8 ' Axial live load NOT included in total displayed, or used for overWmirg resistance, but Is Included for soil pressure calculation. DESIGNER NOTES: