2017-13419 G (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2 THE SOILS REPORT TITLED "REPORT OF LIMITED GEOTECHNICAL INVESTIGATION, PROPOSED KOVACHACCESSORY STRUCTURE, 1906 CREST DRIVE, ENCINITAS, CALIFORNIA' PREPARED BYGEOTECHNICAL EXPLORATION, INC., DATED SEPTEMBER 14, 2017, PROJECT NO. 17- 11591, SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FED -RAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (112) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7.30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770. 10, PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION, 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY, AN 'AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. 13419 -SG HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BYA QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OFANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DR41NAGEAND EROSION CONTROL MEASURES HAVE BEEN INSTALLED, 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATIONS. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OFANY SUCH MATERIAL. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT WILLIAM KOVACH AT (760) 753-7343,24 HOURS A DAY 2 EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER I AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAYARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. TALL EROSION CONTROL MEASURES PROVIDEDPER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKDAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3, ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES AND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITYAND/OR THE TURF/LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP/BMP, 6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7 THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED, 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS, THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON- COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY - APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAYBE REQUIRED FOR THIS STRUCTURE. SAN DIEGUITO WATER DISTRICT NOTES: 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC). 2 REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THEACCURACY OF THE LOCATION OF, OR THE EXISTENCE OR NON- EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, LE, LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BYSAN DIEGUITO WATER DISTRICT. 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNERS EXPENSE. 5. UTILITIES TO MAINTAIN MINIMUM 5 -FOOT SEPARATION WHEN PARALLELING WATER SERVICES. 6. MINIMUM HORIZONTAL SEPARATION OF 10 -FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEYARE SERVING. 