Loading...
2017-578296 DOC# 2017-0578296 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiIIIIIIIIIIIIIIIIIIIIIIII1111IIII Dec 12, 2017 04:22 PM OFFICIAL RECORDS Ernest J. Dronenburg, Jr., Recording Requested By: SAN DIEGO COUNTY RECORDER FEES. $115,00 City Engineer PAGES'. 30 When Recorded Mail to: City Clerk City of Encinitas 505 South Vulcan Avenue Encinitas CA 92024 SPACE ABOVE FOR RECORDER'S USE P4 q This document is intended to superseded the previously recorded "MAINTENANCE 1, �U AGREEMENT FOR PRIVATE STORMWATER TREATMENT AND STORMWATER POLLUTION CONTROL AND HYDROMODIFICATION MANAGEMENT FACILITIES BY HOMEOWNER'S ASSOCIATION" recorded as Document Number 2017-396448 on August 29, 2017. MAINTENANCE AGREEMENT FOR PRIVATE STORMWATER TREATMENT AND STORMWATER POLLUTION CONTROL AND HYDROMODIFICATION MANAGEMENT FACILITIES BY HOMEOWNER'S ASSOCIATION APN: 254-331-23✓ Permit#: 12990-G/I 254-331-24 Case #: 13-187 TM/CDP THIS AGREEMENT is between the City of Encinitas, a municipal corporation, hereinafter referred to as the "City", and Citymark Hymettus LLC a California Limited Liability Company, its heirs, successors, and assigns, collectively hereinafter referred to as "Developer", owner(s) of that certain real property hereinafter referred to as "Property" that is described in Exhibit "A", which is attached hereto and made a part hereof. This Agreement is for the periodic Maintenance of certain private stormwater treatment, pollution control, and hydromodification management facilities, hereinafter referred to collectively as "Stormwater Facilities". Stormwater Facilities include but are not limited to Best Management Practices (BMPs), Integrated Management Practices (IMPs), Low Impact Development (LID) features, Hydromodification Management Plan (HMP) facilities, structural stormwater treatment devices, and drainage facilities. The description and plat of Stormwater Facilities is set forth in Exhibit "B" which is, attached hereto and made a part hereof. The term Maintenance is defined in Paragraph 1 below. WHEREAS, this Agreement is required by the City as condition of approval of a City permit pursuant to City of Encinitas Municipal Code Chapter 20.08 and Chapter 23.24 as well as the City of Encinitas Stormwater Manual, and WHEREAS, the Stormwater Facilities described in Exhibit "B" benefit said Property, the developer, and the future owners of the lots/parcels created per Map Case No. 13-187 TM/DR/CDP, their heirs, successors, and assigns, collectively hereinafter referred to as "Owners", and WHEREAS, City requires that Developer establish a homeowners association in conformance with the California Civil Code Sections 1350 through 1376, hereinafter referred to as "HOK, to be responsible for the Maintenance of Stormwater Facilities into perpetuity; and WHEREAS, it is the desire of the City, the responsibility of the Owners, HOA, and Developer, herein after collectively referred to as "Parties', and to the benefit of the Public that Maintenance of said Stormwater Facilities occur on a regular and periodic basis as necessary to preserve the Storm Water Facilities in good-working order by the Parties in accordance with the minimum Maintenance requirements set forth in Exhibit "C", which is attached hereto and made a part hereof, and in accordance with the City of Encinitas Municipal Code, the Encinitas Stormwater Manual, and other related City policies and requirements, and WHEREAS, it is responsibility of the Developer and HOA to manage and oversee Maintenance of Stormwater Facilities and to assign a single point of contact between the City of Encinitas and HOA or Developer; and WHEREAS, Developer's responsibility of Maintenance of Stormwater Facilities will be transferred to HOA after the sale of all lots/parcels, the completion of development, and the approval of the City; and WHEREAS, following Developer's completion of the development and acceptance by the City, the Owners are responsible to continuously have an HOA for purposes of Maintenance of the Stormwater Facilities, and WHEREAS, for the purpose of this agreement, Maintenance responsibilities mentioned on this agreement equally and collectively apply to Owners and the HOA; WHEREAS, it is requirement of development that this Agreement constitute a covenant running with the land, binding upon each successive owner of all or any portion of the Property into perpetuity; NOW THEREFORE, IT IS HEREBY AGREED FOR VALUABLE CONSIDERATION AS FOLLOWS: 1. This agreement establishes the Parties' Maintenance requirements for the Stormwater Facilities. The term "Maintenance" wherever capitalized in this agreement shall include, but shall not be limited to: inspection for purposes of identifying operational deficiencies in the Stormwater Facilities, routine upkeep and repair of the Stormwater Facilities in proper working order as determined by the City, and preparation and submittal of the annual inspection report to the City, all as set forth in subparagraph 1.i) through 1.iii). The Parties' requirements for providing Stormwater Facilities Maintenance as stated in this agreement shall mean Maintenance managed and paid for by the Parties, and performed by a qualified contractor hired by the Parties. i) The Parties shall inspect the Stormwater Facilities after all major storms. In addition, the Parties shall inspect the Stormwater Facilities at the minimum frequency specified in Exhibit "C", but not less than twice per year. ii) The Parties shall provide upkeep and repair to keep the Stormwater Facilities in good working order and shall repair all deficiencies identified in the Parties' inspections no later than 30 days following the inspection or prior to the next anticipated rain event. Interim water quality control measures shall be utilized to protect damaged or deficient Stormwater Facilities until such time as the Facilities are repaired. The minimum upkeep and repair frequency shall be consistent with the Exhibit "C" but not less than once per year. To the satisfaction of the Director of Engineering Services, the Parties shall ensure that the Stormwater Facilities are in proper working order for the rainy season, which starts on October 1. iii) The Parties shall obtain the City of Encinitas Stormwater Inspection Report form from the City website or the City of Encinitas Civic Center, complete the inspection report form, and submit the inspection report to the City of Encinitas Department of Engineering Services. Prior to the submittal of the inspection report to the City, the Parties shall perform an inspection of the Stormwater Facilities, identify deficiencies, and repair and correct all deficiencies. The inspection report shall be submitted to the City once a year between August 1 and September 30. 