8319WORK TO BE DONE A. GENERAL 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (MOST RECENT EDITION). THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS (MOST RECENT EDITION). ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. 2. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFF -SITE GRADING. 3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE ENGINEER AT NO COST TO THE CITY. 4. THE CONTRACTOR SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYED DURING CONSTRUCTION SHALL BE REESTABLISHED AND REPLACED BY A STATE OF CALIFORNIA REGISTERED CIVIL ENGINEER OR STATE OF CALIFORNIA LICENSED LAND SURVEYOR TO THE SATISFACTION OF THE ENGINEER AND AT NO COST TO THE CITY. 5. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY HEALTH STANDARDS, LAWS, AND REGULATIONS. 6. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (4) MILE OF A STRUCTURE FOR HUMAN OCCUPAN& SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 4:00 PM AND 7:30 AM NOR ON SATURDAYS, SUNDAYS, AND CITY RECOGNIZED HOLIDAYS. 7. THE STRUCTURAL SECTION OF ALL RESURFACING SHALL BE IN ACCORDANCE WITH THE CITY OF ENCINITAS ENGINEERING STANDARDS, AS SHOWN ON THESE PLANS, AND AS APPROVED BY THE CITY ENGINEER. 8. APPROVAL (1 THESE IMPROVEMENT PLANS DOES NOT CONSTITUTE APPROVAL OF ANY WORK OUTSIDE THE PROJECT BOUNDARY. 9. ALL UNDERGROUND UTILITIES WITHIN THE STREET RIGHT -OF -WAY SHALL BE CONSTRUCTED, CONNECTED, AND TESTED PRIOR TO CONSTRUCTION OF BERM, CURB, CROSS GUTTER, AND PAVING. 10. THE EXISTENCE AND LOCATION OF EXISTING UNDERGROUND FACILITIES SHOWN ON THESE PLANS WERE OBTAINED FROM A BASE UTILITY MAP AND SEARCH OF THE AVAILABLE RECORDS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, THE CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT EXISTING FACILITIES SHOWN ltEREON AND OTHERS WHICH ARE NOT OF RECORD OR NOT SHOWN ON THESE PLANS. 11. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL CONFIRMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS (POTHOLING) AND LOCATE ALL EXISTING UNDERGROUND FACILITIES IN THE PROJECT AREA SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES. 12. A. CONTRACTOR SHALL NOTIFY THE SAN DIEGO GAS & ELECTRIC COMPANY PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1 -.800- 422 -4133 (DIG ALERT) B. THE CONTRACTOR SHALL NOTIFY THE AT &T COMMUNICATIONS COMPANY PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 619 -546 -3606 C. THE CONTRACTOR SHALL NOTIFY SAN DIEGUITO WATER DISTRICT PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 760 - 633 -2709 D. THE CONTRACTOR SHALL NOTIFY COX CABLE TELEVISION PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 800 - 422 -4133 (DIG ALERT) E. THE CONTRACTOR SHALL NOTIFY THE SAN ELIJO JPA COMPANY PRIOR TO STARTING WORK NEAR COMPANY FACILITIES (RECLAIMED WATER) AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 760 - 753 -6203 (EXT. 32) 13. THE CONTRACTOR SHALL PROTECT EXISTING LANDSCAPING AND IMPROVEMENTS REMAINING IN PLACE AND THAT ARE NOT CALLED OUT TO BE REMOVED ON THESE PLANS. NO LANDSCAPING OR IMPROVEMENTS SHALL BE DAMAGED OR .REMOVED PRIOR TO APPROVAL OF THE CITY. 14. EXCEPT WHEN WORK IS BEING DONE ON DRIVEWAYS, THE CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS AT ALL TIMES. 