Loading...
2015-12651 I (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. NERAL NOT 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "-4.11A PREPARED BY DATED AND UPDATE DATED PROJECT# SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. -G HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT C14AftL jC AT (2& CIOk jqo S , 24 HOURS A DAY. AA00A6 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY AND /OR THE TURF /LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP /BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP /BMP. 6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON - COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY- APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. STANDARD NOTES FOR SEWER IMPROVEMENT PLANS ALL WORK SHALL BE DONE IF ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, "GREENBOOK ", (LATEST EDITION),THE SAN DIEGO STANDARD SPECIAL PROVISIONS TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, (ADOPTED BY THE SAN DIEGO REGIONAL 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN STANDARDS COMMITTEE) THE SAN DIEGO REGIONAL STANDARD DRAWINGS ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. (LATEST EDITION) AND THE FOLLOWING SPECIAL PROVISIONS: 1. TRENCH WIDTH SHALL BE PER SDRSD NO. SP -02 UNLESS OTHERWISE NOTED. MINIMUM PIPE SEPERATION PER WAS WI -01, 02, & 03. 2. PIPE AND BEDDING CONDITIONS: A) ALL PIPE SHALL HAVE 4" MINIMUM OF %" CRUSHED ROCK BENEATH THE PIPE. B) V.C.P PIPE BEDDING FROM BOTTOM OF PIPE TO 12" MINIMUM ABOVE THE PIPE SHALL BE SAND, GRAVEL, CRUSHED AGGREGATE, NATIVE FREE - DRAINING GRANDULAR MATERIAL HAVING A SAND EQUIVALENT OR 30 OR BETTER. C) P.V.0 AND A.B.S SOLID WALL PIPE BEDDING FROM BOTTOM OF PIPE TO 12" MINIMUM ABOVE THE PIPE SHALL BE %" CRUSHED ROCK. A.B.S. SOLID WALL PIPE MAY BE USED ONLY WHERE PIPE INVERT GRADES ARE 1% OR GREATER. 3. AFTER COMPLETION OF PIPE LAYING, ALL MAIN LINE SEWERS, SEWER SERVICE LATERALS AND STRUCTURES SHALL BE TESTED IN THE PRESENCE OF THE INSPECTOR. AIR PRESSURE TEST SHALL BE USED UNLESS OTHER WISE DIRECTED BY THE CITY ENGINEER. 4. THE CONSTRUCTION OF P.C.C. SEWER MANHOLE SHALL BE PER SDRSD NO. SM -02. POURED IN PLACE MANHOLE BASES SHALL BE A MONOLITHIC POUR FINISHED COMPLETE AT TIME OF POUR. PRECAST MANHOLE BASES ARE ACCEPTABLE FOR USE 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN WITH 8 -INCH COLLECTOR SYSTEMS WITH CITY ENGINEERS APPROVAL. FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY 5. THE CONSTRUCITON OF 4 -INCH SEWER LATERAL PER SDRSD NO'S SS -01 AND PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE SS -02. LATERALS SHALL NOT DISCHARGE DIRECTLY INTO MANHOLE. PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE 6. THE CONSTRUCTION OF CONCRETE CUT -OFF WALLS SHALL BE CONSTRUCTED CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF AS PER SDRSD NO. SP -07 THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE 7. ALL MAINS AND LATERALS SHALL BE A MINIMUM OF 42" BELOW THE FINISHED REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT GRADE WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. CONTINUED ON SHEET 2 CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE Underground Service Alert 6010- - 2u I6 DESCRIPTION: 2" DISC STAMPED7 2" IN TOP OF CURB EAST SIDE LOCATION: VULCAN AVENUE, 200 FEET NORTH OF E. STREET HORIZONTAL: 1" = 20' Call: TOLL FREE RECORD FROM: ROS NO 18416 (PT. NO. 1032) I -SQ0 ELEVATION: 92.0041 NAVD 88 VERTICAL: 1" = 4' 422 -4W STORMWATERPOLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED STEEL PANELS /PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY: THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436 -4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - CSD - (760)- 633 -2770 B. GAS & ELECTRIC - SDGE - (760) -438 -6200 C. WATER - SAN DIEGUITO WATER DISTRICT -1- 800 - 227 -2600 D. TELEPHONE - SBC BELL - (760)- 489 -3411 E. CABLE TV - COX COMMUNICATIONS - (760)- 806 -9809 X -2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)- 633 -2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. OWNER OWNER NAME: CHARLIE MOORE ADDRESS: 401 NEPTUNE AVE ENCINITAS, CA 92024 PHONE: 760 - 402 -1405 SITE ADDRESS ^ PROJECT ADDRESS: 829/852 REGAL ROAD ENCINITAS, CA 92024 APN: 258 - 241 -05 258- 252 -01 OWNER'S CERTIFICATE REQUEZA 5 FREEWAY I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTIONAND STABILITY OF THE SITE. SIGNATURE: I,T/AL6 L -AHAVE BEEN RETAINED TO PREFORM CONSTRUCTION OBSERVATION AND TRENCH BACKFILL COMPACTION TESTING SIGNED: RCE NO.: I,3r>3 EXP. DATE: 7-SO `2017 CI'.3 JOB #: 9a COMPANY TERKA TEcNn�'`Zj1,y ADDRESS SOS -D Si►9'�f�N "I ESCAN Di POD @ �4 9 2-0 2ai �I�D- 7`fD-o 8�,l0 STATEMENT OF ENGINEER OF WORK r 0 O of J 0 w It PARK LN. SITE VICINITY MAP N.T.S. THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. SIGNATURE: ��c %- DATE: ROBERT D. DENTINO EXCEL ENGINEERING 440 STATE PLACE ESCONDIDO, CA 92029 PH. 760 - 745 -8118 RCE EXPIRES 12/31/16 Z?I" No. 45629 K Exp.12 -31 -16 A5 QUILT 1. I= AIGIIVEEROF 1?EL0R13 OR PA/ AUTI•IORIZEn R6PRISEx1r19T /V._ UNDL-/1 MY T7E5P9NSIl3LE CHAR6ff 1a61V! 1NSr'LerL•D Tw -- PITOJCCT 51TL'. 13A5L D UPON MY FICLD YF_RIFIZAT1O�ll RND SUl?VEY, T 14E 513Y 6eRTAFY F40,97c 4 714/7T T-1Ir PROJf:LT WA CO NSTRUCTL:13 ly5V135 TI? /VT -1 L CDNF017MANCf WIF14 T)4r;5! AS BUILT PL*7IUS. P f31Z/7T TJ. DEA1r11uD c n� rl- BMP PROJECT STATUS ' STANDARD PUBLIC WORKS PLANNING AND BUILDING PARKS AND RECREATION ISAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT ZZ lb DATE PLANS PREPARED UNDER SUPERVISION OF DATE: Z/" * /e- R.C.E. NO.: 45629 ROBERT D. DENTINO EXP.: 12/31/16 ENGINEERING DEPARTMENT APPROVALS RECOMMENDED:Sa APPROVE0P MASIH MAHER 3/2C(1 l G DATE 3 • z • �� ,�% �',', `� 3.12 -�� ���� Z11 3 z ► 0�� DATE IGN DATE S DATE 7i CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT DRAWING NO. CL:CM#ftOV[M9M1 P A 0 ' AE 2 REGAL ROAD ENCINITAS CA 92024 GLENN PRLIIM APN 258- 241- 05/258- 251 -01 12651 -1 DATE PLANNING CASE NO: SHEET 1 OF 2 /V JC1 s 0 z z O U ZWco Y w Z Wo L Q r- w J) 0 X 1: ,uca STANDARD NOTES FOR SEWER /MPROVEMENTPLANS NOTE 1% FR AS -BOIL T POSITIONS OF UTIL ITIES IN REGAL ROAD, REFER TO CITY a< EA:C'INITAS DRAWIAG AD. 5975 -I. COYTRACT04 TO POThf�LE ALL CROSSING' UTIL ITIES PRIR TO COVSTRUCTIOV 2% ALL ROADWAYS SHALL BE A MINtAHAN 24FT IN WIDTH &RIAG' CONSTRXTION AAD MAINTAIAED FREE AAD CLEAR IAC'LLD1 PARIAD' OF VEHICLES 3) OWAERS TO OBTAIN SEPARATE OVSITE AtLWIAV PERMIT FR WORK OV PRIVATE PROPERTY 4) COVTRACTR SHALL RTAIN TRAFFIC CONTROL PERMIT FROM EAC 6064 TER PRIOR TO START OF WORK. WORK TO BEDONE 1J 8" PVC SEWER 1.32.48 2) SEWER CLEANOUT PER S.D.R. S.D. - SC -01 1 .3f 4" SEWER LATRAL PER S.D.R.S.O. SS- 01 2 EA 4 IRE C P T IMPORTANT NOTICE PLAN ARESASEDOV PENAVD88DATZN. ��Q( U. L),c�� "Vj. M4F1L•LD Yb 1F1t1?T/OJV RNO SURVEY . I MEREI3Y CERTIFY Section 4216/4217 of the Government Code requires a Dig Alert Identification PREVIOUS RECORD PLAN ELEVATIONS THAT WERE �� p� 2 y T RAT THE PRO -AEer WA5 CONSrT3UGTE0 JN 5U n 5 r/m T /AL ENGINEERING Number be issued before a "Permit to Excavate" be BASED 6W PE NGVD 29 DATLN MAY bF No. 45629 o > CD NFORM ANCr_ W) r/4 T P E ST• AS 13 U l L r PL 1/ N S . will valid. For your Dig Alert I.D. Number Call APPROXIMATL v CONVERTED TO NAND 88 BY AD91 K E.aiz -ai -'e '� 0 20 40 60 80 Underground Alert 2. 15 FEET SEE ROS M9 18416 FR DETAILS �C Z1iG� 9 440 SM F PLAIT Mill PH (AiOJTk5 -B11B FX (7607k3 1890 Two working days before you dig. \� 9j C /0- O FOF CAl \F 17013cR r D. Df AirIA10 017 TE CHANGE NO. DESCRIPTION APPROVED DATE Underground Service Alert BENCHMARK SCALE DESIGNED BY: 1 DRAWN BY: 1 CHECKED BY: ENGINEERING DEPARTMENT APPROVALS CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT DRAWING NO Li 190 CONTINUED 8. THE FINAL LOCATION AND ELEVATION OF SEWER AND WATER MAINS AND LATERALS SHALL BE SHOWN ON ORIGINAL AS -BUILT PLANS PRIOR TO ACCEPTANCE OF WORK. 9. FOR SEWER LATERAL TABLE, SEE SHEET N/A 10. "AS BUILT" DRAWINGS MUST BE SUBMITTED_PRIOR TO FINAL ACCEPTANCE OF THE WORK 11. ALL DESIGN CHANGES OF SEWER MAINS SHALL BE APPROVED BY A CONSTUCTION CHANGE PRIOR TO ACCEPTANCE FOR PUBLIC USE. 12. FILL AREAS MUST BE COMPLATED TO 90% PRIOR TO PIPE INSTALLATION. 13. THE CONTRACTOR SHALL NOTIFY THE DISTRICT'S FIELD OPERATIONS DIVISION 48 HOURS IN ADVANCE OF BEGINNING WORK TO ARRANGE FOR PRE -CON AND INSPECTION OF PROJECT. PHONE NO. 760-633-2770. 14. CONTRACTOR SHALL OBTAIN A PERMIT FROM THE CITY'S ENGINEERING SERVICES DEPARTMENT FOR ANY EXCAVATION WITHIN EXISTING CITY RIGHTS -OF -WAY. 15. THE APPLICANT SHALL WARRANTY THE PUBLIC SEWER FOR ONE YEAR FOLLOWING THE APPROVAL OF THE AS- BUILTS 16. CONTRACTOR SHALL FURNISH AND INSTALL, PER SDRSD SP -01, THE APPROPRIATE BURIED UTILITY WARNING AND IDENTIFICATION TAPE ABOVE ALL PUBLIC SEWER LINES, AND POR TIONS OF SEWER LATERALS LOCATED WITHIN PUBLIC RIGHT -OF -WAY OR EASEMENTS. 