Loading...
2013-11533 SG (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "fJMp('m: GEOTECHNICAL INVESTIGATION .AND EVALUATION LOCATED AT 2505 ROSEIYWAY COURT ENCIRMA5, CA PREPARED BY FMONE,RIN6 DE&4N SR011'P ON OC7o R 2S, 2012 SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE- CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO.19+'30 -44 HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NET AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY °�lJl 1 -(&- CCw R EYe G 4 t8 ® I L_ 1_ - E, 0. CHANGE NO. DESCRIPTION I APPRAWwL VP 4 ^BdIVr C* AC, z •zo •%3 13 -011 03 -21 -13 APPROVED I DATE 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - CSD - (760)- 633 -2770 B. GAS & ELECTRIC - SDGE - (760)- 438 -6200 C. WATER - oafvBjwAl419WATER DISTRICT - D. TELEPHONE - SBC BELL - (760) -489 -3411 E. CABLE TV - COX COMMUNICATIONS - (760)- 806 -9809X -2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)- 633 -2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)- 633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT CURTIS VONDER REITH AT (703) 848 -2127 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES 1, FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY AND /OR THE TURF /LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2 % CROSS SLOPE TOWARD THE IMP /BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP /BMP. 6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON - COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY- APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. ENVIRONMENTAL DATA IMPERVIOUS AREA 1) STEEPEST EXISTING NATURAL SLOPE ON -SITE = 1 :2 IMPERVIOUS AREA 2) MAXIMUM VERTICAL DEPTH OF CUT = 4' IMPERVIOUS AREA 3) MAXIMUM VERTICAL DEPTH OF FILL = 4' INCREASE IN IMPER 4) AVERAGE DEPTH OF CUT = 60 C.Y./ 900 S.F. x 27 = 1.8 FT 5) AVERAGE DEPTH OF FILL = 00 C.Y. /3600 S.F. x 27 = 0.0 FT IMPERVIOUS AREA BENCHMARK EARTHWORK: CUT = 00.0 C.Y. FILL = 60 C.Y. EXPORT = 60 C.Y. REMEDIAL = 140 C.Y. ( +/- 4' REMOVAL AND RECOMPACTION UNDER AND 5' OUTSIDE OF BUILDING AREAS) ESTIMATE DOES NOT INCLUDE STRIPPINGS, UTILITY TRENCH VOLUMES OR ANY OVE REXCAVAT IONS, IF REQUIRED BY SITE CONDITIONS. CONTRACTOR SHALL SATISFY SELF THAT ESTIMATES ARE CORRECT PRIOR TO COMMENCEMENT OF WORK. EARTHWORK QUANTITIES ARE ESTIMATED FOR PERMIT PURPOSES ONLY. (CALCULATED ON A THEORETICAL BASIS. ACTUAL QUANTITIES MAY VARY DUE TO SHRINKAGE AND SWELL FACTORS). DEPTH AND QUANTITY OF REMEDIAL GRADING IS SUBJECT TO FIELD VERIFICATION BY SOILS ENGINEER IN FIELD DURRING EXCAVATION. STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED STEEL PANELS /PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL, PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON - RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436 -4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PRIOR TO CONSTRUCTION: 265 SQFT AFTER CONSTRUCTION: 339 SQFT VIOUS AREA: 74 SQFT REPLACED: 191 SQFT SCALE I SPECIAL DISTRICT APPROVAL N q1z.11.5 DESCRIPTION: ENC -20 LOCATION: INTERSECTION OF CAMINO DEL HORIZONTAL: 1 " =10' RECORD FROM: NORTE RANCHO SANTA FE ELEVATION: 120.56 VERTICAL: N.A. DATUM: NAVD88 ENC. CONTROL SURVEY PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. OLIENHAIN MUNICIPAL WATER DISTRICT NOTES 1. POTABLE WATER WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS AND MATERIALS AS SPECIFIED IN THE MOST RECENT EDITION OF THE OLIENHAIN MUNICIPAL WATER DISTRICT STANDARD SPECIFICATIONS AND DRAWINGS FOR THE CONSTRUCTION OF WATERMAINS AND FACILITIES. INCLUDING ALL AMENDMENTS ADOPTED PRIOR TO THE DISTRICT APPROVAL DATE ON THESE PLANS. CONTRACTOR SHALL HAVE A COPY OF THE STANDARD SPECIFICATIONS ON THE JOB AT ALL TIMES. 2. THE SUBMISSION AND REVIEW OF ALL SUBMITTALS (SHOP DRAWINGS 6 SETS) AS REQUIRED BY THE STANDARD SPECIFICATIONS ARE TO BE ACCOMPLISHED PRIOR TO THE PRE - CONSTRUCTION MEETING WITH THE DISTRICTS INSPECTOR. 3. UNLESS OTHERWISE NOTED, CONNECTIONS TO EXISTING MAINS SHALL BE MADE DRY. THE TIME AND DURATION OF THE SHUTDOWNS OF EXISTING MAINS SHALL BE SUBJECTTO APPOROVAL BY THE DISTRICT. DISTRICT SHALL BE NOTIFIED TWO WEEKS MINIMUM IN ADVANCE OF ANY SHUTDOWN. 4. CONTRACTOR SHALL COORDINATE WITH DISTRICT ALL ARRANGMENTS FOR HIGH - LINING TEMPORARY SERVICES PRIOR TO SHUTDOWNS. NO SHUTDOWNS WILL BE SCHEDULED ON A MONDAY OR FRIDAY. 5. CONTRACTOR SHALL REVIEW ALL PROPOSED TRENCH WORK WITH CALL/OSHA. A COPY OF EXEMPTION LETTER OR TRENCHING PERMIT. IF REQUIRED, SHALL BE SUBMITTED TO THE DISTRICT PRIOR TO CONSTRUCTION. 6. NO WORK MAY BEGIN WITHOUT DIRECTION OF THE DISTRICT'S INSPECTOR. CONTRACTOR SHALL NOTIFY THE DISTRICTS INSPECTION DEPARTMENT 48 HOURS PRIOR TO THE BEGINNING OF WORK TO ARRANGE FOR INSPECTION OF THE PROJECT. 7. THE CONTRACTOR MUST CALL DIG ALERT OF SOUTHERN CALIFORNIA" TO HAVE UNDERGROUND SERVICE UTILITIES LOCATED PRIOR TO CONSTRUCTION. THIS CALL WILL BE MADE AT LEAST 48 HOURS IN ADVANCE PRIOR TO ANY WORK BEING PERFORMED IN THE PUBLIC RIGHT OF WAY. ( DIG ALERT PHONE: 800 - 227- 2600). 8. ALL EXISTING FACILITIES WHICH MAY AFFECT PROJECT CONSTRUCTION, IE. LINE CROSSINGS, LINE PARALLELING, OR PROPOSED CONNECTIONS SHALL BE FIELD VERIFIED BEFORE ANY CONSTRUCTION BEGINS. 9. THE CONTRACTOR SHALL FURNISH AND INSTALL PER THE STANDARD SPECIFICATIONS THE APPROPRIATE BURIED UTILITY AND WARNING IDENTIFICATION TAPE ABOVE ALL PUBLIC WATER LINES INCLUDING WATER LATERALS LOCATED IN THE PUBLIC RIGHT OF WAY. 10. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN PROFILE, TOP OF PIPE ELEVATION OF THE PIPE PROFILE IS 48- INCHES BELOW CENTERLINE OF FINISH GRADDE OF THE STREET. 