2. The Property is benefited by this Agreement, and it is the purpose of the signatories hereto that this instrument be recorded to the end and intent that the obligation hereby created shall be and constitute a covenant running with the land. Any heirs, executors, administrators, assignees, and/or successors in interest to all or any portion of the Property, by acceptance of delivery of a deed and/or conveyance regardless of form, shall be deemed to have consented to and become expressly bound by these presents, including without limitation, the right of any person entitled to enforce the terms of this Agreement to institute legal action as provided in Paragraph 14 hereof, such remedy to be cumulative and in addition to other remedies provided in this Agreement and to all other remedies at law or in equity. 3. The Stormwater Facilities shall be constructed by and have Maintenance performed by the Parties in accordance with the term and conditions of this agreement and the plans and specifications identified in approved Grading/Improvement Plan Number 12990-G/I which is on file as a permanent public record in the City of Encinitas. t , 4. The cost and expense of the Maintenance of the Stormwater Facilities shall be paid by the Parties. The Parties' share of Stormwater Facilities Maintenance costs is proportional to number of lots/parcels that Owners and Developer own as a fraction of the total number of lots/parcels in the Property using and benefiting from the Stormwater Facilities but excluding common ownership lots/parcels. 5. In the event the Property is subdivided in future, the owners, heirs, assigns, and successors in interest of each such newly created parcel(s) shall be included in the existing HOA and be liable under this Agreement and with the HOA for their then pro rata share of expenses reflecting such newly created parcels. 6. The Maintenance to be performed under this Agreement shall include upkeep, repair, and improvements to adequately ensure the Stormwater Facilities are in proper working order as determined by the City. Upkeep, repair, and improvements under this Agreement shall include, but are not limited to, repairing access roadbeds, repairing, preserving, and providing improvement for the upkeep of drainage structures; removing debris, sediment, oil, grease, and other pollutants as determined by the City; perpetually preserving adequate groundcover and/or other erosion control measures within the Property in order to prevent erosion; and the management of materials, pollutants, and hazardous waste to prevent pollution of the stormwater system or Municipal Separate Stormwater Sewer System (MS4) as referenced in local and State codes. Upkeep, repair, and improvement shall also include other work necessary to repair and preserve the Stormwater Facilities for their intended purposes as well as the restoration of the Stormwater Facilities following any non-permitted modification. The restoration shall be as required to restore the Stormwater Facilities to the condition existing prior to damage or alteration. 7. Developer, Owners, and HOA are collectively responsible to the City for Maintenance of Stormwater Facilities so long as either Developer or Owners own any lots/parcels. Developer remains responsible for Maintenance of Stormwater Facilities until such Facilities have been approved by the City, even if Developer no longer owns any lots/parcels of the Property. 8. Upon establishment of an HOA and a management company to manage the maintenance of the stormwater facilities, the Developer must notify the City of the contact information for the HOA and management company within thirty (30) days. At a minimum, contact information for HOA and management company shall include: organization name, mailing address, email address, phone number, contract person, contact person's phone number, and email address. The above information must be provided to the City prior to occupancy of the first unit (model home occupancy may be exempt from this requirement). If the Developer is the acting HOA manager at the time of occupancy, the Developer's current contact information shall be provided in lieu of the management company information. Any future changes in HOA or management company contact information shall be provided to the City within thirty (30) days of the change being made. Contact information shall be provided in writing to the following address (or current City of Encinitas, Civic Center address): City of Encinitas Stormwater Division 505 S Vulcan Ave Encinitas, CA 92024 9. Any liability of the Parties for personal injury to any worker employed to provide Maintenance under this Agreement, or to third persons, as well as any liability of the Parties for damage to the property of any third persons, as a result of or arising out of Maintenance under this Agreement, shall be borne by the Parties. 10. Parties shall jointly and severally defend, indemnify, and hold harmless City, City's engineer, its consultants, and each of its officials, directors, officers, agents, and employees from and against all liability, claims, damages, losses, expenses, personal injury, and other costs, including costs of defense and attorney's fees, to any contractor, any subcontractor, any user of the Stormwater Facilities, or to any other third persons arising out of or in any way related to the use, Maintenance, or the failure to provide Maintenance of the Stormwater Facilities. This Agreement imposes no liability of any kind whatsoever on the City and the Parties agree to hold the City harmless from any liability in the event the Stormwater Facilities fail to operate properly. 11. Nothing in this Agreement, the specifications, other contract documents, the City's approval of the plans and specifications, or the City's inspection of the work constitutes an acknowledgement of any City responsibility for any such item or the material contained therein, and the City, City's engineer, its consultants, and each of its officials, directors, officers, employees and agents, shall have no responsibility or liability therefore. 12. The Parties shall provide access to the Stormwater Facilities within the Property to the City's inspectors, employees, agents, and contractors within 48 hours of receipt of a written notification by the City. The access shall be provided unconditionally and without any obstruction, interference, or hazard. Any animals kept on the Property shall be secured outside of the area subject to the City's inspection. 