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB -1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS. 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC QRGE ESS /O PROTECTION INACCORDANCE WITH WC-17 OR WC-18. �A ,a G LA1,,Sl PASCO LARET SUITER & ASSOCIATES CIVIL ENGINEERING + LAND PLANNING + LAND SURVEYING 535 North Highway 101, Ste A. Solana Beach, CA 92075 ph 858.259.8212 1 fr 858.259.4812 I plaaengineering.com CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE DESCRIPTION: ENC -39; 2.5" BRASS DISC LOCATION: NW QUADRANT BIRMINGHAM DR HORIZONTAL: N/A AND LAKE DRIVE RECORD FROM: ROS 18416 ELEVATION: 323.98' VERTICAL: N/A DATUM: NAVD88 Z3 No. 80356 cr- Exp.12/31/18 COUNTY DEPARTMENT OF ENVIRONMENTAL HEALTH D� +2o I� -I.AM� -tea g'LD°l SIGN DATE AS -BUILT APPROVALS f- Z1'11 PUBLIC WORI G LAWSSOjN�' DATE PLANNING LItXA'f /1 / 9 ts.- REVIEWER ER MAG60SKU DATE STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCHAS 3 "CRUSHED ROCKAND/OR CORRUGATED STEEL PANELS/PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATIONAND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER, DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITHA TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 4364151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTA/NMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECKAND CLEANUP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS, TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK.' A. SEWERS - SEPTIC - (858 }505 -6700 pCF1 B. GAS & ELECTRIC - SDGE - (760)1138 -6200 C. WATER - SAN DIEGUITO WATER DISTRICT-1- 800 - 227.2600 D. TELEPHONE - SBC BELL - (760)- 489 -3411 E. CABLE TV - COX COMMUNICATIONS- (760) -806 -9809 X -2233 2 CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE- (760)-633-2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. FIELD OPERATIONS DATE SIGN INT. DATE PLANS PREPARED UNDER SUPERVISION OF /p _ DATE: It 3.1"1 '/31 1, �� R.C.E. NO.: 80356 °7�I TYLER G LAWSON 9 / I EXP.: 12/31/18 PLANNING DIVISION LEGAL DESCRIPTION THAT PORTION OF LOT 4 OF BLOCK D" OF PALOMARES HEIGHTS, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 2114, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID SAN DIEGO COUNTY, JUNE 19, 1928, DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE WEST LINE OF SAID LOT 4, WITH THE NORTH LINE OF THE SOUTH 100 FEET OF SAID LOT 4; THENCE ALONG SAID WEST LINE, NORTH 0 °2121" EAST 85.08 FEET TO THE SOUTHWESTERLY CORNER OF THE LAND DESCRIBED IN DEED TO DAVID COINS, JR., RECORDED APRIL 9, 1963, AS DOCUMENT NO. 60376 OF OFFICIAL RECORDS; THENCE ALONG THE SOUTHERLY LINE OF SAID LAND, SOUTH 89 03839" EAST 570.38 FEET TO THE EASTERLY LINE OF SAID LOT 4; THENCE ALONG SAID EASTERLY LINE, SOUTH 2°0927" EAST 85.17 FEET TO SAID