Loading...
7947 GENERAL NOTES, ABBREVIATIONS AND DR. DOOR S. SOUTH P y responsible for all 26. Contractor to temporary q ANGLE DS. DOWNSPOUT LAM. LAMINATE S4S SURFACED FOUR SIDES 1. The construction Documents shall represent the entire . 12: The Contractor verify and be rea provide all tam ra field bracing to r ® agreement between the Owner and the General Contractor .dimensions and 'conditions on the job, and the Architect secure structure until completion of building. ENTERLINE D.S.P. DRY STANDPIPE LKR. LOCKER S&P SHELF & POLE 'ems" j • P g' DIAMETER or ROUND DS&P DOUBLE SHELVES b POLES LOUV. LOUVERED S.A.R. SUPPLY AIR REGISTER for the complete construction of this project. These must be notified of any variations from the dimensions PERPENDICULAR DW. DISHWASHER LT. LIGHT documents being the drawings contained herein, the and conditions shown by these drawings. 27. The General Contractor shall be responsible for S.C. SOLID CORE _ PLUS or MINUS (approx ) DWG. DRAWING technical specifications, general conditions of the installation and start-up of all utility services to S.D. SCHEDULE PROPERTY LINE OWR. DRAWER MAX. MAXIMUM oJC h PorraJ &AJJOC;d1 contract, and special conditions of the contract, 11. Omissions from the drawings and specifications, or the the building. All utility companies shall be notified S.D. SOAP DISPENSER S PERCENT M.B. MACHINE BOLT ] P addenda issued during bidding, change orders, and all miadescription of the work which is manifestly by Contractor upon commencement of work that services SEC. SECTION a POUND or NUMBER E. EAST H.C. MEDICINE CABINET Federal, State, and Local codes and regulations necessary to carry out the intent of the drawings and are required. Should utility service not be available S.G.D. SLIDING GLASS DOOR @ AT EA. EACH MECH. MECHANICAL pertaining to the practice of construction. specifications, or which is customarily performed, upon the tenants occupancy, General Contractor shall be sH. SHELF shall not relieve the Contractor from .J. EXPANSION JOINT MEMO. MEMBRANE performing such � responsible for installation and cost of temporary A.A.qq ATTIC ACCESS ELEC. ELECTIRCAL MFR. MANUFACTURER SHT. SHEET 2. The term "N.I.C." shall be construed to mean that omitted or misdescribed details of the work as if fully services until permanent services are in place. A.S. ANCHOR BOLT ELEV. ELEVATION H.H. MAN HOLE SHTG. SHEATHING IiII2Soffentalalligload construction work not be furnished, installed, or and completely set forth and described in the drawings A.C. ASPHALTIC CONCRETE EMER. EMERGENCY MIN. MINIMUM SIM. SIMILAR performed by the Contractor) the term shall mean "Not and specifications. 28. The:General Contractor is responsible for providing all SL. SLIDING S[tlte 2Sl in the Contract" or "Not a Part of the Work to be temporary COUS. ACOUSTICAL E.P. ELEC. PANEL BOARD MIR. MIRROR puding construction facilities and utilities A.D. REA DRAIN EQ. EQUAL MISC. MISCELLANEOUS S.M. SHEET METAL v performed by the Contractor", except that coordination 14. Where details are net shown for any part of the work, including: electricity, heat/ventilation, telephone, S.N.D. SANITARY NAPKIN DISP. San 01 e9a.C31i(afBla 52121 b ADO. ADDITIVE EXIST. EXISTING M.O. MASONRY OPENIN S.N.R. SANITARY NAPKIN RECP. and/or installation of certain N.I.C. items specified the construction shall ti similar for a other similar water, sanitary facilities, barriers, enclosures, ADJ. ADJUSTABLE EXP. EXPANSION MTD. MOUNTED shall be the Contractors responsibility. work, or the Architect notified for clarification. security, trash