8271WORK TO BE DONE FLANS FOR THE CONSTRUCTION OF WORK TO BE DONE A. GENERAL URANIAIAVENUE NEIGHBORHOOD THE WITH IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE IN ACCORDANCE THE LATEST EDITION OF THE FOLLOWING DOCUMENTS: 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS 1. SAN DIEGO AREA REGIONAL STANDARD DRAWINGS CONSTRUCTION (MOST RECENT EDITION). THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ( "GREEN BOOK ") SAN DIEGO AREA REGIONAL STANDARD DRAWINGS (MOST RECENT EDITION). ANY CHANGES OR REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR INSPECTION. TRAFFIC CALMING 3. 4. STATE OF CALIFORNIA' DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARDS PLANS STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD SPECIFICATIONS 2. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFF -SITE GRADING. 5. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) IN THE 6. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL TO MUTCD 3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT PROPERTIES DURING GRADING ��J OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO THE SATISFACTION OF THE ENGINEER AT NO COST TO THE CITY. 0TY � � ENCMTAS 4. THE CONTRACTOR SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS DISTURBED OR DESTROYD DURING CONSTRUCTION SHALL BE REESTABLISHED AND REPLACED BY A STATE OF CALIFORNIA REGISTERED CIVIL ENGINEER OR STATE OF CALIFORNIA LICENSED LAND SURVEYOR TO THE SATISFACTION OF THE ENGINEER AND AT NO COST TO THE D. EROSION CONTROL CITY. 5. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT GREG SHIELDS AT RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY HEALTH STANDARDS, LAWS, AND (760) 633 -2778, 24 HOURS A DAY. REGULATIONS. PROJECT LOCATION 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL 6. GRADING AND EQUIPMENT OPERATING WITHIN ONE -HALF (j) MILE OF A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED BE CONDUCTED BETWEEN THE HOURS OF 4:00 PM AND 7:30 AM NOR ON SATURDAYS, SUNDAYS, AND CITY RECOGNIZED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID HOLIDAYS. S>> CONSTRUCTION OF TF4PORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. 7. THE STRUCTURAL SECTION OF ALL RESURFACING SHALL BE IN ACCORDANCE WITH THE CITY OF ENCINITAS ENGINEERING w STANDARDS, AS SHOWN ON THESE PLANS, AND AS APPROVED BY THE CITY ENGINEER. LEUCADIA 3. CONTRACTOR SHALL PROVIDE A 24 -HOUR TELEPHONE NUMBER AND NAME OF PERSON BLVD. z° RESPONSIBLE FOR EMERGENCY WORK. 8. APPROVAL OF THESE IMPROVEMENT PLANS DOES NOT CONSTITUTE APPROVAL OF ANY WORK OUTSIDE THE PROJECT z e s p BOUNDARY. ° 9tiT9y 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING n 9xyp ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF 9., ALL UNDERGROUND UTILITIES WITHIN THE STREET RIGHT -OF -WAY SHALL BE CONSTRUCTED, CONNECTED, AND TESTED o po PRODUCING RAINFALL. PRIOR TO CONSTRUCTION OF BERM, CURB, CROSS GUTTER, AND PAVING. v ENCINITAS 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY 10. THE EXISTENCE AND LOCATION OF EXISTING UNDERGROUND FACILITIES SHOWN ON THESE PLANS WERE OBTAINED FROM A r "< 821 5 BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR BASE UTILITY MAP AND SEARCH OF THE AVAILABLE RECORDS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, THE s9 6Ng� UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. CONTRACTOR IS REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT EXISTING FACILITIES SHOWN HEREON AND OTHERS WHICH ARE NOT OF RECORD OR NOT SHOWN ON THESE PLANS. a 6. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF REQUEZA ST o EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS 11. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL CONFIRMED BY FIELD FORTY PERCENT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS RAINFALL. (POTHOLING) AND LOCATE ALL EXISTING UNDERGROUND FACILITIES IN THE PROJECT AREA SUFFICIENTLY AHEAD OF S.. an 9s CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF j SANTA FE D IVE 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER MAINTENANCE OF THE EXISTING FACILITIES. N EROSION CONTROL DEVICES AS NECESSARY. 12, A. CONTRACTOR SHALL NOTIFY THE SAN DIEGO GAS &ELECTRIC COMPANY PRIOR TO STARTING WORK NEAR COMPANY - R z 8. ALL EROSION CONTROL MEASURES REQUIRED TO RETAIN SEDIMENT ONSITE AND TO RE FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 800 - 422 -4133 (DIG ALERT) sgtiypyp SAFELY DISCHARGE ANY ACCELERATED RUNOFF GENERATED BY THE PROJECT SHALL z° R p OFF BE INSTALLED WHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40 PERCENT. B. THE CONTRACTOR SHALL NOTIFY THE AT &T COMMUNICATIONS COMPANY PRIOR TO STARTING WORK NEAR COMPANY ;.;.: BIRMINGHAM FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 619 -546 -3606 DRIVE w 9 OMODIFIEDNASOTHDEEWORK' .. �c�� S9 REMOCATED OR PROGRESSESFASERECOMM�NDEDHBYLTHE C. THE CONTRACTOR SHALL NOTIFY SAN DIEGUITO WATER DISTRICT PRIOR TO STARTING WORK NEAR COMPANY OP P, ENGINEER OF WORK AND AS APPROVED BY THE CITY ENGINEER. FACILITIES AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1 -760- 633 -2709 5 10. EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE D. THE CONTRACTOR SHALL NOTIFY COX CABLE TELEVISION PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND Z 0 CONTINUOUS CAPACITY AND ADEQUACY TO FUNCTION AS DESIGNATED. AFTER SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1 -800- 422 -4133 (DIG ALERT) P,� PRECIPITATION EXCEEDING ONE QUARTER (4) INCH IN ANY 12 -HOUR PERIOD OR UPON �p�'G THE DIRECTION OF THE CITY ENGINEER, SILT AND DEBRIS SHALL BE REMOVED FROM E. THE CONTRACTOR SHALL NOTIFY THE SAN ELIJO JPA COMPANY PRIOR TO STARTING WORK NEAR COMPANY FACILITIES d CHECK DAMS. (RECLAIMED WATER) AND SHALL COORDINATE SAID WORK WITH COMPANY REPRESENTATIVES. 1- 760 - 753 -6203 (EXT 32) SAN ELIJO 11. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS 13. THE CONTRACTOR SHALL PROTECT EXISTING LANDSCAPING AND IMPROVEMENTS REMAINING IN PLACE AND THAT ARE NOT LAGOO TO PREVENT PUBLIC TRESPASS INTO AREAS WHERE IMPOUND WATER CREATES A CALLED OUT TO BE REMOVED ON THESE PLANS. NO LANDSCAPING OR IMPROVEMENTS SHALL BE DAMAGED OR REMOVED i S21 HAZARDOUS CONDITION. NECESSARY PRECAUTIONS MAY INCLUDE, BUT NOT BE LIMITED PRIOR TO APPROVAL OF THE CITY. TO, APPROPRIATE PERIMETER FENCING OR A 24 -HOUR GUARD PREVENTING UNAUTHORIZED PERSONS FROM ENTERING THE BASINS. 14. EXCEPT WHEN WORK IS BEING DONE ON DRIVEWAYS, THE CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS AT ALL TIMES. 