8123PLANS FOR THE CONSTRUCTION OF STORM DRAIN OUTFACE REPAIR LEGENDZ�u� WORK TO BE DONE MANCHESTER AVE, EAST OF EL CAMINO REAL ,S.� PROPOSED MODIFIED CUT OFF WALL - - - SDRSD D -80A - 3 A. GENERAL IN THE 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD PROPOSED 6" TYPE 'A' BERM ___________________ - _ ___________________SDRSD G -5 ------------------ 32.92 LF.1 SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (2012 AN EDITION), THE MAY 2010 CITY ENCEANITAS EDITION OF THE CALTRANS STANDARD SPECIFICATIONS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS (AUGUST 2012 EDITION). PROPOSED 10' TYPE 'B' CURB INLET ____________________________ SDRSD D -2 ____________________ 1 2. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTION REQUIRED TO PROTECT ADJACENT PROPERTIES DURING CONSTRUCTION. ANYTHING DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION EXISTING PRIOR TO CONSTRUCTION. PROPOSED 6" CURB &GUTTER -------------------------------------------- SDRSD G- 2------------------ 2'2.96 L.F. 3. GRADING AND EQUIPMENT SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 4:00 91LO tom- P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS, AND CITY RECOGNIZED HOLIDAYS. �C0\1 PROPOSED SAWCUT & REMOVAL OF EX. AC & REPLACE 27 S.F. NOISE LEVELS OF ALL CONSTRUCTION ACTIVITIES SHALL NOT EXCEED 86 DECIBELS (dB) 0 S9 E gLVO• -------------------------- MEASURED AT 50 FEET. y :' B. NOTIFICATIONS �'. PROPOSED GUARDRAIL 4. EXCEPT WHEN WORK IS BEING DONE ON DRIVEWAYS, THE CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS AT ALL TIMES. 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON n Z ENCINITAS loo L•F. 5. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF m CONSTRUCTION SITE WITHIN THIS PROJECT THE CONTRACTOR SUBMIT TO AND RECEIVE OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, o APPROVAL FROM THE CITY ENGINEER FOR THE PROPOSED HAUL ROUTE. THE HOWEVER: = SANTA FE DR. D CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND REQUIREMENTS THE CITY THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT z ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. ANY EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE 0 �co zz CONTRACTOR'S RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR 6. THE CONTRACTOR SHALL NOTIFY AND OBTAIN APPROVAL OF THE CITY ENGINEER OF o STRUCTURES AT LEAST 48 HOURS PRIOR TO ANY EXCAVATION, FOR VERIFICATION AND r SHEET INDEX Z J WORK PRIOR TO MAKING CHANGES IN THE FIELD. LOCATION OF UTILITIES AND NOTIFICATION, OF COMMENCEMENT OF WORK: n a w 7. THE STRUCTURAL SECTION OF ALL RESURFACING SHALL BE IN ACCORDANCE WITH THE a. SEWERS ............................ ENCINITAS SANITARY DIVISION BIRMINGHAM ° CITY OF ENCINITAS ENGINEERING STANDARDS, AS SHOWN ON THESE PLANS, AND AS b. GAS &ELECTRIC ............. SAN DIEGO GAS &ELECTRIC �Z o DRIVE w ±470' APPROVED BY THE CITY ENGINEER. c. WATER .............................. OLIVENHAIN MUNICIPAL WATER (800) 422 -4133 DIG ALERT DUBLIN:., 9<G^ f SHEET 1 - TITLE SHEET d. TELEPHONE ....................... AT &T DRIVE SHEET 2 - ADDITIONAL NOTES 8. THE CONTRACTOR SHALL NOTIFY THE SAN DIEGO GAS & ELECTRIC