NORTH LINE OF THE SOUTH 100 FEET OF LOT 4; THENCE NORTH 89 °3839" WEST 574.12 FEET TO THE POINT OF BEGINNING. EARTHWORK DATA IMPERVIOUS AREA STEEPEST EXISTING NATURAL SLOPE ON -SITE = 2 H: 1 V SITE IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 1 iz796 SOFT MAXIMUM VERTICAL DEPTH OF CUT = 32 TOTAL IMPERVIOUS AREA AFTER CONSTRUCTION: 1552 SOFT MAXIMUM VERTICAL HEIGHT OF FILL = 3.3' INCREASE IN IMPERVIOUS AREA: 3,756 SOFT CUT= 115 CY FILL = 80 CY EXPORT = 35 CY REMEDIAL = 330 CY IMPERVIOUS AREA PROPOSED: 3,756 SOFT ABBREVIATIONS LEGEND BW = BOTTOM OF WALL ELEVATION FS = FINISHED SURFACE FG = FINISHED GRADE FL =FLOW LINE FF = FINISHED FLOOR GF = GARAGE FACE IE = INVERT ELEVATION TG = TOP OF GRATE ELEVATION TW = TOP OF WALL ELEVATION TSW = TOP STEM WALL /1 WILLIAM S. KOVACH AND MARILYN A. KOVACH CO- TRUSTEES OF THE WILLIAMAND MARILYN 1997 FAMILY TRUST 1906 CREST DRIVE ENCINITAS, CA 92024 SITE ADDRESS 1906 CREST DRIVE ENCINITAS, CA 92024 APN: 262 - 041 -24 -00 NOTE: PER SOILS ENGINEER RECOMMENDATIONS A MINIMUM OF _2' REMOVAL AND RECOMPACTION UNDER BUILDING AREAS OWNER'S CERTIFICATE I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITYAND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. I (WE) HEREBY AGREE TO INDEMNIFY, DEFEND, AND HOLD CITY AND CITY'S OFFICERS, OFFICIALS, EMPLOYEES, AND AGENTS HARMLESS FROM, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS, DEMANDS, CAUSES OF ACTIONS, LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING OUT OF, OR IN ANY MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OW R OR OWNERS AGENTS, EMPLOYEES, CONTRACTORS, SUBCONTRACTORS, OFFICIALS, OFFICERS, OR REPRESENTATIVES F ANY AND ALL WORK OR CONSTRUCTION COVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT 0 PROVED Of ANS WITHIN THE PRIVATE PROPERTY OR PUBLIC EASEMENTS. SIGNATURE' DATE: II Z- i WILLIAM KOVACH FOR T WILLIAM AND MARILYN 1997 FAMILY TRUST SOILS ENGINEER'S CE IFICATE I, JAIME A. CERROS A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON JULY 25, 2017 AND FOR AN UPDATE ON . ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, 1 HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS. SIGNED: RCE NO.: 34422 AGE NO.:2007 EXP. DATE: 09 -30 -19 st JOB >g: 17 -11591 STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED 3Y THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENT". AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. !W SIGNATURE: / DATE: TYLER G LAWSON PASCO, LARGT, SUITER & ASSOCIATES 535 N HWY 101, SUITE A, SOLANA BEACH, CA 92075 BMP PROJECT STATUS PH: (858) 259 -8212 RCEEXPIRES 12/31/18 SHEETINDEX 1. TITLE SHEET 2. GRADING SHEET 3. EROSION CONTROL SHEET STANDARD - • • - r - - r 0 10 /� DATE SIGN DATE SIGN DATE T ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT RE OMMENDED: APPROVED: SIMPLIFIED GRADING PLAN FOR- &A 1906 1906 CREST DRIVE dAX_ JESSE OWENS CHRIST HER L. MAG SKU APN; 262 - 041 -24 -00 11./* /(7 12-13 � DATE DATE PLANNING CASE NO: 16 -185 CDP 13419 -SG SHEET 1 OF 3 PLEA 2601 -01 0 rn U x QLu M U Z V o) 0 J N QOM «sQ" o! wx Lu U) (n N Low w0) J< }}S LO > N OxM < m aLna i � APN:262- 041 -18 -00 EXISTING OVERHEAD \ G UTILITIES TO REMAIN j EXISTING RETAINING 4 5 WALL.TO REMAIN ------ O L \ \ \ t N89" 39'38V 566:61' \ . } .: :. EXISTING A _ �PEJ(IST1�G TREE � EXISTING POWER _ STRU RE ( .1 m RIVA'TEPROPPRTY! POLE TO REMAIN TO BE REMOVED .' TO REMAIN A 350.12- °ti m ; v r - - - \ 1 \ 1 ✓� \ i 1 r' f /..... T � T -7 T : "�i" it :`" l � '" �XIStINGWA RMETER AN D KFCOW 1 1 357 68 3 . .?'7 ° T T'? ? i i"'l_ f " �\ \ PREV TER TO EMAIN _ '�j i =G- 344 7) _ = �? _ (FG= 353.0) \� , �� 1 (FG =347.5 - \ EX/STINGYREE rc FL 44.7 2 1 (FG- 350.1) TO REMAIN \ 4�� t / \ FSW =350.8 TSW =350.8 EXISTING STRUCTURE 1 ) APPROXIMATE LOCATION �� ( 7 ) \ TO REMAIN fG =3 6.8 /' EXISTING SEEPAGE i OF EXISTING SEPTIC �/ '2,70 SF J /, / _(1 O iFL =343.0 05=347AS =347.4 1 % � l TSW =353.7 PIT TO REMAIN TANK TO REMAIN �, B t n / x FG- -343.3 o - f �` /, f t a EXISTING RETAINING 1 1 f30 FYS / - ti 4 _ FG= 346.8 \ ) b i C ., �' 4 C \ r i 3t1 CONCRE: F WALL TO , FG -• 3.2 PROPOSED STRUCTURE � PAD ��. -_/ � � � Al �`f 58. 5 2.0% FF =3475 r 9 � t �- -- �- 2 \ F &SSTTN J TELLbCR PAD = 346.8 350 �) \ ?. ? O F' .4 }! 6 �.._. _..._ I Al EXISTINPMONTE Y m _. - ' \ APN: 262-041-24-00 \ Lu 3 ° TG =345.9 `� _- V U 0' \ PINE CITY `T ET TREE 1 4 152 -21 E R( S c V IE =342.9 -- 8 POi R MOV OF t FF = 350.0 BW -352.5 I ✓ v \ E D INITAS \ PAD = 349.3 ( �� EXISTING RETAKING �. t O "ITEM9 WALL TO REMAIN I �' (D . y FG =343.3 ° FG =346.8 �', TG =350.5 lVo / i ,i 7 EXISTINGAC PAVEMENT \ FG =3452 TG 345 6" PVC STORM TO REMAIN _ _ ... f ? 7 IE =348.0 i \ X 35 71 /� k\ i IE =344.4 DRAIN PIPE @ 5.0% 1 2 FS =349.9 I ` EXISTING STRUCTURE ` f 4 \ MA ✓ '; EXISTINGO ERHEAD F p�o f �� �' .I (UTILITIES TO REMAIN O \ FS =3474 G =349. TO REMAIN �� � � x GF = 347.2 GF = 347. 1 ( -2,707 SF) /I \ '� ' t i FL =343 D Q 347 y °. .a� a, V o pcc WALL m w 1 ' " ° Q p ?�. `�i 357 -Eif� x 357 89 i 1 \ ` �t �� - �0.. . A a FS =3469 FS =3471 0 �. m o l A 1 EXISTING OVERHEAD t -- `. C n Q o !