2018-06-13 Item 08V FY 2017-18 Third Quarter Budget Status ReportMEETING DATE: June 13, 2018 PREPARED BY: DEPARTMENT: SUBJECT: Tom Gallup, Finance Manager Finance AGENDA REPORT City Council DEPT. DIRECTOR: Teresa S. McBroome CITY MANAGER: Karen P. Brust Fiscal Year 2017 -18 Third Quarter Budget Status Report and Proposed Budget Amendments RECOMMENDED ACTION: Staff recommends that City Council take the following actions: 1. Receive and file the Fiscal Year 2017 -18 Third Quarter Budget Status Report; and 2. Adopt Resolution No. 2018 -59 titled "A Resolution of the City Council of the City of Encinitas Amending the Fiscal Year 2017 -18 Budget" (Attachment 1) STRATEGIC PLAN: This agenda item falls within the Organizational Efficiency and Effectiveness focus area of the Strategic Plan by maintaining the City's financial health. FISCAL CONSIDERATIONS: The Finance Department has completed the third quarter review of the FY 2017 -18 budget, which includes recommendations for budget appropriations and budget transfers for Council consideration. Proposed third quarter budget amendments for all funds will increase estimated revenues by $30,000 and reduce budgeted expenditures by $329,013. The impact of all proposed General Fund amendments is an increase of $30,000 in estimated revenue and an increase of $58,000 in budgeted expenditures, for a net decrease in available fund balance of $28,000, as shown in Table 7 below Attachment 2 provides detailed descriptions of these proposed operating budget amendments. Proposed third quarter amendments to transfers between all funds total $459,573, as shown in Table 8 below The General Fund impact is an increase in capital transfers into the General Fund of $51,997 from closed projects, as shown in Table 6 below. Attachment 3 provides detailed descriptions of these proposed amendments to transfers. Approval of the third quarter operating budget amendments and fund transfer amendments will increase the General Fund available fund balance by $23,997. 2018 -06 -13 Item 08V 1 of 35 A summary of previous Council actions and available fund balance is included as Attachment 4. The available fund balance in the General Fund as of May 23, 2018 was $6,151,119, which includes all previous FY 2017 -18 General Fund budget amendments approved by the City Council since the adoption of the FY 2017 -18 budget through March 31, 2018. This balance does not include the proposed amendments under consideration or those approved after March 31, 2018. Table 1 below summarizes beginning fund balance as of March 31, 2018 (as reflected in Schedule A — Revised Budget Summary Third Quarter FY 2017 -18 in Attachment 5), current budget amounts, proposed revisions, adjusted budget amounts and ending fund balances for the General Fund and all other funds following adoption of the proposed amendments. Table 1 FY 2017 -18 Third Quarter Budget summary General Fund Current Third Quarter Revisions Adjusted Budget Beginning Fund Balance (7/1/17) $ 25,651,592 - $ 25,651,592 Revenues 71,609,810 30,000 71,639,810 Expenditures (64,622,172) (58, 000) (64, 680,172) Transfers -In 1,354,195 51,997 1,406,192 Transfers -Out 13,153,346 13,153,346 Ending Projected Fund Balance $ 20,840,079 $ 23,997 $ 20,864,076 BACKGROUND: On June 28, 2017, the City Council adopted Resolution 2017 -51, approving the FY 2017 -18 Operating Budget and Capital Improvement Program (CIP) appropriations. On November 29, 2017, the City Council received the Report on the Financial Results for Fiscal Year 2017 -18 and adopted the ending fund balances for FY 2017 -18 as beginning fund balances for FY 2017 -18. Beginning fund balance in the General Fund for FY 2017 -18 was $25,651,592, with $10,987,099 unrestricted and available for appropriation after reserve requirements were met, as shown in Attachment 4. The unrestricted General Fund balance was projected to be drawn down $1,189,960 for planned capital projects, leaving $9,797,139 available for City Council appropriation at the beginning of FY 2017 -18. On December 20, 2017, the City Council received the FY 2017 -18 First Quarter Budget Status Report and adopted Resolution 2017 -113 amending the FY 2017 -18 Operating Budget, resulting in an available General Fund fund balance of $8,175,678. On March 28, 2018, the City Council received the FY 2017 -18 Mid -Year Budget Status Report and adopted Resolution 2018 -32 amending the FY 2017 -18 Operating Budget, resulting in an available General Fund balance of $6,242,794. Attachment 4 lists all Fiscal Year 2017 -18 General Fund budget amendments approved by the City Council since adoption of the original budget. Through May 23, 2018, the available fund balance is $6,151,119. Adopting the proposed third quarter budget and transfer amendments will increase the General Fund available fund balance by $23,997 to $6,175,116. 2018 -06 -13 Item 08V 2 of 35 ANALYSIS: Schedule A — Revised Budget Summary Third Quarter FY 2017 -18 (Attachment 5) provides the adjusted budget summary for all city funds for the current fiscal year. Schedule C — Detail of General Fund Revenue, Expenditures and Transfers (Attachment 6) presents a summary of budget versus actuals for General Fund operating revenues, expenditures and transfers. General Fund Revenues Table 2 below provides General Fund revenue totals by adopted budget, amended budget, year -to -date (YTD) actual and proposed third quarter amendments. Through nine months, General Fund revenues are $47,091,251 which is 66% of the total estimated revenue for the fiscal year. Table 2 Over 85% of General Fund revenue is generated from taxes, with property tax alone accounting for over 60% of total General Fund revenue. A higher percentage of property tax revenue is received in the second half of the fiscal year than in the first half. Receipts for taxes paid for the second installment due in April are not received by the City until the fourth quarter of the fiscal year. Similarly, revenue from franchise taxes is largely collected in the second half of the fiscal year, mostly in the fourth quarter. Sales tax revenue is expected to slightly exceed projections at year -end. Through nine months, sales tax revenue is at 61 % of the projected budget. The advance payment for February was received after March 31, and the advance payment for March and clean -up payment for the first quarter (January through March) allocation is expected to be received in June. These payments are estimated to total $2.3 million. Revenues in the Use of Money and Property category have exceeded projections primarily due to higher than anticipated revenue from renegotiated leases for cell towers at City parks. Revenues collected in the Fines and Penalties for the first nine months of the current fiscal year is slightly lower than projected due to lower than anticipated revenue from fewer citations issued and fines collected for vehicle code, parking and red light camera violations. This category typically sees relatively higher revenues collected from parking citations in the fourth quarter (spring and early summer). Revenues in the Other Revenues category are lower than projected at this point in the fiscal year because of outstanding reimbursements due for firefighter strike team deployments that 2018 -06 -13 Item 08V 3 of 35 General Fund Revenue summary (March 31, 2018) Budget with Adopted Amended Percent Proposed Proposed Budget Budget YTD Actual Realized Budget Amendments Description 2017 -18 2017 -18 2017 -18 2017 -18 Amendments 2017 -18 Property Tax $ 43,192,718 $ 43,192,718 $ 27,693,609 64% $ $ 43,192,718 Documentary Transfer Tax 550,000 550,000 318,220 58% 550,000 Sales Tax 13,263,424 13,263,424 8,119,321 61% 13,263,424 Transient Occupancy Tax 1,688,000 1,688,000 1,409,480 83% 1,688,000 Franchise Tax 2,277,500 2,277,500 1,135,470 50% 2,277,500 Licenses, Fees and Permits 246,000 246,000 178,407 73% 246,000 Intergovernmental Revenue 530,346 619,140 509,703 82% 619,140 Charges for Services 7,006,469 7,070,769 5,582,592 79% 30,000 7,100,769 Fines and Penalties 746,653 746,653 473,247 63% - 746,653 Use of Money and Property 751,003 738,203 1,030,086 140% 738,203 Other Revenue 600,200 1,217,403 641,116 53% 1,217,403 Revenue Total $70,852,313 $71,609,810 $ 47,091,251 66% $ 30,000 $71,639,810 Over 85% of General Fund revenue is generated from taxes, with property tax alone accounting for over 60% of total General Fund revenue. A higher percentage of property tax revenue is received in the second half of the fiscal year than in the first half. Receipts for taxes paid for the second installment due in April are not received by the City until the fourth quarter of the fiscal year. Similarly, revenue from franchise taxes is largely collected in the second half of the fiscal year, mostly in the fourth quarter. Sales tax revenue is expected to slightly exceed projections at year -end. Through nine months, sales tax revenue is at 61 % of the projected budget. The advance payment for February was received after March 31, and the advance payment for March and clean -up payment for the first quarter (January through March) allocation is expected to be received in June. These payments are estimated to total $2.3 million. Revenues in the Use of Money and Property category have exceeded projections primarily due to higher than anticipated revenue from renegotiated leases for cell towers at City parks. Revenues collected in the Fines and Penalties for the first nine months of the current fiscal year is slightly lower than projected due to lower than anticipated revenue from fewer citations issued and fines collected for vehicle code, parking and red light camera violations. This category typically sees relatively higher revenues collected from parking citations in the fourth quarter (spring and early summer). Revenues in the Other Revenues category are lower than projected at this point in the fiscal year because of outstanding reimbursements due for firefighter strike team deployments that 2018 -06 -13 Item 08V 3 of 35 have not yet been received from the State of California, but are expected to be recorded by the end of the fiscal year. Current fiscal year revenues are $4,781,392 greater at this point than through the first nine months of FY 2016 -17. Table 3 below identifies the variances per category: Table 3 General Fund Revenue Summary (March 31, 2018) YTD Actual YTD Actual Description 2016 -17 2017 -18 $ Variance % Variance Property Tax $ 24,448,039 $ 27,693,609 $ 3,245,570 13.3% Documentary Transfer Tax 364,301 318,220 (46,081) -12.6% Sales Tax 7,523,802 8,119,321 595,519 7.9% Transient Occupancy Tax 1,258,440 1,409,480 151,040 12.0% Franchise Tax 1,015,524 1,135,470 119,946 11.8% Licenses, Fees and Permits 195,633 178,407 (17,226) -8.8% Intergovernmental Revenue 405,934 509,703 103,769 25.6% Charges for Services 5,179,879 5,582,592 402,713 7.8% Fines and Penalties 558,828 473,247 (85,581) -15.3% Use of IVloney and Property 740,332 1,030,086 289,754 39.1% Other Revenue 619,147 641,116 21,969 3.5% Revenue Total $ 42,309,859 $ 47,091,251 $ 4,781,392 11.3% Documentary Transfer Tax is an excise tax imposed on documents exchanged in the transfer of ownership interests in real estate. The City's share of the tax is 27.5 cents per $500 of the property value. Revenues collected in this category are lower than projected through the same period in FY 2016 -17 due to fewer home sales. While San Diego County set a new all -time high for its median sale price for the first time since the recession, inventory remains tight. The housing market closed 2017 with a year- over -year decline in December home sales. Revenues collected in the Licenses, Fees and Permits category are also lower compared with the previous fiscal year. The number of building inspections being processed for the year is slightly lower than anticipated due to lower activity levels this fiscal year. Additionally, a large number of short -term rental compliance payments were received last fiscal year as the result of an audit. In the Fines and violations issued 2016 -17. Penalties category, the number of citations for parking and red light camera is lower this fiscal year through March compared with the same period in FY 2018 -06 -13 Item 08V 4 of 35 General Fund Expenditures Third quarter General Fund expenditures amount to $44,178,694, or 