Loading...
2015-12578 G (Plans)RIGHT OF WAY NOTE OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS. DRAINAGE NOTE NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO AN APPROVED DRAINAGE FACILITY. UTILITY NOTE ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. THE SOILS REPORT TITLED "PRELIMINARY GEOTECHNICAL INVESTIGATION" PREPARED BY COAST GEOTECHNICAL DATED 02/19/15, AND UPDATE DATED , PROJECT #P - 633115 SHALL BE CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE I WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY OR EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING. 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH C C IS DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED I C VIL ENGINEER OR A LICENSED LAND SURVEYOR. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (1/2) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS BEEN HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE- CONSTRUCTION MEETING SHALL BE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. 12578 -G HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION. 12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. 16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. CHANGE NO.I DESCRIPTION I APPROVED 1 DATE EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT SCOTT McDANIEL AT (858) 353 -8388 - 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. DEVICES SHOWN ON PLANS SHALL NO- BE MOVED OR MODIFIED Wf i "HOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. STORMWATE77 - -_vLU -ION CONTROL POST CONSTRUCTION BMP /IMP NOTES 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND LISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN SYSTEM. 2. GRASS AND LANDSCAPE AREAS DFSIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. 3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE. FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY AND /OR THE TURF /LANDSCAPED AREAS. 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2% CROSS SLOPE TOWARD THE IMP /BMP AREA OR HAVE ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE IT TO AN ADEQUATE IMP /BMP. 6. ALL STORMWATER IMP /BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED WITHOUT A PERMIT FROM THE CITY. 7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 8. ALL EXISTING AND PROPOSED TRASH LNCLOSURES SHALL BE FITTED TO COMPLY WITH STORM WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN IMPERVIOUS, NON - COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH s CITY - APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY ` ck SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING Pr'-, I MAY BE REQUIRED FOR THIS STRUCTURE. SAN DIEGUITO WATER DISTRICT NOTES 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL PI vONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS 0" "4 <E CURRENT WATER AC" .;IES' STANDARDS COMMITTEE (WASC). 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON - EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT. 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND /OR ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE. 5. UTILITIES TO MAINTAIN MINIMUM 5 -FOOT SEPARATION WHEN I :.RALLELING WATER SERVICES. 6. MINIMUM HORIZONTAL SEPARATION OF 10 -FEET REQUIRED BETWEEN FIRE H (GRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. 