Loading...
Appendix 1.3 Eng Division Schedule of Fees 1.1.18 Engineering DIVISION SCHEDULE OF FEES Grading Permit Processing GradingPlan Check (GR)$1,747.00/ Sheet NPDES Plan Check (NP)$ 168.00/ Sheet Erosion Control Plan Check (EO)$190.00/ Sheet Simplified Grading (SG)$2,376.00 Construction ChangeMinor(C4) Over-the-Counter$ 220.00/ Sheet Construction ChangeMajor (C5)Submitted for Plan Check $468.00/ Sheet Construction Change New Sheet$ 1,604.00/ Sheet Inspection (GI) 5% of ACE Inspection (GI) Approved Cost Estimate > $100,000 $5,000 plus 3% of ACE over $100,000 NPDESInspection (NI& NG)Approve1.0% of ACE NPDESInspection (NI&NG)Approved Cost Estimate > $100,000 $1,000 plus 0.6% of ACE over $100,000 Public Improvement Processing Improvement Plan Check (IR)$2,230.00/ Sheet Construction Change Minor (C4) Over-the-Counter$ 220.00 Construction Change Major (C5) Submitted for Plan Check $468.00 Construction Change New Sheet$1,870.00/ Sheet Inspection (II) 5% of ACE Inspection (II) Approved Cost Estimate > $100,000$5,000 plus 3% of ACE over $100,000 NPDESInspection (NI& NG) 1.0% of ACE NPDESInspection (NI&NG)Approved Cost Estimate > $100,000$1,000 plus 0.6% of ACE over $100,000 Sewer Construction $ 440.00 Sewer Lateral Construction Permit (DCS, DES) $2,230.00/ Sheet Public Sewer Improvement Plan Check Fee (IR) Public Sewer Inspection (II) Approved Cost Estimate > $100,000 5% of ACE Public Sewer Inspection (II) Approved Cost Estimate > $100,000$5,000 plus 3% of ACE over $100,000 Wastewater Discharge Permit Processing Fee (WP)$ 47.00 $3,050.00 Sewer Reimbursement District –Establishment Fee Traffic $ 250.00 Traffic Control (TR) $60.00 Traffic Control –Minor (TQ) Transportation PermitNo Fee Haul Route PermitNo Fee Building Permit Plan Check Residential (EA) 0-500 SF $204.00 Residential(EB) 500-2,000 SF$336.00 Residential (EC) 2,000-5,000 SF $ 500.00 Residential (ED) > 5,000 SF$ 679.00 Commercial (EF) 0-500 SF $204.00 Commercial (EG) 500-2,000 SF$336.00 Commercial (EH) 2,000-10,000 SF $ 610.00 Commercial (EI) > 10,000 SF$ 830.00 APPENDIX 1-3 page 1-3 Commercial Remodel, Tenant Improvement (EJ)$ 300.00 Pool, Spa (EE)$ 250.00 Demo Building Permit (EK)$ 84.00 Misc. Building Permit (EL)$ 30.00 Map and Parcel Map Processing Final Map Processing (FM) Major Subdivision Map $2,112.00/ Sheet Final Parcel Map Processing (PM)Minor Subdivision Map$2,400.00/ Sheet Certificate of Correction (C3)$ 144.00 Landscaping and Irrigation $348.00 Plan Check: Public (LV) $168.00 Plan Check: Private (LP) Urban Forest Management Permit$732.00 Stormwater and Flood Control SWPPP (PP)$ 830.00 Storm Water Control Simulation Model Revision: Minor $1,392.00 Storm Water Control Simulation Model Revision: Major$2,330.00 FEMA Conditional Letter of Map Revision(FC)$1,390.00 FEMA Letter of Map Revision(FL)$ 460.00 FEMA Letter of Map Revision/Elevation Certificate(FE)$ 460.00 Utility and Right-of-Way Construction $ 280.00 Utility Construction Permit (EX) Trenching < 200 LF 5% of ACE Inspection Fee for EX Permit Trenching >200 LF Right-of-Way Minor (CN) Associated with a Single Family Dwelling $330.00 Right-of-Way Major (CJ) Not associated with a Single Family Dwelling; or more than one trench; and/or ACE > $10,000 $890.00 Inspection Fee for CJ Permit Trenching >200 LF5% of ACE Various Encroachment Permits $1,526.00 Beach Encroachment (TB) 5% of ACE Beach Encroachment Security Deposit (SY) per Attachment E, Policy No. CS P005 Permanent Encroachment Permit (PE)$ 384.00 Permanent Encroachment Permit with Construction (PX)$ 500.00 Temporary Encroachment Permit (TE)$179.00 Newsrack Operations Permit (NO)$54.00 Sidewalk Café$ 288.00 Sidewalk Café Renewal$ 92.00 Sidewalk Café Renewal with Violation$ 170.00 Miscellaneous $ 410.00 GIS Map Fee (GS) Update of GIS Database; (Bond and Fee Letter) Deposit (T.B.D.) Structural Review (M1) Outside Review Structural Review (M1) New Sheet$305.00 Street Name Change Application (SN)$3,740.00 Street Vacation Application (VA)$3,610.00 Tree Removal Permit$ 610.00 Miscellaneous Engineering Approval$ 30.00 Generic Survey Review$191.00 Additional security deposit may be required at the discretion of the City Engineer. page 1-4APPENDIX 1-3