Loading...
2013 11784-I (Plans)GENERAL NOTES 1. NO ACCESS OR WORK SHALL BE PERFORMED W9774IN CITY RIGHT OF WAY WITHOUT A FULL KNOWLEDGE OF ASSIGNED CITY INSPECTOR WHO SHALL BE GIVEN NOT LESS THAN 48 HOURS ADVANCE N0710E OF THE 1N177ATION OF PERMIT USE AT 7601633 -2796 OR AS STATED ON THE PERMIT 2. AT LEAST 48 HOURS PRIOR TO STARTING OF WORK, UNDERGROUND SERVICE ALERT (USA) SHALL BE N077FIED FOR LOCATION OF UNDERGROUND U77LI77ES AT 1- 800- 422 -4133. THE PROPOSED DIG AREA MUST BE MARK IN WHITE PAINT PRIOR TO CONTACTING (USA) J. ALL WORK COVERED BY THIS PERMIT SHALL BE PERFORMED BY A CONTRACTOR POSSESSING A VALID CALIFORNIA CONTRACTORS LICENSE OF THE APPROPRIATE CLASS 4. ALL TRAFFIC CONTROLS WITHIN THE CONSTRUCTION AREA SHALL BE SUBJECT TO AN APPROVED TRAFFIC CONTROL PLANS AND SHALL BE FLAGGED AND BARRICADED TO 774E SA7ISFAC71ON OF THE CITY INSPECTOR IN COMPLIANCE WITH THE "WORK AREA TRAFFIC CONTROL HANDBOOK ", LATEST EDI77ON PUBLISHED BY BUILDING NEWS INC. IN THE EVENT THAT THE INSPECTOR DETERMINES PROPER TRAFFIC CONTROL IS NOT PLACE, ALL WORK SHALL BE CEASE AND PERMITTEE AUTHORIZES THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE TO ORDER, ON THE RENTAL BASIS, SUCH AS TRAFFIC CONTROL DEVICES AS SHALL BE NECESSARY AND PROPER TO PR07ECT THE PUBLIC SAFETY AND FURTHER AGREES TO PAY ANY AND ALL COST AND CHARGES THAT THE CITY MAY INCUR IN PROVIDING SAID TRAFFIC CONTROL 5. APPLICANT AGREES THAT IT SHALL BE HIS RESPONSIBILITY TO PROVIDE THE CONTRACTOR, SUBCONTRACTOR, OR ANY 07HER AGENT RESPONSIBLE FOR CONSTRUCTION OF PERMITTED WORKS WITHIN THE CITY RIGHT OF WAY, WITH A COPY OF THE PERMIT INCLUDING THESE STANDARD COND177ONS AND A COMPLETE SET OF APPROVED PLANS. THE PERMIT, PLANS AND WORK AREA TRAFFIC CONTROL HANDBOOK SHALL BE AVAILABLE AT THE PERMIT S17E WHENEVER WORK IS IN PROGRESS 6. PERMITTED WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY SPECIFICATIONS AND APPROVED PLANS, SUBJECT TO INSPECTION AND SUBJECT TO INSPECTION AND APPROVED BY THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTA7IVE. CERTIFICATION OF ALL MATERIALS AND WORK, INCLUDING COMPACTION TES7S SHALL BE FURNISHED BY THE APPLICANT UPON REQUEST BY 7HE CITY INSPECTOR. PAYMENT FOR ANY COMPACTION 7ES71NO SHALL BE BY THE PERMITTEE. CER71FICA77ON SHALL BE MADE BY A CERTIFIED TESTING AGENCY OR FIRM ACCEPTABLE BY THE CITY. 7. NO WORK WITHIN THE PUBLIC RIGHT OF WAY IS PERMITTED ON SATURDAY, SUNDAY, OR HOLIDAYS ANY DEVIA77ON FROM THE WORK SCHEDULE PRESENTED IN THIS CONDITIONS MUST RECEIVE PRIOR, WRITTEN APPROVAL OF THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. ANY QUES71ONS REGARDING DAYS CITY IS CLOSED, CALL 7601633 -2770. 8. NO WORK ON ANY PUBLIC ROADWAY, EXCLUDING PRIME ARTERIAL AND MAJOR ROAD SHALL BE STARTED BEFORE 7.•30 AM OR CONTINUE AFTER 5:00 PM ON WEEKDAYS 9. NO WORK SHALL BEGIN BEFORE 9:00 AM OR CON71NUE AFTER 3.•00 PM ON PRIME ARTERIALS AND 0774ER MAJOR ROADS, UNLESS AUTHORIZED ON PERMIT BY THE DIRECTOR OF ENGINEERING SERVICES ALL WORK ON PRIME ARTERIALS AND 07HER MAJOR ROAD AS SHOWN ON THE CIRCULA71ON ELEMENT OF 774E CITY GENERAL PLAN, WILL REQUIRE A TRAFFIC CONTROL PLAN ACCEPTABLE TO THE CITY TRAFFIC ENGINEER WHOSE OFFICE CAN BE CONTACTED AT 7601633 -2704 10. THE ROAD SHALL BE CLEAN AND FREE OF ALL OBSTRUCTION AND COMPLETELY OPEN TO ALL 7RAMC AT THE END OF WORKING DAY. (NO LATTER THAN 3.00 PM ON MAJOR ROADS, DEFINED HEREIN) 11. TWO WAY 7RAFFC SHALL BE MAINTAINED AT ALL TIMES MINIMUM TRAVEL LANE WIDTH FOR MOTOR VEHICLES SHALL BE 12 FEET. IF STREET WID7H PREVENT MAINTAINING TWO WAY TRAFFIC, PERMIT7EE AND DIRECTOR OF ENGINEERING SERVICES SHALL AGREE ON A ADEQUATE TRAFFIC CONTROL PLAN PRIOR TO STARING OF WORK, WHICH SHALL INCLUDE THE USE OF A FLAGMAN. 