7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELL D WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB -1953 IS REQUIRING THAT NO -LEAD BRASS BF USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS, 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC -17 OR WC -18. BENCHMARK SCALE AS -BUILT UI - 7 DESCRIPTION: BENCHMARK ENC -30 /� LOCATION: HORIZONTAL: 1" = 20' RECORD FROM: CITY OF ENCINITAS { V ELEVATION: 388.47 VERTICAL: N/A DATUM: NAVD88 VCCI�n -rvr M 3411 i V(NLEN"T L• StsMVC STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES CONCRETE WASHOUT CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT LOCATION. CONSTRUCTION SITE ACCESS A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED STEEL PANELS /PLATES. CONSTRUCTION VEHICLES A SPECIFIC AREA AWAY FROM GUTTF 2S AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT VAINT' ;NANCE. ALL MA,Ir .1 REPAIRS SHALL BE MADE OFF -SITE. EROSION CONTROL EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX. NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS UNNECESSARILY; THEY HELP DECREASE EROSION. TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE SOIL. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. ON -SITE CONSTRUCTION MATERIAL STORAGE STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A B R AR ND THE PERIMETER AT ALL TEMPORARY SEDIMENT BARRIER AROUND TIMES. TRAINING CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. WASTE MANAGEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES WITH IMPEPVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND CONCRETE, WOOD AN'^ Cl EARED VEGETATION CAN BE RECYCLED. NON - RECYCLABLE MATERIALS MUST BE TAKEN TO AN APPROPRIATE LAN[3FILL Uk OISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDE_`;. DUMPSTERS CALL EDCO AT (760) 436 -4151. POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE SITE. PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SURFACES. ALL CONS -RUCTION DEBRIS SHALL BE KEFT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - CSD - (760)- 633 -2770 B. GAS & ELECTRIC - SDGE - (760) -438 -6200 C. WATER - SAN DIEGUITO WATER DISTRICT -1- 800 - 227 -2600 D. TELEPHONE - SBC BELL - (760)- 489 -3411 E. CABLE TV - COX COMMUNICATIONS - (760) -806 -9809 X -2233 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)- 633 -2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. IMPER AOUS AREA IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 4,000 SQFT IMPERVIOUS AREA AFTER CONSTRUCTION: 9,120 SQFT INCREASE IN IMPERVIOUS AREA: 5,120 SQFT OWNER SCOTT McDANIEL 3075 CAMINITO SAGUNTO DEL MAR, CA 92014 P. 858 -353 -8388 SITE ADDRESS 1329 LAKE DR. APN 260- 213 -19 LEGAL DESCRIPTION PCL. 2, PARCEL MAP 20136 OWNER'S CERTIFICATE I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THE SITE. SIGNATURE DATE: SCOTT McDANIEL SOILS ENGINEER'S CERTIFICATE VICINITY MAP N.T.S. 1,V1 't A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN THE FIE D OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON ®,!q -�.5 AND FOR AN UPDATE ON /2 -23-IS ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY -ENGINEER. FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMEN6 IONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN INCORPORATED IN T NS AND SPECIFICATIONS. SIGNED: Jy�/I�y�.v,.�.