\ X-4 10 � Al UTILITIES TO REMAIN f j t -.TOP Of �V � , o v � L� - yx 09 V � =j � � - ; <ti 1` E3d �, Al � ®HE � EXISTNGkPO_WER SLOPE ( - a k 35 .2 POLE REM FS =346.1 -� -s E � ( j LIE `V•0 - - -- E E - - - t�liE F y' - r E E- E EXISTING AC DRIVEWAY L 344.5; F -� E- = E E m (S- 344.5) (FS= 346.2) (FS =348.0 1 E -- - As, ; H - - - L EXISTING AC DRIVEWAY ? (- 10.0 °a �PROXSMATL�LOCI1TSChI ` $` E c . ` --- E`, TO EM ONE EXISTING UNDERGROUND ;; m - \ E 1 14 R TO REMAIN �" °' OF Team DRf�iAl �i � ��, ELECTRIC LINE �0 REMAIN \ � � (10.0 %) G � E E E E E E OHE � OHy � � \ REMAIN g� T E E � / E 1 34 �1 �l � - I i �, a � \ S 9 °39'35 °E 570 �., EXISTIN6T(iEE; N EXISTING GREENHOUSE APN: 262 - 041 -21 -00 EXISTING RETAINING PRIVATEPRO EXISTING FENCE PEi EXISTING WATER METER : r TO REMAIN TO REMAIN SIMPLIFIED GRADING PLAN WALL AND FENCE TO REM�iI TO REMAIN J PREV€N -TER (0 REMAIN d O SCALE. 9" = 90' HOLD CITY HARMLESS FOR DRAINAGE COVENANT SITE NOTES y m APN:262- 041 -18 -00 RECORDED Iz Z011 - - - - - - - - - - - -o - - - - - - - - - es - - - - - - a _ _ AS DOCUMENT # 1 - uq 1. TREES LOCATED WiTHIN CITY STREET RIGHT -OF -WAY, ON CITY PROPERTY, OR WiTH /N LEGEND N89 39' 38 "W 566 61' � 9 CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED iN d CHANGE NO. DESCRIPTION J DATE 0 291' u �8" PROPERTYCINE O w m 25' m PROPOSED PROJECT SITE 30' DRAWING NO. s RYSB _�ai APN:262 -041 -24 -00 BUILDING EXISTING 4YSB EXISTING RIGHT- OF- WAY/ADJACENT LOT LINE BL5 ;..,.,..d.,.;. N - - - - EXISTING EASEMENT "N°o INT. S89- 3935E 570.34' �� PLANS PREPARED UNDER SUPERVISION OF DATE: -J"r/7 R.C.E. NO.: 80356 TYLER G LAWSON EXP.: 12/31/18 W W W m 13419 -SG o z PROPOSED LIMIT DEGRADING PUBLIC WORKS - - - "-- APN: 262 - 041 -25 -00 APN: 262 - 041 -21 -00 EXISTING SETBACKS PLANNING GF = 3472 GARAGE FACE ELEVATION d CHANGE NO. DESCRIPTION J DATE ' d u �8" D D D CHECKED BY: p CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. BAK BAK. o: a _ o d PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. STORM DRAINPIPE (SIZE PER PLAN) /- APPROXIMATE GRADE / ATINVERT 2. ALL EXISTING SURVEY MONUMENTS TO BE PROTECTED IN PLACE. IFANY MONUMENT IS DISTURBED OR DESTROYED iT SHALL BE REPLACED BYA LICENSED LAND SURVEYOR AND A CORNER RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY. ` 3. ALL PRIVATE DRAINAGE SWALES TO MAINTAIN A MINIMUM OF 1.070. PCC HEADWALL DROUGHT TOLERANT 4. BMPS SHOWN TO BE PRIVATELY MAINTAINED. BMP AREA IS PERMANENT AND SHALL THICKNESS =8" PLANTS (TYP.) NOT BE REMOVED OR MODIFIED WITHOUT A PERMIT FROM THE CITY. KEY 2" HARDWOOD MULCH/ PROPOSED STEM WALL 1�E1 MAP MODIFIED CUTOFF WALL EMBEDMENT DEPTH =D GRASS COVER EQUIVALENT NOTES APPROVED EQUIVALENT „ _ 1% 1% O CONSTRUCT STEM WALL PER SEPARATE BUILDING PERMIT - PROPOSED DEEPENED FOOTING SCALE: 1 900 NOT ro SCALE 10^ 12" 18 "LAYER ENGINEERED SOIL Q CONSTRUCT DEEPENED FOOTING PER SEPARATE PLAN PROPOSED BUILDING OUTLINE ( (� SEENOTEBELOW ��� ���� @3 INSTALL S' WIDEX22 'LONG RIP RAP ENERGY DISSIPATER PER - - - - EXISTING CONTOUR LINE INSTALL LARGE COBBLE OR SDRSD D -00 TYPE 2, NO.2 BACKING, 1.1 FT THiCK 346 PROPOSED CONTOUR LINE 3' 2' 6' T 13' 4' VEGETATION