COMPANY PRIOR TO e. CABLE TV ......................... COX CABLE STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE HIS WORK WITH f. MCI (CONTACT IS ALAN NAGEL AT (951)681 -4863 5 SHEET 3 - IMPROVEMENT PLAN COMPANY REPRESENTATIVES. �� PROJECT SHEET 4 - EROSION CONTROL PLAN 2. THE CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO �p��P LOCATION NOTICE: ALL ELECTRICAL AND GAS SERVICES WITHIN THIS PROJECT ARE BEGINNING ANY WORK ON THIS PROJECT. PHONE: (760) 633 -2770. "UNDERGROUND INSTALLATIONS ". FOR LOCATION OF ELECTRICAL CABLES AND GAS PIPING AND APPURTENANCES CONTACT THE SAN DIEGO GAS & ELECTRIC COMPANY. 3. THE CONTRACTOR SHALL GIVE 48 HOURS NOTICE ON ALL CALLS FOR INSPECTION. PHONE: SAN TELEPHONE: (858) 654 -8735 (760) 633 -2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE ELIJO SUBJECT TO REJECTION AND REMOVAL. LAGOO 9. THE CONTRACTOR SHALL NOTIFY AT &T PRIOR TO STARTING WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE WITH COMPANY REPRESENTATIVES. 4. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT (USA) AT S21 NOTE TO CONTRACTOR (1 -800- 422 -4133) NOT LESS THAN TWO (2) WORKING DAYS PRIOR TO CONDUCTING ANY r TELEPHONE: (760) 489 -3943 EXCAVATION WORK ON THIS PROJECT. THIS REQUIREMENT SHALL EXTEND TO EXCAVATION THE LOCATIONS AND SIZES OF THE EXISTING UTILITIES SHOWN HEREON HAVE BEEN WORK CONDUCTED WITHIN THE PUBLIC RIGHT -OF -WAY AND TO EXCAVATION WORK VICINITY MAP OBTAINED FROM AVAILABLE RECORDS AND ARE SHOWN FOR THE BENEFIT OF THE 10. THE CONTRACTOR SHALL NOTIFY THE OLIVENHAIN MUNICIPAL WATER DISTRICT 48 CONDUCTED ON PRIVATE PROPERTY. USA PROVIDE THE CALLER WITH AN "INQUIRY NO SCALE CONTRACTOR. ACTUAL LOCATIONS AND SIZES MUST BE VERIFIED BY THE CONTRACTOR HOURS IN ADVANCE OF STARTING WORK NEAR COMPANY FACILITIES AND SHALL IDENTIFICATION NUMBER" WHICH WILL SERVE AS PROOF OF THE TIME AND DATE THAT THE PRIOR TO CONSTRUCTION. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE ALL COORDINATE WITH COMPANY REPRESENTATIVES. CALL WAS MADE. CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING THIS NUMBER AND NECESSARY PRECAUTIONARY MEASURES TO PROTECT ALL UNDERGROUND AND PRODUCING IT TO THE OWNER OR THEIR REPRESENTATIVE UPON DEMAND. NO EXCAVATION OVERHEAD STRUCTURES WHETHER SHOWN OR NOT ON THESE DRAWINGS. NOTICE: FOR THE LOCATION OF WATER DISTRICT FACILITIES WITHIN THE PROJECT AREA PERMIT SHALL BE VALID UNTIL THIS NUMBER HAS BEEN OBTAINED PURSUANT TO SECTION TELEPHONE: (760) 753 -6466. 4216 OF THE GOVERNMENT CODE. 11. THE CONTRACTOR SHALL NOTIFY COX CABLE TELEVISION COMPANY PRIOR TO STARTING D. EROSION CONTROL WORK NEAR COMPANY FACILITIES AND SHALL COORDINATE WITH COMPANY REPRESENTATIVES. 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT GREG SHIELDS AT (760) NOTICE: FOR LOCATION OF CABLES AND APPURTENANCES CONTACT COX CABLE 633 -2778. TELEVISION COMPANY. TELEPHONE: (619) 266 -5217. