Loading...
2016-13155 G (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT EROSION CONTROL STOMWATER POLLUTION CONTROL BAP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES OWNER y LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO 1° IN CASE EMERGENCY WORK IS REQUIRED, CONTACT RYAN ORTMAN AT (858) 6BB -1103, CONCRETE WASHOUT t� WILL RESULT %N ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS 2348 MANCHESTER AVENUE `t THE RESPONSIBILITY OF THE OWNER' TO KNOW WHERE HIS /HER PROPERTY LINE IS. 24 HOURS A DAY.. CONTRACTOR SH LL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR STUCCO, PLASTER AND THE LIKE INTO ENCINITAS, CA 92024 � DRAINAGE NOTE 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL THE STORM9WAOER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS THE WASHOUT LOCATION. 858- 688 -1103 oR' NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE N WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. CONSTRUCTION SITE ACCESS SITE ADDRESS PACIRC AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO OCEAN PROECT i UTILITY NOTE 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR 2348 MANCHESTER AVENUE STE OF THE ENGINEERING INSPECTOR. CORRUGATED STEEL PANELS/PLATES. ENCINITAS, CA 92024 101 ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER CONSTRUCTION VEHICLES APN.• 261- 053 -20 NOTES TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES GENERAL PARKING VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE DESCRIPTION 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS THE STANDARD 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE OFF -SITE. LEGAL REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS LOTS 15 & 16 IN BLOCK 16 OF CARDIFF, IN THE UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. EROSION GONTAOL OF THE CITY OF RECISIONS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. CITY OF ENCINITAS COUNTY OF SAN DIEGO, EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, STATE OF CALIFORNIA, ACCORDING TO MAP TO ANY REQUEST FOR INSPECTION. PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. ADEQUATE GROUND COVER VEGETATION, AND BONDED FIU3ER MATRIX. THEREOF NO. 1298 FI ED DIEGO COUNTY, ON THE VICINITY MAP 2. THE SOILS REPORT TITLED "UPDATED GEOTECHNICAL EVALUATION PROPOSED RESIDENTIAL 7° ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. NOVEMBER 14, 1910. NOT TO SCALE BUILDINGS 2348 AND 2350 MANCHESTER AVENUE ENCINITAS, SAN DIEGO COUNTY, CALIFORNIA BE INCORPORATED HEREON. PREPARED BY GEOTEK INC., DATED NOVEMBER 17, 2016 AND ADDENDUM TITLED 'ADDENDUM TO DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR UPDATED GEOTECHNICAL EVALUATION 2348 AND 2350 MANCHESTER AVENUE ENCINITAS, SAN B. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. DIEGO COUNTY, CALIFORNIA" REGARDING SHORING RECOMMENDATIONS PREPARED BY GEOTEK, SLOPE AT THE CONCLUSION OF EACH WORK DAY. OWNER S CERTIFICATE INC., DATED JANUARY 4, 2017. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY UNNECESSARILY; THEY HELP DECREASE EROSION. TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON TRIP COMPACTION AND STABILITY OF THE SITE. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED I (WE) HEREBY AGREE TO INDEMNIFY, AGAINST A AND HOLD CITY AND CITY L OFFICERS, OFFICIALS, EMPLOYEES STORMWATER POLLUTION CONTROL POST CONSTRUCTION BAP /IMP NOTES FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND AND AGENTS HARMLESS COSTS, AND AGAINST ANY AND ALL LIABILITIES, CLAIMS ARISING CAUSES N ACTIN 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE LOSSES, DAMAGES AND COSTS, INCLUDING ALL COSTS OF DEFENSE THEREOF, ARISING OUT � OR IN ANY PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. GRADING. MANNER CONNECTED DIRECTLY OR INDIRECTLY WITH ANY ACTS OR OMISSIONS OF OWNER OR OWNERS AGENTS 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS EMPPLOYEES, CONTRACTORS, SUBCONTRACTORS OFFICIALS, OFFICERS, OR REPRESENTATIVES FOR ANY AND ALL SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT WORK OACONSTRUCTIONNN{{{^ OVERED IN THE PERMIT OR CONNECTED DIRECTLY OR INDIRECTLY TO THE PERMIT OR PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM COMPLETE. APPROVED PLANS WIT THE _V TE PROPERTY OR PUBLIC EASEMENTS. REPLACED OR REPAIRED TO CONDITION DRAIN SYSTEM. EXISTING PRIOR TO GRADING. WATER USAGE FOR DUST CONTROL SHALL 8E MINIMIZED. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL #_. ti SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. ON -SIT ONST NCT ON MA RTAI STORAGE SIGNATUNE: DATE. 6. THE DEVELOPER SHALL 8E RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS RYAN ORT N DISTURBED OR DESTROYED SHALL BE PRE- ESTABLISHED AND REPLACED BY A REGISTERED STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. 2348 MANHESTER AVE CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL ENCINITA4 CA 92024 FACILITIES AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF ��_ TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT V�/ 7. THE CONTRACTOR SHALL DESIGN CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, 858 - 6881103 INCLUDING SHORING AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE APPROVED BMP /IMP FACILITY AND /OR THE TURF/LANDSCAPED AREAS. CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STOFRMWATER AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION 4. NO DRAINS SHALL BE INSTALLED IN HAROSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TINES. B. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (112) MILE OF A STRUCTURE AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. I FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP/BMP AREA OR SOILS ENGINEER S CERT ICATF 7.30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP /BMP. TRAINING w_� �. �^-��' A AEGISTEFRED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE PRINCIPALLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL FAMILIAR WITH THE CITY OF ENCINITAS STORMIWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES 6. ALL STORMWATEiR IMP /8h>p FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MAC BY ME OR UNDER MY ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE-CONSTRUCTION ALTERED WITHOUT A PERMIT FROM THE CITY. SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER (S) AND THE PRIME CONTRACTOR DIRECTION ON rG_ AND FOR AN UPDATE ON _P�S '_s_. ONE COMPLETE COPY OF THE SOILS MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY MUST IIEORM SUBCONTRACTORS ABOUT STORMWATEA REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. REPORT COMPILED FROM TMIS STURDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF CALLING (760) 633 -2770. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN THE CITY ENGINEER. FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE TE MANAGEMENT MAY REQUIRE THAT THIS FLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE WAS RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN THE 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED OBTAINED. CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION GRADING PLANS AND SPECIFICATIONS. CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO ,APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER 8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STO3MWATE7R. BERMS /DIKES SHALL BE PLACED WITH REGARDS TO THE HAULING OPERATION. HAVE AN IMPERVIOUS, NON- COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY ✓.h. 3�A7�� j ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN FOR LEAKS. DUNPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. OUMPSIEES WITHOUT LIDS SHALL BE 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT PLACED WITHIN STRUCTURES WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS %N ORDER TO AVOID RAIN GeoTe K, Inc° DATE FINAL GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN 'AS GRADED ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE CONTACT WITH ANY TRASH MATERIAL. 