68% of the budget, as shown in Table 4 below. Table 4 Expenditures in the personnel category are slightly under budget at third quarter and are projected to finish the year under budget due to vacancies throughout the year. The materials and supplies category is under budget mostly due to lower than anticipated expenditures during the first nine months on: • Maintenance and repair supplies for streets, beaches and trails. • Park maintenance supplies (required for spring maintenance) that will be purchased in the fourth quarter. • Equipment and recreation program purchases for Marine Safety and Parks, Recreation and Cultural Arts that occur in the fourth quarter, prior to the summer season. • Firefighting equipment. • Firefighter uniforms and personal protective equipment that will be purchased in the fourth quarter. • Postage and office supplies that are centrally purchased for all City departments. Year -to -date actuals through the third quarter in the contracts and services category are under the revised budget for the current fiscal year mostly due to the following reasons: • Fewer payments than budgeted for law enforcement services occurring during the first nine months of the fiscal year. As of third quarter, this contract was 67% expended with eight of twelve monthly payments having been made. Monthly payments total approximately $1.2 million. • Approximately $428,000 in administrative fees assessed by the County of San Diego for property tax collection are scheduled to paid in the fourth quarter of the fiscal year. • Expenditures for contract inspection services for private development were lower than anticipated. • Lower than anticipated expenditures for urban forestry tree care services and public works general repair services over the first nine months. The new contract for tree care services was approved on December 20, 2017, and approval of the general repair services contract is pending. • The contract for storm drain inventory consulting services budgeted at $73,000 was approved on April 18, 2018, and there were fewer repairs made to storm drains. • A reduction in water consumption in the Park Maintenance Division, partly due to the installation of new artificial turf at Leo Mullen Sports Park. • Lower than anticipated expenditures for beach maintenance. 2018 -06 -13 Item 08V 5 of 35 General Fund Expenditures Summary by Category (March 31, 2018) Budget with Adopted Amended Percent Proposed Proposed Budget Budget YTD Actual Realized Budget Amendments Description 2017 -18 2017 -18 2017 -18 2017 -18 Amendments 2017 -18 Personnel $32,026,881 $32,796,548 $ 24,430,341 74% $ (117,900) $32,678,648 Materials & Supplies 1,404,631 1,456,691 825,687 57% - 1,456,691 Contracts & Services 28,484,418 29,502,784 18,487,176 63% 177,850 29,680,634 Internal Cost Allocation 431,013 431,013 323,260 75% - 431,013 Capital Outlay 125,845 302,402 110,286 36% (1,950) 300,452 Debt/Finance 128,975 128,975 1,944 2% - 128,975 Expenditure Total $62,601,763 $64,618,413 $ 44,178,694 68% $ 58,000 $64,676,413 Expenditures in the personnel category are slightly under budget at third quarter and are projected to finish the year under budget due to vacancies throughout the year. The materials and supplies category is under budget mostly due to lower than anticipated expenditures during the first nine months on: • Maintenance and repair supplies for streets, beaches and trails. • Park maintenance supplies (required for spring maintenance) that will be purchased in the fourth quarter. • Equipment and recreation program purchases for Marine Safety and Parks, Recreation and Cultural Arts that occur in the fourth quarter, prior to the summer season. • Firefighting equipment. • Firefighter uniforms and personal protective equipment that will be purchased in the fourth quarter. • Postage and office supplies that are centrally purchased for all City departments. Year -to -date actuals through the third quarter in the contracts and services category are under the revised budget for the current fiscal year mostly due to the following reasons: • Fewer payments than budgeted for law enforcement services occurring during the first nine months of the fiscal year. As of third quarter, this contract was 67% expended with eight of twelve monthly payments having been made. Monthly payments total approximately $1.2 million. • Approximately $428,000 in administrative fees assessed by the County of San Diego for property tax collection are scheduled to paid in the fourth quarter of the fiscal year. • Expenditures for contract inspection services for private development were lower than anticipated. • Lower than anticipated expenditures for urban forestry tree care services and public works general repair services over the first nine months. The new contract for tree care services was approved on December 20, 2017, and approval of the general repair services contract is pending. • The contract for storm drain inventory consulting services budgeted at $73,000 was approved on April 18, 2018, and there were fewer repairs made to storm drains. • A reduction in water consumption in the Park Maintenance Division, partly due to the installation of new artificial turf at Leo Mullen Sports Park. • Lower than anticipated expenditures for beach maintenance. 2018 -06 -13 Item 08V 5 of 35 Expenditures for capital outlay are under budget at third quarter. Purchases of a concert grand piano for the Community Center and a pad and lighting system for public art at four locations budgeted in this category are expected to be made during the fourth quarter of the fiscal year. Expenditures in the debt / finance category are under budget. The debt service payment of $127,000 for the Next Generation (NextGen) Regional Communications System (RCS) is paid in the fourth quarter. Table 5 below shows the variances for each General Fund expenditure category compared with YTD expenditures through the third quarter of FY 2016 -17. Table 5 General Fund YTD Expenditures -Variance by Category (Through March 31, 2018) YTD Actual YTD Actual Description 2016 -17 2017 -18 $ Variance % Variance Personnel $ 22,787,080 $ 24,430,341 $ 1,643,261 7.2% Materials & Supplies 698,398 825,687 127,288 18.2% Contracts & Services 17,125,724 18,487,176 1,361,452 7.9% Internal Cost Allocation 339,491 323,260 (16,231) -4.8% Capital Outlay 21,324 110,286 88,962 417.2% Debt /Finance - 1,944 1,944 100.0% Expenditure Total $40,972,017 $44,178,694 $ 3,206,677 7.8% General Fund expenditures (excluding transfers out and capital contributions) through the first nine months of FY 2017 -18 are $3.2 million higher than the same period in FY 2016 -17. This overall variance is primarily the result of increased expenditures of $1.6 million in the personnel category and $1.4 million in the contracts and services category. Although year -to -date expenditures are higher overall than last fiscal year, all categories are projected to be within budget for the current fiscal year. The variance in personnel expenditures is due to: • Budgeted salary increases for employees approved by the City Council and identified in the executed Memorandum of Understanding (MOU) with the Service Employees International Union (SEIU), and in a separate resolution for unrepresented employees. • Higher unfunded pension liability payments to CalPERS. • Increased expenditures for Other Post - Employment Benefits (OPEB), primarily retiree health benefits provided to firefighters hired before March 1995. • Positions that were vacant during the first nine months of FY 2016 -17, and are now filled in the current fiscal year. The overall variance in the contracts and services category from FY 2016 -17 is mostly the result of increased budgeted expenditures for the following: • Contracted law enforcement services with the Sheriff's Department. • Landscape and tree maintenance contracts in the Street and Park Maintenance Divisions. • Road striping and street maintenance in the operating budget. • Contract engineering inspection services for backfilling permanent inspector vacancies. • Animal control services contract with the County of San Diego. This category is under budget at mid -year and is projected to be within budget by the end of the year. 2018 -06 -13 Item 08V 6 of 35 General Fund Transfers Transfers involve moving budgeted appropriations between funds. Staff is proposing increasing transfers into the General Fund by $51,997 for the return of unspent funds from closed capital and work projects. Transfers out of the General Fund consist of operating transfers, transfers for debt service payments and transfer to fund capital projects. Staff is not proposing any additional transfers out at this time. Table 6 below provides a summary of proposed third quarter transfers. Table 6 General Fund Transfers Summary (March 31, 2018) Adopted Amended Fund Balance Percent Proposed Revised Budget Budget YTD Actual Realized Budget Projections Description 2017 -18 2017 -18 2017 -18 2017 -18 Amendments 2017 -18 Transfers In $ 1,214,191 $ 3,444,195 $ 1,267,042 37% $ 51,997 $ 3,496,192 Transfers Out 10,654,702 13,018,675 12,162,760 93% - 13,018,675 General Fund Transfers Total $ (9,440,511) $ (9,574,480) $ (10,895,718) 114% $ 51,997 $ (9,522,483) Proposed Budget Amendments (Attachment 2) Detailed explanations for each proposed budget amendment (arranged by Department, Division and Fund) are included in Attachment 2. Table 7 below provides a summary of all the proposed operating budget amendments by fund, with additional detail provided in Attachment 2: Table 7 Third Quarter Operating Budget Amendment Summary Revenue Expenditure Fund Balance Increase Increase Increase Description (Decrease) (Decrease) (Decrease) General Fund (101) $ 30,000 $ 58,000 $ (28,000) Capital Improvement Funds (401/402) - (387,013) 387,013 Fleet Maintenance Program Fund (621) 3,906 (3,906) Vehicle Replacement Program Fund (622) (64,357) 64,357 E ui ment Replacement Program Fund 623 - 60,451 60,451 Operating Budget Amendment Total $ 30,000 $ (329,013) $ 359,013 2018 -06 -13 Item 08V 7 of 35 Proposed Adjustments to Transfers between Funds (Attachment 3) In addition to the third quarter appropriations, several budget transfers have been identified, which require City Council approval. The transfers are summarized below in Table 8 and detailed in Attachment 3: Table 8 Fund Transfer Amendments - Third Quarter Transfer In Transfer Out Increase Increase Fund (Decrease) (Decrease) General Fund (101) $ 51,997 $ - Capital Improvements Fund (401) 36,280 423,293 Park Development Fund (231) 371,296 Open Space Acquisition Fees Fund (235) - 26,280 Recreation Trails Fees Fund 236 - 10,000 Fund Transfer Amendments Total $ 459,573 $ 459,573 Capital Improvement Program Status Update (Attachment 7) There were 119 active projects with project -to -date expenditures totaling approximately $50 million as of March 31, 2018. Staff is requesting that the following four completed projects be closed and unspent funds be returned to their original funding sources as identified in Attachment 3: • La Costa Basin Permitting (WD16B) • Coastal Rail Trail Western Alignment (CS18F) • Park Shade Structures (CP18A). Expenditures for park shade structures will now be budgeted and funded in the Park Improvements project (CP04G). • Alternative Fuels Study (WC15H) Other transfer amendments include committing uncommitted funds collected from Development /Impact Fees for habitat /open space acquisition and recreation trails, in compliance with the 1996 Mitigation Fee Act. As a result of closing these projects, $51,997 will be returned to the unassigned General Fund balance and $407,576 to other funding sources. Status updates and project -to -date expenditures for active projects are provided in Attachment 7. ENVIRONMENTAL CONSIDERATIONS: The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it is not a "project" under Section 15378(b)(5) of CEQA Guidelines. The action involves an organizational or administrative activity of government that will not result in the direct or indirect physical change in the environment. This item does not relate to the City's Climate Action Plan. ATTACHMENTS: 1. Resolution No. 2018 -59 titled "A Resolution of the City Council of the City of Encinitas Amending the Fiscal Year 2017 -18 Budget" 2. FY 2017 -18 Proposed