12. PAVED STREETS, SIDEWALKS, AND OTHER IMPROVEMENTS SHALL BE MAINTAINED IN A VICINITY MAP NEAT AND CLEAN CONDITION, FREE OF LOOSE SOIL, CONSTRUCTION DEBRIS, AND 15. ALL PRIVATE IMPROVEMENTS IN THE PUBLIC RIGHT OF WAY DESIGNATED TO BE REMOVED SHALL BE SALVAGED AND TRASH. STREET SWEEPING OR OTHER EQUALLY EFFECTIVE MEANS SHALL BE USED TO RETURNED TO THE PROPERTY OWNER. ALL PRIVATE IMPROVEMENTS OUTSIDE THE PUBIC RIGHT OF WAY, THAT ARE NOT NOT TO SCALE CLEAN STREETS EXCEPT FOR THE REMOVAL OF FINE MATERIAL NOT OTHERWISE DESIGNATED TO BE REMOVED, THAT ARE DAMAGED DURING CONSTRUCTION OF THE PROJECT SHALL BE REPAIRED BY THE REMOVED BY SWEEPING OR OTHER MECHANICAL MEANS. CONTRACTOR AT NO COST TO THE CITY. 13. STANDBY CREWS SHt L BE ALTERED BY THE CONTRACTOR FOR EMERGENCY WORK 16. THE CONTRACTOR SHALL NOTIFY IN WRITING AND OBTAIN APPROVAL OF THE CITY ENGINEER OF WORK PRIOR TO MAKING DURING RAINSTORMS. CHANGES IN THE FIELD. q 14. GRAVEL BAGS AND NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND 17. NOTES AND DETAILS ON THE PLANS SHALL TAKE PRECEDENCE OVER THESE GENERAL NOTES IN CASE OF CONFLICT. PROJECT LOCATION STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES OR REPAIR ANY DAMAGED EROSION CONTROL MEASURES WHEN 18. THE CONTRACTOR SHALL MAINTAIN AN UP TO DATE SET OF AS -BUILT DRAWINGS ON WHICH ALL CHANGES OR, VARIATIONS ALONG URANIA AVENUE AT THE RAIN IS IMMINENT. A STANDBY CREW SHALL BE MADE AVAILABLE AT ALL TIMES IN THE WORK, INCLUDING UTILITIES ARE RECORDED. A COPY OF SAID AS -BUILT DRAWINGS SHALL BE PROVIDED TO THE INTERSECTION OF SANDY COURT. DURING THE RAINY SEASON. CITY OF ENCINITAS WHEN REQUESTED. ENCINITAS, CALIFORNIA 92024 - 15. ALL UTILITY TRENCHES SHALL BE BACK FILLED WITHIN 24 HOURS AND MUST BE BACK 19. MATERIAL OF DEBRIS SHALL NOT BE STORED OR REMAIN IN THE PUBLIC RIGHT OF WAY WITHOUT APPROVAL BY THE CITY FILLED BEFORE THE END OF WORK DAY IF A 40 PERCENT, OR GREATER CHANCE OF RAIN IS PREDICTED. C. GRADING 20. OCCIUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) NOTE: THE CONTRACTOR IS REQUIRED TO OBTAIN A PERMIT 16. A GRAVEL BAG SILT BASIN OR TRAP SHALL BE PROVIDED AT EVERY STORM DRAIN FROM OSHA PRIOR TO COMMENCING CONSTRUCTION OF TRENCHES OF EXCAVATIONS WHICH ARE 5 FOOT OR DEEPER AND 1. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE DRAINAGE INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. INTO WHICH A PERSON IS REQUIRED TO DESCEND. AND PREVENT PONDING OF WATER. HE /SHE SHALL CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR TO FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURES TO + PREVENT EROSION OF FRIENDLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. SHEET I N D E X IMPERVIOUS AREA B. NOTIFICATIONS A4 2. ALL TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED iN ACCORDANCE IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 500 SQFT AREAS SHEET DESCRIPTION IMPERVIOUS AREA AFTER CONSTRUCTION: 500 SQFT 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON WITH STANDARD SPECIFICATIONS. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED 1 TITLE SHEET INCREASE IN IMPERVIOUS AREA: 0 SQFT THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. LOOSE FILL AND ALLUVIAL KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE SOILS SHALL BE SCARIFIED TO A DEPTH OF 6" AND THEN COMPACTED TO A MINIMUM OF 92 PERCENT. IT 2 INDEX MAP, TYPICAL SECTIONS & DETAILS IMPERVIOUS AREA REPLACED: 500 SQFT CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING SHALL BE THE CONTRACTORS RESPONSIBILITY TO PLACE, SPREAD, WATER, AND COMPACT THE FILL IN STRICT 3 SPEED CUSHION & STORMDRAIN PLAN UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCORDANCE WITH SPECIFICATIONS. CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK: SMOOTH SURFACES AND UNIFORM CROSS SECTIONS. THE SLOPES OF EXCAVATIONS AND EMBANKMENTS SHALL A. SEWERS - LWD - (760)- 753 -0155 BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND B. GAS & ELECTRIC - SDGE - (760) -438 -6200 E ORDERLY CONDITION. ALL STONES, ROOTS, AND OTHER WASTE MATTER EXPOSED OR EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE ROUNDED IN BMP PROJECT STATUS C. WATER SAN DIEGUITO WATER DISTRICT -1- 800 - 227 -2600 ACCORDANCE WITH THE GRADING ORDNANCE. D. TELEPHONE - SBC BELL - (760)- 489 -3411 Q`gQFE5Slp,Vq E. CABLE TV - COX COMMUNICATIONS- (760)- 806 -9809 X -2233 4. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED AN6 HAULED OFF ®�a� ®sevy`�g�y F. RECLAIMED WATER -SAN ELIJO JPA ,r THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH` A NEAT AND ' ���� o STANDARD sTORMWATER TREATMENT FACILITIES To BE MAINTAINED BY FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF LOCATION OF DEBRLS= ALL SHALE, QE � �� "� m I �-` FIELD OPERATIONS CITY OF ENCINITAS PUBLIC WORKS DEPT. IN ACCORDANCE WITH 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEERS OFFICE 48 HOURS PRIOR TO SECURED FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL - a C79J/ "MAINTENANCE AGREEMENT. BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760) - 633 -2770. ,.. F ` 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. 5. THE CONTRACTOR SHALL MAINTAIN ADEQUATE DUST CONTROL MEASURES THROUGHOUT THE` DURATION OF THE PROJECT CONSTRUCTION. PROJECT SITE MAINTENANCE SHALL CONFORM TO SECTIW 7 8 OF =THE A , DFCAL�F�� PHONE: (760) 633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT STANDARD SPECIFICATIONS. TO REJECTION AND REMOVAL. SIGN DATE CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT DESIGNED BY: DRAWN Mjvv BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. Al;- OUILT Lf PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED: APPROVE IMPROVEMENT F 4N FOR: HORIZONTAL: NONE DATE. I012AI20)1 jz URANIA AVENUE NEIGHBORHOOD SEE SHEET 54 TRAFFIC CALMING SI -1 O6 VERTICAL: NONE �® ,4 ®� ®, R.C.E. NO.: 71087 /D ZS /G+ O /6 254 - 400 -10 ENGINEER' NAME DATE MATTHEW J. WIDELSKI EXP.: 6/30/2017 DATE: DATE : 22C R.C.E.--4-AR-11 R.C.E. CIS. WORK ORDER NO: CS14G SHEET 1 OF 3 Wg N Cl Cl C rn o, rI 0 0 V 6) E v tiz a, 0 a v m n a� C CL a) 3 m E E. IMPROVEMENTS 1. A PERMIT SHALL BE OBTAINED FROM THE ENCINITAS SERVICES DEPARTMENT FOR ANY WORK WITHIN THE STREET RIGHTOOF -WAY AT NO COST TO THE CONTRACTOR. 2. APPROVAL OF THESE IMPROVEMENT PLANS AS SHOWN DOES NOT CONSTITUTE APPROVAL OF ANY CONSTRUC1ON OUTSIDE THE PROJECT BOUNDARY. A PERMIT SHALL BE OBTAINED FROM THE ENCINITAS ENGINEERING SERVICES DEPARTMENT ANY WORK WITHIN THE STREET RIGHT -OF -WAY AT NO COST TO THE CONTRACTOR. 