710 E•DARKRIO6E gVSNUE,SuItE 105 CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. 13155 -G TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW (,OROAIA,GA 9Z%7q -°1099 HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR ROLLING OF THE DUMESTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS VEHICLE FLUIDS, BROKEN ASPHALT AS SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE AND CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN PROJECT NO. 1597-GR THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING SEPARATOR AND IS THEN FILTERED THROUGH A CITY - APPROVED HYDROCARBON FILTER AND TO AN APP'ROP'RIATE LANDFILL OR DISPOSED O AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF C9sQ 710- 1160 OPERATION. DISCHARGED INTO THE PUBLIC SANITARY SEWER SYSTEM NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE REQUIRED FOR THIS STRUCTURE. HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR ON LANDFILLS AND TO ORDER OUMPSTERS CALL EDCO AT (760) 436 -4151. UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND SAN DIEGUITO WATER DISTRICT NOTES: POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION O= TRENCHES. HE SHALL SUBMIT THE SITE. SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL 1. WATER MAIM LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT THE STANDARD SPECIFICATIONS OF THE CL RRENT WATER AGENCIES' STANDARDS COMMITTEE PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN (WASC). SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMORAIN INLETS ON HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED PERVIOUS SURFACES. USE. 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORM GRAIN. CONTRACTOR POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER NON- EXISTE7NCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE OF THIS PROJECT. AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH 3. ALL EXISTING FACILITIEG WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, FOR MORE INFORMATION ON STORMWATEFR POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND /OR ADJUST TO GRADE TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES ETC.) STATEMENT OF ENGINEER OF WORK DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET THE CONTRACTORS RESPONSIBILITY TO PLACE SPREAD, WATER AND COMPACT CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEERS TRADE OPRO=ESSION. THE ENGINEER 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRAS TO PRODUCE OWNER'S EXPENSE. FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND SMOOTH SURFACE AND SLOPES CROSS SECTION. THE SLOPES I EXCAVATION AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH SMOOTH EMBANKMENTS SHALL BE SHAPED, PLANTED AND TRIMMED AS DIRECTED BY THE ENGINEER OF 5. UTILITIES TO MAINTAIN MINIMUM 5 -FOOT SEPARATION WHEN PARALLELING WATER PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL DIRECT ROOTS AND ENGINEER SERVICES. IN ITS CAPACITY AS A PUBLIC ENTITY FOR TAE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION WASTE MATTER EXPOSED OR AND ORDERLY OR EDITION. SLOPES WHICH ARE LIABLE OTHER BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP IA ALL 6. MINIMUM HORIZONTAL SEPARATION OF 10 -FEET REQUIRED BETWEEN FIRE HYDRANTS AND THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. SAN DIEGO GAS AND ELECTRIC VAULTS. IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING 16. ALL TREES, BRUSHi GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE TRAVELED WAYS. EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM WATER METERS A41ST BE IN FRONT OF THE PARCEL THEY ARE SERVING. THE WORK PERFORMED BY THE 71NEER. SOILS ENGINEER DEBRIS. APPROVAL N LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB -1953 IS REQUIRING THAT NO -LEAD BRASS \ SOILS ENGINEER AHdD CITY ENGINEER PRIOR TO THE DISPOSAL O ANY SUCH MATERIAL. BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL SIGNATURE: DATE :'�•1� URBAN FOREST MANAGEMENT PROGRAM, TREES LOCATED WITHIN CITY STREET RIGHT -O= -WAY, MATERIALS TO BE NO -LEAD BRASS PARTS. BRIAN MICHAEL ARDOLZNO ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND PASCO LARET SUITER & ASSOCIATES VICES SHALL 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES BE SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION IAVLESS SPECIFICALLY APPROVED PpFESSIp OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC -17 OR WC -18. 535 N. HIGHWAY 101 O Q GHAEL y�! OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO SOLANA BEACH, CA 92075 THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE NOTIFICATIONS (858)259 -8212 PASCO LARET BUNTER IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF RIDE EXPIRES: 12 -31 -17 APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN w m No. 71651 o m UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF Exp. 12/31/17 OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, x} & ASSOCIATES IMPERVIOUS AREA HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO IMPERVIOUS AREA PRIOR TO CONSTRUCTION.' 1,611 SF PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS bjq CIVIL CIVIL ENGINEERING +LAND PLANNING +LAND SURVEYING IMPERVIOUS AREA AFTER CONSTRUCTION: 2,612 SF THE CONTRACTORS RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID OF GAiIF� 535 North Highway 101, Ste A, Solana Beach, CA 92075 BMP PROJECT STATUS INCREASE IN IMPERVIOUS AREA: 1,001 SF UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION Ph 355.259 °E3212 1 fa 8355,259,4812 glsaengineering,com OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: IMPERVIOUS AREA REPLACED: 1,611 SF A. SEWERS - CSD - (760)- 633 -2770 STANDARD B. GAS & ELECTRIC - SDGE - (760)- 438 -6200 EARThWOW D41A C. WATER -SAN DIEGUITO WATER DISTRICT -1- 800 -227 -2600 D. TELEPHONE SBC BELL - (760) -4B9 -3411 FIELD OPERATIONS PLANNING AND BUILDING PARKS AND RECREATION SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT - STEEPEST EXISTING NATURAL SLOPE ON -SITE = NIA E. CABLE TV - COX COMMUNIC4TIONS- (760)- 806 -9809 X -2233 MAXIMUM VERTICAL DEPTH OF CUT = 5' MAXIMUM VERTICAL DEPTH OF FILL = 2.5' 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE (760) -633 -2770. CUT = 525 C. Y. FILL *AIT EXPORT = 375 C.Y. 3. THE CONTRACTOR SHALL GIVE 24 HOURRS NOTICE ON CALLS FOR INSPECTION. PHONE: 1- REMEDIAL = 120 C.Y. (760)633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT SIG S GN SIGN DATE IGN E GN DATE (3' -5' REMOVAL AND FECOr1PACTION UNDER BUILDINGS) TO REJECTION AND REMOVAL. CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE A -BUILT ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. IL-13-1;? DESCRIPTION: #1042 ENC.