Loading...
2018-13381 G (Plans)RIGHT OF WAY NOTE EROSION CONTROL NOTIFICATIONS WORK TO BE DONE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT DANA LOVE AT (619) 990 -8400, 24 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE ACCORDING TO THE 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT HOURS A DAY. PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE SPECIAL PROVISIONS, AND THE FOLLOWING SPECIFICATIONS OF THESE PLANS AND IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF ARE NC EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS STANDARD DRAWINGS: THE OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING STANDARD SPECIFICATIONS DRAINAGE NOTE SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION 1. "GREENBOOK" STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: (2012 EDITION). NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IMMINENT. A. SEWERS - CSD - (760)- 633 -2770 IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE B. GAS & ELECTRIC - SDGE - (760)- 438 -6200 2. CALIFORNIA DEPARTMENT OF TRANSPORTATION, "MANUAL OF TRAFFIC CONVEYED TO AN APPROVED DRAINAGE FACILITY. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. C. WATER -SAN DIEGUITO WATER DISTRICT -1- 800 - 227 -2600 CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK ZONES," (1996 UTILITY NOTE D. TELEPHONE - SBC BELL - (760) -489 -3411 EDITION). 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO E. CABLE TV - COX COMMUNICATIONS- (760)- 806 -9809 X -2233 3. STATE OF CALIFORNIA STANDARD SPECIFICATIONS -APRIL 2006. ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL: 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO STANDARD DRAWINGS GENERAL NOTES 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760) -633 -2770. 1. COUNTY OF SAN DIEGO REGIONAL STANDARD DRAWINGS -APRIL 2006. REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD 2. STATE OF CALIFORNIA STANDARD PLANS -MAY 2006. SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS PHONE: (760)633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO WILL BE SUBJECT TO REJECTION AND REMOVAL. OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY DESCRIPTION STD DWG SYMBOL CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY ANY REQUEST FOR INSPECTION. UNSAFE. SOILS ENGINEERS CERTIFICATE EXIST. LOT BOUNDARY ........... ............................... 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE I, MARK SWEENEY A REGISTERED ENGINEERING GEOLOGIST IN THE STATE OF CALIFORNIA HEREBY EXIST. EDGE OF PAVEMENT. / h 2. THE SOILS REPORT TITLED GEOTECHNICAL INVESTIGATION LOVE RESIDENCE DATED 4/19/18 INCORPORATED HEREON. CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS PREPARED BY LA CRESTA GEOTECHNICAL INC. PROJECT# 1804 -1.9-01 SHALL BE MADE BY ME OR UNDER MY DIRECTION ON APRIL 19, 2018, ONE COMPLETE COPY OF THE SOILS EXIST. CONTOURS .... _ .......... ............................... - - -- 175 CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN 8, GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID SLOPE AT THE CONCLUSION OF EACH WORK DAY. OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND PROP. CONTOURS ................ ............................... REPORT. CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE PROP. RETAINING WALL ............. C- 04/C -09 ........... . 