12. ALL EXCAVATION IN EXISTNG PAVEMENT SHALL BE SAWCAUT TO NEAT LINES AND AC REPLACEMENT SHALL BE MADE TO THE SA7ISFAC71ON OF THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. 13. OPEN TRENCH MUST BE BACKFILLED WITH AT LEAST 2" OF COLD MIX ASPHALT OR METAL PLATED ACCORDING TO CITY SPECIFICATIONS DURING NON WORKING HOURS METAL PLATES ARE REQUIRED TO HAVE COLD MIX ASPHALT RAMPS ON ALL (4) SIDES AND MUST BE MAINTAINED 14. NAIVE MATERIAL MAY BE USED UPON APPROVAL OF THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE. REFER TO CITYS STANDARD DRAWING DATED SEPTEMBER 30, 1996 15. TWO SACK SAND - CEMENT SLURRY BACKFILL SHALL BE REQUIRED WHEN TUNNELING UNDER CURB AND GUTTER OR OTHER IMPROVEMENTS NOT DESIGNATED FOR REMOVAL 16. TWO SACK SAND- CEMENT SLURRY MIX SHALL BE REQUIRED AS BACKFILL ON ALL LATERAL EXCAVATIONS WITHIN PRIME ARTERIALS, MAJOR ROADS AND COLLECTORS AS WELL AS ALL LOCATIONS INHERE INSPECTOR DEEMS THE NAIVE MATERIAL TO BE UNACCEPTABLE FOR USE AS BACKFILL 17. CARE SHALL BE EXERCISED TO PREVENT WATER, SOIL, DEBRIS FROM DEPOSITING IN GUTTERS, STREETS AND STORM DRAINS NO WASHING OUT OF MIXERS OR CONCRETE PUMPS WILL BE ALLOWED IN CITY S7REET5. VIOLA TONS WILL REFERRED FOR NPDES ENFORCEMENT AND PENALTIES. 18. ANY ROADWAY STRIPING DAMAGED OR REMOVED DURING THE OPERATIONS OF THIS PERMIT SHALL BE MATCH AND REPLACED BY THE APPLICANT USING THE LATEST EDITION OF STATE DEPARTMENT OF 7RANSPORTA71ON SPECIFICATIONS FOR PAINT, ALL TO THE SATISFACTION OF DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE 19. ALL CONCRETE WORK SHALL BE TRANSIT AND CONFORM TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION SECTION 201, AND BE APPROVED BY THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE 20. TRENCHING FOR INSTALLATIONS ACROSS ANY INTERSECTING ROADWAY OPEN TO TRAFFIC SHALL BE PROGRESSIVE. NOT MORE THAN HALF OF 714E NO 7H OF TRAVELED ROADWAY SHALL BE DISTURBED AT ONE THE AND THE REMAINING W107H SHALL BE KEPT OPEN TO TRAFFIC BY BRIDGING OR BACKFILLING 21. WHERE STREET DIMENSIONS AND STATE DEPARTMENT OF HEALTH SERVICES REGULATION ALLOW, ALL PIPES AND CONDUITS LAID PARALLEL TO THE ROADWAY SHALL BE PLACED AT LEAST FIVE (5) FEET FROM THE EDGE OF THE PAVEMENT OR GRADED TRAVELED ROADWAY, UNLESS OTHERWISE AUTHORIZED IN WRITING BY THE DIRECTOR OF ENGINEERING SERVICES THE SHALLOWEST PORTION OF ANY PIPELINE OR OTHER FACILITY SHALL BE INSTALLED NOT LESS THAN THIRTY (30) INCHES BELOW 714E ROAD SURFACE. 22. ALL EXCAVATED MATERIAL SHALL BE CAST AWAY FROM THE IMPROVED PORTION OF HIGHWAY. AFTER THE WORK HAS BEEN COMPLETED, ALL EXCESS MATERIAL, INCLUDING 7RENCH SPOILS, SHALL BE REMOVED FROM THE RIGHT -OF -WAY. THE ROADWAY SHALL BE LEFT IN NEAT AND ORDERLY CONDITION. 23 ALL ROADSIDE DRAINAGE DITCHES SHALL BE RESTORED TO TRUE GRADES AND THE INTAKE AND OUTLET ENDS AT ALL CULVERTS SHALL BE FREE FROM ALL EXCESS MATERIALS AND DEBRIS 24. ALL APPROACHES TO PRIVATE DRIVEWAYS AND INTERSECTING ROADS AND S7REE7S SHALL BE KEPT OPEN TO TRAFFIC AT ALL TIMES, UNLESS OTHERWISE APPROVED BY THE DIRECTOR OF ENGINEERING SERVICES. 25 CLAY & EARTH WHICH ADHERE TO 7HE PAVED SURFACE OF THE ROADWAY SHALL BE REMOVED BY HAND SCRAPING, WASHING & SWEEPING, OR BY ANY OTHER METHOD OF WHICH WILL LEAVE A CLEAN NON -SKID SURFACE WITHOUT IMPAIRING, INJURING OR LOOSENING THE SURFACE. 26. PERMITTEE SHALL COMPLY WITH ANY & ALL DIRECTIVES ISSUED BY THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE IN ORDER TO PREVENT DUST OR OTHER MATERIALS FROM BECOMING A NUISANCE OR ANNOYING. 