13. The Parties hereby grant permission to the City, its authorized agents, and its employees, to enter upon the Property and to inspect the Stormwater Facilities following a 48-hour notice whenever the City deems necessary. The purpose of inspection is to evaluate the condition and performance of the Stormwater Facilities, to follow-up on reported deficiencies, to respond to citizen complaints, and/or to comply with State and City requirements for City inspection of such facilities. The City shall provide the Owner, with copies of the inspection findings and a directive to commence with any repairs deemed necessary. 14. In the event the Parties fail to preserve the Stormwater Facilities in good working condition as determined by the City Engineer, the City, its agents, employees, or its contractors, may enter upon the Property and take the steps deemed necessary to correct deficiencies and shall charge the costs of such repairs to the Parties. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds for attorney's fees, administrative costs, contractors, employees, consultants, materials, or other costs in the performance of said work, the Owner shall reimburse the City. Such reimbursement shall be due within thirty (30) days of receipt of a notification for all costs incurred by the City, including any administrative costs and attorney's fees. If said funds are not paid by the Parties within (30) days, City reserves the right to take legal action for cost recovery and to file with the County Recorder of San Diego County an assessment lien on the Property. It is expressly understood and agreed that the City is under no obligation to perform Maintenance of said Stormwater Facilities, and in no event shall this Agreement be construed to impose any such obligation on the City. 15. The terms of this Agreement may be amended in writing following the Parties request and upon written approval by the City Engineer. 16. This Agreement shall be governed by the laws of the State of California. In the event that any of the provisions of this Agreement are held to be unenforceable or invalid by any court of competent jurisdiction, the validity, and enforceability of the remaining provisions shall not be affected thereby. IN WITNESS HEREOF, the Parties have executed this Agreement. OWNER: Richard V. Gustafson « Date for Citymark Hymettus, LLC. Signature of OWNER must be notarized. Attach the appropriate acknowledgement. CITY OF ENCINITAS: & i� 8 ads Christopher L. Magdosku Date City Engineer City of Encinitas - Development Services Department CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT A Notary Public or other Officer Completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of San Diego On December 8, 2017 before me, Kris Johnson, Notary Public, personally appeared Richard V. Gustafson , who proved to me on the basis of satisfactory evidence to be the person whose nome(s) is are subscribed to the within instrument and acknowledged to me that he she/they executed the some in his/her/they authorized copacity(ies), and that by his her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY, under the laws of the State of California, the foregoing paragraph is true and correct. 01%J11111, , �`aA970�M9N�' GY ®r .ry WITNESS my and and official seal. '9<IFO r ohnso , N tory Public �: 6 ar,a+ f'P Commission #2219707 My Commission Expires: November 20, 2021 OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document: CityMark Hymettus LLC— Maintenance Agreement For Private Storm Water Treatment and Storm Water Pollution Agreement - Permit#: 12990-G/I - Case#: 13-187 TM/CDP APN #'s: 254-331-23 & 24 CA Rev. 1/01/2015 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California ) County of `;r,V-, On before me, Y�Y�C P�A � � J ��G i �� 0 1T�f V � �J 1, Date Here Insert Name and Title of the Offic r personally appeared Ci h r� 5 9��r' ; L—• /LOCi.e-\k ) Name(s) of Sig (s) who proved to me on the basis of satisfactory evidence to be th person(s) whose name(s) isT e Scribed to the within instrument and acknoyr�ged to me that/fihe/they executed the same in hisser/their authorized capacity(ies), and that t�his/der/their signature(s)on the instrument the person(s), r the entity upon behalf of which the person(sracife'd, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. r44 ANGBA A. SIA WITNESS my hand and official seal. �'� y Comm.I it$2396 So� y Not p CarTM r \ �� caw 4EW z,pit Signature Sig6ature of Notary Public Place Notary Seal Above OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: Signer's Name: ❑ Corporate Officer — Title(s): G Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑Attorney in Fact ❑ Individual ❑Attorney in Fact ❑Trustee ❑ Guardian or Conservator ❑Trustee ❑ Guardian or Conservator ❑ Other: ❑ Other: Signer Is Representing: Signer Is Representing: 02016 National Notary Association • www.NationaiNotary.org • 1-800-US NOTARY(1-800-876-6827) Item#5907 EXHIBIT"A" LEGAL DESCRIPTION OF PROPERTY PARCELI: (APN: 254-254-23-00) PARCEL A AS SHOWN ON CERTIFICATE OF COMPLIANCE,AS EVIDENCED BY DOCUMENT RECORDED APRIL 24, 2012 AS INSTRUMENT NO. 2012-0239567 OF OFFICIAL RECORDS, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: THAT PORTION OF LOT 1 IN BLOCK 8 OF SOUTH COAST PARK IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA,ACCORDING TO MAP THEREOF NO. 1776, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTYJANUARY 11, 1924, MORE PARTICULARLY AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE CENTER LINES OF FULVIA STREET AND HYMETTUS AVENUE; THENCE 1. NORTH 55°22'53" WEST 39.17 FEET TO THE SOUTHEAST CORNER OF SAID LOT 1,ALSO BEING THE TRUE POINT OF BEGINNING;THENCE ALONG THE EASTERLY LINE OF SAID LOT 1,ALSO BEING THE WESTERLY RIGHT-OF-WAY OF HYMETTUS AVENUE 2. NORTH 15 043'30"WEST 189.55 FEET;THENCE LEAVING SAID EASTERLY LINE 3. SOUTH 74°26'30" WEST 102.00 FEET;THENCE 4. SOUTH 42°59'00" WEST 163.66 FEET TO THE WESTERLY LINE OF SAID LOT 1,ALSO BEING THE EASTERLY RIGHT-OF-WAY OF FULVIA STREET;THENCE ALONG SAID WESTERLY LINE 5. SOUTH 47°32'30" EAST 14.92 FEET TO A POINT ON A 145.45 FOOT RADIUS CURVE CONCAVE NORTHEAST;THENCE ALONG SAID CURVE 6. SOUTHEASTERLY 120.57 FEET THROUGH A CENTRAL ANGLE OF 47°29'45";THENCE CONTINUING ALONG THE SOUTHERLY LINE OF LOT 1 7. NORTH 84°57'45" EAST 139.79 FEET TO THE TRUE POINT OF BEGINNING. PARCEL 2: (APN: 258-121-13-00) PARCEL B AS SHOWN ON CERTIFICATE OF COMPLIANCE, AS EVIDENCED BY DOCUMENT RECORDED APRIL 24, 2012 AS INSTRUMENT NO. 2012-0239567 OF OFFICIAL RECORDS, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: THAT PORTION OF LOTS 1, 2 AND 18 IN BLOCK 8 OF SOUTH COAST PARK IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA,ACCORDING TO MAP THEREOF NO. 1776, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY JANUARY 11, 1924, MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT THE INTERSECTION OF THE CENTER