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ABBREVIATIONS 12. CONTRACTOR SHALL RELOCATE ALL INTERFERING TRAFFIC SIGNS AS DIRECTED BY THE ALL TIMES DURING RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE CITY INSPECTOR. STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID AC = ASPHALT CONCRETE VERT. = VERTICAL CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS IMMINENT. LIP = GUTTER LIP HORIZ. = HORIZONTAL 13. THE CONTRACTOR SHALL PROTECT EXISTING LANDSCAPING AND IMPROVEMENTS EP = EDGE OF PAVEMENT SDRSD = SAN DIEGO REGIONAL REMAINING IN PLACE. NO LANDSCAPING OR IMPROVEMENTS SHALL BE DAMAGED OR 3. CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, EQUIPMENT AND ALL TC = TOP OF CURB STANDARD DRAWINGS REMOVED WITHOUT PRIOR APPROVAL OF THE CITY. APPURTENANT WORK NECCESSARY TO COMPLY WITH THE EROSION CONTROL PLAN FL = FLOWLINE PP = POWER POLE INCLUDED AS PART OF THESE PLANS AND SPECIFICATIONS. DEVICES SHOWN ON TB = TOP OF BERM THESE PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE 14. THE CONTRACTOR SHALL MAINTAIN ADEQUATE DUST CONTROL MEASURES THROUGHOUT ENGINEERING INSPECTOR. THE CONTRACTOR SHALL PROVIDE A 24 HOUR TELEPHONE THE DURATION OF THE PROJECT CONSTRUCTION. PROJECT SITE MAINTENANCE SHALL C. GRADING NUMBER AND THE NAME(S) OF THE PERSON(S) RESPONSIBLE FOR EMERGENCY CONFORM TO SECTION 7 -8 OF THE STANDARD SPECIFICATIONS. WORK. A TELEPHONE ANSWERING MACHINE OR ANSWERING SERVICE IS 15. THE CONTRACTOR SHALL MAINTAIN A SET OF "AS- BUILT" DRAWINGS ON WHICH ALL 1. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE UNACCEPTABLE. DRAINAGE AND PREVENT PONDING OF WATER. THE CONTRACTOR SHALL CONTROL SURFACE WATER CHANGES OR VARIATIONS IN THE WORK, INCLUDING UTILITIES, ARE TO BE RECORDED. A AND AVID DAMAGE TO ADJOINING PROPERTIES OR TO FINISHED WORK ON THE SITE AND SHALL TAKE 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING COPY OF SAID "AS- BUILT' DRAWINGS SHALL BE PROVIDED TO THE CITY OF ENCINITAS REMEDIAL MEASURES TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER RUN -OFF PRODUCING WHEN REQUESTED. PERMANENT DRAINAGE AND EROSION MEASURES HAVE BEEN INSTALLED. RAINFALL. TRAFFIC CONTROL NOTES 16. MATERIAL OR DEBRIS SHALL NOT BE STORED OR REMAIN IN THE PUBLIC 2. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS 1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH SECTION 7 -10 OF THE RIGHT -OF -WAY WITHOUT APPROVAL BY THE CITY ENGINEER. ACCORDANCE WITH STANDARD SPECIFICATIONS. ALL VEGETABLE MATTER AND OBJECTIONABLE MAY BE REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING STANDARD SPECIFICATIONS, AND APPENDIX "A" OF THE SAN DIEGO COUNTY MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. REGIONAL STANDARD DRAWINGS (AUGUST 2012). 17. OCCUPATIONAL SAFETY &HEALTH ADMINISTRATION (OSHA) NOTE: THE CONTRACTOR IS TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL REQUIRED TO OBTAIN A PERMIT FROM OSHA PRIOR TO COMMENCING CONSTRUCTION OF GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 6" AND THEN COMPACTED TO A 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY TRAFFIC FLOW IN BOTH DIRECTIONS IN TR THE CONTRACTOR SHALL MAINTAIN TRENCHES OF EXCAVATIONS WHICH ARE 5 FOOT OR DEEPER AND INTO WHICH A MINIMUM OF 92 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHEN IMPOUNDED 2. PERSON IS REQUIRED TO DESCEND. WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. WATERS CREATE A HAZARDOUS