Loading...
2016-12868-SG (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "GEOTECHNICAL INVESTIGATION, PROPOSED SINGLE FAMILY RESIDENCE, 3031 WILDFLOWER DRIVE, CITY OF ENCINITAS PARCEL 4, PARCEL MAP #18461, APN 264- 091 - 6700" PREPARED BY BELFAST ENGINEERS, LLC, DATED NOVEMBER 12, 2015, PROJECT #0105- 001 -00, SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. 12868 -SG HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12, ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION C ON OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. CHANGE NO. DESCRIPTION APPROVED DATE I ClAh%GE G60TECN EgGR OF RECORD & REMEDIAL I AA. A,^ I Q I/. ,_(_j EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT RALPH GENOVESE AT (n8) 756 - 5249, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY AND /OR THE TURF /LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP /BMP AREA OR HAVE ANOTHER- APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP /BMP: 6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON - COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT`THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A CITY - APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. 4 OLIVENHAIN MUNICIPAL WATER DISTRICT POTABLE WATER SYSTEM NOTES: 1. POTABLE WATERWORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS AND MATERIALS AS SPECIFIED IN THE MOST RECENT EDITION OF THE OLIVENHAIN MUNICIPAL WATER DISTRICT (DISTRICT) STANDARD SPECIFICATIONS AND DRAWINGS FOR THE CONSTRUCTION OF WATER MAINS AND FACILITIES, INCLUDING ALL AMENDMENTS ADOPTED PRIOR TO THE DISTRICT APPROVAL DATE ON THESE PLANS. CONTRACTOR SHALL HAVE A COPY OF THE STANDARD SPECIFICATIONS ON THE JOB SITE AT ALL TIMES. 2. THE SUBMISSION AND REVIEW OF ALL SUBMITTALS (SHOP DRAWINGS, SIX SETS) AS REQUIRED BY THE STANDARD SPECIFICATIONS ARE TO BE ACCOMPLISHED PRIOR TO THE PRE - CONSTRUCTION MEETING WITH THE DISTRICT'S INSPECTOR. 3. UNLESS OTHERWISE NOTED, CONNECTIONS TO EXISTING MAINS SHALL BE MADE DRY. THE TIME AND DURATION OF ANY SHUTDOWNS OF EXISTING MAINS SHALL BE SUBJECT TO APPROVAL BY THE DISTRICT. DISTRICT SHALL BE NOTIFIED TWO WEEKS MINIMUM IN ADVANCE OF ANY SHUTDOWN. 4. CONTRACTOR SHALL COORDINATE WITH DISTRICT ALL ARRANGEMENTS FOR HIGH - LINING TEMPORARY SERVICES PRIOR TO SHUTDOWNS. NO SHUTDOWNS WILL BE SCHEDULED ON A MONDAY OR FRIDAY. 5. CONTRACTOR SHALL REVIEW ALL PROPOSED TRENCH WORK WITH CAL /OSHA. A COPY OF EXEMPTION LETTER OR TRENCHING PERMIT, IF REQUIRED, SHALL BE SUBMITTED TO THE DISTRICT PRIOR TO CONSTRUCTION. 6. NO WORK MAY BEGIN OR PROCEED WITHOUT DIRECTION OF DISTRICT'S INSPECTOR. CONTRACTOR SHALL NOTIFY THE DISTRICT INSPECTIONS DEPARTMENT 48 HOURS PRIOR TO THE BEGINNING OF WORK TO ARRANGE FOR INSPECTION OF THE PROJECT. 7. THE CONTRACTOR MUST CALL "DIG ALERT OF SOUTHERN CALIFORNIA" TO HAVE UNDERGROUND SERVICE UTILITIES LOCATED PRIOR TO CONSTRUCTION. THIS CALL WILL BE MADE AT LEAST 48 HOURS IN ADVANCE PRIOR TO ANY WORK BEING PERFORMED IN PUBLIC RIGHT -OF -WAY. (DIG ALERT PHONE: 800 - 227 -2600) 8. ALL EXISTING FACILITIES WHICH MAY AFFECT PROJECT CONSTRUCTION, I.E., LINE CROSSINGS, LINE PARALLELING, OR PROPOSED CONNECTIONS SHALL BE FIELD VERIFIED BEFORE ANY CONSTRUCTION BEGINS. (NOTES CONTINUED ON SHEET 4) BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DESCRIPTION: 2.5" DISK STAMPED CLSB -012 LOCATION:NE C07 VLT SW QW LONE JOCK & DR L RNCh HORIZONTAL: N/A RECORD FROM: CITY OF ENCINITAS - POINT NO. 101 ELEVATION: 203.16 VERTICAL: N/A DATUM: N4VD88 STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED STEEL PANELS /PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE, CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY: THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON - RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO AT (760) 436 -4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. OWNER ROSE GENOVESE REVOCABLE TRUST P.O. BOX 1853 RANCHO SANTA FE, CA 92067 SITE ADDRESS 3091 WILDFLOWER DRIVE APN: 264 - 091 -67 •o \�n T n 0 �Z <n Y Z D LEGAL DESCRIPTION F m \\ PARCEL 4 OF PM FILED IN THE OFFICE � a{ G OF THE SAN DIEGO COUNTY RECORDER i ON APRIL 24, 2000. OWNER'S CERTIFICATE I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. SIGNATURE: ffyi.