Operating Budget Amendments — Third Quarter 3. FY 2017 -18 Proposed Fund Transfer Amendments — Third Quarter 4. FY 2017 -18 Summary of Budgetary Fund Balance 5. Schedule A: Revised Budget Summary — Third Quarter FY 2017 -18 6. Schedule C: General Fund Revenues, Expenditures and Transfers Detail 7. FY 2017 -18 YTD Capital Improvement Project Status Report (Third Quarter) 2018 -06 -13 Item 08V 8 of 35 ATTACHMENT 1 RESOLUTION NO. 2018 -59 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ENCINITAS AMENDING THE FISCAL YEAR 2017 -18 BUDGET WHEREAS, on June 28, 2017 the City of Encinitas City Council adopted Resolution No. 2017 -51 appropriating the budget for Fiscal Year 2017 -18; WHEREAS, changes in anticipated revenues and /or expenditures of the City of Encinitas necessitates a revision of the appropriations for Fiscal Year 2017 -18; WHEREAS, budgeted expenditures do not exceed anticipated revenue and available fund balance; and WHEREAS, the City Council has reviewed the proposed Fiscal Year 2017- 18 budget amendments. NOW, THEREFORE, BE IT RESOLVED, DETERMINED AND ORDERED that the City Council of the City of Encinitas does, hereby, adopt the amendments for Fiscal Year 2017 -18 as shown in Exhibit A to this resolution. PASSED AND ADOPTED this 13th day of June 2018, by the following vote, to wit: AYES: NAYS: ABSENT: ABSTAIN: Catherine S. Blakespear, Mayor ATTEST: Kathy Hollywood, City Clerk 2018 -06 -13 Item 08V 9 of 35 EXHIBIT A - RESOLUTION 2018 -59 # Fund Name Fund Organization Object Project Description Revenue/ Expenditure/ Code Code No. Transfer In Transfer Out Increase Increase (Decrease) (Decrease) 1 CIP -NEW 402 95101 590 CS18F Project is complete. Close and return remaining funds to the General Fund $ (0) (101) 2 CIP -NEW 402 95231 590 CP18A Close project and return remaining funds to the Park Development Fund $ (371,296) (231) CP18A 3 CIP -NEW 402 00000 498.2 CP18A Close project and return remaining funds to the Park Development Fund $ 371,296 (231) CP18A 4 PARKDEV 231 00000 398.2 CP18A Close project and return remaining funds to the Park Development Fund $ 371,296 (231) CP18A 5 CIP - EXISTN 401 95101 590 WC15H Project is complete. Close and return remaining funds to the General Fund $ (1,997) (101) 6 CIP - EXISTN 401 00000 498.2 Project is complete. Close and return remaining funds to the General Fund $ 1,997 (101) WC15H 7 GENFUND 101 00000 398.2 Project is complete. Close and return remaining funds to the General Fund $ 1,997 (101) WC15H 8 CIP - EXISTN 401 95101 590 WD16B Project is complete. Close and return remaining funds to the General Fund $ (50,000) (101) 9 CIP - EXISTN 401 00000 498.2 Project is complete. Close and return remaining funds to the General Fund $ 50,000 (101) WB16B 10 GENFUND 101 00000 398.2 Project is complete. Close and return remaining funds to the General Fund $ 50,000 (101) WB16B 11 CIP - EXISTN 401 95235 590 CP05A Appropriate the uncommitted balance to project CP05A - Open Space $ 26,280 Acquisition 12 CIP - EXISTN 401 00000 398.2 Appropriate the uncommitted balance to project CP05A - Open Space $ 26,280 Acquisition 13 OPENSPACE 235 90999 498.2 Appropriate the uncommitted balance to project CP05A - Open Space $ 26,280 Acquisition 14 CIP - EXISTN 401 95236 550 CPOOF Appropriate the uncommitted balance to project CPOOF - Recreational Trails $ 10,000 Project 15 CIP - EXISTN 401 00000 398.2 Appropriate the uncommitted balance to project CPOOF - Recreational Trails $ 10,000 Project 16 RECTRAILS 236 90999 498.2 Appropriate the uncommitted balance to project CPOOF - Recreational Trails $ 10,000 Project 17 GENFUND 101 80876 346.1 PR323 Increase revenue budget due to an increase in program fees. $ 30,000 18 GENFUND 101 80876 432.1 PR323 Increase expenditure budget to pay instructor for increase in program fees. $ 22,500 19 GENFUND 101 80820 441.1 PBMLB Increase utilities due to construction of the new Marine Safety Center. $ 7,500 20 GENFUND 101 40360 431.1 Increase budget due to bank fees increasing approximately 40% $ 28,000 21 GENFUND 101 20320 431.1 Increase contracts and services budget for recruitment services. $ 45,900 22 GENFUND 101 51400 411.1 Reduce personnel budget for contract services expensed in Human $ (11,475) Resources division for Development Services Director recruitment. 23 GENFUND 101 51410 411.1 Reduce personnel budget for contract services expensed in Human $ (11,475) Resources division for City Planner recruitment. 2018 -06 -13 Item 08V 10 of 35 EXHIBIT A - RESOLUTION 2018 -59 # Fund Name Fund Organization Object Project Description Revenue/ Expenditure/ Code Code No. Transfer In Transfer Out Increase Increase (Decrease) (Decrease) 24 GENFUND 101 52700 411.1 Reduce personnel budget for contract services expensed in Human $ (11,475) Resources division for City Engineer recruitment. 25 GENFUND 101 71600 411.1 Reduce personnel budget for contract services expensed in Human $ (11,475) Resources division for Public Works Director recruitment. 26 GENFUND 101 62510 411.1 Reduce personnel budget for partial UAL payment to North County Dispatch $ (72,000) JPA. 27 GENFUND 101 62511 433 Increase contracts and services budget for partial UAL payment to North $ 72,000 County Dispatch JPA. 28 FLEETMAINT 621 71670 476 Increase expenditure budget for the additional cost of a two post $ 3,906 vehicle /apparatus life. The expenditure budget will be reduced by the same amount in Fund 623, for a net zero impact 29 MACHINEREP 622 71670 475 Reduce expenditure budget for the purchase of VM339 (Ford Service Truck). $ (64,357) The purchase should have been appropriated and expensed in Fund 623. The budget appropriation and expenditure are being moved from Fund 622 to 623. The purchase was approved by Council on 3/14/18. 30 VEHICLEREP 623 71670 476 Reduce expenditure budget for the portable jacks to offset additional cost $ (3,906) of a two post vehicle /apparatus life budgeted in Fund 621, for a net zero fiscal impact. 31 VEHICLEREP 623 71670 476 Increase expenditure budget for the purchase of VM339 (Ford Service $ 64,357 Truck). The purchase should have been appropriated and expensed in Fund 623. The budget appropriation and expenditure are being moved from Fund 622 to 623. The purchase was approved by Council on 3/14/18. Total Budget Amendments and Transfers (All Funds) $ 489,573 $ 130,560 2018 -06 -13 Item 08V 11 of 35 ATTACHMENT 2 FY 2017 -18 Proposed Operating Budget Amendments - Third Quarter Revenue Expenditure Fund Balance Department Increase Increase Increase Description Division Decrease Decrease Decrease General Fund (101) Transfer savings from vacancies in multiple divisions for professional City Manager $ 45,900 $ (45,900) recruitment services for four executive and management level (Human positions (Development Services Director, City Planner, City Engineer Resources) and Public Works Director), resulting in a net zero fiscal impact. Development $ (34,425) $ 34,425 Services Public Works $ (11,475) $ 11,475 Transfer savings from vacant Program Assistant position in Fire Fire Operations $ 72,000 $ (72,000) Administration to Fire Operations division in order to make an advance payment to North County Dispatch JPA (NCDJPA) for a special assessment for each member agencies' share of the CalPERS Fire Administration $ (72,000) $ 72,000 Unfunded Accrued Liability (UAL) for NCDJPA employees. This action results in a net zero fiscal impact. City received notice from its current vendor that bank fees were Finance $ 28,000 $ (28,000) increasing approximately 40 %. The Finance Department was able to cover part of the increase within its approved operating budget, but not the entire amount. Staff will be issuing an RFP for banking services in order to identify a vendor offering more favorable fees. Transfer budget from Debt Service (Lease Expense) to Contracts and Development $ (1,950) $ 1,950 Services category for annual rent paid to the San Dieguito Water Services District for use of a portion of its storage yard by Traffic Engineering for (Traffic equipment storage. Engineering) $ 1,950 $ 1,950 Gas and electrical usage has increased due to the opening of the new Parks, Recreation $ 7,500 $ (7,500) Marine Safety Center, which is larger than the old facility. An increase and Cultural Arts is necessary to cover the projected expenditures through the (Beach remainder of the fiscal year. Maintenance) Adjustment to revenue and expenditures to reflect increased Parks, Recreation $ 30,000 $ 22,500 $ 7,500 participation in the Surf Camp program. and Cultural Arts (Rec Facility Programs) Total General Fund (101) $ 30,000 $ 58,000 $ (28,000) 2018 -06 -13 Item 08V 12 of 35 ATTACHMENT 2 FY 2017 -18 Proposed Operating Budget Amendments - Third Quarter Revenue Expenditure Fund Balance Department Increase Increase Increase Description Division Decrease Decrease Decrease Capital Improvements Funds (401/402) Appropriate the uncommitted fund balance in the Open Space Development $ 26,280 $ (26,280) Acquisition Fees Fund 235 to the Habitat /Open Space Acquisition Services project (CP05A), in compliance with the Mitigation five year findings (Advanced test and report. Development /Impact Fees need to be committed per Planning) the 1996 Mitigation Fee Act, California Government Code § §66000 et Se g. La Costa Basin permitting (WD16B) has been completed. The project Development $ (50,000) $ 50,000 will be closed and the remaining funds will be returned to the General Services Fund. As part of the FY 2016 -17 budget revise, this project was (Engineering) combined with the Citywide Flood and Channel Maintenance Permitting Program project WC09D . Coastal Rail Trail Western Alignment project (CS18F) has been Development $ - $ completed. Payment has been made to SANDAG for the realignment Services design and environmental cost incurred by SANDAG and the project (Engineering) will be closed. Close Park Shade Structures project (CP18A) and return remaining Parks, Recreation $ (371,296) $ 371,296 budget and funding to the Park Development Fund (231). Funding will and Cultural Arts be allocated to Standard Pacific Park as part of the FY 18 -19 Capital Improvement Program (CIP) and financial plan revision. Expenditures for park shade structures will now be budgeted and funded in the Park Improvements project (CP04G), which has available funding for installation at the following locations: Encinitas Community Park, Leo Mullen Sports Park, Oakcrest Park, Scott Valley Park and Cottonwood Creek Park. Appropriate the uncommitted fund balance in the Recreation Trails Parks, Recreation $ 10,000 $ (10,000) Fees Fund 236 to the Recreation Trails Development project (CPOOF), and Cultural Arts in compliance with the Mitigation five year findings test and report. Development /Impact Fees need to be committed per the 1996 Mitigation Fee Act, California Government Code § §66000 et Seq. Alternative Fuels Study project (WC15H) to ascertain the feasibility of Public Works $ (1,997) $ 1,997 converting the City's fleet to alternative fuels has been completed. The (Fleet project will be closed and the remaining funds will be returned to the Maintenance) General Fund. Total Capital Improvements Funds (401/402) $ - $ (387,013) $ 387,013 Fleet Maintenance Proaram Fund (621) Increase expenditure budget for additional cost of a two post Public Works $ - $ 3,906 $ (3,906) vehicle /apparatus lift. The expenditure budget will be reduced by the (Fleet same amount in Fund 623, for a net zero fiscal impact. Maintenance Total Fleet Maintenance Program Fund (621) Vehicle Replacement Program Fund (622) $ $ 3,906 $ (3,906) Purchase of VM 339 (Ford F350 Service Truck) was incorrectly Public Works $ - $ (64,357) $ 64,357 budgeted and expensed in Fund 622. The purchase should have been (Fleet appropriated and expensed in Fund 623. The budget appropriation and Maintenance) expense are being moved from Fund 622 to 623. The purchase was approved by Council on 3/14/18. Total Vehicle Replacement Program Fund (622) $ $ (64,357) $ 64,357 2018 -06 -13 Item 08V 13 of 35 ATTACHMENT 2 FY 2017 -18 Proposed Operating Budget Amendments - Third Quarter Revenue Expenditure Fund Balance Department Increase Increase Increase Description Division Decrease Decrease Decrease Equipment Replacement Program Fund (623) Reduce expenditure budget for portable jacks to offset additional cost