3. ALL UNDERGROUND UTILITIES WITHIN THE RIGHT -OF WAY SHALL BE CONSTRUCTED, CONNECTED AND TESTED PRIOR TO CONSTRUCTION OR BERM, CURB, CROSS GUTTER AND PAVING. 4. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL BE CONFORMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES. 5. THE CONTRACTOR SHALL ENFORCE ALL MEASURES. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN SAFETY DEVICES AS APPROVED BY THE CITY ENGINEER, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS, AND REGULATIONS. 6. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONUMENTATION AND /OR ANY BENCHMARKS WHICH WILL BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH POINTS SHALL BE REFERENCED AND REPLACED WITH APPROPRIATE MONUMENTATION SET BY A STATE OF CALIFORNIA LICENSED LAND SURVEYOR OR A REGISTERED CIVIL ENGINEER AUTHORIZED TO PRACTICE LAND SURVEYING. A CORNER RECORD OR RECORD OF SURVEY, AS APPROPRIATE, SHALL BE FILED BY THE STATE OF CALIFORNIA LICENSED LAND SURVEYOR OR REGISTERED CIVIL ENGINEER, AS REQUIRED BY THE LAND SURVEYORS ACT. 8. THE LOCATION OF EXISTING BUILDINGS SHOWN ON THESE PLANS ARE APPROXIMATE. 9. THE CONTRACTOR IS RESPONSIBLE TO POTHOLE AND LOCATE ALL EXISTING SUBSURFACE UTILITIES, PRIOR TO THE START OF DEMOLITION OR CONSTRUCTION. ANY EXISTING UTILITIES THAT REQUIRE REMOVAL OR RELOCATION SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY AGENCY PRIOR TO THE BEGINNING OF CONSTRUCTION. IF DURING POTHOLING THE CONTRACTOR DISCOVERS A POTENTIAL CONFLICT BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CITY. THE CONTRACTOR SHALL ALLOW AMPLE TIME FOR REVISIONS TO BE MADE TO THE PLANS TO AVOID CONFLICTS PRIOR TO THE START OF UTILITY INSTALLATION. 10. THE CONTRACTOR SHALL REQUEST MARKOUT OF EXISTING UNDERGROUND UTILITIES BY CALLING THE LISTED REGIONAL NOTIFICATION CANTER FOR AN INQUIRY IDENTIFICATION NUMBER, AT LEAST (2) DAYS PRIOR .TO .START OF ANY CONSTRUCTION. TRAFFIC CONTROL NOTES 1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH 2010 EDITION OF CALIFORNIA MANUAL OF TRAFFIC CONTROL FOR CONSTRUCTION AND MAINTENANCE WORK ZONE, AND THE CURRENT EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). 2. THE CONTRACTOR SHALL MAINTAIN TRAFFIC FLOW IN BOTH DIRECTIONS IN CONFORMANCE WITH THE CURRENT EDITION OF THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE APPROVED TRAFFIC CONTROL PLAN DURING WORKING HOURS OF 7:30 AM TO 4:00 PM, MONDAY THROUGH FRIDAY, UNLESS OTHERWISE AUTHORIZED, NO WORK THAT OBSTRUCTS NORMAL TRAFFIC FLOW WILL BE ALLOWED DURING THE HOURS OF 4 :00 PM TO 7:30 AM AND AT ALL TIMES SATURDAYS, SUNDAYS, AND LEGAL HOLIDAYS. THE PROJECT SPECIFICATIONS AND /OR CONDITIONS OF TRAFFIC CONTROL PLAN APPROVAL MAY FURTHER LIMIT WORKING HOURS 3. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. A. ALL TRAVEL LAMES WILL BE A MINIMUM OF 12 -FEET WIDE UNLESS OTHERWISE SHOWN. 5. TRENCH PLATES TO BE PROVIDED WITH SKID RESISTANT SURFACE. 6. THE CONTRACTOR SHALL NOTIFY ALL ADJACENT PROPERTY OWNERS AND TENANTS OF PROPOSED POSSIBLE TRAFFIC DETOURS AT LEAST 72 HOURS PRIOR TO COMMENCING WORK. THE PROJECT SPECIFICATIONS MAY CONTAIN ADDITIONAL NOTIFICATION REQUIREMENTS THAT SHALL SUPERSEDE THIS REQUIREMENT. 7. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED AT ALL TIMES DURING PROJECT CONSTRUCTION. ee� r' C,¢ ^, I of ABBREVIATIONS AB AGGREGATE BASE AC ASPHALT CONCRETE APN ASSESSOR'S PARCEL NUMBER BC BEGIN CURVE BCR BEGIN CURB RETURN BVC BEGIN VERTICAL CURVE C &G CURB & GUTTER CO CLEAN OUT CONC CONCRETE EC END CURVE ECR END CURB RETURN EOP EDGE OF PAVEMENT EP END POINT EVC END VERTICAL CURVE EX EXISTING FG FINISH GRADE FL FLOWLINE FS FINISH SURFACE GV GAS VALVE HP HIGH POINT IE INVERT ELEVATION LF LINEAR FEET LP LOW POINT MB MAILBOX PCC PORTLAND CEMENT CONCRETE PCC POINT OF CONTINUOUS CURVE PP POWE( POLE PRO POINT OF REVERSE CURVE PRV PRESSURE REDUCING VALVE PVMT PAVEMENT RET RETAINING RIM RIM ELEVATION SCO SEWER CLEANOUT SO STORM DRAIN. SDG &E SAN DIEGO GAS & ELECTRIC SDRSD SAN DIEGO REGIONAL STANDARD DRAWING SMH SEWER MANHOLE STD STANDARD SWK SIDEWALK TB TOP OF BERM TO TOP OF CURB TS TRAFFIC SIGNAL WM WATER METER WV WATER VALVE LEGEND ITEM SYMBOL PROPOSED CROSSWALK STRIPING PROPOSED CURB, RAMP PROPOSED CURB INLET EXISTING STORMDRAIN PROPOSED SPEED CUSHION EXISTING EDGE OF PAVEMENT EXISTING FENCE EXISTING WATER VALVE EXISTING FIRE HYDRANT EXISTING WATER METER EXISTING SIGN EXISTING TREE �Jlll CL f � TRAFFIC LOGIX SPEED CUSHION SPECIFICATIONS • GENERAL DESCRIPTION: SPEED CUSHIONS OF VARIOUS DIMENSIONS MIGHT BE FROM IN CASE EMERGENCY WORK IS REQUIRED, CONTACT GREG SHIELDS AT BENCHMARK STANDARD INTERLOCKING MODULES OF THE BASIC FOOTPRINT DIMENSIONS 18" BY 42 ". 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL E4CH UNIT IS BOLTED TO THE ROAD USING SIX LAG BOLTS J" DIA. THROUGH A ENGINEERING DIVISION APPROVALS ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID ELASTIC SHIELD INSTALLED IN THE PAVEMENT. THE TRAFFIC LOGIX PROPRIETARY TWO MJW IMMINENT. DIRECTIONAL TONGUE AND GROVE INTERLOCKING SYSTEM PROV {DES ADDITIONAL J RESPONSIBLE FOR EMERGENCY WORK. CONNECTION BETWEEN THE MODULES AND INCREASES STABILITY OF THE SPEED ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF CUSHION. PRODUCING RAINFALL. 5. • DIMENSIONS OF THE MODULES: BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR •• WIDTH 18" (+/-1/16") ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF •• LENGTH 42" ( +/ -1/8 ") FORTY PERCE",IT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH •• THICKNESS 3" ( +/ -1/8 ") THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER MAINTENANCE OF THE • DIMENSIONS OF THE SPEED CUSHIONS (WIDTH AND LENGTH OF SPEED CUSHION SAFELY DISCHARGE ANY ACCELERATED RUNOFF GENERATED BY THE PROJECT SHALL ADJUSTABLE) BE INSTALLED WHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40 PERCENT. 9. •• WIDTH FROM 36" UP, BY 18" INCREMENTS RELOCATED OR MODIFIED AS THE WORK PROGRESSES AS RECOMMENDED BY THE •• LENGTH FROM 84" UP BY 42" INCREMENTS EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE •• HEIGHT OF CUSHION 3" PRECIPITATION EXCEEDING ONE QUARTER (j) INCH IN ANY 12 -HOUR PERIOD OR UPON • STANDARD SPEED CUSHION DIMENSIONS: CHECK DAMS. 11. •• WIDTH 72" TO PREVENT PUBLIC TRESPASS INTO AREAS WHERE IMPOUND WATER CREATES A •• LENGTH 84" TO, APPROPRIATE PERIMETER FENCING OR A 24 -HOUR GUARD PREVENTING •• HEIGHT OF CUSHION 3" PAVED STREETS, SIDEWALKS, AND OTHER IMPROVEMENTS SHALL BE MAINTAINED IN A • ENTRANCE AND EXIT GRADIENT: 7% TRASH. STREET SWEEPING OR OTHER EQUALLY EFFECTIVE MEANS SHALL.BE USED TO • SIDE GRADIENT: 35% REMOVED BY SWEEPING OR OTHER MECHANICAL MEANS. 