OVERFLOW EDGES TO , ENSURE EROO SION DOES NOT OCCUR 2" LAYER OF 318" - GRAVEL ® INSTALL 6 "AREA DRAIN TO THESATISFACTION OF THE CITY ! - ® PROPOSED PERMANENT BMP AREA (SIZE PER PLAN) CONSTRUCT INSPECTOR AND ENGINEER OF WORK 5 INSTALL PCC MODIFIED CUTOFF WALL; IE =342.5 PCC WALKWAY O PROPOSED PCC PAVEMENT 6 "AREA DRAIN 30 "LAYER OF3l4 "GRAVEL 6 (,GJlC6 i� tsllTTER APPROXIMATE LOCATION o 0 0 0 0 0 SEE NOTE BELOW ; TOP SLOPE ::. EXISTING RETAINING WALL OF BERM BEYOND FG =3468 FF = 347.5 Q7 INSTALL 18 "X 18" BROOKS BOX CATCH BASIN FG =346.0 20% PAD 34 EXISTING EDGE OF PAVEMENT TOP FG =342.3 0 S !0 D , X68 PROPOSED 40 PVC DRAIN PiPE FG =342.2 21 OPE k \ tvO Q� FG q N9! LIMIT DEGRADING; $L , BIORETENTION "ENGINEERED SOIL" LAYER SHAH BE MINIMUM 18" DEEP y� KSo F MATCH EXISTING _ _ : "'� PER COUNTY OF SAN DIEGO LOW IMPACT DEVELOPMENT HANDBOOK: BIOFILTRATION F� _ =y PROPOSED RIP RAP ENERGY DISSIPATER ?•� BASIN' FG =342 5 = � ✓ j" € y' ,1 r APPENDIX G - BIORETENTION SOIL MEDIA (BSM) EXAMPLE SPECIFICATION. y i PER SDRSD D-40, -_ -_ -� _- r T" III I I- (__ € ( € No. 80356 - 3!4" CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 30" BUT MAY BE Ex p. 12/31/18 ROCKCLASS= No.2BACKiNG - 1 I I -III -) , 1 :__ `1 . ._.._ P T = 1.1, TYPE2 WITH NO SILL 4 ' -{ ._j ( DEEPENED TO INCREASE THE INFILTRATION AND STORAGE ABILITY OF THE { } DETAIL. THE EFFECTIVE AREA OF THE BASIN SHALL BE LEVEL AND SHALL Sp CIYi� �P r - DASHED LINE BE SIZED BASED ON CALCULATION. TYPICALLY, THE SURFACE AREA OF 9jF INSTALLXX22'RIPRAP _ REPRESENTS THE BIORETENTION BASIN IS 4% OF THE IMPERVIOUS AREA DRAINING TO OF CAS +F ENERGY DISSIPATER i- 4 "PVC DRAIN EXISTING GRADE IT. ALL BIORETENTION PLANTERS TO BE DEPRESSED AT LEAST 10" BELOW EXISTING EASEMENT NOTES PER SDRSD D-40 (I j ` t PIPE BIOFILTRATION BASIN ADJACENT FIN /SHED SURFACE. ®� Ill AN EXISTING EASEMENT FOR ROAD, PUBLIC UTILITIES, AND INCIDENTAL PURPOSES IN THE DOCUMENT RECORDED FEBRUARY28, 1984 AS INSTRUMENT NO. 84-71338 OF OFFICIAL RECORDS PER DETAIL THIS SHEET SECTION A A BIOFIL TRA TION BASIN DETAIL GRAPHIC SCALE 1 "= 10' NOT TO SCALE NOT TO SCALE 10 0 10 20 30 m 0 rn U x U Qm� UZUO�i 0 Q N Q U) 06 LL w F? U) Cl1 N u o C? }�} M LO � > N OxON) U Z CO aLOxa CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT APPROVALS DESIGNED BY: DRAWN BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT DRAWING NO. BAK BAK. TGL DESCRIPTION: ENC -39; 25" BRASS DISC LOCATION: NW QUADRANT BIRMINGHAM DR AND LAKE DRIVE RECORD FROM: ROS 18416 ELEVATION: 323.98' DATUM: NAVD88 HORIZONTAL: N/A VERTICAL: N/A � INT. DATE PLANS PREPARED UNDER SUPERVISION OF DATE: -J"r/7 R.C.E. NO.: 80356 TYLER G LAWSON EXP.: 12/31/18 RE OMMENDED: APPROVED: �� � / JESSE OWE S CHRIST PHER L. MA OSKU '=G' "� DATE DATE SIMPLIFIED GRADING PLAN FOR: 1906 CREST DRIVE APN: 262- 041 -24 -00 PLANNING CASE NO: 16 -185 CDP 13419 -SG PUBLIC WORKS A/^ TY R G LAWSON DATE n�� [ .l?