2016-12271 G (Plans)RIGHT OF WAY NOTE
OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48
HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN
ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE
OWNER TO KNOW WHERE HIS /HER PROPERTY LINE IS.
DRAINAGE NOTE
NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES. WATER IS
TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO
AN APPROVED DRAINAGE FACILITY.
UTILITY NOTE
ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF
ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR
REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR
INSPECTION.
2. THE SOILS REPORT TITLED " LIMITED GEOTECHNICAL INVESTIGATION PROPOSED SINGLE - FAMILY
RESIDENCE 812 BRACERO ROAD, ENCINITAS, CALIFORNIA 92024" PREPARED BY EAST COUNTY SOIL
CONSULTATION AND ENGINEERING, INC. DATED FEBRUARY 3, 2015 , PROJECT# 15- 1147E7 SHALL BE
CONSIDERED AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE
WITH THE RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT.
3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT -OF -WAY OR
EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS.
4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE GRADING.
5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT
PROPERTIES DURING GRADING OPERATIONS. ANYTHING DAMAGED OR DESTROYED SHALL BE
REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO GRADING.
6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS
DISTURBED OR DESTROYED SHALL BE RE- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL
ENGINEER OR A LICENSED LAND SURVEYOR.
7. THE NTRA T I CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES INCLUDING
CO CO R SHALL DESIGN,
SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL
SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
IN ONE-HALF (1 12) MILE F A STRUCTURE FOR HUMAN
8. GRADING AND EQUIPMENT OPERATING WITH ON (/) O S U U
OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M. AND 7.30 A.M. NOR ON
SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS.
9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE - CONSTRUCTION MEETING HAS BEEN
HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS
ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE - CONSTRUCTION MEETING SHALL BE
SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633 -2770.
10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE
WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY
ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS
AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION.
11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL
GRADING APPROVAL AND /OR FINAL RELEASE OF SECURITY, AN "AS GRADED CERTIFICATION" SHALL
BE PROVIDED STATING: "THE GRADING UNDER PERMIT NO. 12271 -G HAS BEEN PERFORMED IN
SUBSTANTIAL CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE ATTACHED
AS- GRADED PLAN ". THIS STATEMENT SHALL BE FOLLOWED BY THE DATE AND SIGNATURE OF THE
CIVIL ENGINEER WHO CERTIFIES SUCH GRADING OPERATION.
12. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS
DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS
AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED
AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING
OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS
SUPERVISION AND THAT IN HIS OPINION, ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE
FOR THEIR INTENDED USE.
13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE
DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID
DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL
MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT
DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED.
14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN
ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE
MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS
TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL
GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN
COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
PLACE, SPREAD, WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS.
15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH
SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL
BE SHAPED, PLANTED, AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT
AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR
EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE
REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN
ACCORDANCE WITH THE GRADING ORDINANCE.
16. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED
OR OTHERWISE DISPOSED OF (OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT
HAVE BEEN CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS.
APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY
ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL.
17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN
FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT -OF -WAY, ON CITY
PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE
PROTECTED IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO
GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE
CITY TREE DRIP LINE AREA (THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF
THE TREE CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE
REMOVED, IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT
WITH A CITY TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE
TREE REMOVAL.
CHANGE NO.
EROSION CONTROL
1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT KYE H. OH AT (760) 720-9546,24 HOURS A DAY
2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING
THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON
SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY
EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT.
3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE
ENGINEERING INSPECTOR.
4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE
SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN -OFF PRODUCING RAINFALL.
5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED
BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN
CIRCUMSTANCES WHICH MAY ARISE.
6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT
PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE.
7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE
INCORPORATED HEREON.
8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT
THE CONCLUSION OF EACH WORK DAY.
9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING
DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40 %). SILT AND
OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL.
STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP /IMP NOTES
1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS
SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS
PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM
DRAIN SYSTEM.
2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL
NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY.
3. ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP /IMP FACILITIES
AND /OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE
FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP /IMP FACILITY
AND /OR THE TURF /LANDSCAPED AREAS.
4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA
UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP /BMP.
5. DRIVEWAYS SHALL HAVE A MINIMUM 2 % CROSS SLOPE TOWARD THE IMP /BMP AREA OR HAVE
ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE
IT TO AN ADEQUATE IMP/BMP.
6. ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED
WITHOUT A PERMIT FROM THE CITY.
7. THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY
REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED.
8. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM
WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN
IMPERVIOUS, NON - COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE
ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM
SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE
DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE
AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN
AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES
THROUGH AN ADEQUATELY SIZED OIL/ GREASE SEPARATOR AND IS THEN FILTERED THROUGH A
CITY - APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER
SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE
REQUIRED FOR THIS STRUCTURE.
SAN DIEGUITO WATER DISTRICT NOTES:
1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE
STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES' STANDARDS COMMITTEE (WASC).
2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION
AS TO THE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON - EXISTENCE OF, ANY
UNDERGROUND UTILITY, PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT.
3. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING
OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY
CROSSING WITHIN 10 FEET OF PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS.
ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY
SAN DIEGUITO WATER DISTRICT.
4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND /OR ADJUST TO GRADE ANY
EXISTING WATER FACILITY (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED
BY THEIR PROJECT. ALL AFFECTED WATER FACILITIES MUST MEET CURRENT WATER AGENCIES'
STANDARDS COMMITTEE (WASC) STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY
SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE.
5. UTILITIES TO MAINTAIN MINIMUM 5 -FOOT SEPARATION WHEN PARALLELING WATER SERVICES.
6. MINIMUM HORIZONTAL SEPARATION OF 10 -FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN
DIEGO GAS AND ELECTRIC VAULTS.
7. ALL WATER SERVICES TO BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED
WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING.
8. CALIFORNIA STATE LAW ASSEMBLY BILL AB -1953 IS REQUIRING THAT NO -LEAD BRASS BE USED IN THE
CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECTIVE JANUARY 1, 2010. IN
COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO -LEAD BRASS PARTS.
9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS, AND SERVICES SHALL BE PROVIDED
WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18.
DESCRIPTION APPROVED DATE BENCHMARK SCALE
DESCRIPTION: CITY OF ENCINITAS. 2.5" BRASS
DISK STAMPED "ENC -51, LS 7322, 2008"
LOCATION: TOP OF CATCH BASIN ON WEST SIDE HORIZONTAL:
OF BONITA DR., 400 FT. NORTHERLY
OF SANTA FE DR.
RECORD FROM: R.O.S. No. 20188 VERTICAL:
ELEVATION: 292.088 DATUM: NAVD88
STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES
CONCRETE WASHOUT
CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE
WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO,
PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL
POST A SIGN DESIGNATING THE WASHOUT LOCATION.
CONSTRUCTION SITE ACCESS
A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT
TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3" CRUSHED ROCK AND /OR CORRUGATED STEEL
PANELS /PLATES.
CONSTRUCTION VEHICLES
A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES
PARKING, VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF -SITE.
EROSION CONTROL
EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE
PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS,
ADEQUATE GROUND COVER VEGETATION, AND BONDED FIBER MATRIX.
NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER.
DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL
PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES.
REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN
PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS
UNNECESSARILY; THEY HELP DECREASE EROSION.
TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR
EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST - GROWING ANNUAL AND PERENNIAL
GRASSES TO SHIELD AND BIND THE SOIL.
PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE
WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED.
ON -SITE CONSTRUCTION MATERIAL STORAGE
STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL
STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY
CONTAINMENT FOR ALL FUEL STORED ON -SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES
KEPT ON -SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE, ETC.
STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN
INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A
TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES.