13. • MATERIAL: COMPRESSION MOLDED 100% RECYCLED SYNTHETIC AND NATURAL RUBBER 14. GRAVEL BAGS AND NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND COMPOSITE STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF • PHYSICAL PROPERTIES: RAIN IS IMMINENT. A STANDBY CREW SHALL BE MADE AVAILABLE AT ALL TIMES •• TENSILE STRENGTH: MINIMUM 500 PSI ALL UTILITY TRENCHES SHALL BE BACK FILLED WITHIN 24 HOURS AND MUST BE BACK •• SHORE HARDNESS 70A RAIN IS PREDICTED. 16. •• SPECIFIC GRAVITY 1.1 INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. BASIS OF COORDINATES NAD'83 (1991.35 EPOCH) a€ 4AQFESS /q ' • MARKING: RUBBER MODULES ARE AVAILABLE IN BLACK OR BLACK WITH YELLOW JOSEp "134WCCS1" IN SIDEWALK AT BRASS DISC STAMPED REFLECTIVE TAPE PR BLACK WITH WHITE REFLECTIVE TAPE. WELL S.E. QUAD. OF LEUCADIA "ENC -25 L.S. 7322" IN WELL MON. IN THE MIDDLE OF THE BLVD. AND ORPHEUS AVE. MON. IN THE MIDDLE OF THE INTERSECTION OF S. EL ° N 1968854.614' INTERSECTION OF S. EL PORTAL ST. & LA MESA AVE E 6242001.192' PORTAL ST. & LA MESA AVE. N 1965570.266' x $A, C 71087 RECORD OF SURVEY 18416 ELEV. 60.601 FEET DATUM: NAVD 88 CIVIL, ®f CALW D. EROSION CONTROL 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT GREG SHIELDS AT BENCHMARK (7F0) 633 -2778, 24 HOURS A DAY. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL """v�" ter: TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ENGINEERING DIVISION APPROVALS ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID DRAWING NO. CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS MJW IMMINENT. 3. CONTRACTOR SHALL PROVIDE A 24 -HOUR TELEPHONE NUMBER AND NAME OF PERSON J RESPONSIBLE FOR EMERGENCY WORK. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF RECOMMENDED: APPROVE DATE: /� yS• /�i DATE:/Q iS g R.C.E. rs 71 R.GE PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCE",IT (40 %). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER MAINTENANCE OF THE EROSION CONTROL DEVICES AS NECESSARY. 8. ALL EROSION CONTROL MEASURES REQUIRED TO RETAIN SEDIMENT ONSITE AND TO SAFELY DISCHARGE ANY ACCELERATED RUNOFF GENERATED BY THE PROJECT SHALL BE INSTALLED WHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40 PERCENT. 9. TEMPORARY EROSION CONTROL DEVISES WHICH INTERFERE WITH WORK SHALL BE RELOCATED OR MODIFIED AS THE WORK PROGRESSES AS RECOMMENDED BY THE ENGINEER OF WORK AND AS APPROVED BY THE CITY ENGINEER. 10. EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE CONTINUOUS CAPACITY AND ADEQUACY TO FUNCTION AS DESIGNATED. AFTER v PRECIPITATION EXCEEDING ONE QUARTER (j) INCH IN ANY 12 -HOUR PERIOD OR UPON THE DIRECTION OF THE CITY ENGINEER, SILT AND DEBRIS SHALL BE REMOVED FROM CHECK DAMS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS INTO AREAS WHERE IMPOUND WATER CREATES A HAZARDOUS CONDITION. NECESSARY PRECAUTIONS MAY INCLUDE, BUT NOT BE LIMITED TO, APPROPRIATE PERIMETER FENCING OR A 24 -HOUR GUARD PREVENTING UNAUTHORIZED PERSONS FROM ENTERING THE BASINS. 12. PAVED STREETS, SIDEWALKS, AND OTHER IMPROVEMENTS SHALL BE MAINTAINED IN A NL.',T AND CLEAN CONDITION, FREE OF LOOSE SOIL, CONSTRUCTION DEBRIS, AND TRASH. STREET SWEEPING OR OTHER EQUALLY EFFECTIVE MEANS SHALL.BE USED TO CLEAN STREETS EXCEPT FOR THE REMOVAL OF FINE MATERIAL NOT OTHERWISE REMOVED BY SWEEPING OR OTHER MECHANICAL MEANS. 