LINES OF FULVIA STREET AND HYMETTUS AVENUE; THENCE 1. NORTH 55°22'53" WEST 39.17 FEET TO THE SOUTHEAST CORNER OF LOT 1;THENCE ALONG THE EASTERLY LINE OF LOTS 1 AND 18,ALSO BEING THE WESTERLY RIGHT-OF-WAY OF HYMETTUS AVENUE ' f 2. NORTH 15 043'30" WEST 357.74 FEET TO THE TRUE POINT OF BEGINNING;THENCE LEAVING SAID EASTERLY LINE 3. SOUTH 74°26'30" WEST 370.06 FEET TO THE WESTERLY LINE OF LOT 2, ALSO BEING THE EASTERLY RIGHT-OF-WAY OF FULVIA STREET;THENCE ALONG SAID WESTERLY LINE 4. SOUTH 33°24'30" EAST 102.20 FEET;THENCE ALONG THE WESTERLY LINE OF LOTS 2 AND 1 5. SOUTH 47°32'30" EAST 184.29 FEET;THENCE LEAVING SAID WESTERLY LINE 6. NORTH 42°59'00" EAST 163.66 FEET;THENCE 7. NORTH 74°26'30" EAST 102.00 FEET;TO THE EASTERLY LINE OF LOT 1;THENCE ALONG THE EASTERLY LINE OF LOTS 1 AND 18 8. NORTH 15 043'30" WEST 168.19 FEET TO THE TRUE POINT OF BEGINNING. STORM WATER MAINTENANCE AGREEMENT EXHIBIT HYMEITUS ESTATES - 378 FULVIA STREET ENCINITAS, CA 3' X 3' BROOKS BOX OUTLET STRUCTURE DROUGHT TOLERANT 6" FREEBOARD GROUNDCOVER PLANTINGS TOP OF & CONVEYANCE PER LANDSCAPE PLANS BERM I L 24' 18" MIN. ENGINEERED SOIL I III I I-11 I I-=III=III=_ 1=III=III=1 240 CLEAN WASHED CRUSHED ROCK NOTE: NO PERFORATED 12" PVC EMERGENCY PIPE IS PROPOSED OUTLET PIPE FOR Q100 OVERFLOW IMP BASIN BMP N.T.S. BMP SIZING PROP A (SF) SURFACE VaUME.• Vi(CF) BASIN VOLUME: V2(CF) 3,650 SF 6,089 CF 5,110 CF ONER APPLICANT SITE ADDRESS ASSESSORS PARCEL NUMSERS CIIYMARK HYMETTU3, LCC 378 FULVIA STREET 254-331-23-00, 254-331-24-00 A CAUFORNW LIMITED ENCIMIAS, CA 92024 LIABILITY COMPANY 3818 PARK BLVD SAN DIEGO, CA 92103 LEGAL DESCRIPTION PARCEL 1, 2 (APN 254-331-23-00, 254-331-24-00): ALL OF LOT 1 IN BLOCK 8 AND ALL THOSE PORTIONS OF L07S 2 AND 18 IN SAID BLOCK 8 OF SOUTH COAST PARK, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE MAP THEREOF NO. 1776, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAID SAN DIEGO COUNTY, JANUARY 11, 1924. EXHIBIT B-1 STORMWATER MAINTENANCE AGREEMENT EXHIBIT HYMETTUS ESTATES — 378 FULVIA STREET ENCINITAS, CA PRIVATELY MAINTAINED IMP BASIN FOR BEST MANAGEMENT PRACTICE NOT TO BE MODIFIED KITHOUT A PERMIT FROM THE CITY (3,650 SF PROPOSED) 1 PRIVATELY MAINTAINED PERMEABLE PAVER RIVEWAYS (TIP. PRIVATELY i MAINTAINED PRIVATELY MAINTAINED PERMEABLE PAVER - ( \ ROADSIDE BID— DRIVEWAYS (TIP.) \ ��� �; BASINS (TYP.) PRIVATELY MAINTAINED as ROADSIDE BID— } BASINS (TYP.) SCALE: 1"=80' 80 0 80 EXHIBIT 78-2" EXHIBIT "C-1 " INF-2 Bioretention BMP MAINTENANCE FACT SHEET FOR STRUCTURAL BMP INF-2 BIORETENTION Bioretention (bioretention without underdrain) facilities are vegetated surface water systems that filter water through vegetation and soil, or engineered media prior to infiltrating into native soils. Bioretention facilities are designed to infiltrate the full design capture volume (DCV) into native soils. They have no underdrain, and no impermeable liner.Typical bioretention components include: • Inflow distribution mechanisms(e.g., perimeter flow spreader or filter strips) • Energy dissipation mechanism for concentrated inflows(e.g.,splash blocks or riprap) • Shallow surface ponding for captured flows • Side slope and basin bottom vegetation selected based on climate and ponding depth • Non-floating mulch layer • Media layer(planting mix or engineered media)capable of supporting vegetation growth • Filter course layer consisting of aggregate to prevent the migration of fines into uncompacted native soils or the optional aggregate storage layer • Optional aggregate storage layer for additional infiltration storage • Uncompacted native soils at the bottom of the facility • Overflow structure Normal Expected Maintenance Bioretention requires routine maintenance to: remove accumulated materials such as sediment, trash or debris; maintain vegetation health; maintain infiltration capacity of the media layer; replenish mulch; and maintain integrity of side slopes, inlets, energy dissipators, and outlets. A summary table of standard inspection and maintenance indicators is provided within this Fact Sheet. Non-Standard Maintenance or BMP Failure If any of the following scenarios are observed, the BMP is not performing as intended to protect downstream waterways from pollution and/or erosion. Corrective maintenance, increased inspection and maintenance, BMP replacement,or a different BMP type will be required. • The BMP is not drained between storm events. Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface ponding longer than approximately 96 hours following a storm event poses a risk of vector(mosquito) breeding. Poor drainage can result from clogging of the media layer, filter course, aggregate storage layer, underlying native soils, or outlet structure. The specific cause of the drainage issue must be determined and corrected. If it is determined that the underlying native soils have been compacted or do not have the infiltration capacity expected,the[City Engineer] shall be contacted prior to any additional repairs or reconstruction. • Sediment, trash, or debris accumulation greater than 25°% of the surface ponding volume within one month. This means the load from the tributary drainage area is too high, reducing BMP function or clogging the BMP. This would require pretreatment measures within the tributary area draining to the BMP to intercept the materials. Pretreatment components, especially for sediment,will extend the life of components that are more expensive to replace such as media,filter course,and aggregate layers. INF-2 Page 1 of 11 January 12, 2017 INF-2 Bioretention • Erosion due to concentrated storm water runoff flow that is not readily corrected by adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade,the[City Engineer]shall be contacted prior to any additional repairs or reconstruction. Other Special Considerations Bioretention is a vegetated structural BMP. Vegetated structural BMPS that are constructed in the vicinity of, or connected to, an existing jurisdictional water or wetland could inadvertently result in creation of expanded waters or wetlands. As such, vegetated structural BMPs have the potential to come under the jurisdiction of the United States Army Corps of Engineers, SDRWQCB, California Department of Fish and Wildlife, or the United States Fish and Wildlife Service. This could result in the need for specific resource agency permits and costly mitigation to perform maintenance of the structural BMP. Along with proper placement of a structural BMP, routine maintenance is key to preventing this scenario. INF-2 Page 2 of 11 January 12, 2017 INF-2 Bioretention SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR INF-2 BIORETENTION The Property owner Is responsible to ensure Inspection,operation