Public Works $ - $ (3,906) $ 3,906 of a two post vehicle /apparatus lift budgeted in Fund 621, for a net zero (Fleet fiscal impact. Maintenance Purchase of VM 339 (Ford F350 Service Truck) was incorrectly Public Works $ - $ 64,357 $ (64,357) budgeted and expensed in Fund 622. The purchase should have been (Fleet appropriated and expensed in Fund 623. The budget appropriation and Maintenance) expense are being moved from Fund 622 to 623. The purchase was approved by Council on 3/14/18. Total Equipment Replacement Program Fund (623) Total All Funds $ $ 60,451 $ (60,451) $ 30,000 $ (329,013) $ 298,562 2018 -06 -13 Item 08V 14 of 35 ATTACHMENT 3 FY 2017 -18 Proposed Fund Transfer Amendments - Third Quarter Transfer In Transfer Out Increase Increase Description Department Decrease Decrease Capital Improvements Funds (401/402) La Costa Basin permitting project (WD16B) has been completed. The Development project will be closed and the remaining funds will be returned to the Services General Fund. (Engineering) Capital Improvement Funds (401) $ 50,000 General Fund 101 $ 50,000 Alternative Fuels Study project (WC15H) to ascertain the feasibility of Public Works converting the City's fleet to alternative fuels has been completed. The (Fleet project will be closed and the remaining funds will be returned to the Maintenance) General Fund. Capital Improvement Funds (401) $ 1,997 General Fund 101 $ 1,997 Close Park Shade Structures project (CP18A) and return remaining Parks, Recreation budget and funding to the Park Development Fund (231). Funding will and Cultural Arts be allocated to Standard Pacific Park as part of the FY 18 -19 Capital Improvement Program (CIP) and financial plan revision. Capital Improvement Funds (401) $ 371,296 Park Development Fund 231 $ 371,296 Appropriate the uncommitted fund balance in the Open Space Development Acquisition Fees Fund 235 to the Habitat /Open Space Acquisition Services project (CP05A). (Advanced Planning) Open Space Acquisition Fees Fund (235) $ 26,280 ,Capital Improvement Funds 401 $ 26,280 Appropriate the uncommitted fund balance in the Recreation Trails Fees Parks, Recreation Fund 236 to the Recreation Trails Development project (CPOOF). and Cultural Arts Recreation Trails Fees Fund (236) $ 10,000 Capital Improvement Funds 401 $ 10,000 Total Transfers $ 459,573 $ 459,573 2018 -06 -13 Item 08V 15 of 35 RIA City of Encinitas Summary of Budgetary Fund Balance FY 2017 -2018 Descri Beginning Fund Balance, 7/1/17 Less: Contingency Reserve Budget Stabilization Reserve Non - spendable Reserve CIP Carryover Reserve Available Beginning Fund Balance, 711117 FY 2017 -18 Original Budgets Adopted FY 2017 -18 Budget Adjustments by Council: 1. Design review of mobility projects 2. Harbaugh Seaside Parkway maintenance costs 3. Encumbrance Carry Forward for professional services contract 4. SANDAG Coastal Rail Trail invoice 5. Sheriffs Department 960 hour rehire program for Code Enforcement 6. Districting Election professional services 7. Lump sum payment to CalPERS to reduce unfunded pension liability 8. Fund balance transfer to Open Space Acquisition Fund (Fund 235) 9. Preparation of joint technical feasibility study on Community Choice Energy 10. As Needed Grant Writing Services Contract 11. FY 2017 -18 First Quarter adjustments 12. FY 2017 -18 First Quarter CIP transfer adjustments 13. Interim improvements on Coast Highway 101 14. Legal retainer and additional services 15. Security and fire system contract adjustments 16. Private inspection services 17. Additional Funding to the Housing Plan project budget 18. Implementation of the CMLS /RCVS 19. Abandoned Vessel South of Beacon Beach 20. Mobile Data Computer (MDC) Replacement - No effect to the GF 21. FY 2017 -18 Mid -Year budget amendments 22. FY 2017 -18 Mid -Year CIP transfer amendments 23. Montgomery Avenue Sidewalk Improvements Project (CS17C) 24. Cardiff Living Shoreline Project Additional Grant Funds - No effect to the GF 25. Verdi Pedestrian Rail Undercrossing Project (CS16E) 26. FY 2017 -18 Third Quarter Budget Amendments (pending approval) 27. FY 2017 -18 Third Quarter Transfer Amendments (pending approval) 28. 29. 30. 31. 32. Available Fund Balance 613012018 ATTACHMENT 4 Increase (Decrease) to Available Fund Date Resolution # I Fund Balance Balance 2018 -06 -13 Item 08V 16 of 35 $ 25,651,592 (12,520,353) (1,417,046) (727,094) 10,987,099 6128/17 2017 -51 (1,189,960) 9,797,139 8/9/17 2017 -62 (50,000) 9,747,139 8/23/17 2017 -68 (29,535) 9,717,604 8/25/17 Jn1105203 (7,000) 9,710,604 8/30/17 2017.81 (218,579) 9,492,025 8130/17 2017 -84 (57,600) 9,434,425 8/30/17 2017 -86 (150,000) 9,284,425 11/29/17 2017 -95 (500,000) 8,784,425 11/29/17 2017 -95 (500,000) 8,284,425 11/29/17 2017 -106 (16,731) 8,267,694 11/29/17 2017 -107 (20,000) 8,247,694 12/20/17 2017 -113 (160,885) 8,086,809 12/20/17 2017 -113 88,869 8,175,678 12/20/17 2017 -109 (150,000) 8,025,678 12/20/17 2017 -116 (32,950) 7,992,728 12/20/17 2017 -110 (16,474) 7,976,254 12/20/17 2017 -112 (399,598) 7,576,656 1110/18 2018 -06 (546,027) 7,030,629 2/14/18 2018 -19 (60,000) 6,970,629 3/14/18 2018 -29 (14,500) 6,956,129 3/14/18 2018 -25 - 6,956,129 3/28/18 2018 -32 95,596 7,051,725 3/28/18 2018 -32 (808,931) 6,242,794 5/9/18 2018 -44 (36,675) 6,206,119 5/23/18 2018 -53 6,206,119 5/23/18 2018 -51 (55,000) 6,151,119 6/13/18 2018 -59 (28,000) 6,123,119 6/13/18 2018 -59 51,997 6,175,116 - 6,175,116 6,175,116 6,175,116 6,175,116 6,175,116 (4,811,983)11 $ 6,175,116 2018 -06 -13 Item 08V 16 of 35 ATTACHMENT 5 Schedule A: Revised Budget Summary FY 2017 -18 Unassigned Operating Approved Net Operating Operating Debt Service Debt Service Net Available Capital Capital Net Capital Ending Fund Revenue Operating Operating Transfers In Transfers Out Transfers In Transfers Out Operating Fund Transfers In Transfers Out Capital Expenditures Fund Balance Balance Projections Expenditures Transfers Balance Transfers Fund Name Fund 7/1/2017 6/30/2018 GENERAL FUND Available Fund Balance 101 10,987,099 71,639,810 64,680,172 6,959,638 1,214,192 3,378,602 4,020,527 (6,184,937) 11,761,800 192,000 5,754,217 (5,562,217) 6,199,583 Committed & Unspendable Fund Balance 101 727,094 - - 727,094 - 727,094 Contingency Reserves (20% of Operating Expenditures) 101 12,520,353 - - 12,520,353 - 12,520,353 Budget Stabilization Reserve (2% of revenues) 101 1,417,046 - - 1,417,046 - 1,417,046 Other Reserves 101 - - - - - TOTALGENERALFUND 25,651,592 1 71,639,810 64,680,172 6,959,638 1 1,214,192 3,378,602 1 4,020,527 (6,184,937)1 26,426,293 192,000 5,754,217 1 (5,562,217) 20,864,076 INFRASTRUCTURE FUNDS State Gasoline Taxes 201 334,835 1,730,551 1,730,551 1,125,484 (1,125,484) 939,902 898,000 (898,000) 41,903 State Capital Grants 203 - 2,505,096 2,505,096 - 2,505,096 2,505,096 (2,505,096) - Transnet Program (Prop A Sales Tax) 211 - 1,709,000 1,709,000 - 1,709,000 1,802,000 (1,802,000) (93,000) Coastal Zone Management Fund 212 609,947 422,000 227,981 194,019 - 803,966 120,000 (120,000) 683,966 Federal Capital Grants 223 39,644 39,644 39,644 39,644 (39,644) 944,782 6,406,291 227,981 6,178,310 - 1,125,484 - - (1,125,484) 5,997,608 - 5,364,740 (5,364,740) - 632,869 TOTAL INFRASTRUCTURE FUNDS GRANTFUNDS State Law Enforcement Grant 202 20,848 100,000 100,000 - - 20,848 - 20,848 Government Education Access 213 101,181 372,838 149,521 223,317 - 324,498 211,089 (211,089) 113,409 Solid Waste, Recycling and HHW 214 1,012,351 420,500 506,630 (86,130) - 926,221 - 926,221 Asset Forfeiture 215 103,361 - - - - 103,361 103,361 (103,361) - SeniorNutritionGrant 221 - 89,626 131,493 (41,867) 41,867 41,867 - - - Comm Devel Block Grant (CDBG) 222 317,639 254,781 62,858 38,500 38,500 101,358 98,000 (98,000) 3,358 HOME Entitlement Program 227 - 5,016 (5,016) 5,016 5,016 - - - Federal Law Enforcement Grant 228 - - - - - - - Donations &Contributions 229 156,973 232,593 364,583 (131,990) 75,000 75,000 99,983 - 99,983 CSA17 Fire Operations 230 205,672 79,581 73,432 6,149 211,821 10,000 (10,000) 201,821 TOTALGRANTFUNDS 1,600,386 1,612,777 1,585,456 27,321 160,383 - - - 160,383 1,788,090 - 422,450 (422,450) - 1,365,640 DEVELOPMENT IMPACT FUNDS Park Improvement Fees 231 232,185 239,000 239,000 - 471,185 371,296 375,000 (3,704) 467,481 Park Acquisition Fees 232 563,851 410,639 410,639 - 974,490 - 974,490 Traffic Mitigation Fees 233 401,744 1,608,093 1,608,093 - 2,009,837 75,000 (75,000) 1,934,837 RTCIP - (Regional Arterial System) Fee 234 869,164 155,702 155,702 - 1,024,866 - - 1,024,866 Open Space Acquisition Fees 235 146,033 26,489 26,489 500,000 500,000 672,522 26,280 (26,280) 646,242 Recreational Trails Fees 236 45,094 10,131 10,131 - 55,225 10,000 (10,000) 45,225 Community Facilities Fees 237 - 45,680 45,680 45,680 (45,680) - - - Fire Mitigation Fees 238 43,028 43,028 43,028 (43,028) - - - Flood Control Mitigation Fees 239 88,084 80,731 80,731 - 168,815 - 168,815 In Lieu Fees Curb Gutter Sidewalks 251 12,709 24 24 - 12,733 - 12,733 In Lieu Fees Underground Utilities 252 12,110 1,885 1,885 - 13,995 - 13,995 Affordable Housing 253 1,418,944 2,000 2,000 1,420,944 1,383,841 (1,383,841) 37,103 3,789,918 2,623,402 - 2,623,402 500,000 88,708 - - 411,292 6,824,612 371,296 1,870,121 (1,498,825) - 5,325,787 TOTAL DEVELOPMENT IMPACT FUNDS MUNICIPAL IMPROVEMENT DISTRICTS Villanitas Road M.I.D. 291 248,172 14,814 26,751 (11,937) - 236,235 - 236,235 Cerro Street M.I.D. 292 383,398 52,097 45,314 6,783 - 390,181 - 390,181 Village Park M.I.D. 293 128,712 33,310 70,984 (37,674) - 91,038 - 91,038 Wiro Park M.I.D. 294 6,357 11,010 22,863 (11,853) 14,000 14,000 8,504 - 8,504 Encinitas Lighting Landscape District 295 871,097 1,344,950 1,551,598 (206,648) - 664,449 40,000 (40,000) 624,449 Encinitas Ranch Lighting Landscape 297 1,310,340 628,200 568,656 59,544 1,369,884 30,305 20,000 10,305 1,380,189 TOTAL MUNICIPAL IMPROVEMENT DISTRICT FUNDS 2,948,076 2,084,381 2,286,166 (201,785) 14,000 - - - 14,000 2,760,291 30,305 60,000 (29,695) - 2,730,596 DEBT SERVICE FUNDS Debt Service Fund 301 512,866 150 483,175 (483,025) 483,025 483,025 512,866 - 512,866 Encinitas Public Finance Authority 302 9,576 9,200 3,546,702 (3,537,502)1 3,537,502 3,537,502 9,576 9,576 TOTAL DEBT SERVICE FUNDS 522,442 9,350 4,029,877 (4,020,527) - - 4,020,527 - 4,020,527 522,442 - - - - 522,442 CAPITAL IMPROVEMENT FUNDS Capital Project Fund 401 - - - - - - 8,571,115 519,460 8,051,655 8,051,655 - Capital Project Fund 402 - - - - - - 5,163,375 380,166 4,783,209 4,783,209 - Facility Maintenance Fund 403 606,726 - - - 1,000,000 1,000,000 1,606,726 - 811,000 795,726 606,726 1,000,000 1,000,000 1,606,726 13,734,490 899,626 12,834,864 13,645,864 795,726 TOTAL CAPITAL IMPROVEMENT FUNDS 2018 -06 -13 Item 08V 17 of 35 ATTACHMENT 5 Schedule A: Revised Budget Summary FY 2017 -18 Unassigned Operating Approved Net Operating Operating Debt Service Debt Service Net Available Capital Capital Net Capital Ending Fund Revenue Operating Operating Transfers In Transfers Out Transfers In Transfers Out Operating Fund Transfers In Transfers Out Capital Expenditures Fund Balance Balance Projections Expenditures Transfers Balance Transfers Fund Name Fund 7/1/2017 6/30/2018 CARDIFF SANITARY DIVISION FUNDS Operations 511 3,571,520 4,927,143 4,117,698 809,445 - 4,380,965 1,629,784 (1,629,784) 2,751,181 Capital Replacement 512 (949,830) - - (949,830) 1,629,784 34,089 1,595,695 1,988,454 (1,342,589) Capital Expansion 513 988,601 55,000 55,000 - 1,043,601 - 1,043,601 3,610,291 4,982,143 4,117,698 864,445 4,474,736 1,629,784 1,663,873 (34,089) 1,988,454 2,452,193 TOTAL CSD FUNDS ENCINITAS SANITARY DIVISION FUNDS Operations 521 1,783,946 2,715,678 1,584,936 1,130,742 - 2,914,688 1,427,152 (1,427,152) 1,487,536 Capital Replacement 522 4,462,102 - - 4,462,102 1,427,152 17,045 1,410,107 2,087,475 3,784,734 Capital Expansion 523 2,414,745 35,000 35,000 2,449,745 2,449,745 TOTAL ESD FUNDS 8,660,793 2,750,678 1,584,936 1,165,742 - - - - - 9,826,535 1,427,152 1,444,197 17,045 2,087,475 7,722,015 OTHER PROPRIETARY FUNDS Section 8 Housing- Admin 551 17,229 224,290 270,333 (46,043) 59,597 59,597 30,783 - 30,783 Section 8 Housing- HAP 552 1,768 990,141 994,108 (3,967) (2,199) - (2,199) Pacific Pines Affordable Housing 561 1,537,017 216,342 250,812 (34,470) 13,039 13,039 1,515,586 21,739 (21,739) 1,493,847 1 1,556,014 1,430,773 1,515,253 (84,480) 72,636 72,636 1,544,170 1 21,739 