11. ALL DEFLECTIONS (HORIZONTAL AND VERTICAL) SHALL BE MADE BY USE OF JOINT COUPLINGS WITH 4 IN MAXIMUM DELECTION PERCOUPLING (21N PER JOINT). NO BENDING, (CURVING) OF PIPE SHALL BE PERMITTED. 12. MANUAL AIR RELEASES SHALL BE INSTALLED AT ALL HIGH POINTS AND BLOW -OFFS AT ALL LOW POINTS IN THE WATER MAIN PROFILE. PLACE MANUAL AIR RELEASES AND BLOWOFFS WITHIN METER BOXAND LOCATE BEHIND CURB UNLESS OTHERWISE APPROVED BY DISTRICT REPRESENTATIVE. FIRE HYDRANTS MAY BE USED IN LIEU OF A MANUAL AIR RELEASE OR BLOW OFF WHEN LOCATED AT OR NEAR HIGH OR LOW POINTS, AS APPROVED BY THE DISTRICT REPRESENTATIVE. 13. INSTALL A MINIMUM 1 -INCH WATER SERVICE TO EACH LOT. METER TO BE LOCATED 5 -FEET FROM A SIDE LOT LINE. A3/4 INCH HIGH LETTER "W" SHALL BE CHISELED IN TOP OF EXISTING CURB OR IMPRINTED IN NEW CURB AT ALL WATER SERVICE CROSSINGS, 14. METER BOXES SHALL NOT BE PLACED WITHIN DRIVEWAYS OR SIDEWALKS WITHOUT THE DISTRICTS PRIOR WRITTEN CONSENT. 15. ALL WATER SERVICES FOR IRRIGATION, MULTIPLE RESIDENTIAL COMPLEXES, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL HAVE APPROVED BACKFLOW PREVENTION DEVICE ON CUSTOMER'S SIDE OF WATER METER. 16. CONTRACTOR SHALL TIE OFF ALL VALVE LOCATIONS AND PROVIDE WRITTEN DIMENSIONS TO INSPECTOR IMMEDIATELY UPON INSTALLATION OF VALVES. 17. LINE VALVES, WHERE REQUIRED AT STREET INTERSECTIONS SHALL BE LOCATED AT THE TEE WHENEVER POSSIBLE. 18. FIRE HYDRANTS, AS APPROVED BY THE APPROPRIATE FIRE DISTRICT AND MEETING THE DISTRICT'S STANDARD SPECIFICATIONS, ARE TO BE INSTALLED AT LOCATIONS SPECIFID BY THE FIRE DISTRICT. 19. ALL DESIGN CHANGES TO THE WATER SYSTEM SHALL BE APPROVED BY THE DISTRICT REPRESENTATIVE IN WRITING PRIOR TO CONSTRUCTION AND ACCEPTANCE OF THE CHANGE 20. THE WATER SYSTEM SHALL BE PRESSURE TESTED IN ACCORDANCE WITH THE PROCEDURES IN THE OMWD STANDARD SPECIFICATIONS. THE CLASS OF PIPE SHALL BE USED AS THE DESIGNATED WORKING PRESSURE FOR TESTING ALL PIPE, VALVES (CLOSED) AND APPURTENANCES. LANDSCAPING 1. ALL SLOPES SHALL BE PLANTED AND IRRIGATED IN ACCORDANCE WITH PLANS APPROVED BY THE CITY ENGINEER. PLANS SHALL CONFORM TO THE CITY OF ENCINITAS GRADING ORDINACE AND ALL ADOPTED LANDSCAPE AND IRRIGATION STANDARDS. 2. FINISH GRADING AND PLANTING SHALL BE ACCOMPLISHED ON ALL SLOPES PRIOR TO OCTOBER 1 OR IMMEDIATELY UPON COMPLETION OF ANY SLOPES GRADED BETWEEN OCTOBER 1 AND APRIL 15. OWNER ERIC LEITSTEIN 2505 ROSEMARY COURT ENCINITAS, CA 92024 7660 -230 -2470 ER'S CERTIFICATE SITE ADDRESS 2505 ROSEMARY COURT ENCINITAS, CA 92024 APN: 265 - 026 -61 LEGAL DESCRIPTION LOT 5 MAP NO. 12886 IT IS AGREEED THAT FIELD CONDITIONS MAY REQUIRE CHANGES TO THESE PLANS. IT IS FURTHER AGREED THAT THE (OWNER (DEVELOPER) SHALL HAVE A REGISTERED CIVIL ENGINEER MAKE SUCH CHANGES, ALTERATIONS OR ADDITTIONS TO THESE PLANS WHICH THE CITY ENGINERER DETERMINES ARE NECESSARY FOR AND DESIRABLE FOR THE PROPER COMPLETION OF THE IMPROVEMENTS. I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. DATE: SIGNATURE: ERIC LEITSTEIN STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PP.ACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. J. SIGNATURE: "I le', 1 !