TRAINING "
CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR
WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE
AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM
SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES.
WASTE MANAGEMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION
MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE
CONVEYANCE SYSTEM IS STRICTLY PROHIBITED.
NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS /DIKES SHALL BE PLACED AROUND
ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS.
DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES
WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL.
MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER -BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND
CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON - RECYCLABLE MATERIALS MUST BE TAKEN TO AN
APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON DISPOSAL OF HAZARDOUS
MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO
ORDER DUMPSTERS CALL EDCO AT (760) 436 -4151.
POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROUND THE
SITE.
PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR SHALL
PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS
SURFACES.
ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND STORMDRAIN. CONTRACTOR MUST
ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE
FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE
ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760) 633 -2770.
NOTIFICATIONS
1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON THESE PLANS WERE
OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES
EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY EXCAVATION,
FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF COMMENCEMENT OF WORK:
A. SEWERS - CSD - (760) - 633 -2770
B. GAS & ELECTRIC - SDGE - (760)-438 -6200
C. WATER - SAN DIEGUITO WATER DISTRICT -1- 800 - 227 -2600
D. TELEPHONE - SBC BELL - (760) -489 -3411
E. CABLE TV - COX COMMUNICATIONS- (760)- 806 -9809 X -2233
2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY WORK ON THIS PROJECT.
PHONE: (760)- 633 -2770.
3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)633 -2770. ALL WORK
PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND REMOVAL.
IMPERVIOUS AREA
IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 4,620 SQ. FT.
IMPERVIOUS AREA AFTER CONSTRUCTION: 5,565 SO. FT.
INCREASE IN IMPERVIOUS AREA: 945 SQ. FT.
IMPERVIOUS AREA REPLACED: 4,620 SO. FT.
•
KYE H. OH
1730 SCHOONER WAY
CARLSBAD, CA. 92008
(760) 720 -9546
SITE ADDRESS
812 BRACERO ROAD
ENCINITAS, CA. 92024
A.P.N. :258-350-21-00 7
G
LEGAL DESCRIPTION m
THE W'LY 115.00 FT. OF THE E'LY 135.00 FT. OF THE
S'LY 130.00 FT. OF THE NTY 260.00 FT. OF THE SE.
QTR. OF THE NW. QTR. OF THE NE. QTR. OF THE
SE. QTR. OF SEC. 15, TOWNSHIP 13 SOUTH, RANGE 4 C
WEST, SAN BERNARDINO BASE AND MERIDIAN IN
THE COUNTY OF SAN DIEGO, STATE OF CALIFORNIA
ACCORDING TO U.S. GOVERNMENT SURVEY, APPROVED
APRIL 19, 1881.
OWNER'S CERTIFICATE
WE HEREBY CERTIFY THAT A REGISTERED
SOILS ENGINEER OR GEOLOGIST HAS BEEN OR
WILL BE RETAINED TO SUPERVISE OVER ALL
GRADING ACTIVITY AND ADVISE ON THE
COMPACTION AND STABILITY OF THE SITE.
KAFf AEOIA -
DATE: M4V All IS
KYE9ri. OH IF
SOILS ENGINEER'S CERTIFICATE
5
fN9IN /t4 gvp.
0
}
REQUEZA ST.
°0 450'
w
ao
MELBA� m6. RD.
VICINITY MAP
N.T.S.
1, MAMADOU SALIOU DIALLO A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING
BUSINESS IN THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE
SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON FEB. 2, 2015
AND FOR AN UPDATE - . ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY,
WITH MY RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, 1
HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS
REPORT FOR THIS P OJECT HAVE BEEN I CORPORATED IN THE GRADING PLANS AND SPECIFICATIONS.
r A < - -15-
SIGNED: Mt tti, 1� rJ i-8
J �""� DATE. Q�� f E SS /OH
RCE NO.: 54071, GE N0.2704 O
SOU S. Di 9l
W P 9ll a
EXP. DATE: 12 -31 -15 No. GE 2704 o
EXP. 12 -31 -15
JOB #: 15- 1147E7
JycFflrECHN��P�Pa
EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 9 OF CAKE
10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071
(619) 258 -7901
STATEMENT OF ENGINEER OF WORK
THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH
THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE
ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE
RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS, TO THE EXTENT THAT THE ENGINEER
CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANY PLANCHECK OR REVIEW PERFORMED BY
THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS
NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE
PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIEVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS
OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS
THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY
INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS /HER
AGENTS OR EMPLOYEES ACTING WITHIN THE COURSE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND
ARISING OUT OF THE WORK PERFORMED BY THE ENGINEER_
• DATE: 'J�27116 O GOF EL$ Q�ql
E ICK L. RICCI, R.C.E. 32103
RCE EXPIRES: 12/31/16 W
E RICCI, CIVIL ENGINEERING ",� No. 32103 r7 EXP.12 -31 -16 a�
3103 FALCON STREET, SUITE C d
SAN DI GO, CALIFORNIA 92103 . flgTf \
N) E or \ �\P
EARTHWORK DATA
STEEPEST EXISTING NATURAL SLOPE ON -SITE = 6.15 %H : 65' V: 4'
MAXIMUM VERTICAL DEPTH OF CUT = 2'
MAXIMUM VERTICAL DEPTH OF FILL = 2'
CUT = 130 C.Y. FILL = 90 C.Y.
IMPORT = 0 C.Y. EXPORT= 40 C.Y.
REMEDIAL= 910 C.Y. ( 2' REMOVAL AND RECOMPACTION UNDER ENTIRE SITE)
BMP PROJECT STATUS
STANDARD
AS -BUILT I FIELD OPERATIONS I PLANNING AND BUILDING I PARKS AND RECREATION I SAN DIEGUITO WATER DISTRICT I ENCINITAS FIRE DEPARTMENT
7
GN DATE SIGN DATE SIGN ATE SIGN D$ E GN DATE SIGN
SPECIAL DISTRICT APPROVAL
PLANS PREPARED UNDER SUPERVISION OF
DATE: ✓�7�/�7
CIJ.r:eGc �Gnr: R.C.E.NO.: 32103
ERICK L. RICCI EXP.: 12 -31 -16
ENGINEERING DIVISION APPROV
SIGNATURE EXPIRES 2 YEARS AFTER DATE
CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT
BY: r °yl -M •(-- BY: /"�. Ul'�-. 0H RES11DENCE ROAD
MASH MAHER GLENN PRUIM
ENGINEERING /PUBLIC WORKS DIRECTOR ENCINITAS, CA- 92024
DATE: G/1I/IS DATE: 41-t 3 5- A_P -N_ 258 - 350 - 21 - 00
PLANNING CASE NO: 14 -250 CDP
DRAWING NO.
12271 -G
1 OF 4
' NOTE: SEE D -75 FOR
CONC.AND
PRA
BIORETENTION
BASIN w 18"
z
J
U
L "_1
NATIVE SOIL
OR 90% COMPACTED FILL N
SECTION B -B
NOT TO SCALE
SAW CUT LINE
5' 2.5' APPROX. 6" OF
PROPOSED PROPOSED CURB & GUTTER (G -2) COMPACTED FILL
FINISH GRADE EXIST. : .
BERM TOCBE B RM EXIST. GRADE %
REMOVED ._
PROPOSED
SIDEWALK EXIST. A.C.
(G -7) PROPOSED STREET ASPHALT
PAVEMENT SECTION (SEE DET. 1 ABOVE)
BRACERO ROAD
TYPICAL STREET SECTION
SCALE: VER. 1" = 5.'
H OR. 1" = 10'
NOTES
1. ALL EXISTING ON -SITE IMPROVEMENTS WILL BE DEMOLISHED.
2. THE EXISTING OVERHEAD UTILITY SERVICE LINES TO THE PROPERTY
SHALL BE REINSTALLED UNDERGROUND.