15. ALL PRIVATE IMPROVEMENTS IN THE PUBLIC RIGHT OF WAY DESIGNATED TO BE REMOVED SHALL BE SALVED AND RETURNED TO THE PROPERTY OWNER. ALL PRIVATE IMPROVEMENTS OUTSIDE THE PUBIC RIGHT OF WAY, T T ARE NOT DESIGNATED TO BE REMOVED, THAT ARE DAMAGED DURING CONSTRUCTION OF THE PROJECT SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CITY. 16. THE CONTRACTOR SHALL NOTIFY IN WRITING AND OBTAIN APPROVAL OF THE CITY ENGINEER OF WORK PRIOR TO MAKING CHANGES IN THE FIELD. 17. NOTES AND ETAILS ON THE PLANS SHALL FAKE PRECEDENCE OVER THESE GENERAL NOTES IN CASE OF CONFLICT. 18. THE CONTRACTOR SHALL MAINTAIN AN UP TO DATE SET OF AS -BUILT DRAWINGS ON WHICH ALL CHANGES OR VARIATIONS IN THE WORK, INCLUDING UTILITIES ARE RECORDED. A COPY OF SAID AS -BUILT DRAWINGS SHALL BE PROVIDED TO THE CITY OF ENCINITAS WHEN REQUESTED. 19. MATERIAL OF DEBRIS SHALL NOT BE STORED OR REMAIN IN THE PUBLIC RIGHT OF WAY WITHOUT APPROVAL BY THE CITY ENGINEER 20. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) NOTE: THE CONTRACTOR IS REQUIRED TO OBTAIN A PERMIT FROM OSHA PRIOR TO COMMENCING CONSTRUCTION OF TRENCHES OF EXCAVATIONS WHICH ARE 5 FOOT OR DEEPER AND INTO WHICH A PERSON IS REQUIRED TO DESCEND, B. NOTIFICATIONS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: A. SEWERS - LWD - (760)- 753 -0155 B. GAS & ELECTRIC - SDGE - (760)- 438 -6200 C. WATER - SAN DIEGUITO WATER .DISTRICT -1 -800- 227 -2600 D. TELEPHONE - SBC BELL - (760)- 489 -3411 E. CABLE TV - COX COMMUNICATIONS- (760)- 806 -9809 X -2233 F. RECLAIMED WATER - SAN ELIJO JPA 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760)- 633 -2770. 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760) 633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL. PLANS FOR THE CONSTRUCTION OF HIGHWAY 101 TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED BEAUTIFICATION ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID PHASE II N THE CITY 0 ENCHTAS VICINITY MAP NOT TO SCALE PROJECT LOCATION ALONG SOUTH COAST HIGHWAY 101 BETWEEN F STREET & G STREET ENCINITAS, CALIFORNIA 92024 ��101113111,10 1. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE /SHE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR TO FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURES TO PREVENT EROSION OF FRIENDLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. 2. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATIONS. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE SCARIFIED TO A DEPTH OF 6" AND THEN COMPACTED TO A MINIMUM OF 92 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER, AND COMPACT THE FILL. IN STRICT ACCORDANCE WITH SPECIFICATIONS. SMOOTH SURFACES AND UNIFORM CROSS SECTIONS. THE SLOPES OF EXCAVATIONS AND EMBANKMENTS SHALL BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS, AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDNANCE. 4. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE-'COLLECTED AND HAULED OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT.k+iAME BEEN CLEARED WITH A NEAT AND FINISHED •',PPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF "'DEBRIS ALL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. 5. THE CONTRACTOR SHALL MAINTAIN ADEQUATE DUST CONTROL MEASURES THROUGHOUT THE DURATION OF THE PROJECT CONSTRUCTION. PROJECT SITE MAINTENANCE SHALL CONFORM TO SECTION 7 -8 OF THE STANDARD SPECIFICATIONS. 11, 1 WORK TO BE DONE THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE FOLLOWING DOCUMENTS: 1. SAN DIEGO AREA REGIONAL STANDARD DRAWINGS 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ( "GREEN BOOK") 3. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARDS PLANS 4. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD SPECIFICATIONS 5, MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES ( MUTCD) 6. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL TO MUTCD D. EROSION CONTROL IN CASE EMERGENCY WORK IS REQUIRED, CONTACT GREG SHIELDS AT SHEET INDEX SHEET DESCRIPTION 1 TITLE SHEET 2 TYPICAL SECTIONS & DETAILS 3 IMPROVEMENT PLAN •!A . IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 5,027 SQFT IMPERVIOUS AREA AFTER CONSTRUCTION: 5,027 SQFT INCREASE iN IMPERVIOUS AREA: 0 SQFT IMPERVIOUS AREA REPLACED: 5027 SQFT BMP PROJECT STATUS STANDARD STORMWATER TREATMENT FACILITIES TO BE MAINTAINED BY CITY OF ENCINITAS PUBLIC WORKS DEPT. IN ACCORDANCE WITH "MAINTENANCE AGREEMENT. CHANGE NO. (760) 633 -2778, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL BENCHMARK" TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED AS -BUILT ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID UNA tjY: CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS ENGINEERING DIVISION APPROVALS IMMINENT. 3. CONTRACTOR SHALL PROVIDE A 24 - -HOUR TELEPHONE NUMBER AND NAME OF PERSON RESPONSIBLE FOR EMERGENCY WORK. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING -_8U L 3 t ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF 3 I PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY PLANS PREPARED UNDER SUPERVISION OF DATE: 3 /A� t7 R.C.E. NO.: 71087 MATTHE J. WIDELSKI EXP.: 6/30/2017 BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR IMPROVEMENT PLAN FOR: HIGHWAY 101 BEAUTIFICATION PHASE II WORK ORDER NO: CS01E UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 7, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER MAINTENANCE OF THE EROSION CONTROL DEVICES AS NECESSARY. 8, ALL. EROSION CONTROL MEASURES REQUIRED TO RETAIN SEDIMENT ONSITE AND TO SAFELY DISCHARGE ANY ACCELERATED RUNOFF GENERATED BY THE PROJECT SHALL ENGINEE S NAME DATE BE INSTALLED WHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40 PERCENT. 9. TEMPORARY EROSION CONTROL DEVISES WHICH INTERFERE WITH WORK SHALL BE RELOCATED OR MODIFIED AS THE WORK PROGRESSES AS RECOMMENDED BY THE ENGINEER OF WORK AND AS APPROVED BY THE CITY ENGINEER. 10. EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE CONTINUOUS CAPACITY AND ADEQUACY TO FUNCTION AS DESIGNATED. AFTER PRECIPITATION EXCEEDING ONE QUARTER (4) INCH IN ANY 12 -HOUR PERIOD OR UPON THE DIRECTION OF THE CITY ENGINEER, SILT AND DEBRIS SHALL BE REMOVED FROM CHECK DAMS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS INTO AREAS WHERE IMPOUND WATER CREATES A HAZARDOUS CONDITION. NECESSARY PRECAUTIONS MAY INCLUDE, BUT NOT BE LIMITED TO, APPROPRIATE PERIMETER FENCING OR A 24 -HOUR GUARD PREVENTING UNAUTHORIZED PERSONS FROM ENTERING THE BASINS. 12. PAVED STREETS, SIDEWALKS, AND OTHER IMPROVEMENTS SHALL BE MAINTAINED IN A NEAT AND CLEAN CONDITION, FREE OF LOOSE SOIL, CONSTRUCTION DEBRIS, AND TRASH. STREET SWEEPING OR OTHER EQUALLY EFFECTIVE MEANS. " -.iALL BE USED TO CLEAN STREETS EXCEPT FOR THE REMOVAL OF FINE MATERIAL NOT OTHERWISE REMOVED BY SWEEPING OR OTHER MECHANICAL MEANS. 13. STANDBY CREWS SHALL BE ALTERED BY THE CONTRACTOR FOR EMERGENCY WORK DURING RAINSTORMS. 14, GRAVEL BAGS AND NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES OR REPAIR ANY DAMAGED EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. A STANDBY CREW SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. 