removal, and final cleaning. SPEC. SPECI FICATIONS A.F.F. ABOVE FINISH FLOOR EXT. EXTERIOR MTG. MOUNTING SQ. SQUARE SI9•I72•C21S P 15. All notes listed below are a P y AGGR. AGGREGATE E.W.C. ELEC. WATER COOLER MTL. METAL 7. All work shell be in compliance with all governing applicable unless otherwise 29. Prior to final inspection b the Architect and Owner S.S. SELECT STRUCTURAL codes and ordinances, including the Uniform Building noted within the construction documents or and . alter all construction work is essentially A.I .A. AM. INST. OF ARCHITECTS E.W.W.M. ELEC. WELDED WIRE MESH MUL. MULLION S.SK. SERVICE SINK far 132-211z Code National Electric Code Uniform Plumbing ode specifications. A.I .S.C. AM. INST. OF STEEL CONST. S.STL. STAINLESS STEEL complete, thoroughly clean the area to work. Items to ALT. ALTERNATE F.A. FIRE ALARM N. NORTH STA. STATION 4 , be cleaned include, but are not limped to: all glass, ALUM. ALUMINUM F.A.U. FORCED AIR UNIT N.I .C. NOT IN CONTRACT STAG. STAGGERED OSIfA, City County, State and National standards and 16. Dimensions shown shell take ale drawl over drawing , opening frames ANOO. ANODIZED F.B. FLAT BAR NO. NUMBER STD. STANDARD safety codes. References given attar any of the P plastic, doors o , grilles, trim, exposed followin notes refer to the 19 edition of the U.B.C. scale or proportion. Larger scale drawings shall take 9 91 nonferrous metal suzlaces, [loot cova[inq, light APPROX. APPROXIMATE FD. FLOOR DRAIN precedence over smeller scale drawings. Due to NOM. NOMINAL fixtures and plates, plumbing fixtures, and trim and ARCH. ARCHITECTURAL FDN. FOUNDATION STL. STEEL '. 4. The General Contractor shall be responsible to verify reprographic processes, these plans may not be accurate all finish surfaces throughout the construction. N.T.S. NOT TO SCALE STOR. STORAGE permits and approvals have been cleared with to scale. Therefore, these plans should not be - A.S.T.M. AM. SOC. FOR TESTING MTRLS. F.E. FIRE EXTINGUISHER that all "scaled". "'Thoroughly remove ink trademarks from laminated plastic AVE. AVENUE F.E.C. FIRE EXTINGUISHER CABINET STRUC7• STRUCTURAL appropriate agencies prior to start of construction. surfaces. Vacuum-clean the area and remove all spots, O.A. OVERALL SUSP• SUSPENDED FINISH FLOOR ELEVATION F.F.No construction or fabrication any !tams shall begin including those of vandals. Follow recommendations of DDS. OBSCURE SYn. SYMBOL or SYMMETRICAL until the Contractor has received ed ell plena and any a. All dimensions are rough and to stud line Be.T BOARD F.G. FINISH GRADE the manufacturer of the materials and items to be O.C. ON CENTER unless otherwise noted. BIT. BITUMINOUS F.H. FIRE HYDRANT other documentation from all of the permitting and any cleaned for all cleaning, polishing, and treatment such O.D. OUTSIDE DIAMETER T. TREAD other regulatory authorities. Failure of the b. All dimensioned and existing conditions shall BLDG. BUILDING F.H.C. FIRE HOSE CABINET 011. OVERHEAD Tb8 TOP b BOTTOM 4 �' be verified in field before commencing as waxing. BLK. BLOCK FIN. FINISH '. Contractor to follow this procedure shall Cause the , g work. OPNG. OPENING TbG TONGUE b GROOVE Contractor to assume full responsibility for the C. Do not scale drawings. BLKG. BLOCKING F/J FLOOR JOIST OPP. OPPOSITE ]0. Remove from the entire site all construction waste and T.B. TOWEL BAR ' Subsequent modification o[ the work mandated b an d. Reference to any detail or drawing is for BM. BEAM F.JST. FLOOR. JOIST 4 y y convenience only and does not limit the unused materials, and