3. DRAIN ROOFTOPS INTO ADJACENT LANDSCAPING AREAS.
4. COVENANT HOLDING THE CITY HARMLESS FOR CROSS LOT
DRAINAGE RECORDED ON AS
DOCUMENT S -0
5. PROGRESS PICTURES OF BIORETENTION BASIN CONSTRUCTION SHALL BE TAKEN
AND PROVEDED TO THE CITY AT THE FOLLOWING STAGES: -
1. BASIN EXCAVATION
2. PLACEMENT OF PERFORATED PIPE, OUTLET PIPE, ETC.
3. PLACEMENT OF GRAVEL LAYER
4, PLACEMENT OF ENGINEERED SOIL LAYER
5. FINAL BASIN GRADING
6. FINAL COMPLETED BASIN WITH VEGETATION ESTABLISHED
EXIST- 6 FT. HIGH
FENCE TO REMAIN
246 SQ. FT. MIN. -
BIORETENTION
BASIN
(SEE CROSS
SECTION RIGHT)
PF A R 11
YX 258 - 350 -4
F:
LEGEND:
ITEM
SDRSD
IM/
1 r: ��7 6 27
GONG.
RIGHT -OF -WAY LINE
EXISTING CONTOUR
GARAGE
PROPOSED CONTOUR
'i k'( ?..- r.�>Yi,•.: M,?n;Y".K" lr
' PROPOSED FINISH GRADE ELEVATION
_. ...........
. .... _
.. -.- .......
PROPOSED BUILDING LINE
..................................... ..........
F
........
y
SAW CUT LINE
PROPOSED RESIDENTIAL DRIVEWAY
t
h
TRENCH DRAIN EF U ;
(G -2)
PROPOSED SIDEWALK
(G -7)
r
1. SECTION A -A
A.C. PAVEMENT
A.P.N.
258-
350
-
NOT TO SCALE
PROPOSED TRENCH DRAIN
,
CONCRETE TRANSITION STRIP
ROUNDED TOP
PROPOSED CULVERT
BIORETENTION
BASIN w 18"
z
J
U
L "_1
NATIVE SOIL
OR 90% COMPACTED FILL N
SECTION B -B
NOT TO SCALE
SAW CUT LINE
5' 2.5' APPROX. 6" OF
PROPOSED PROPOSED CURB & GUTTER (G -2) COMPACTED FILL
FINISH GRADE EXIST. : .
BERM TOCBE B RM EXIST. GRADE %
REMOVED ._
PROPOSED
SIDEWALK EXIST. A.C.
(G -7) PROPOSED STREET ASPHALT
PAVEMENT SECTION (SEE DET. 1 ABOVE)
BRACERO ROAD
TYPICAL STREET SECTION
SCALE: VER. 1" = 5.'
H OR. 1" = 10'
NOTES
1. ALL EXISTING ON -SITE IMPROVEMENTS WILL BE DEMOLISHED.
2. THE EXISTING OVERHEAD UTILITY SERVICE LINES TO THE PROPERTY
SHALL BE REINSTALLED UNDERGROUND.
3. DRAIN ROOFTOPS INTO ADJACENT LANDSCAPING AREAS.
4. COVENANT HOLDING THE CITY HARMLESS FOR CROSS LOT
DRAINAGE RECORDED ON AS
DOCUMENT S -0
5. PROGRESS PICTURES OF BIORETENTION BASIN CONSTRUCTION SHALL BE TAKEN
AND PROVEDED TO THE CITY AT THE FOLLOWING STAGES: -
1. BASIN EXCAVATION
2. PLACEMENT OF PERFORATED PIPE, OUTLET PIPE, ETC.
3. PLACEMENT OF GRAVEL LAYER
4, PLACEMENT OF ENGINEERED SOIL LAYER
5. FINAL BASIN GRADING
6. FINAL COMPLETED BASIN WITH VEGETATION ESTABLISHED
EXIST- 6 FT. HIGH
FENCE TO REMAIN
246 SQ. FT. MIN. -
BIORETENTION
BASIN
(SEE CROSS
SECTION RIGHT)
PF A R 11
YX 258 - 350 -4
RETENTION AREA SHALL BE
LEVEL AND DEPRESSED A
MINIMUM OF 12" FROM THI
SURROUNDING GRADE
DEEP ROOTED, DENSE, DROUGHT
TOLERANT PLANTING SUITABLE
FOR WELL DRAINED SOIL (CHOOSE
FROM EACH CATEGORY ABOVE)
�2 -3" HARDWOOD
wcs*
F:
LEGEND:
ITEM
SDRSD
PROPERTY LINE
0
RIGHT -OF -WAY LINE
EXISTING CONTOUR
PROPOSED CONTOUR
EXISTING SPOT ELEVATION
' PROPOSED FINISH GRADE ELEVATION
PROPOSED FINISH SURFACE ELEVATION
PROPOSED BUILDING LINE
L2ErA1A11NG WAZZ (KEYSTGWE), UNDER 3 FTC BY OTHERS
SAW CUT LINE
PROPOSED RESIDENTIAL DRIVEWAY
(G -14D)
PROPOSED CURB & GUTTER
(G -2)
PROPOSED SIDEWALK
(G -7)
SCH. J A.C. PAVEMENT
A.C. PAVEMENT
PROPOSED CONCRETE
PRIVATE COA(CRETE CURB
SWALE OR DIRECTION OF FLOW
PROPOSED TRENCH DRAIN
AREA ORQ /A/
PROPOSED CULVERT
STORM DRAIN CLEANOUT
PROPOSED HEADWALL
(D -32)
PROPOSED RIP -RAP
(D -40)
BIORETENTION SWALE:
"BMP AREA TO BE PRIVATELY
MAINTAINED AND NOT TO BE
MODIFIED WITHOUT CITY PERMIT"
CONCRETE TRANSITION STRIP
AND SPILLWAY
COMPACTED FILL AREA
BIORETENTION
PLANTS
GROUND COVERS:
1. DWARF COYOTE BUSH
2. ISLAND ALUM ROOT
3. CANYON SUNFLOWER
GRASSES AND
1. CALIFORNIA MEADOW SEDGE
GRASSLIKE:
2• TUFTED HAIRGRASS
3. SALT GRASS
RETENTION AREA SHALL BE
LEVEL AND DEPRESSED A
MINIMUM OF 12" FROM THI
SURROUNDING GRADE
DEEP ROOTED, DENSE, DROUGHT
TOLERANT PLANTING SUITABLE
FOR WELL DRAINED SOIL (CHOOSE
FROM EACH CATEGORY ABOVE)
�2 -3" HARDWOOD
wcs*
n
- 7,z t! �4 .. "__.- ,.�._,. I <:r I o 4� �.7U ii �.p,_- - ,. KE OCATEI/ I I-
P Gp
REMOVE NO PARK /N6 ; °�� 'a5 L T C 2 •g9 AND PROFILE ON SHEET) - 24" MIN. ENGINEERED SOIL
1, I, _.� m - _ M� G. 293.49 III =III - - *SEE NOTE BELOW
1 A T 3 1 W, Y r,S i`,:3.. 1 uWi 5// m 9 -- 2 3 0
_...... -.... 2C STA.10+31.29 r - - - F 3/8" GRAVEL
FIRE DEPARTMENT NOTES R -
- �: ... _ G. 293.30
�`3 .... rY CONCRETE - .""_""i I$ U 4e ......_ ...