CONDITION. NECESSARY PRECAUTIONS MAY INCLUDE, CONFORMANCE WITH APPENDIX MAINTAIN TR THE SAN DIEGO COUNTY REGIONAL BUT NOT BE LIMITED TO, APPROPRIATE PERIMETER FENCING OR A 24 -HOUR GUARD STANDARD DRAWINGS (AUGUST 2012) AND THE APPROVED TRAFFIC CONTROL PLAN 18. NOTES AND DETAILS ON THE PLANS SHALL TAKE PRECEDENCE OVER THESE GENERAL PREVENTING UNAUTHORIZED PERSONS FROM ENTERING THE BASINS DURING THE WORKING HOURS OF 7:30 AM TO 4:00 PM, MONDAY THROUGH NOTES IN CASE OF CONFLICT. 3. FILL SLOPES SHALL BE TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH SURFACES AND UNIFORM FRIDAY, UNLESS OTHERWISE AUTHORIZED, NO WORK THAT OBSTRUCTS NORMAL CROSS SECTIONS. THE SLOPES OF EXCAVATIONS AND EMBANKMENTS SHALL BE SHAPED AND 7 ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED SWPPP SHALL BE TRAFFIC FLOW WILL BE ALLOWED DURING THE HOURS OF 4:00 PM TO 7:30 AM . TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY CONDITION. INCORPORATED HEREIN. AND AT ALL TIMES SATURDAYS, SUNDAYS AND LEGAL HOLIDAYS. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED ON EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE 3. ACCESS TO PRIVATE PROPERTY SHALL BE MAINTAINED AT ALL TIMES. SLOPES SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE.. FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. 4. ALL TREES, BRUSH, GRASS, AND OTHER OBJECTIONABLE MATERIALS SHALL BE COLLECTED AND 4. ALL TRAVEL LANES WILL BE A MINIMUM OF 12" WIDE UNLESS OTHERWISE SHOWN. HAULED OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN KEN 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN IN THE APPROVED SWPPP SHALL BE CLEARED WITH A NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL OF �S`�' `�71� IN PLACE AT THE END OF EACH WORKING DAY WHEN FIVE (5) DAY RAIN 5. TRENCH PLATES TO BE PROVIDED WITH SKID RESISTANT SURFACE. LOCATION OF DEBRIS FILL SHALL BE FROM THE SOILS ENGINEER AND CITY ENGINEER PRIOR TO QOM ��C���' /F`F9 PROBABILITY FORECAST EXCEEDS FORTY PERCENT (407). SILT AND OTHER DEBRIS 6. THE CONTRACTOR SHALL NOTIFY ALL ADJACENT PROPERTY OWNERS AND TENANTS DISPOSAL OF ANY SUCH MATERIAL. 4 y i SHALL BE REMOVED AFTER EACH RAINFALL. Q << OF THE PROPOSED POSSIBLE TRAFFIC DETOURS AT LEAST 72 HOURS PRIOR TO 5. THE CONTRACTOR SHALL MAINTAIN ADEQUATE DUST CONTROL MEASURES THROUGHOUT THE Zj y 10. SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COMMENCING WORK. DURATION OF THE PROJECT CONSTRUCTION. PROJECT SITE MAINTENANCE SHALL CONFORM TO * 70971 * COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO OCTOBER 1, THE SLOPE 7, ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED AT SECTION 7 -8 OF THE STANDARD SPECIFICATIONS. SHALL BE STABILIZED WITH BONDED FIBER MATRIX PER CASQA DETAIL EC -3 OF ALL TIMES DURING PROJECT CONSTRUCTION. ,rte 0 L �P THE CONSTRUCTION STORMWATER BEST MANAGEMENT PRACTICES HANDBOOK. 'rtor EptIFC� 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER MAINTENANCE OF THE EROSION CONTROL DEVICES AS NECESSARY. 