- 42 PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED :g1}a APPROVED: D GRADING PLAN FOR: LOCATION.' EAST WING WALL 10 THE 101 It -1.1'1 x'20 li � /��/ - - END � NDRTR°60UkD HWY 101 - @_� DATE: 2S�FS MANCHESTER AVENUE BRIDGE OVER LAGOON VERTICAL: N/A BRIAN M AE A LINO DATE �\ MA IH AHER EDWARD W. DANE II 151.55'G HORIZONTAL: NIA RECORD FROM. ROS 18416 R.C.E. NO.: 71651 APE: 261- 053 -20 -- DATUM.' ELEVATION. NAVD88 16 9 / s i3 1 C 2 BRIAN MICHt EL A�DOLINO EXP : 12 -31 -17 DATE Z DATE 3 • Z$ • /7 PLANNING CASE N0: 05 -178 OR /COP 16 -284 SUBC SHEET 1 OF 4 REVIEWER SPECTOR SENIOR ENGINEER PLSA 2635 mil NOTES: LEGEND 1. THE MAINTENANCE OF ALL PROPOSED BMP S WILL BE THE RESPONSIBILITY O BW THE OWERS. THIS WILL INCLUDE ANY POST-CONSTRUCTION AS WELL AS ANY PROPERTY LIB CONSTRUCTION BAP THAT IS DETERMINED TO NEED TO REMAIN PERMANENTLY OR FOR A SPECIFIED PERIOD OF TIME AFTER THE COMPLETION OF ALL CONSTRUCTION NEIGHBORING PROPERTY LINE OPERATIONS. TW -42.0 . TWCG 5 i PROPOSED CONTOURS 92 2. THE OWNER WILL BE PFESENTED WITH INFORMATION ON SOLIRCE CONTROL BW@EG 4 MEASURES SUCH AS THE PROPER MEANS OF DISPOSING OF POLLUTANTS DIRECTING I EXISTING CONTOURS - - 90 - - WAS WATER INTO LANDSCAPING AREAS RATHER THAN INTO THE STREET GUTTER OR TW .0I STORK MAIN MINIMIZING THE USE HOUSEHOLD CLEANERS AND OTHER PRODUCTS c MASONRY BIOFETENTION PVT. LANDSCAPING AHD /OR WHEN THEY HAVE THE POTENTIAL TO CONTRIBUTE POLLUTANTS INTO STORM WATER 0 RETAINING BASIN MASONRY RETAINING COMBINED FEND 6 WALL NOT TO EXCEED GAQLMOCOVER TO BE SAW CUT LIFE TRANSITION PROPOSED ALLEY IMPROVEMENTS G 9 5 WALL � FG 9l.5 200 AMP ELEC. SERVICE WALL PER SOHSD C -3 TW@FS y357 6' UNLESS BOTH WALL &FENCE A OFFSET AND SPILL CLEAN UP TECHNIQUES. MlAINTAIAED BY, HOMEOWNER TO EXISTING ALLEY CONDITIONS (MAINTAIN I SDRSD C- 70 SF TW 93,5 PANEL. VERIFY EXACT LOCATION BWIaEG 90 1 HORIZONTALLY. SEE ENCINITAS PLANNING. IN PERPETUITY!, PER EM RA 3. IN THE EVENT THAT LANDSCAPING MATERIALS ARE REQUIRED TO STOCK- MIN !% SLOPE @ FLOWLIAE ALLEY) IN FIELD WITH SDG&E TEMPORARY c gyp) CENTERLINE - PILED, THE STOCKPILES WILL BE LOCATED OUTSIDE OF ANY DRAINAGE COURSE IN I 3 TW 92.0 935 3f1 SEE SHORING PLANS TW 97.06 DOC �1 �3C ORDER TO REDUCE THE POTENTIAL FOR STORM WATER TO COME IN CONTACT WITH DISTRICT TO INSTALL 1" LATERAL TW@FG 91.5 � 91.0 = ny 83 TW' 96.83 -� - -- DRAINAGE DIRECTION AND SUSPEND THE MATERIALS WITHIN ITS FLOW. IN ADDITION TO THE LOCATION AND DUAL METER PER WAS WS TW@FS 93.57 TWOS 93.57 CLEANOUT TW 97.06 TWDEG 93.5 -q9�- 8w@EG 90.6_11__ OF THE STOCKPILES WEN THE STOCKPILES WILL REMAIN IN PLACE FOR THE WC -17 AT OWNERS EXPENSE C 3° TW y2.0_.@S3 5,7 „BWG TIFFS 93.57 BW�EG 90 93 IE 91.6 TW@FS 93.57 TiV@FS 9357 BW@EG 91.40 �C- --3 FLOWLIAE '- C'O1RSE OF MORE THAN 1 DAY, THEN THE STOCKPILE WILL DE ADEQUATELY COVERED G,_90 83A ., BW G 91.06 BW@EG 91.06 97.06 j TW@FS 92.0 BW@EG 90 BUILDING FOOTPRINT SUCH THAT PRECIPITATION WILL NOT BE CAPABLE COMM IN CONTACT WITH iFL 89.9 P 5' FENCE PER B " ' ' STA 1+50.00 15.00' LT - - - - - - - - - TFE STOCKPILED MATERIAL. G 91.5 . , f 3.5 GUANO a _ 4. THE PROPOSED IRRIGATION SYSTEM WILL HAVE AN AUTOMATED RAIN SAITOFF ARCH, ING ML�i9 46E x'00' I RAC `Q MATCH EXISTING IMPROVEMENTS & 3 PVC STORM DRAIN PIPE - - - - - - - - - DEVII WHIG WILL DISCOVTINIE If#?IGATZO! IN THE EVENT RAIN AND IF TW 92.0 FS 902 THE SOIL IS SIFFICIENTLY SATURATED. TW@FG 91.0 W - * * 3.57, _ T : " { y -_ y - STING !% LZGffR 1% TG 92.9 FL 90.89 RETAINING WALL F'ER SDRSD C -3 5. THE PROPOSED IRRIGATION SYSTEM WILL 8E tROUTINELY INSPECTED AND BW@FG 90.3 FL 90.0 93 57 -: - - �� IE 91.7 PROPOSED Cf &GUTTER PCC PAVING MAINTAINED TO ENSILE THAT OVER WATERING IS MINIMIZED BROKEN DE �+ 9 - - T, W W MALFUNCTIONING SPRINKLER HEADS WILL BE REPLACED AS NEEDED, AND IN THE �' 90 3 E OVER�I 'OW FS 3.25 I FS 93.6 f 5, F'EH SDRSD G -2 (50 LF) LIMIT DE GRADING EVENT THAT ANY IRRIGATION PIPING DEVELOPS CRACKS LEAKS OR BREAKS FS 90.3 y lDA_Eil I APNk 262- 053 -20 i 4 • FENGME } BIORETENTION BASIN REPAIRS WILL BE ARRANGED FOR AAA] THE IRRIGATION SYSTEM WILL EITHER BE HATCHED AREA REPRESENTS PROPOSED H�TAINIMG 10.7%1TG 92 "0 IE OUT I PROPOSED R�SIDEMCE I III 5 11 SHUT -DOWN ENTIRELY OR THE PROBLEM AREA WILL ISOLATED AND TAKEN TURFBLOCK REINFORCED GRASS STRIPS FOR $AB n . WAL'L..P€Rt., -, -. - .. _ 92.0 UNIT ! I PROPOSED } DEFLINE IF POSSIBLE UNTIL THE PROBLEM IS CORRECTED. TO BE PRIVATELY MAINTAINED AND NOT TO BE SDFISD C 2 I GARAGE I MAIN LEVEL -._ - I $' SAW CUT LI ° � PROPOSED SEWER LATERAL S MODIFIED WITHOUT A PERMIT FROM THE CITY I -� -�� I - - � FF 93.67 IE 81. I 4, d II ,° � 6. FOR STORM WATER POLLUTION CONTROL PUSS ALL RUMFF FROM ALL ROOF ENCINITAS. {TYPICAL ALL DRIVEWAYS) PAD --93.0 IE 7 .! I 4f 4' WIDE DRAINS SHALL DISCHARGE ONTO (MASS AND LANDSCAPE AREAS PRIOR TO IE 82.1 BASEMENT W <' AREA PROPOSED WATER SERVICE W COLLECTION AMA) DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM PROPOSED 4" SEWER LATERAL 10 3 %I I I FF =$3.0 FS 82.9 PER SDRS7 SS -01 FS 8357 PA0=82.33 ( S2.8 T6' 92.9 STA 1+25.001 15.00' LT EXISTING SEWER MAIN DRAIN SYSTEM. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER "� I POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE Cm. DISTRICT TO ABANDON � 4 � - - - _ -_ _ _ _ _ - - � IE 91.9 I TC 92.04 EX WATER SERVICE AT FL 90.1 c . FS 9325 LIGHT WELL �� 81.8 ai FL 91.54 7. OWNER TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING OWNERS EXPEL FS 90.4 ar - - - - } $ EXISTING WATER MAIN DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF d FS 93 25 LIGHT WELL F .0 �+ � WAY. FAILLRE TO DO SO WILL RESULT IN AN ISSUANCE OF A STOP WORK NOTICE PROPOSED IMPROVED ALLEY FS 90:4 co r _ - = __ � } AND DOUBLE PERMIT FEES. IT IS THE RESPONSZBLIBITY OF THE OWNER TO KNOW I I WITH AC PAVEMENT AND 3' WIDE r� I TG 82.8 �� 3.5' WOOD FENCES CONCRETE RIBBON GUTTER WHERE THE LOCATIO THE PROPERTY LIRE IS. w PCC RIBBON GUTTER , 10 1 FS 82.9 FS 82.9 WELL AT PROP. LIME �i IE 82.1 AF'MC 261 -053 20 I B. ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED PROPOSED PCC RIBBON ;'WALLA I TW 92.0 I pgppOSEO RESIDENCE I �" GUTTER FLOWLIAE DIRECTION i TRIES 92.0 ( UNIT 2 TG a2 r G r lld ': a ti g 91.9 I ( PROPOSED SIB &PUMP 9. NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY (1% MIN SLOB SDFtSO � 2 O�FFLO � 8M@FG 91.5 I MAIN LEVEL IE 81.8 I � III I LIMES. WATER IS TO DRAIN AWAY FROM STRJCTUAES FOR A MlNIMAAN OF 5 FEET 3" REEF. I� ET ( GARAGE I FF =93.67 sm & PUMP III F1'S8 ALL NCO COBBLE DISSIPATOA PROPOSED 4" SEWER LATERAL PIPE 1Gi 92.0 IE OUT PAD =93.O 4 . AT 2 PERCENT AND BE COWYED TO AN APPROVED DRAINAGE FACILITY. F'ER SDRSD SS -0! FL 902 10. % C 92.0 ( Q�3' BASEMENT; S TE 79 81.1 II = ARC-RITECT FS 90 i o- I/ FF =83 0 I :' DRAWING 10. EROSION COVTO MEASLES (E.G. BOLD FIBER MATRIX VEGETATIVE COVER TW 92.0 `� . FS 93.25 d'f. 9357 PAD 33 � �J: AEG � TG 92.9 JUTE MATING) MAST BE IMPLEMENTED WERE APPLICABLE TO PREVENT SOIL / v n S 82.9 \ . IE 91.7 EROSION ON SITE. SEDIMENT CONTROL MEASLFES (E.G. SILT FENCING, FIBER TWDEG 91.0 ROLLS GRAVEL BAGS) MUST BE IN PLACE TO PFEVENT ERODED SOIL FROM BW@FG 90.5 905 -� �- * - 1s _ :_ c - - _ -� .. 20' FS 90.5 12'X42" PCC S 93.25 LEAVING SITE. MATERIALS MANAGEMENT BMP MET ALSO BE FOLLOWED TO ENSURE W � � � .� � - � _ - ` - F NO CONTACT OF RAINWATER WITH MATERIALS THAT MAY CONTRIBUTE TO WATER Fs 93.51 1% .; 1% - !