. ' RIP RAP TRANSITION ` PROPOSE 6' HIGH gr3. - PROP. 3' HIQH MAX. W ��rc 5 STA. 10 +23
IIIIIIIIII _
1. ALL FIRE APPARATUS ACCESS ROADS SHALL HAVE AN UNOBSTRUCTED VERTICAL CLEARANCE OF (SEE ;, STRIP` "WIDE < 90• WOOD FENCE• T�� WOOD FENCE z =� ?);
Y 19:2' w 93 2 °!� i 12" MIN.
NOT LESS THAN 13 FEET 6 INCHES. CFC 503.2.1 PROVIDE 49'WIDEBY PROPOSED 6FT.HIGH I 1 MAX ; S7A. 10 +15 SC�i{ '.< ,ri ** III -I I
` AND SPILL AY as LOU F SEE NOTE
6" HIGH DRAIN MAX. FENCE WITH GRATE \ ? I =�
TRIMMING AND PRUNING OF SURROUNDING TREES ALONG DRIVEWAY AND BRACERO ROAD MAY BE o ; USINGMETALBA S EXIST. W.M. TOB m eo ¢16'DIW I BELOW -I I =I 3/4' CRUSH ROCK
o " PROVIDE 36" WIDE BY 6' HIGH W4 � Ri €y1
REQUIRED. �� 8 O.C.INITHO>sSCREEN DRAIN OPENING 1 ih ADJUSTED (PROPOSED)
c . N.', P NONE
w� o (G -14D LE,
, z NEEDED A.C. TRANSITION�� )
t w
n
-._ -.
fit 2. FIRE APPARATUS ACCESS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE IMPOSECt- n - -- - - - - - -? -- ¢ y, ....._'" '. tF5 Gpg2gg' j
_ �l
LOADS OF NOT LESS THAN 75,000 POUNDS AND SHALL BE PROVIDED WITH AN APPROVED PAVED w dM4 STA. 10+07293.2 f
r i S ( : 3
w^ :. yn �� -
SURFACE TO PROVIDE ALL - WEATHER DRIVING CAPABILITIES. AMENDMENT 503.2.3 ac �5` *BIORETENTION "ENGINEERED SOIL" LAYER SHALL BE MINIMUM 24 DEEP "SANDY LOAM" SOIL
G•22 >7I (?- ...__' t a' rfiC.293.)6,v, .,., xc.
ANC3i. R 1 N 89004'21" W 115.01' ? ti a `v ry - MIX WITH NO MORE THAN 5% CLAY CONTENT. THE MIX SHALL CONTAIN 50 -60% SAND,
�....::, e 25 . F? 9 "' .. G. 292,76: r - rv`
9 .--- -m - - -..... f , 20 -30% COMPOST OR HARDWOOD MULCH, AND 20 -30% TOPSOIL
PROPOSED DRIVEWAY SHALL BE ABLE TO SUPPORT A FIRE APPARATUS OF 75,000 LBS. - y ...... �....... -x : :: r. : :. �.. -� S�A.10 +02.173 fA:10 +00 r; I
ri Tip W L_ "" F MATCH EXIST. IMPR. v
�' - R RELOCATED MA /L BOXES € I STA. 10 +00±
INCREASE CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 12' BUT MAY BE DEEPENED TO
L} if EASE THE INFILTRATION AND STORAGE ABILITY OF THE BASIN.
I f
�.: i > I BIORETENTION DETAIL FOR IMP
2 ( c? o <
t: I 2b' a 20, NOT TO SCALE
A.P.N.
258 -3 -29
�aFEssiow j NOTE:
1 ,. f5 `n af
w FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL ROOF DRAINS
4 n L o j a i
RIP RAP NOTE: W o I ` SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND
wl GRAPHIC SCALE BIORETENTION BASIN: INSTALL s' WIDE MIN. TYPE 2 No. 32103 (� oa ;I DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN SYSTEM. GRASS
e�.12 =31 -16 j 1 � 0 �
RIP RAP PER SDRSD D -40. USE d a AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT
10 0 10 20 30 's C I V\\- �g
AREA REQ.= 0.04X4,620 SQ.FT. (IMPERVIOUS) + 0.065X945 SQ.FT. (CONC. DWY.) = 246 SQ.FT. No. 2 BACKING ROCK, 1.0 FT. THICK, r OF CAUF� "�
qT BE MODIFIED WITHOUT A PERMIT FROM THE CITY.
NOTE: BIORETENTION BASIN SIZED TO MITIGATE INCREASE OF CROSS -LOT OVER FILTER BLANKET `
( IN FEET) DRAINAGE DUE TO ADDITIONAL IMPERVIOUS SURFACES:"
1 inch = 10 ft.
SIGNED BY: DRAWN BY CHECKED BY:
CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DESIGNED T.T. E.R. ENGINEERING DIVISION APPROVA S CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO.
- oi9.1(o DESCRIPTION: CITY OF ENCINITAS. 2.5 "BRASS PLANS PREPARED UNDER SUPERVISION OF,
GRADING PLAN FOR:
DISK STAMPED "ENC- 51,LS7322,2008" ,,^ OH RESIDENCE 12271 -G
LOCATION: TOP OF CATCH BASIN ON WEST SIDE HORIZONTAL: 1 " =10' DATE: '`✓/27115 BY: V '" M `�" BY: 812 BRACERO ROAD
OF BONITA DR.. 400 FT. NORTHERLY ^^ -- MASIH MAHER GLENN PRUIM
OF SANTA FE DR. R.C.E. NO.: 32103 ENGINEERINGIPUBLIC WORKS DIRECTOR ENCINITAS, CA. 91 - 0
VERTICAL: - '® ($�I� ( �, tf �S A.P_N. 258 - 350 - 21 - 00
RECORD FROM: R.O.S. No. 20188 ERICK L. RICCI EXP.: 12 -31 -16 DATE: S DATE: PLANNING CASE NO: 14 -250 CDP SHEET 2 OF 4
ELEVATION: 292.088 DATUM: NAVD88
h
A
C7
Z U
IY W
W
z�
W in
J Z M
0 o
U ¢L N
UMm
� o
wM�D
F:
0
n
- 7,z t! �4 .. "__.- ,.�._,. I <:r I o 4� �.7U ii �.p,_- - ,. KE OCATEI/ I I-
P Gp
REMOVE NO PARK /N6 ; °�� 'a5 L T C 2 •g9 AND PROFILE ON SHEET) - 24" MIN. ENGINEERED SOIL
1, I, _.� m - _ M� G. 293.49 III =III - - *SEE NOTE BELOW
1 A T 3 1 W, Y r,S i`,:3.. 1 uWi 5// m 9 -- 2 3 0
_...... -.... 2C STA.10+31.29 r - - - F 3/8" GRAVEL
FIRE DEPARTMENT NOTES R -
- �: ... _ G. 293.30
�`3 .... rY CONCRETE - .""_""i I$ U 4e ......_ ...
. ' RIP RAP TRANSITION ` PROPOSE 6' HIGH gr3. - PROP. 3' HIQH MAX. W ��rc 5 STA. 10 +23
IIIIIIIIII _
1. ALL FIRE APPARATUS ACCESS ROADS SHALL HAVE AN UNOBSTRUCTED VERTICAL CLEARANCE OF (SEE ;, STRIP` "WIDE < 90• WOOD FENCE• T�� WOOD FENCE z =� ?);
Y 19:2' w 93 2 °!� i 12" MIN.