27. TEMPORARY PATCHING OF TRENCH IS REQUIRED ON LATERAL CUTS IN SURFACE STREETS IMMEDIATELY AFTER BACKFILL. AFTER COMPLETION OF THE REFILLING MATERIAL IN THE EXCAVATION, ALL AS SPECIFIED IN THE STANDARD DRAWING DATED SEPTEMBER 30, 1996, & THE REMOVAL OF THE OBSTRUCTON(S), THE PERMITTEE SHALL PROMPTLY REPLACE W1774 TEMPORARY OR PERMANENT PATCHING MATERIAL, OR REPAIR ANY PORTION OF THE HIGHWAY SURFACE REMOVAL OR DAMAGED BY THE EXCAVATION, OBSTRUCTION, OR CONSTRUCTION OPERATIONS, ALL TO THE SA71SFAC77ON OF 774E DIRECTOR OF ENGINEERING SERVICES, & AS SPECIFIED ELSEWHERE HEREIN. THE DIRECTOR OF ENGINEERING SERVICES MAY AT HIS OPTION, ELECT TO DO THE SURFACING OR REPAIRING HIMSELF, • IN SUCH CASE, THE PERMITTEE SHALL BEAR 774E COST OF SUCH WORK. TEMPORARY LEFT IN PLACE FOR UP TO 30 DAYS, BUT MUST BE CONTINUALLY MAINTAINED. 28. WHERE THE PAVEMENT EXCEPT PORTLAND CONCRETE CEMENT PAVEMENT, OR OTHER TYPE OF SURFACE HAS BEEN REMOVED BY OTHERS, THE PERMITTEE SHALL REPLACE IT K17H A STANDARD REPAIR OF FOUR (4) INCHES AC OVER APPROVED BACKFILL OR REPAIR SHALL BE ONE (1) INCH GREATER THAN STRUCTURAL SECTION, WHICHEVER IS GREATER. REFER TO THE MOST CURRENT STANDARD DRAWING. REFER TO PCC PAVEMENT SHALL BE MADE PURSUANT TO THE SPECIFICATIONS OF THE ASSIGNED ENGINEERING INSPECTOR. 25. CLAY AND EARTH WHICH ADHERE TO THE PAVED SURFACE OF THE ROADWAY SHALL BE REMOVED BY HAND SCRAPING, WASHING AND SWEEPING, OR BU ANY OTHER METHOD WHICH WILL LEAVE A CLEAN NON -SKID SURFACE W17HOUT IMPAIRING OR LOOSENING THE SURFACE. 26. PERMITTEE SHALL COMPLY K17H ANY AND ALL DIREC7VES ISSUED BY THE DIRECTOR OF ENGINEERING SERVICES OR HIS DULY AUTHORIZED REPRESENTATIVE IN ORDER TO PREVENT DUST OR OTHER MATERIALS FROM BECOMING A NUISANCE OR ANNOYANCE. 27. TEMPORARY PATCHING OF TRENCH IS REQUIRED ON LATERAL CUTS IN SURFACED STREET IMMEDIATELY AFTER BACK FILLING AFTER COMPLETION OF THE REFILLING AND COMPACTING OF THE OF 774E BACK FILL MATERIAL IN THE EXCAVATION, ALL AS SPECIFIED IN THE STANDARD DRAWING DATED SEPTEMBER 30, 1996, AND THE REMOVAL OF THE OF OBSTRUCTON(S), THE PERMITTEE SHALL PROMPTLY REPLACE WITH TEMPORARY OR PERMANENT PATCHING MATERIAL, OR REPAIR ANY POR7101V OF THE HIGHWAY SURFACE REMOVED OR DAMAGED BY EXCAVATION, OBSTRUCTION, OR CONSTRUCTION OPERA7ONS, ALL TO THE SA77SFAC71ON OF THE DIRECTOR OF ENGINEERING SERVICES, AND AS SPECIFIED ELSEWHERE HEREIN. THE DIRECTOR OF ENGINEERING SERVICES MAY AT HIS OPTION, ELECT TO DO THE SURFACING OR REPAIRING HIMSELF IN SUCH CASE, THE PERMITTEE SHALL BEAR THE COST OF SUCH WORK. TEMPORARY PATCHING MATERIAL MAY BE LEFT IN PLACE FOR UP TO 30 DAYS, BUT MUST BE CONTINUALLY MAINTAINED. 28. WHERE THE PAVEMENT, EXCEPT PORTLAND CONCRETE CEMENT PAVEMENT, OR OTHER TYPE OF SURFACE HAS BEEN REMOVED BY OTHERS, THE PERMITTE SHALL REPLACE IT WI7H A STANDARD REPAIR OF FOUR (4) INCHES AC OVER APPROVED BACKFILL OR REPAIR SECTION SHALL BE ONE (1) INCH GREATER THAN EXISTING STRUCTURAL SECTION, WHICHEVER IS GREATER. REFER TO THE MOST CURRENT STANDARD DRAWING REPAIRS TO THE PCC PAVEMENT SHALL BE MADE PURSUANT TO THE SPECIFICATIONS OF THE SIGNED ENGINEER INSPECTOR. 29. IF, AFTER THE FILLING OF AN EXCAVATION, THE PERMITTEE FAILS TO REFUSES TO RESURFACE OR REPAIR THE POR77ON OF THE SURFACE OF THE ROADWAY DAMAGED BY HIM, OR IF THE DIRECTOR OF ENGINEERING SERVICES HAS ELECTED TO DO SUCH RESURFACING OR REPAIRING, THE DIRECTOR OF ENGINEERING SERVICES SHALL CAUSE THE REPAIR TO OCCUR, AND THE PERMITTEE SHALL BE CHARGED WITH THE COST THEREOF COMPUTED BY THE DIRECTOR OF ENGINEERING SERVICES. 