and maintenance of permanent BMPs on their property unless responsi luImy has been formally transferred to an agency,comm u city facilities district,homeowners association,property owners association,or other special district. Maintenance frequencies listed in this table are average/typical frequencies.Actual ma l mma nce needs are site-specific,antl maintenance may be requ lred more frequently. Me lnteni nce must be performed whenever needed,based on maintenance indicators presented in this table.The BM owner is responsible for conducting regular inspections to see when maintenance is needed based on the maintenance Indicators.During the first year of operation of a structural BMP,inspection Is recommended at least once prior to August 31 and then monthly from September through May Inspection during a storm event is also recommended After the initial period of frequent Inspections,the minimum Inspection and maintenance frequency can be determined based on the results of the first year inspections. Threshold/Indicator Maintenance Anion Typical Maintenance Frequency Accumulation of sediment,litter,or debris Remove and properly dispose of accumulated materials, a Inspect monthly. If the PIMP Is 25%fi or more in without damage to the vegetation or compaction of the one month,increase inspection frequency to monthly media layer plus after every O.1-inch or larger storm event. a Remove any accumulated materials found at each inspection. Obstructed inlet or outlet structure Clear blockage. a Inspect monthly and after every 0.5-inch or larger storm event. e Remove any accumulated materials found at each Inspection. Damage to structural components such as weirs,Inlet or Repair or replace as applicable. a Inspect annually. outlet structures a Maintenance when needed. Poor vegetation establishment Re-seed,re-plant,or re-establish vegetation per original a Inspect monthly, plans. a Maintenance when needed. Dead or diseased vegetation Remove dead or diseased vegetation,re-seed,re plant, a Inspect monthly.or re-establish vegetation per original plans. a Maintenance when needed. Overgrown vegetation Mow or trim as appropriate. a Inspect monthly. a Maintenance when needed. 2/3 of mulch has decomposed, or mulch has been Remove decomposed fraction and top off with fresh a Inspect monthly. removed mulch to a total depth of 3lnches. Replenish mulch annually,or more frequently when needed based on Inspection. ­25%full"Is defined as K of the depth from the design bottom elevation to the crest of the outflow structure Ile,,if the height to the outflow opening is 12 inches from the bottom elevation,then the materials must be removed when there Is 3lnches of accumulation—this should be marked on the outflow structure). INF-2 Page 3 of 11 January 12,2017 INF-2 Bioretention SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR INF-2 BIORETENTION(Continued from previous page) Threshold/Indicator Maintenance Action Typical Maintenance Frequency Erosion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the .Inspect monthly. Irrigation system. .Maintenance when needed. Erosion due to concentrated storm water runoff Flow Repair/re-seed/re-plant eroded areas, and make .Inspect after every D.5-inch or larger storm event, If appropriate corrective measures such as adding erosion due to storm water flow has been observed, erosion control blankets, adding stone at Row entry increase inspection frequency to after every 0.1 inch points,or minor re-grading to restore proper drainage or larger storm event. according to the original plan. If the Issue Is not •Maintenance when needed " the Issue Is not corrected by restoring the BMP to the original plan and corrected by restoring the BMP to the original plan and grade, the[City Engineer] shall be contacted prior to grade,the[City Engineer] shall be contacted prior to any additional repairs or reconstruction any additional repairs or recons truction. Standing water In BMP for longer than 24 hours Make appropriate corrective measures such as .Inspect monthly and after every 0.5-inch or larger following a storm event adjusting irrigation system, removing obstructions of storm event. If standing water is observed, m s Surface pending longer than approximately 24 hours debris or Invasive vegetation, or repairing/replacing inspection frequency to after every 0.1-inch or larger clogged or compacted soils.If it Is determined that the storm event. following a storm even( may be detrimental to underlying native soils have been compacted or do not .Maintenance when needed. vegetation health have the infiltration capacity expected the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. Presence of mosquitos/larvae If mosquitos/larvae are observed first, Immediately •Inspect monthly and after every 05-inch or larger remove any standing water by dispersing to nearby storm event. If mosquitos are observed, increase lI For Images of egg rafts, larva, pupa, and adult landscaping; second, make corrective measures as inspection frequency to after every 01 inch or larger I mosquitos,see applicable to restore BMP drainage to prevent standing storm event, htto'//www.mospuito.org/biology water. •Maintenance when needed, If mosquitos persist following corrective measures to remove standing water,or If the BMP design does not meet the 96-hour drawdown criteria because the underlying native soils have been compacted or do not have the infiltration capacity expected, the [City Engineer]shall be contacted to determine a solution.A different BMP type, or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health, may be required INF-2 Page 4 of 11 January 12,2017 INF-2 Bioretention References American Mosquito Control Association. hftp://www.mosquito.o Storm Water Quality Association(CA5QA).2003.Municipal BMP Handbook. https://www.casga.org/resou rces/bmo-hand books/mu nici pa I-bm p-hand book County of San Diego,2014.Low Impact Development Handbook, htto://wwwsand'egocountv.