��dz V R C E NO.: Gr 782T� EXP. DATE: 12-3/- /7 T'-3!!ei I Y� 109 J B #: ,. ':_ O 3L J j 01 COMPANY COAST GEOTHECHNICAL / 3 t .r ADDRESS 779 ACADEMY DRIVE, SOLANA BEACH, CA 92075 PHONE (858) 755 -8622 w �� STATEMENT OF ENGINEER OF WORK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL_ SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FRO J THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THEW PERFORMED BY THE ENGINEER. s VIUG��T l SU1d�b ES / F S Q S IGNATURE: � _ ` D 2 1 ATE: 10/09/ 0 5 to YERM TSA K COMPANY $w NO. C 2871 m 44978 Inc AI AMITOS oID�Pp /-, LOS n nM TOo G nm� ADDRESS fi oG EXP. 12 1/2016 PHONE NUMBER 599 -797. 9483 C- 7Lb)Lj6-OW16 1-7( SftXONU JrOK1i S� RCE 52871 EXPIRES 12/3112016 Crvr_INITi15cA g20Z Ll 9�OF OpU bfp- 3��2or� EARTHWORK DATA STEEPEST EXISTING NATURAL SLOPE ON -SITE = 2 H: 1 V MAXIMUM VERTICAL DEPTH OF CUT = 4 ' MAXIMUM VERTICAL DEPTH OF FILL = 2 ' CUT = 500 C.Y. FILL = 380 C.Y. EXPORT = 120 C.Y. REMEDIAL = 1 100 C.Y.( REMOVAL AND RECOMPACTION UNDER AND IMPERVIOUS AREA REPLACED: 800 SQFT TOTAL DISTURBED AREA = 41,300 s.f. =0.94 oc. FIELD OPERATIONS " LANNING AND BUILDING Q �q %.-7. 1110 3�3�C� SIG(N) DATE SIGN DATE PREPARED UNDER SUPERVISION OF Vows DATE: 02/25/2016 R.C.E. NO.: 52871 A TSALYUK _ EXP.: 12/31/2016 PARKS AND RECREATION SIGN DATE ENGINEERING DIVISION APPROVALS RECOMMEN ED: J06 APP V AA All MASIH MAHER GLENN PRUIM 3n) I en DATE 3�P�/6 DATE OUTSIDE OF BUILDING AREAS) I BMP PROJECT STATUS STANDARD 1 SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT SIGN ' DATE SIGN CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT GRADING PLAN FOR: 1329 LAKE DRIVE OWNER: SCOTT McDANIEL APN 260- 213 -19 PLANNING CASE NO: 15 -155 CDP DRAWING NO. 12578 -G EET 1 OF 3 z a O X U (7 LL Z C wU)a zofz (7 0 C z0x w¢a a% _ a cam c a O X y O X y O X _ O X EXISTING 30' PUBLIC - o - = o = = o - = o ROAD PURPOSES y = y z.� ; _ 0 N = Z LEGEND - 30' -0" 30'_0^ EASEMENT m° m m °IV m° m m° N / I v v ... 3� m a 3 m a 3 a 3� a mny mn< mny m�< .._.._._ z z n z z D ._......... _. y m m y m -i y - . - - - -- , , - - - - - -- EXISTING CONTOUR mI - ........' _ ° TO LAKE DRIVE - s 76 PROPOSED CONTOUR a m _ - F %{s.7= 8'u I _ L PR g 2 L12 1 412- ci EXISTING CONTOUR - - -- - ._ - - -- ... - - - LI e EXIST WATER METER _ P - FOR 7329 LAKE DR: fiu -• p ° PROPOSED CONTOUR m g A x n o x ` D= �•- PER SOILS ENGINEER z m a y m F n y . m y T a z y °_° y m n 4 "CMB RECOMMENDATION ynm01z P n (4" AC/ 6" CMB MIN.) -yzc� -`-yo to °- � x r mma.o.. ycN - zm DETAIL 'A -m •a T 3< 3 m A m '9 n O m D m n t O` T �_�- FLOW DIRECTION M a m m _ PCC CONC. GUTTER N m y N �. _ .. N. T. S. -� BUILDING FOOTPRINT SEE BELOW FOR CONTINUATION sow �____- EXISTING WALL - - -/ .` PROPOSED WALL ;! I it ; r o- EXIST. SEWER LATERAL „ L �) L L f 5f - i EXIST. CLEANOUT - - 4 WIDE PCC SWALE ✓ v , PER-- DETAIL._HEREQN REPLACE AS NECESSARY PR6PDSEB RETENTION AREA SHALL BE - DEEP ROOTED, DENSE, DROUGHT - - -- - -- ___ LEVEL AND DEPRESSED A / TOLERANT PLANTING SUITABLE , A i, EXI',ST SEWER'LIN� -" ' rl rnnrnr,T LIMITS OF GRADING GRAVEL MINIMUM OF 6" FROM THE / FOR WELL DRAINED SOIL Z / �' 1 /, COX CAf DQ`vEW FILL 'Om'^O°'• I LI AN PROPOSED SURROUNDING GRADE 014, : ,_r - F I / L f CLEANOUT PL g 88'55'01 " E 91.84' "' � 2PT6 UG APPROVED GRATE INLET ' / , / �� € '��� PROPOSED 4" PROPOSED RET. WALL 2 -3° HARDWOOD MULCH REF w - , -- - s,�, -- ` S— — '� _ _S— _:., PROPOSED 4 , �' PER SDRSD C -2 o SURFP _ i \. 1 N01 °0458 "E SEWER LATERAL i (2 -3') T_... �- „� 3830 TW _ S 8�' 379.00TF PL 1 - zc A _. 