17. THE DEVELOPER SHALL PROVIDE EASEMENTS AND ACCESS ROADS OVER PUBLIC SEWERS TO THE SATISFACTION OF THE CITY ENGINEER. THESE ARE TO BE SHOWN ON THIS PLAN. 18. WASTEWATER DISCHARGE PERMITS AND PLUMBING PERMITS ARE REQUIRED PRIOR TO CONNECTION TO THE SANITARY SEWER SYSTEM. 19. ALL NEW SEWER MAINS SHALL BE INSPECTED BY CLOSED CIRCUIT TELEVISION AFTER COMPLETION OF TRENCHING BACKFILL AND FINISHED GRADING BUT PRIOR TO PLACEMENT OF PAVEMENT OR PERMANENT TRENCH RESURFACING. CONTRACTOR SHALL PROVIDE FOR TELEVISION INSPECTION. (SEE 500- 1.1.5) 20. SEWER MANHOLE LINING: (A) NEW MANHOLES WITH 8-10" DIAMETER SEWER MAINS: THE INSIDE OF THE SEWER MANHOLES SHALL BE COATED WITH AN EPDXY PROTECTIVE LINING SYSTEM PER SECTION 500 -2.7 OF THE GREENBOOK. (B) NEW MANHOLES WITH 12" DIAMETER AND GREATER SEWER MAINS: THE INSIDE OF THE SEWER MANHOLES SHALL BE PROVIDED WITH INTEGRALLY LOCKING PVC LINING PER SECTION 500 -2.5 OF THE GREENBOOK. (C)EXISTING MANHOLES: ALL EXISTING MANHOLES WITH NEW CONNECTIONS SHALL BE INSPECTED AND REPAIRED, AS NEEDED, WITH THE LINING SYSTEM THAT MATCHES THE EXISTING LINING FOR THAT MAINHOLE; FOR MANHOLES WITHOUT ANY EXISTING LINING, THE INSIDE OF THE SEWER MANHOLES SHALL BE COATED WITH AN EPDXY PROTECTIVE LINING SYSTEM PER SECTION 500 -2.7 OF THE GREENBOOK. EXCEPTIONS OR VARIATIONS OF THESE MANHOLE LINING REQUIREMENTS MAY BE CONSIDERED ON A SPECIFIC CASE -BY -CASE BASIS BY THE CITY ENGINEER. 21. NO ADDITIONAL LATERALS SHALL BE PERMITTED WITHOUT PAYING SEWER CAPACITY FEES, PROCESSING A CONSTRUCTION CHANGE, AND JOINING THE SEWER REIMBURSEMENT DISTRICT, IF CREATED 22. MANHOLE FRAMES AND COVERS SHALL BE MADE IN THE USA OF HEAVY DUTY - j Q I ti W Q 2 I V 2 • h p I y ~ 1 h V w R I I � y �. \ ISTI E ° � Z p ❑ EG L R❑ D -ICI- Q L 44 p ° \ 3G " D P P TO APR /M TE PO /A P 0 MA " A _ - _ F PIPE 6" AC W / D - TA 1 1 t��/ e " 1 5. 111. 0. 2 �• a ~ 17 .96 w: [•. WEA - - W E C/ TA D -1 � ^ _ _ 10100 �{� 12+00 LF EA f N H A CH PR SD.R.S.O. G -24 A, TYPE A 140 LF EXISTIAAC SEWER CASE -IRON TYPE WITH A 36 -INCH OPENING. MANHOLE COVER INSERTS SHALL BE 5f EPDXY L /NE /SPARK TEST MANHOE 1 EA DISCHARGE PERMIT CS 24 -INCH DIAMETER WITH LETTERING "CITY OF ENCINITAS" AND "SEWER" SIMILAR TO ( 200,3 -011 WHAT IS INDICATED ON SDRSD M -1 APN 256- 252 -04 56 \ APN 256- 252.01 STANDARD CAST NOW MH APN 256 - 252_02 APN 256 - 251 -01 FRAME AND COVER CEMENT IN `` ' K: ~c.. FLX/R4 BARS, OR /LL STA 5167.50 REGAL ROAD 3 629 REGAL ROAD PLACE WIN CEMENT MORTAR : ".,':. EMBED INTH EPDXY =STA 1Ot00, MH ,�4 � � CEMENT PER ENC /N /TAS DWG 5975 -1. BEC/N CDNSTRUCAON I APPROX /MATE POS /ADN STA 11t14. CONSTRUCT 4 " PVC SEWER I STA 4t i5.02 RECAL ROAD r O" B PVC SEWER. RECONSTRUCT MANHOLE AS R� LATERAL PER SDRSD SS -01, /.E ® +: I11 =111; " I 0/- ABANDONED 12" I I =STA 11 t .32.48 SEWER EXTENSYON 1 i ,3(' " DIA �" 1 =1 11= •.: L � •- • ; \ } �. MA /N= 177.04 /.E., O R/W = ,PR99, CONSTRUCT SEWER 6LEAN011T PER SD. R. S.D. ! 