15. ALL UTILITY TRENCHES SHALL BE BACK FILLED WITHIN 24 HOURS AND MUST BE BACK FILLED BEFORE THE END OF WORK DAY IF A 40 PERCENT, OR GREATER CHANCE OF RAIN IS PREDICTED. 16. A GRAVEL BAG SILT BASIN OR -1 RAP SHALL BE PROVIDED AT EVERY STORM DRAIN INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. SHEET INDEX SHEET DESCRIPTION 1 TITLE SHEET 2 TYPICAL SECTIONS & DETAILS 3 IMPROVEMENT PLAN •!A . IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 5,027 SQFT IMPERVIOUS AREA AFTER CONSTRUCTION: 5,027 SQFT INCREASE iN IMPERVIOUS AREA: 0 SQFT IMPERVIOUS AREA REPLACED: 5027 SQFT BMP PROJECT STATUS STANDARD STORMWATER TREATMENT FACILITIES TO BE MAINTAINED BY CITY OF ENCINITAS PUBLIC WORKS DEPT. IN ACCORDANCE WITH "MAINTENANCE AGREEMENT. CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK" SCALE AS -BUILT utoimw rsr: UNA tjY: UHLUNcu by: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. �IN -_8U L 3 t W 3 I NONE HORIZONTAL: NONE VERTICAL: NONE $ PLANS PREPARED UNDER SUPERVISION OF DATE: 3 /A� t7 R.C.E. NO.: 71087 MATTHE J. WIDELSKI EXP.: 6/30/2017 RECOMMEND D� -� APPROVED: /0- /v & Pr�.tT - DATE: 3[�] DATE:3 a- /7 R.C.E. _4Zgfq R. C. E.4 f � IMPROVEMENT PLAN FOR: HIGHWAY 101 BEAUTIFICATION PHASE II WORK ORDER NO: CS01E SI-107 ENGINEE S NAME DATE SHEET 1 OF 3 E. IMPROVEMENTS 1. A PERMIT SHALL BE OBTAINED FROM THE ENCINITAS SERVICES DEPARTMENT FOR ANY WORK WITHIN THE STREET RIGHTOOF -WAY AT NO COST TO THE CONTRACTOR. 2. APPROVAL OF THESE IMPROVEMENT PLANS AS SHOWN DOES NOT CONSTITUTE APPROVAL OF ANY CONSTRUCTION OUTSIDE THE PROJECT BOUNDARY. A PERMIT SHALL BE OBTAINED FROM THE ENCINITAS ENGINEERING SERVICES DEPARTMENT ANY WORK WITHIN THE STREET RIGHT -OF -WAY AT NO COST 1-0 THE CONTRACTOR. 3. ALL UNDERGROUND UTILITIES WITHIN THE RIGHT -OF WAY SHALL BE CONSTRUCTED, CONNECTED AND TESTED PRIOR TO CONSTRUCTION OR BERM, CURB, CROSS GUTTER AND PAVING. 4. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL BE CONFORMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES. 5. THE CONTRACTOR SHALL ENFORCE ALL MEASURES. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN SAFETY DEVICES AS APPROVED BY THE CITY ENGINEER, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS, AND REGULATIONS. 6. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE 'FOR MONUMENTATION AND /OR ANY BENCHMARKS WHICH WILL BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE REFERENCED AND REPLACED WITH APPROPRIATE MONUMENTATION SET BY A STATE OF CALIFORNIA LICENSED LAND SURVEYOR OR A REGISTERED CIVIL ENGINEER AUTHORIZED TO PRACTICE LAND SURVEYING. A CORNER RECORD OR RECORD OF SURVEY, AS APPROPRIATE, SHALL BE FILED BY THE STATE OF CALIFORNIA LICENSED LAND SURVEYOR OR REGISTERED CIVIL ENGINEER, AS REQUIRED BY THE LAND SURVEYORS ACT. 8. THE LOCATION OF EXISTING BUILDINGS SHOWN ON THESE PLANS ARE APPROXIMATE. 9. THE CONTRACTOR IS RESPONSIBLE TO POTHOLE AND LOCATE ALL EXISTING SUBSURFACE UTILITIES, PRIOR TO THE START OF DEMOLITION OR CONSTRUCTION. ANY EXISTING UTILITIES THAT REQUIRE REMOVAL OR RELOCATION SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY AGENCY PRIOR TO THE BEGINNING OF CONSTRUCTION. IF DURING POTHOLING THE CONTRACTOR DISCOVERS A POTENTIAL CONFLICT BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CITY. THE CONTRACTOR SHALL ALLOW AMPLE TIME FOR REVISIONS TO BE MADE TO THE PLANS TO AVOID CONFLICTS PRIOR TO THE START OF UTILITY INSTALLATION. 