55'02' 250 30' 24" MIN. ENGINEERED SOIL WALL 8 -12" I `SEE NOTE BELOW - S� \ ., 1 c ?'d W `� '.� g° > i Fti, d 2-3" OF 3/8" GRAVEL F�[ i ._. ,«- ! ._ __. - _ I �. N — — — —' —' • ",i %-- PVC — - - .. - -_ - -_ — — — _ ?KCQ��I TY'j „j- t _ g -. t ,! - _ 3884.00 PIPE 9 z ., ., -/ — RISER h. 'F a W J( - _ - ^>' 12” MIN. ' o C R " ; y ", GDNG ILI Ve why( _« SEE NOTE O : , - =` -- - - - -- - \y I' _ n � CON �y I BELOW : � /. / ` tr (/ CON 7 � .a AC•',D Wci._ � ,._ x x� ., I y , �..> / � h � � C;;�RI WAY ,. 3/4" CRUSHED ROCK - 36th. OT 161 '�✓ �� / ` t y' ��� C v DISCHARGE 357. IE 6� ! - - - - -� - - - -- - - - - - -- °o PL o PIPE FROM5.- w."m 01f+�� 362.00:, y -- - - - - -- - - -� AD AQ 1 ? BIORETENTION 36 � � � �` DNS- o CaV q ,: � LIMITS OF GRADING 'BIORETENTION "ENGINEERED SOIL" LAYER SHALL BE MINIMUM 24" DEEP "SANDY LOAM" SOIL MIX '� , ri' ,U '•O } 358 0; WITH NO MORE THAN 5% CLAY CONTENT. THE MIX SHALL CONTAIN 50 -60 °k SAND, 20-30% COMPOST ISER %>�.' .et O 7 +^ DISTURBANCE J OR HARDWOOD MULCH, AND 20 -30 %TOPSOIL !, O _ i, `—' _- 61.8 TG $ tp - I� G•. ,j�� -p EQOlP11CN[ ,Q - Q LWAY INTO_.. 58.2 lE � 3, "3 r� « . s,a•, U - MT M r - - -- p" NEW RESIDENCE q tR?� DQ RIN "314" CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 12" BUT MAY BE DEEPENED TO INCREASE THE O ` j E'WA Y - IV, q?, piper INFILTRATION AND STORAGE ABILITY OF THE BASIN. r p w �L , I - ' �• . -,. -7I < ; I 50 F.F. - - - O THE EFFECTIVE AREA OF THE BASIN SHALL BE LEVEL AND SHALL BE SIZED BASED ON ENCINITAS " , ,...r `: , , •_ �/ < /D p _ 0_ IP �� - . �` l ( - ,._ „' Q Il - 378., W 25 F 01 REAR SETBACK STORMWATER MANUAL CALCULATIONS, TYPICALLY, THE SURFACE AREA OF THE BIORETENTION ;5fIiNP _ -__ -- - - - -•- - - -- - , - -.__. _ ”- _ .; ' -, � t O R F.F. PIPE. 378.50 BASIN 154°/a OF THE IMPERVIOUS AREA DRAINING TO IT. i - C9 1 i� 9 _ �U{Fj / 77 90 ? D I- LANDSCAPE AREA PER 30 r . ^,.T FRO e: BE A _. -- - ,,: _ W -'- i SEPARATE LANDSCAPE PLAN O �1� •3 PAD* B OR T ION PfR ;rptJC LRNTt¢ �• T M rr PL Wo !: II D TAI , %H REON N w BIORETENTION DETAIL FOR BMP 0146 361 FG S.F. J. I i g CJ .:; 7 00 z ¢ - - -- -- - - - - � Boa• TOTAL AREA = 53,220 S.F. TOTAL DISTURBED AREA = 41,300 s.f. =0.94 ac. AC DRIVEWAY- 4,410 S.F. TRUEGRID PAVERS DRIVEWAY- 2,110 S.F. (PERVIOUS) BUILDING AREA- 4,710 S.F. DECK AREA- 1,020 S.F. (PERVIOUS) TOTAL IMPERVIOUS AREA =9,120 S.F. TOTAL LANDSCAPE AREA = 40,970 S.F. BMP AREA= 0.09X(IMP. AREA+ 0.ILNDSC.AREA) BMP AREA= 0.09x(9,120 +0.1 x40, 970) =1,190 S.F. BMP AREA PROVIDED= 1,235 S.F. * SPECIAI INSPFCTINN RFOUIRFD CQ r ; "r > PARCEL 2 - PLACE i`�EtI c�.i„ ,;,5 '� i' f I ' L z O con 17s'OOn v9tr, u �E ; ^ I . ?2 rp z yr..... - a utr� A GROSS -A.20 AC NE "E. �'� 1 A,p� RRE' IT - E W h A A ^' /V�KI� 5` EXTENDED y,r >. r 4xt 111YEPTH FTG. i II S NECESSARY .. _ ,, tea, 3 Do C - SHED f 6J1 -� - 11% Y 7 6.20FL PL Tli% THE „_. PL y, S 88 °56'46" E 342.20' CIAMW LINK xEwce 0' TIM 3e,.~' a T (380.0)FG 0 5 CH ERtINIrC -� _ E \00, ILL OAD -•� [ F tl- O- h4hkh / /�• ��51FOOTS0ESET BACK. 12" MIN7--9EE-FL- LIMITS OF GRADING DISTURBANCE " _ CONTRACTOR TO VERIFY SLAB SECTION WITH ' SOILS ENGINEER PRIOR TO CONSTRUCTION NO1L_ NOTES ALL SERVICE LINES TO THE SUBJECT BUILDINGS SHALL BE ALL UNDOCUMENTED FILLS SHALL BE REMOVED & REPLACED CONSTRUCTED UNDERGROUND WITH STRUCTURAL FILL. ALL FAILING WALLS TO BE DEMOLISHED AND REMOVED BMPs ARE TO BE PRIVATELY MAINTAINED AND THE FACILITIES NOT MODIFIED OR FIRE DEPARTMENT NOTES REMOVED WITHOUT A PERMIT FROM THE f"!TY LANDSCAPE AREA, MAXIMUM ALLOWABLE WATER USAGE CALCULATION AND BEST LANDSCAPE PRACTICES CHECKLIST INCLUDING PRINCIPLES PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING CONSTRUCTION MATERIALS THE PROJECT SITE ALL OF THE FOLLOWING CONDITIONS SHALL BE COMPLETED TO O THE THE APPLICANT SHALL REMOVE ALL OF THE EXISTING FAILING WOODEN RETAINING PROVIDED BY ARCHITECT ON THE PROJECT PLANS FOR BP NO. 15 -2234. SATISFACTION OF THE FIRE DEPARTMENT.