1 (21,739) 1,522,431 TOTAL OTHER PROPRIETARY FUNDS INTERNAL SERVICE FUNDS Self - Insurance Fund 601 3,841,408 1,089,554 2,579,573 (1,490,019) 1,128,583 1,128,583 3,479,972 - 3,479,972 Wastewater Support 611 - 935,448 822,448 113,000 113,000 (113,000) - - - Fleet Maintenance 621 - 588,706 588,706 - - - - - Vehicle Replacement 622 883,933 10,000 816,000 (806,000) 113,000 113,000 190,933 - 190,933 Mach Equipment Replacement 623 1,283,707 10,000 411,161 (401,161) 125,000 125,000 1,007,546 - 1,007,546 Fire Apparatus Replacement 624 1,512,218 449,493 (449,493) 378,000 378,000 1,440,725 - 1,440,725 7,521,266 1 2,633,708 1 5,667,381 1 (3,033,673)1 1,744,583 1 113,000 1,631,583 1 6,119,176 6,119,176 TOTAL INTERNAL SERVICE FUNDS 1 TOTAL ALL FUNDS 1 57,412,286 1 96,173,313 1 85,694,920 1 10,478,393 1 4,705,794 1 4,705,794 1 4,020,527 1 4,020,527 1 - 1 67,890,679 1 17,385,027 1 17,500,963 1 (115,936)1 17,721,793 1 50,052,951 2018 -06 -13 Item 08V 18 of 35 ATTACHMENT 6 Schedule C: General Fund Revenue, Expenditures and Transfers Detail FY 2017 -18 FY 2017 -18 FY 2017 -18 Adopted Budget Amended Budget Amendment Budget 6/29/17 REVENUE FY 2017 -18 FY 2017 -18 FY 2017 -18 Actual Budget Budget Amounts $ Variance % Over /(Under) YTD YTD 318,220 1 PROPERTY TAXES $ 43,192,718 $ $ 43,192,718 $ 27,693,609 $ (15,499,109) 64.1% 2 DOCUMENTARY TRANSFER TAXES 550,000 550,000 318,220 (231,780) 57.9% 3 SALES TAXES 13,263,424 13,263,424 8,119,321 (5,144,103) 61.2% 4 TRANSIENT OCCUPANCY TAX 1,688,000 1,688,000 1,409,480 (278,520) 83.5% 5 FRANCHISE FEES 2,277,500 2,277,500 1,135,470 (1,142,030) 49.9% 6 TAX REVENUE TOTAL 60,971,642 60,971,642 38,676,100 (22,295,542) 63.4% VHER REVENUE 7 LICENSES AND PERMITS 246,000 - 246,000 178,407 (67,593) 72.5% 8 INTERGOVERNMENTAL REVENUE 530,346 88,794 619,140 509,703 (109,437) 82.3% 9 CHARGES FOR SERVICES 7,006,469 64,300 7,070,769 5,582,592 (1,488,177) 79.0% 10 FINES AND PENALTIES 746,653 - 746,653 473,247 (273,406) 63.4% 11 USE OF MONEY 751,003 (12,800) 738,203 1,030,086 291,883 139.5% 12 OTHER REVENUE 600,200 617,203 1,217,403 641,116 (576,287) 52.7% 13 OTHER REVENUE TOTAL 9,880,671 757,497 10,638,168 8,415,151 (2,223,017) 79.1% 14 REVENUE TOTAL 70,852,313 757,497 71,609,810 47,091,251 (24,518,559) 65.8% _*3 "►lltPIZIP GOVERNMENT 15 CITYCOUNCIL - ADMINISTRATION 438,990 - 438,990 240,659 (198,331) 54.8% 16 CITY COUNCIL - CITY ATTORNEY 375,500 182,950 558,450 420,613 (137,837) 75.3% 17 CITYMANAGER - ADMINISTRATION 1,043,997 20,000 1,063,997 709,898 (354,099) 66.7% 18 CITY MANAGER - ECONOMIC DEV 108,500 - 108,500 72,000 (36,500) 66.4% 19 CITYMANAGER- ENVIRONMENTAL SVC 135,471 30,029 165,500 100,644 (64,856) 60.8% 20 CITY MANAGER - HUMAN RESOURCES 810,850 - 810,850 584,980 (225,870) 72.1% 21 CITY MANAGER- IT OPERATIONS 1,105,386 1,105,386 757,959 (347,427) 68.6% 22 CITY MANAGER - IT APPLICATIONS 1,341,453 1,341,453 907,754 (433,699) 67.7% 23 CITYCLERK - ADMINISTRATION 420,804 - 420,804 288,250 (132,554) 68.5% 24 CITY CLERK - ELECTIONS 1,000 1,000 1,012 12 101.2% 25 FINANCE - ADMINISTRATION 1,766,309 4,950 1,771,259 1,219,845 (551,414) 68.9% 26 GENERAL GOVERNMENT TOTAL 7,548,260 237,929 7,786,189 5,303,614 (2,482,575) 68.1% tEVELOPMENT SERVICES 27 DEV SVC-DI RECTOR 336,254 336,254 221,899 (114,355) 66.0% 28 DEV SVC - PLAN -ADMIN SVCS 415,366 415,366 283,630 (131,736) 68.3% 29 DEV SVC - PLAN -LAND DEVELOPMENT 2,402,359 2,402,359 1,484,247 (918,112) 61.8% 30 DEV SVC - PLAN - REGULATORY PERMIT 155,741 155,741 101,246 (54,495) 65.0% 31 DEV SVC -PLAN- APPLICANT DEPOSIT 10,000 10,000 1,000 (9,000) 10.0% 32 DEV SVC - PLAN -ADV PLANNING -HSG 560,804 560,804 380,420 (180,384) 67.8% 33 DEV SVC -PLAN- BUILDING & CODE 2,435,130 57,600 2,492,730 1,488,408 (1,004,322) 59.7% 34 DEV SVC -PLAN- PARKING CITATION 113,500 - 113,500 58,702 (54,798) 51.7% 35 DVCSVC -ENG -CITY ENGINEER 1,030,509 60,001 1,090,510 632,126 (458,384) 58.0% 36 DEV SVC -ENG- TRAFFIC ENGINEERNG 671,163 - 671,163 417,228 (253,935) 62.2% 37 DEV SVC - ENG - STORMWATER PROG 853,789 10,000 863,789 491,025 (372,764) 56.8% 38 DEV SVC - ENG - INSPECTIONS 841,403 399,598 1,241,001 653,633 (587,368) 52.7% 39 DEV SVC -ENG- ENVIRONMENTAL 17,320 - 17,320 1,481 (15,839) 8.5% 40 DEVELOPMENT SERVICES TOTAL 9,843,338 527,199 10,370,537 6,215,043 (4,155,493) 59.9% 2018 -06 -13 Item 08V 19 of 35 ATTACHMENT 6 Schedule C: General Fund Revenue, Expenditures and Transfers Detail ARKS, RECREATION & CULTURAL ARTS FY 2017 -18 FY 2017 -18 FY 2017 -18 FY 2017 -18 FY 2017 -18 FY 2017 -18 59 PARKSREC - ADMINISTRATION Adopted Budget Amended Actual Budget Budget 60 PARKS REC - PARK MAINTENANCE Budget Amendment Budget Amounts $ Variance % 61 PARKS REC - BEACH MAINTENANCE 6/29/17 6,300 583,265 299,298 Over /(Under) YTD 62 PARKSREC - TRAIL MAINTENANCE 182,502 (0) 182,502 87,354 YTD 47.9% 41 PUBLIC SAFETY -LAW ENFORCEMENT 14,322,777 (1,050) 14,322,777 9,481,131 (4,841,646) 66.2% 42 PUBLIC SAFETY - FIREADMIN 603,900 - 603,900 391,273 (212,627) 64.8% 43 PUBLIC SAFETY -FIRE OPERATIONS 11,874,565 489,797 12,364,362 9,304,679 (3,059,683) 75.3% 44 PUBLIC SAFETY -LOSS PREVENTION 632,567 - 632,567 433,906 (198,661) 68.6% 45 PUBLIC SAFETY - DISASTER PREP 162,210 6,950 169,160 144,383 (24,777) 85.4% 46 PUBLIC SAFETY - MARINE SAFETY 1,266,103 81,056 1,347,159 872,046 (475,113) 64.7% 47 PUBLIC SAFETY -1R LIFEGUARDS 244,521 (18,000) 226,521 146,030 (80,491) 64.5% 48 PUBLIC SAFETY TOTAL 29,106,643 559,803 29,666,446 20,773,449 (8,892,997) 70.0% tUBLIC WORKS 71 NON DEPT - CENTRAL PURCHASES 154,000 (6,950) 49 PUBLICWORKS - ADMINISTRATION 321,278 - 321,278 172,158 (149,120) 53.6% 50 PUBLIC WORKS - ENVIRONMENTAL - 2,050 2,050 - (2,050) 0.0% 51 PUBLIC WORKS - STREETMAINT 2,670,542 44,147 2,714,689 1,526,992 (1,187,697) 56.2% 52 PUBLIC WORKS -FAC MAINT CVC CTR 422,171 7,150 429,321 300,188 (129,133) 69.9% 53 PUBLIC WORKS -FAC MAINT FIRE ST 255,468 5,434 260,902 165,018 (95,884) 63.2% 54 PUBLIC WORKS -FAC MAINT PW YRD 222,089 1,620 223,709 148,348 (75,361) 66.3% 55 PUBLIC WORKS -FAC MAINT LIBRARY 390,049 (25,544) 364,505 250,809 (113,696) 68.8% 56 PUBLIC WORKS -STORM WATER MAINT 750,936 855,915 750,936 432,044 (318,892) 57.5% 57 PUBLIC WORKS -STORM WATER FLOOD 148,337 - 148,337 67,210 (81,127) 45.3% 58 PUBLIC WORKS TOTAL 5,180,870 34,857 5,215,727 3,062,767 (2,152,960) 58.7% ARKS, RECREATION & CULTURAL ARTS 59 PARKSREC - ADMINISTRATION 1,058,749 23,907 1,082,656 907,314 (175,342) 83.8% 60 PARKS REC - PARK MAINTENANCE 2,257,435 50,035 2,307,470 1,458,668 (848,802) 63.2% 61 PARKS REC - BEACH MAINTENANCE 576,965 6,300 583,265 299,298 (283,967) 51.3% 62 PARKSREC - TRAIL MAINTENANCE 182,502 (0) 182,502 87,354 (95,148) 47.9% 63 PARKS REC- RECREATION PROGRAMS 525,432 (1,050) 524,382 330,574 (193,809) 63.0% 64 PARKS REC - COMM CENTER OPER 938,057 21,370 959,427 592,791 (366,636) 61.8% 65 PARKS REC - COMM CENTER PROGRAMS 348,553 50,000 398,553 203,007 (195,546) 50.9% 66 PARKS REC - COMM CENTER RENTALS 93,976 - 93,976 63,207 (30,769) 67.3% 67 PARKSREC - SENIOR CENTER 429,613 - 429,613 287,404 (142,209) 66.9% 68 PARKS REC - REC FACILITY PROGRAMS 532,948 24,050 556,998 398,335 (158,663) 71.5% 69 PARKSREC - CULTURAL ARTS 338,579 (10,800) 327,779 153,829 (173,950) 46.9% 70 PARKS, REC & CULTURAL ARTS TOTAL 7,282,809 163,812 7,446,621 4,781,779 (2,664,842) 64.2% ANON - DEPARTMENTA 71 NON DEPT - CENTRAL PURCHASES 154,000 (6,950) 147,050 85,647 (68,353) 58.2% 72 NON DEPT - SHARED EXPENSES 3,485,843 500,000 3,985,843 3,956,393 470,550 99.3% 73 NON - DEPARTMENTAL TOTAL 3,639,843 493,050 4,132,893 4,042,040 402,197 97.8% 74 EXPENDITURES TOTAL 62,601,763 2,016,650 64,618,413 44,178,694 (19,946,669) 68.4% 75 EXCESS OF REVENUE OVER EXPENDITURES 8,250,550 (1,259,153) 6,991,397 2,912,557 (4,571,890) 41.7% TRANSFERS A 76 TRANSFERS IN 1,214,191 2,230,004 3,444,195 1,267,042 (2,177,153) 36.8% 77 TRANSFERS OUT (10,654,702) (2,363,973) (13,018,675) (12,162,760) 855,915 93.4% 78 TRANSFER TOTAL (9,440,511) (133,969) (9,574,480) (10,895,718) (1,321,238) 113.8% 79 NET INCREASE (DECREASE) TO FUND BALANCE $ (1,189,961) $ (1,393,122) $ (2,583,083) $ (7,983,161) $ (5,400,078) 309.1% 2018 -06 -13 Item 08V 20 of 35 F-11a i I"T d:1 � III li FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Project Title WP /CIP No. Responsible Department Project to Date Budget as of 3/31/2018 Project to Date Expenditures as of 3/31/2018 Transfers or Returns Remaining Balance as of 3/31/2018 Anticipated Completion Date (Month - Year) Status DRAINAGE PROJECTS 1 Storm Drain Repair CD05E DEVELOPMENT SERV -ENG 2,386,001 2,063,077 (73,375) 249,549 Ongoing On -going Master Project. Transfer $200,000 to CD17C for tracking purposes. 2 El Camino Real Channel Storm Drain Repairs /Improvements CD06D DEVELOPMENT SERV - ENG 1,929,274 1,777,080 0 152,194 Completed The construction is completed. Project also requires a 5 year monitoring period (CD17B). Project will be closed after FEMA send Cal OES a Notification of Project Closure. This could take 3 -6 months from 9 -2017. 3 (229)Manchester Ave @ Mira Costa Drainage Improvements CD07C DEVELOPMENT SERV - ENG 56,902 0 0 56,902 N/A Belmont Contribution. 4 5 Yr. Habitat - Biological & Monitoring CD17B DEVELOPMENT SERV - ENG 174,474 50,855 0 123,619 8/1/2021 The 5 year maintenance and monitoring of the El Camino Real Channel Storm Drain began in June 2016. 5 Lone Jack Rd Culvert Project CD17C DEVELOPMENT SERV -ENG 377,166 247,706 0 129,460 Completed Construction ongoing. Scheduled to finish on -time Category Total 4,923,817 4,138,718 (73,375) 711,724 4,923,817 4,138,718 (73,375) 711,724 WASTEWATER PROJECTS - CARDIFF SANITARY DIVISION 6 CSD Collection System Rehab CC04E CSD 2,916,691 489,186 2,427,505 Ongoing Currently in construction. 7 Olivenhain Trunk Improvements CC04J CSD 7,323,702 1,785,386 0 5,538,316 4/1/2020 EIR certified by Planning Commission in January 2018; Anticipate MUP approval February 2018. Construction expected to begin Summer 2018. 8 Lone Jack & Somerset Main Replacement CC07B CSD 1,793,280 9,500 0 1,783,780 4/1/2020 Included in the Olivenhain Trunk Sewer Project. See status above. 9 Coast Blvd Pump Station Upgrades CC14B CSD 2,163,778 1,944,928 0 218,850 12/31/2017 Completed December 2017. Notice of Completion January 2018. 10 SEJPA Plant Improvements CC16A CSD 719,459 504,761 (214,698) 0 Ongoing Annual contribution to SEJPA capital improvement program. 11 Sewer Master Plan Update CC16B CSD 120,000 0 0 120,000 6/30/2019 Reserve funding for next Sewer Master Plan Update - anticipate FY 2019. 12 SEJPA Plant Improvements CC17A CSD 520,010 457,668 (62,342) 0 Ongoing Annual contribution to SEJPA capital improvement program. 13 SEJPA Plant Improvements CC18A CSD 488,454 0 277,040 765,494 Ongoing Annual contribution to SEJPA capital improvement program. Category Total 16,045,374 5,191,429 0 10,853,945 16,045,374 5,191,429 0 10,853,944 WASTEWATER PROJECTS - ENCINITAS SANITARY DIVISION 14 Batiquitos 2004 Pump Station Improvement CE04A ESD 2,664,420 2,567,360 97,060 Ongoing Annual contribution to LWD capital improvements at Batiquitos pump station. 15 Collection System Rehabilitation CE04H ESD 3,387,685 489,377 0 2,898,309 Ongoing Currently in construction. 16 Master Plan Implementation CE16A ESD 120,000 0 0 120,000 6/30/2019 Reserve funding for next Sewer Master Plan Update - anticipate FY 2019. 