( DATE: O$� IG ROSE GENOVESE, TR. SOILS ENGINEER'S CERTIFICATE VID F _ _� \ -CDR. v eo4 VICINITY MAP N.T.S. 1 DALE R. REQ0 ' A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT t1IAVE RCVIEW0TASAlA?LI9G & STUDY OF THE SOIL COMPITIO14SPKEVALEN1 WITH111TIQS SITE PERFORMED SYAUTKU14Y BELE'AST (RCE 40333) OR UNDER HIS DIRECTtON ON 3 6 14 AND OU II L5 15. ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, -WITH MB BELFAST'S RECOMMEN1700N9- 111% BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS �PROJECT HAVE BEEN INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS. 1L / SIGNED: < :Q� RCE NO.: 19393 � q CD C\ g13 I EXP. DATE: 9130 30J20-D' w Y p. 913011T Via' JOB #: 0105 - 001 -00 i 07FCIA 'TERRA 'CECHNOLOr Y ENGt11EERING , INC. OFC 1305 SIMPSO" WAY, SUITE D ESCoUD100, CA 92029 STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PE 0RMED BY THE ENGINEER. ESS/gllq� SIGNATURE: DATE: lz ? 4�`a S CO,r� CO EY ' �/9 ?114 .4 Ns. C062716� COFFEY ENGINEERING, INC. + Exp. 06/30/18 + 9666 BUSINESSPARK AVENUE, SUITE 210 s SAN DIEGO, CA 92131 -1646 1 PH (858)831 -0111 1 FAX(858)831 -0179 %qi� C1V1�'e RCE EXPIRES: JUNE 30, 2018 OF CP&ti �s nv 1 Irwe+l Ivlw EARTHWORK DATA STEEPEST EXISTING NATURAL SLOPE ON -SITE = N/A H: N/A V (SITE PREVIOUSLY GRADED) 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE MAXIMUM VERTICAL DEPTH OF CUT = 1.8 ' OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES MAXIMUM VERTICAL DEPTH OF FILL = 1.3 ' U EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY Z s MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S CUT = 250 C.Y. FILL = 250 C.Y. s RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, IMPORT = N/A C.Y. LL FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: REMEDIAL = 4$$ C.Y. (VfITN 18 OF REMOVAL & RECOMPACTION FOR STRUCTURES) 1 /I nn V A. SEWERS - CSD - (760)- 633 -2770 (PER GEOTECHNICAL REPORT RECOMMENDATION OF ALTERNATIVE 1) Z c B. GAS 8 ELECTRIC - SDGE - (760)- 438 -6200 cz e p C. WATER - OLIVENHAIN MUNICIPAL WATER DISTRICT - (760)753 -6466" W D. TELEPHONE - SBC BELL - (760) -489 -3411 DRAWING INDEX W " E. CABLE TV - COX COMMUNICATIONS - (760)- 806 -9809 X -2233 TITLE SHEET 1 Z ° ___ BMP PROJECT STATUS (� 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. GRADING PLAN - -- 2 Z PHONE: (760)- 633 -2770. CONSTRUCTION BMP PLAN 3 LL W e SECTIONS AND DETAILS __ 4 r c 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760 )633 -2770. ALL WORK STANDARD W PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. APPROVALS AS-BUILT LL IMPERVIOUS AREA - (SEE SPECIAL INSPECTION NOTE ON SHEET 2) INITIAL DATE ® LL IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 0 SQ FT '9'IS PUBLIC YIDRKS U /A- ANA U a IMPERVIOUS AREA AFTER CONSTRUCTION: 9,830 SQ FT BONN S. FFE DATE INCREASE IN IMPERVIOUS AREA: 9_,830 SQ FT PLANNING /(J� lFliz SRl1% IMPERVIOUS AREA REPLACED: 0 SQ FT CITY NGINEER DATE INSPECTOR 21 IB PUBLIC WORKS PLANNING AND BUILDING PARKS AND RECREATION OLIVENHAIN MUNICIPAL WATER ENCINITAS FIRE DEPARTMENT DISTRICT - tt,tI0 PLANS PREPARED UNDER SUPERVISION OF DATE _3[o )m / R.C.E. NO.: 62716 JO . C FEY EXP. 6/30/18 I \LV VItlIItlI LIY✓L /•'fir /j/1 \ ✓. /� MASIH MAHER GLENN PRUIM r 16 ENG. /PUB. I> ROTOR 16 DA E DATE �, If 3091 WILDFLOWER DRIVE GENOVESE REVOCABLE TRUST (APN: 264- 091 -67) SHEET 