• WALLS AND REMOVE AND RECOMPACT, ALL UNDOCUMENTED AND UNSUITABLE FILLS ON THE ENTIRE PROPERTY. 1. ALL WET AND DRY UTILITIES SHALL BE INSTALLED AND APPROVED BY THE, THE MODIFICATION OR REMOVAL OF THE STORM WATER POLLUTION CONTROL (SWPC) APPROPRIATE INSPECTING DEPARTMENT OR AGENCY,• FACILITIES WITHOUT A PERMIT FROM THE CITY IS PROHIBITED. 2. AS A MINIMUM THE FIRST LIFT OF ASPHALT PAVING SHALL BE IN PLACE TO PROVIDE A PERMANENT ALL WEATHER SURFACE FOR EMERGENCY VEHICLES, AND SECTIONA -A 3.ALL FIRE HYDRANTS SHALL BE INSTALLED, IN SERVICE AND ACCEPTED BY THE FIRE DEPARTMENT AND APPLICABLE WATER DISTRICT." T NTS Ql REFERS TO MONUMENTS PER PARCEL MAP 20136 PROTECT IN PLACE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT DESIGNED BY: DRARG BY: CHECKED D BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. ACUISE, Q 13 ( DESCRIPTION: BENCHMARK ENC -30 LOCATION: RECORD FROM: CITY OF ENCINITAS HORIZONTAL: 1" = 20' VERTICAL: NIA i S PREPARED UNDER SUPERVISION DATE: R.C.E. OF 02/25/2016 NO.: 52871 RECOMMEND D: A%lD MASIH MAHER APP V GLENN PRUIM GRADING PLAN FOR: 1 329 LAKE DRIVE OWNER: SCOTT McDANIEL 12578 -G 199 _ ELEVATION: 388.47 DATUM: NAVD88 �__ r �� t EFIM TSALYUK ENGINEER'S NAME EXP.: 12/31 /2016 —T A 16 DATE DATE ' ' /� APN 260- 213 -19 PLANNING CASE NO: 15 -155 CDP °. TO ^�S �� -' ° VINC.�I� L' SRI"��j SHEET 2 OF 3 r1 Pir ,rTENTION BASINS SHALL BE EXCAVATED AND USED AS DESILTING BASINS ,DURING CONSTRUCTION. THE SILT SHALL BE COMPLETELY REMOVED AND THE BIORETENTION BASINS COMPLETED ONCE FINAL SITE STABILIZATION IS ACHIEVED, PRIOR TO OCCUPANCY AND /OR FINAL. SILT FENCE SC -1 BMP NTS r a:anc,K 0 cV .I W J U oI CONSTRUCTION NOTES Q1 GRAVEL BAGS PER DETAIL HEREON Q2 CONSTRUCTION ENTRANCE PER DETAIL HEREON. Q3 SILT FENCE PER DETAIL HEREON FRONT VIEW WOVEN FABRIC GRAVEL BAG FILLED WITH COARSE SAND CROSS SECTION GRAVEL BAGS BERM SE -6 BMP NTS �2 STABILIZE ENTRANCE NTS CRUSH AGGREGATE GREATER THAN 1" BUT SMALLER THAN 3 ". 12" MIN. UNLESS —J OTHERWISE SPECIFIED BY A SOIL'S ENGINEER CORRUGATED STEEL PANELS. CRUSH AGGREGATE GREATER THAN 1" BUT SMALLER THAN 3 ". FILTER FABRIC LORIGINAL L12" MIN. UNLESS GRADE OTHERWISE SPECIFIED FILTER FABRIC BY A SOIL'S ENGINEER. SECTION A -A SECTION B -B GRADE l- N W CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT u��� u tsr: urtHVRvG �Y: �r,t u �Y: ENGINEERING DDIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. YT YT DESCRIPTION: BENCHMARK ENC -30 LOCATION: RECORD FROM: CITY OF ENCINITAS ELEVATION: 388.47 DATUM: NAVD88 HORIZONTAL: 1" = 20' VERTICAL: N/A PLANS PREPARED UNDER SUPERVISION OF DATE: 02/25/2016 R.C.E. 0.:52871 YEFIM TSALYUK EXP.: 12/31/2016 ENGINEER'S NAME RECOMMENDED: Ao 7z, ,, l /� &t— sV vdl � MASIH MAHER GLENN PRUIM �Q/26 DATE ( ��� DATE DATE GRADING PLAN FOR: 1329 LAKE DRIVE OWNER: SCOTT McDANIEL APN 260 - 213 -19 PLANNING CASE NO: 15 -155 CDP 12578-V G " YEFIM roes Y II! -�*� SHEET 3 OF 3