NOT LESS THAN 13 FEET 6 INCHES. CFC 503.2.1 PROVIDE 49'WIDEBY PROPOSED 6FT.HIGH I 1 MAX ; S7A. 10 +15 SC�i{ '.< ,ri ** III -I I
` AND SPILL AY as LOU F SEE NOTE
6" HIGH DRAIN MAX. FENCE WITH GRATE \ ? I =�
TRIMMING AND PRUNING OF SURROUNDING TREES ALONG DRIVEWAY AND BRACERO ROAD MAY BE o ; USINGMETALBA S EXIST. W.M. TOB m eo ¢16'DIW I BELOW -I I =I 3/4' CRUSH ROCK
o " PROVIDE 36" WIDE BY 6' HIGH W4 � Ri €y1
REQUIRED. �� 8 O.C.INITHO>sSCREEN DRAIN OPENING 1 ih ADJUSTED (PROPOSED)
c . N.', P NONE
w� o (G -14D LE,
, z NEEDED A.C. TRANSITION�� )
t w
n
-._ -.
fit 2. FIRE APPARATUS ACCESS ROADS SHALL BE DESIGNED AND MAINTAINED TO SUPPORT THE IMPOSECt- n - -- - - - - - -? -- ¢ y, ....._'" '. tF5 Gpg2gg' j
_ �l
LOADS OF NOT LESS THAN 75,000 POUNDS AND SHALL BE PROVIDED WITH AN APPROVED PAVED w dM4 STA. 10+07293.2 f
r i S ( : 3
w^ :. yn �� -
SURFACE TO PROVIDE ALL - WEATHER DRIVING CAPABILITIES. AMENDMENT 503.2.3 ac �5` *BIORETENTION "ENGINEERED SOIL" LAYER SHALL BE MINIMUM 24 DEEP "SANDY LOAM" SOIL
G•22 >7I (?- ...__' t a' rfiC.293.)6,v, .,., xc.
ANC3i. R 1 N 89004'21" W 115.01' ? ti a `v ry - MIX WITH NO MORE THAN 5% CLAY CONTENT. THE MIX SHALL CONTAIN 50 -60% SAND,
�....::, e 25 . F? 9 "' .. G. 292,76: r - rv`
9 .--- -m - - -..... f , 20 -30% COMPOST OR HARDWOOD MULCH, AND 20 -30% TOPSOIL
PROPOSED DRIVEWAY SHALL BE ABLE TO SUPPORT A FIRE APPARATUS OF 75,000 LBS. - y ...... �....... -x : :: r. : :. �.. -� S�A.10 +02.173 fA:10 +00 r; I
ri Tip W L_ "" F MATCH EXIST. IMPR. v
�' - R RELOCATED MA /L BOXES € I STA. 10 +00±
INCREASE CRUSHED ROCK LAYER SHALL BE A MINIMUM OF 12' BUT MAY BE DEEPENED TO
L} if EASE THE INFILTRATION AND STORAGE ABILITY OF THE BASIN.
I f
�.: i > I BIORETENTION DETAIL FOR IMP
2 ( c? o <
t: I 2b' a 20, NOT TO SCALE
A.P.N.
258 -3 -29
�aFEssiow j NOTE:
1 ,. f5 `n af
w FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL ROOF DRAINS
4 n L o j a i
RIP RAP NOTE: W o I ` SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS PRIOR TO COLLECTION AND
wl GRAPHIC SCALE BIORETENTION BASIN: INSTALL s' WIDE MIN. TYPE 2 No. 32103 (� oa ;I DISCHARGE ONTO THE STREET AND /OR INTO THE PUBLIC STORM DRAIN SYSTEM. GRASS
e�.12 =31 -16 j 1 � 0 �
RIP RAP PER SDRSD D -40. USE d a AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL NOT
10 0 10 20 30 's C I V\\- �g
AREA REQ.= 0.04X4,620 SQ.FT. (IMPERVIOUS) + 0.065X945 SQ.FT. (CONC. DWY.) = 246 SQ.FT. No. 2 BACKING ROCK, 1.0 FT. THICK, r OF CAUF� "�
qT BE MODIFIED WITHOUT A PERMIT FROM THE CITY.
NOTE: BIORETENTION BASIN SIZED TO MITIGATE INCREASE OF CROSS -LOT OVER FILTER BLANKET `
( IN FEET) DRAINAGE DUE TO ADDITIONAL IMPERVIOUS SURFACES:"
1 inch = 10 ft.
SIGNED BY: DRAWN BY CHECKED BY:
CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DESIGNED T.T. E.R. ENGINEERING DIVISION APPROVA S CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT DRAWING NO.
- oi9.1(o DESCRIPTION: CITY OF ENCINITAS. 2.5 "BRASS PLANS PREPARED UNDER SUPERVISION OF,
GRADING PLAN FOR:
DISK STAMPED "ENC- 51,LS7322,2008" ,,^ OH RESIDENCE 12271 -G
LOCATION: TOP OF CATCH BASIN ON WEST SIDE HORIZONTAL: 1 " =10' DATE: '`✓/27115 BY: V '" M `�" BY: 812 BRACERO ROAD
OF BONITA DR.. 400 FT. NORTHERLY ^^ -- MASIH MAHER GLENN PRUIM
OF SANTA FE DR. R.C.E. NO.: 32103 ENGINEERINGIPUBLIC WORKS DIRECTOR ENCINITAS, CA. 91 - 0
VERTICAL: - '® ($�I� ( �, tf �S A.P_N. 258 - 350 - 21 - 00
RECORD FROM: R.O.S. No. 20188 ERICK L. RICCI EXP.: 12 -31 -16 DATE: S DATE: PLANNING CASE NO: 14 -250 CDP SHEET 2 OF 4
ELEVATION: 292.088 DATUM: NAVD88
h
A
C7
Z U
IY W
W
z�
W in
J Z M
0 o
U ¢L N
UMm
� o
wM�D
CHANGE NO.
300
W'LY T. C. 295
10 10+50 11 11+50
1
10 10 +50 11 11 +50
BRACERO ROAD PROFILE
SCALE: HORZ. 1" = 10'
j
VIER. 1" = 5'
DRAWING NO.
12271 -G
SHEET 3 OF 4
i
Z U
Y W
L F
Z
L
J Z M
O co
J U m
J �p
coo N
M
Y o
L M
�,pFESS /pN
No. 32103 m
�d
EXP.12 -Ji -16
.ST9Tf OF A1. \\P
DESCRIPTION
APPROVED
DATE
BENCHMARK
SCALE
SPECIAL DISTRICT APPROVAL
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ENGINEERING
DIVISION APPROVALS
CITY OF ENCINITAS - PUBLIC WORKS DEPARTMENT
E.R.
T.T.
E.R.
dq
cc (0.26.1
DESCRIPTION: CITY OF ENCINITAS. 2.5" BRASS
DISK STAMPED "ENC -5I, LS 7322, 2008"
LOCATION: TOP OF CATCH BASIN ON WEST SIDE
HORIZONTAL: 1" = 10'
PLANS PREPARED UNDER SUPERVISION OF
DATE: 5 !115
BY: �. 1
BY:
GRADING PLAN FOR:
OH RESIDENCE
OF BONITA DR., 400 FT. NORTHERLY
/
MASIH MAHER
GLENN PRUIM
812 BRACE RO ROAD
OF SANTA FE DR.
RECORD FROM: R.O.S. No. 20188
ELEVATION: 292.088 DATUM: NAVD88
VERTICAL: 1"= 5
(/�.[aGk'c �°�'G�C.: R.C.E. NO- : 32103
ERICK L. RICCI
EXP.: 12 -31 -16
DATE: �� I I / (S
ENGINEERINGIPUBLIC WORKS DIRECTOR
DATE: 0 Z3 �.r
ENCINITAS, CA_ 92024
A_ P _ N _ 258 - 350 - 21 - 00
PLANNING CASE NO: 14 -250 CDP
DRAWING NO.
12271 -G
SHEET 3 OF 4
i
Z U
Y W
L F
Z
L
J Z M
O co
J U m
J �p
coo N
M
Y o
L M
P�
P O W 1 7'^�."J�7
LEGEND
PUBLIC RIGHT- 2
2116SQ ", N_
DESCRIPTION SYMBOL
OF -WAY B
..... - -_.