all debris down any description B.N. BOUNDARY NAILING FLR. FLOOR PART. P ARTIAL T.C. TRASH COMPACTOR regulatory authority. Written authority to proceed Y resulting from the work.. Hose down and scrub where TEL. TELEPHONE will be given to the General Contractor b the Owner. application of such drawing or detail. necessary TM. BOTTOM FLSHG. FLASHING P.B. PUSH BUTTON y e. These drawings are only representative with ry all concrete and asphalt pavement and walks B.T.U. BRITISH THERMAL UNIT FLUOR. FLUORESCENT P.C. PORTLAND CEMENT TEMP. TEMPERED (glass) dirtied as a result of the work. Thoroughly remove TER. TERAZZO 5. The General Contractor shall be responsible for details to assist the Contractor. Drawings BU. BUILT-UP F.O.C. FACE OF CONCRETE PCST. PRECAST Po Concrete or mortar droppings from walks and other THK. THICK maintaining the "on-the-job" set of permit documents do not illustrate every condition. pavements where the y occur. F.O.F. FACE OF FINISH II.. PLATE T.O. TOP OF with appropriate approval stamps from local regulatory C. CHANNEL F.O.M. FACE OF MASONRY P.LAM. PLASTIC LAMINATE T.D.B. TOP OF BEAM agency. All work shall be in accordance with such 17. Workmanship throughout shall be of the best quality of 31. Dispose of waste, trash, and debris is a safe, CAB. CABINET F.O.S. FACE OF STUD PLAS. PLASTER T.D.C. TOP OF CURB or CONCRETE documents. the trade involved. Each subcontractor is considered a acceptable manner, in accordance with applicable laws CAR. CARPET FRMG. FRAMING PLYWO. PLYWOOD T.O.H. TOP OF MASONRY specialist in his respective field and shall notify the and ordinances and as prescribed by authorities having C.B. CATCH BASIN FT. FOOT or FEET PR. PAIR T.O.P. TOP OF PLATE OR PAVEMENT 6. No changes or modifications to the work shall be made Owner of any work in his trade that cannot be fully jurisdiction. Bury no such waste material and debris CB7. CABINET FTG. FOOTING PT. POINT T.O.S. TOP OF SLAB approval of the Architect. Failure to obtain guaranteed prior to submitting his bid, and shall ' without a on the site. Burning of trash and debris on the site GEM. CEMENT FURR. FURRING P.T.D. PAPER TOWEL DISP. T.U.W. TOP OF WALL Architect's approval shall cause the General Contractor supply all labor, equipment and material necessary to will not be permitted. C.G. CORNER GUARD FUT. FUTURE P.T.D.F. PRESSURE TREATED DOUG FIR T.P.O. TOILET PAPER DISPENSER to assume full responsibility for subsequent complete his work properly. C.H. CONDUCTOR HEAD FXD. FIXED P.T.D./R. COMP. b RECEPTICAL po y any 4 TV TELEVISION modification of the work required by Owner or any 18. All attachments, connections, fastening, etc, to be :72.. Location of dump 'Lori trash and debris and length of C.J. CONST EILI JOINT PTT- PARTITION TYP. TYPICAL regulatory agency. - haul is the Contractor's responsibility. - .. C/J CEILING JOIST GA. GAUGE P.T.R. PAPER TOWEL RECEPTICAL properly secured in conformance with best practice, and C.JST. CEILING JOIST GAL. GALVINIZED PVC. POLYVINYL CHLORIDE U.B.C. UNIFORM BUILDING CODE 7. General Contractor shall be responsible for all Lase the Contractor is responsible for providing and 33. Plans identified as "BID SET" on any or all sheets may. C.L. CENTER LINE G.B. GRAB BAR required by inspections. Work not ready for Inspection installing all connections. be subject to review by ,the Architect, or others such CLG. CEILING GD. GARBAGE DISPOSAL O.T. QUARRY TILE U.M.C. UNIFORM MECHANICAL CODE U.N.F. UNFINISHED that requires reinspection due to Improper placement of as the builder, Building Inspection