Loading...
2018-13843 SG (Plans)RIGHT OF WAY NOTE EROSION CONTROL OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 1. IN CASE EMERGENCY WORK IS REQURED, CONTACT 2Yl�nS.Qvy tn1N AT 1( �b )g9� 4�'3 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN 24 HOURS A DAY. ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE t A OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. 2. EQUIPMENT AND WORKERS FOR EhERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM. THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE DRAINAGE NOTE STOCKPILED ON SITE ON OCTOBEE 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID , CONSTRUCTION OF TEMPORARY EROSDN CONTROL MEASURES WHEN RAIN IS IMMINENT. NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO 3. DEVICES SHOWN ON.PLANS SHALL N)T BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE AN APPROVED DRAINAGE FACILITY. ENGINEERING INSPECTOR. UTILITY NOTE 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO POST A SIGN DESIGNATING THE WASHOUT LOCATION. THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE GENERAL NOTES ' REQUIRED BY THE CITY ENGINEER DUETO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CONSTRUCTION SITE ACCESS CIRCUMSTANCES WHICH MAY ARISE. 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS 4 / FOR PUBLIC WORKS CONSTRUCTION; THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF O SHALL BE RESFONSIBLE AND SHALL TAKE NE PRECAUTIONS T 6. THE CONTRACTOR E CESSARY O ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. ,, 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE a Z. T�e SoILS telloET- - TITLED 5UMEMIEWAL GHY(ECIINIC L PRc5fmeDW mfP, INCORPORATED HEREON. rJA'tED - DATED PROJECT #" SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL 8. GRADED AREAS AROUND THE PRCJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF GRADING SHALL BE 'DONE IN-ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS SLOPE AT THE CONCLUSION OF EACH MORK DAY. CONTAINED IN SAID REPORT. 9. ALL REMOVABLE PROTECTIVE DEVCES SHOWN SHALL BE IN PLACE AT THE END OF EACH 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY OR WORKING DAY WHEN THE FIVE (5) DAY. RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. (40%). SILT AND OTHER DEBRIS SHALL EE REMOVED AFTER EACH RAINFALL. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS REPLACED OR REPAIRED TO CONDITION SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS EXISTING PRIOR TO GRADING. PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET ANDIOR INTO THE PUBLIC STORM -DRAIN SYSTEM. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL 2. GRASS AND LANDSCAPE AREAS DESGNATED FOR STORM WATER POLLUTION CONTROL SHALL ENGINEER ORA LICENSED LAND NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. SURVEYOR: 3, ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMPIIMP FACILITIES 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING ANDIOR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. AND /OR THE TURF /LANDSCAPED AREAS 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (112) MILE OF A STRUCTURE FOR HUMAN 4. NO DRAINS SHALL BE INSTALLED IN {ARDSCAPE, DRIVEWAYS, UR ANY OTHER IMPERVIOUS AREA OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7 :30 A.M. NOR ON UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2 °l° CROSS SLOPE TOWARD THE IMPlBMP AREA OR HAVE 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS BEEN ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE HELD` ONSITE WITH THE FOLLOWING PEOPLE 'PRESENT. CITY INSPECTOR, CIVIL ENGINEER, SOILS IT TO AN ADEQUATE IMP /BMP. ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770. 6. ALL STORMWATER IMP113MP FACILITIES: SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED. WITHOUT A PERMIT FROM THE CITY. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY' 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS REQUIRE THAT THIS PLAN BE REVISED DR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL IMPERVIOUS, NON- COMBUSTIBLE ROCF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE BE PROVIDED STATING: "THE GRADING UNDER PERMIT . ENCLOSURE. THE ENCLOSURE SHAL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM NO. ,13@ 6,'2x ' -G HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE GRADING PLAN OR AS SHOWN ON THE ATTACHED AS- GRADED PLAN". -THIS STATEMENT SHALL BE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN OPERATION., AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIU GREASE SEPARATOR AND IS THEN FILTERED THROUGH A 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS CITY - APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS SYSTEM, NOT TO PLANTERS OR THE S -ORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED REQUIRED FOR THIS STRUCTURE. AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE OLIVENHAIN MUNICIPAL WATER DISTRICT NOTES FOR THEIR INTENDED USE. 1. Potable water works shall be construc,ed in accordance with the details and materials as 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE specified in themost recent edition ofthe Olivenhain Municipal Water District (District) DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID Standard Specifications and Drawings for the Construction of Water Mains and Facilities, DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL including all amendments adopted prior to the District approval date on these plans. MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT Contractor shall have a copy of the Sundard Specifications on the job site at all times. DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 2. The submission and review of all subnivals (shop drawings, six sets) as required by the 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN Standard Specifications are to be, accomplished prior to the pre - construction meeting with the ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROG THE SURFACE UPON WHICH THE FILL IS District's Inspector. TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN 3. Unless otherwise noted, connections to existing mains shall be made dry. The time and COMPACTED TO A MINIMUM OF 90 PERCENT, IT SHALL BE TI HE CONTRACTOR'S RESPONSIBILITY TO duration of any shutdowns of existitigmains shall be subject to approval by the District.; PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. District shall be notified two weeks minimum in advance of any shutdown. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH 4. Contractor shall coordinate with Distrct all arrangements for high - lining temporary services SURFACE AND UNIFORM CROSS SECTION. THE SLOPES ORIEXCAVATION AND EMBANKMENTS SHALL prior to shutdowns. No shutdowns wilbe scheduled on a Monday or Friday. BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND J OTHER WASTE MATTER EXPOSED OR 5. Contractor shall review all proposed trench work with Cal/OSHA. A co P copy of exemption letter EXCAVATION i OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE or trenching permit, if required, shall it submitted to the District prior to construction. REMOVED A�D DISPOSED OF. THE TOE AND TOP OFf ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 1 6. No work may begin or proceed withoit direction of District's Inspector. Contractor shall 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED notify the District inspections department 48 hours prior to the beginning of work to arrange OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT for inspection of the project. HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY 7. The Contractor must call !'Dig Alert o °Southem Catifomia" to have underground service ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. utilities located prior to construction. This call will be made at least 48 hours in advance prior to any work being performed in public right -of -way. (Dig Alert phone: 800 -227 -2600) 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY 8. All existing facilities which may affect project construction, i.e., line crossings, line PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE paralleling, or proposed connections sell be field verified before any construction begins. PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE 9. The Contractor shall furnish and installper the Standard Specifications the appropriate buried CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF utility warning and identification tape above all public water lines including water laterals THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT located in public right-of- WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE (NOTES CONTINUED ON SHEET 2) TREE REMOVAL. CHANGENO.1 DESCRIPTION APPROVED DATE BENCHMARK SCALE DESCRIPTION: LOCATION. EL RECORD FROA ELEVATION. -1 DATUM: NAV'DI 1�ljiR i STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES OWNER PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL SIGNATURE: PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS ca?RCA,ItaE 3yZovsN SURFACES. t A CONCRETE WASHOUT %SO 4VEEtNtQp L4 T6SS7D ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM. THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST 85$4-1 .13-89GP8 CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE r-_mu 1Toc C-A. %0, 4 , WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLLRRY, MORTAR, STUCCO, 2 PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL SITE ADDRESS SS .1SG5 /aVFl�110A �_a MTA 0 POST A SIGN DESIGNATING THE WASHOUT LOCATION. APN: Z S.S; I3ti 32 O /' CONSTRUCTION SITE ACCESS m 4 / A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK ANDIOR CORRUGATED STEEL LEGAL DESCRIPTION � a1 2 v PANELS /PLATES. ? E Lt?T 26s ),AMP WZ4- EN CONSTRUCTION VEHICLES l 0 A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHAD. BE MADE OFF -SITE. OWNER'S CERTIFICATE \ y GISD A EROSION CONTROL I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEERNR EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL\ �y PROTECTED AGAINST EROSION BY INSTALLING EROSION REST §TANT SURFACES SUCH AS EROSION CONTROL MATS, GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF\ ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. THE SITE, GNGItJ1TAS NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. \� QVEitiI>� DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. SIGNATURE: rilti DATE: ! �! �! VICINITY MAP REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN (�AC�L(N- SOWN N.T.S. PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS. SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHAD. PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND LNUSED CONSTRUCTION STATEMENT OF ENGINEER OF WORK MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANYTRASH MATERIAL. CONTROLS SUCH PERFORMANCE, THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO AN PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE, FOR INFORMATION ON DISPOSAL OF HAZARDOUS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY ORDER DUMPSTERS CALL EDCO AT (760) 436-4151, ARIS G INJURY LELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HISMER AGENTS OR L YEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES, PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE ARISING OU T E WORK PERFORMED BY THE ENGINEER. 1 SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL SIGNATURE: PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS 1�a hack W. HAeKls,izc>~ 29x4( SURFACES. ILOgo etSST ROAD WwAvi, cn.0RO-S4- ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM. THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST 85$4-1 .13-89GP8 ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTON SITE ,° RCE EXPIRES 1,41--&n FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 - 2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR 1S REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. R IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: DATE: 35251zot� EARTHWORK DATA STEEPEST EXISTING NATURAL SLOPE ON-SITE= Z H: I V MAXIMUM VERTICAL DEPTH OF CUT =2.•S ' MAXIMUM VERTICAL DEPTH OF FILL= 75 ' CUT =Z,O.. G.Y. FILL =&O C.Y. IMPORT = O C.Y. A. SEWERS - CSD - (760 }633 -2770 LW O -(760) 753 -0155 REMEDIAL=* O C.Y. B. GAS & ELECTRIC - SDGE - (760)438 -6200 C. WATER -SAN DIEGUITO WATER DISTRICT -1 -800- 227 -2600 D. TELEPHONE - SBC BELL - (760) -489 -3411 E. CABLE TV - COX COMMUNICATIONS - (760)-806 -9809 X -2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)- 633 -2770. 3. THE CONTRACTOR SHALL .GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (;60)633 -2770. ALL WORK LEUCADIA WASTEWA� PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. BMP PROJECT STATUS STANDARD IMPERVIOUS AREA q � IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 0 SQFT C37al2 L-141 IMPERVIOUS AREA AFTER CONSTRUCTION: lob SQFT erS- ilsom PE Date _ VC-CREASE IN IMPERVIOUS AREA: O SQFT Dexier F Wilson En ineerin 1r1G 6130/2020 IMPERVIOUS AREA REPLACED: b SQFT Firm Exp.DATE t�J s PUBLIC WORKS PLANNING Dl`s! PARKS A ouVENHAIN MUNICIPAL WATER DISTRICT ENCINITAS FIRE DEPARTMENT 15lt�1 PA S ND RECREATION i ;I = W� CD a 7 (o S z 8: g� 3 8 Y GN DATE ./ DATE SIGN DATE SIGN C?�� DATE IG DATE 3 0 N 5 E)LR 2`IRS 4FTER tX/it= 00 SIGNED B DRAWN BY- GHNCKED BY: ENGINEERING 13lVl5i6N APPROVALS CITY OF ENCINITAS - .�lE(rbPILgE11Y SERVICES DRAWING NO. T1W NS PREPARED UNDER SUPERVISION OF RECOMMENDED) std APMOUL • GRADING PLAN FOR DATE: P-- _GARDEN _WALLS R.C.E. NO.: Z°..! I �UaC1 S " 1�J Z 6 / W tl ter 1569 AVENIDA LA POSTA zm w. HA2It15C40, ?m EXP.: 3 31 Zb19 DATE DATEf- I PLANNING CASE NO: !(.i/�• SHEET f OF Oki Fm:: 1'115 N EXISTING PCC CURB, GUTTER & SIDEWALK LO- _ EXISTING WATER METER ✓_ 46.07' a NORTH 871 3 ' 25" ' ST 33.0 -3 0.00' i; - Q1 —.