10. THE CONTRACTOR SHALL REQUEST MARKOI.IT OF EXISTING UNDERGROUND UTILITIES BY CALLING THE LISTED REGIONAL NOTIFICATION CANTER FOR AN INQUIRY IDENTIFICATION NUMBER, AT LEAST (2) DAYS PRIOR TO START OF ANY CONSTRUCTION. TRAFFIC CONTROL NOTES 1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH 2010 EDITION OF CALIFORNIA MANUAL OF TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONE, AND THE CURRENT EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 2. THE CONTRACTOR SHALL MAINTAIN TRAFFIC FLOW IN BOTH DIRECTIONS IN CONFORMANCE WITH THE CURRENT EDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE APPROVED TRAFFIC CONTROL PLAN DURING WORKING HOURS OF 7:30 AM TO 4:00 'PM, MONDAY THROUGH FRIDAY, UNLESS OTHERWISE AUTHORIZED, NO WORK THAT OBSTRUCTS NORMAL TRAFFIC FLOW WILL BE ALLOWED DURING THE HOURS OF 4:00 PM TO 7:30 AM AND AT ALL TIMES SATURDAYS, SUNDAYS, AND LEGAL HOLIDAYS. THE PROJECT SPECIFICATIONS AND /OR CONDITIONS OF TRAFFIC CONTROL PLAN APPROVAL MAY FURTHER LIMIT WORKING HOURS 3. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. 4. ALL TRAVEL LAMES WILL BE A MINIMUM OF 12 -FEET WIDE UNLESS OTHERWISE SHOWN. 5. TRENCH PLATES TO BE PROVIDED WITH SKID RESISTANT SURFACE. 6. THE CONTRACTOR SHALL NOTIFY ALL ADJACENT PROPERTY OWNERS AND TENANTS OF PROPOSED POSSIBLE TRAFFIC DETOURS AT LEAST 72 HOURS PRIOR TO COMMENCING WORK. THE PROJECT SPECIFICATIONS MAY CONTAIN ADDITIONAL NOTIFICATION REQUIREMENTS THAT SHALL SUPERSEDE THIS REQUIREMENT. 7. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES DURING PROJECT CONSTRUCTION. " 1 14 4 7 =I S00 STRUSTRINOW. AB AGGREGATE BASE AC ASF'HALT CONCRETE APN ASSESSOR'S PARCEL NUMBER BC BEGIN CURVE BCR BEGIN CURB RETURN BVC BEGIN VERTICAL CURVE C &G CURB & GUTTER CO CLEAN OUT CONC CONCRETE EC END CURVE ECR END CURB RETURN EOP EDGE OF PAVEMENT EP END POINT EVC END VERTICAL CURVE EX EXISTING FG FINISH GRADE FL FLOWLINE FS FINISH SURFACE GV GAS VALVE HP HIGH POINT IE INVERT ELEVATION LF LINEAR FEET LP LOW POINT MB MAILBOX PCC PORTLAND CEMENT CONCRETE PCC POINT OF CONTINUOUS CURVE PP POWER POLE PRC POINT OF REVERSE CURVE PRV PRESSURE REDUCING VALVE PVMT PAVEMENT RET RETAINING RIM RIM ELEVATION SCO SEWER CLEANOUT SD STORM DRAIN SDG &E SAN DIEGO GAS & ELECTRIC SDRSD SAN DIEGO REGIONAL STANDARD DRAWING SMH SEWER MANHOLE STD STANDARD , SWK SIDEWALK TB TOP OF BERM TC TOP ;= CURB TS TRAFFIC SIGNAL WM WATER METER WV WATER VALVE EXISTING R/W 1' LEGEND ITEM SYMBOL 9 d PROPOSED PCC DRIVEWAY PROPOSED SIDEWALK PROPOSED 2" AC OVERLAY EXISTING EDGE OF PAVEMENT _12 _ 11' 2% MATCH EXISTING - I VARIES EX SIDEWALK TO BE REPLACED EX CURB & GUTTER 50' wi 50' EXISTING R/W 2" ASPHALT CONCRETE OVERLAY ALONG REPLACED DRIVEWAYS TYPICAL SECTION SOUTH COAST HIGHWAY 101 STA 101+00 - 105 +50 0 0 0 , , „ D. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT GREG SHIELDS AT (760) 633 - 2-'78, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 3. CONTRACTOR SHALL PROVIDE A 24 -HOUR TELEPHONE NUMBER AND NAME OF PERSON RESPONSIBLE FOR EMERGENCY WORK. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN ,INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER MAINTENANCE OF THE EROSION CONTROL DE` ✓ICES AS NECESSARY. & ALL EROSION CONTROL MEASURES REQUIRED TO RETAIN SEDIMENT ONSITE AND TO SAFELY DISCHARGE ANY ACCELERATED RUNOFF GENERATED BY THE PROJECT SHALL BE INSTALLED WHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40 PERCENT. 