Department, etc. CLKG. CAULKING GI GALVANIZED SHEET METAL work by General Contractor or due to incomplete work 19. The General Contractor shall be responsible for This review may result in changes which may be made to CLOS. CLOSET GL. GLASS R. RISER U.N.O. UNLESS NOTED OTHERWISE shall require the General Contractor to pay for any conditions of all work and materials, including those the plans prior to issuance. of the final construction CLR. CLEAR GLU-LAM GLUE-LAMINATED R- INSULATION VALUE U.P.C. UNIFORM PLUMBING CODE reinspeetion services or fees, if required. General furnished by Subcontractors. set which will contain no -BID SET- designations. C.H.U. CONCRETE MASONRY UNIT G.N. GENERAL NOTE RAD. RADIUS UR. URINAL Contractor shell be responsible for obtaining final CNTR. COUNTER GR.. GRADE R.A.G. RETURN AIR GRILLE V. VANITY inspections and certificate of occupancy. Final 20: All material stored on the site shall he properly 34. Upon completion of the project, general contractor C.O. CLEAN-OUT G.S. GAL. STEEL SHEET MTL. RD. ROUND payment shall be made after receipt of certificate of stacked and protected to prevent damage and shall provide the Architect with a Complete marked up COL. COLUMN GYP. GYPSUM R.D. ROOF DRAIN V.C.T. VINYL COMPOSITION TILE deterioration until use. Failure to VEST. VERTICAL occupancy and final approval of punch list. protect materials set of prints indicating actual construction methods COMB. COMBINATION RDWD. REDWOOD VEST. VESTIBULE may be cause for rejection of work. used which deviated from conditions represented within CONC. CONCRETE H.D. HOSE BInB REBAR REINFORCING STEEL V.T.R. VENT THROUGH ROOF 8. All required `permits must be obtained from the Fire the construction documents. CONN. CONNECTION H.C. HOLLOW PORE - RECP. RECEPTACLE Prevention Bureau before the building is occupied. 21. All trades shall at all times keep the project free CONST. CONSTRUCTION HCAP. HANDICAPPED REF. REFERENCE or REFLECTED V.T.W. VENT THROUGH WALL from waste materials and shall leave the job broom 35. The Architect shall in no way be responsible for how CONT. CONTINUOUS HDR. HEADER REFR. REFRIGERATOR { 9. The Contractor shall verify he site condition, clean upon completion of their work. the field work is performed, safety in, on or about the W. WEST existing o y y CORR. CORRIDOR HOW. HARDWOOD RE . REINFORCED 4 pography, location of utilities or any - job site, methods of performance or timeliness in the C/R CEILING RAFTER HDWD. HARDWOOD RES. RESILIANT W/ WITH -� special features unique to the site. The Contractor 22. Theme notes are provided to show basic areas of performance of the work. REV. REVERSE W/o WITHOUT 6 shall be tea C.T. CERAMIC TILE tI.M. HOLLOW METAL , responsible for all appropriate utility, responsibility, and any items not specifically included CTSK. COUNTERSUNK REQ. REQUIRED WAIN. WAINSCOT cc "hookups", underground utility location and but necessary for proper completion of the work shall 36. All ideas, designs, arrangements and plans indicated or HR. HORIZUNTAI- WC. WATER CLOSET C.W. COLD WATER HR. HOUR R/J ROOF JOIST M excavations, or other requirements for the work. ba included as s part of the work. represented by these drawings are owned by , and are RM . ROOM WD. WORD T H.RD. HALF ROUND t _ the property of the Architect and were created, evolved D, PENNY R.O. ROUGH OPENING WOW. WINDOW °B,. HT. HEIGHT 10. The Contractor shell notify the Architect and Owner if 27. . Each trade shall furnish submittals for all materials and developed for use on, and in connection with this