Loading...
2001-7291 TE (Plans)�krs-rtrt� `t-tt�_�w� �slatt Z� At-h' Z° (4 ± . a` sr►� t7- t t � � SPECCNTO , AO NUTES r+� - 14t� s ti t LqC Pig �� Z The proposed seawall shall conform as closely to the natural contour of the c, bluff as possible. I r is �C �S To £?t"1 i= i�i�l 2. No local sand, cobbles or shoreline rocks shall be used for backftil or for any other purpose as construction material. Disturbance to sand and intertidal nareas shall be minimized to the maximum extent possible -To`'TxEI, tp...�t-t 5-nt lt�9'�k . S � -L 3. Any existing permanent irrigation systems located within the geologic rye C setback area (40 feet from the bluff edge) shall be removed or capped• S A lu .4 t/v 4. All runoff from impervious surfaces on the site shall be collected and J ' � directed away from the bluff edge towards the street and -shall avoid pondiag of the pad arm 5. the • S. The seawall shall be colored and textured to match, to the extent :pom le, rt r surrounding bluff areas. Coloring of the seawall will be performed using PERMEON coloration system. 1 n ./. _ f or materials shall occur oa sandy beach or Pub 6. No staging o . During of the � �jc . rking areas. Dnrin both construction and the removal stages Si✓,o Ucs►t�, \ ro ect, the perm and or contractor shall not store any coastraMion ''.. p 3 / r� z .�-^ 1 materials or waste where it will be or could potentially be subject to wave ' a tiN i n S erosion and dispersion. No machioerq shall be placed, stored or otherwise located in the Intertidal zone at any time. t 1 ✓ y� 7. Construction corridors shall be located in a manner that has the least impact on public access to and along the shoreline. No work, unless approved - by the City of Encinitas and the California Coastal rip OVA Not;TH Commission staff, shaft occur on the beach between Memorial Day weekend. -rt and Labor Day of any Year- -:5 C^ z -h1St. ekz Ap�S 71st - S� tSY.v�tl. A-r `ht�St.o{�� 1 SL, LFo -r x�. Lvv . ntl ;L2- -r rya C4--- 7z, r; itSl• �Lp11 b.O.uC/. ,�t�s C R r , C7 + Ct) S>=.E NRF�q�pq To DER 3�.VFF " SEC. , DOrrev 9 (zo 191 u 1 c a ba S A $f Ith r 7 et4 k t l' •1 tJ 4 r tr I _0 _ 10 "rtT' S r, I • 2?�(� 7'T �,f IttSTti4t�� IA411 A'fS N A,Q E . l i' { 04 Cam. t--Y LXr— 'k= ��c I S-7" I t4- �1'r#'tJ � ��+ S �-� >r -kT7✓ �t-t?' I -�t� S c-,h 'T- -I f.`LS + z "'bt -A sell . Ca �iP�- 1'rCaS l 1 F S Tel to i C& (H- S'T^tom, 4F) # V r4 +4NVL -V f, P17F>t, , 1ccaS t'$_ Tom+ s3 Gam. -1r�v s t Oft A--T--TA La4'�; sj 04 N (� c7 A(�YA N 1 Z-,4, ��� %► � S GH- . G<� f> rPr--- Pr GF, bftC-6—C7r'<=AJN{ta (lit �):.Nl /ar`rrON -!=N `r4" &. uvt r+<=�, �rw tv� S t.t, t- +c�t+.tt t+ c� `ttzP�x,r�tc,S r1. S.dAr LA >_-Z,., Its-) ASS t*+S LA<:5 $ ov7 jv /-;; 0 x z Z ZO E III —i W W OZN Z Z LLJ O (-)13 I ?Q ESS /pN MA/y, ql ,y� FZ� No. C. 16459 W No. GE 554 EXP.6 -30 -01 OF CAL�FO V) Z 0 Q W C) V) < J Z V— a. n U. M I.L. W 0 Z w� O <J {.L i Q � ZU t-- CL Q zz Q. Uj 05 Of (00 w FILE No. DATE PROJECT 99 -0.19 DWG. No. Sru"02 REVISION REVISK)N RVASION J ^ 12_ 10 0 REASION DESIGNED BY; RH CHECKED BY-. ROM r6;2 jv /-;; 22 MAX.) PLACE COM& J)INTS IN UPPER WAL� AS NECESSARY 8 MSL* 0 12" C.C.* EW #4 120 12* #5 0 5" C.C.