% m TW 97.07 BANDING 10.5% GARAGE FF FG 91.5 - ew 93.57 ALLEY BIOFETENTION BAs QUALITY STORAGE AR DOOR HAZARDOUS DOUS CONCRETE OR STUCCO WASHOUT AREAS - 3.5' GUARD FS 93.57 ~ STA 1 .00 15.00' LT CO e VEREO STORAGE AREAS FOR HAZAFOOJS MATERIAL F'LA T � T v S C,EIEN PORTABLE 69 TW@FS 93.57 S59 120 46 W 99.99' TOILETS OVER A PERVIOUS SUJFFALr`J TH 82.0 J f . y� y'l;;, - �'_.3._ --,- DISTRICT TO INSTALL WAS TW 92 BhWEG 90.77 TW 97.31 LIGHT RAC I p q BEGIN c-2 ! CURB s GUTTER BASEMENT FF 11. NO DIRECTLY RUNOFF IMPERVIOUS AREAS (YED SHALL R ALLOWED. AND DUAL METER PER WAS WS-09, TW@FG 91 5 TW 97.31 WELL TW 97.07 LIMIT DF MATCH EXISTING IMPROVEMENTS DCIA MEANS STORM RUNOFF GENERATED AND CONVEYED VIA IMPERVIOUS WC -17 AT OWNER S EXPENSE � S@FG 1'S 7�{y g3.5 TW@FS 93.57 (LEANOUT ' BWIdEG 90.2 BWaEG .8 BW@EG 91.31 TW@FS 93.57 ITr@FS 93.5 GRACING E 1 TO 92.69 =/4 C FosNL °D AREAS SUCH AS ROOF ROOF DRAIN DRIVEWAY, AND STREET. BAP MEASURES TW(aFS 93.5 BWDEG 91.62 TW@FS, 93.57 IE 91.6 BW@EG 9i. FL 92.19 AOGK (TOP) SHALL BE IDENTIFIED ON THE SITE FLAN. MOST COMMON MEASURES ARE TRANSITION PROPOSED ALLEY IMPROVEMENTS TW 99;:0 ; ; BW@FG 91.0 TN@FS 93.57 BWUUEG 91.62 TWtES 93.5 TW 97.07 DESIGNATED TUFF AREAS WHICH RECEIVE ROOF DRAINS AND RUANOFF FROM TO EXISTING ALLEY CONDITIONS (MAINTAIN I� 5' FENCE PER BW@EG 91.86 TEMPORARY ?SHORR (TOP) I IMPERVIOUS AREAS. TURF AND LANDSCAPED AREAS THAT ARE DESIGNED FOR MIN 1% SLOPE @ FLONLINE OF ALLEY) BW@FG 90.5 ARCH. DRAWING BIYiEG 9131 SEE SHORING CLANS TW@FG 93.5 I SECTION C - DRIVEWAY BAPS SHALL BE DELINEATED ON PLANS AND A NOTE PLACED ON PLANS , ; . MASONRY RETAINING BW@EG 92.70 PROHIBITING MODIFICATION OR REMOVAL OF THE BMP LANDSCAPE AREAS 9 xj M T)S 1kj( _ . ..... ____,_ ,.. __ - _ WALL PER SDRSD C -3 ar COMBINED FENCE & WALL NOT TO EXCEED NTS WITHOUT A CITY PERMIT. 200 AMP ELEF'. SERVICE r 6' UNLESS BOTH WALL & FENCE AFE OFFSET I WAASOAA:IY RETAINING PANEL. VERIFY EXACT LOCATION 2- HORIZONTALLY. SEE ENCINITAS PLANNING. APPROXIMATE LOCATION OF � BJ�$Li2 WALL PER SDFLSD C -3 � IN FIELD WITH SDG&E ROOF DRAIN NOTE: FOR STORM WATER POLLUTION CONTROL PURPOSES ALL RRUVOFF EX 6" ACP WATER MAIN `- FROM ALL DRAINS STALL DISCHARGE' ONTO GRASS AND LANDSCAPE AREAS PRIOR TO 1 i�rrf{ ��'� TW 92.0 IE OUT TW 93.5 COLLECTION AND DISCHARGE ONTO THE STREET ARDIOR INTO THE PUBIC STORM � n ab _ ..r�msa • _ R, , F4� SuEfdCr. i r � '- DRAIN SYSTEM. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER 1 ' 92.0 POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. °PCC 3" °vEtFlow I ( FG 90.3 BIORETENTI . - ASIN FG_ 915 - - - GRADING MOTE ALL THE WORK PROPOSED ON THIS PLAN IS ENTIRELY WITHIN THE L WELL- DRAINED SOILS OR 4 p BANDING 'PIPE TOLERANT PLANTS FORT TW 92.0 } „ ' APPLICANT S PROPERTY. IF ANY DISTU�ANCE TO ADJACENT PROPERTIES IS - y s ANTICIPATED AS A RESULT OF ANY PROPOSED WORK OR AT THE DISCRETION OF � * � CITY APPROVED EQUIV. � ALLEY � �' ' _ COBBLE THE CITY FIELD INSPECTOR. A WRITTEN LETTER OF PER41SSSION FROM THE PUMP FOR COLLECTION OF PERVIOUS PAVER 2" HARDWOOD MULCH - - ADJACENT PROPRTY OWNER MUST BE DETAINED AND SA�NITTED TO THE CITY PRIOR I STORMWATER IN LIGHTWELL DRIVEWAY COVER OR CITY RO R COBBLE .� ^ITT TO START DE ANY SUCH WORK. ANY DISTUFBANCE' ON THE ADJACENT PRIVATE DALY. DEWATERING OF APPROVED EQUIVALENT W I OW 3" ' PERFORATED PROPERTY THAT HAS NOT BEEN PREVIOUS Y AUTHORIZED IN WRITING AND BASEMENT NOT PERMITTED. 6" I ( 40' I SUBDRAIN PIPE SUBMITTED TO THE CITY IS GROUNDS FOR A STOP -WORK TO BE ISSUED FOR THE' PROJECT UNTIL THE REOUINED PERMISSION IS DETAINED. CONCRETE WALKWAY BUILDING WALL _ 20' 20' HaVAENT NOTE 1 r 18" ENGINEERED SOIL I 1 THE COVTRRACTOR SHALL BE RESPONSIBLE FOR ANY MONUMENTATION AHD /OR SEE SIB NOTE ' g5' 15' SECTION D - BIORETENTION BASIN BENOMRKS WHICH WILL BE DISTLBSED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE REFERENCED AID REPLACED WITH MATE 2" 3/8" GRAVEL L DEPTH STEEL COVER. ' �" `` �� � i MONUMENTATION BY A LICENSED LAND SURVEYOR OR A REGISTERED CIVIL LIGHTWELL � PER @BOTTOM OF ENGINEER AUTHORIZED TO PRACTICE LAND SURVEYING. A CORER FECORO PLANS LIGHT WELL OR RECORD OF SURVEY, AS APPROPRIATE SHALL BE FILED BY THE t'..: ; .y ••' 4ti: �t• i {��•' EG 90.4 LICENSED LAID SURVEYOR OR THE REGISTERED CIVIL ENGAGER AS �, • :� j .` -.. ' := 5' 3.5 5' GATE VALVE :Y FF BASEMENT :- �:: 1.5" X 18" GRIND REQUIRED BY THE LAND SURVEYORS ACT TO 3 PVC DISCHARGE TTOIBMP +,"f' he' i~~ f j:: r _' I ~ & OVERLAY NOTE TO fxNRRACTO4 s', 12" O= 3/4" GRAVEL LANDSCAPE AREA PER - �' - t u 3 UTILITIES ARE KNOWN TO EXIST IN THE AREA. INFORMATION SHOWN HEREON PLAN. Ti 7= I "* SEE IOFE BELOW 29 IS PER BEST AVAILABLE RECORD INFORMATION. EXACT HORIZONTAL AND � I � � CHECK VALVE L _ VERTICAL LOCATION OF EXISTING UTILITIES UNKNOWN. CONTRACTOR TO " =1° ;- r- MASONRY HET. WALL MASONRY -7. WALL. �- FIELD VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO ORDERING -i - I PER SDRSD C -2 PER SL�Q C -3 3" F�ORATED �{ I MATERIALS AID CONSTRUCTION. CONTRACTOR STALL NOTIFY EMGIMEERR OF * SUIBDR41N PIPE FIBERGLASS PUMP BASIN TO BE nN HYDAOMATIC SK60A2 NON CLOGGING INSTALLED AT BOTTOM OF 0 Pr BUILDJVG WALL I WORK ANY DISCREPANCIES BETWEEN ACTUAL LOCATION AND PLAN SUBMERSIBLE PUMP W /O.6HP, 1750RPM, i I -: =i s �I -1 : , , -! I ` - -s "� �� I- s i� -� i EXISTING SIDEWALK LOCATION OF UTILITIES UPON DIS'C'OVERY DE DISCREPANCY. LIGHT WELL 23011160 MOTOR AND INTERGRAL LEVEL `SECTION E - BIDRETENTION BASIN PROPOSED 4' WIDE � I ; � j j � (; � � I I � j j � U � ���_ I CONTROL SWITCH (SEE SPECIFICATIONS NITS DG AREA ; -1 CONCRETE WALKWAY- CONTROL CALCIXATRCNV AND DETAILS PER BARRET IN BIOFETENTION 'ENGINEERED SOIL" LAYER SHALL BE MINDCMM 18" DEEP REMOVE AND REPLACE EXISITNG EXISTING CURB &GUTTER 6RO55 LOT AREA =4,960 5F ENGINEERED PUMPS) OR EQUAL "SANDY LOAM" SOIL MIX WITH NO MORE THAN 5% CLAY CONTENT. THE MIX CURB WITH STANDARD SDRSD EXISTING AC PAVEMENT STALL CONTAIN 50-60% SAW 20-30% COMPOST OR HAROWOORD MULCH AM G -2 CURB & GUTTER NOTE: TOTAL AREA EXEMPT =4,510 5F DETAIL - LIGHTWELL SUMP & PUMP 20 -30% TOPSOIL, FREE OF STOLES STUFFS, ROOTS OR SIMILAR OBJECTS REMOVE AND REPLACE EXISTING CONTRACTOR TO TRANSITION PROPOSED PRON AHANfA CALCULATION AND ALSO FREE OF NOXIOUS WEEDS. STREET IMPROVEMENTS TO EXISTING STREET ? PAVEMENT WITH 4" AC OVER EX 90.85 NTS CONDITIONS TO THE SATISFACTION OF THE mm 3/4" CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 12" BUT MAY BE 6" CLASS II AGGREGATE BASE CITY ENGINEER. TOTAL LANDSGAr'E AREA 42.9xOb2x150 = 3,490 ETO __. NTS FS 93.57 DEEPENED TO INCEAS= THE INFILTRATION AND STORAGE ABILITY THE ! I.--•1 R °w 15 DETAIL R °W s" x 16" PCC FLUSH TYPICAL SECTION - MANCHESTER AVENUE llq' L'LFB OR DEEPENED PL PL I G-1 CLUB NTS 6' MAX SDRSD C -3 V 7.5' 7.5' VOID FILLER - 118" TO 318" UNO.8) RETAINING WALL t APPROVED pERVI FF BASEMENT ( PROPOSED MASONRY I PAVERS W/ MIN. 318" VOID SDRSD CNG3 WALL PER I 1 3 AGGREGATE IN VOIDS SECTION A 5' BEDDING LO(UfSE - 2" THICK OF NTS 5' BUILDING WALL (TYPICAL) 3/e" I I -1/8" TO 318" (M.8) AGATE ' PROPOSED MASONRY 2% 3/8" 2 %_ 4" - CHOKER COURSE - 4" THICK OF 4r RETAINING WALL PER 318" TO 112" (N0.57) DIED ROCK FS 93.57 SDRSD C -3 FS 93.57 n •° n _ MIN 6" THICK OF 3/4° FfiW AL MFFm93.67 6' MAX (TOP.) 3, ROCK EX (90.81) EX (91.25) 4" AC OVER SOIL S19GRADE Q�OFESSIpA,q �O SCHAEL 4 CONCRETE WALKWAY CONCRETE WALKWAY 6" CLASS II AB 8" THICK PCC RIBBON GUTTER Q2 90o�m EX 6" ACP OVER 6" CLASS II AB PERVIOUS PAVER DETAIL �Q <� Z PASCO LARET SUITER EXISTING GRADE EXISTING GRADE WATER MAIN w m No. 71651 o m & ASSOCIATES Pl�83.0 TYPICAL SECTION -ALLEY -AALL AGGREGATE MET BE CLEAWAS•ED AND NTS FREE OF FINES (SAW SILT, ETC) � Exp. 12/31/17 � NOTE: NTS -THE PAVER SHALL NOT BE SEALED ONCE' THE VOID FILLER HAS BEEN ADDED GRAPHIC SCALE 1 " =10 {� y} CIVIL ENGINEERING +LAND PLANNING +LAND SURVEYING SECTION B CONSTRUCTION MATERIALS SHALL CONFORM -EACH COARSE SHALL BE VIBRATORY COMPACTED BEFORE PLACEMENT OF NEXT COARSE S'T4 CIVI1- Q 535 North Highway 101, Ste A, Solana Beach, (CA 92 975 NTS T ORKHECST STANDARD ANENT EDITION PUBLIC -MO IMPERVIOUS LINER OR FILTER FABRIC IS TO BE USED 7F - SPECIAL APPROVAL FEOUIFED IN HIGHLY EXPANSIVE SOIL - 9- BOR41N MAY BE REQUIRED 0 10 20 30 OF CO- Ph $58b.25D.