��,� •``� DATE: - * `• I I GREMRY A. CAUDILL GAC ENGINEERING AND LAND SURVEYING 725 OLD STAGE ROAD #7 FALLBROOK, CA 92028 760 - 594 -4889 EDG PROJECT NO. 125100 -1 ENGINEERING DESIGN GROUP 2121 MON7IEL ROAD SAN MARCOS CA 92069 760 - 839 -7302 •O 7- G16 THE RECOMMENDATIONS IN THIS REFERENCED REPORT TITLED LIMITED GEOTECHNICAL INVESTIGATION AND EVALUATION NEW CARPORT TO BE LOCATED AT 2505 ROSEMARY COURT, ENCINITAS, CALIFORNIA, DATED OCTOBER 23, 2012 ARE TO BE INCORPOATEO INTO THIS PLAN FOR THE GRADING AND IMPROVEMENT THE SITE. SITE 2505 ROSEMARY CT. KEY MAP PER SHT 9 ENCINITAS BLVD, VICINITY MAP NTS BMP PROJECT STATUS PUBLIC WORKS PLANNING AND BUILDING PARKS AND RECREATION OLIVENHAIN WATER DISTRICT ENCINITAS FIRE DEPARTMENT M / f3 PLANS PREPARED UNDER SUPERVISION OF DATE: 2 -13 -13 GREGORY A. CAUDILL R.C.E. NO.: C -60957 ENGINEER'S NAME EXP.: 12 -31 -14 IIB ENGINEERING DEPARTMENT APPROVALS AA CEfypED: A �w PP MASIH MAHER�C42-5119 GLENN PRUIM, C51274 ENGINEERING/ PUBLIC WORKS DIRECTOR 41Z3113 IfIz71 3 DATE DATE j 41 it./ DATE SI DATE IGN CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT SIMPLIFIED GRADING PLAN FOR: 2505 ROSEMARY CT. LEITSTEIN CAR PORT 265 - 026 -61 DRAWING NO. 11533 -SG SHEET 1 OF 3 V ' o I� w O a LL LL Tz m Ira ;Nm �D . o .o �N� H k RET. WALL PER PLAN TW 106.8' 2 :1 2' 1 2' -1 2s :[6" CONCRETE WITH 1 112" X 1 112; `a 17 GAGE STUCCO NETTING. 3' DRAINAGE DITCH m a koa nts O 3' WIDE , SWALE SHALL BE PLANTED WITH DEPTH COMPACTED TOP SOIL ELBOW. � ORIGINAL LOT LINE LOT 10: g7 s ADEQUATE GROUNDCOVER OR TURF, ,3 FEET r OVER HEAD POWER LINES: OHP 6WI' REMOVE DRAIN v W F��.51 PLANTS THAT ARE NOT PRONE TO DIRECTED THROUGH CONVENTIONAL VEGETATED SWALE PRIOR TO OUTLET AND n ON EX. TT EE ...,, o > ( I m 14 BLOCKING THE DRAINAGE FLOW MAY CRUSHED STONE DRY WELL TYPICAL POP UP DRAIN EMMITER DETAIL TURF REINFORCEMENT MAT m nts bo A CO � ALSO BE PLANTED ON SIDE SLOPES, COBBLESTONE DISIPATER PER PLAN: ' AJ,",. IF APPLICABLE `t z CONVENTIONAL VEGETATED SWALE wr fp� 0� yQ" o m z LAWN s' nts B III III '.. m m X G7 D r 00 N J D O ! r r Z r Y" m0 m m z a m� o D Ar 6' MIN. ENGINEERED SOIL f j �`_, �' z r *SEE NOTE BELOW �,, f, %, .d. •'ENGINEERED SOIL' LAYER SHALL BE MINIMUM 6' DEEP 'SANDY LOAM' SOIL C T_ MIX WITH NO MORE THAN 5% CLAY CONTENT. THE MIX SHALL CONTAIN 50 -60% 4 '7 � 7•8' SAND, 20 -307 COMPOST OR HARDWOOD MULCH, AND 20 -30% TOPSOIL G NOTE. VEGETATED SWALES ON