¢ov/con[ent/sdc/dow/watersheds/susmoAid.html San Diego County Copermittees.2D16.Model BMP Design Manual,Appendix E,Fact Sheet INF-2. htto'//,.Droectcleanwaterorelndex.ohoPOOtion=com content&view=artkle&id-250&itemid=220 IN F-2 Page 5 of 11 January 12,2017 INF-2 Bioretention Date: Inspector: BMP ID No.: Permit No, I APN(s): Property/Development Name: Responsible Party Name and Phone Number Property Address of BMP: Responsible Party Address: INSPECTION AND MAINTENANCE CHECKLIST FOR INF-2 BIORETENTION PAGE 1 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Accumulation of sediment,litter,or debris ]Remove and properly dispose of Maintenance Needed? accumulated materials,without damage to the vegetation ]YES ]If sediment,litter,or debris ]NO N/A accumulation exceeds 25%of the surface Funding volume within one month(25%full%add a forebav or other pre-treatment measures within the tributary area draining to the PIMP to intercept the materials. ] Other/Comments'. Poor vegetation establishment ]Re seed,re plant,or re-establish Maintenance Needed? vegetation per original plans YES ]'Other/Comments: ]NO ]N/A "25%full"Is defined as L of the depth from the design bottom elevation to the crest of the outflow structure(e.g.,If the height to the cu0low opening is 12 Inches from the bottom elevation,then the materials must be removed when there Is 3 inches of accumulation-this should be marked on the ouHlow structure). INF-2 Page 7 of 11 January 12,2017 INF-2 Bioretention Date: Inspector BMP ID No.: Permit No.: APN�s)'. INSPECTION AND MAINTENANCE CHECKLIST FOR INF-2 BIORETENTION PAGE 2 of 5 Threshold/Indicator Maintenance RemmmentlaHOn Date Description of Maintenance Conducted Dead or diseased vegetation -1 Remove dead or diseased vegetation, Maintenance Needed? re seed,re-plant,or re-establish vegetation per original plans ]YES ]Other/Comments: ]NO ]N/A Overgrown vegetation 7 Mow or trim as appropriate Maintenance Needed? ]Other/Comments: ]YES ]NO N/A 2/3 of mulch has decomposed, or mulch has ]Remove decomposed fraction and top been removed off with fresh mulch to a total depth of Maintenance Needed? 3inches YES ]Other/Comments. ]NO ]N/A INF-2 Page 8 of 11 January 12,2017 INF-2 Bioretention Date: Inspector: BMP ID I Permit No APN]s]: INSPECTION AND MAINTENANCE CHECKLIST FOR INF-2 BIORETENTION PAGE 3 of S Threshold/indicator Maintenance Recommendation Date Description of Maintenance Conducted Erosion due to concentrated irrigation Row :1 Repair/re-seed/replant eroded areas Maintenance Neii and adjust the irrigation system -1 YES Other/Comments'. -NO N/A Erosion due to concentrated storm water runoff =Repair/re-seed/re-plant eroded areas, flow and make appropriate correarve Maintenance Needed? measures such as adding erosion control blankets,adding stone at flow YES entry points,or minor re grading to ::I NO restore proper drainage according to ::I N/A the original plan If the issue Is not corrected by restoring the BMP to the original plan and grade,the[City Engineer]shall be contacted prior to any additional repairs or reconstruction Other/Comments. INF-2 Page 9 of 11 January 12,2017 INF-2 Bioretention Date'. Inspector: BMP ID No.: Permit No.: APNIsI: INSPECTION AND MAINTENANCE CHECKLIST FOR INF-2 BIORETENTION PAGE a of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Concluded Obstructed inlet or outlet structure ]Clear blockage Maintenance Needed? Other/Comments: -YES NO N/A Damage to structural components such as weirs, -Repair or replace as applicable Inlet or outlet structures ]Other/Comments: Maintenance Needed? ]YES NO N/A INF-2 Page 10 of 11 January 12,2017 INF-2 Bioretention Date: Inspector: BMP ID No.: Permit No APN(s)'. INSPECTION AND MAINTENANCE CHECKLIST FOR INF-2 BIORETENTION PAGE 5 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Concluded Standing water In BMP for longer than 24 hours ]Make appropriate corrective measures following a storm event' such as adjusting irrigation system, Surface pending longer than approximately 24 removing obstructions of debris or hours following a storm event may be invasive vegetation,or detrimental to vegetation health repairing/replacing clogged or compacted soils. Maintenance Needed? -1 Other/Comments YES J NO -'N/A Presence of mosquitos/larvae =Apply corrective measures to remove standing water in BMP when standing For images of an rafts, larva, pupa,and adult water occurs for longer than 2496 mosquitos,see hours following a storm event." http://www.mosguito.org/biologv �:l Other/Comments Maintenance Needed? YES NO N/A 'Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health,and surface posting longer than approximately 96 hours following a storm event poses a risk of vector(mosquito)breeding,Poor drainage can result from clogging of the media layer,filter course,aggregate storage layer,uncertain, or outlet structure.The specific cause of the drainage Issue must be determined and corrected.If it Is determined that the underlying native soils have been compacted or do not have the Infiltration capacity expected,the[City Engineer]shall be contacted prior to any additional repairs or reconstruction. "If mosquitos persist following corrective measures to remove standing water,or If the BMP design does not meet the 96 hour drawdown criteria because the underlying native soils have been compacted or do not have the Infiltration capacity expected,the[City Engineer]shall be contacted to determine a solution.A different BMP type,or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health,may be required. INF-2 Page 11 of 11 January 12,2017 EXHIBIT "C-2" SD-6B Permeable Pavement as Site Design BMP BMP MAINTENANCE FACT SHEET FOR SITE DESIGN BMP SD-6B PERMEABLE PAVEMENT AS SITE DESIGN BMP Permeable pavement is pavement that allows for percolation through void spaces in the pavement surface into subsurface layers.When used as a site design BMP,the subsurface layers are designed to provide storage of storm water runoff so that outflow rates can be controlled via infiltration into subgrade soils. As a site design BMP, permeable pavement areas are designed to be self-retaining and are designed primarily for direct rainfall. Self- retaining permeable pavement areas have a ratio of total drainage area(including permeable pavement)to area of permeable pavement of 1.5:1 or less. Permeable pavement as structural BMP usually receives runoff from a larger tributary area than permeable pavement as site design BMP (see INF-3 for permeable pavement as structural BMP). Permeable pavement surfaces can be constructed from modular paver units or paver blocks, pervious concrete, porous asphalt, and turf pavers.Typical components include: • Permeable surface layer • Bedding layer for permeable surface • Aggregate storage layer with optional underdrain(s) • Optional final filter course layer over uncompacted existing subgrade • Optional subsurface check dams at regular intervals when pavement is sloped (more closely spaced on steeper slopes) Normal Expected Maintenance Routine maintenance of permeable pavement includes: removal of materials such as trash and debris accumulated on the paving surface; vacuuming of the paving surface to prevent clogging; and flushing paving and subsurface gravel to remove fine sediment. If the BMP includes underdrains,check and clear underdrains.A summary table of standard inspection and maintenance indicators is provided within this Fact Sheet. Non-Standard Maintenance or BMP Failure If the permeable pavement area is