17 Encina Plant Improvement CE16B ESD 1,037,971 400,913 (637,058) 0.00 Jun -16 Annual contribution to EWA capital improvement program. FY16 complete 18 Encina Plant Improvement CE17B ESD 684,622 543,080 (141,542) 0.00 Jun -17 lAnnual contribution to EWA capital improvement program. FY17 complete 19 Lanlikai Gravity Sewer Line CE17C ESD 169,600 13,906 155,694 Jun -18 ESD share of Leucadia Wastewater project 20 Encina Plant Improvement CE18B ESD 612,475 85,898 778,601 1,305,178 Ongoing Annual contribution to EWA capital improvement program. Category Total 8,676,773 4,100,534 0 4,576,240 8,676,773 4,100,534 0 4,576,240 PUBLIC FACILITIES PROJECTS 2018 -06 -13 Item 08V 21 of 35 FAaL•G3.1T,1:4iJ1MA FY 2017 -18 YTD Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status 21 Library Community Room CF16C PARKS, REC AND 50,000 667 0 49,333 FY 17/18 Double set of blinds being replaced and a motorized system to be installed. Remodel CUL ARTS Quotes have been requested and completion is anticipated by the end of FY 2017/18. Category Total 50,000 667 0 49,333 50,000 6671 1 49,333 2018 -06 -13 Item 08V 22 of 35 F-11 a ED]:l"T d:1 �11 li FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status PARKS & BEACHES PROJECTS 22 Recreation Trails Development CPOOF PARKS, REC AND 698,736 542,883 0 155,853 FY 17/18 - According to the Trails Master Plan, there are 80 miles of trails and 40.5 miles are Fund CUL ARTS FY 20/21 currently developed. Funding was approved for the following trails during the FY 2017/18 six year CIP budget process. The Adams Run Trail Connection Engineering is currently working with a consultant on the design phase and completion is anticipated in FY 2017/18. The Trail 95 El Camino Del Norte Connection Engineering will work with a consultant on design in FY 2018/19 and construction is anticipated to be completed in FY 2018/19. Trail 82 Rancho Santa Fe Road Link Engineering is working with a consultant on the ROW studies and design and completion is anticipated in FY 2018/19. The Trail 79 Manchester Avenue Connection Engineering will work with a consultant on design in FY 2019/20 and completion is anticipated in FY 2020/21. 23 Park Improvement Projects CP04G PARKS, REC AND 1,824,373 1,400,392 0 423,981 Ongoing The PR &CA Department identifies improvement projects for park and recreational CUL ARTS facilities on an annual basis, funded by revenue from cell tower lease agreements. Projects may include, but are not limited to, the replacement of various park/beach /trail amenities and rehabilitation of existing facilities /amenities. Playground equipment at Encinitas Viewpoint Park and Mildred Macpherson Park has been purchased. Bids for installation have been awarded and installation will be completed in FY 2017/18. Scott Valley Park is the next park scheduled for improvements. This site will require re- design. Additional sites will be identified for improvements. 24 Habitat /Open Space Acquisition CP05A DEVELOPMENT 395,000 6,932 0 388,069 On -going This project involves the acquisition and preservation of habitat/ open space SERV - PLANNING parcels from willing sellers in support of the approved SANDAG Multiple Habitat Conservation Program (MHCP), Storm Water/ Watershed Management Program and habitat preservation and open space goals. The City will utilize local funds to leverage federal and state grants and /or any other opportunities that may arise. (`TEA Grant is no longer available to City $134,242 - Augmentation form was forwarded to Finance on 3/25/15) The City seeks to establish a balance between new development and the maintenance and preservation of these valuable environmentally sensitive habitat and open space resources. Planning requests to move project to Parks & Recreation Dept. to monitor, budget, etc. 25 Standard Pacific Park Site CP14A DEVELOPMENT 2,720,000 45,825 0 2,674,175 Apr -19 Funding for the design has been approved as part of the FY 2016 -17 budget. This Design SERV - ENG additional funding fully funds the design and development of this project. It is anticipated the 3.14 acre park will include facilities and equipment found at neighborhood parks. 2018 -06 -13 Item 08V 23 of 35 FAaL•G3iI141:4zIMA FY 2017 -18 YTD Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status 26 Beacon's Beach Access CP14B DEVELOPMENT 850,000 138,008 0 711,992 Apr -18 AECOM Design contract underway. SERV -ENG 27 MLB Marine Safety CP14C ENG /MARINE 3,831,465 3,573,944 0 257,521 Complete Construction began in October 2016. Anticipated Construction Complete Headquarters Rebuild SAFETY November 2017. Received $105K in Asset Forfeiture Funding Sep 2017 to help fund the law enforcement office. 2018 -06 -13 Item 08V 24 of 35 re1lrrdyaild:1 � 111i FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status PARKS & BEACHES PROJECTS Continued 28 Dune Restoration CP16A DEVELOPMENT 2,999,596 292,981 0 2,706,615 FY 18/19 100% Design Completed. Project delay due to San Elijo Lagoon Restoration SERV -ENG Project. Scheduled construction September 2018 29 Leo Mullen Artificial Turf CP16B DEVELOPMENT 1,212,600 1,050,296 0 162,304 Study Complete The installation of artificial turf at Leo Mullen Sports Park is complete. The SERV - ENG May -18 installation of field lights is pending the outcome of a light study. Category Total 14,531,770 7,051,261 0 7,480,509 14,531,770 7,051,2611 0 1 7,480,509 STREETS & ROADS PROJECTS 30 Safe Rte. 2 Schools Program CS01 E DEVELOPMENT 2,061,932 1,289,992 (275,000) 496,940 Ongoing Master Program - ongoing. $275,000 transferred to B Street Sidewalk Project (City) SERV - ENG CS18G for tracking purposes. 31 Traffic Safety and Calming CS02F DEVELOPMENT 391,165 254,908 0 136,257 Ongoing Master Program - ongoing. SERV -ENG 32 Traffic Signal Modifications CS02G DEVELOPMENT 1,205,988 580,587 0 625,401 Ongoing Master Program - ongoing. SERV -ENG 33 North Coast Hwy 101 CSO4D DEVELOPMENT 9,878,546 2,414,049 0 7,464,497 FY 2019 -20 Segment A construction to begin Fall 2018. EIR to Council to consider adoption in Streetsca a SERV - ENG March/April 2018. 60% plans for Segment A Underway. 34 Santa Fe Dr Improvements CS07B DEVELOPMENT 2,957,305 1,953,424 0 1,003,881 FY 2019 -20 North side construction complete. Undergrounding complete April 2018. South SERV - ENG Sidewalk/SDA frontage improvements design commencing February 2018. 35 Devonshire Dr Traffic Calming CS10G DEVELOPMENT 125,000 31,565 0 93,435 Ongoing Master Project. SERV -ENG 36 La Costa Avenue Improvements CS11 C DEVELOPMENT 1,475,000 79,013 0 1,395,987 TBD Traffic study is being revised to reflect potential La Costa Avenue at Highway 101 SERV - ENG modifications. Roadway Classification may be modified depending on the outcome of the Circulation Element Update. Project scope, once determined, will be reviewed with the City of Carlsbad. 37 Encinitas Community Park CS12E DEVELOPMENT 38,000 0 0 38,000 TBD City's financial contribution for traffic impacts. (ECP) Mitigation /Santa Fe @ SERV - ENG Scripps 38 ECP Offsite Improvements CS13C DEVELOPMENT 750,000 563,876 0 186,124 TBD Master Project for future traffic mitigation costs. SERV -ENG 39 Encinitas Blvd SR2S CS13E DEVELOPMENT 663,908 624,341 0 39,567 Complete Construction is complete. Project will be closed after the grant process is finalized. Improvements SERV - ENG 40 Upgrade Traffic Signals - El CS14E DEVELOPMENT 411,100 387,064 0 24,036 Complete Project can be closed after final grant check is recorded. Camino Real, Etc. SERV - ENG 41 Upgrade Traffic Signals - CS14F DEVELOPMENT 551,700 515,280 0 36,420 Complete Project can be closed after final grant check is recorded. Leucadia Blvd, Etc. SERV - ENG 42 South Coast Hwy101 Sidewalk CS15C DEVELOPMENT 628,000 19,669 0 608,331 Summer 2018 100% plans are under review. Advertisement for bids 2/13. Construction is Improvements SERV - ENG anticipated to begin March 2018' 43 Downtown Cardiff ADA Curb CS16C DEVELOPMENT 150,000 20,612 (128,926) 462 Jun -18 Consultant design proposal for project submitted and under review Ramp Project (Transition Plan SERV - ENG Compliance) 44 Montgomery Ave At -Grade CS16E DEVELOPMENT 3,126,025 377,987 0 2,748,038 FY 19/20 HDR instructed to more forward with design of Verdi location for the rail Pedestrian Rail Crossing SERV - ENG undercrossin . Design kick off January 2018. 45 El Portal Pedestrian /Bike CS16F DEVELOPMENT 5,395,000 170,640 0 5,224,360 FY 2018/19 T.Y. Lin design contract underway and is expected to be completed in October Underpass Project SERV - ENG 2018. 2018 -06 -13 Item 08V 25 of 35 le1lil/eCya"T d:1 � 111 WA FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status STREETS & ROADS PROJECTS Continued 46 FY 2016 -17 Annual Street CS17A DEVELOPMENT 4,407,921 3,725,490 (682,431) Feb -17 Construction is complete. Overlay SERV -ENG 47 FY 2017 -18 Annual Street CS18A DEVELOPMENT 3,000,000 1,673,305 406,704 1,733,399 Complete Construction completed February 2018. Overlay SERV - ENG 48 B Street Sidewalk Project CS18G DEVELOPMENT 0 12,427 275,000 262,573 May -19 In design. Construction start in October to avoid summer beach impacts. SERV -ENG 49 Downtown Cardiff ADA Project CS18H DEVELOPMENT 98,000 0 50,000 148,000 Aug -18 Schematic Preliminary Design in review. Estimated construction start June 2018 SERV -ENG Category Total 37,314,590 14,694,229 (354,653)1 22,265,707 37,314,590 14,694,229 (354,652)1 22,265,707 STORM RELATED PROJECTS 50 Emergency Repair Project - CX11 F DEVELOPMENT 872,746 853,462 0 19,284 Complete Project is complete. Project will be closed in the fourth quarter. Awaiting full Hiqhwav 101 South SERV - ENG reimbursement from FHWA ER Grant. 51 Emergency Repair Project - CX16E DEVELOPMENT 110,000 22,678 0 87,322 Jul -18 All repairs including temporary irrigation were completed by March 2016. The city Porto Storm Drain SERV - ENG received a coastal development permit from Carlsbad. The permit requires approximately 2 ye ars of monitoring. 52 Emergency Repair Project - Hwy CX16F DEVELOPMENT 112,512 25,557 0 86,955 Jul -21 This is the five year monitoring associated with Project CX11 F (Emergency Repair 101 Monitoring SERV - ENG Highway 101 South). The five year monitoring will be completed in 2021. Category Total 1,095,258 901,697 0 193,561 1,095,258 901,697 0 193,561 Capital Projects Fund 402 53 L Flooding Issues CD17A DEVELOPMENT 435,000 148,750 0 286,250 Dec -18 Project to install sumps and East Jason Street culvert. 8 sump catch basins SERV - ENG currently being installed (anticipate completion April 2018). Jason Street Storm drain is at 90% design, construction expected Fall 2018. 54 ELLD -Zone H Lot 15 Recycled CP17A PARKS, REC AND 30,000 0 0 30,000 FY 2017/18 - This project is a joint project between SDWD, SEJPA, and the COE Parks H2O Conversion & Booster CUL ARTS FY 2018/19 Department. Phase 1 of a two phase project to bring in reclaimed water to the Pump Installation south mesa of Encinitas Ranch is complete. Phase 2 is scheduled for completion in mid 2018. 55 Park Shade Structures CP18A PARKS, REC AND 375,000 0 0 375,000 FY 2017/18- The RFP for design and installation of a playground shade structure at ECP is CUL ARTS FY 2018/19 scheduled for the third quarter of FY 2017/18. The Bid for a playground shade structure at LMSP is scheduled for first quarter of FY 2018/19. The timelines for Oakcrest Park, Scott Valley Park and Cottonwood Creek Park are TBD. 56 Birmingham Drive - Complete CS17B DEVELOPMENT 1,348,560 154,564 0 1,193,996 Nov -20 50% street improvement design complete. Coordinating with utilities for Streets SERV - ENG undergrounding. SDGE Undergrounding design to be complete by March 2019. Construction will begin thereafter. 57 SR2S Cardiff School District CS17C DEVELOPMENT 305,000 166,614 0 138,386 Jun -18 MacKinnon Sidewalks complete; Encinitas Community Park/Mackinnon pedestrian SERV - ENG ramp project complete. Montgomery Avenue Sidewalks expected to begin construction in March 2018. 58 SR2S San Dieguito Union HIS CS17D DEVELOPMENT 300,000 52,664 0 247,336 Jul -18 Requeza Street Sidewalk currently being advertised with bid opening February 15, District SERV - ENG 2018. Anticipate construction to begin March 2018 and completion in July 2018. 59 Hwy 101 Pedestrian Crossing CS17E DEVELOPMENT 323,000 7,000 0 316,000 FY 19/20 Incorporated in Streetscape EIR. EIR final scheduled Spring 2018. Construction in SERV - ENG 2019. 2018 -06 -13 Item 08V 26 of 35 FAaL•G3.1T,1:4iJ1MA FY 2017 -18 YTD Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status 60 Chesterfield Drive Quiet Zone CS17F DEVELOPMENT 770,000 0 0 770,000 Spring 2018 HDR Contract Underway. Supplemental Safety Measures to be implemented in Implementation SERV -ENG Spring 2018. Study underway for quiet zone implementation from Chesterfield to La Costa. 61 Street light & Traffic Signal CS17G DEVELOPMENT 200,000 72,856 0 127,144 on -going Master program to replace street lights and traffic signals that are knocked down. Replacements SERV - ENG 2018 -06 -13 Item 08V 27 of 35 re1ardyaird:1 � 111i FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status Capital Projects Fund (402) Continued 62 Street Light Conversion Project CS17H DEVELOPMENT 760,500 0 0 760,500 TBD Grant funding was appropriated in December 2016. Entering into a task order for SERV - ENG an as- needed consultant to manage this project. 