GRADES OF MORE THAN 2.5% MUST INSTALL CHECK DAMS TO LIMIT THE SLOPE OF THE SWALE TO 2.5% UNLESS OTHERWISE 5 SOdy APPROVED BY THE DIRECTOR OF ENGINEERING SERVICES, I ee LAWN NOTE, NO FILTER FABRIC IS TO BE USED IN THIS SECTION. REMOVE EX. TREE O STORMWATER RUNOFF IN LANDSCAPE AREAS TO DRAIN AWAY FROM STRUCTURE isj A. z�� �O AT 2 0% FOR 5 OFT 3 O. I m ■ CHANGE NO. w, a CD m. 0 ., O z n W� J DD O m O NOTE: ALL BMP'S AND DRAINAGE STRUCTURES ARE OWNERS MAINTENANCE RESPONSIBILITY. D Fn 0 w rI "t bY. "INIWnLS_ COMPACTED TOP SOIL ELBOW. � ORIGINAL LOT LINE LOT 10: g7 s EXISTING CONTOUR: 6 RUNOFF FROM STRUCTURE, ROOF DOWN DRAINS AND HARDSCAPE SURFACES TO BE r OVER HEAD POWER LINES: OHP 6WI' REMOVE DRAIN v W F��.51 �m PERFORATED DRAIN PIPE. DIRECTED THROUGH CONVENTIONAL VEGETATED SWALE PRIOR TO OUTLET AND n ON EX. TT EE ...,, o > ( I LEACH HOLE. 14 o CONFUENCE WITH PUBLIC STORM WA 1ER FLOW. CRUSHED STONE DRY WELL TYPICAL POP UP DRAIN EMMITER DETAIL OUTLET EMITTER BY NDS: r, nts bo m P °ii � COBBLESTONE DISIPATER PER PLAN: ® AJ,",. REMOVE EX. n CONVENTIONAL VEGETATED SWALE wr fp� yQ" GRA VEL BAGS PER PLAN: lz)� � C) � ,.f`F z LAWN s' nts B III III p• rI 4" DIA PVC 4" DIA COBLESTONE ____ III • •. I} 3/4" GRAVEL NDS POLYOLEFIN POP -UP DRAINAGE EMITER WITH U.V. INHIBITOR. .5' 1.5' PERF. PVC 1 PER PLAN 12 "02" COBLE STONE DISIPATER COBBLE DRAINAGE DISIPATER DETAIL: n is NDS POLYOLEFIN POP -UP DRAINAGE EMITER WITH U.V. INHIBITOR. NDS } BEND SEWER DRAIN "t bY. "INIWnLS_ COMPACTED TOP SOIL ELBOW. � ORIGINAL LOT LINE LOT 10: g7 INITIALS EXISTING CONTOUR: 6 RUNOFF FROM STRUCTURE, ROOF DOWN DRAINS AND HARDSCAPE SURFACES TO BE OVER HEAD POWER LINES: OHP 6WI' REMOVE DRAIN v W F��.51 �m PERFORATED DRAIN PIPE. DIRECTED THROUGH CONVENTIONAL VEGETATED SWALE PRIOR TO OUTLET AND PROPOSED BUILDING ON EX. TT EE CONCRETE PER PLAN: o > ( I LEACH HOLE. 14 o CONFUENCE WITH PUBLIC STORM WA 1ER FLOW. CRUSHED STONE DRY WELL TYPICAL POP UP DRAIN EMMITER DETAIL OUTLET EMITTER BY NDS: nts bo m P °ii � COBBLESTONE DISIPATER PER PLAN: ® AJ,",. REMOVE EX. n CONVENTIONAL VEGETATED SWALE wr fp� yQ" GRA VEL BAGS PER PLAN: lz)� � C) � ,.f`F ( p RETAINING WALL ;i co ru nts B III III p• I � �0- NEW CONC. DWY MATCH EXIST. AD DW'Y 4" DIA PVC 4" DIA COBLESTONE ____ III • •. I} 3/4" GRAVEL NDS POLYOLEFIN POP -UP DRAINAGE EMITER WITH U.V. INHIBITOR. .5' 1.5' PERF. PVC 1 PER PLAN 12 "02" COBLE STONE DISIPATER COBBLE DRAINAGE DISIPATER DETAIL: n is NDS POLYOLEFIN POP -UP DRAINAGE EMITER WITH U.V. INHIBITOR. NDS } BEND SEWER DRAIN "t bY. "INIWnLS_ COMPACTED TOP SOIL ELBOW. CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT ORIGINAL LOT LINE LOT 10: / INITIALS EXISTING CONTOUR: 6 y✓ � 3 OVER HEAD POWER LINES: OHP 6WI' PVC DRAIN / SIZE PER PLAN PERFORATED DRAIN PIPE. PROPOSED BUILDING ON A 4" DEEP BED OF CRUSHED ROCK CONCRETE PER PLAN: .' 