12. ALL EROSION CONTROL MEASURES REQUIRED TO RETAIN SEDIMENT ONSITE AND TO SAFELY DISCHARGE ANY ACCELERATED RUNOFF GENERATED BY THE PROJECT SHALL BE INSTALLED WHEN THE 5 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40 PERCENT. Underground Service Alert Dig Alert (SEE SHEET 2 FOR CONTINUATION OF EROSION CONTROL NOTES) YOU DIG CALL L TOLL FREE 811 REVISIONS APPROVED DATE REFERENCES DATE BENCHMARK SCALE DESIGNED BY II DRAWN BY I CHECKED BY APPROVALS )QTY OF ENCINITAS ENGINEERING DEPARTMENT DRAWING N0. '� •I _ ELEV 38 52' NA 1038) PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED APPROVE ELEV 37.52' (NAVD fia) TITLE SHEET FOR: .. RECORD OF SURVEY 18416 HORIZONTAL _ DATE. lb IO BY: GREG SHIELDS BY: GLENN PRUIM STORM DRAIN OUTFALL REPAIR 4�- D 1 2.5" CITY OF ENCINITAS BRASS DISC IN NORTHEAST VERTICAL A 70917 CORNER DRAINAGE INLET ON THE EAST SIDE OF R.C.E. No. DATE: DATE: �/ �y MANCHESTER AVE. EAST OF EL CAMINO REAL MANCHESTER AVENUE 0.1 MILE SOUTH OF THE EXP. 6/30/2015 WORK PROJECT N0. CXIIG INTERSECTION WITH EL CAMINO REAL. CHRISTY A R.C.E. NO.: 30869 R.C.E. NO.: 51274 SHEET 1 OF 4 V N W WORK TO BE DONE (CONT'D) EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE 3. HYDROSEED MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 2. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE E. HYDROSEED AND TURF REINFORCEMENT MATTING G. CONTRACTOR'S RESPONSIBILITIES D. EROSION CONTROL (CONT'D) PRECIPITATION EXCEEDING ONE— QUARTER (1/4) INCH IN ANY 12 —HOUR PERIOD, OR . : 1 SEED MIX SHALL CONSIST OF NO LESS THAN 1. HYDRO SEED SHALL BE APPLIED TO ALL FILL SLOPES THAT ARE GRADED 6:1 1. THE CONTRACTOR SHALL ENFORCE ALL SAFETY MEASURES. THE CONTRACTOR 13. TEMPORARY EROSION CONTROL DEVICES SHOWN ON THE SWPPP WHICH INTERFERE ( HORIZONTAL TO VERTICAL ) OR STEEPER. SHALL CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES AS APPROVED BY THE CITY WITH THE WORK SHALL BE RELOCATED OR MODIFIED AS THE WORK PROGRESSES a. 20 LBS. PER ACRE OF ROSE CLOVER ENGINEER, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR AS RECOMMENDED BY THE ENGINEER OF WORK AND AS APPROVED BY THE CITY 2. IRRIGATION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH ENGINEER. LEVEL FOR THE GROWTH OF HYDROSEED AND BONDED FIBER MATRIX. STANDARDS, LAWS, AND REGULATIONS. 14. EROSION CONTROL SYSTEMS SHALL BE SERVICED AND MAINTAINED TO PROVIDE 3. HYDROSEED MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 2. CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONTINUOUS CAPACITY AND ADEQUACY TO FUNCTION AS DESIGNED. AFTER CONDITIONS DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF ALL PRECIPITATION EXCEEDING ONE— QUARTER (1/4) INCH IN ANY 12 —HOUR PERIOD, OR . : 1 SEED MIX SHALL CONSIST OF NO LESS THAN PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND UPON THE DIRECTION OF THE CITY ENGINEER, SILT AND DEBRIS SHALL BE NOT BE LIMITED TO NORMAL WORKING HOURS. REMOVED FROM CHECK DAMS AND DESILTING BASINS, AND BASINS PUMPED DRY a. 20 LBS. PER ACRE OF ROSE CLOVER AND RESTORED TO THE ORIGINAL DESIGN CONDITION. b. 20 LBS. PER ACRE OF ZORRO FESCUE 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MONUMENTATION AND /OR ANY c. 3 LBS. PER ACRE OF ESCHSCHOLZIA CALIFORNICA BENCHMARKS WHICH WILL BE DISTURBED OR DESTROYED BY CONSTRUCTION. SUCH 15. DESILTING BASINS CONSTRUCTED