OBL. DOUBLE H.W. HOT WATER R/R. ROOF RAFTER W.G. WIRE GLASS ` unusual, latent, or presently unknown conditions are to be furnished prior to the ordering of materials for specific project. None of such ideas, designs,y DEMO. DEMOLITION or DEMOLISHED R.S. RE-SAWN W.H. WATER HEATER ■ `6 encountered -which might affect the structural stability - Architect and Owner approval. The Owner shall select arran ements of plans shall be used b or disclosed to W.I . WROUGHT IRON r DEPT. DEPARTMENT L. of work to follow, or if existing conditions are found all colors and finishes unless specified. any person, firm or corporation for any purpose I.D. INSIDE DIAMETER DET. DETAIL W-P. WATER PROOF Q) - to be different than those indicated. whatsoever without the written permission of the INSUL. INSULATION W.R. WATER RESISTANT D.F. DOUGLAS FIR INT. INTERIOR W,S. WHEEL STOP Cf cn 24. Electrical Contractor will supply and install equipment Architect. DIA. DIAMETER INV. INVERT 11. All work described in the drawings shall be verified and fixtures as indicated in these drawings and will WT. WEIGHT DIM. DIMENSION for dimensions, grade, extent, and compatibility to the provide final connection to equipment provided by 37. No Claim for extra work or materials will be allowed DISP. DISPENSER W.W.F. WELDED WIRE FABRIC existing site. Any discrepancies and unexpected plumbing and HVAC contractor in accordance with these unless the claim is agreed in writing between the JAN. JANITOR p, conditions that affect or change the work described in drawings and NVAC shop drawings as applicable. Contractor and Owner, prior to the furnishing of such DO..JS DIVISION JST, JOIST Al..+ the Contract Documents shall be brought to the materials or labor. . DOWN DECK JOIST JT. JOINT DN. Architect's attention immediately. Do not proceed with 25. All testings required for soils compaction, percolation [/. the work in the area of discrepancies until such test, coring samples, continuous concrete inspections, 38. Trade names and/or manufacturers names referred to are , ■ discrepancies are resolved. If the Contractor chooses or other tests necessary for the work shall be the for quality standards only. Equal products are ��('''""" r■ to do-so, he shall be proceeding at his own risk. General, Contractor's responsibility. permitted if approved by the Architect. J - I 1 SITE PLAN SYMBOLS PROJECT DATA DIRECTORY SHEET INDEX ' OWNER: T-1 TITLE SHEET COMMUNITY SERVICES DEPARTMENT CITY OF ENCINITAS 5 SOUTH VULCAN AVE. M A-1 FLOOR PLANS/ELEVATIONS/INTERIOR ELEVATIONS 5 DESCRIPTION: RENOVATION OF EXISTING TOILET ENCINITAS, CALIFORNIA 92024 FACILITIES AT"SWAMI'S, IN ORDER CONTACT: JESSE TENCH A-2 SECTIONS/ARCH. DETAILS r TO CONFORM TO ADA GUIDELINES. (619) 633-2746 S-1 STRUCTURAL PLAN M A4 Sheet t " GENERAL SCOPE ARCHITECT: P-1 PLUMBING PLAN OF WORK: JOSEPH PORRAS &ASSOCIATES r l a 1 GRIDS REPLACE EXISTING FIXTURES & 11772 SORRENTO VALLEY RD. Top to Bottom - Numbers PARTITIONS WITH NEW FIXTURES & SAN DIEGO, CALIFORNIA 92121 Left to Right - Letters PARTITIONS: (619) 792-0215 \JJ PORTIONS OF THE INTERIOR WALLS job nDmber rSpFCIrICATION REFERENCE - Specifications WILL NEED TO BE DEMOLISHED AND STRUCTURAL: 94Z)14 3 - Division t RE-CONSTRUCTED. ACCUTECH ENGINEERING 28 - Page t EXTERIOR STEM WALL MUST BE 9540 WAPLES STREET, STE. F REMOVED,AND A PARTIAL NEW SAN DIEGO, CALIFORNIA 92121 drawn by 2l nrratt REFERExcE - Drawings SIDEWALK AND STEM WALL MUST (619) 554-1284 - ° Section t BE CONSTRUCTED. V1 sheet t SURROUNDING SITE SHALL BE PLUMBING checked by II Gc ALTERED, AS REQUIRED. ALL