111 -II P MANHOLE PER DETAIL THIS /EET /.E. ®MH = 171.40, z s < . >, CMP F/LLED INTH SAND 7�_ R = 184.5 17q, 50 SC -OL END CONSTRUCTION 1I R EXISTINi^ /.E. 0 DROP = 175.78 TOP AW= 181.58 - EXTEND CLEANOUT s EX /SANG CURB / T /.E = 177.50 , TOP R/M = 186.00 R /SER TO SURFACE MH TO BE EPDXY L /NED t SPARK TESTED PER TER METER 17.398 FL o GREENBOOK STD SEE SEWER NOTES 120 y.. � M� GRADE P 90 CR055 I 1 =1 =1111 - - VC DROP MH .:;•. D 8 "PROPOSE II = CLRE OR/LL OPEN /NG /N MH WALL 6" ACP WATER PER WO -57 -42 ^� 1 / / I I < j SEWin -I 1- GROUT ANNULAR SPAL� INIH SECTIONS B - w- w -w -w -w w w -w -w -w w w--(p�-w w�w -w w w -w w w- -�4�- w -w -w -w w w� w I-w w -A -w -w ` w w -w 7 -w w- II III , II 111 - i.. I'I 1111 NON - SHRINK CEMENT MRTAR " sva - srs - svo - SVD - Svc Svc -- sva _ SVD v� - svo - vo - Sv9 Ev`a -- SV`E, - Sv9 - a SVS Sv0 - SV°J svS - -,ro ' - sv� ;v� v3 - .- Rf�ACC� -CLWy.I.- .G(..�iaT£ -R>- s. svo - seo - - _ REA/OVF AND RECONSTRUCT HP GAS LINE -� >, . ,max .;v, �- ', �J G -2�+ �� j II 175. 7B y�• II111111 M /N. (RP) SILLWALK PER SRSD W LINE TO .. - - STAA�P IN - - - - A006W 09A7F NEW LINE • "� 7 �� S" A r 27" RCP WATER MA /N \ \ \ ( \ CURB FALL \ ) 1 "1 =11 -III- w---'____W_-w w w -w -w w-I-w w -w w - -w w�._- `tia - -w -w -mow w _ w- w� -"-- -w W v. --w w - -w. �__v�� -w -wow w w- w -w� -w w_.__.,- e :':'. s.,• 1) I� NOTES - w- c- w- w- ,- r- w- w- w- w -w -w -w w w- �- �&iw w { w w w w -w -w \ w -w -w- w - -w- \ w---w -w w w -w w�c -w w� w w iv- R�� i t ..: ` -`; 1 =111 �- - " wR4A =11, s , 1 ROP MH SHALL BE /DENACAL TO STANDARD 16" ACP WATER PER WD -BO -10 - ' -' T \ \ III I 60190qF7F MH EXCEPT FOR PIPE DETA /LS AS SHOINV 2 THE OR M . v . a ,'.: .•� . a o . / is •... o:• . .. _ _ RNG SEAL WALL PENES )70N PERRSORSO SM-04 o _ _ _ ° _ °� r.V. III }} lll��l -R /W- - - - - ',. =.;. 1111 3J CLEAN AND rno _ �- � . , , ...': � : `�•' .• 111 -I I ( I � a °� X X• X E /SANG RANT RINGS AND APPL Y BOND/NG AGENT CEMENT PR /OR TO V A '. - = Ili =III= PUR/NG SVPPRT FOR ROP SECAOV. O 1 1.'; °: `�, �T-- X ' "X X PVC DROP M/i( ,. I - o 4J NO MH APN 258-24102-01 154 '� } :; '- ! / I i 90'BEND 111 II STEPS ALL01fE0 0 W EX /SANG 6" ACP WATER. \ °f <;:. f / 132 Ril Rup I -I 171.4 I I1 I 5J CONTRACTOR TO REA/OVE CONCRETE MH BASE Z ~' EXISTIAC CURB /GRATE i =1 1 - - I- - O _ Ti 1 i i- INTH FLOW L /NE, REPLAar COVCREIE SDRSD? ININ v �\ } I / I " I APN 256- 241 -06 I_III r_....�;i: '.; ,_:; "ti::.a_.. = -:._ Ill! I M. - Ni W FLOWt /NE z w INLET. FL= 172.02 } \_.`` .