OF COMPACTED EARTH SHALL BE COMPACTED TO d. PER ACRE OF ACHILLEA MILLEFOLIA 4 LBS. POINTS SHALL BE REFERENCED AND REPLACED WITH APPROPRIATE MONUMENTATION A RELATIVE COMPACTION OF 90 PERCENT OF MAXIMUM DENSITY. A SOILS e. 3 LBS. PER ACRE OF ALYSSUM (CARPET OF SNOW) SET BY A STATE OF CALIFORNIA LICENSED LAND SURVEYOR OR A STATE OF ENGINEERING REPORT INCLUDING THE TYPE OF FIELD TESTING PERFORMED, f. 1/2 LBS. PER ACRE OF DIMORPHOLECA CALIFORNIA REGISTERED CIVIL ENGINEER AUTHORIZED TO PRACTICE LAND LOCATION, AND RESULTS OF TESTING SHALL BE SUBMITTED TO THE CITY ENGINEER g. ITEM (a) OF THIS SUBSECTION MUST BE INOCULATED WITH A NITROGEN FIXING SURVEYING. A CORNER RECORD OR RECORD OF SURVEY, AS APPROPRIATE, SHALL FOR APPROVAL UPON COMPLETING THE DESILTING BASIN. BACTERIA AND APPLIED DRY EITHER BY DRILLING OR BROADCASTING BEFORE BE FILED BY THE LICENSED LAND SURVEYOR OR REGISTERED CIVIL ENGINEER, AS APPLYING HYDROSEED AND BONDED FIBER MIX. REQUIRED BY THE LAND SURVEYORS ACT. 16. PAVED STREETS, AC BERMS, AND OTHER IMPROVEMENTS SHALL BE MAINTAINED IN h. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOB SITE IN UNOPENED A NEAT AND CLEAN CONDITION, FREE OF LOOSE SOIL, CONSTRUCTION DEBRIS, AND CONTAINERS WITH CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE TRASH. STREET SWEEPING OR OTHER EQUALLY EFFECTIVE MEANS SHALL BE USED CERTIFICATION TAG ATTACHED TO, OR PRINTED ON SAID CONTAINERS. 4. THE CONTRACTOR IS RESPONSIBLE TO POTHOLE AND LOCATE ALL EXISTING TO CLEAN STREETS EXCEPT FOR THE REMOVAL OF FINE MATERIAL NOT OTHERWISE L NON —PHYTO —TOXIC WETTING AGENTS MAY BE ADDED TO THE HYDROSEED AND SUBSURFACE UTILITIES, PRIOR TO THE START OF DEMOLITION OR CONSTRUCTION. REMOVED BY SWEEPING OR OTHER MECHANICAL MEANS. BONDED FIBER MATRIX SLURRY AT THE DESCRIPTION OF THE CONTRACTOR. ANY EXISTING UTILITIES THAT REQUIRE REMOVAL OR RELOCATION SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY AGENCY PRIOR TO THE BEGINNING OF 17. STANDBY CREWS SHALL BE ALERTED BY THE CONTRACTOR FOR EMERGENCY WORK WHERE TURF REINFORCEMENT MATTING IS APPLIED: CONSTRUCTION. IF DURING POT HOLING THE CONTRACTOR DISCOVERS A POTENTIAL DURING RAINSTORMS. AFTER HYDROSEEDING, INSTALL TURF REINFORCEMENT MATTING (SERIES C350 BY CONFLICT BETWEEN PROPOSED UTILITIES AND EXISTING UTILITIES, THE CONTRACTOR NORTH AMERICAN GREEN, OR APPROVED EQUAL). SHALL IMMEDIATELY NOTIFY THE CITY. THE CONTRACTOR SHALL ALLOW AMPLE TIME 18. GRAVEL BAGS AND NECESSARY MATERIALS IN ACCORDANCE WITH THE APPROVED FOR REVISIONS TO BE MADE TO THE PLANS TO AVOID CONFLICTS PRIOR TO THE SWPPP PLANS, SHALL BE AVAILABLE ON —SITE AND STOCKPILED AT CONVENIENT 4. FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFATE, 16 -20 -0, WITH 15% START OF UTILITY INSTALLATION. LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES OR TO SULFUR APPLIED AT THE RATE OF 500 LBS. PER ACRE. REPAIR ANY DAMAGED EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. A 5. THE CONTRACTOR SHALL REQUEST MARKOUT OF EXISTING UNDERGROUND UTILITIES STANDBY CREW SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY AREA TO RECEIVE HYDROSEED SHALL BE PREPARED PRIOR TO APPLICATION BY: BY CALLING THE LISTED REGIONAL NOTIFICATION CENTER FOR AN INQUIRY SEASON. IDENTIFICATION NUMBER, AT LEAST (3) DAYS PRIOR TO THE START OF ANY 5. ROUGHENING THE. SURFACE TO BE PLANTED BY ANY OR A COMBINATION OF: CONSTRUCTION. 