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY 9• ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH BEEN INCORPORATED IN THE GRA PLANS AND SPECIFICATIONS. WORKING DAY WHEN THE FIVE 5 DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PROP. CONCRETE . ......... ........ ................ a OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. PERCENT (40 7.). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. SIGNED: ` / /% /I�GL'��✓/� '' ,`�,j 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMPZIMP NOTES GE NO.: 2339 �1A KA 4" DRAIN PIPE .... ..... .......... .............. � a•�b =�m��t' �... ........ ......... ............. 5, CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT a4o23 � 6" AREA DRAIN. . . . . . ..... . 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS EXP. DATE: 6/30/2020 CEF .FED PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE FliU;NSER!, X QROfESS104q BIORETENTION BASIN .............. ............................... REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. ,a GEOLOGIST 'T o e AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE JOB #: 1804 -15 -01 A syF �y 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS PUBLIC STORM DRAIN SYSTEM. Or'CAt� n2F� Z RIP-RAP. D- 40............ DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED COMPANY: LA CRESTA GEOTECHNICAL INC. - CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL ADDRESS: 44055 TORTUGA ROAD No. GE 713 z SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY, -707770-LA, CA 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING PHONE: (951) 699 1494 *s9lF000G NOTE- SPECIAL INSPECTION SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES F OF cg. F FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO STATEMENT OF ENGINEER OF WORK PRIOR TO OCCUPANCY, FINAL INSPECTION, RELEASE OF SECURITIES, AS- GUILTS, AND /OR GRADING DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED PLAN SIGNOFF, WHICHEVER MAY COME FIRST, THE ENGINEER OF RECORD SHALL FIELD SURVEY AND 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (1/2) MILE OF A STRUCTURE FOR BMP /IMP FACILITY AND /OR THE TURF /LANDSCAPED AREAS. THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL VERIFY THAT THE CONSTRUCTED IMPERVIOUS SURFACE IS LESS THAN 10,OOOSF. A SIGNED AND HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE STAMPED INSPECTION REPORT SHALL BE PROVIDED TO THE ENGINEERING FIELD INSPECTOR. IF 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN 10,000SF OR MORE OF IMPERVIOUS SURFACE IS CREATED, THE PROJECT SHALL BE CONSIDERED A AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE PRIORITY DEVELOPMENT PROJECT FOR PURPOSES OF STORMWATER QUALITY TREATMENT AND SHALL 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE- CONSTRUCTION MEETING HAS BEEN EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY COME INTO FULL COMPLIANCE WITH THE PROVISIONS OF THE NPDES MS4 PERMIT AND THE CITY OF HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP /BMP AREA OR PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE- CONSTRUCTION MEETING SHALL HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS BMP DESIGN MANUAL. BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) DISCHARGE IT TO AN ADEQUATE IMP /BMP. ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT 633 -2770. THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF 6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE OWNER 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION ALTERED WITHOUT A PERMIT FROM THE CITY. CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM BODILY INJURY ARISIN ; SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE DANA LOVE THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY ENGINEER AND HIS /H IAGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH 1312 CREST DR. ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE AGENCY AND EMPLOY IJT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. ENCINITAS, CA 92024 HAULING OPERATION. OBTAINED. THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE / Q, ENCINITAS BLVD. SIGNATURE: DATE: �{ ���J SITE ADDRESS: 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR FI FINAL 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH DOUGLAS E. LOGAN GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS, THE TRASH ENCLOSURES 1312 CREST DR. SHALL BE PROVIDED STATING: `'THE GRADING UNDER PERMIT NO. 000000 HAS BEEN SHALL HAVE AN IMPERVIOUS, NON- COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER QFtOFESS /Ohq ENCINITAS, CA 92024 PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT ADDRESS: COASTAL ENGINEERING &SURVEYING INC, ��o E 4 <� SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ADDRESS: 310 VIA VERA CRUZ. #205 CO d�G 0� 2� APN: 262- 011 -13 SANTA FE DR. r^ PHONE NUMBER: 760- 510 -3152 0 92 - r THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH LEGAL DESCRIPTION OPERATION. THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO RCE EXPIRES: 12/31/2019 w � G 39726 A SITE ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF tr sY c� 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED EARTHWORK LOT 5 IN BLOCK A OF PALOF SAN HEIGHTS IN THE Z sTq �IVI� ��P CITY OF ENCINITAS COUNTY OF SAN DIEGO, STATE OF HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OIL /GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY - APPROVED STEEPEST EXISTING NATURAL SLOPE ON -SITE = 5 H: 1 V: OF CAQf CALIFORNIA, ACCORDING TO MAP THEREOF N0. 2114, N m OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT MAXIMUM VERTICAL DEPTH OF CUT = 3 -FT. FILED IN THE OFFICE OF THE COUNTY RECORDER OF AS 9� z REQUIRED AND DETERMINE TIONS S SUITABILITY OTE FILL TUPON D O THE DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE MAXIMUM VERTICAL DEPTH OF FILL = COMPLETION OF GRADING OPERA HE HA 2 -FT. SAN DIEGO COUNTY, JUNE 19, 1928. WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL SAN DIEGUITO WATER DISTRICT NOTES: CUT = 500 C.Y. FILL = 375 G.Y. OWNERS CERTIFICATE EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE I WE HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO EXPORT = 125 C.Y. ) DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE COMMITTEE (WASC). NOTE: EARTHWORK QUANTITIES ARE THEORETICAL ONLY AND DO NOT GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS INCLUDE SPOILS, SHRINKAGE, OR SWELLING. THE SITE. PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE IMPERVIOUS AREA (WE) HEREBY AGREE TO IDENTIFY, DEFEND, AND HOLD CITY AND REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR CITY'S OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN NON- EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE TOTAL IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 6.030 SQFT AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE LIMITS OF THIS PROJECT. TOTAL IMPERVIOUS AREA AFTER CONSTRUCTION: 12.260 SQFT ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF N MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE TOTAL INCREASE IN IMPERVIOUS AREA: 6.230 SOFT DEFENSE THEREOF, ARISING OUT OF, OR IN ANY MANNER CONNECTED FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE DIRECTLY OR INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OWNER OR VICINITY MAP FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR EXISTING IMPERVIOUS AREA TO REMAIN: 2.280 SOFT INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE OWNER'S AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, T.B. PG. 1167 -F1 CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER IMPERVIOUS AREA REPLACED: 3.750 SQFT � IMPERVIOUS AREA CREATED AND REPLACED: 9.980 SQFT OFFICIALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL WORK OR STRICT ACCORDANCE WITH SPECIFICATIONS. MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. CONSTRUCTION TOE PERMIT THE PERMIT CONNECTED WITHIN ED DIRECTLY PRIVATE 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND /OR ADJUST TO GRADE TOTAL AREA OF LAND DISTURBANCE PROPERTY OR PUBLI ASEMENTS SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) • 36,000 S.F. / 0.83 ACRES SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET SIGNATURE: DATE: 60 Z8� /g LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME DANA LOV DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL AT THE OWNER'S EXPENSE. /� BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. RANCHO COASTAL DEPARTMENT ENV. HEALTH BMP PROJECTS STATUS 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, 5 SERVICES. TO MAINTAIN MINIMUM 5 -FOOT SEPARATION WHEN PARALLELING WATER ENGINEERING &SURVEYING SHEET INDEX PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM 6. MINIMUM HORIZONTAL SEPARATION OF 10 -FEET REQUIRED BETWEEN FIRE HYDRANTS AND SINGLE SOURCE DEVELOPMENT CONSULTANT SHEET 1 COVER SHEET STANDARD UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SAN DIEGO GAS AND ELECTRIC VAULTS. 310 VIA VERA CRUZ, #205 SHEET 2 GRADING PLAN SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. SAN MARCOS, CA. 92078 Y�4� lo"25-18 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE 'CONSISTENT WITH THE CITY'S URBAN 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER (760) 510 -3152 Ph / (760) 510 -3153 Fax SHEET 3 EROSION CONTROL PLAN & NOTES SIGN DATE FOREST MANAGEMENT PROGRAM, TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BLIC WORKS PLANNING DIVISION PARKS AND RECREATION SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB -1953 IS REQUIRING THAT NO -LEAD BRASS OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL IS NOT CLEARLY EDDGELOD THEBTREE CANOPY T MUST PROTECTED GROUND). PLACE. EVENITY TREE MATERIALS TO BE NO -LEAD BRASS PARTS. f II APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE i8 �� �� (8 /c9'2 -/$ �� Ib UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC -17 OR WC -18. lz DATE SIGN DATE SI N DATE SIGN DATE N DATE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT APPROVALS DESIDGE BY: RW BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DWG. NO DESCRIPTION: POINT ID NO.1029 DESIGNATED AS ENC -35 INT, DATE PLANS P PARED UNDER SUPERVISION OF RECTO NDED:yI APPROVED: GRADING & DRAINAGE PLAN F R LOCATION: BRASS DISC CROSS AND CENTER PUNCHED INCENTER OF PUBLIC WORKS DATE: '! Il_I� �f tbVE -CHU RESIDENCE CUL -DE -SAC AT THE EAST END OF ORANGE VIEW DRIVE DOUGLAS E. LOGAN DATE PLANNING 312 CREST DR. ENCINITAS, CA 92024 13881 -G RECORD FROM: CITY OF ENCINITAS SURVEY CONTROL NETWORK R.C.E. N0. 39726 JESSE WENS CITY ENGIN CDP:17 -NIT REVIEWER ENGINEER ELEVATION: 243.24' DATUM: NAVD88 CITY ENGINEER DATE INSPECTOR DOUGLAS E. LOGAN EXP• 12 -31 -19 DATE AT L / CASE NO. 17 -235 CDP APN:262- 011 -13 SHEET 1 OF 3 R:\Projects\7698 - L0VE \7698- GP01.dwg 10/22/2018 2:11 PM l a. il CD /)u rj Ln W U r il il .5 ij J J Q t ::�i n LEI t� D� D CV � L �I I �O i..l � O t no lz il il W E: z O 7 = il 0- GRADING &DRAINAGE PLAN 1312 CREST DR. CASE No. 17-235 CDP PCC HEADWALL 12" 3' MIN. WIDE x 4" THICK OVERFLOW BERM ALONG DEEP ROOTED, DENSE, DROUGHT DRAINAGE SWALE -R OF BASIN, LINED WITH TOLERANT PLANTING SUITABLE OUTLET & NO. 2 6" MINUS ROCK. FOR WELL DRAINED SOIL BACKING RIP --RAP. TOP OF BERM 2 -3 HARDWOOD 10" F.G. = 384.0 8„ MULCH MIN. F.G. =383.3 RETENTION AREA j /\ —� —� F9 I I —I I I —I I I —I I I —I I LEI I I—I I I —I I I —I I _l I J� \ 24" MIN. SHALL BE LEVEL AND / \ \// I —I EEil I I —I I —I I —I I F1 I —_� I I —_d I l—1 I I—_) I I —_1 —I I _\ /\ ENGINEERED SOIL DEPRESSED FROM THE //� III — III —III— III — III — III — III _III — III—III— III— III_III \ \/� *SEE NOTE BELOW SURROUNDING GRADE \i \\ = = = = = = = = I =I _I I= I = _I, „ \ / 2 -3 OF �\ �a �a a 6a �a �a Da�\ 3/8 GRAVEL MIN. SE — \`/ „ ** SEE NOTE BELOW � �\� 3/4 CRUSHED ac </ ROCK DO SCARIFY BOTTOM OF \� \\ \/\ �, . EXCAVATION 30 MIL LDPE MEMBRANE/�' IMPERVIOUS LINER NO LINER ALONG R SIDE OF BASIN REAR BIORETENTION BASIN DETAIL SECTION A —A NOT TO SCALE *BIORETENTION "ENGINEERED SOIL° LAYER SHALL BE MINIMUM 24" DEEP "SANELY LOAM" SOIL MIX WITH NO MORE THAN 5% CLAY CONTENT. THE MIX SHALL CONTAIN 50 -60% SAND, 20 -30% COMPOST OR HARDWOOD MULCH, AND 20 -30% TOPSOIL, FREE OF STONES, STUMPS, ROOTS, OR SIMILAR OBJECTS, AND ALSO FREE OF NOXIOUS WEEDS. * *3/4" CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 24" AND HAVE A MINIMUM POROSITY OF 40 %. THE EFFECTIVE AREA OF THE BASIN SHALL BE LEVEL AND SHALL BE SIZED BASED ON CALCULATION. TYPICALLY FOR CROSS LOT DRAINAGE, THE SURFACE AREA OF THE BIORETENTION BASIN IS 9% OF THE IMPERVIOUS AREA DRAINING TO IT IF THE PONDING DEPTH IS 4" AND THE GRAVEL STORAGE DEPTH IS 12" WITH 40% VOIDS. THIS BASIN PROVIDES THOSE SAME STORAGE AND PONDING VALUES WITH A SMALLER FOOTPRINT AS DEEPER PONDING AND DEEPER GRAVEL LAYER IS SHOWN. SEE CALCULATIONS ON THIS SHEET CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK DESCRIPTION: POINT ID NO.1029 DESIGNATED AS ENC -35 LOCATION: BRASS DISC CROSS AND CENTER PUNCHED INCENTER OF CUL -DE -SAC AT THE EAST END OF ORANGE VIEW DRIVE RECORD FROM: CITY OF ENCINITAS SURVEY CONTROL NETWORK ELEVATION: 243.24' DATUM: NAVD88 3' MIN. OVERFLOW BERM ALONG OF BASIN, LINED WITH 6" MINUS ROCK. TOP OF BERM-' '' RETENTION AREA SHALL BE LEVEL AND DEPRESSED FROM THE SURROUNDING GRADE 12" MIN. ** SEE NOTE BELOW DEEP ROOTED, DENSE, DROUGHT TOLERANT PLANTING SUITABLE FOR