1 OF EASEMENTS ' OA EXISTING 40' PRIVATE ROAD AND UTILITY PER PARCEL MAP NO. 18461. -! OB WATER EASEMENT TO THE OLIVEHAIN WATER DISTRICT PER PARCEL MAP NO. 18461. OC WATER EASEMENT TO THE CARDIFF SANITATION DISTRICT PER PARCEL MAP NO. 18461. ® ®y OD EXISTING PRIVATE DRAINAGE EASEMENT PER PARCEL MAP N0, 18461. OE 10' EASEMENT FOR PEDESTRIAN AND EQUESTRIAN TRAIL PURPOSES (TOGETHER WITH THE ACCESS EASEMENT TO MAINTAIN THE TRAIL PER PARCEL MAP NO. 18461 . EXISTING 40' PRIVATE ROAD AND UTILITY EASEMENT RECORDED APRIL 3, 1998 AS I. DOCUMENT NO. 1998- 0187785. OG EXISTING FLOWAGE EASEMENT PER PARCEL MAP 189461. i OH EXISTING 20' EASEMENT TO THE CITY OF ESCONDIDO RECORDED JANUARY 9 , 1975 AS FILE NO. 75- 005919. PERMEABLE VOID FILLER, TYP Y8 " -3/8" PAVER GRADE AS NEEDED BEDDING COURSE (NO. 8) AGGREGATE IN Y8 " -3 /g" (N0. 8) VOIDS (19 MIN) SOLDIER COURSE, TYP AGGREGATE 2" DEPTH isi if VARIES PER 6" " o B/OFILTR4TION PAVER 12 AREA, 400 FTZ THICKNESS �— �_ AT BASE =11 =1 =11 =1 G NATIVE MATERIAL COMPACTED TO 95% 5 x lO' RIP RAP WET EDGE j REL. COMPACTION PER D -40. rf ' RESTRAINT, TYP VARIES 6" MW 3/4" CRUSHED ROCK BASE �' 2 BACKING -8" T 6" THK. OVER 6" D.G. FILTER 3" PERFORATED PVC BLANKET PIPE (SCHD 40) CHOKER COURSE 3/8 "J/2" PERMEABLE PAVER SECTION (N0. 57) CRUSHED ROCK 4" THK. V , / �, A, U NO SCALE q - NOTES - PERMEABLE Pal VER INSTALLS TION: 1. ALL AGGREGATE MUST BE CLEAN /WASHED AND FREE OF FINES (SAND, SILT, ETC.). 2. THE PAVERS SHALL NOT BE SEALED ONCE THE VOID FILLER HAS BEEN ADDED. J. EACH COURSE SHALL BE VIBRATORY COMPACTED BEFORE PLACEMENT OF NEXT COURSE. Q0/' Y, , 18" CB PARKWAY GRATE f R/M -214 53 rte° �A�� r ` _I 1 =1 =1 I- iii =1 �I 1 =iii -I i1 =1 a =1 1 =1I �I 1 =1 =1I ' 4. NO IMPERVIOUS LINER OR FILTER FABRIC IS TO <- ,Z < % / \ - 812 PVC _ _ _ _ _ _ 4T OF 3/8" GRAVEL ' � ' ' , ! // , I I rl I1 =1I GI I =1LC- -III �\ r IE= 212.83 ?; 217\ m BE USED. 1 �_ ,., ,_ a; - "` � � �� \ �'' -� '% '..... � "' ' ,/ � � °• � +'' PIPE RISER r ; X111= III =III III III =III =1 II III =III= III = 11111 =11� /\ 5. SPECIAL APPROVAL REQUIRED FOR USE IN \ \ 8 2-T COVER / . , 12.1 s \ /— OVER PIPE HIGHLY EXPANSIVE SOIL- SUBDRA/N MAY BE / "' f 1 . Y CON " , 8 A� REQUIRED. '<: ,' r o f, ; -.: e ' .°� 11: P, \.., o ° NOTE / /% a o ," CRUSHED ROCK 12" , � .., � � � � � / .✓ / ; % / K�ORATED PVC PIPE 2 ;t /, 0 / 1 °���� __ I . PVC, \ \ \ 'd PIPE WITH i v / i i2° h TIE 4" PERF(�R1C7 1S TIE 4 -6" 4 PVC PIPE Ti7 / , BY� k ^z> PIPE INTO RISER STORMORAIN SYSTEM PERFORATIONS AT THE INVERT* Y i ti � ��; ,. �\� NOTE: `BIORETENTION "ENGINEERED SOIL" LAYER SHALL BE MINIMUM 24" DEEP "SANDY LOAM" SOIL MIX WITH NO MORE THAN 5% CLAY f uo ,'r ,..... o a o / ,; ;,/ ,,,, '/ J �� �� . PAR � ..,GRAT� 60% SAND, 20 -30% COMPOST OR HARDWOOD MULCH, AND 20 30 /o TOPSOIL. �. k % % "� �' �-� �� RIM ='93 ° a CONTENT. 17,63 ` +. 314 CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 12" BUT MAY BE DEEPENED TO INCREASE THE INFILTRATION AND o� 11 �� jE= 214.63 .wM �;;1 STORAGE ABILITY OF THE BASIN. ,�� FL ,. r, /,. �, THE EFFECTIVE AREA OF THE BASIN SHALL BE LEVEL AND SHALL BE SIZED BASED ON ENCINITAS STORMWATER MANUAL j . SURFACE AREA OF THE BIORETENTION BASIN v- x_276.43 Z , 1;_ , -:. �� v CALCULATIONS. TYPICALLY, S4% OF THE IMPERVIOUS AREA DRAINING TO IT. L --- s� Ft,. 150 HOSE - r I L % i .4 q 1, P eio RErENri ®n� �� ei�irY '- e.`� Z f , r PERFORATED "? r -'' hIPEUNbEROR4iN.�� , 6. P AI ox � r r g� NOT TO SCALE i DRAINAGE NOTES Off �� �` ..?'rr r � � �; � h •�� .�, . �. ?� � r � f�, �`� � HARDSCAPE GRADES TO BE 19 MINIMUM TO DRAINS AND AWAY FROM STRUCTURE. i, SINGLE FAMILY RESIDENCE = Z� <' SOFTSCAPE GRADES TO BE 29 MINIMUM TO DRAINS (19 WHERE FLOW IS CONCENTRATED) AND 29' ..[ o t 218.53 F �'.' f PAD`= 217.73 �' + ] i' ' ' - %- MINIMUM AWAY FROM STRUCTURE. si, "/. 