19. ALL UTILITY TRENCHES SHALL BE BACK FILLED WITHIN 24 HOURS AND MUST BE BACK FILLED BEFORE THE END OF WORK DAY IF A 40 PERCENT, OR GREATER, a. TRACK WALKING SLOPES STEEPER THEN 6:1. CHANCE OF RAIN IS PREDICTED. b. RIPPING AREAS THAT WILL NOT BREAK UP USING ITEM (A) ABOVE. 20. A GRAVEL BAG SILT BASIN OR TRAP SHALL BE PROVIDED AT EVERY STORM DRAIN 6. CONDITIONING OF THE SOILS SO THAT IT IS SUITABLE FOR PLANTING BY: INLET TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT 21. A 12 —INCH HIGH BY 4 —FOOT WIDE BERM SHALL BE MAINTAINED ALONG THE TOP SATURATED SEED BED. OF THE SLOPE OF THOSE FILLS ON WHICH GRADING IS NOT IN PROGRESS, b. THE CONDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING OF CONCENTRATED WATER SHALL BE CARRIED NOT CLOSER THAN 10 —FEET FROM THE COVERING SALINE SOILS TO PROVIDE VIABLE CONDITIONS FOR GROWTH. TOP OF SLOPES. HYDROSEED AND TURF REINFORCEMENT MATTING AREAS SHALL BE MAINTAINED TO 22. PROVIDE VELOCITY CHECK DAMS IN ALL UNPAVED STREET AREAS AT THE PROVIDE A VIGOROUS GROWTH UNTIL THE PROJECT IS COMPLETED AND ALL SECURITY INTERVALS INDICATED BELOW. VELOCITY CHECK DAMS MAY BE CONSTRUCTED OF RELEASED. THIS INCLUDES THE CONTRACTOR APPLYING ADEQUATE IRRIGATION WATER GRAVEL BAGS, TIMBER, OR OTHER EROSION RESISTANT MATERIALS APPROVED BY UNTIL VIGOROUS GROWTH HAS TAKEN HOLD. THE CITY ENGINEER AND SHALL HALF WAY ACROSS THE STREET AT RIGHT ANGLES TO THE CENTERLINE. EARTH MAY NOT BE USED AS VELOCITY CHECK DAMS. CHECK DAM INSTALLATION SHALL PROVIDE FOR THE PREVENTION OF EROSION AROUND IHE ENDS OF THE DAM. CRADE OF THE STREET INTERVAL LESS 2% THAN AS100REQUIRED F. IMPROVEMENTS 4% TO 10% 50 FEET OVER 10% 25 FEET 1. A PERMIT SHALL BE OBTAINED FROM THE ENCINITAS ENGINEERING SERVICES DEPARTMENT FOR ANY WORK WITHIN THE STREET RIGHT —OF —WAY. 2. APPROVAL OF THESE IMPROVEMENT PLANS AS SHOWN DOES NOT CONSTITUTE APPROVAL OF ANY CONSTRUCTION OUTSIDE THE PROJECT BOUNDARY. A PERMIT SHALL BE OBTAINED FROM THE ENCINITAS ENGINEERING SERVICES DEPARTMENT FOR ANY WORK WITHIN THE STREET RIGHT —OF —WAY AT NO COST TO THE CONTRACTOR. 3. ALL UNDERGROUND UTILITIES WITHIN THE RIGHT —OF —WAY SHALL BE CONSTRUCTED, CONNECTED AND TESTED PRIOR TO CONSTRUCTION OF BERM, CURB, CROSS GUTTER AND PAVING. 4. LOCATION AND ELEVATION OF IMPROVEMENTS TO BE MET BY WORK TO BE DONE SHALL BE CONFIRMED BY FIELD MEASUREMENTS PRIOR TO CONSTRUCTION OF NEW WORK. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES. REVISIONS APPROVED DATE REFERENCES DATE BENCHMARK SCALE DESIGNED BY i DRAWN BY CHECKED BY APPROVALS I TY OF EN Cl N I TAS ENGINEERING DEPARTMENT DRAWING NO. ILT -I -ly ENC -38 (PT NO. 1038) ELEV 37.52' (NAVD 88) PLANS PREPARED UNDER SUPERVISION OF RECOMMEND E SHEET FOR: RECORD OF SURVEY 18416 HORIZONTAL DATE: �i0 BY: GREG SHIELDS BY: UI STORM DRAIN OUTFALL REPAIR 48 -DI 2.5" CITY ENCINITAS BRASS DISC IN CORNER DRAINAGE INLET ON THE EAST NORTHEAST SIDE OF VERTICAL R.C.E. NO. 70917 � DATE: ��' I L� � DATE: MANCHESTER AVE, EAST OF EL CAMINO REAL V MANCHESTER AVENUE 0.1 MILE SOUTH OF INTERSECTION THE /// EXP. 6/30/2015 30869 51274 WORK PROJECT NO. CXIIG SHEET 2 OF 4 WITH EL CAMINO REAL. CHRISTY V R.C.E. NO.: R.C.E. NO V RI PROFILE SCALES VERT. 1"=2 HORIZ.1 " =5' PLAN HORIZ. 