� • 1 �\ y EXISTING PCC DRIVEWAY —^ 1 ,1$2 5S 1 \0ti �- EXISTING SIDEWALK 1 OP _ EXISTING FENCE X I,o X ?Fbt"bs �4RA�E pDDiTtoN :R (,4�t+T A FPR� OC�`SL11S Pc.tSN� 1, • EXISTr-G FENCE EXISTING HOUSE Al n LEGEND q� DESCRIPTION DWG.NO: SYMBOL QUANTITY / EXISTING PENCE Sp 'gy m ' a ORCO ALLAN BLOCK ' 1. - $��; PROPOSED GARDEN WALL.. 4yK' -� DAYLIGHT LINE (CUT/FILL) _� u i n _-� a —v oSjai; F1ht� 1 DIRECTION OF DRAINAGE g °fu - -- 1 1 gX1ST(NG PCC PATIO • 3 ' 1 'Sop GRAS J 183 EXISTING ELEVATION L EXISTING PROPOSED ELEVATION 8S5 a /� t( --c / GRAM- 42 83 2t ia;�°'�� tt GI 1S3 �+b� CO EXiS1'PVG WALL (-To Z R- ollED% �Q � � u --�%� __,mil � � s• 3 50 S ff � CAtr EXISTING TREE � 86I -- VlJ1' W o 71 PROPOSED ORCOALLAN BLOCK RETAINING WALs Ora !(� EXISTING TREE:cz a°/ (98 -- �f`� coo + G Roc:I"fl un�G -• ^� ��R,`r� �"- \ \F � �„ -rw 7 93^ EXISTING OAK TREE a - j (PROPOSED ORCO ALLAN BLOCK RETAtNING WALL-----,' —5% .�,% )��J kfOb ~ �- - POUND %" IRON PIPE WITH DISC STAMPED :'RCF 23080: PER MAP 9.1.124 PROTECT IN PLACE eb° T�— _� 1` 1 °NORTH 89 °23' 56AAST62.71' NOTE: MAXIMUM WALL HEIGHT 3.0 � \ 1 Rp3 `EXISTING FENCE 10. Where elevations and grades are not shown on the water main profile, top of pipe profile is 48- inches below centerline of finish grade of street. 11. All deflections (horizontal and vertical) shall be made by use of joint couplings with 40 maximum deflection per coupling (2° per joint). No bending (curving) of pipe shall be permitted. 12. Manual air releases shall be installed at all high points and blow -offs at all law points in the water main profile. Place manual air releases and blow -offs within meter box and locate behind curb unless otherwise approved by District's Representative. Fire hydrants may be used in lieu of a manual air release or blow -off when located at or near high or low points, as approved by the District's Representative. 13. Install a minimum 1 -inch water service to each lot. Meter to be located 5 -feet from a side lot line. A 3/4 -inch high letter "W" shall be chiseled in top of existing curb or imprinted in new curb at all water service crossings. 14. Meter boxes shall not be placed within driveways or sidewalks without the District's prior written consent. 15. All water services for irrigation, multiple residential complexes, commercial or industrial development shall have approved backflow prevention device on customer's side of water meter. 16. Contractor shall tie off all valve locations and provide written dimensions to Inspector immediately upon installation of valves. 17. line valves, where required at street intersections shall be located at the tee whenever possible. 18. Fire hydrants, as approved by the appropriate Fire District and meeting the District's Standard Specifications, are to be installed at locations specified by the Fire District. 19. All design changes to the water system shall be approved by the District Representative in writing prior to construction and acceptance of the change. 20. The water system shall be pressure tested in accordance with the procedures in the OMWD Standard Specifications. The class of pipe shall be used as the designated working pressure for testing all pipe, valves (closed) and appurtenances. 21. Pipelines and appurtenances shall be disinfected in accordance with Section 15041 of the OMWD Standard Specifications prior to tie -in or connection to existing system facilities. Bacteriologic quality test results shall conform to the criteria specified in that specification. 22. Contract Record Drawings must be submitted prior to final acceptance of work. The plans must provide post construction verification of the location and elevation of pipes and appurtenances. 23. Contractor shall guarantee all work for a period of one (1) year after the date of acceptance for the project. Contractor shall repair or replace any or all such work, together with any other work which may be displaced in so doing that may prove defective in workmanship and/or materials vrithin the one -year period from the date of acceptance without expense whatsoever to the District, ordinary wear and tear, unusual abuse or neglect excepted. 24, All irrigation meters shall be served with recycled water unless previously approved in writing by the District. 25. All buried fittings and valves shall be wax tape wrapped in accordance with OMWD Standard Specifications. IGNED gY D � Ey. CHECKED pY TM E VG 1N���- 1 � APPROVALS ciANGE NO DESCRIPTION APPROVED DATE BENCHMARK � iJl AI. +,lA ,N1TiA" w,�..�.. ., APP Y 22 ppi�CC:� PREPARED UNDER SUPERVISION O. , 4- iYa7 P' "d�c[�r��C:..Ld il1�i✓C. =rS aJ:�P. �,5��3 1 iY , DESCRIPTION. � ST - Moc�b+M�i LOCATION.E GQMtNO fLAtcut)^cNktAlO Rt} r ,' DATE. 31Z4s,� — - - -- RECORD FROM SSG GoN'S�ot, t�0 to y l" ^ l� ELEVATION, M. 3. tf� O Z f R.G.E. N: ; i a, SE owE �S 9 _.. D A TUM: NAVD88 b _ .1'i t3. Hb lS�'R7ZCF EX R: FAT DATE _�{ yp�.i. .. ,}may.» - nn / /iy +(�,�.� -e 4r P '✓'v� `ki3p •tr �i A', m M VELD W�r!'�� y`!.7E F4 ICEG *9 1569 AVENIDA LA POS,A 0 R