Appendix 1.3 Eng Division Schedule of Fees 1.1.18
Engineering DIVISION SCHEDULE OF FEES
Grading Permit Processing
GradingPlan Check (GR)$1,747.00/ Sheet
NPDES Plan Check (NP)$ 168.00/ Sheet
Erosion Control Plan Check (EO)$190.00/ Sheet
Simplified Grading (SG)$2,376.00
Construction ChangeMinor(C4) Over-the-Counter$ 220.00/ Sheet
Construction ChangeMajor (C5)Submitted for Plan Check
$468.00/ Sheet
Construction Change New Sheet$ 1,604.00/ Sheet
Inspection (GI) 5% of ACE
Inspection (GI) Approved Cost Estimate > $100,000
$5,000 plus 3% of ACE over $100,000
NPDESInspection (NI& NG)Approve1.0% of ACE
NPDESInspection (NI&NG)Approved Cost Estimate > $100,000
$1,000 plus 0.6% of ACE over $100,000
Public Improvement Processing
Improvement Plan Check (IR)$2,230.00/ Sheet
Construction Change Minor (C4) Over-the-Counter$ 220.00
Construction Change Major (C5) Submitted for Plan Check
$468.00
Construction Change New Sheet$1,870.00/ Sheet
Inspection (II)
5% of ACE
Inspection (II) Approved Cost Estimate > $100,000$5,000 plus 3% of ACE over $100,000
NPDESInspection (NI& NG)
1.0% of ACE
NPDESInspection (NI&NG)Approved Cost Estimate > $100,000$1,000 plus 0.6% of ACE over $100,000
Sewer Construction
$ 440.00
Sewer Lateral Construction Permit (DCS, DES)
$2,230.00/ Sheet
Public Sewer Improvement Plan Check Fee (IR)
Public Sewer Inspection (II) Approved Cost Estimate > $100,000
5% of ACE
Public Sewer Inspection (II) Approved Cost Estimate > $100,000$5,000 plus 3% of ACE over $100,000
Wastewater Discharge Permit Processing Fee (WP)$ 47.00
$3,050.00
Sewer Reimbursement District –Establishment Fee
Traffic
$ 250.00
Traffic Control (TR)
$60.00
Traffic Control –Minor (TQ)
Transportation PermitNo Fee
Haul Route PermitNo Fee
Building Permit Plan Check
Residential (EA) 0-500 SF
$204.00
Residential(EB) 500-2,000 SF$336.00
Residential (EC) 2,000-5,000 SF
$ 500.00
Residential (ED) > 5,000 SF$ 679.00
Commercial (EF) 0-500 SF
$204.00
Commercial (EG) 500-2,000 SF$336.00
Commercial (EH) 2,000-10,000 SF
$ 610.00
Commercial (EI) > 10,000 SF$ 830.00
APPENDIX 1-3 page 1-3
Commercial Remodel, Tenant Improvement (EJ)$ 300.00
Pool, Spa (EE)$ 250.00
Demo Building Permit (EK)$ 84.00
Misc. Building Permit (EL)$ 30.00
Map and Parcel Map Processing
Final Map Processing (FM) Major Subdivision Map
$2,112.00/ Sheet
Final Parcel Map Processing (PM)Minor Subdivision Map$2,400.00/ Sheet
Certificate of Correction (C3)$ 144.00
Landscaping and Irrigation
$348.00
Plan Check: Public (LV)
$168.00
Plan Check: Private (LP)
Urban Forest Management Permit$732.00
Stormwater and Flood Control
SWPPP (PP)$ 830.00
Storm Water Control Simulation Model Revision: Minor
$1,392.00
Storm Water Control Simulation Model Revision: Major$2,330.00
FEMA Conditional Letter of Map Revision(FC)$1,390.00
FEMA Letter of Map Revision(FL)$ 460.00
FEMA Letter of Map Revision/Elevation Certificate(FE)$ 460.00
Utility and Right-of-Way Construction
$ 280.00
Utility Construction Permit (EX) Trenching < 200 LF
5% of ACE
Inspection Fee for EX Permit Trenching >200 LF
Right-of-Way Minor (CN) Associated with a Single Family Dwelling
$330.00
Right-of-Way Major (CJ) Not associated with a Single Family Dwelling; or
more than one trench; and/or ACE > $10,000
$890.00
Inspection Fee for CJ Permit Trenching >200 LF5% of ACE
Various Encroachment Permits
$1,526.00
Beach Encroachment (TB)
5% of ACE
Beach Encroachment Security Deposit (SY) per Attachment E, Policy No. CS P005
Permanent Encroachment Permit (PE)$ 384.00
Permanent Encroachment Permit with Construction (PX)$ 500.00
Temporary Encroachment Permit (TE)$179.00
Newsrack Operations Permit (NO)$54.00
Sidewalk Café$ 288.00
Sidewalk Café Renewal$ 92.00
Sidewalk Café Renewal with Violation$ 170.00
Miscellaneous
$ 410.00
GIS Map Fee (GS) Update of GIS Database; (Bond and Fee Letter)
Deposit (T.B.D.)
Structural Review (M1) Outside Review
Structural Review (M1) New Sheet$305.00
Street Name Change Application (SN)$3,740.00
Street Vacation Application (VA)$3,610.00
Tree Removal Permit$ 610.00
Miscellaneous Engineering Approval$ 30.00
Generic Survey Review$191.00
Additional security deposit may be required at the discretion of the City Engineer.