1 " =5' 1+50 1+75 o- _389_ \ NUJ CURB DATA NO. BEARING ILENGTH REMARKS 1 N88'44'56 "W 10.00' 6" AC BERM PER SDRSD G -5 TYPE A 2 N88'44'56 "W 2.00' CURB & GUTTER PER G -2 TRANSITION FROM 6" TO 10" CURB 3 N89'17'23 "W 10.00' 10" CURB PER D -2 4 N86'13'16 "W 10.00' CURB & GUTTER PER G -2 TRANSITION FROM 10" TO 6" CURB 5 N86'13'16 "W 22.92' 6" AC BERM PER SDRSD G -5 TYPE A REVISIONS I APPROVED I DATE REFERENCES ❑ STORM DRAIN DATA NO. BEARING I LENGTH 1 N56-05.08 "W 12.38' REMARKS 24 "1@8P"9 -800 HOPE DATE BENCHMARK ENC -38 (PT N0. 1038) ELEV 37.52' (NAVD 88) RECORD OF SURVEY 18416 SCALE HORIZONTAL 1 " =5' 2.5" CITY OF ENCINITAS BRASS DISC IN NORTHEASTI VERTICAL CORNER DRAINAGE INLET ON THE EAST SIDE OF 1 " =2' MANCHESTER AVENUE 01 MILE SOUTH OF THE INTERSECTION WITH EL CAMINO REAL. rs MANCHESTER EX. ? GUARD ?A' PQl A VE ti9 PGl RAIL � `6180 `y`I.• (Sg 93� / J EXIST. 60 "RCP'S /_ -- — — — -- — r �reBF sJ r V EXI STINy Ipl. Fool w4 WALL SECTION B -B NO SCALE s99s�s �99�� — — — — — — — — — — — S6 EX. 60 "RCP1 0 GRAPHIC SCALE 1 INCH = 5 FT. SECTION A -A NO SCALE CONSTRUCTION NOTES 1O— PROJECT BIOLOGIST MUST REVIEW THE SITE AND PROVIDE INSTRUCTION /TRAINING TO WORKERS PRIOR TO COMMENCEMENT OF WORK, PER SECTION C OF THE PROJECT SPECIFICATIONS. Q— PROPOSED WORK AREAS SHALL BE ACCESSED FROM THE TOP OF THE EXISTING ROADWAY. EQUIPMENT AND MACHINERY WILL NOT BE PERMITTED WITHIN WATERS OF THE U.S. /STATE, INCLUDING WETLANDS, AND NATIVE VEGETATION COMMUNITIES. WORK AREAS THAT CANNOT BE ACCESSED FROM THE ROADWAY WILL BE PREPARED FOR USING HAND LABOR AND HAND TOOLS ONLY. 3o- VEGETATION REMOVED SHALL BE DISPOSED OF IN ACCORDANCE WITH THE PROJECT BMPS IN ORDER TO PREVENT THE SPREAD OF INVASIVE VEGETATION INTO LUX CANYON CREEK. 4o- ALL SOIL SHALL BE UTILIZED ON —SITE. NO SOIL SHALL BE EXPORTED WITHOUT THE PRIOR AUTHORIZATION OF THE CITY ENGINEER. PLANS PREPARED UNDER SUPERVISION OF DATE: / R.C.E. N0. 70917 MRRIISTY t1 to EXP. 6/30/2015 wo Iv ams "t1WC-4 FOar Ny CONSTRUCTION NOTES (CONT.) So- INSTALL CURB & GUTTER PER SDRSD G -2. O6 — INSTALL 6" AC BERM PER SDRSD G -5 TYPE A 7o- SAWCUT 1' BEYOND PROPOSED GUTTER & INSTALL AC PAVEMENT TO MATCH EXIST. GRADES. 8o- REPAIR EXISTING EROSION, REGRADE BLENDING CEMENT TREATED BASE INTO FILL (APPROX. 5 C.Y. OF FILL). l� EXTEND GUARDRAIL PER CALTRANS STD. PLAN A77E1 (TYPE IID). 10 INSTALL FLARED TERMINAL SYSTEM END TREATMENT PER CALTRANS STD. PLAN A77L2. APPROVALS RECOMMENDE [� BY: GREG SHIELDS DATE: _�' /b•?rOI R.C.E. NO.: 30869 +25 PHOTOGRAPH # 1 NO SCALE Underground Service Alert Dig Alert roS nD CALL L TOLL FREE Bll M Va DAIS MW OF EN CI N I TAS ENGINEERING DEPARTMENT APPROVE PUBLIC IMPROVEMENT PLANS FOR: BY: GLENN PRUI STORM DRAIN OUTFALL REPAIR DATE: _� iy MANCHESTER AVE. EAST OF EL CAMINO REAL R.C.E. NO.: 51274 WORK PROJECT NO. CXIIG DRAWING NO. 48 -DI SHEET 3 OF 4 V V v � N W d V OQ N W