13. STANDBY CREWS SHALL BE ALTERED BY THE CONTRACTOR FOR EMERGENCY WORK DURING RAINSTORMS. 14. GRAVEL BAGS AND NECESSARY MATERIALS SHALL BE AVAILABLE ON SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES OR REPAIR ANY DAMAGED EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. A STANDBY CREW SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. 15. ALL UTILITY TRENCHES SHALL BE BACK FILLED WITHIN 24 HOURS AND MUST BE BACK FILLED BEFORE THE END OF WORK DAY IF A 40 PERCENT, OR GREATER CHANCE OF RAIN IS PREDICTED. 16. A GRAVEL BAG SILT BASIN OR TRAP SHALL BE PROVIDED AT EVERY STORM DRAIN INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. BASIS OF COORDINATES NAD'83 (1991.35 EPOCH) BENCHMARK 1025 (ENC -25) 1024 (134WCCS1) 1025 (ENC -25) 2" SO. CITY OF ENCINITAS 2 1/2" DISK STAMPED 2" SO. CITY OF ENCINITAS BRASS DISC STAMPED "134WCCS1" IN SIDEWALK AT BRASS DISC STAMPED "ENC -25 L.S. 7322" IN WELL S.E. QUAD. OF LEUCADIA "ENC -25 L.S. 7322" IN WELL MON. IN THE MIDDLE OF THE BLVD. AND ORPHEUS AVE. MON. IN THE MIDDLE OF THE INTERSECTION OF S. EL ° N 1968854.614' INTERSECTION OF S. EL PORTAL ST. & LA MESA AVE E 6242001.192' PORTAL ST. & LA MESA AVE. N 1965570.266' RECORD OF SURVEY 18416 RECORD OF SURVEY 18416 E 6239988.375' RECORD OF SURVEY 18416 ELEV. 60.601 FEET DATUM: NAVD 88 CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE AS -BUILT "c "`' "c" ter: """v�" ter: ` "c" t" �r: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. JW MJW A s - SUI L J -4/ SEE ABOVE HORIZONTAL: NONE VERTICAL: NONE PLANS PREPARED UNDER SUPERVISION OF DATE : R.C.E. NO' 71087 MATTH J. WIDELSKI EXP.: 6/30/2017 RECOMMENDED: APPROVE DATE: /� yS• /�i DATE:/Q iS g R.C.E. rs 71 R.GE IMPROVEMENT PLAN FOR: URANIA AVENUE NEIGHBORHOOD TRAFFIC CALMING 254 - 400 -10 WORK ORDER NO: CS14G SI -1 U6 ENGINE S NAME DATE SHEET 2 OF 3 EX 12" PVC STORMDRAIN--\ E SIGN W11-2 �FAI NIODIFI INSTALLI-CURB INLET TYPE B; L=5' PER SDRSD D-2. CONNECT ONNECT INVERT TO EX 12" PVC IN W W 1.111 llIl 1. - INSTALL TRAFFIC SIGN W11-2 & W16-7 INSTALL CURB RAMP TYPE C, WITH BLACK TRUNCATED DOMES PER SDRSD G-29 s w w wv INSTALL LADDER CROSSWALK PER 2015 CALTRANS STANDARD PLAN A24F 1 1 �i INSTALL TRAFFIC SIGN W11-2 & W16-7 tl SIGN W8-1 INSTALL TRAFFIC LOGIC SPEED CUSHION BLACK WITH DOUBLE CHEVRON ARROWS PER DE AILS SHEET 2 Ar� DRWy- CAUTION: HIGH PRESSURE GAS LINE" V3 j li ii w W - ------ - -- ---- to II ti m W8_l & W13-1p 11 I 10, 7' SIGN W13-11' -EX CATCH BASIN- -TO REMAIN INSTALL TRAFFIC SIGN W8-1 & W13 -1P AC DRWY W w I i CHANGE NO. DESC�IPTION APPROVED DATE BENCHMARK SCALE AS-BUILT DESIGNED BY: I DRAWN BY. 1 CHECKED BY: ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO]. I Mjw tu 67V LLT PLANS PREPARED UNDER SUPERVISION OF DATE: lo/Z4 zm(p RECOMMENDED: APPROVED./,07 IMPROVEMENT PLAN FOR: URANIA AVENUE NEIGHBORHOOD SEE SHEET 2 HORIZONTAL: 1"=10' TRAFFIC CALMING SI-106 VERTICAL: NONE %AtL. I Mm R.C.E. NO.: 71087 NAAm. a. im4fm MATTHEW J. WIDELSKI EXP.: ElIV2017 EDWARD DEANE- GLENN PRUfM DATE: 10 re DATE R.C.E._O� I 254-400-10 WORK ORDER NO: CS1 4G ENGINEER'S NAME DATE SHEET 3 OF 3 i