`//�%ilc .ems QG�8 PLANNING REVIEWER 6/3 CHR STI OPHER M GDOSKU DATE INSPECTOR I SHEET 2 OF 3 PLSA 2601 -01 �S L ` 1 _ A - - N 1 L, { e . 89° 39' 38 "W 566.61 _ �l } r Z 1 y GRAVEL BAG CHECK X 350 ° DAMPER DETA 8 l E _ THIS SHET �- -e + + r x 3 f a.? 771 <, t + + + DROSEED PER t: i u tt i + NOTES THIS SHEET / .. .. ` + i PQ + + SILT FENCE PER + + + + + + I _ - -- - r THIS SHEET a DETAIL C + + 1 PROPOSED STRUCTURE E3NCdR E � � � � � �'1 i � � � � �' � � c + + � I -1l ` t i;[ALLrIL�V� HOME ++ X 35 % 7T � + i 350 07 A �. � ,r N + + t t3 EXISTING STRUCTURE It i + y.. __ {aJl I 4 ,-. 352,21 DAM PER DE _ �I _ + + - - --- -- -- THIS SHEET (NOT A PART) S SH X 353, + t + LIMItT OF + + + PROPOSED GRADING + + + + + 1 j a HYDROSEED PER + \ + + NOTES THIS SHEET SH EET + o d — .. ;+ Q + — , ✓ i r ' rr�+ + + + + _ - i _.._....... 7 '( I -h / + + + + + + + + d ° ^� l .a A � r A s � _l / 1­1­e'1.1-- ✓ 1 LL _z 1 + + _— ,y 351.09 ,t "M+ - - n eia �c>G,. h r, -. +-F + ...� n..S.,.J.2 _ - ._ -r �til y .. ___.. -... �� QyE \, 5 _ f ;_ OHE f _ - -- / { " i n x �, , t � —E �c E -- � -- �1 w _ .. – S r � r„ ur E E - -- E_ GRAVEL BAG CHECK —: – E - -- 1, O i STABILIZED CONSTRUCTI0�1 E – — E _ ,� J PAM PER DETAIL ENTRANCE PER — – E'\— — E OHE iTHIS� ET DETAIL THIS SHEET '., t ,,, t,. E'' , E E -- -- E E f+ of E E 2a sr� .l OyE c. ' \ t ' lE i D4 i —_ —;_' ` _— 9° 39' 35 E 570,34' ty It EROSION CONTROL LEGEND PROPOSED CONSTRUCTION TR -1 ENTRANCE PER DETAIL A GRAVEL BAGS PER DETAIL B SE4, SE -6, SE -10 SILT FENCE PER DETAIL C SE -1 n n n FIRER ROLL PER DETAIL E SC -5 - -- — FR LIMIT OF WORK W W HYDROSEEDING SS4 + + + + + + CHANGE NO. 3" TO 6" COARSEAGGREGI EXISTING GROUND 16'M/N. PLAN ' PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCEAND PUBLIC RIGHT -OF- WAY "LESSER DISTANCEALLOWED WITH CITY INSPECTOR APPROVAL t. RUNOFF GAr BETWEEN BAGS ACTS AS SPILLWAY DETAIL A: CONSTRUCTION ENTRANCE NOT TO SCALE DESCRIPTION APPROVED DATE BENCHMARK DESCRIPTION: ENC -39; 2.5" BRASS DISC LOCATION: NW QUADRANT BIRMINGHAM DR AND LAKE DRIVE RECORD FROM: ROS 18416 ELEVATION: 323.98' DATUM: NAVD88 TWO LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED EROSION CONTROL PLAN SCALE: 1 If = 10' DETAIL B: GRAVEL BAGS NOT TO SCALE SCALE ASS - BUILT APPROVALS HORIZONTAL: NIA °A �–' ` PUBLIC WOR' TYLM G LAWSON DATE PLANNING VERTICAL N!A_ REVIEWER CHRISTOPHER MAG(0SKU DATE M001=1­7nc 1. SET POSTS AND EXCAVATE A 4BY4IN(10BY10CM) TRENCH UPSLOPE FROM AND ALONG THE LINE OF POSTS. 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 2 STAPLE WIRE FENCING TO THE POSTS. 