>32ll2 I fa S5S.25R.4SIl2 I plaae�gl�eeanag.c ®ffi CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE A - ILT ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - ° UBLIC WORKS DEPARTMENT DRAWING NO. UMA Z -13 -1 DESCRIPTION: PT. 1039 ENC -39 _ PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: APPROVED' GRADING PLAN FOR LOCATION _E,4ST WING WALL OF TFE NORTH -__ HORIZONTAL: 1 "=10' 2348 MANCHESTER AVENUE OF MDATHBOUVD HWY 101 11 t. I� DATE: tot -11 H • - cD -- . N 13155 -G BRIDGE - MASZH MAHER EDWARD W DEANE II OVER VERTICAL: N/A BRIAN AEL ARDOL DATE R.C.E. NO.: 71651 APN: 261- 053 -20 FROM: ROS 18416 ELEVATION 16.93.. (IyJ I II•I LA'( ?.�/ BRIAN MICHAEL OLINO EXP.: 12 -31 -17 DATE DATE 5.?-S./'7 DATUM: NAVD88 - , REVIEWER INSPECTOR SENIOR ENGINEER, L �- - PLANNING CASE N0: 05 -178 DR /GDP 16 -284 SUIBC SHEET 2 OF 4 PLSA 2635 I U A --�- °d COARSE AGGREGATE FILTER FABRIC / m• VA 1.1' MIN., UNLESS OTHERWISE SPECIFIED BY A SOILS ENGINEER SBCr=A AA 13 m • m• e m i • W ° m m A m _j m• • m� e ® a .e • a A ed 4 m ° m ° ®d • e 19' RADIUS A MIN. 50' MIN. f� CONSTRUCMNE RntANC8 ('DC-1) 1. SET POSTS AND EXCAVATE A 4 BY 4 IN (10 BY 10 CM) TRENCH UPSLOPE FROM AND ALONG THE LINE OF POSTS. ORIGINAL GRADE WIDTH AS REQUIRED TO ACCOMODATE ANTICIPATED TRAFFIC 2 STAPLE WIRE FENCING TO THE POSTS FILTER FABRIC a� WIRE I V Gi CHANGE NO.I DESCRIPTION r :♦, r � 6_u GRAVEL BAGS OVERLAP ONTO CURB -� A RUNOFF GAP BETWEEN BAGS ACTS AS SPILLWAY NOTE CONTRACTOR TO MODIFIY CONSRUCTION ENTRANCE IN THE FIELD AS NECESSARY CONSTRUCT SEDIMENT BARRIER AND CHANNELIZE RUNOFF TO SEDIMENT TRAPPING DEVICE LEGEND HATCHED AREA REPRESENTS CONSTRUCTION ENTRANCE GRAVEL BAGS =00000000 SILT FENCE —X X— PROPOSED �Q t SILT FENCE (TYP.) -9,. - __ - F _--- — �- x =� T; ,. AL r 7 / 7_ t as - _ 1 I ; � ty < °y`` ?�ti ��y' •l w, a r •`r x I F � P �� ,il i. i' s , s i , 1- 053 -20 s , y , . I . 4• :4 UNIT 1 A PAt 26 I t 171" j y " - — w �. - - - GRAVEL BAG (. _.-� F_ w_.-.. �� _� � G � � INLET PRO7ECI�ION (TYP.) CHAT 2 ! APO. 261- 053 -20 ¢ ? s LZ ! i t i ; j s E � t I �1 3 FT (0.9 M) MIN. THREE LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED GRAVE. BAGS (SC-4) APPROVED DATE BENCHMARK SCALE CC.WI I '13'1 DESCRIPTIONt PT. 1_039 ENC -39 LOCATION: EAST WING WALL OF THE NORTH END OF NORTHB HWY 101 HORIZONTAL: 1`10' BRIDGE OVER LAGOON VERTICAL: N/A - RECORD FROM: ROS 18415 ELEVATION: 16.938' DATUM: NAVD88 GRAVEL BAGS OVERLAP THREE LAYERS OF GRAVEL BAGS RUNOFF NTH ENDS OVERLAPPED ROM PROTE(.nM (SCE 1 w Tv FILLED BAGS �o FLOW GRAVEL BAG ROW SPACING TABLE GRADE INTERVAL LESS THAN 2% 100' 2% TO 4% 50' 4% TO 6% 40' 6% TO 8% 25, DIRECTION (TYP) GRAVE. BAG CEEVRON3 (SC-6) ILT U=1UNLU CT: I UHAWN tfT: 1 LoNjIUKtU CT: ENGINEERING DIVISION APPROVALS RMA 13M \ PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: APPROVED' J DATE: 3.1 1�I - / 41111 a� L-G IL I I� - - - - - -- -- - 140 T AA MAHER EDWARD W. DEANE II 'IL(i R.C.E. NO.: 71651 CLM 12 -13 -17 BRIAN MICI-REL ARDOLINO EXP.: 12 -31 -17 DATE 3/23 1 DATE ,3.28 • �7 SENIOR ENGINEER - No. 71651 Exp. 12/31/17 GRAPHIC SCALE 1 " =10' 0 10 20 30 PASCO LARET SUITER & ASSOCIATES CIVIL ENGINEERING + LAND PLANNING + LAND SURVEYING 535 North highway 101, Ste A, Solana Beach, CA 92875 ph 858.259.8212 ( fz 558.259.4512 1 glsaem8ineeaing.c®m CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT NTROL PLAN FOR: 2348 MANCHESTER AVENUE APN: 261- 053 -20 ISE NO 05 -17B DR /COP. 16 -2B4 SLCC DRAWING NO. 13155 -G SHEET 3 OF 4 PLSA 2635 CHANGE DESCRIPTION SEE SETBACK TABLE SURCHARGE X (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE -- RAIL PANEL (TYP) ;7 1 - 48' -5" B SECTION - PHASE I 4 SCALE: 1/8' =1 =0" 4� SEE SETBACK TABLE 48' -5" X MAX (RAIL TO RAIL) 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) 10' -0° SBH DSR ROLLING STRUT ASSEMBLY TO BE RELOCATED TO POSITION SHOWN ONCE RAILS ARE BLOCKED TIGHT TO CURED CONCRETE SLAB 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) n n � 4, -0„ 12' -0" 1 C' -3" MAC MAX I 10' -0" T 8' -0" MAX l' -9° 4-4 1 SECTION -PHASE 2 a 4 SCALE APPROVED DATE BENCHMARK SCALE L 14 IVI.5-11 DESCRIPTION: PT. 1039 ENC -39 LOCATION EAST WING WALL OF THE NORTH END OF NORTHBOUND HWY 101 HORIZONTAL: 1"=10' BRIDGE OVER LAGOON RECORD FROM: ROS 18416 VERTICAL:. NIA ELEVATION: 16.938 DATUM: NAVD88 MIN 12x12 HARDWOOD TIMBER BLOCKING INSTALLED TIGHT BETWEEN RAIL AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) AS —BUILT BRIAN MICHAEL ARDOLINO DATE Ma ii•t�n I Ct-M /L-l3� REVIEWER I INSPECTORI SENIOR ENGINEE rom t U -LUIVV JUI I uVUULL JLIUL RAIL PANEL (TYP) RAIL MIDDLE POST (TYP) PLAN VIEW L' SCALE: 1/8' =1'-0" _ SETBACK TABLE tST: SHORING DESIGN PLAN X = 1. EXCAVATOR WILL INSTALL THE PLATE$ AND POSTS WITH ITS 2348 MANCHESTER AVENUE BACKHOE IN CONJUNCTION WITH EXCAVATING THE HOLE, 7' CARDIFF, CA X = SUPPORT SOILS DURING EACH PHASE. TRENCH SHORING COMPANY 2, EXCAVATION WILL PROCEED FROM THE CENTER OF THE 12' RYAN ORTMAN X = 3. ONCE THE HOLE HAS A DEPTH OF 5-0 ", THE CENTER CHANGE DESCRIPTION SEE SETBACK TABLE SURCHARGE X (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE -- RAIL PANEL (TYP) ;7 1 - 48' -5" B SECTION - PHASE I 4 SCALE: 1/8' =1 =0" 4� SEE SETBACK TABLE 48' -5" X MAX (RAIL TO RAIL) 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) 10' -0° SBH DSR ROLLING STRUT ASSEMBLY TO BE RELOCATED TO POSITION SHOWN ONCE RAILS ARE BLOCKED TIGHT TO CURED CONCRETE SLAB 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) n n � 4, -0„ 12' -0" 1 C' -3" MAC MAX I 10' -0" T 8' -0" MAX l' -9° 4-4 1 SECTION -PHASE 2 a 4 SCALE APPROVED DATE BENCHMARK SCALE L 14 IVI.5-11 DESCRIPTION: PT. 1039 ENC -39 LOCATION EAST WING WALL OF THE NORTH END OF NORTHBOUND HWY 101 HORIZONTAL: 1"=10' BRIDGE OVER LAGOON RECORD FROM: ROS 18416 VERTICAL:. NIA ELEVATION: 16.938 DATUM: NAVD88 MIN 12x12 HARDWOOD TIMBER BLOCKING INSTALLED TIGHT BETWEEN RAIL AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) AS —BUILT BRIAN MICHAEL ARDOLINO DATE Ma ii•t�n I Ct-M /L-l3� REVIEWER I INSPECTORI SENIOR ENGINEE rom t U -LUIVV JUI I uVUULL JLIUL RAIL PANEL (TYP) RAIL MIDDLE POST (TYP) PLAN VIEW L' SCALE: 1/8' =1'-0" _ SETBACK TABLE tST: GENERAL SHORING NOTES: X = 1. EXCAVATOR WILL INSTALL THE PLATE$ AND POSTS WITH ITS 1. SHORING DESIGN IS BASED ON SOILS CONSISTING OF 35 BACKHOE IN CONJUNCTION WITH EXCAVATING THE HOLE, 7' POE, AS OUTLINED IN GEOTECHNICAL REPORT PREPARED X = SUPPORT SOILS DURING EACH PHASE. BY GEOTEK (DATED 1/4/17) PROVIDED BY THE 2, EXCAVATION WILL PROCEED FROM THE CENTER OF THE 12' CONTRACTOR. CONTRACTOR SHALL CONTACT ENGINEER IF X = 3. ONCE THE HOLE HAS A DEPTH OF 5-0 ", THE CENTER DIFFERING DESIGN PARAMETERS APPLY OR REPORT IS CROSS MEMBER WILL GO IN AND WILL BE LOWERED AS THE 5' REVISED AT ANY TIME AFTER THIS DATE. X = OF THE HOLE TO CENTER OF THE CROSS MEMBER WILL 2. DURING SHORING INSTALLATION, CONTRACTOR TO TAKE NEVER EXCEED 7' -0" PER THE DETAIL. 8' SPECIAL CARE TO PROTECT ADJACENT PROPERTY BY X = THE SAME METHODOLOGY UNTIL THE HOLE IS DUG TO ADVANCING PANELS AS FAR AHEAD OF EXCAVATION AS EXCAVATION GRADE AND ALL CROSS MEMBERS ARE IN PER 10' POSSIBLE (MIN. 18 "), AND MONITORING AND IMMEDIATELY BACKFILLING ALL VOIDS TIGHT WHICH DEVELOP BETWEEN FACE OF EXCAVATION AND SHORING. IF SITE SOILS ARE HARD, AND ADVANCEMENT OF PANELS WOULD CAUSE EXCESSIVE VIBRATION, CONTACT ENGINEER. 3. DURING SHORING REMOVAL, BACKFILL AHEAD OF PANEL EXTRACTION (MIN. 18 "), AND ENSURE ALL VOIDS ARE IMMEDIATELY BACKFILLED TIGHT AS SOON AS THEY DEVELOP. 4. SLIDE RAIL SYSTEM SHALL BE CERTIFIED SBH ASSEMBLIES. PE STAMPED TABULATED DATA SHALL BE PROVIDED AT JOBSITE, AND MANUFACTURER'S TABULATED DATA APPLIES EXCEPT AS IS NOTED HERE. 5. PROVIDE ACCESS, BARRICADING, AND FALL PROTECTION, IN ACCORDANCE WITH ALL OSHA GUIDELINES. 