216: a 7 e Ir.';° 1I f , i //////jjj r f 3O SOIL COVER ABOVE DRAIN LINES SHALL BE 12" MINIMUM UNLESS OTHERWISE NOTED. os — I I, /s, NOTIFY CIVIL E INEER !F ANY NON DRAINING SUMP CONDITIONS BECOME APPARENT DURING irrCONSTRUCTION.NG { ' /..... t� "� _ 11�l,', �; �saA k�f ,I� \ ; / r�,r,s 11 -1 / / { �t; rf.`` '{ , _ ....,__ �1• ' , 5O. PROVIDE MIN 4'x4" OPENING IN BASE OF WALL FOR DRAINAGE. ... CONC r ! gk _ 1 WALKWAY.b r ;?. ::_: 'y�1 01� TYP �1 J . / a n° ti� 3 CAR f „ - n r r l _ 1,4R4 �� ° - ti, r m ' TOPOGRAPHY NOTE r _. r GRADING PLAN WITH THE BENEFIT OF A TOPOGRAPHY AND OR A RECORD DRAWINGS � WE PREPARED THIS GR w 3 ' PROVIDED BY THE OWNER, ANOTHER SURVEYOR, AND OR A GOVERNMENT AGENCY. THEREFORE, WE WILL I bs t;_.� -.'� __ NOT BE HELD RESPONSIBLE FOR CONSTRUCTION CONFLICTS DELAYS OR ADDITIONAL COSTS INCURRED F 218 _.� d s >, (.. . spa'; ;;t - , W a' ' ✓' , -_ - _, fib Cf AS A RESULT OF INACCURATE TOPOGRAPHIC INFORMATION. FURTHERMORE, THE PLOTTING OF EXISTING " - ._ � '- _ ''i �- 'a: f i ; ' PARKWAY GRATE UTILITIES ON THIS PLAN DOES NOT CONSTITUTE A GUARANTEE OF THEIR LOCATION, SLOPE, DEPTH, SIZE, t / f "r' ;` <y _ OR TYPE EXACT LOCATION DEPTH, SIZE, OR TYPE OF LINES AND FACILITIES CAN ONLY BE DETERMINED - Lu = "�'% "' t 211' P� _ ' / IE= 215143 BY FIELD EXPLORATION I.E. POTHOLING, EXCAVATION) PRIOR TO CONSTRUCTION. WE WILL NOT BE HELD (� �a _l� r RESPONSIBLE FOR COSTS INCURRED IN THE EVENT THAT EXISTING UTILITIES WERE NOT OF THE Z /� l q F „ t F u `\� Lu - LOCATION, SLOPE, DEPTH, , SI E TYPE INDICATED. F- _. _..._.. _ ON P TH Z OR W .yi FIR €...L9EPT � >,_'_ i t ,.. ,, ' ° fir` r i T LL it TI E ®1% IL _ Y / !l�){U SOURCE OF P ®GRAPH .._ r .._ ,. ,,,,,,,_ r A �r MIN. CON GECT FROM i r s _ .., �:- -' . %:;,,.. r /'� � PERFO�TEfi` PIPE PERFORATEp �� � PIPL�,UNDERDRAIN (TYP –3 LOAT/ONS) GEOCENTRIC LAND SURVEYING MONUMENT NOTES _ _ N69 °23'52 "E ,258.89' z 2150 N. CENTRE CITY PKWY, SUITE E ' ' ' ``r r s� j"""� -- INDICATES FOUND 2 IRON P WITH DISC STAMPED LS 4306 PER pp... ....... .... ... ._... - .._.. .. .. _ r,. t ,, `T"v - "- \, d O (7 �� - X INDICATES SEARCH FOR NOT FOUND r k.. TEL 4 CA 45 94429 ' I O 2401 BR OL` QITCH FAX . (7 0) 749 ,.r f . ✓' §;a 7 a ,;, �,l ib , , �, _., - � r , ' , / y _J ,., r 3oNN 5i CoFF - ` D c8 p E SSI � / Az A PROVALS 20 0 20 40 60 EMAIL: e geent lome@geocentricsufvey.com s .... RCV D / / 6 . S INITIAL DATE , 2-i PUBLIC WO KS No. C062 Exp. 06 /307 II /6 11F 8 DA TE SCALE de �0 PLANNING C REVIEWER GRADING & DRAINAGE PLAN � � ' `CIf'Y' E GIREEER DATE 1NSPECT9R MHK 2 a cA%- CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DESIGNED BY: DRAWN BY: CHECKED BY: ENGINEERING DEPARTMENT APPROVALS CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT DRA ING NO. JC DK JC As aUIL� h( s 13 tb G PLANS PREPARED UNDER SUPERVISION OF RECOiV MENUE GRADING PLAN FOR: DESCRIPTION: 2,5" DISK STAMPED CLSB -012 �� 3091 WILDFLOWER DRIVE -- - - LOCATION: NE COR VLT SW QW LONE BACK & OR L RAC HORIZONTAL: 1" =20' DATE 1 -4_ 12868-SG - -- - -- RECORD FROM: CITY OF ENCINITAS - POINT N0. 101 1 MASIH MAHER GLENN PRUIM GENOVESE REVOCABLE TRUST ELEVATION: 203.16 VERTICAL: N/A ENG. /PU W KS ECTOR -- - - __. DATUM: NOW R.C.E. N0. JOHN OF Y 6/30/18 DATE I `�` 3 i (APN: 264 - 091 -67) EXP. DAB SHEET 2 OF 4 LEGEND DESCRIPTION STD DWG * SYMBOL PROPERTY LINE N45'4545"W SILT FENCE SE- I STABILIZED CONSTRUCTION ENTRANCE TR -1 O 00 p 00ojo HYDRAULIC MULCH /HYDROSEED EC -3, EC -4 (SLOPE PROTECTION) Km GRAVEL BAG BERM /BARRIER SE -6 DIRECTION /COURSE OF FLOW HAZARDOUS AND CONCRETE WM -6, WM -8 W M -6 WASTE MANAGEMENT 1 WM -8 SANITARY WASTE WM -9 WM -9 (PORTABLE TOILET) INLET PROTECTION SE -10 MATERIALS DELIVERY AND STORAGE AREA WA4 -1 WM- 11"'' "" TEMPORARY TRASH /SOLID WASTE WM -5 F WM -5 SE- 7 STREET