1/4" LEACH HOLE. MK=ZK=l 12'x12' BOX INLET BY NDS: CRUSHED STONE DRY WELL TYPICAL POP UP DRAIN EMMITER DETAIL OUTLET EMITTER BY NDS: nts f i I __ "t bY. "INIWnLS_ BOUNDARY: c- CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT ORIGINAL LOT LINE LOT 10: INITIALS EXISTING CONTOUR: 6 y✓ � 3 OVER HEAD POWER LINES: OHP 6WI' ROOF DOWN DRAIN: • 3' WIDE CONVENTIONAL VEGETATED SWALE: �- 0 z J W 10 CD Ul � I I'll z f._ cl DESCRIPTION APPROVED DATE BENCHMARK SCALE PRtDVAL- UPDATE S[4#i y Z is DESCRIPTION: ENC -20 V GEC LOCATION: INTERSECTION OF CAMINO DEL HORIZONTAL: 1"=10' RECORD FROM: NORTE RANCHO SANTA FE L •?A sk • ELEVATION: 120.56 VERTICAL: N.A. DATUM:NAVD88 ENC. CONTFOL SURVEY 1,3_011 03 -21 -10 MIN. 5 1/2 IN. PCC ON q COMPAC FED BASE. o �0 00 m y.00 /.�:PI' 6.0' Ff r GARAGr EL_, 100,00 PROPOSED RET. WALL CONST PER BLDG. PLANS 11-1518 0 +00 0 +05 0 +10 0 +15 0 +20 SECTION DZrALL A -A': nts B 0 +00 0 +05 0 +10 0 +15 0 +20 0 +25 0 +30 SEMON DETAIL. -` nts nts RESIDENCE 7 N 15 °07'37" 0.rt� no/ 1.0% GRADING PER AS BUILT GRADING PLAN1035 —G PROPOSED CARPORT CONST PER BLDG. PLANSlti-1 -518 BLDG. RI nr_ LEGEND: "t bY. "INIWnLS_ BOUNDARY: ENGINEERING DEPARTMENT APPROV CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT ORIGINAL LOT LINE LOT 10: INITIALS EXISTING CONTOUR: 6 PLANS PREPARED UNDER SUPERVISION OF DATE: 2 -13 -13 GREGORY A. CAUDILL R.C.E. NO.: C -60957 ENGINEER'S NAME EXP.: 12 -31 -14 RECOMMEND APP V . ASIH MAHER, C42519 GLENN PRUIM,; C51274 ENGINEERING( PUBLIC WORKS DIRECTOR 4/23/ l 3 _ Y/�213 DATE DATE OVER HEAD POWER LINES: OHP 6WI' ROOF DOWN DRAIN: • 3' WIDE CONVENTIONAL VEGETATED SWALE: �- PROPOSED BUILDING CONCRETE PER PLAN: .' RETAINING WALL PER ARCHITECT PLAN: (SHT S3 -1) MK=ZK=l 12'x12' BOX INLET BY NDS: OUTLET EMITTER BY NDS: COBBLESTONE DISIPATER PER PLAN: ® AJ,",. _ GRA VEL BAGS PER PLAN: lz)� � C) � ,.f`F ;i co ru III III AD DW'Y r J � ! r ._ELEC. H.H.; '�-� ❑ 17 - V VEGETATE SWALE o PER Etta -D ;u R p � z OMB pf. oi. } m m t r oF�, v i / T� s 3 V i4 __ rf.. r / S BOX - w i EX. 41N. A.C. % ROLLED CURB i 7 / c o CD / m o XI 97, SPECIAL DISTRICT APPROVAL "t bY. "INIWnLS_ ` ENGINEERING DEPARTMENT APPROV CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT N TIAL INITIALS PLANS PREPARED UNDER SUPERVISION OF DATE: 2 -13 -13 GREGORY A. CAUDILL R.C.E. NO.: C -60957 ENGINEER'S NAME EXP.: 12 -31 -14 RECOMMEND APP V . ASIH MAHER, C42519 GLENN PRUIM,; C51274 ENGINEERING( PUBLIC WORKS DIRECTOR 4/23/ l 3 _ Y/�213 DATE DATE SIMPLIFIED GRADING PLAN FOR: 2505 ROSEMARY CT. LEITSTEIN CAR PORT 265- 026 -61 DRAWING NO. 11533 —SG SHEET 2 OF 3 O Z Lu m Nd N N 0 U n ? o d JQ a m� ? oa Lu W m� O W N> U^ Q O \)7 n \% \ \\ E±} \\° !:$ t>i !=e ! p, zJa !/! `7f �;. B 08— 011 06-21 -10