6, SHORING MUST BE PROPERLY INSTALLED PRIOR TO WORKERS ENTERING EXCAVATION. WORKERS MAY ONLY ENTER, EXIT, AND WORK WITHIN SHORED AREAS. 7. STEEL SHAPES TO BE ASTM A572 OR, 50 OR A992, MIN FY = 50 KSI. 8. STEEL SHAPES SHALL BE IN GOOD CONDITION AND SHALL BE FREE OF ANY HOLES OR VISUAL DEFECTS. 9. GROUNDWATER LEVEL MUST BE MAINTAINED AT OR BELOW THE MINIMUM LEVEL SHOWN ON THESE PLANS AT ALL TIMES. IF DEWATERING SYSTEM IS NECESSARY TO ACHIEVE THIS, IT IS THE CONTRACTOR'S RESPONSIBILITY FOR DEVELOPING, INSTALLING, AND MONITORING DEWATERING SYSTEM, AND VERIFYING THAT THE GROUNDWATER LEVEL BEHIND THE SHORING WALLS HAS BEEN LOWERED AT LEAST TO THE MINIMUM LEVEL SHOWN ON THESE PLANS AT ALL TIMES. IF CONTRACTOR IS UNABLE TO LOWER THE GROUNDWATER TO THE LEVEL SHOWN, CONTACT THE SHORING ENGINEER IMMEDIATELY. 10. D.H. CHARLES ENGINEERING, INC. WILL NOT SUPERVISE, DIRECT, CONTROL OR HAVE AUTHORITY OVER OR BE RESPONSIBLE FOR CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF CONSTRUCTION, OR THE SAFETY PRECAUTIONS AND PROGRAMS INCIDENT THERETO, OR FOR ANY FAILURE OF CONTRACTOR TO COMPLY WITH LAWS AND REGULATIONS APPLICABLE TO THE FURNISHING, OR PERFORMANCE OF WORK. 11. VERIFY THE ACCURACY OF ALL DIMENSIONS FOR BOTH EXISTING AND PROPOSED WORK. VERIFY THAT REQUIRED CLEARANCES ARE OBTAINED PRIOR TO COMMENCEMENT OF THE WORK. 12. VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCING THE EXCAVATION. 13. TRENCH SHORING AND D.H. CHARLES ENGINEERING, INC. BEARS NO RESPONSIBILITY OR LIABILITY FOR ANY SETTLEMENT, MOVEMENT, OR DAMAGE OF ANY KIND THAT MAY OCCUR TO SURROUNDING SOILS, EXISTING BUILDING STRUCTURES, OR UTILITIES DUE TO SHORING INSTALLATION, DEFLECTION, REMOVAL, OR OTHER CONSTRUCTION ACTIVITIES. CHANGE DESCRIPTION SEE SETBACK TABLE SURCHARGE X (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE -- RAIL PANEL (TYP) ;7 1 - 48' -5" B SECTION - PHASE I 4 SCALE: 1/8' =1 =0" 4� SEE SETBACK TABLE 48' -5" X MAX (RAIL TO RAIL) 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) 10' -0° SBH DSR ROLLING STRUT ASSEMBLY TO BE RELOCATED TO POSITION SHOWN ONCE RAILS ARE BLOCKED TIGHT TO CURED CONCRETE SLAB 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) n n � 4, -0„ 12' -0" 1 C' -3" MAC MAX I 10' -0" T 8' -0" MAX l' -9° 4-4 1 SECTION -PHASE 2 a 4 SCALE APPROVED DATE BENCHMARK SCALE L 14 IVI.5-11 DESCRIPTION: PT. 1039 ENC -39 LOCATION EAST WING WALL OF THE NORTH END OF NORTHBOUND HWY 101 HORIZONTAL: 1"=10' BRIDGE OVER LAGOON RECORD FROM: ROS 18416 VERTICAL:. NIA ELEVATION: 16.938 DATUM: NAVD88 MIN 12x12 HARDWOOD TIMBER BLOCKING INSTALLED TIGHT BETWEEN RAIL AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) AS —BUILT BRIAN MICHAEL ARDOLINO DATE Ma ii•t�n I Ct-M /L-l3� REVIEWER I INSPECTORI SENIOR ENGINEE rom t U -LUIVV JUI I uVUULL JLIUL RAIL PANEL (TYP) RAIL MIDDLE POST (TYP) PLAN VIEW L' SCALE: 1/8' =1'-0" _ SETBACK TABLE tST: INSTALLATION NOTES: X = 1. EXCAVATOR WILL INSTALL THE PLATE$ AND POSTS WITH ITS CAT 325 EXCAVATOR' BACKHOE IN CONJUNCTION WITH EXCAVATING THE HOLE, 7' TAKING CARE TO ADVANCE THE PANELS AND FULLY X = SUPPORT SOILS DURING EACH PHASE. CAT 365 EXCAVATOR 2, EXCAVATION WILL PROCEED FROM THE CENTER OF THE 12' EXCAVATION TO THE EAST AND WEST EDGES. X = 3. ONCE THE HOLE HAS A DEPTH OF 5-0 ", THE CENTER DUMPTRUCK CROSS MEMBER WILL GO IN AND WILL BE LOWERED AS THE 5' HOLE IS DUG. THE MAXIMUM DISTANCE FROM THE BOTTOM X = OF THE HOLE TO CENTER OF THE CROSS MEMBER WILL CONCRETE TRUCK NEVER EXCEED 7' -0" PER THE DETAIL. 8' 4. EACH SUBSEQUENT CROSS MEMBER WILL BE APPLIED USING X = THE SAME METHODOLOGY UNTIL THE HOLE IS DUG TO STREET TRAFFIC EXCAVATION GRADE AND ALL CROSS MEMBERS ARE IN PER 10' THE DETAIL. CHANGE DESCRIPTION SEE SETBACK TABLE SURCHARGE X (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE -- RAIL PANEL (TYP) ;7 1 - 48' -5" B SECTION - PHASE I 4 SCALE: 1/8' =1 =0" 4� SEE SETBACK TABLE 48' -5" X MAX (RAIL TO RAIL) 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) 10' -0° SBH DSR ROLLING STRUT ASSEMBLY TO BE RELOCATED TO POSITION SHOWN ONCE RAILS ARE BLOCKED TIGHT TO CURED CONCRETE SLAB 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) n n � 4, -0„ 12' -0" 1 C' -3" MAC MAX I 10' -0" T 8' -0" MAX l' -9° 4-4 1 SECTION -PHASE 2 a 4 SCALE APPROVED DATE BENCHMARK SCALE L 14 IVI.5-11 DESCRIPTION: PT. 1039 ENC -39 LOCATION EAST WING WALL OF THE NORTH END OF NORTHBOUND HWY 101 HORIZONTAL: 1"=10' BRIDGE OVER LAGOON RECORD FROM: ROS 18416 VERTICAL:. NIA ELEVATION: 16.938 DATUM: NAVD88 MIN 12x12 HARDWOOD TIMBER BLOCKING INSTALLED TIGHT BETWEEN RAIL AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) AS —BUILT BRIAN MICHAEL ARDOLINO DATE Ma ii•t�n I Ct-M /L-l3� REVIEWER I INSPECTORI SENIOR ENGINEE rom t U -LUIVV JUI I uVUULL JLIUL RAIL PANEL (TYP) RAIL MIDDLE POST (TYP) PLAN VIEW L' SCALE: 1/8' =1'-0" _ SETBACK TABLE tST: REMOVAL NOTES: X = 1. AFTER THE NEW CONCRETE FOOTING HAS BEEN PLACED, CAT 325 EXCAVATOR' THE SHORING RAILS WILL BE BLOCKED TIGHT AS SHOWN 7' PER PLAN. X = 2. THE PERMANENT WALLS WILL BE CONSTRUCTED IN LIFTS TO CAT 365 EXCAVATOR 2.5 TO 3' FROM GRADE. 12' 3. AS THE SOILS ARE BACKFILLED AND COMPACTED BEHIND X = THE NEW WALLS, THE SHORING WILL BE EXTRACTED DUMPTRUCK STARTING WITH THE PANELS, ENSURING ALL SOILS ARE 5' SUPPORTED DURING EACH PHASE. X = 4. THIS WILL CONTINUE IN LIFTS UNTIL THE SHORING IS FULLY CONCRETE TRUCK REMOVED. 8' CHANGE DESCRIPTION SEE SETBACK TABLE SURCHARGE X (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' -TALL SBH SLIDE -- RAIL PANEL (TYP) ;7 1 - 48' -5" B SECTION - PHASE I 4 SCALE: 1/8' =1 =0" 4� SEE SETBACK TABLE 48' -5" X MAX (RAIL TO RAIL) 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) 10' -0° SBH DSR ROLLING STRUT ASSEMBLY TO BE RELOCATED TO POSITION SHOWN ONCE RAILS ARE BLOCKED TIGHT TO CURED CONCRETE SLAB 18' -LONG SBH DOUBLE SLIDE RAIL MIDDLE POST (TYP) n n � 4, -0„ 12' -0" 1 C' -3" MAC MAX I 10' -0" T 8' -0" MAX l' -9° 4-4 1 SECTION -PHASE 2 a 4 SCALE APPROVED DATE BENCHMARK SCALE L 14 IVI.5-11 DESCRIPTION: PT. 1039 ENC -39 LOCATION EAST WING WALL OF THE NORTH END OF NORTHBOUND HWY 101 HORIZONTAL: 1"=10' BRIDGE OVER LAGOON RECORD FROM: ROS 18416 VERTICAL:. NIA ELEVATION: 16.938 DATUM: NAVD88 MIN 12x12 HARDWOOD TIMBER BLOCKING INSTALLED TIGHT BETWEEN RAIL AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) AS —BUILT BRIAN MICHAEL ARDOLINO DATE Ma ii•t�n I Ct-M /L-l3� REVIEWER I INSPECTORI SENIOR ENGINEE rom t U -LUIVV JUI I uVUULL JLIUL RAIL PANEL (TYP) RAIL MIDDLE POST (TYP) PLAN VIEW L' SCALE: 1/8' =1'-0" _ SETBACK TABLE tST: CRANE TO 30 TON MAX X = 12' CAT 325 EXCAVATOR' X = 7' CAT 345 EXCAVATOR X = 10' CAT 365 EXCAVATOR X = 12' 5 CY LOADER X = 5' DUMPTRUCK X = 5' SPOIL PILE (4' -TALL) X = 6' CONCRETE TRUCK X = 8' BUILDING STRUCTURES X = 5' STREET TRAFFIC X = 10' ABOVE LISTED SETBACKS SHALL BE MAINTAINED 4 DISTANCE "X" FROM ALL EDGES OF SHORING AND ALL TO SLOPE (TYP) NOTE: STRUCTURAL SHORING DESIGN REVIEWED AND APPROVED BY ESSIL CORP. AS PC X17 -200 RFv=61A/APPRe ✓90 ISYS.SRA/OERS 3-23 -17 0 -IHLL X II -LUINU )OM SLIDE RAIL PANEL (TYP) STRUT ASSEMBLY (TYP) A SECTION 4 j SCALE 118 =1' -0" D.H. CHARLES ENGINEERING, INC. 2187 Newcastle Avenue, Suite 200 Cardiff, CA 92007 Ph: (760) 436-9756 Fax: (760) 436-9757 CITY OF ENCINITAS — PUBLIC WORKS DEPARTMENT DRAWING NO. ING PLAN FOR: 2348 MANCHESTER AVENUE 13155 -13 APN: 261 - 053 -20 j f W Q I1^ W V UtJWNtU tST: I UKH4VL ::ST: VtitJBC CS Y: ENGINEERING DIVISION APPROVALS JBC SAL JBC PLANS P SPARED UNDER SUPERVISION OF RECOMMENDED: APPROV DATE: 31�1t2 � MASIH MAHER EDWARD W. DEANE II R.C.E. NO.: 62941 JA ER 8. CALCARA EXP.: 72 -31 -17 DATE 3/.2'5/ 17 DATE 3.2,8.17 PLANNING CASE NO: 05 -178 SHEET 4 OE 4 PLSA 2635 CNA WN CHANGE DESCRIPTION SURCHARGE (MATERIALS & EQUIPMENT) 4' —TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SHORING TO BE REMOVED (TYP) APPROVED I DA TE 't SEE SETBACK TABLE SBH DSR ROLLING STRUT 18' —LONG SBH DOUBLE SLIDE ASSEMBLY RAIL MIDDLE POST (TYP) 12' -0" MAX 12' -0" MAX X (RAIL TO RAIL) (RAIL TO RAIL) (N) RETAINING WALL FOOTING TO BE INSTALLED (TYP) SECTION - PHASE I SCALE. 