SWEEPING (NO SYMBOL) STANDARD DRAWINGS (SE -5, WM -5, ETC.) CAN BE FOUND AT THE CALIFORNIA STORMWATER QUALITY ASSOCIATION (CASQA) WEBSITE https://www.cosga.org/ resources /bmp- handbooks /construction SITE DESIGN EMPS MAINTAIN NATURAL DRAINAGE & HYDROLOGIC FEATURES SD -1 CONSERVE NATURAL AREAS, SOILS, VEGETATION SD -2 MINIMIZE IMPERVIOUS AREAS SD -3 MINIMIZE SOIL COMPACTION SD -4 IMPERVIOUS AREA DISPERSION - DIRECTLY CONNECTED IMPERVIOUS SD -5 AREAS NOT ALLOWED LANDSCAPING WITH NATIVE OR DROUGHT TOLERANT SPECIES SD -7 SOURCE CONTROL, BMPS PREVENT ILLICIT DISCHARGES INTO THE MS4 SC -1 PROTECT TRASH STORAGE AREAS SC -5 _ • / 20 40 60 SCALE: 1 If = 20' CONSTRUCTION & POST- CONSTRUCTIONBW PLAN !(N'o'' 18`)) U Z - LL z ° W LLl 2 z a Z° 2 LL1 W LL ®` Wd I U a LI11 Cn VIMQGw � V/-t1G INSI'ECTOK I MF ICI 18 `J V CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DESIGNED BY: DRAWN BY: CHECKED BY: ENGINEERING DEPARTMENT APPROVALS CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT DRAWING NO. JC DK JC A5-$L11�T at(�Ae� i IT tb DESCRIPTION: 2,5" DISK STAMPED CLSB -012 LOCATION:NE COR VLT SW 0(lM LONE JACK & DBL L RECORD FROM: CITY OF ENCINITAS -POINT N0. 101 ELEVATION: 203.16 DATUM: NAVD68 HORIZONTAL: V =20' VERTICAL: N/A PLANS PREPARED UNDER SUPERVISION OF DATE Z 1L I R.C.E. NO.: _62716 JOHN OFF EXP. 6/30/18 RECOMMENDED: AP RO D: - MASIH MAHER GLENN PRUIM ENG. /PUB RKS DI CTOR g���� 2a c �. LG� DATE DATE' GRADING PLAN FOR: 3091 WILDFLOWER DRIVE GENOVESE REVOCABLE TRUST (APN:264- 091 -67) 2H68 ®S - __ SHEET 3 OF 4 -_ U Z - LL z ° W LLl 2 z a Z° 2 LL1 W LL ®` Wd I U a FOR SEDIMENT TO ACCUMULATE I FILTER HAY- BALE KEY IN FILTER FABRIC A MINIMUM OF 6' BELOW THE GROUND SURFACE AND 6" ACROSS, THEN BACKFILL WITH DIRT OR GRAVEL STAKE FILTER FABRIC INSTALLA — BACK FILL STRENGTHENING ANCHORING BACK FILL DETAIL 'R' SILT FENCE INSTAL LA TION NO SCALE CHANGE AS- BUILT DESCRIPTION GRAVFI RAGS nnn nr DETAIL 'V GRAVEL BAGS BARRIER NO SCALE EXISTING 8" MINT PROFILE PAVED )UND� SURFACE REMAINING DETAIL 'S' STABILIZED CONSTRUCTION ENTRANCE BIFFY TWO LEVELS OF SAND OR GRAVEL Q FBAGS - ONE BELOW VISQUEEN, ONE ABOVE SPILLAGE)AIN �v DETAIL 'T' SANITARY TOILET (BIF, y VISQUEEN SKIRT I PROTECTION OLIVENHAIN MUNICIPAL WATER DISTRICT POTABLE WATER SYSTEM NOTES GRAVEL BAGS OVERLAP ONTO CURB OR SIDE BERM— RUNOFF / GAP BETWEEN BAGS ACTS AS SPILLWAY CURB OR SIDE OF TRAVELWAY 7iIi , THREE LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED DETAIL 'W' GRA VEL BAGS ON TRA VEL WAYS NO SCALE TURF REINFORCEMENT MATTING, UV RESISTANT VMAX3, C350 BY NORTH AMERICAN GREEN OR EQUAL 3' MIN. GRASS MIN. 3" HYDROSEED DEPTH BASE * FOR WATER CLEANSING CAPABILITIES, FLOW DEPTH SHOULD BE LIMITED TO TWO INCHES FOR 85TH PERCENTILE STORM OF I = 0.2 INCH /HR. * SUBGRADE UNDER REINFORCEMENT MATTING SHALL BE PREPARED AND HYDROSEEDED. C -350 OR EQUAL SHALL BE PLACED OVER THE HYDROSEEDED AREA AND PROPERLY ANCHORED PER MANUFACTURER'S SPECIFICATIONS. THE GRASS SWALE SHALL BE IRRIGATED WITH A PROPERLY DESIGNED IRRIGATION SYSTEM. DETAIL X TYPICAL GRASS SWALE: NOT SUBJECT TO VEHICLE TRAFFIC NO SCALE TWO- STACKED 200 ROUGH WC` FRA 10 mil PLASTIC LINING 10 mil WOOD FRAME PLASTIC SECURELY FASTENED AROUND ENTIRE PERIMETER SECTION 1 W /TWO STAKES TOP VIEW DETAIL 7 =S 'IN) )OD STAKE (TYP) CONCRETE WASHOUT -ABOVE GROUND NO SCALE (NOTES CONTINUED FROM SHEET 1) 17. LINE VALVES, WHERE REQUIRED AT STREET INTERSECTIONS SHALL BE LOCATED AT THE TEE WHENEVER POSSIBLE. 9. THE CONTRACTOR SHALL FURNISH AND INSTALL PER THE STANDARD SPECIFICATIONS THE APPROPRIATE BURIED UTILITY WARNING AND 18. FIRE HYDRANTS, AS APPROVED BY THE APPROPRIATE FIRE DISTRICT AND PAVED 20 'MIN. AT LOCATIONS SPECIFIED BY THE FIRE DISTRICT. 10. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN 19. ALL DESIGN CHANGES TO THE WATER SYSTEM SHALL BE APPROVED BY THE SURFACE ,,. GRADE OF STREET. ACCEPTANCE OF THE CHANGE. 11. ALL DEFLECTIONS (HORIZONTAL AND VERTICAL) SHALL BE MADE BY USE OF REMAINING JOINT COUPLINGS WITH 40 MAXIMUM DEFLECTION PER COUPLING (2° PER JOINT). PROCEDURES IN THE OMWD STANDARD SPECIFICATIONS. THE CLASS OF PIPE NO BENDING (CURVING) OF PIPE SHALL BE PERMITTED. SHALL BE USED AS THE DESIGNATED WORKING PRESSURE FOR TESTING ALL PIPE, PLAN VALVES (CLOSED) AND APPURTENANCES. 12. MANUAL AIR RELEASES SHALL BE INSTALLED AT ALL HIGH POINTS AND PROVIDE APPROPRIATE TRANSITION GRAVEL STONE SHALL BE 1 -3 INCHES BETWEEN STABILIZED CONSTR. UNLESS OTHERWISE APPROVED BY DISTRICT'S REPRESENTATIVE. FIRE HYDRANTS OR CONNECTION TO EXISTING SYSTEM FACILITIES. BACTERIOLOGIC QUALITY TEST ENTRANCE AND PAVED SURFACE DETAIL 'S' STABILIZED CONSTRUCTION ENTRANCE BIFFY TWO LEVELS OF SAND OR GRAVEL Q FBAGS - ONE BELOW VISQUEEN, ONE ABOVE SPILLAGE)AIN �v DETAIL 'T' SANITARY TOILET (BIF, y VISQUEEN SKIRT I PROTECTION OLIVENHAIN MUNICIPAL WATER DISTRICT POTABLE WATER SYSTEM NOTES GRAVEL BAGS OVERLAP ONTO CURB OR SIDE BERM— RUNOFF / GAP BETWEEN BAGS ACTS AS SPILLWAY CURB OR SIDE OF TRAVELWAY 7iIi , THREE LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED DETAIL 'W' GRA VEL BAGS ON TRA VEL WAYS NO SCALE TURF REINFORCEMENT MATTING, UV RESISTANT VMAX3, C350 BY NORTH AMERICAN GREEN OR EQUAL 3' MIN. GRASS MIN. 3" HYDROSEED DEPTH BASE * FOR WATER CLEANSING CAPABILITIES, FLOW DEPTH SHOULD BE LIMITED TO TWO INCHES FOR 85TH PERCENTILE STORM OF I = 0.2 INCH /HR. * SUBGRADE UNDER REINFORCEMENT MATTING SHALL BE PREPARED AND HYDROSEEDED. C -350 OR EQUAL SHALL BE PLACED OVER THE HYDROSEEDED AREA AND PROPERLY ANCHORED PER MANUFACTURER'S SPECIFICATIONS. THE GRASS SWALE SHALL BE IRRIGATED WITH A PROPERLY DESIGNED IRRIGATION SYSTEM. DETAIL X TYPICAL GRASS SWALE: NOT SUBJECT TO VEHICLE TRAFFIC NO SCALE TWO- STACKED 200 ROUGH WC` FRA 10 mil PLASTIC LINING 10 mil WOOD FRAME PLASTIC SECURELY FASTENED AROUND ENTIRE PERIMETER SECTION 1 W /TWO STAKES TOP VIEW DETAIL 7 =S 'IN) )OD STAKE (TYP) CONCRETE WASHOUT -ABOVE GROUND NO SCALE (NOTES CONTINUED FROM SHEET 1) 17. LINE VALVES, WHERE REQUIRED AT STREET INTERSECTIONS SHALL BE LOCATED AT THE TEE WHENEVER POSSIBLE. 9. THE CONTRACTOR SHALL FURNISH AND INSTALL PER THE STANDARD SPECIFICATIONS THE APPROPRIATE BURIED UTILITY WARNING AND 18. FIRE HYDRANTS, AS APPROVED BY THE APPROPRIATE FIRE DISTRICT AND IDENTIFICATION TAPE ABOVE ALL PUBLIC WATER LINES INCLUDING WATER MEETING THE DISTRICT'S STANDARD SPECIFICATIONS, ARE TO BE INSTALLED LATERALS LOCATED IN PUBLIC RIGHT -OF -WAY. AT LOCATIONS SPECIFIED BY THE FIRE DISTRICT. 10. WHERE ELEVATIONS AND GRADES ARE NOT SHOWN ON THE WATER MAIN 19. ALL DESIGN CHANGES TO THE WATER SYSTEM SHALL BE APPROVED BY THE PROFILE, TOP OF PIPE PROFILE IS 48- INCHES BELOW CENTERLINE OF FINISH DISTRICT REPRESENTATIVE IN WRITING PRIOR TO CONSTRUCTION AND GRADE OF STREET. ACCEPTANCE OF THE CHANGE. 11. ALL DEFLECTIONS (HORIZONTAL AND VERTICAL) SHALL BE MADE BY USE OF 20. THE WATER SYSTEM SHALL BE PRESSURE TESTED IN ACCORDANCE WITH THE JOINT COUPLINGS WITH 40 MAXIMUM DEFLECTION PER COUPLING (2° PER JOINT). PROCEDURES IN THE OMWD STANDARD SPECIFICATIONS. THE CLASS OF PIPE NO BENDING (CURVING) OF PIPE SHALL BE PERMITTED. SHALL BE USED AS THE DESIGNATED WORKING PRESSURE FOR TESTING ALL PIPE, VALVES (CLOSED) AND APPURTENANCES. 12. MANUAL AIR RELEASES SHALL BE INSTALLED AT ALL HIGH POINTS AND BLOW -OFFS AT ALL LOW POINTS IN THE WATER MAIN PROFILE. PLACE MANUAL AIR 21. PIPELINES AND APPURTENANCES SHALL BE DISINFECTED IN ACCORDANCE RELEASES AND BLOW -OFFS WITHIN METER BOX AND LOCATE BEHIND CURB WITH SECTION 15041 OF THE OMWD STANDARD SPECIFICATIONS PRIOR TO TIE -IN UNLESS OTHERWISE APPROVED BY DISTRICT'S REPRESENTATIVE. FIRE HYDRANTS OR CONNECTION TO EXISTING SYSTEM FACILITIES. BACTERIOLOGIC QUALITY TEST MAY BE USED IN LIEU OF-A MANUAL AIR RELEASE OR BLOW -OFF WHEN LOCATED RESULTS SHALL CONFORM TO THE CRITERIA SPECIFIED IN THAT SPECIFICATION. AT OR NEAR HIGH OR LOW POINTS, AS APPROVED BY THE DISTRICTS REPRESENTATIVE. 