63 Leucadia Blvd Roundabout @ CS18B DEVELOPMENT 550,000 550,000 Dec -19 Starting RFP for consultant services. Hygeia SERV - ENG 64 Springwood Sidewalks CS18C DEVELOPMENT 500,000 2,375 357,158 854,783 May -18 Construction in progress, anticipate completion May 2018. SERV -ENG 65 Installation of Innovative Bike CS18D DEVELOPMENT 75,000 75,000 Jun -18 Master project for general striping improvements. Lane Treatment SERV - ENG 66 General Mobility Improvements CS18E DEVELOPMENT 400,000 5,493 394,508 on -going Master Project for general mobility improvements. SERV -ENG 67 Coastal Rail Trail Western CS18F DEVELOPMENT 218,579 218,579 0 Completed Per Resolution 2017 -81 - Payment to SANDAG for the realignment design and Alignment SERV - ENG environmental cost incurred by SANDAG 68 Emergency Repair - Lone Jack CX17B DEVELOPMENT 347,300 296,956 0 50,344 Completed Submitted request for authorization for construction to Caltrans 11/20, updated Road SERV - ENG with cost proposal form 12A 1/24. Reimbursement is $282,652 69 Climate Action Plan - Mitigation WC17A CITY MANAGER - 100,000 12,827 0 87,173 On -going The final CECA document (Negative Declaration) and final Climate Action Plan Measures ENVIRONMENTAL were adopted by City Council on January 17, 2018. The remaining funds will be SERVICES used to im lement the adopted CAP measures. 70 Vulcan & San Elijo Active WC17B DEVELOPMENT 100,000 10,279 0 89,721 On hold Study on hold. Transportation Improvement SERV - ENG Stud 71 Leo Mullen Sports Park Lighting WC17C ENG /PARKS & 165,000 0 0 165,000 TBD An update to the Encinitas Ranch Specific Plan is required for the installation of (ERSP) REC field lights. A Lighting Study is required to determine potential impacts. Study awarded to IMEG Inc. April 2017. Hoch Consulting brought on for project management of design 72 800 MHZ Radio Upgrades WC18A FIRE 45,000 41,997 (2,462) 541 June 2021 First year radio purchase done in December 2017, have not received invoice 73 Assessment of Fair Housing WC18B DEVELOPMENT 50,000 0 0 50,000 TBD Program participants including Housing Authorities and recipients of Community SERVICES - Development Block Grant program funds are required to take actions to PLANNING affirmatively further fair housing choice. Budgeted funds will be used to prepare the Assessment of Fair Housing, including technical assistance, data analysis & input, and community outreach. Per HUD Notice 2018 -106, released January 5, 2018, the AFH deadline is being extended. The Cities within San Diego County will complete the AFH as a region, with an anticipated new due date of October 2023. The City (along with all San Diego County jurisdictions) may still need to update the current (San Diego Regional) Analysis of Impediments in the meantime. Budgeted funds may be used to select a consultant with those efforts. 74 Affordable Housing Acquisition WC18C DEVELOPMENT 1,383,841 0 0 1,383,841 On -going On March 22, 2017, the EHA Board directed staff to develop a strategy for SERVICES - acquisition of units using the City's in -lieu fees (Affordable Housing Fund). Part of PLANNING this strategy includes appropriating the available fund balance in the In -Lieu Fees fund the purposes of purchasing affordable housing within the City of Encinitas, when it becomes available and it is the City's desire to purchase. 75 Pacific Pines Maintenance WC18D DEVELOPMENT 21,739 9,578 0 12,161 On -going In 2003, the EHA acquired 16 condo units at Pacific Pines to provide affordable Schedule SERVICES - housing opportunities to low- income households. Since 2003, maintenance has PLANNING been completed on an as- needed basis. In 2016, a replacement study was done to anticipate major needs over 20 years. Reserve funds are budgeted according to the study. 76 Tech Infrastructure Replacement WC18E IT /GIS 336,889 0 0 336,889 Ongoing This project includes the migration of end of life GIs web applications, security software, disaster recovery software, end of life servers and infrastructure management tools. 2018 -06 -13 Item 08V 28 of 35 F-11 a ED]:l"T d:1 �11 li FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Project Title WP /CIP No. Responsible Department Project to Date Budget as of 3/31/2018 Project to Date Expenditures as of 3/31/2018 Transfers or Returns Remaining Balance as of 3/31/2018 Anticipated Completion Date (Month - Year) Status 77 ADA /Section 504 Update of Self Evaluation WC18F CM /RISK 75,000 0 0 75,000 Dec -19 Update of City's Self- Evaluation and Transition plan as mandated by Federal Regulations 78 Joint Tech Feasibility Study on CCE WC18G CM/ ENVIRONMENTAL 100,525 0 0 100,525 Jun -18 Contract and Cost share signed. Consultant initiating work. 79 Storm Capture and Reuse Study WD17A DEVELOPMENT SERV - ENG 100,000 55,554 0 44,446 Complete Dokken prepared a Preliminary Engineering Report studying stormwater capture at Leucadia Roadside Park. The task is complete. Waiting to see if the City wants to pursue and fund design and construction of a roject. 80 SHSP Grant -Dr Suits WF18A Fire 7,106 7,073 0 33 Jun -18 Dr suits urchased, waiting for rant reimbursement to close out project. Category Total 9,423,039 1,263,158 354,696 8,514,577 9,423,039 1,263,158 354,696 8,514,577 2018 -06 -13 Item 08V 29 of 35 le1al/eCya"T d:1 � III WA FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status FACILITY MAINTENANCE PROJECTS (403 Fund 78 Civic Center Improvements CF16A PW 1,605,000 110,339 0 1,494,661 Ongoing HVAC controls replacement complete; fire sprinkler system replacement in design; security upgrades in progress. FY 19 tasks include carpet replacement (anticipated completion Summer 2018), exterior painting and parking lot rehab. 79 Fire Stations Improvements CF16B PW 254,000 65,825 0 188,175 Ongoing Garage doors at Station 2 replaced Fall 2017. Station 1 being evaluated to determine scope of repairs and /or rehab. Station 4 garage rehabilitation in design. 80 PW Facility Improvements CF16D PW 555,000 174,679 0 380,321 Ongoing Roof replacement complete. Carpet replacement anticipated to be completed Summer 2018. Additional FY18 and FY19 tasks include parking lot resurfacing, completion of window replacements, cargo shed roof rehab and exterior painting. 81 ADA Facilities Compliance CF16E PW 60,000 0 0 60,000 Ongoing Reserve funding for emergency ADA projects that are not in the City's current ADA Transition Plan. Anticipate using some of the funds in FY 18 for a consultant study to verify compliance with Transition plan and find any additional areas that need addressing. 82 Library Improvements CF16F PW 167,000 63,291 0 103,709 Ongoing FY18 and FY19 tasks include furniture and countertop replacement, parking lot resurfacing and exterior painting. 83 Senior /Community Center Paint CF16G PARKS, REC AND 130,000 7,099 0 122,901 FY 2017/18 Replacement of deteriorated wall panels is complete in preparation for new carpet and Carpet CUL ARTS and paint. The RFB has closed and award of contracts is scheduled for February 14, 2018. Carpet and paint is scheduled to be completed by March 6, 2018. 84 ADA Parking Lot Upgrades CF18A PARKS, REC AND 205,000 205,000 FY 2019/20 On September 11, 2013, the City adopted Resolution 2013 -41, the Transition and CUL ARTS Self Evaluation Plans Under the Americans with Disabilities Act (ADA) and Section 504 of the Rehabilitation Act of 1973, and directed staff to complete the funded CIP projects as previously approved by the City Council at the June 12, 2013 meeting. Item #20 of the Transition Plan identifies several City parking lots in need of upgrades for compliance. Engineering is working with a consultant on ADA design upgrades for the Community /Senior Center parking lot in FY 2017/18. Construction is anticipated to be complete in FY 2018/19. Glen Park is scheduled for design in FY 2018/19 and the remaining park and beach parking lots are scheduled for FY 2019/20. 85 Community Center LED Art CF18B PARKS, REC AND 20,000 20,000 FY 2017/18 The LED lighting system has been selected and will move forward upon completion Gallery Lighting CUL ARTS of the Center paint and carpet in March 2018. The purchasing process is anticipated to be completed by the end of March and installation will be completed by the end of FY 2017/18. Category Total 2,996,000 421,234 0 2,574,766 2,996,000 421,234 0 2,574,766 2018 -06 -13 Item 08V 30 of 35 F-11 a ED]:l"T d:1 �11 li FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status CONSULTANT SERVICES & STUDIES (WORK PROJECTS) 86 ACOE Shoreline Protection WB06A CITY MANAGER - 1,420,951 1,171,984 0 248,967 Apr -19 Completed the EIR /EIS. Waiting funding from the 2018 Work plan to begin the Study COASTAL ZONE Design Agreement & PMP. 87 SCOUP -Sand Compatibility WB08C CITY MANAGER - 962,331 527,721 0 434,610 Ongoing Will begin to receive sand from the San Elijo Lagoon Restoration Project in Opportunistic Use Program COASTAL ZONE February 2018. Dredging will begin on Monday, February 19 and continue for six weeks at the Cardiff site. Phase 1 is expected to be completed in June 2018, followed by the pr oceedin of Phase 2 in July 2018. 88 TMDL Compliance Program WB11A DEVELOPMENT 806,171 516,121 0 290,050 Ongoing The Carlsbad Watershed Water Quality Improvement Program (WQIP) draft is SERV - complete and was approved by the Regional Water Quality Control Board in STORMWATER November 2016. Implementation of the water quality improvement strategies defined in the WQIP and ongoing TMDL monitoring will be ongoing. 89 Beach Habitat Study WB16A CITY MANAGER - 150,000 9,983 0 140,017 Nov -18 Tierra Data completed a Baseline Biological Report. Next phase will be to develop COASTAL ZONE a scope of work for Spring and Fall 2018. 90 Enhancement of Native Habitats WB16B DEVELOPMENT 206,393 82,824 0 123,569 Oct -21 This a 5 year SEP project with the San Elijo Lagoon Conservancy. in San Elijo Lagoon Ecological SERV - Reserve Project STORMWATER 91 Coastal Storm Damage WB16C CITY MANAGER - 700,000 0 0 700,000 Ongoing Congress has approved the Water Resource Development Act (WRDA) which Reduction Project COASTAL ZONE places this project on a federal list appropriation list for future funding. Prior to construction, the Corps is waiting on federal funds to begin the Design Agreement and Pre- Construction and Engineering and Design (PED) phase. 92 GIS Basemap Updates and WC01A GIS 744,600 677,651 0 66,949 Ortho: Ongoing Orthos - An ortho (i.e. aerial photo) project with a regional consortium is to be Enhancements Easements: TBD completed approximately every 2 -3 years. The current project being planned has a tentative flight date of late February /early March 2017. In addition to orthophotos, Encinitas, along with other regional partners, will acquire oblique imagery (bird's eye view) which has many important and relevant uses for Fire, Code, and Planning. Encinitas, a partner agency, has confirmed commitment of the 2017 project to the regional agency leading the effort (SANGIS) based on the funds allocated to it in this CIP. Current status: New imagery has been delivered to the City and is now available to all staff. The oblique imagery and the new imagery are available through a variety 93 Open Space Mgmt. Plan WC08K DEVELOPMENT 74,499 64,424 0 10,075 On -going This began as a component of the Multiple Habitat Conservation Program (MHCP) SERVICES - Subarea Plan. However, due to high costs relative to benefits, the City did not PLANNING pursue the OSMP, but instead developed the Encinitas Habitat Stewardship Program. No future funding is requested for the OSMP. Of the $10,075 remaining, $576.40 is general fund money. The other $9,499.30 is the remaining balance of a NCCP Planning grant from U.S. Fish and Wildlife Service. 2018 -06 -13 Item 08V 31 of 35 F-11a D]:lild:1 �11 Ii FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status CONSULTANT SERVICES & STUDIES (WORK PROJECTS) Continued 94 Citywide Flood and Channel WC09D DEVELOPMENT 425,000 177,174 0 247,827 TBD City pursuing a citywide programmatic permit for ongoing maintenance activities of Maintenance Permitting SERV -ENG stormwater and flood control systems. Phase 1 - Identification and validation of Program city -owned facilities has been completed. Coordination with Resource Agencies is tanned for Phase 2. 