..... _ - ....... --
I .. .
j
AGGREGATE "
GRAVEL BAGS DoocK=
"f
t
SILT FENCE I-- 0- -�--ti
j J
I C_
�..
rT
r
STABILIZED CONSTRUCTION
ENTRANCE
258-350-50
8" M
I9EW
"
MIN. a "
PROFILE ,
•
....
......�_�
.W.W.I_
...�
r
iT �s SILT F NICE
A41. :,i EASE
_.� __
PUBLIC RIGHT "
"
r
,05'
J
r �5� t
\ r 0 °o�
,
1. SET POSTS AND EXCAVATE A
4 BY 4 IN (10 BY 10 CM)
TRENCH UPSLOPE FROM AND
ALONG THE LINE OF POSTS.
2, STAPLE WIRE FENCIKLG TO
THE POSTS.
nbb
/ .P.. I
�n 350-20
I _ 4 1N (10 CM)
3. ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE
THE WIRE FENCE AND EXTEND IT EXCAVATED SOIL. a " T Her w
t
INTO THE TRENCH. as G AGE
(a ( I s
r I,
FILTER FABRIC
_ I WIRE - (, i
��♦
_I =11' 'II =III III III — III = III = III =III- 1 `°
(
SILT FENCE I fy
f �`f
EXISTING GROUND OF -WAY
40'MIN.
EXIST. EDGE
12'MIN. OF PAVEMENT
f :r
PLAN
SEE CALTRANS PROVIDE APPROPRIATE TRANSITION
STANDARD DWG. NO. BETWEEN STABILIZED CONSTRUCTION
TC -1 FOR ADDTIONAL ENTRANCE AND EXISTING A.C. STREET
INFORMATION r
STABILIZED CONSTRUCTION ENTRANCE DETAIL
N.T.S.
a
c, L I
i
.P.N. 258 - 350 -
— .. ._ ....... _ ....... _........_
— ........ — _ —... __
- ___..._ —_.. L ....._ f I
s> i 2vut" a
t I
u/y y r'i ; Fr �:v % , {E{'?I /t.�§)'�[,'it ✓L.. €'t £ `',<"j} ct: y
It3Af ft. %ilr .bY i:.u£I,,,.1 '£k3`.i x '3V;.,h� I ���:'/1£
/ E , ._, . .
f u a Iv %'t 3 A �t..
r. ? 3'''•` f3:I z JAM
d l '24.. •
L3 u
r r..
f r C>
u
N 89 004'43" W 115. r \ 1t T r J.
01, ..� .._ ... ... ......... .... Y .., ...... ... . ......._... 4
f4 b : ,,, IT
AIYnrf.i,'S , „, ;iii'!',...:,. µ '°" 'i( t L.r #'
p� .i
i
....� f , . a \ .......... O ._ ' ,ems, v il _.. _,,�a.9. # C?:
:
;D,,n C
\ ik
_.,. SILT FIE
B`.
GRAVEL B�4GS,, , _> ., � 1 ' ,i „ it
2 -BAGS FLIlGI-1 � i.. — __. �
r-
pe"m ,, //
2-CAI"?
GARAGE 99At=
LKVVAal
CxI€TE�
,
5
—... ....._.__ 0.,
K",
A!
f
1
f=
k
.,'.,
ON —SITE CONSTRUCTION MATERIAL STORAGE
STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND
SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT
OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED
ON -SITE.
ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE.
STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE,
ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER FLOWS AND
STORMDRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL
STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE
PERIMETER AT ALL TIMES.
TRAINING
CONTRACTOR'S EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL
BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL
REQUIREMENTS THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE.
THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS
ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES.
WASTE MANAGEMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND
UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE
GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY
PROHIBITED.
t
c.
NO SEEPAGE FROM DUMPSTER S SHALL BE DISCHARGED INTO STORMWATER. BERMS DIKES
o
J SHALL BE PLACED AROUND DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF.
f DUMPSTERS SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUNPSTER LIDS SHALL REMAIN
`I CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES
{'
WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT
WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS,
r ,
t ( i WATER -BASED PAINTS, VEHICLE FLUIDS BROKEN A SPH A L T
AND CONCRETE WOOD , AND
CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO
s AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON
.wn((qq •' , _.__ E DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT
Y , r L Lrr (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO
- � a �� �, i •'' t[` ,1 r 1L✓'' AT 760 436 -4151.
W POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING
�L Z C P
j C 1 N ENTRANCE
GA A 7. a .. '
R i
£,O RECEPTACLES AR
I " "�`� � PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR
LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE
L .. TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SSURFACES.
LX,;t ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND
296 4 C>. E
. I 1 STORMDRAIN.
- (.
i
302,2 �`?�'`' I ' CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED
AST# A,C, CRiVEWAY '/ ti . �)
I 0 BE REMl E D f ', 3 AWAY FROM CONSTRUCTION SITE.
's 9, w£ ,, = T ✓ i FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND
1 5 REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT
(760) 633 -2770.
rg
._
J_..... _, f_.._.. ,s _ ..— _...._....____._ _ ! 3
9 �
t * " r r ' .._...._ r
, -y
(_
j
F _ t` •,I f S. I ✓ } .(( } '0,14 fa`,67 _A13
1
... 4. ° ° "•. s i is -
i
.,g mg's , I [j: z Y'. L,'a,- STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO
j 51.1 +U ;26 CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA
TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY,
MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR
1 ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT
/ " { LOCATION
gX's OUSIC t l
%r
+l, '-' 1 T„ ` 3
AC5,1 ;, � W (I CONSTRUCTION SITE ACCESS
AWA � � , v, T , � � � ♦ A STABLILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND
Ig t V INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH
HHI F L = AS GRAVEL AND /OR CORRUGATED STEEL PANELS /PLATES.
j t {
` .., _y k ✓ CONSTRUCTION VEHICLES
/ ?J4 YEi ` A SPECIFIC AREA AWAY FROM GUTTERS AND STORMDRAIN SHALL BE DESIGNATED FOR
_ ^T — -� - ..._...... ? „'.,,r <i %. ;1 VEHICLE REFUELING AND ROUTINE EQUIPMENT
11 P. - __.._
_.£ 3 CONSTRUCTION VEHICLES PARKING, Q
�� TC1 mow. _ A, . £ I �
—_ t; - ✓ MAINTENANCE. ALL MAJOR REPAIRS LL BE MADE OFF SITE. I
E ........ 'a SHA
f ,.....,+3.. _ _, s m ,-
i.Ya✓cim�a.i iiii�:z��✓ia� i
//r'�Y,i4E / /; v.., a ¢. E r t"r .,if / n- fCj,;,, (`,'.
31 I'T, EROSION CONTROL
11
L. ij I#
EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES
e,.::IrT, y ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT
- `
•. w v `T" r u =� w, ACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND
f,' SILT FENCE I SURF
BONDED :FIBER MATRIX.
6509 — —€ i r.. - - -- — " " " " " " NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER.
Hf3H rte, ,, r bra. -rr; (..:::., �_ L3 /�: -
.. h`,.,` ......._ . _.__ ` .............. E �� '� : 15, ' � ,S I a i ION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION
Sar PiR,1.,..d"3 T�;�Ii.rl, ,— ..._... _._,........ ��,,. .. ,_.._.____ ....�_._ € _.._. ....._... ,.z .... ri -�L Fy£p �... Y .r'. 3,x 'v. f,.` ,h ...A I� f5. SITE.