1/8' =1' -0" SEE SETBACK TABLE LONG SBH DOUBLE SLIDE SBH DSR ROLLING STRUT ASSEMBLY TO RAIL BE RELOCATED TO POSITION SHOWN RAIL MIDDLE POST (TYP) 12' -0" MAX ONCE RAILS ARE BLOCKED TIGHT TO 12' -0" MAX X (RAIL TO RAIL) CURED CONCRETE SLAB (TYP) (RAIL TO RAIL) F1 n 4 -0' II II 10' -3' MAX MAX (� MAX (TYP) II 8' 0„ MIN C -TALL x 10"-WIDE CONCRETE BLOCKING INSTALLED TIGHT BETWEEN SLIDE RAIL POST AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) rB-'\N SECTION -PHASE 2 �,J4 SCALE: 1/8"_F-0" SOIL TO BE REMOVED AFTER SLIDE RAIL REMOVAL li ------- it ..Iii u , I"! III II 'lilli ii °IV' �_ T lit — — — — Jiii id III ' ".nn nm a,u" io u o [I 4, i' u10 iY it SECTION - PHASE 3 4 SCALE 1 1S' =I' -0" BENCHMARK DESCRIPTION: PT 1039 Ell LOCATION: EAST WING WALL OF THL�AOR7 END OF NORTHBOUND HWY 101 BRIDGE OVER LAGOON RECORD FROM: ROS 18416 ELEVATION: 16.938 DATUM: NAVD88 FREE STANDING RETAINING WALL BY OTHERS (TYP) 1 „o nP MAX (TYP) SCALE AS -BUILT HORIZONTAL: I"=10' VERTICAL: N A BRIAN MICHAEL ARDOLINO DATE -u -1 C&M 12 -13 1 EVIEWER INSPECTOR SENIOR ENGINEER 0' v J Q v 8' -LONG SBH DOUBLE Il_11 RAIL MIDDLE POST (TYP) 4 �11.483'11. 483 '11.483'11.483'11.483'� UNIT 2 -0" MAX (RAIL TO RAIL) r o 56' -11" n i i SBH DER ROLLING STRUT ASSEMBLY (TYP) OSHA COMPLIANT SLOPE PER CONTRACTOR (TYP) I I ( I I — — — — — — — — — — — — — — — — — — — — — — L— - - - - -3 1 I I I I I 16' -11° I SETBACK TABLE SHORING DESIGN PLAN X = 2348 MANCHESTER AVENUE 1. SHORING DESIGN IS BASED ON SOILS CONSISTING OF 35 CARDIFF, CA 7' TRENCH SHORING COMPANY X = RYAN ORTMAN BY GEOTEK (DATED 1/4/17) PROVIDED BY THE CHANGE DESCRIPTION SURCHARGE (MATERIALS & EQUIPMENT) 4' —TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SHORING TO BE REMOVED (TYP) APPROVED I DA TE 't SEE SETBACK TABLE SBH DSR ROLLING STRUT 18' —LONG SBH DOUBLE SLIDE ASSEMBLY RAIL MIDDLE POST (TYP) 12' -0" MAX 12' -0" MAX X (RAIL TO RAIL) (RAIL TO RAIL) (N) RETAINING WALL FOOTING TO BE INSTALLED (TYP) SECTION - PHASE I SCALE. 1/8' =1' -0" SEE SETBACK TABLE LONG SBH DOUBLE SLIDE SBH DSR ROLLING STRUT ASSEMBLY TO RAIL BE RELOCATED TO POSITION SHOWN RAIL MIDDLE POST (TYP) 12' -0" MAX ONCE RAILS ARE BLOCKED TIGHT TO 12' -0" MAX X (RAIL TO RAIL) CURED CONCRETE SLAB (TYP) (RAIL TO RAIL) F1 n 4 -0' II II 10' -3' MAX MAX (� MAX (TYP) II 8' 0„ MIN C -TALL x 10"-WIDE CONCRETE BLOCKING INSTALLED TIGHT BETWEEN SLIDE RAIL POST AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) rB-'\N SECTION -PHASE 2 �,J4 SCALE: 1/8"_F-0" SOIL TO BE REMOVED AFTER SLIDE RAIL REMOVAL li ------- it ..Iii u , I"! III II 'lilli ii °IV' �_ T lit — — — — Jiii id III ' ".nn nm a,u" io u o [I 4, i' u10 iY it SECTION - PHASE 3 4 SCALE 1 1S' =I' -0" BENCHMARK DESCRIPTION: PT 1039 Ell LOCATION: EAST WING WALL OF THL�AOR7 END OF NORTHBOUND HWY 101 BRIDGE OVER LAGOON RECORD FROM: ROS 18416 ELEVATION: 16.938 DATUM: NAVD88 FREE STANDING RETAINING WALL BY OTHERS (TYP) 1 „o nP MAX (TYP) SCALE AS -BUILT HORIZONTAL: I"=10' VERTICAL: N A BRIAN MICHAEL ARDOLINO DATE -u -1 C&M 12 -13 1 EVIEWER INSPECTOR SENIOR ENGINEER 0' v J Q v 8' -LONG SBH DOUBLE Il_11 RAIL MIDDLE POST (TYP) 4 �11.483'11. 483 '11.483'11.483'11.483'� UNIT 2 -0" MAX (RAIL TO RAIL) r o 56' -11" n i i SBH DER ROLLING STRUT ASSEMBLY (TYP) OSHA COMPLIANT SLOPE PER CONTRACTOR (TYP) I I ( I I — — — — — — — — — — — — — — — — — — — — — — L— - - - - -3 1 I I I I I 16' -11° I SETBACK TABLE GENERAL SHORING NOTES: X = 1. EXCAVATOR WILL INSTALL THE PLATES AND POSTS WITH ITS 1. SHORING DESIGN IS BASED ON SOILS CONSISTING OF 35 BACKHOE IN CONJUNCTION WITH EXCAVATING THE HOLE, 7' BCE, AS OUTLINED IN GEOTECHNICAL REPORT PREPARED X = SUPPORT SOILS DURING EACH PHASE. BY GEOTEK (DATED 1/4/17) PROVIDED BY THE 2. EXCAVATION WILL PROCEED FROM THE CENTER OF THE 12' CONTRACTOR. CONTRACTOR SHALL CONTACT ENGINEER IF X = 3. ONCE THE HOLE HAS A DEPTH OF 5' -0 ", THE CENTER DIFFERING DESIGN PARAMETERS APPLY OR REPORT IS CROSS MEMBER WILL GO IN AND WILL BE LOWERED AS THE 5' REVISED AT ANY TIME AFTER THIS DATE. X = OF THE HOLE TO CENTER OF THE CROSS MEMBER WILL 2. DURING SHORING INSTALLATION, CONTRACTOR TO TAKE NEVER EXCEED 7'-0" PER THE DETAIL. 8' SPECIAL CARE TO PROTECT ADJACENT PROPERTY BY X = THE SAME METHODOLOGY UNTIL THE HOLE IS DUG TO ADVANCING PANELS AS FAR AHEAD OF EXCAVATION AS EXCAVATION GRADE AND ALL CROSS MEMBERS ARE IN PER 10' POSSIBLE (MIN. 18 "), AND MONITORING AND IMMEDIATELY BACKFILLING ALL VOIDS TIGHT WHICH DEVELOP BETWEEN FACE OF EXCAVATION AND SHORING. IF SITE SOILS ARE HARD, AND ADVANCEMENT OF PANELS WOULD CAUSE EXCESSIVE VIBRATION, CONTACT ENGINEER. 3. DURING SHORING REMOVAL, BACKFILL AHEAD OF PANEL EXTRACTION (MIN. 18 "), AND ENSURE ALL VOIDS ARE IMMEDIATELY BACKFILLED TIGHT AS SOON AS THEY DEVELOP. 4. SLIDE RAIL SYSTEM SHALL BE CERTIFIED SBH ASSEMBLIES. PE STAMPED TABULATED DATA SHALL BE PROVIDED AT JOBSITE, AND MANUFACTURER'S TABULATED DATA APPLIES EXCEPT AS IS NOTED HERE. 5. PROVIDE ACCESS, BARRICADING, AND FALL PROTECTION, IN ACCORDANCE WITH ALL OSHA GUIDELINES. 6. SHORING MUST BE PROPERLY INSTALLED PRIOR TO WORKERS ENTERING EXCAVATION. WORKERS MAY ONLY ENTER, EXIT, AND WORK WITHIN SHORED AREAS. 7. STEEL SHAPES TO BE ASTM A572 DR. 50 OR A992, MIN FY = 50 KSI. 8. STEEL SHAPES SHALL BE IN GOOD CONDITION AND SHALL BE FREE OF ANY HOLES OR VISUAL DEFECTS. 9. GROUNDWATER LEVEL MUST BE MAINTAINED AT OR BELOW THE MINIMUM LEVEL SHOWN ON THESE PLANS AT ALL TIMES. IF DEWATERING SYSTEM IS NECESSARY TO ACHIEVE THIS, IT IS THE CONTRACTOR'S RESPONSIBILITY FOR DEVELOPING, INSTALLING, AND MONITORING DEWATERING SYSTEM, AND VERIFYING THAT THE GROUNDWATER LEVEL BEHIND THE SHORING WALLS HAS BEEN LOWERED AT LEAST TO THE MINIMUM LEVEL SHOWN ON THESE PLANS AT ALL TIMES. IF CONTRACTOR IS UNABLE TO LOWER THE GROUNDWATER TO THE LEVEL SHOWN, CONTACT THE SHORING ENGINEER IMMEDIATELY. 10. D.H. CHARLES ENGINEERING, INC. WILL NOT SUPERVISE, DIRECT, CONTROL OR HAVE AUTHORITY OVER OR BE RESPONSIBLE FOR CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OF CONSTRUCTION, OR THE SAFETY PRECAUTIONS AND PROGRAMS INCIDENT THERETO, OR FOR ANY FAILURE OF CONTRACTOR TO COMPLY WITH LAWS AND REGULATIONS APPLICABLE TO THE FURNISHING OR PERFORMANCE OF WORK. 11. VERIFY THE ACCURACY OF ALL DIMENSIONS FOR BOTH EXISTING AND PROPOSED WORK. VERIFY THAT REQUIRED CLEARANCES ARE OBTAINED PRIOR TO COMMENCEMENT OF THE WORK. 12. VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES PRIOR TO COMMENCING THE EXCAVATION. 13. TRENCH SHORING AND D.H. CHARLES ENGINEERING, INC. BEARS NO RESPONSIBILITY OR LIABILITY FOR ANY SETTLEMENT, MOVEMENT, OR DAMAGE OF ANY KIND THAT MAY OCCUR TO SURROUNDING SOILS, EXISTING BUILDING STRUCTURES, OR UTILITIES DUE TO SHORING INSTALLATION, DEFLECTION, REMOVAL, OR OTHER CONSTRUCTION ACTIVITIES. CHANGE DESCRIPTION SURCHARGE (MATERIALS & EQUIPMENT) 4' —TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SHORING TO BE REMOVED (TYP) APPROVED I DA TE 't SEE SETBACK TABLE SBH DSR ROLLING STRUT 18' —LONG SBH DOUBLE SLIDE ASSEMBLY RAIL MIDDLE POST (TYP) 12' -0" MAX 12' -0" MAX X (RAIL TO RAIL) (RAIL TO RAIL) (N) RETAINING WALL FOOTING TO BE INSTALLED (TYP) SECTION - PHASE I SCALE. 