WELL DRAINED SOIL 2 -3" HARDWOOD Add a rW_ 2 M, MIN.) F.G. =383.0 WORK TO BE DONE 10 DRIVEWAY OPENING, 6" P.C.C. OVER 6" CLASS II BASE WITH #6 O2 P.C.C. CONCRETE SURFACE (IMPERVIOUS) O3 CONCRETE PERVIOUS PAVERS PER DETAIL THIS SHEET (PERVIOUS) O4 CONCRETE PAVERS (IMPERVIOUS) O5 RAISED WOOD DECKING AROUND SPA WITH 1/8" GAP BETWEEN BOARDS PER ARCHITECTURAL PLANS (PERVIOUS). O LAWN O7 BOCCE BALL COURT PROPOSED KEYSTONE BLOCK WALL, 2' MAX. O PROPOSED RETAINING WALL PER SDRSD "C -9 ", OR PER LANDSCAPE PLAN. 10 RIP RAP AT EDGE OF BASIN ALONG PROPERTY LINE PER DETAIL THIS SHEET 11 INSTALL BIORETENTION BASIN PER DETAIL THIS SHEET 12 6" AREA DRAINS 13 4" PVC /ABS DRAIN PIPE ® 1% (MIN.) 14 2' x 2' NO. 2 BACKING RIP -RAP BASIN 15 EXISTING SEPTIC VERTICAL PIT TO REMAIN 16 EXISTING SEPTIC TANK TO REMAIN 17 PROP. FENCE PER ARCHITECTURAL PLANS 18 PROP. SITE WALL PER ARCHITECTURAL PLANS 19 COBBLE STONE PERIMETER (PERVIOUS). STORM WATER SIZING CALCS REAR BASIN • AREA DRAINING TO REAR BASIN =8,060 S.F. SIZE MINIMUM STORAGE BASED ON STANDARDS • 9% OF AREA =726 S.F. • 4" OF PONDING =242 C.F. • 12" GRAVEL W/ 40% VOIDS =290 C.F. SIZE STORAGE BASED ON REDUCED FOOTPRINT • REDUCE AREA TO 365 S.F. • 8" OF PONDING =244 C.F. • 24" OF GRAVEL W/ 40% VOIDS =292 C.F. DRAINAGE SWALE OUTLET & NO. 2 BACKING RIP -RAP. KEYSTONE �— WALL, OR PER LANDSCAPE PLAN, 2' MAX. %'_`24" MIN. ENGINEERED SOIL *SEE NOTE BELOW 2 " -3" OF 3/8" GRAVEL 3/4" CRUSHED ROCK `�-- SCARIFY BOTTOM OF EXCAVATION 30 MIL LDPE MEMBRANE ' ���' / /� / /. \ / / \ / / \ / / \ / /. \ '� "' IMPERVIOUS LINER NO LINER ALONG Ft' SIDE OF BASIN FRONT BIORETENTION BASIN DETAIL SECTION B —B PN IafQ&YfL1Wj *BIORETENTION "ENGINEERED SOIL" LAYER SHALL BE MINIMUM 24" DEEP `SANDY LOAM" SOIL MIX WITH NI MORE THAN 5% CLAY CONTENT. THE MIX SHALL CONTAIN 50 -60% SAND, 20 -30% COMPOST OR HARDWOOD MULCH, AND 20 -30% TOPSOIL, FREE OF STONES, STUMPS, ROOTS, OR SIMILAR OBJECTS, AN[ ALSO FREE OF NOXIOUS WEEDS. * *3/4" CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 12" AND HAVE A MINIMUM POROSITY OF 407o. THE EFFECTIVE AREA OF THE BASIN SHALL BE LEVEL AND SHALL BE SIZED BASED ON CALCULATION. TYPICALLY FOR NON -CROSS LOT DRAINAGE, THE SURFACE AREA OF THE BIORETENTION BASIN IS 4% OF THE IMPERVIOUS AREA DRAINING TO IT WITH A PONDING DEPTH OF 4" AND THE GRAVEL STORAGE DEPTI IS 12" WITH 40% VOIDS. AS -BUILT APPROVALS PUBLIC WORKS DOUGLAS E. LOGAN DATE PLANNING REVIEWER CITY ENGINEER DATE FRONT BASIN • AREA DRAINING TO FRONT BASIN =4,200 S.F. SIZE MINIMUM STORAGE BASED ON STANDARDS • 4% OF AREA =168 S.F. • 4" OF PONDING =56 C.F. • 12" GRAVEL W/ 40% VOIDS =68 C.F. NOTE - SPECIAL INSPECTION REQUIRED: • PRIOR TO OCCUPANCY, FINAL INSPECTION, RELEASE OF SECURITIES, AS- BUILTS, AND /OR GRADING PLAN SIGNOFF, WHICHEVER MAY COME FIRST, THE ENGINEER OF RECORD SHALL FIELD SURVEY AND VERIFY THAT THE CONSTRUCTED IMPERVIOUS SURFACE IS LESS THAN 10,000 S.F. A SIGNED AND STAMPED INSPECTION REPORT SHALL BE PROVIDED TO THE ENGINEERING FIELD INSPECTOR. IF 10,000 S.F. OR MORE OF IMPERVIOUS SURFACE IS CREATED, THE PROJECT SHALL BE CONSIDERED A PRIORITY DEVELOPMENT PROJECT FOR PURPOSES OF STORMWATER QUALITY TREATMENT AND SHALL COME INTO FULL COMPLIANCE WITH THE PROVISIONS OF THE NPDES MS4 PERMIT AND THE CITY OF ENCINITAS BMP DESIGN MANUAL. RCP PERMEABLE PAVER JOINT FILL - 1/8" TO 1/4" (NO. 4) RCP