4 IN (10 CM) 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. FILTER FABRIC WIRE _ ADJACENT PROPERTY DISTURBANCE NOTE ALL OF THE WORK PROPOSED ON THIS PLAN IS EIITIRELY WITHIN THE APPLICANT'S PROPERTY IF ANY DISTURBANCE TO ADJACENT PROPERTIES IS ANTICIPATED AS A RESULT OF ANY PROPOSED WORK, A WRITTEN LETTER OF PERMISSION FROM THE ADJACENT PROPERTY OWNER MUST BE OBTAINED AND SUBMITTED TO THE CITY PRIOR TO START OF ANY SUCH WORK ANY DISTURBANCE ON THE ADJACENT PRIVATE PROPERTY THAT HAS NOT BEEN AUTHORIZED IN WRITING AND SUBMITTED TO THE CITY IS GROUNDS FOR A STOP -WORK TO BE ISSUED FOR THE PROJECT UNTIL THE REQUIRED PERMISSION IS OBTAINED. ADDITIONAL NOTES 1, EROSION CONTROL MEASURES (E.G. „JNDED FIBER MATRIX, VEGETATIVE JUTE MATING) MUST BE IMPLEMENTED WHERE APPLICABLE TO PREIZNI SUIL EROSION ON SITE SEDIMENT CONTROL MEASURES (E.G. SILT FEN(',1NG, .'-,BER ROLLS, GRAVEL BAGS) MUST BE IN PLACE TO PREVENT ERODED SOIL FROM LEAVING SITE. MATERIALS MANAGEMENT BMP MUST ALSO BE FOLLOWED TO ENSURE NO CONTACT OF RAINWATER WITH MATERIALS THAT MAY CONTRIBUTE TO WATER QUALITY DEGRADATION DOWNSTREAM (E.G. CONCRETz- OR STUCCO WASHOUT AREAS, COVERED STORAGE AREAS FOR HAZARC )US MATERIALS, PLACEMENT OF PORTABLE TOILERS OVER A PERVIOUS SURFACE. 2 NO DIRECTLY CONNECTED IMPERVIOUS AREAS (DCIA) SHALL BE ALLOWED. DCIA MEANS STORM RUNOFF GENERATED AND CONVEYED VIA IMPERVIOUS AREAS, SUCH AS ROOF, ROOF DRAIN, DRIVEWAY, AND FLATWORK. HYDROSEED NOTES 1. IT IS THE INTENT THAT THE HYDROSEED MIX BE APPLIED NO SOONER THAN JUST BEFORE THE FIRST RAIN IN OCTOBER AND NO LATER THAN JUST AFTER THE SECOND RAIN AFTER THE FIRST RAIN IN OCTOBER. 2 ALL DISTURBED SLOPES TO BE HYDROSEEDED UNLESS OTHERWISE NOTED. DESIL TING BASIN NOTE BIOFILTRATION BASIN SHALL BE EXCAVATED AND USED AS DESILTING BASIN DURING CONSTRUCTION. THE SILT SHALL BE COMPLETELY REMOVED AND THE BIORLTRAT ON BASIN COMPLETED ONCE FINAL SITE STABILIZATION IS ACHIEVED. DETAIL C: SILT FENCE GRAPHIC SCALE I"=10' NOT TO SCALE 10 0 10 20 30 INT. DATE PLANS PREPARED UNDER SUPERVISION OF A/A DATE: 1/ j Cq /�— R.C.E. NO.: 80356 E SI L TYLER G LAWSON /)iYf 4 L L R EXP.: 12/31/18 G No. 80356 Exp. 12/31/18 iy & ASSOCIATES 'IL ENGINEERING + LAND PLANNING + LAND SURVEYING I North Highway 101, Ste A. Solana Beach, CA 92075 858.259.8212 1 & 858.259.4,ic i plaaengineering.com ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - DEVELOPMENT SERVICES DEPARTMENT RE OMMENDED: APPROVED: SIMPLIFIED GRADING PLAN FOR: C�F�i/i/fw,;rlm1A4 1906 CREST DRIVE LS OWENS CHRIS PHER L. MAA )OSKU APN: 262 -04 i -24 -00 3 DATE ` DATE PLANNING CASE NO: 16 -185 CDP FbC, 1. ► ►• 13419 -Sv SHEET 3 OF 3 PLSA 2601 -01 X11 LO r N N U ~Q M 00 Uza O -i N tq QOto 06 r. w �t �An N W O � yS rn J S N O =C 0z 00 LO aLOa