30. WHEN SHORING IS REQUIRED, AN ENGINEER DETAIL DRAWING WILL BE REQUIRED FOR APPROVAL BY THE DIRECTOR OF ENGINEERING SERVICES ALL OSHA REGULATIONS SHALL BE MET. 31. ALL DIRECTIONAL BORES SHALL BE SUBJECT TO APPROVAL OF THE METHOD IN THE FIELD BY ASSIGNED ENGINEERED INSPECTOR , ACING AS THE DULY AUTHORIZED AGENT OF THE DIRECTOR OF ENGINEERING SERVICES A THOROUGH EXAMINATION OF THE SURFACE COND17IONS 1S A PREREQUIS17E THE APPLICANT SHALL IDENTIFY THE BORE METHOD ON THE PERMIT APPLICATION EITHER AS A AUGER, HYDRAULIC, ETC., AND SHOW THE BORE PITS. GROUTING AND INTERMEDIATE BORE PITS MAY BE REQUIRED. LEVCADIA WASTEWATER DISTRICT GENERAL SEWER NOTES 1. LWD APPROVAL OF THESE PLANS DOES NOT RELIEVE THE APPLICANT, PRIVATE ENGINEER OR WORK, OR CONTRACTOR FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING OR AFTER CONSTRUCTION. 2. ALL DESIGN, MATERIALS, AND CONSTRUCTION WORK SHALL CONFORM TO THE LEUCADIA WASTEWATER DISTRICT LWO SEWER STANDARDS AND TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GEM BOOK AND THE REGIONAL STANDARD DRAWINGS MOST CURRENT EDITIONS IN THE EVENT OF CONFLICT THE LWD SEWER STANDARDS GOVERN. J. OSHA SAFETY ORDERS AND OSHA CONFINED SPACE ENTRY REQUIREMENTS SHALL BE FOLLOWED AT ALL TMES WITHOUT EXCEPTION. 4. THE CONTRACTOR SHALL HAVE A COPY OF THE SEWER NOTES 2. & 3. DOCUMENTS ON THE JOBSI7E AT ALL TIMES. 5. THE CONTRACTOR SHALL GUARANTEE ALL WORK FOR A PERIOD OF ONE YEAR AFTER THE DATE OF FINAL ACCEPTANCE BY LWD AND SHALL REPAIR OR REPLACE ANY WORK THAT MAY PROVE DEFECTIVE IN WORKMANSHIP AND /OR MATERIALS WITHIN THE ONE YEAR PERIOD WITHOUT EXPENSE WHATSOEVER TO L IN). 6. QUANIIES SHOWN HEREON ARE FOR BOND ES7IMA7E PURPOSES ONLY NEITHER THE PRIVATE ENGINEER NOT LWD GUARANTEES THE ACCURACY OR COMPLETENESS OF THE SEWER QUANTTES 7. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS REPRESENTING ALL MATERIALS AND SUPPLIES SATISFACTORY TO LWO. WORK SHALL NOT COMMENCE UNIL SUCH MATERIALS ARE APPROVED BY LWD. 8. PRIOR TO BEGINNING SEWER WORK, 7HE' LWD INSPECTOR SHALL BE FURNISHED THREE SETS OF CUT SHEETS AND SHALL COMPLY WITH LWO STANDARD SPEC SURVEY REQUIREMENTS. 9. PRIOR TO BEGINNING SEWER WORK, CONTRACTOR SHALL SECURE A LWD PERMIT FOR CONSTRUCTION AND SHALL PROVIDE A MINIMUM OF 72 HOURS NOTICE TO LWD PRIOR TO CONSTRUCTION. 10. NO WORK SHALL BE COMMENCED UNIL ALL PERMITS HAVE BEEN OBTAINED FROM THE JURISDICTIONAL CITY, COUNTY, AND /OR OTHER APPROPRIATE AGENCIES. 11. CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL PLAN TO THE DISTRICT ENGINEER SHOWING THE DESIGN OF SHORING, BRACING SLOPING, OR OTHER PROVISIONS TO BE MADE FOR PROTECTION OF WORKERS FROM THE HAZARD OF CAVING GROUND DURING TRENCH EXCAVATION AND PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET OR MORE IN DEPTH. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8, CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE LAD INSPECTOR PRIOR TO EXCAVATION. 12. ALL SEWER FACIL177ES SHALL BE INSTALLED IN DRY EXCAVA7ONS AND TRENCHES CONTRACTOR SHALL CENTER AND MAINTAIN DEWATERING CONTINUOUSLY UNTIL THE WORK IS COMPLETED INCLUDING PLACEMENT AND COMPACTION OF BACKFILL MATERIALS IN A DRY STATE. ALL PIPE ZONE MATERIAL LOCATED IN WET OR AREAS SUSPECTED TO BE WET IN THE FU7URE SHALL BE ENCASED IN GE07EX77LE MATERIAL. SUITABLE GE07EX71LE MATERIAL SHALL BE SUBMITTED TO THE DISTRICT ENGINEER FOR REVIEW AND APPROVAL. CONTRACTOR SHALL OBTAIN DEWATERING PERMITS AS NECESSARY AND RETURN OF GROUNDWATER TO 774E SEWER SHALL NOT BE ALLOWED. 13. THE EXISTENCE AND LOCA77ON OF UNDERGROUND U71LI77ES SHOWN ON THESE PLANS WAS OBTAINED BY AVAILABLE RECORDS SEARCH BY THE PRIVATE ENGINEER. TO THE BEST OF THE PRIVATE ENGINEERS KNOWLEDGE, THERE ARE NO EXISTING U77LI77ES EXCEPT THOSE SHOWN ON THESE PLANS. ATTFNTON IS CALLED TO THE POSSIBLE EXISTENCE OF 07HER U77LI77ES OR STRUCTURES NOT SHOWN, OR IN A DIFFERENT LOCA77ON FROM THAT SHOWN ON 774E PLANS THE CONTRACTOR SHALL TAKE DUE PRECAUTIONARY MEASURES TO PROJECT THE U77LI71ES SHOWN ON THE PLANS AND OTHER EXISTING FACIL177ES OR STRUCTURES NOT SHOWN. 