not drained between storm events, or if runoff sheet flows across the permeable pavement area and flows off the permeable pavement area during storm events, the BMP is not performing as intended to protect downstream waterways from pollution and/or erosion. During storm events up to the 85`h percentile storm event (approximately 0.5 to 1 inch of rainfall in San Diego County), runoff should not flow off the permeable pavement area. The permeable pavement area is expected to have adequate hydraulic conductivity and storage such that rainfall landing on the permeable pavement and runoff from the surrounding drainage area will go directly into the pavement without ponding or overflow (in properly designed systems, the surrounding drainage area is not more than half as large as the permeable pavement area). Following the storm event,there should be no standing water(puddles)on the permeable pavement area. If storm water is flowing off the permeable pavement during a storm event, or if there is standing water on the permeable pavement surface following a storm event, this is an indicator of clogging somewhere within the system. Poor drainage can result from clogging of the permeable surface layer, any of the subsurface components, or the subgrade soils. The specific cause of the drainage issue must be determined and corrected. Surface or subsurface ponding longer than approximately 96 hours following a storm event poses a risk of vector(mosquito) breeding. Corrective maintenance, increased inspection and maintenance, BMP replacement, or a different BMP type will be required. If poor drainage persists after flushing of the paving, subsurface gravel, and/or underdrain(s) when applicable,or if it is determined that the underlying soils do not have the infiltration capacity expected, the [City Engineer]shall be contacted prior to any additional repairs or reconstruction. SD-613 Page 1 of 7 January 12, 2017 SD-6B Permeable Pavement as Site Design BMP Other Special Considerations Site design BMPs, such as permeable pavement, installed within a new development or redevelopment project are components of an overall storm water management strategy for the project. The presence of site design BMPs within a project is usually a factor in the determination of the amount of runoff to be managed with structural BMPs (i.e., the amount of runoff expected to reach downstream retention or biofiltration basins that process storm water runoff from the project as a whole). When site design BMPs are not maintained or are removed, this can lead to clogging or failure of downstream structural BMPs due to greater delivery of runoff and pollutants than intended for the structural BMP. Therefore, the [City Engineer] may require confirmation of maintenance of site design BMPs as part of their structural BMP maintenance documentation requirements. Site design BMPs that have been installed as part of the project should not be removed, nor should they be bypassed by re-routing roof drains or re-grading surfaces within the project. If changes are necessary, consult the [City Engineer] to determine requirements. The runoff storage and infiltration surface area in this BMP are not readily accessible because they are subsurface. This means that clogging and poor drainage are not easily corrected. If the tributary area draining to the BMP includes unpaved areas, the sediment load from the tributary drainage area can be too high, reducing BMP function or clogging the BMP. All unpaved areas within the tributary drainage area should be stabilized with vegetation. Other pretreatment components to prevent transport of sediment to the paving surface,such as grass buffer strips, will extend the life of the subsurface components and infiltration surface. Along with proper stabilization measures and pretreatment within the tributary area, routine maintenance, including preventive vacuum/regenerative air street sweeping,is key to preventing clogging. SD-6B Page 2 of 7 January 12, 2017 SD-6B Permeable Pavement as Site Design BMP SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR SD-6B PERMEABLE PAVEMENT AS SITE DESIGN BMP The property owner is responsible to ensure Inspection,operation and maintenance of permanent BMPS on their property unless responsibility has been formally transferred to an agency,community facilities district,homeowners association,property owners association,or other special district. Maintenance frequencies listed in this table are average/typical frequencies.Actual maintenance needs are site specific,and maintenance may be required more frequently. Maintenance must be performed whenever needed,based on maintenance Indicators presented In this table.The BMP owner Is responsible for conducting regular inspections to see when maintenance is needed based on the maintenance Indicators.During the first year of operation of a structural BMP,Inspection Is recommended at least once prior to August 31 and then monthly from September through May. Inspection during a storm event is also recommended.After the Initial period of frequent Inspections,the minimum inspection and maintenance frequency can be determined based on the results of the first year Inspections. Threshold/Indicator Maintenance Action Typical Maintenance frequency Preventive vacuum/regenerative air street sweeping Pavement should be swept with a vacuum power or .Schedule/perform this preventive action at least twice regenerative air street sweeper to maintain infiltration per yea,. through paving surface Accumulation of sediment, litter, or debris on Remove and properly dispose of accumulated materials. .Inspect monthly and after every 0.5-inch or larger permeable pavement surface Inspect tributary area for exposed soil or other sources storm event. of sediment and apply stabilization measures to .Remove any accumulated materials found at each sediment source areas.Apply source control measures inspection, as applicable to sources of litter or debris. Weeds growing on/through the permeable pavement Remove weeds and add features as necessary to prevent a Inspect monthly. surface weed intrusion.Use non-chemical methods(e.g.,Instead .Remove any weeds found at each inspection. of pesticides,control weeds using mechanical removal, physical barriers, and/or physical changes In the surrounding area adjacent to pavement that will preclude weed intrusion clothe pavement). Standing water In permeable paving area fallowing a Therandltion requires investigation ofwhy infiltration is •Inspect monthly and after every 0.5-inch or larger storm event,or runoff is observed overflowing off the notoccurring.Iffeasible,corrective action shall be taken storm event. If standing water Is observed, increase permeable