95 Technology Replacement WC10A IT /GIS 2,039,587 1,703,066 0 336,521 Ongoing This project is meant to replace end -of -life equipment and software /applications, Project including but not limited to: Server 2016 licenses, IT network infrastructure, Public Works plotter, Microsoft Exchange email upgrade, Seamless Docs forms software, Citywide records management project, and credit card readers. 96 Fees and Other Studies WC10B FINANCE 199,060 140,045 0 59,015 Fall 2018 Unfunded Pension Liability Study RFPs received. Need to update & review the proposals before starting the study inspring 2018. 97 Citywide Landscape & Lighting WC10C DEVELOPMENT 200,000 59,724 0 140,276 On -Hold Consultant prepared draft report of Preliminary Analysis of Assessments. District Prop 218 Ballot SERV - ENG 98 Encinitas Habitat Stewardship WC11A DEVELOPMENT 217,941 110,207 0 107,734 Summer 2018 An initial assessment report to prioritize properties/ projects for cleanup of City Program (Early Multi- Habitat SERVICES - owned habitat property was presented to Council in September 2015. Council Consery Plan Implementation) PLANNING directed Environmental Commission (EC) review. EC reviewed report on 1/14/16 and established a subcommittee for further review. The EC Subcommittee presented their recommendations to the EC on 10/13/2016 which were accepted by the EC for final consideration and recommendation to Council. This project to stay open with remaining funds. Beginning in FY15/16, funds for the Stewardship Program are recurring and included in the Development Services operating budget ($62,600). Development Services is working with Parks & Rec to present the project to Council and to ultimately transition the project to Parks & Rec. 99 Governmental /Educational WC12C IT 1,849,068 495,152 0 1,353,916 Ongoing This project includes audio visual and smart screen upgrades to public meeting Access Project- Equipment rooms at City Hall/Community Center, build -out of the City I -Net infrastructure, Update video library and camera and other misc. equipment replacement in the Audio Visual Room and Council Chambers for broadcasting. 100 Safe Funding WC13B DEVELOPMENT 222,446 123,019 0 99,427 Ongoing Master Project. The Traffic Operations Center was completed in Summer 2017. SERV -ENG 101 Cityworks Server WC14A GIS 128,000 89,580 0 38,420 Summer 2018 Current Status: Cityworks Server Upgrade from 2014 service pack 5 to 2015.2. This is planned as a vendor initiated and vendor performed upgrade leveraging Azteca support services. 102 Housing Element Update WC14B DEVELOPMENT 1,234,436 1,171,308 63,128 June 2018 To make adequate provisions for the housing needs of all income levels, a SERVICES - jurisdiction must identify adequate sites with the appropriate zoning in place. PLANNING Where the element does not demonstrate appropriately zoned sites sufficient to accommodate the regional housing need (RHNA) by income level, a program must be included to identify sites that can be developed within the planning period. City Council, with assistance from the Housing Element Task Force (Mayor Blakespear, Deputy Mayor Kranz, Bruce Ehlers and Kurt Groseclose), is working to obtain a state compliant housing element. At the January 10, 2018 joint meeting of the City Council and the Housing Element Task Force (HETF) a total of 18 sites were selected for further analysis and consideration. 2018 -06 -13 Item 08V 32 of 35 FAaL•G3iI141:4ZIMA FY 2017 -18 YTD Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status 103 Rail Corridor Vision WC15A DEVELOPMENT 557,927 243,747 0 314,180 February 2018 Caltrans Grant awarded ($175K) in March 2015. WSP USA, Inc. (formerly SERVICES - Parsons Brinckerhoff) is project consultant. Project related work was incorporated PLANNING into a consolidated study approach called the "Coastal Mobility and Livability Study'. Additional funding of $34,200 was approved at first quarter of FY16/17. Another $64,000 was approved in Feb. for work on the Verdi crossing and another $232,227 was added for Quiet Zone analysis. Additional expenditures authorized 9/27/2017, within the existing budget (beyond scope of contract), in a not -to- exceed amount of $10,000 to allow for consultant preparation and attendance at additional meetings. Final draft to be presented to Council 2/14/2018 for approval. 2018 -06 -13 Item 08V 33 of 35 F-11 a ED]:lild:1 �11 Ii FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status CONSULTANT SERVICES & STUDIES (WORK PROJECTS) Continued 104 Active Transportation Plan WC15B DEVELOPMENT 86,400 22,289 0 64,111 April 2018 Contract awarded to KTU +A. Project related work was incorporated into a SERVICES - consolidated study approach called the "Coastal Mobility and Livability Study ". PLANNING Additional funding of $11,400 was approved at first quarter of FY16/17. Additional expenditures authorized 9/27/2017, within the existing budget (beyond scope of contract), in a not -to- exceed amount of $10,000 to allow for consultant preparation and attendance at additional meetings. Working group and Council reviewing second r f in ear l 2018. 105 Coast Hwy 101 Business WC15C DEVELOPMENT 86,400 61,361 0 25,039 April 2018 An additional $25,000 was approved by Council on 7/13/16 to authorize the full Districts Parking Study SERVICES - parking study with adopted resolution. Chen Ryan is project consultant. Project (Comprehensive Parking Study) PLANNING related work was incorporated into a consolidated study approach called the "Coastal Mobility and Livability Study ". Additional funding of $11,400 was approved at first quarter of FY16/17. Additional expenditures authorized 9/27/2017, within the existing budget (beyond scope of contract), in a not -to- exceed amount of $3,600 to allow for consultant preparation and attendance at additional meetings. Working group and Council reviewing second draft in early 2018. 106 Update Inclusionary Ordinance WC15E DEVELOPMENT 50,000 8,290 0 41,711 March 2018 Direction and funding was given in May 2014 for staff to update the City's SERVICES - Inclusionary Housing Ordinance to better address the need for affordable units PLANNING reserved in new development projects. Staff presented a draft ordinance to Council in September 2015 at which time staff was directed to hold a workshop to further vet the Inclusionary and Affordable Housing issue. The $50,000 was originally allocated to cover consultant costs, which will largely include outside legal counsel. Actual costs may vary depending upon the ultimate scale and scope of the ordinance. A draft Ordinance will be presented to Council on 2/14/2018. 107 Alternative Fuel Study for City WC15H PW 41,925 39,928 (1,997) 0 Completed Complete a comprehensive fleet study to ascertain the feasibility of converting the Fleet City's fleet to alternative fuels. Issue RFP and receive report. Council originally appropriated $10k for the project, but actual project cost est. at $40k. Council approved additional funding. Study completed. 108 Enterprise Workflow WC16A IT /GIS 542,753 318,701 0 224,052 Winter 2019 EnerGov Phase 2 —This phase will build upon the customer service improvements Management (EnerGov) and underlying core technology implemented in EnerGov Phase 1. Phase 2 will expand EnerGov functionality, (to include permitting, inspections, and mobile) for the following departments: Planning & Building, Code Enforcement, Fire Prevention, Fire Operations, and Public Works Engineering. Additionally, Phase 2 will include new customer facing self- service features, such as electronic plan submittal, online inspection scheduling, and real time project status. Current project focus includes testing code enforcement (office) and code enforcement mobile (iGEnforce). Finishing configuration for request management for use by City Manager staff. Early stages of migrating Clean Water Annual inspections over to the EG system, (office and mobile). Citizen Self Service (CSS) is also in process of being configured (public facing). Caveat to functionality of phase 2 implementation is the dependency on departments' ability to dedicate resources to this effort. Current Status: CSS is now live. Additional services will be offered throughout 2018. Roy Sapau has formed a new implementation team IT will be working with for additional functionality in the Development Services area. 2018 -06 -13 Item 08V 34 of 35 re1a ETC ld:1 �11 i FY 2017 -18 Y Capital Im rovement Project Status Report - Third Quarter Anticipated Project to Date Project to Date Remaining Completion WP /CIP Responsible Budget as of Expenditures as of Transfers Balance as of Date (Month - Project Title No. Department 3/31/2018 3/31/2018 or Returns 3/31/2018 Year) Status CONSULTANT SERVICES & STUDIES WORK PROJECTS CONTINUED 109 Mobile Workforce WC16C IT /GIS 60,000 42,277 0 17,723 Summer 2020 This project consolidates mobile hardware (primarily iPads) and related peripherals (i.e. cases, cords, printers, etc.) for all City departments. This will allow relevant staff to access mobile applications applicable to their duties and related to one or more of the City's business systems which include but are not limited to: enterprise workflow management (EnerGov), work order /inspection management, and data collection /updates on City -owned or maintained assets and infrastructure. Current status: No new deployments have been made. New deployments will focus on Building and Engineering once they begin their transition over to EnerGov. 110 Circulation Element of General WC16D DEVELOPMENT 310,000 0 0 310,000 TBD Funding transferred here from Roadway Master Plan project (WC16B). The Plan SERVICES Coastal Mobility and Livability Study will be used as a foundation for the PLANNING preparation of the Circulation Element Update of the General Plan. Upon completion of the CMLS an RFP will be developed * 111 Facade Improvement Program WC97F CM 266,786 227,785 0 39,001 FY 17/18 In May 2017, Council amended the budget $66K to pay remaining outstanding applications. In June, 2017, The Cardiff strip mall project received $15K grant. In November 2017, Moonlight Marketplace received a $45K grant. One grant remaining. 112 Cottonwood Creek Runoff Plan WD02A DEVELOPMENT 41,575 40,144 0 1,431 TBD Grant (settlement) funded project awarded by the RWQCB to address water quality SERV -ENG issues associated with Cottonwood Creek. Remaining funding could be used for education and outreach related to Prop 84 prolects. 113 South Leucadia/Vulcan Ave WD16A DEVELOPMENT 357,239 224,617 0 132,622 Spring 2018 Design completion anticipated in Spring 2018. No funding has been established Storm Drain Project SERV - ENG for construction. 114 La Costa Basin Permitting WD16B DEVELOPMENT 50,000 0 (50,000) 0 Close As part of the FY 2016 -17 budget revise, this project was combined with the SERV - ENG Citywide Flood and Channel Maintenance Permitting Program project (WC09D). 115 Green Building Incentive WF10A DEVELOPMENT 44,000 20,200 0 23,800 On -going The Green Building Incentive Program encourages "green" construction Program SERVICES - techniques by providing funds to assist applicants that build "green." Projects that PLANNING propose and achieve certification through the Build It Green GreenPoint Rated program for residential projects or the US Green Building Council's LEED program for commercial projects would be provided up to $2,000 per application to assist with costs of providing "green" building measures utilized to achieve certification. The Council adopted an Environmental Policy on October 8, 2008 that included a requirement to ensure green building practices in all public and private development and funded the project beginning FY2010. The $20,000 annual allocation for this project was incorporated into the operating budget during the two - year cycle for FY15/16 & FY16/17. In FY17/18, that amount was reduced to $10,000 per year. Any remaining funding in this project budget must stay in place in order to cover applications that are already in process. 116 Pacific View Consultant Services WF15A CM /RISK MGT 100,000 70,538 0 29,462 On -going A Right of Entry Agreement was executed in July 2016 (expires December 20, 2018) . The permit process is underway (entitlements) with Development Services Dept. 5,683,632 Category Total 14,175,488 8,439,859 51,997 5,683,632 14,175,488 8,439,859 (51, 997) 5,683,632 Capital and Work Project Total 109,232,109 46,202,786 (125,329) 62,903,994 2018 -06 -13 Item 08V 35 of 35