14. APPROVAL OF THIS PLAN BY LWD DOES NOT CONS777UTF A REPRESENTATION OF THE ACCURACY OF 774E LOCA7ON OF, OR THE EXISTENCE OR NON - EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE, OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT 15. CONTRACTOR SHALL N077FY UNDERGROUND SERVICE ALERT (800) 422 -4133, AS REQUIRED BY STATE LAW. ALL U77LITY CROSSINGS SHALL BE P07HOLED PRIOR TO TRENCHING. 16. CONTRACTOR IS RESPONSIBLE FOR COMPLYING NTH ALL LOCAL, STATE AND FEDERAL SAFETY REGULATIONS INCLUDING, BUT NOT LIMITED TO, TRENCH SAFETY AND CONFINED SPACE ENTRY. 17. SOILS REPORTS SHALL BE SUBMITTED TO LWD BY A QUALIFIED SOILS ENGINEER WHICH CERTIFIES THAT TRENCH BACKFILL WAS COMPACTED AS DIRECTED BY THE SOILS ENGINEER IN ACCORDANCE WITH ON S17E EARTHWORK SPECIFICATIONS AND THE LWD STANDARD SPEC. 18. SEWER ELEVATIONS SHOWN ARE INVERT ELEVATION (I.E.), INSIDE BOTTOM OF PIPE. SEWER LENGTHS SHOWN ARE FROM CENTER OF MANHOLE TO CENTER OF MANHOLE. 19. ALL REVISIONS TO DRAWINGS SHALL BE APPROVED BY THE LWD DISTRICT ENGINEER AS CONSTRUCTION CHANGES TO THE ORIGINAL MYLAR DWGS WITH INITIALED APPROVAL ON THE MYLARS 20. CONTRACTOR IS RESPONSIBLE FOR KEEPING COMPLETE RECORD OF CHANGES AND SHALL MAKE SUCH RECORD AVAILABLE TO THE PRIVATE ENGINEER. 774E PRIVATE ENGINEER SHALL PROVIDE AS -BUILT DRAWINGS TO LWD FOR REVIEW AND APPROVAL PRIOR TO FINAL ACCEPTANCE OF THE PROJECT. 21. LENGTH OF OPEN TRENCH SHALL BE LIMITED TO 350 FEET INCLUDING COLLECTORS AND LATERALS, UNLESS OTHERWISE APPROVED IN WRITING BY THE DISTRICT. TRENCH SHALL BE BACKFILLED OR PLATED AT THE CONCLUSION OF EACH DAY OF WORK. 22. THE CONTRACTOR SHALL PR07ECT ALL SURVEY MONUMENTAION. IF ANY SURVEY MONUMENTS ARE DISTURBED OR DESTROYED, 7HE CONTRACTOR SHALL RETAIN A LICENSED SURVEYOR TO RE- ESTABLISH AND RECORD THE MONUMENT CHANGE PER STATF LAW. 23 A MINIMUM OF 12 INCHES VERTICAL CLEARANCE SHALL BE PROVIDED BETWEEN THE SEWER PIPE AND ANY 07HER UTILITIES 24. SEPARATION OF SEWER / WATER AND SEWER / RECLAIMED WATER SHALL COMPLY WITH LWD STD DWG S -2 AND WI7H ALL COUNTY AND STATE HEALTH DEPT REGULATIONS. 25. CONNECTIONS TO EXISTNG SEWER PIPE OR MANHOLES SHALL ONLY BE DONE IN THE DIRECT PRESENCE OF THE LWD INSPECTOR. NEW SEWER SHALL NOT BE CONNECTED OR ALLOWED TO FLOW TO EXISTNG SEWER UNIL AFTER FINAL ACCEPTANCE OF ALL UPSTREAM WORK BY THE LWD INSPECTOR, OR AS APPROVED BY DISTRICT ENGINEER. 26. ALL SERVICE LATERALS SHALL BE LOCATED AT RIGHT ANGLES TO THE SEWER MAIN UNLESS 07HERKISE SHOWN AS APPROVED BY LWD DN THE PLANS. 27 A 2 -INCH HIGH "S" SHALL BE INSCRIBED ON 771E CURB FACE AT EACH LATERAL LOCATION BY 774E CONTRACTOR. 28. A 10 GAGE SHIELDED COPPER WIRE SHALL BE BURIED OVER EACH LATERAL. THE WIRE SHALL EXTEND UP TO A 2" COPPER TAG TED AND SOLDERED TO THE WIRE. THE TAG OVER 7HE SEWER MAIN SHALL TERMINATE NO MORE THAN TWO FEET (2) BELOW TOP OF ASPHALT PAVING. 774E TAG OVER THE CUSTOMER END OF 771E LATERAL SHALL EXTEND ABOVE GRADE UNIL CONNECTED AND SHALL THEREAFTER BE BURIED AT THE POINT OF CONNECTION. 29. ALL PIPE SHALL BE HANDLED AND INSTALLED SO AS TO PROTECT PIPE, JOINTS LINING, AND COATING. THE PIPE SHALL BE CAREFULLY BEDDED TO PROVIDE CONTINUOUS BEARING AND PREVENT UNEVEN SETTLEMENT. PIPE SHALL BE PROTECTED AGAINST FLOTATION AT ALL TIMES OPEN ENDS OF PIPE SHALL BE SEALED AT ALL TIMES WHEN CONSTRUCTION IS NOT IN PROGRESS 30. PIPE JOINTS SHALL NOT BE DEFLECTED UNLESS SO DESIGNED AND SHALL .THEN BE LIMITED TO LESS THAN ONE -HALF OF THE ANGLE RECOMMENDED BY THE PIPE MANUFACTURER. 31. SEWER PIPE ZONE AND TRENCH BACKFILL SHALL BE PER THE LWD SEWER STANDARDS WATER JETTING SHALL NOT BE ALLOWED. 32. ALL LATERALS SHALL BE CONSTRUCTED CLEAR OF DRIVEWAYS. 33. JOB MIXING OF CONCRETE IS NOT ALLOWED WITHOUT EXCEPTION. CONCRETE 7ES77NG BY LWND WILL BE AT CONTRACTOR EXPENSE. 