± EW CONCRETE PLACEMEN .' vj��14� .44 LosF, .,11 0! Z N isF A 10 R 110 i A' i2" DETAIL B/3 SCALE: 3/4"= 1'-0" T.O.W. +32' +30' +22' — — +20' — — +10, — — +8' — — B.O.W. _V7 -4' SECTION C13 SCALE- 3/4'_-1 '-0' SECTION D13 SCALE- 3/4*=l*-O" PROFILE SCALE: 3/16"=l'-O" 20'+ (3T MAX.) KIPS SECTION E/3 SCALE: 3/4"-l'-O* 1R'_EQ1`UIRED,^'1VwZR�1ESJr 44-�: +32' — — — — — — — — +30' — — — — — — — — SEE SECTION C/3 SEE DErAIL A/3 +22' — — — — — — — +20' — — — — — — ­ SEE SECTION SEE DETAIL 8/3 +10, — — — — — I +81 — — — — — SEE 30 PVC DRAIN PIPE FORMATIONAL MATERIAL 0 -4� DETAIL A/3 SCALE: 3/16*=l*-O" NOTE* 12 INCH WALL THICKNESS ASSUMED FOR STRUCTURAL CALCULATIONS REINFORCEMENT STEEL SHALL BE EPDXY PAINTED. MIN. DEVELOPMENT LENGTH IN INCHES (1d): T2 (DQ = Vc = 3.0 k9i Vc = 4.0 Wi #4 120 12* #5 150 150 #9 44" 380 #1_1 68" 59, LAP LENGTH IN INCHES (1.31d): T2 (DQ = f#c 3.0 ks, Vc - 4.0 k9i Design load 16" 160 [#4 #5 #5 20" 20" 9 # 19 58" 50" #11 #1 wall 77* 2T t2S*:I:L AFIPRO�. TOP OF TORRY SANDff0_Nff'_ ROCK ANCHOR UNBONDE4 AREA T--" ) (BONDED AREA) % WITH CONCRETE AS NECESSARY FEET INTO BEDROCK OR AS DIRECTED BY ENGINEER IN THE FIELD. GENERAL NOTES: 1 Design and construction to be in accordance with 1994 UBC and local Codes. 2. All dimensions, conditions and location of facilities to be verified and determined in field. 3. Exact location of concrete sea wall may be adjusted as field conditions require at time of construction. 4. All cost-in-place concrete shall have compressive strength of 4,000 psi at 28 days, U.N.O..-Er,3CL%3Pirj& S4orr_QeTE� 5. All structural steel, if any, shall be A 36. 6. Reinforcing steel to be Gr. 60 for #4 bars and above. Bars to be epoxy painted. 7. All exposed steel shall, if any, to be or coated with corrosilon galvanized inhibiting point. Tieback heads to be completely coated with epoxy grout or concrete. 8. Special inspection is required for reinforcing steel placement and tiebacks. Concrete test cylinder shall be taken and tested. (UBC 1701.5.12). 9. Section at construction joint make rough or form key. 10. Tieback notes: a. Use Dywidog bars and Dywidag standard hardware, or ecLual. b. Bar to be 1 dio.(#8), Gr. 150. c. As alternative Multistrand anchor with (2) min. 0.6" dia., 270 ks! strands could be utilized. d. Tiebacks installed at 8'-6" C.C.±. e. Tiebacks shall be epoxy pointed and covered in concrete. f. Use adequate centralizers 0 15' C.C. Use (2) min. centralizers per bar. g. Tieback Loads: Rock anchor T1 Design load (DQ = 45.0 kips Test load 0 150 % of DL = 70.0 kips Rock anchor T2 (DQ = 45.0 kips Design load Test load 0 150 X of DL = 70.0 kips h. All tiebacks shall be proof tested to test load. 1. Grout to be cement grout w/water-cement ratio (w:c) of 0.4 to 0.5 = 5 gal. per sock. Allow up to 22.5 cf sand/yard. Allow cure time before testing. Provide for two stages of grouting. First stage of grouting shall be for testing of tiebacks. Holes to be tremie pipe grouted from bottom of hole to approx. 5' to 10' from face of bluff, to provide for bonded zone. Second stage of grouting shall be accomplished after accepted testing. all way up remaining hole. ABBREVIATIONS: M.S.L -Mean sea level N.I.C. -Not in contract E.W. -Each way C.C. -Center to center U.N.O. -Unless noted otherwise T.O.W. -Top of wall B.O.W. -Bottom of wall BENCHMARK THE BENCHMARK USED FOR THIS PLAT IS SAN DIEGO COUNTY VERTICAL CONTROL MONUMENT NO. O.C. 141, LOCATED ON THE EAST SIDE OF HWY. 101, 150' SOUTH OF THE CENTERLINE OF EL PORTAL STREET IN THE CITY OF ENCINITAS, CA. EL. 63.913 M.S.L. Z C? in 0 t� A Z 0 0 Z -J UJ 0 UJ Z 0 Z Z LLI 0 0 ES,,; MA No. C. 16 Z No. GE EDX(P.6-30 1 or 0 V) LJ (,6 Z 0 0 Z Z < LL_ J ry LIJ 0 < Z UJ (If LL 0 ��0 I UJ < Z 0 U) W n < UJ F..; Z Z 0 ry to (0 LIJ FU NO. DATE PRWWT 9"9 DW No. er"new t - FOAM A 57 RIDY"M VENOM W. RH