pavingsurface duringa storm event to restore Infiltration(e.g., pavement should be swept inspection frequency to after every 0.l inch or larger with a vacuum power or regenerative air street sweeper storm event. to restore Infiltration rates, clear underdra'ms if .Maintenance when needed. underdra'ms are present). BMP may require retrofit N Infiltration cannot be restored.The(City Engineer)shall be contacted prior to any repairs or reconstruction. SD-613 Page 3 of 7 January 12,2017 SD-6B Permeable Pavement as Site Design BMP SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR SD-6B PERMEABLE PAVEMENT AS SITE DESIGN BMP(Continued from previous page) Threshold/Indicator Maintenance ARion Typical Maintenance Frequency Presence of mosquitos/larvae If mosquitos/larvae are observed'. first, Immediately .Inspect monthly and after every 0.5-inch or larger remove any standing water by dispersing to nearby storm event If mosquitos are observed, In c ease For images of egg rafts, larva, pupa, and adult landscaping; second, make corrective measures as inspection frequency to after every 0.1 inch or larger mosquitos,see applicable to restore BMP drainage to prevent standing storm event. htto'//www.mosguito.ore/biology water. •Maintenance when needed. If mosquitos persist following corrective measures to remove standing water,or If the BMP design does not meet the 96-hour drawdown criteria because the underlying soils do not have the Infiltration capacity expected, the [City Engineer] shall be contacted to determine a solution.A different BMP ryoe,or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health,may be required. Damage to permeable paving surface leg., cracks, Repair or replace damaged surface as appropriate. a Inspect annually, settlement, misaligned paver blocks, void spaces •Maintenance when needed. between paver blocks need fill materials replenished) References American Mosquito Control Association. http://www.mosouRcicing/ California Storm Water Quality Association(CASQA).2003.Municipal BMP Handbook. htto// ¢/ /b handbook/ I-Into-handbook County of San Diego,2014.Low Impact Development Handbook. hap'// d / t t/d/d / t hed/usm /I'd html San Diego County Copermittees.2016.Model BMP Design Manual,Appendix E,Fact Sheet 50-6. htt '// t l [ l, d h C - tent&vim=adicle&id=250&ltemid=220 SD-6B Page 4 of 7 January 12,2017 SD-6B Permeable Pavement as Site Design BMP Date: Inspector: BMP ID hi Permit No.: Al: Property/Development Name' Responsible Parry Name and Phone Number: Property Address of BMP: Responsible Party Address: INSPECTION AND MAINTENANCE CHECKLIST FOR SD-BB PERMEABLE PAVEMENT AS SITE DESIGN BMP PAGE 1 of 3 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Accumulation of sediment, Utter, or debris on ]Remove and properly dispose of permeable pavement surface accumulated materials Maintenance Needed? ]Inspect tributary area for exposed soil or ]YES other sources of sediment and apply ]NO stabilization measures to sediment source areas.Apply source control —�'N/A measures as applicable to sources of litter or debris ]Other/Comments: Weeds growing on/through the permeable --Remove weeds and add features as pavement surface necessary to prevent weed Intrusion Maintenance Needed? ] Use nor chemical methods (e.g., instead ]YES of pesticides, control weeds using —NO mechanical removal, physical barriers, and/or physical changes in the ]N/A surrounding area adjacent to pavement that will preclude weed Intrusion into the pavement). Other/Comments: SD-613 Page 5 of 7 January 12,2017 SD-6B Permeable Pavement as Site Design BMP Date'. Inspector'. BMP ID No.: Permit No INSPECTION AND MAINTENANCE CHECKLIST FOR SD B PERMEABLE PAVEMENT AS SITE DESIGN BMP PAGE 2 of 3 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Standing water In permeable paving area -If feasible,take corrective action to restore following a storm event, or runoff Is observed infiltration(e.g.,sweep pavement with a overflowing off the permeable paving surface vacuum power or regenerative air street during a storm event' sweeper to restore Infiltration rates, clear underdrains If underdralns are Maintenance Needed? present).BMP may require retrofit If -YES Infiltration cannot be restored.The[City -NO Engineer]shall be contacted prior to any -N/A repairs or reconstruction. -1 Other/Comments'. Presence of mosquitos/larvae -Apply corrective measures to remove standing water in BMP when standing For Images of egg rafts, larva,pupa, and adult wateroccursfor longerthan 96 hours mosquitos,see following a storm event" hUp//www mosou to.c rg/biolcev Maintenance Needed? - Other/Comments: YES -NO N/A 'If storm water Is Flowing off the permeable pavement during a storm event,or If there Is standing water on the permeable pavement surface following a storm event,this Is an Indicator of clogging somewhere within the system.Poor drainage can result from clogging of the permeable surface layer,any of the subsurface components,or the subgrade soils.The specific cause of the drainage Issue must be determined and corrected.Surface or subsurface ponding longer than approximately 96 hours following a storm event poses a risk of vector(mosquito)breeding.If poor drainage persists after flushing of the paving,subsurface gravel,and/or underdraln(s)when applicable,or if It Is determined that the underlying soils do not have the infiltration capacity expected,the[City Engineer]shall be contacted prior to any additional repairs or reconstruction. "If mosquitos persist following corrective measures to remove standing water,or If the BMP design does not meet the 96-hour drawdown criteria because the underlying sods do not have the Infiltration capacity expected,the(City,Engineer]shall be contacted to determine a solution.A different BMP type,or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health,may be required. SD-6B Page 6 of 7 January 12,2017 SD-6B Permeable Pavement as Site Design BMP Dale: Inspector: BMP ID No.: Permit No APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR Sol PERMEABLE PAVEMENT AS SITE DESIGN BMP PAGE 3 of 3 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Concluded Damage to permeable paving surface ie.g.. Repair or replace damaged surface as cracks,settlement,misaligned paver blocks,void appropriate spaces between paver blacks need fill materials Other/Comments: replenished) Maintenance Needed? YES -1 NO N/A Preventive vacuum/regenerative air street Pavement should be swept with avacuum sweeping power or regenerative air street sweeper to maintain infiltration through paving Maintenance Neetletl? surface. YES 5chedule/perform this preventive action at NO least twice per year. N/A -Other/Comments: SD-6B Page 7 of 7 January 12,2017