34. MANHOLE BASES SHALL BE MONOLITHICALLY PLACED, FINISHED, AND COMPLETED AT THE OF PLACEMENT. GPK PRODUCTS, INC., OR APPROVED EQUAL, MANHOLE ADAPTERS SHALL BE SET IN THE BASE FOR EACH PIPE CONNECTION. SETTING OF MH RINGS SHALL NOT BE ALLOWED FOR 48 HOURS AFTER CONCRETE PLACEMENT. PRECAST MANHOLE BASES ARE ACCEPTABLE FOR USE K17H 8" SEWERS W7774 DISTRICT ENGINEER APPROVAL. 35. JOINTS BETWEEN MH BASE, SHAFTING, CONE SECTIONS, AND RING SHALL HAVE A 2" BY 2" BUTYL RUBBER GASKET PLACED WITHIN THE FULL' CIRCUMFERENCE. GASKET SHALL BE CPS -210 BY PRESS -SEAL GASKET CORP., OR APPROVED EQUAL. 36. ALL MANHOLES SHALL BE VACUUM TESTED 1) BEFORE BACKFILL, 2) AFTER BACKFILL, AND 3) SUBSEQUENT TO ANY SUSPECTED MOVEMENT OR DAMAGE AFTER BACKFILL. 37 ALL SEWERS AND LATERALS SHALL BE WAYNE BALLED, LOW PRESSURE AIR TESTED, AND TELEVISED AT THE APPLICANT /CONTRACTORS EXPENSE PRIOR TO CONSIDERATION FOR FINAL ACCEPTANCE BY LWD. AIR TEST SHALL BE DONE AFTER CONSTRUCTION OF ALL OTHER UTILITIES AND UTILITY LATERALS. 38. ALL SEWERS AND LATERALS SHALL BE IN PLACE AND SHALL HAVE FINAL APPROVAL BY THE LWD INSPECTOR PRIOR TO PAVING 39. MANHOLES SHALL BE 4 -FEET DIAMETER FOR PIPE UP TO 15 -INCH DIAMETER PER LAD SID DWG S -3. MANHOLES SHALL BE 5 -FEET DIAMETER FOR PIPE 18- INCHES AND LARGER PER LWD STD DWG S -4. 40. MHS SHALL BE LINED WITH INTEGRALLY LOCKING PVC (T -LOCK) OR A POLYURETHANE PR07EC17VE LINING SYSTEM PER SECTION 500 -2 OF THE GREENBOOK FOR. A. ALL NEW MH'S B. ALL EXISTING MH'S W77H NEW CONNEC7ONS 41. MAXIMUM DEPTH OF SEWER FOR SDR35 PVC PIPE IS 15: PVC C900 OR C905 PIPE IS REQUIRED FOR DEPTH OF COVER OVER 15. 42. FINAL APPROVAL OF PLANS BY DISTRICT ENGINEER IS VALID FOR A PERIOD OF 77ME NOT TO EXCEED ONE YEAR FROM APPROVAL DATF TO START OF CONSTRUCTION. IF THE ONE YEAR TIME LIMIT IS EXPIRED PRIOR TO START OF CONSTRUCTION THE DEVELOPER SHALL RESUBMIT THE PLAN CHECK TO THE DISTRICT ENGINEER FOR AN UPDATED REVIEW AND APPROVAL. ANY CHANGES REQUIRED TO THE PLANS SHALL BE MADE AT 774E DEVELOPERS EXPENSE AND APPROVED BY THE LWD DISTRICT ENGINEER PRIOR TO THE START OF CONSTRUCTION. 43. WHEN CONNECTION TO EXISTING MANHOLES IS NECESSARY AND SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL CONNECT TO EXISTING MANHOLE STRUCTURES AND CONSTRUCT 714E NEW FLOW - THROUGH CHANNELS IN EACH MANHOLE BASE TO ACCOMMODATE THE NEW SEWER LINES AS REQUIRED. SM00774 TRANSITIONS SHALL BE INSTALLED FROM THE INVERTS OF THE NEWLY INSTALLED PIPES TO 714E EXISTNG MANHOLE STRUCTURES MANHOLES SHALL BE CORE DRILLED AND MANHOLE CONNECTION FIT77NGS SHALL BE CONNECTED TO THE CORE DRILLED HOLE BY LINK -SEAL, OR APPROVED EQUAL. THE FIRST FLEXIBLE JOINT SHALL BE LOCATED W17HIN ONE -FOOT OF THE MANHOLE BASE. JACK HAMMERING SHALL NOT BE ALLOWED. 44. ALL NEW CONNECTIONS TO EXISTNG SEWER SHALL BE MADE TO EXISTNG WYES OR SHALL BE MADE BY INSTALLING NEW MANUFACTURED WYES STANDARD BELL AND SPIGOT OR PLAIN END WYES AND PLAIN END PIPE SPOOLS MATCHING THE ADJACENT EXISTNG PIPE MAY BE USED FOR INSER71NG WYES INTO AN EXISTNG SEWER. 45. IF NECESSARY DURING THE LATERAL CONNECTION WORK, UPSTREAM FLOW IN 774E EXISTNG SEWER SHALL BE TEMPORARILY PLUGGED AND BY- PASSED BY PUMPING OR PUMPER TRUCKS FOR DISPOSAL TO A DOWNSTREAM LIVID SEWER. IN LOCATIONS WI774 SIGNIFICANT UPSTREAM FLOW, LWD MAY REQUIRE TEMPORARY PROVISION OF DUTY AND BYPASS EQUIPMENT WITH FULL -TIME MANNED MONITORING NO UNMANNED BYPASS SHALL BE ALLOWED. 