HYDROLOGIC AGGREGATE IN VOIDS PERVIOUS PAVERS BEDDING COURSE - 2" W/ MIN. 5/16" VOID THICK OF 1/8" TO 3/8" (NO. 8) AGGREGATE ° CHOKER COURSE - 4" 2 THICK OF 3/8" TO 1/2" 4" (NO. 57) CRUSHED ROCK MIN. 6" THICK ---'6 c CRUSH DF ROCK SOIL SUBGRA \. �� DEJVW /l • PAD D GRADING NOTE ROUND PERIMITER OF THE BUILDING FOOTPRINT SHALL SLOPE AWAY AT 2.0% MINIMUM FOR 5 -FEET. STORMWATER BMP's: • STORMWATER POLLUTION CONTROL BMP's TO BE PRIVATELY MAINTAINED AND NOT TO BE MODIFIED WITHOUT A PERMIT FROM THE CITY UTILITY NOTE: • ALL UTILITY SERVICE LINES TO THE PROPERTY INCLUDING CABLE, TELEPHONE, AND ELECTRIC SHALL BE INSTALLED UNDERGROUND. RETAINING WALL NOTE • TW = ELEVATION ® TOP OF WALL • BW = FINISH GRADE @ BOTTOM OF WALL (NOT TOP OF FOOTING) WEEP SCREED NOTE • BOTTOM OF WEEP SCREED TO BE A MINIMUM OF 8" ABOVE FINISHED LANDSCAPE AREAS & 2" ABOVE HARDSCAPE AREAS. THIS NOTE TO SUPERCEDE ELEVATIONS SHOWN ON PLANS SHOULD THERE BE ANY CONFLICT. SURVEY NOTE: ANY EXISTING SURVEY MONUMENTS SHALL BE PROTECTED -IN- PLACE. IF ANY MONUMENT IS DISTURBED OR DESTROYED IT SHALL BE REPLACED BY A LICENSED SURVEYOR. PERVIOUS PAVERS NOTE: • FOR THE PERVIOUS PAVEMENT WITH THE BANDS /GAPS /JOINTS HAVE TO ACCOUNT FOR 5% OF THE OVERALL DIMENSION. • THIS INCLUDES BOTH DRIVEWAY AND BACKYARD. • MAXIMUM PAVER DIMENSION IS 4'X4' FOR SLOPES LESS THAN 5% "X16" PCC FLUSH CURB OR DEEPENED G -1 CURB > 20 10 0 20 40 SCALE IN FEET SCALE: 1" = 20' NOTES: -ALL AGGREGATE MUST BE CLEAN /WASHED AND FREE OF FINES (SAND, SILT, ETC.) -THE PAVERS SHALL NOT BE SEALED ONCE THE VOID FILLER HAS BEEN ADDED -EACH COURSE SHALL BE VIBRATORY COMPACTED BEFORE PLACEMENT OF NEXT COURSE -NO IMPERVIOUS LINER OR FILTER FABRIC IS TO BE USED - SPECIAL APPROVAL REQUIRED FOR USE IN HIGHLY EXPANSIVE SOIL - SUBDRAIN MAY BE REQUIRED. PERVIOUS PAVER DETAIL NOT TO SCALE RANCHO COASTAL ENGINEERING & SURVEYING SINGLE SOURCE DEVELOPMENT CONSULTANT 310 VIA VERA CRUZ, #205 SAN MARCOS, CA. 92078 (760) 510 -3152 Ph / (760) 510 -3153 Fax NEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT INT. DATE PLANS PR ARED UNDER SUPERVISION OF RECOMMENDED: APPROVED: DATE: ` �� i'�� R.C.E. NO. 39726 JESS OWE S CITY ENGIN ENGNEEV DOUGLAS E. LOGAN EXP. 12 -31 -19 DATE DATE GRADING &DRAINAGE PLAN FCOVE—CHU RESIDENCE -'- 1312 CREST DR. ENCINITAS, CA 92024 CDP: 17-235 CIS CASE NO. 17 -235 CDP APN: 262- 011 -13 R: \Projects \7698 - L0VE \7698- GP02.dwg U � O N Ln U� zl Q O 0' Ln LEI . . O Q � DWG. N0. o �Lli Z 13881 -G z= w w 10/22/2018 2:13 PM U Z C.� z w af V U (n U w Z U QpOfESS /ON LL1 U, JG�pS E. �OCy� Fy z O h��4� ti O G z 0 0 C 39726 a w J * * sr clvi�_ P qTf J Q a OF CALF w Q� O RANCHO COASTAL ENGINEERING & SURVEYING SINGLE SOURCE DEVELOPMENT CONSULTANT 310 VIA VERA CRUZ, #205 SAN MARCOS, CA. 92078 (760) 510 -3152 Ph / (760) 510 -3153 Fax NEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT INT. DATE PLANS PR ARED UNDER SUPERVISION OF RECOMMENDED: APPROVED: DATE: ` �� i'�� R.C.E. NO. 39726 JESS OWE S CITY ENGIN ENGNEEV DOUGLAS E. LOGAN EXP. 12 -31 -19 DATE DATE GRADING &DRAINAGE PLAN FCOVE—CHU RESIDENCE -'- 1312 CREST DR. ENCINITAS, CA 92024 CDP: 17-235 CIS CASE NO. 17 -235 CDP APN: 262- 011 -13 R: \Projects \7698 - L0VE \7698- GP02.dwg U � O N Ln U� zl Q O 0' Ln LEI . . O Q � DWG. N0. o �Lli Z 13881 -G z= w w 10/22/2018 2:13 PM CHANGE NO. STORMWATER POLLUTION_ CONTROL BMP NOTES RELATIVE _TO CONSTRUCTION ACTIV CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED STEEL PANELS /PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE, STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. bUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436 -4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE. FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. NOTE: LOWER BAG ROW TO BE BURIED 6" UNDER GRADE. GRAVEL BAG CHECK DAM NOT TO SCALE BIORETENTION BASINS SHALL BE EXCAVATED AND USED AS DESILTING BASINS DURING CONSTRUCTION. THE SILT SHALL BE COMPLETELY REMOVED AND THE BIORETENTION BASIN COMPLETED ONCE FINAL SITE STABILIZATION IS ACHIEVED, PRIOR TO OCCUPANCY AND /OR FINAL. 1. SET POSTS AND EXCAVATE A 4 BY 4 IN (10 BY 10 CM) TRENCH UPSLOPE FROM AND ALONG THE LINE OF POSTS. I�r IllMl I;p /Ylli I•r / �j MII VIy i'p�y lgyy r I / V INY yI' /�- 'tll,pyV,411,411 I- III- III�IIlilll- 2. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND 17 INTO THE TRENCH. i 0 SILT FENCE EXISTING GROUND IN (10 CM) I* EXISTING ACCESSORY UNIT PAD-385.3± FF= 386.0± P �oi, ii 1, J it IJ— 11 -1 , m ED, 20'MIN. PROFILE - 1 -1/2" CRUSHED ROCK a a 4..l PUBLIC RIGHT -OF -WAY PUBLIC RIGHT -OF -WAY 3. BACKFILL AND COMPACT THE EL& `PROVIDE APPROPRIATE TRANSITION EXCAVATED SOIL. BETWEEN STABILIZED CONSTRUCTION FILTER FABRIC - 111_I I_I WT E C III �I] I_I I I_I I I III I I I SILT FENCE DETAIL NOT TO SCALE DESCRIPTION APPROVED DATE BENCHMARK AS -BUILT APPROVALS DESCRIPTION: POINT ID NO.1029 DESIGNATED AS ENC -35 INT, DATE LOCATION: BRASS DISC CROSS AND CENTER PUNCHED INCENTER OF PUBLIC WORKS CUL -DE -SAC AT THE EAST END OF ORANGE VIEW DRIVE DOUGLAS E. LOGAN DATE PLANNING RECORD FROM: CITY OF ENCINITAS SURVEY CONTROL NETWORK REVIEWER ELEVATION: 243.24' DATUM: NAVD88 CITY ENGINEER DATE inlcoGnTnR ENTRANCE AND PUBLIC RIGHT -OF -WAY STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE I ENGINEER DOUGLAS E. LOGAN SUPERVISION OF DATE: P9 R.C.E. N0. 39726 EXP. 12 -31 -19 ENGI VEL BAG' CK DAM d' APPLICABLE STANDARD PROJECT REQUIREMENTS BMPS SYMBOL DESCRIPTION DWG. N0. SC -1, PREVENTION OF ILLICIT DISCHARGES INTO MS4 SC -3, PROTECT OUTDOOR MATERIALS STORAGE AREAS SC -4, PROTECT MATERIALS IN OUTDOOR WORK AREAS SC -5, PROTECT TRASH STORAGE AREAS SHEET 3 OF 3 SC -6, STORM DRAIN INLET PROTECTION SD -1, MAINTAIN NATURAL DRAINAGE /HYDRO FEATURES SD- CONSERVE NATURAL AREAS, SOILS, AND VEGETATION SD -3, MINIMIZE IMPERVIOUS AREA SD -4, MINIMIZE SOIL COMPACTION SD -5, IMPERVIOUS AREA DISPERSION SD -7, LANDSCAPING OF NATIVE /DROUGHT TOLERANT ESS/ E. �z C 39726 OF CA�- LEGEND PROPERTY BOUNDARY SILT FENCE CONSTRUCTION ENTRANCE GRAVEL BAGS W � g O � U O (n (D W z U 20 10 0 N 20 40 LLJ w � SCALE IN FEET z O SCALE: 1" = 20' U C) z LLJ __jQ Q:�i Li Ln a� O RANCHO COASTAL ENGINEERING & SURVEYING SINGLE SOURCE DEVELOPMENT CONSULTANT 310 VIA VERA CRUZ, #205 SAN MARCOS, CA. 92078 (760) 510 -3152 Ph / (760) 510 -3153 Fax SION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT APPROVED: EROSION CONTROL PLAN FOR: LOVE —CHU RESIDENCE i` 1312 CREST DR. ENCINITAS, CA 92024 CITY ENGIN DA CDP:17 -235 ll / $ CASE NO. 17 -235 CDP APN: 262- 011 -13 R:\Projects\7698 - LOVE \7698- GP03.dwg U O N Lo U ro Ln L.LJ . . � O a 10/22/2018 2:15 PM z� DWG. N0. o LLJz 13881 —G �o SHEET 3 OF 3 w 10/22/2018 2:15 PM