�,
IIIIII)) DIVERSION
L 'tip .a i'c"J _41WG (.P:i C. ._;. F` 4h ti C }I" f t:. 'it "' I �. -->H- 'q 4i.. ', 3 1'* f E s i£. , SE' ERPAs.H ?i
- kY I S .�' I x... :.:.i E
U "3k .. ......:�..... �. z a es .. { srI'S_ I'
PO V, 2 4'x.E " .I(Ci j f
(" 29'3. a IL'sI<3 CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND
j v 14 _. TEMPORARY EROSION CONTROL MEASURES.
x u r � ', . _ , 3 I . VN' OPENING A.C. • LS�. >�
`1` 'EM i d day \1 rE £ ( L,.i'
• i n I E &;,7tA,j 5F i "•} , 'A 3 e i j
Y,
REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL
.. —...._ _...d— �._ —. v _ 1
} BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND
COVER. D NOT REMOVE TREE R SHRUBS UNN SSARI THEY HELP DECREASE
E 0 5 0 ECE TY;
......
pL• Sa, x� - 'r ' , t ,d, 'v k' '?+ r�r ., xz a [ �era2.; EROSION.
a .._..... — _ ...._ ......
f
k- /ytR3372 'I "i`" s r�, o ......_...._....,.. .... -'3., .- .-- e�.i+.W3. ..._Y nl / t�`.F,. ,h
N 89 04'21 "� -..,
F.I ; 'U r' : W 115.01 r ,,. ,..a' 2 s:
l a .%f c, 'E v. -.., riG F, i P ._.i� •'Fv :v r,. ta.
— '--- - -'' -- £> �•; �2 :E t ,,, ' TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT
— r. W = == — "T I?° 1 IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED
6 a , per. =r #... Is r
1'r \ BY PLANTING FAST- GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE
i I ( Cr d��...% vi i S SOIL.
J1�� ; ,��(
W.
E `� .; «: PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING
ACTIVITIES ARE COMPLETE.
A.'49 - 370 - r
.... ...__..___,r,�
� f' � �` a, �; £ � � WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED.
175 1
�pf ESS /pN I
L. �
l
GRAPHIC SCALE
10 0 10 20 30 �d N EXP 2103 16
's clv\\-
( IN FEET) rq O Cr.00ifi`�
1 inch = 10 ft.
SIGNED BY: DRAWN BY: CHECKED BY:
CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DEE.R. T.T. E.R. ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS — PUBLIC WORKS DEPARTMENT DRAWING NO.
C LIP DESCRIPTION: CITY OF ENCINITAS. 2.5" BRASS PLANS PREPARED UNDER SUPERVISION OF - ^j EROSION CONTROL PLAN FOR:
DISK STAMPED "ENC -51, LS 7322,2008- 'V ` /'TJ OH RESIDENCE G
LOCATION: TOP OF CATCH BASIN ON WEST SIDE HORIZONTAL: 1 " =10' DATE: 1i&7�5 BY: BY: 812 E3RACERO ROAD
OF BONITA DR., 400 FT. NORTHERLY ��--^^�� MASIH MAHER GLENN PRUIM
OF SANTA FE DR. � k�.�— ,G.GrC. R.C.E. NO. : 32103 ENGINEERINGIPUBLIC WORKS DIRECTOR ENCINITAS, CA_ 92024
VERTICAL: G /II IS L Z3 /f A.P_N_ 258 - 350 - 21 - 00
RECORD FROM: R.O.S. No. 20188 ERICK L. RICCI DATE: DATE:
ELEVATION: 292.088 DATUM: NAVD88 EXP.: 12 -31 -16 PLANNING CASE NO: 14 -250 CDP SHEET 4 OF 4
It
PUBLIC RIGHT- 2
2116SQ ", N_
OF -WAY B
B f01RE EN
2 " -3" COARSE j
j
AGGREGATE "
"f
40'MIN.
EXIST. EDGE "
"I"" a -C.
8" M
"
MIN. a "
PROFILE ,
,
A41. :,i EASE
_.� __
PUBLIC RIGHT "
"
N.T.S.
a
c, L I
i
.P.N. 258 - 350 -
— .. ._ ....... _ ....... _........_
— ........ — _ —... __
- ___..._ —_.. L ....._ f I
s> i 2vut" a
t I
u/y y r'i ; Fr �:v % , {E{'?I /t.�§)'�[,'it ✓L.. €'t £ `',<"j} ct: y
It3Af ft. %ilr .bY i:.u£I,,,.1 '£k3`.i x '3V;.,h� I ���:'/1£
/ E , ._, . .
f u a Iv %'t 3 A �t..
r. ? 3'''•` f3:I z JAM
d l '24.. •
L3 u
r r..
f r C>
u
N 89 004'43" W 115. r \ 1t T r J.
01, ..� .._ ... ... ......... .... Y .., ...... ... . ......._... 4
f4 b : ,,, IT
AIYnrf.i,'S , „, ;iii'!',...:,. µ '°" 'i( t L.r #'
p� .i
i
....� f , . a \ .......... O ._ ' ,ems, v il _.. _,,�a.9. # C?:
:
;D,,n C
\ ik
_.,. SILT FIE
B`.
GRAVEL B�4GS,, , _> ., � 1 ' ,i „ it
2 -BAGS FLIlGI-1 � i.. — __. �
r-
pe"m ,, //
2-CAI"?
GARAGE 99At=
LKVVAal
CxI€TE�
,
5
—... ....._.__ 0.,
K",
A!
f
1
f=
k
.,'.,
ON —SITE CONSTRUCTION MATERIAL STORAGE
STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND
SPILLAGE. CONTRACTOR SHALL STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT
OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT FOR ALL FUEL STORED
ON -SITE.
ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES KEPT ON -SITE.
STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS, ASPHALT CONCRETE, AGGREGATE BASE,
ETC. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER FLOWS AND
STORMDRAIN INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL
STABILIZATION MEASURES AND PROVIDED WITH A TEMPORARY SEDIMENT BARRIER AROUND THE
PERIMETER AT ALL TIMES.
TRAINING
CONTRACTOR'S EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL
BE TRAINED TO BE FAMILIAR WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL
REQUIREMENTS THESE BMP NOTES SHALL BE AVAILABLE TO EVERYONE WORKING ON SITE.
THE PROPERTY OWNER(S) AND THE PRIME CONTRACTOR MUST INFORM SUBCONTRACTORS
ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES.
WASTE MANAGEMENT
CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND
UNUSED CONSTRUCTION MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE
GROUND, WHERE WATER CAN CARRY THEM INTO THE CONVEYANCE SYSTEM IS STRICTLY
PROHIBITED.
t
c.
NO SEEPAGE FROM DUMPSTER S SHALL BE DISCHARGED INTO STORMWATER. BERMS DIKES
o
J SHALL BE PLACED AROUND DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF.
f DUMPSTERS SHALL BE CHECKED FREQUENTLY FOR LEAKS. DUNPSTER LIDS SHALL REMAIN
`I CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES
{'
WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT
WITH ANY TRASH MATERIAL. MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS,
r ,
t ( i WATER -BASED PAINTS, VEHICLE FLUIDS BROKEN A SPH A L T
AND CONCRETE WOOD , AND
CLEARED VEGETATION CAN BE RECYCLED. NON- RECYCLABLE MATERIALS MUST BE TAKEN TO
s AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. FOR INFORMATION ON
.wn((qq •' , _.__ E DISPOSAL OF HAZARDOUS MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT
Y , r L Lrr (800) 714 -1195. FOR INFORMATION ON LANDFILLS AND TO ORDER DUMPSTERS CALL EDCO
- � a �� �, i •'' t[` ,1 r 1L✓'' AT 760 436 -4151.
W POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING
�L Z C P
j C 1 N ENTRANCE
GA A 7. a .. '
R i
£,O RECEPTACLES AR
I " "�`� � PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR
LEAKS. CONTRACTOR SHALL PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE
L .. TOILETS AWAY FROM STORMDRAIN INLETS ON PERVIOUS SSURFACES.
LX,;t ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER, AND
296 4 C>. E
. I 1 STORMDRAIN.
- (.
i
302,2 �`?�'`' I ' CONTRACTOR MUST ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED
AST# A,C, CRiVEWAY '/ ti . �)
I 0 BE REMl E D f ', 3 AWAY FROM CONSTRUCTION SITE.
's 9, w£ ,, = T ✓ i FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND
1 5 REQUIREMENTS PLEASE CONTACT THE ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT
(760) 633 -2770.
rg
._
J_..... _, f_.._.. ,s _ ..— _...._....____._ _ ! 3
9 �
t * " r r ' .._...._ r
, -y
(_
j
F _ t` •,I f S. I ✓ } .(( } '0,14 fa`,67 _A13
1
... 4. ° ° "•. s i is -
i
.,g mg's , I [j: z Y'. L,'a,- STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO
j 51.1 +U ;26 CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE WASHOUT AREA
TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY,
MORTAR, STUCCO, PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR
1 ANY RECEIVING WATER. CONTRACTOR SHALL POST A SIGN DESIGNATING THE WASHOUT
/ " { LOCATION
gX's OUSIC t l
%r
+l, '-' 1 T„ ` 3
AC5,1 ;, � W (I CONSTRUCTION SITE ACCESS
AWA � � , v, T , � � � ♦ A STABLILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND
Ig t V INGRESS TO PREVENT TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH
HHI F L = AS GRAVEL AND /OR CORRUGATED STEEL PANELS /PLATES.
j t {
` .., _y k ✓ CONSTRUCTION VEHICLES
/ ?J4 YEi ` A SPECIFIC AREA AWAY FROM GUTTERS AND STORMDRAIN SHALL BE DESIGNATED FOR
_ ^T — -� - ..._...... ? „'.,,r <i %. ;1 VEHICLE REFUELING AND ROUTINE EQUIPMENT
11 P. - __.._
_.£ 3 CONSTRUCTION VEHICLES PARKING, Q
�� TC1 mow. _ A, . £ I �
—_ t; - ✓ MAINTENANCE. ALL MAJOR REPAIRS LL BE MADE OFF SITE. I
E ........ 'a SHA
f ,.....,+3.. _ _, s m ,-
i.Ya✓cim�a.i iiii�:z��✓ia� i
//r'�Y,i4E / /; v.., a ¢. E r t"r .,if / n- fCj,;,, (`,'.
31 I'T, EROSION CONTROL
11
L. ij I#
EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES
e,.::IrT, y ESPECIALLY SHALL BE PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT
- `
•. w v `T" r u =� w, ACES SUCH AS EROSION CONTROL MATS, ADEQUATE GROUND COVER VEGETATION, AND
f,' SILT FENCE I SURF
BONDED :FIBER MATRIX.
6509 — —€ i r.. - - -- — " " " " " " NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER.
Hf3H rte, ,, r bra. -rr; (..:::., �_ L3 /�: -
.. h`,.,` ......._ . _.__ ` .............. E �� '� : 15, ' � ,S I a i ION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION
Sar PiR,1.,..d"3 T�;�Ii.rl, ,— ..._... _._,........ ��,,. .. ,_.._.____ ....�_._ € _.._. ....._... ,.z .... ri -�L Fy£p �... Y .r'. 3,x 'v. f,.` ,h ...A I� f5. SITE.
�,
IIIIII)) DIVERSION
L 'tip .a i'c"J _41WG (.P:i C. ._;. F` 4h ti C }I" f t:. 'it "' I �. -->H- 'q 4i.. ', 3 1'* f E s i£. , SE' ERPAs.H ?i
- kY I S .�' I x... :.:.i E
U "3k .. ......:�..... �. z a es .. { srI'S_ I'
PO V, 2 4'x.E " .I(Ci j f
(" 29'3. a IL'sI<3 CONTRACTOR SHALL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND
j v 14 _. TEMPORARY EROSION CONTROL MEASURES.
x u r � ', . _ , 3 I . VN' OPENING A.C. • LS�. >�
`1` 'EM i d day \1 rE £ ( L,.i'
• i n I E &;,7tA,j 5F i "•} , 'A 3 e i j
Y,
REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL
.. —...._ _...d— �._ —. v _ 1
} BE CONDUCTED IN PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND
COVER. D NOT REMOVE TREE R SHRUBS UNN SSARI THEY HELP DECREASE
E 0 5 0 ECE TY;
......
pL• Sa, x� - 'r ' , t ,d, 'v k' '?+ r�r ., xz a [ �era2.; EROSION.
a .._..... — _ ...._ ......
f
k- /ytR3372 'I "i`" s r�, o ......_...._....,.. .... -'3., .- .-- e�.i+.W3. ..._Y nl / t�`.F,. ,h
N 89 04'21 "� -..,
F.I ; 'U r' : W 115.01 r ,,. ,..a' 2 s:
l a .%f c, 'E v. -.., riG F, i P ._.i� •'Fv :v r,. ta.
— '--- - -'' -- £> �•; �2 :E t ,,, ' TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT
— r. W = == — "T I?° 1 IMMEDIATELY PLANNED FOR EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED
6 a , per. =r #... Is r
1'r \ BY PLANTING FAST- GROWING ANNUAL AND PERENNIAL GRASSES TO SHIELD AND BIND THE
i I ( Cr d��...% vi i S SOIL.
J1�� ; ,��(
W.
E `� .; «: PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING
ACTIVITIES ARE COMPLETE.
A.'49 - 370 - r
.... ...__..___,r,�
� f' � �` a, �; £ � � WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED.
175 1
�pf ESS /pN I
L. �
l
GRAPHIC SCALE
10 0 10 20 30 �d N EXP 2103 16
's clv\\-
( IN FEET) rq O Cr.00ifi`�
1 inch = 10 ft.
SIGNED BY: DRAWN BY: CHECKED BY:
CHANGE NO. DESCRIPTION APPROVED DATE BENCHMARK SCALE SPECIAL DISTRICT APPROVAL DEE.R. T.T. E.R. ENGINEERING DIVISION APPROVALS CITY OF ENCINITAS — PUBLIC WORKS DEPARTMENT DRAWING NO.
C LIP DESCRIPTION: CITY OF ENCINITAS. 2.5" BRASS PLANS PREPARED UNDER SUPERVISION OF - ^j EROSION CONTROL PLAN FOR:
DISK STAMPED "ENC -51, LS 7322,2008- 'V ` /'TJ OH RESIDENCE G
LOCATION: TOP OF CATCH BASIN ON WEST SIDE HORIZONTAL: 1 " =10' DATE: 1i&7�5 BY: BY: 812 E3RACERO ROAD
OF BONITA DR., 400 FT. NORTHERLY ��--^^�� MASIH MAHER GLENN PRUIM
OF SANTA FE DR. � k�.�— ,G.GrC. R.C.E. NO. : 32103 ENGINEERINGIPUBLIC WORKS DIRECTOR ENCINITAS, CA_ 92024
VERTICAL: G /II IS L Z3 /f A.P_N_ 258 - 350 - 21 - 00
RECORD FROM: R.O.S. No. 20188 ERICK L. RICCI DATE: DATE:
ELEVATION: 292.088 DATUM: NAVD88 EXP.: 12 -31 -16 PLANNING CASE NO: 14 -250 CDP SHEET 4 OF 4
It