46. FOR CONNECTION OF PLAIN END TO PLAIN END PVC SEWER, REPAIR COUPLINGS SHALL BE MADE OF PVC MATERIAL MEETING THE SAME MATERIAL REQUIREMENTS AND OUTSIDE DIMENSION AS THE PIPE BEING REPAIRED. PVC SEWER REPAIR COUPLINGS SHALL BE RUBBER GASKETFD WITH NO CENTER STOP. PIPE ENDS SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF THE REPAIR COUPLING(S). THE REPAIR COUPLING SHALL BE SLIPPED ALL THE WAY ON TO ONE PLAIN END PIPE, THEN THE PIPE AND ADJOINING PIPES SHALL BE ALIGNED TOGETHER AND THE REPAIR COUPLING SLIPPED BACK INTO A POSITION EQUALLY SPACED BETWEEN THE TWO PLAIN END PIPES. PVC SEWER REPAIR COUPLINGS SHALL BE AS MANUFACTURED BY PW PIPE, OR EQUAL APPROVED BY THE LWD DISTRICT ENGINEER. 47. PVC OR VITRIFIED CLAY PIPE (VCP) SEWER PIPE AND WYES MAY BE USED TO TIE -W TO EXISTING VCP. FOR CONNECTION OR REPAIR OF PLAIN END VCP TO VCP OR VCP TO PVC, A ROMAC INDUSTRIES, INC. STYLE 501, OR APPROVED EQUAL, STRAIGHT OR TRANSITION COUPLING SHALL BE USED WITH A GASKET RANGE FOR EACH END OF THE COUPLING TO MATCH THE OUTSIDE DIAMETER OF THE PIPE ON THAT SIDE OF THE COUPLING BEING JOINED. 774E CENTER RINGS SHALL BE DUCTILE IRON PER ASTM A536, GRADE 65 -45 -12 AND SHALL BE PROVIDED WITH 16 MILS FUSION BONDED EPDXY COLOR CODED TO 774E TYPE OF CONNECTING PIPE. GASKETS SHALL BE SBR PER ASTM 02000 MBA710, COMPOUNDED FOR WATER AND SEWER SERVICE ALL NUTS AND BOLTS SHALL BE TYPE 316 STAINLESS STEEL. STATEMENT OF ENGINEER OF *VRK THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OF PROFESSION. THE ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS THE ENGINEER AGREES THAT ANY PLAN CHECK OR REVIEW PERFORMED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE PLANS OR DESIGN, AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER AGENTS OR EMPLOYEES ACTNG WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER. B Y. DATE• 6 -23-16 Y RANDY R. B QPOFESS /O RCE No.: 36190 _ _ EXP. DATE: 6130116 ��Q�OQpV R Bq COMPANY SOWARDS AND BROWN ENGINEERING, INC. ADRESS 2187 NEWCASTLE AVENUE SUI7E 103 w Q No. 36190 LEND PROPERTY BOUNDARY EXISTNG CONTOUR EXISTNG ELEVATION EDGE OF AC PAVEMENT EXIS71NG SEWER MAIN EXISTING WATER MAIN PROPOSED SEWER MAIN PROPOSED SEWER MANHOLE IIRYONO aj ullfam►llm TRENCH RESURFACING SHEET INDEX SHEET No. 1 2 STANDARD LO S -11, S -12 LO S -3 LWD S -17, S -25 CITY OF ENC. STD. TRENCH BACKFILL & RESURFACING DWG. DESCRIPTION 717LE SHEET SEWER PLAN & PROFILE ASSESSORS PARCEL NUMBER: 254 - 391 -50 LEGAL DESCRIPTION : PARCEL B AS SHOWN ON CERTHCATE OF COMPLIANCE FOR BOUNDARY ADJUSTMENT 10- 1828A, IN THE CITY OF ENCINITAS, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, AS EVIDENCED BY DOCUMENT REC 12 -27 -2011 AS INSTRUMENT NO. 2001 - 0697148 OF O.R. OWNER / PERMITTEE EOLUS 4, LLC, A CALIFORNIA LIMITED LIABILITY COMPANY 740 LOMAS SANTA FE DRIVE SUITE 204 SOLANA BEACH, CA. 92075 858 - 481 -3310 I HEREBY AGREE TO COMMENCE WORK ON ANY IMPROVEMENTS SHOWN ON THESE PLANS WITHIN EXISTNG RIGHT- OF-WAY WITHIN 60 DAYS AFTER ISSUANCE OF THE CONSTRUCTION PERMIT AND TO PURSUE SUCH WORK ACTIVELY ON EVERY NORMAL WORKING DAY UNIL COMPLETED, IRRESPECTIVE AND INDEPENDENT OF ANY OTHER WORK ASSOCIATED WITH THIS PROJECT OR UNDER MY CONTROL. OWNER : EOLUS 4, LLC, A CALIFORNIA LIMITED LIABILITY COMPANY ADDRESS : 1050 EOLUS AVENUE ENCINITAS CA 92024 SIGNATURE : _ DATE: CHRISTOPHER R. HALL - PRESIDENT LEUCADIA WASTERWATER DISTRICT FIELD OPERATIONS As W7771 X 154.50 a d, v lull v 1 1 rvvyr N.T.S. DIEGUITO WATER DISTRICT CARDIFF BY THE SEA, CA. 92007 m m PHONE 760 - 436 -8500 Exp. 6130116 * Iviv 7-0 F OF CAI \F SIGN I DATE IGN DATE JOB No. 13 -013 DATE 6 -23 -15 APPROVAL VALID FOR 2 YEARS Q �[{/ /// DESIGNED BY: DRAWN BY: CHECKED BY: Irl DESCRIPTION APPROVED WOF BENCHMARK SCALE (JlJ L RGP RGP � ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO. eg fIEV /SE WAT/ONOf 91411 x'01-2 /30 Otte 0 DESCRIPTION CITY OF ENCINITAS STATION "134WCCS1 ; PLANS PREPARED UNDER SUPERVISION OF RECOMMENDS O APP V IMPROVEMENT PLANS FOR: PDT OLE LOt4TIOd afE7(t9T. W,dTER MAIA(- 11-10Hb LOCARONSE QUADRANT OF THE INTERSECTION