9, TEMPORARY EROSION CONTROL DEVISES WHICH INTERFERE WITH WORK SHALL BE RELOCATED OR MODIFIED AS THE WORK PROGRESSES AS RECOMMENDED BY THE ENGINEER OF WORK AND AS APPROVED BY THE CITY ENGINEER. 10. EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE CONTINUOUS CAPACITY AND ADEQUACY TO FUNCTION AS DESIGNATED. AFTER PRECIPITATION EXCEEDING ONE QUARTER (4) INCH IN ANY 12 -HOUR PERIOD OR UPON THE DIRECTION OF THE CITY ENGINEER, SILT AND DEBRIS SHALL BE REMOVED FROM CHECK DAMS. 11, THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS INTO AREAS WIRE IMPOUND WATER CREATES A HAZARDOUS CONDITION. NECESSARY PRECAUTIONS MAY INCLUDE, BUT NOT BE LIMITED TO, APPROPRIATE PERIMETER FENCING OR A 24 -HOUR GUARD PREVENTING UNAUTHORIZED PERSONS FROM ENTERING THE BASINS. 12. PAVED STREETS, SIDEWALKS, AND OTHER IMPROVEMENTS SHALL BE MAINTAINED IN A NEAT AND CLEAN CONDITION, FREE OF LOOSE SOIL, CONSTRUCTION DEBRIS, AND TRASH. STREET SWEEPING OR OTHER EQUALLY EFFECTIVE MEANS SHALL BE USED TO CLEAN STREETS EXCEPT FOR THE REMOVAL OF FINE MATERIAL NOT OTHERWISE REMOVED BY SWEEPING OR OTHER MECHANICAL MEANS. 13. STANDBY CREWS SHALL BE ALTERED BY THE CONTRACTOR FOR EMERGENCY WORK DURING RAINSTORMS. 14. GRAVEL BAGS AND NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES OR REPAIR ANY DAMAGED EROSION CONTROL MEASURES WHEN RAIN IS IMMII`'=NT. A STANDBY CREW SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. 15. ALL UTILITY TRENCHES SHALL BE BACK FILLED WITHIN 24 HOURS AND MUST BE BACK FILLED BEFORE THE END OF WORK DAY IF A 40 PERCENT, OR GREATER CHANCE OF RAIN IS PREDICTED. 16. A GRAVEL BAG SILT BASIN OR TRAP SHALL BE PROVIDED AT EVERY STORM DRAIN INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. `1 w EX TRASH CAN PROTECT IN PLACE-7\ 3 ki > a a I J T 105. 03� 106. EX TRAFFIC SIGNAL >a I 3 w POLE TO PROTECT w o a zz a IN PLACE a 0:� 0 °rW-z z EX CURB RAMP o \ TO REMAIN -i U o v ' D D v v D. D vI IN7. IQ -0 v � v D v D wD D w 258 - 163 -01 LLv F-- U) w 7 1/2" DRIVEWAY APRON STANDARD GRAY PER G -14A ® 4" SIDEWALK STANDARD GRAY MICP.O -ETCH 003 WITH TOOLED GRID PATTERN 2" ASPHALT CONCRETE OVERLAY 104. 103. 1 rell I SITZ 102. EX PLANTER AREA TO REPLANCE WITH PCC SIDEWALK PER RSD G -7 EX PLANTER EX TRASH CAN AREA 0 a EX STREETLIGHT PROTECT IN PLACE 0 a EX PLANTER > r't TO PROTECT U a z n i .N PLACE o >_';t AREA 3 i N cf ° w EX STREETLIGHT o w ° > TO PROTECT "� _j it w o a IN PLACE —� UIo a U° a N 258 - 163 -02 258 - 163 -03 ALLEY WIDTH TO BE PRPEARED BY CONTRACTOR & INSPECTOR WEAKENED PLANE JOINT -J O1 SAWCUT JOINT, 1/2" DEEP, 3' O.C. �}2 1/4" PRE — MOLDED EXPANSIO JOINTSET BELOW CONCRETE SURFACE, SAWCUT CONCRETE 4" DEEP TO COMPLETE JOINT, 18' O.C. �3 4" CONC, PAANG, COLOR AND FINISH PER NOTES CONCRETE PAVING WITH SAWCUT JOINTS NOT TO SCALE 0 0 '1 N v T D < v D 101. EX STREET SIGN TO PROTECT IN PLACE EX CURB RAMP TO REMAIN D v N7. v D is D D D D v CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT DESIGNED BY: DRAWN BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS s PUBLIC WORKS DEPARTMENT DRAWING NO. 0 PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: — _ APPROVED: IMPROVEMENT PLAN FOR: HIGHWAY 101 BEAUTIFICATION NONE HORIZONTAL: 1 ° =20' DATE: 3/i/�7 01, PHASE II aI -107 q �� d.I' R.C.E. NO.: 71087 MASH MAHER EDWARD DEAN.. VERTICAL: NONE Wr ®. !sy �l�/J� Mir 1. 'IA/.t/ i�1i DATE:_. —SO DA:zE: 3 / /% ENG EER'S NAME DATE I MATTHE J. WIDELSKI EXP.: 6/30/2017 R.CE. 4_2rk q R.C.E. 7 _ WORK ORDER NO: CS01E SHEET 3 OF 3