22. CONTRACT RECORD DRAWINGS MUST BE SUBMITTED PRIOR TO FINAL ACCEPTANCE OF WORK. THE PLANS MUST PROVIDE POST CONSTRUCTION 13. INSTALL A MINIMUM 1 -INCH WATER SERVICE TO EACH LOT. METER TO BE, VERIFICATION OF THE LOCATION AND ELEVATION OF PIPES AND APPURTENANCES. LOCATED 5 -FEET FROM A SIDE LOT LINE. A 3/4 -INCH HIGH LETTER "W" SHALL BE CHISELED IN TOP OF EXISTING CURB OR IMPRINTED IN NEW CURB AT ALL WATER 23. CONTRACTOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE (1) YEAR SERVICE CROSSINGS. AFTER THE DATE OF ACCEPTANCE FOR THE PROJECT. CONTRACTOR SHALL REPAIR OR REPLACE ANY OR ALL SUCH WORK, TOGETHER WITH ANY OTHER 14. METER BOXES SHALL NOT BE PLACED WITHIN DRIVEWAYS OR SIDEWALKS WORK WHICH MAY BE DISPLACED IN SO DOING THAT MAY PROVE DEFECTIVE IN WITHOUT THE DISTRICT'S PRIOR WRITTEN CONSENT. WORKMANSHIP AND /OR MATERIALS WITHIN THE ONE -YEAR PERIOD FROM THE DATE OF ACCEPTANCE WITHOUT EXPENSE WHATSOEVER TO THE DISTRICT, 15. ALL WATER SERVICES FOR IRRIGATION, MULTIPLE RESIDENTIAL COMPLEXES, ORDINARY WEAR AND TEAR, UNUSUAL ABUSE OR NEGLECT EXCEPTED. COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL HAVE APPROVED BACKFLOW PREVENTION DEVICE ON CUSTOMER'S SIDE OF WATER METER. 24. ALL IRRIGATION METERS SHALL BE SERVED WITH RECYCLED WATER UNLESS PREVIOUSLY APPROVED IN WRITING BY THE DISTRICT. 16. CONTRACTOR SHALL TIE OFF ALL VALVE LOCATIONS AND PROVIDE WRITTEN DIMENSIONS TO INSPECTOR IMMEDIATELY UPON INSTALLATION OF VALVES. 25. ALL BURIED FITTINGS AND VALVES SHALL BE WAX TAPE WRAPPED IN ACCORDANCE WITH OMWD STANDARD SPECIFICATIONS. APPROVED] DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DESCRIPTION: 2,5" DISK STAMPED CLSB -012 LOCATION:NE COR VLT SW OWiD LONE JACK & DBL L RNCh HORIZONTAL: N/A RECORD FROM: CITY OF ENCINITAS - POINT N0. 101 ELEVATION: 203.16 VERTICAL: N/A DATUM: MVD88 S FORMWA TER POLLUTION CONTROL BMP NOTES FOR CONSTRUCTION A CTI VI TIES CONCRETE WASHOUT • CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS • A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS GRAVEL AND /OR CORRUGATED STEEL PANELS /PLATES. CONSTRUCTION VEHICLES • A SPECIFIC AREA AWAY FROM GUTTERS AND STORMDRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL • EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. • NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. • DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. • REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY- THEY HELP DECREASE EROSION. • TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. • PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. • WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE • STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. • ELIMINATE OR REDUCE POLLUTION OF STORMWAkl? FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER FLOWS AND STORMDRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. TRAINING • CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT • CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. • NO SEEPAGE FROM DUMPSTERS SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSTERS SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. • MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER OUMPSTERS CALL EDCO AT (760) 436 -4151. • POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. • PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. • ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET GUTTER, AND STORMORAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE PLANS PREPARED UNDER SUPERVISION OF DATE i9 R.C.E. NO.: 62716 JO N IOFFmkNi vi EXP. 6/30/18 I AS -BUILT APPROVALS I [,-1-116 IPURLICW02VSI JONt1 . coFF£ DATE PLANNING v✓3- g RmEWER cIT1( GINEEK DATE INSPE cTo>Z 4)44PA ENGINEERING DEPARTMENT APPROVALS RECOMMENDE A PR ED MASIH MAHER GLENN PRUIM ENG. /PUB. �(p S DIRE TOR DATE' DATE i' 2 3 CONSTRUCTION BMP NOTES SITE MANAGEMENT REQUIREMENTS: DRY SEASON REQUIREMENTS (APRIL 1 THRU SEPT 30) A. EXPOSED DISTRUBED AREAS MUST HAVE EROSION PROTECTION BMPs PROPERLY INSTALLED. THIS WOULD INCLUDE ALL BUILDING PADS, UNFINISHED ROADS AND SLOPES. THE ONLY RELIEF FROM THIS REQUIREMENT FOR SLOPES GREATER THAN 3:1 (HOR TO VERT) IS IF THE SITE HAS PROPERLY - DESIGNED DE- SILTING BASINS AT ALL DISCHARGE POINTS. B. ADEQUATE PERIMETER PROTECTION BMP's MUST BE INSTALLED AND MAINTAINED. C. ADEQUATE SEDIMENT CONTROL BMP's MUST BE INSTALLED AND MAINTAINED. D. ADEQUATE BMP's TO CONTROL OFF -SITE SEDIMENT TRACKING MUST BE INSTALLED AND MAINTAINED. E A MINIMUM OF 1259 OF THE MATERIAL NEEDED TO INSTALL STANDBY BMP's NECESSARY TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE FROM EROSION, AND TO PREVENT SEDIMENT DISCHARGES, MUST BE STORED ON SITE. AREAS THAT HAVE ALREADY BEEN PROTECTED FROM EROSION USING PHYSICAL STABILIZATION OR ESTABLISHED VEGETATION STABILIZATION BMP's AS DESCRIBED BELOW ARE NOT CONSIDERED TO BE EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. F. THE PROJECT PROPONENT MUST HAVE AN APPROVED "WEATHER TRIGGERED" ACTION PLAN AND HAVE THE ABILITY TO DEPLOY STANDBY BMPs AS NEEDED TO COMPLETELY PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT A PREDICTED STORM EVENT IS DEFINED AS A FORECASTED, 509 CHANCE OF RAIN. ON REQUEST, THE PROJECT PROPONENT MUST PROVIDE PROOF OF THIS CAPABILITY. G. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMP's MUST COMMENCE AS SOON AS SLOPES ARE COMPLETED FOR ANY PORTION OF THE SITE. THE PROJECT PROPONENT MAY NOT CONTINUE TO RELY ON THE ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT HAVE BEEN COMPLETED. H THE AREA THAT CAN BE CLEARED OR GRADED AND LEFT EXPOSED AT ONE TIME IS LIMITED TO THE AMOUNT OF ACREAGE THAT THE PROJECT PROPONENT CAN ADEQUATELY PROTECT PRIOR TO A PREDICTED RAINSTORM. RAINY SEASON REQUIREMENTS (OCT 1 THRU MARCH 31) IN ADDITION TO THE REQUIREMENTS LISTED UNDER THE DRY SEASON REQUIREMENTS. 1, PERIMETER PROTECTION AND SEDIMENT CONTROL BMP'S MUST BE UPGRADED IF NECESSARY TO PROVIDE SUFFICIENT PROTECTION FOR STORMS LIKELY TO OCCUR DURING THE RAINY SEASON. 2. ADEQUATE PHYSICAL OR VEGETATION EROSION CONTROL BMP'S MUST BE INSTALLED AND ESTABLISHED FOR ALL COMPLETED SLOPES PRIOR TO THE START OF THE RAINY SEASON. IF A SELECTED BMP FAILS, IT MUST BE REPAIRED AND IMPROVED, OR REPLACED WITH AN ACCEPTABLE ALTERNATE AS SOON AS IT IS SAFE TO DO SO. THE FAILURE OF A BMP SHOWS THAT THE BMP, AS INSTALLED, WAS NOT ADEQUATE FOR THE CIRCUMSTANCES IN WHICH IT WAS USED. REPAIRS OR REPLACEMENT MUST THEREFORE PUT A MORE ROBUST BMP IN PLACE. J. THE AMOUNT OF EXPOSED SOIL ALLOWED AT ONE TIME SHALL NOT EXCEED THAT WHICH CAN BE ADEQUATELY PROTECTED BY DEPLOYING STANDBY EROSION CONTROL AND SEDIMENT CONTROL BMP'S PRIOR TO A PREDICTED RAINSTORM. 4. A DISTURBED AREA THAT IS NOT COMPLETED BUT THAT IS NOT BEING ACTIVELY GRADED MUST BE FULLY PROTECTED FROM EROSION IF LEFT FOR 10 OR MORE DAYS. THE ABILITY TO DEPLOY STANDBY BMP MATERIALS IS NOT SUFFICIENT FOR THESE AREAS. BMP'S MUST ACTUALLY BE DEPLOYED. IT IS THE RESPONSIBILITY OF THE PROPERTY OWNER AND PERMIT HOLDER TO SELECT, INSTALL AND MAINTAIN APPROPRIATE BMP'S. CONSTRUCTION BMP NOTES DETAILS CITY OF ENCINITAS - ENGINEERING SERVICES DEPARTMENT GRADING PLAN FOR: 3091 WILDFLOWER DRIVE GENOVESE REVOCABLE TRUST (APN: 264- 091 -67) 12868 -SG SHEET 4 OF 4