OF HORIZONTAL: NONE DATE: 6 -23-15 fin AS BUILT 1941-16 LEUCADIA BLVD & ORPHEUS ST IN THE S'LY SDI MASIH MAHER LENN PRUIM a SEWER • ER MAIN EXTENSION 11784 -I OF LEUCADIA BLVD. 3' FROM FACE OF CURB & 37' VERTICAL: NONE '% �y�E� R.C.E. NO.: SMO /� APN : 254 - 391 -50 TRAFFIC SIGNAL ON THE CORNER fLEVA71ON 178.54 DA7UM NA VD 88 RdNvy' /F' B/Y04VN 0,4 T6 RANDY R. BROWN Exp.: a -s1-16 DATE DATE TPM 07 -060 SHEET 1 OF 2 U5 8 Z m w $ Z_ U5 Z Ill o w� m WZ'o ?a5 OZ`w ONzoo ZO`� 0 Z'm J V/ OUNU z a O U (3 LL z o wU)Q Www Z M Z wQa LWD SUMMARY TABLE +00 2.J7% 1+00 12 +00 �a MANHOLE ID NUMBER UPSTREAM MH COORDINATES PIPE LENGTH .(„FEET) PIPE DIA (IN) PIPE MATERIAL SLOPE % LOCA77ON OF MANHOLE (ADDRESS) MH RIM ELEV. UPS MH INVERT EL. (FEET) DWN MH INVERT EL. (FEET) MH DEPTH (FEET) MANHOLE TTE No. OF LINES THROUGH MH COMMENTS UPS LOT DWN UPSTREAM DOWNSTREAM X Y ADDRESS DESOP77ON ADDRESS DESCRIPTION UPS T) DO IN T. IN OUT UPS DO UPS D0 UPS DPW 01 -2130 TO Ol -2f20 ?70393.41 624092.91 1437 8 PVC (C -900) 6.13% EOLUS AVENUE EOLUS AVENUE EOLUS AVENUE PRIVATE ROAD -167.00 155.76 149.0 152.3 14357 143.37 14.55 12.29 STD STD 1 1 ADD 5' STUB, BOTH DIREC77ON 01 -2120 TO 01 -2066 1970355.57 6241251.10 168.26 8 PVC (SDR -35) 217% PRIVATE ROAD SEWER EASEMENT SEWER EASEMENT SEWER EASEMENT 155.76 14730 143.57 143.37 139.72 155.76 12.29 8.07 STD STD 1 1 CONNECT TO EXIST. 5' STUB LAST MANHOLE COORDINATES ARE, 197026359 6241099.6J, , )2 s s t f' w'fj�PL 1 J 5 -31 ,sT /2" Wd7FR Ada/Al L7a aF PIAE 164.0 ) 5.0' 8' 0 2% PVC STUB OUT WITH CLEANOUT PER LW S -31 N T u coJ V U �N 0 M SEWER LATERAL DATA TABLE SEWER MAIN DATA TABLE No. AlBEARING INVERT DESCRIP77ON II N5847'31'E am GROUND 8' PVC SEWER (SDR 35) OY N745648'E BACKWATER BENCHMARK 8' PVC SEWER (C -900) 8 // DRY U7'111 TY P /PE QPOFESS( w No. 36190 * Exp.6/30/16 JJ cIV1v �P qTF OF CA1-\FOQ v INVERT LENGTH DROP LATERAL LATERAL GROUND DEPTH PAD UPS MH BACKWATER BENCHMARK SEQ. LOT STA77ON AT MAIN OF TO IE AT SLOPE ELEV. BELOW PL ELEV. RIM VALVE REMARKS NO. NO. - HORIZONTAL: 1' 20' VERTICAL: 1 " =4' lE LATERAL MAIN PL % AT PL PL TO IE FT. ELEV. REQ'D W/O. 1/ -/0 -/. 1 3 9 +15.00 140.37 15.6' 1.2' 141.88 2.0 147.3 5.4' 149.0 155.76 NO s / I 2 2 9 +20.00 140.59 9.4' 1.2' 141.98 2.0 148.0 6.0' 149.06 155.76 NO 3 PCL A 10 +24.35 14513 98.4' 1 1.2' 1 148.30 2.0 1538 5.5' NO GRADING 155.76 NO 4 1 10 +29.35 145.35 29.2' 1.2' 147.13 2.0 154.3 7.2' 155.5 155.76 NO 5 4 10 +35.77 145.63 49.3' 1.2' 147.82 2.0 154.2 6.4' 1 15.5 155.76 NO 8 // DRY U7'111 TY P /PE QPOFESS( w No. 36190 * Exp.6/30/16 JJ cIV1v �P qTF OF CA1-\FOQ v 0 a 0 I 2 �0 �N W QZ WZU WW (5Co ZO WFI t1l Z,) m m �wk o Z'o o°a w 87 6 h u_ 0 U)za a°= - r r°y I € JOB No. 13 -013 DATE 6-23-15 CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE Q 60t r DESIGNED BY: I DRAWN BY: CHECKED BY: ENGINEERING DIVISION APPROVALS CITY O F E N C I N I TA S PUBLIC WORKS DEPARTMENT DRAWING NO. RGP � � J REO/SELimmA/OFBMN dl 2/30 X16 t 11 /2 1s DESCRIPTION: CITY OF ENCINITAS STA71ON "134WCCS1' LOCA710N: SE QUADRANT OF THE IWERSEC770N OF LEUCADIA BLVD & ORPHEUS ST. IN THE SLY SOWLK - HORIZONTAL: 1' 20' VERTICAL: 1 " =4' �Z (ZZ I R4 /Voy /3. 6 ROWN 0417'45 PLANS PREPARED UNDER SUPERVISION OF DATE: 23 -t5 R.C.E. NO: 36190 RANDY R. BROWN EXP.: 6-3x16 RECOMMENDED: ,G20 APP OV MASH MAHER GLENN PRUIM $ /S / I S 8 - 7 -1.r DATE DATE IMPROVEMENT PLANS FOR: A6 �" SEWER MAIN EXTENSION APN 254®391 -50 I TPM 07 -060 11784 -I TO POTHOLE 10=1OMOFEXIST W4TER W/O. 1/ -/0 -/. QS t3UlLi l 22 /G a 7 OF LEUCADIA BLVD. 3 FROM FACE OF CURB & 3T , ELY OF TRAFFIC SIGNAL ON THE CORNER s / I ELEVA710N: 178.54 DATUM: NAVD 88 SHEET 2 OF 2 0 a 0 I 2 �0 �N W QZ WZU WW (5Co ZO WFI t1l Z,) m m �wk o Z'o o°a w 87 6 h u_ 0 U)za a°=