= CONSTRUCT TRENCH 11 j TA 11429, 0, ,CONS)*JCT 4 I, I1 -1) -1 - -_„ i -111- 111 = III= 111= {I1 =1I - 9 MIN. 62 FOLLOINNG RECOVSARUCAOV DROP MH IS TO BE R w G PATCH PER S.D.R. S.O. xl' `� 1 \ }PVC SEWER LATERAL IpER APN 256-24P -05 EAD -1 l EPDXYL /NED /COATED AND SPARK TESTED PER LU g op C/TY OF ENC /N /TEAS } \ } \ ;': ii' �/ SOR SD. SSS -01, /.E 0 MAIN CAST TO /NCLUDE SEWER MAIN GREEN806W STANDARDS D a SCALE 1"=20' STANDARD TRENCH } 1 1 1 Y:.; (:': 5 90' BEND 0 W;! CITY AOF ENC /N /TASEDRA{f7NG NO. TO &PA /R DETA /L I I 1 I I I / = 10 RI /E ®R/1V 179.5, 5 j� U (� r w r o 5975 -1. I 1 { < < � ';:.! f ®R = 185.6 R ( _j OFESS/ I. ENGINEER OF 1?Ff,09D DR AN AUTNOR/ZE-h R/_-PT�r5EA1TAT)VC UAIDE•/7 MY � c DATL/M Ak7TE ALL ELEVATIONS Sf�WN ON THIS RGS PONS11'3LC L71-1,91W WYE /lJ5PtCTL -/_7 T9f P92 [CT 51 rt. I3AST-17 UPON u� � � - /3u if L-M - PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: APP OV D: PUBLIC SEWER EXTENSION FOR: " Call: TOLL FREE DESCRIPTION: 2" DISC SIMM ETC 2" DI TO? 0` IND EAST SIDE DATE: z� /8�/6 HORIZONTAL: 1" = 20' ✓V� . ^/\ a„' 829/852 REGAL ROAD, ENCINITAS, CA 92024 LOCATION: OM: OS N 1 16 (PT. � . s»r APN: 258 -241 - 05/258- 252-01 12651 -I 12-41 RECORD FROM: R0S NO 18416 (PT. N0. 1032 R.C.E. N0.:45629 MASH MAHER GLENN PRUIM 422 -4133 ELEVATION: 92.004/ NAND 88 VERTICAL: 1"= 4' Two WORKING DAYS BEFORE YOU DIG ROBERT D. DENTINO EXP.: 12 -31 -16 DATE .3/1q / 16 DATE `� 5� /(� PLANNING CASE NO: NA SHEET 2 OF 2 IMPORTANT NOTICE PLAN ARESASEDOV PENAVD88DATZN. ��Q( U. L),c�� "Vj. M4F1L•LD Yb 1F1t1?T/OJV RNO SURVEY . I MEREI3Y CERTIFY Section 4216/4217 of the Government Code requires a Dig Alert Identification PREVIOUS RECORD PLAN ELEVATIONS THAT WERE �� p� 2 y T RAT THE PRO -AEer WA5 CONSrT3UGTE0 JN 5U n 5 r/m T /AL ENGINEERING Number be issued before a "Permit to Excavate" be BASED 6W PE NGVD 29 DATLN MAY bF No. 45629 o > CD NFORM ANCr_ W) r/4 T P E ST• AS 13 U l L r PL 1/ N S . will valid. For your Dig Alert I.D. Number Call APPROXIMATL v CONVERTED TO NAND 88 BY AD91 K E.aiz -ai -'e '� 0 20 40 60 80 Underground Alert 2. 15 FEET SEE ROS M9 18416 FR DETAILS �C Z1iG� 9 440 SM F PLAIT Mill PH (AiOJTk5 -B11B FX (7607k3 1890 Two working days before you dig. \� 9j C /0- O FOF CAl \F 17013cR r D. Df AirIA10 017 TE CHANGE NO. DESCRIPTION APPROVED DATE Underground Service Alert BENCHMARK SCALE DESIGNED BY: 1 DRAWN BY: 1 CHECKED BY: ENGINEERING DEPARTMENT APPROVALS CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT DRAWING NO - /3u if L-M - PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: APP OV D: PUBLIC SEWER EXTENSION FOR: " Call: TOLL FREE DESCRIPTION: 2" DISC SIMM ETC 2" DI TO? 0` IND EAST SIDE DATE: z� /8�/6 HORIZONTAL: 1" = 20' ✓V� . ^/\ a„' 829/852 REGAL ROAD, ENCINITAS, CA 92024 LOCATION: OM: OS N 1 16 (PT. � . s»r APN: 258 -241 - 05/258- 252-01 12651 -I 12-41 RECORD FROM: R0S NO 18416 (PT. N0. 1032 R.C.E. N0.:45629 MASH MAHER GLENN PRUIM 422 -4133 ELEVATION: 92.004/ NAND 88 VERTICAL: 1"= 4' Two WORKING DAYS BEFORE YOU DIG ROBERT D. DENTINO EXP.: 12 -31 -16 DATE .3/1q / 16 DATE `� 5� /(� PLANNING CASE NO: NA SHEET 2 OF 2