1/8' =1' -0" SEE SETBACK TABLE LONG SBH DOUBLE SLIDE SBH DSR ROLLING STRUT ASSEMBLY TO RAIL BE RELOCATED TO POSITION SHOWN RAIL MIDDLE POST (TYP) 12' -0" MAX ONCE RAILS ARE BLOCKED TIGHT TO 12' -0" MAX X (RAIL TO RAIL) CURED CONCRETE SLAB (TYP) (RAIL TO RAIL) F1 n 4 -0' II II 10' -3' MAX MAX (� MAX (TYP) II 8' 0„ MIN C -TALL x 10"-WIDE CONCRETE BLOCKING INSTALLED TIGHT BETWEEN SLIDE RAIL POST AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) rB-'\N SECTION -PHASE 2 �,J4 SCALE: 1/8"_F-0" SOIL TO BE REMOVED AFTER SLIDE RAIL REMOVAL li ------- it ..Iii u , I"! III II 'lilli ii °IV' �_ T lit — — — — Jiii id III ' ".nn nm a,u" io u o [I 4, i' u10 iY it SECTION - PHASE 3 4 SCALE 1 1S' =I' -0" BENCHMARK DESCRIPTION: PT 1039 Ell LOCATION: EAST WING WALL OF THL�AOR7 END OF NORTHBOUND HWY 101 BRIDGE OVER LAGOON RECORD FROM: ROS 18416 ELEVATION: 16.938 DATUM: NAVD88 FREE STANDING RETAINING WALL BY OTHERS (TYP) 1 „o nP MAX (TYP) SCALE AS -BUILT HORIZONTAL: I"=10' VERTICAL: N A BRIAN MICHAEL ARDOLINO DATE -u -1 C&M 12 -13 1 EVIEWER INSPECTOR SENIOR ENGINEER 0' v J Q v 8' -LONG SBH DOUBLE Il_11 RAIL MIDDLE POST (TYP) 4 �11.483'11. 483 '11.483'11.483'11.483'� UNIT 2 -0" MAX (RAIL TO RAIL) r o 56' -11" n i i SBH DER ROLLING STRUT ASSEMBLY (TYP) OSHA COMPLIANT SLOPE PER CONTRACTOR (TYP) I I ( I I — — — — — — — — — — — — — — — — — — — — — — L— - - - - -3 1 I I I I I 16' -11° I SETBACK TABLE INSTALLATION NOTES: X = 1. EXCAVATOR WILL INSTALL THE PLATES AND POSTS WITH ITS CAT 325 EXCAVATOR BACKHOE IN CONJUNCTION WITH EXCAVATING THE HOLE, 7' TAKING CARE TO ADVANCE THE PANELS AND FULLY X = SUPPORT SOILS DURING EACH PHASE. CAT 365 EXCAVATOR 2. EXCAVATION WILL PROCEED FROM THE CENTER OF THE 12' EXCAVATION TO THE EAST AND WEST EDGES. X = 3. ONCE THE HOLE HAS A DEPTH OF 5' -0 ", THE CENTER DUMPTRUCK CROSS MEMBER WILL GO IN AND WILL BE LOWERED AS THE 5' HOLE IS DUG. THE MAXIMUM DISTANCE FROM THE BOTTOM X = OF THE HOLE TO CENTER OF THE CROSS MEMBER WILL CONCRETE TRUCK NEVER EXCEED 7'-0" PER THE DETAIL. 8' 4. EACH SUBSEQUENT CROSS MEMBER WILL BE APPLIED USING X = THE SAME METHODOLOGY UNTIL THE HOLE IS DUG TO STREET TRAFFIC EXCAVATION GRADE AND ALL CROSS MEMBERS ARE IN PER 10' THE DETAIL. CHANGE DESCRIPTION SURCHARGE (MATERIALS & EQUIPMENT) 4' —TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SHORING TO BE REMOVED (TYP) APPROVED I DA TE 't SEE SETBACK TABLE SBH DSR ROLLING STRUT 18' —LONG SBH DOUBLE SLIDE ASSEMBLY RAIL MIDDLE POST (TYP) 12' -0" MAX 12' -0" MAX X (RAIL TO RAIL) (RAIL TO RAIL) (N) RETAINING WALL FOOTING TO BE INSTALLED (TYP) SECTION - PHASE I SCALE. 1/8' =1' -0" SEE SETBACK TABLE LONG SBH DOUBLE SLIDE SBH DSR ROLLING STRUT ASSEMBLY TO RAIL BE RELOCATED TO POSITION SHOWN RAIL MIDDLE POST (TYP) 12' -0" MAX ONCE RAILS ARE BLOCKED TIGHT TO 12' -0" MAX X (RAIL TO RAIL) CURED CONCRETE SLAB (TYP) (RAIL TO RAIL) F1 n 4 -0' II II 10' -3' MAX MAX (� MAX (TYP) II 8' 0„ MIN C -TALL x 10"-WIDE CONCRETE BLOCKING INSTALLED TIGHT BETWEEN SLIDE RAIL POST AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) rB-'\N SECTION -PHASE 2 �,J4 SCALE: 1/8"_F-0" SOIL TO BE REMOVED AFTER SLIDE RAIL REMOVAL li ------- it ..Iii u , I"! III II 'lilli ii °IV' �_ T lit — — — — Jiii id III ' ".nn nm a,u" io u o [I 4, i' u10 iY it SECTION - PHASE 3 4 SCALE 1 1S' =I' -0" BENCHMARK DESCRIPTION: PT 1039 Ell LOCATION: EAST WING WALL OF THL�AOR7 END OF NORTHBOUND HWY 101 BRIDGE OVER LAGOON RECORD FROM: ROS 18416 ELEVATION: 16.938 DATUM: NAVD88 FREE STANDING RETAINING WALL BY OTHERS (TYP) 1 „o nP MAX (TYP) SCALE AS -BUILT HORIZONTAL: I"=10' VERTICAL: N A BRIAN MICHAEL ARDOLINO DATE -u -1 C&M 12 -13 1 EVIEWER INSPECTOR SENIOR ENGINEER 0' v J Q v 8' -LONG SBH DOUBLE Il_11 RAIL MIDDLE POST (TYP) 4 �11.483'11. 483 '11.483'11.483'11.483'� UNIT 2 -0" MAX (RAIL TO RAIL) r o 56' -11" n i i SBH DER ROLLING STRUT ASSEMBLY (TYP) OSHA COMPLIANT SLOPE PER CONTRACTOR (TYP) I I ( I I — — — — — — — — — — — — — — — — — — — — — — L— - - - - -3 1 I I I I I 16' -11° I SETBACK TABLE REMOVAL NOTES: X = 1. AFTER THE NEW CONCRETE FOOTING HAS BEEN PLACED, CAT 325 EXCAVATOR THE SHORING RAILS WILL BE BLOCKED TIGHT AS SHOWN 7' PER PLAN. X = 2. THE PERMANENT WALLS WILL BE CONSTRUCTED IN LIFTS TO CAT 365 EXCAVATOR 2.5 TO 3' FROM GRADE. 12' 3. AS THE SOILS ARE BACKFILLED AND COMPACTED BEHIND X = THE NEW WALLS, THE SHORING WILL BE EXTRACTED DUMPTRUCK STARTING WITH THE PANELS, ENSURING ALL SOILS ARE 5' SUPPORTED DURING EACH PHASE. X = 4. THIS WILL CONTINUE IN LIFTS UNTIL THE SHORING IS FULLY CONCRETE TRUCK REMOVED. 8' CHANGE DESCRIPTION SURCHARGE (MATERIALS & EQUIPMENT) 4' —TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SURCHARGE (MATERIALS & EQUIPMENT) 4' -TALL SBH SLIDE RAIL PANEL (TYP) 8' —TALL SBH SLIDE RAIL PANEL (TYP) SHORING TO BE REMOVED (TYP) APPROVED I DA TE 't SEE SETBACK TABLE SBH DSR ROLLING STRUT 18' —LONG SBH DOUBLE SLIDE ASSEMBLY RAIL MIDDLE POST (TYP) 12' -0" MAX 12' -0" MAX X (RAIL TO RAIL) (RAIL TO RAIL) (N) RETAINING WALL FOOTING TO BE INSTALLED (TYP) SECTION - PHASE I SCALE. 1/8' =1' -0" SEE SETBACK TABLE LONG SBH DOUBLE SLIDE SBH DSR ROLLING STRUT ASSEMBLY TO RAIL BE RELOCATED TO POSITION SHOWN RAIL MIDDLE POST (TYP) 12' -0" MAX ONCE RAILS ARE BLOCKED TIGHT TO 12' -0" MAX X (RAIL TO RAIL) CURED CONCRETE SLAB (TYP) (RAIL TO RAIL) F1 n 4 -0' II II 10' -3' MAX MAX (� MAX (TYP) II 8' 0„ MIN C -TALL x 10"-WIDE CONCRETE BLOCKING INSTALLED TIGHT BETWEEN SLIDE RAIL POST AND CURED CONCRETE, AND SECURED IN PLACE BY CONTRACTOR (TYP) rB-'\N SECTION -PHASE 2 �,J4 SCALE: 1/8"_F-0" SOIL TO BE REMOVED AFTER SLIDE RAIL REMOVAL li ------- it ..Iii u , I"! III II 'lilli ii °IV' �_ T lit — — — — Jiii id III ' ".nn nm a,u" io u o [I 4, i' u10 iY it SECTION - PHASE 3 4 SCALE 1 1S' =I' -0" BENCHMARK DESCRIPTION: PT 1039 Ell LOCATION: EAST WING WALL OF THL�AOR7 END OF NORTHBOUND HWY 101 BRIDGE OVER LAGOON RECORD FROM: ROS 18416 ELEVATION: 16.938 DATUM: NAVD88 FREE STANDING RETAINING WALL BY OTHERS (TYP) 1 „o nP MAX (TYP) SCALE AS -BUILT HORIZONTAL: I"=10' VERTICAL: N A BRIAN MICHAEL ARDOLINO DATE -u -1 C&M 12 -13 1 EVIEWER INSPECTOR SENIOR ENGINEER 0' v J Q v 8' -LONG SBH DOUBLE Il_11 RAIL MIDDLE POST (TYP) 4 �11.483'11. 483 '11.483'11.483'11.483'� UNIT 2 -0" MAX (RAIL TO RAIL) r o 56' -11" n i i SBH DER ROLLING STRUT ASSEMBLY (TYP) OSHA COMPLIANT SLOPE PER CONTRACTOR (TYP) I I ( I I — — — — — — — — — — — — — — — — — — — — — — L— - - - - -3 1 I I I I I 16' -11° I SETBACK TABLE CRANE TO 30 TON MAX X = 12' CAT 325 EXCAVATOR X = 7' CAT 345 EXCAVATOR X = 10' CAT 365 EXCAVATOR X = 12' 5 CY LOADER X = 5' DUMPTRUCK X = 5' SPOIL PILE (4' -TALL) X = 6' CONCRETE TRUCK X = 8' BUILDING STRUCTURES X = 5' STREET TRAFFIC X = 10' ABOVE LISTED SETBACKS SHALL BE MAINTAINED A DISTANCE "X" FROM ALL EDGES OF SHORING AND ALL TOT - - — - - PLAN VIEW SCALE: 118' =1=0" RAIL PANEL (TYP) NOTE: STRUCTURAL SHORING DESIGN REVIEWED AND APPROVED BY ESSIL CORP. AS PC #17 -200 1I1&VI5Z6N APP40VED 61 S.SAIIIDEdS 3-34.17 PLANS PR ARED UNDER SUPERVISION OF DATE: 3 /$6/f 7 R.C.E. NO.: 62941 JASPE CALCARA EXP.: 12 -31 -17 I I wives JUI SLIDE RAIL PANEL (TYP) STRUT ASSEMBLY (TYP) A SECTION 4 SCALE 1/8' =1' -0" y D.H. CHARLES ENGINEERING, INC. 2187 Newcastle Avenue, Suite 200 Cardiff, CA 92007 Ph: (760) 436-9756 Fax: (760) 436-9757 CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. GRADING PLAN FOR: 2348 MANCHESTER AVENUE 13155 -G APN: 261- 053 -20 PLANNING CASE NO: 05 -178 DR/CDP SHEET 4A OF 4A. PLSA 2635 W � W W vJ T j ENGINEERING DIVISION APPROVALS RECOMMENDED: APPROVE 'Di-- MASIH MA II EDWARD W. DEA DATE 3_,.,�4 �j -7 DATE 3 •Z,8 47