Loading...
2004-9206 G Recording Requested by: P-!F TFW-t DO,CUMENF City Engineer ) FEB08 2005 L7 : -Z; NII.W'V':,-� -,-A)­0 When Recorded Mail To: i r H t c.o riu E City Clerk OFFICE City of Encinitas NJ F_ PM 505 South Vulcan Avenue Encinitas, CA 92024 SPACE For the Benefit of City COVENANT REGARDING REAL PROPERTY WAIVER OF PROTEST TO ASSESSMENTS Assessor s Parcel Work Order 9206GI Number: 258-234-04 Project 04-47CDP A. Robert F. Mance, ("OWNER" hereinafter) is the owner of real property { "PROPERTY" hereinafter) and which is legally described as follows: See Attachment, A which is attached hereto and made a part hereof. B. In consideration of 04-47CDP, OWNER hereby covenants and agrees for the benefit of CITY, to do the following: No protest shall be made by the owners to any proceedings for the installation or acquisition of street improvements, including undergrounding of utility lines, under any special assessment 1911 or the Municipal Improvement Act of 1913, or any other applicable state or local law, and whether processed by the City of Encinitas or any other governmental entity having jurisdiction in the matter and for the purposes of determining property owners support for same. C. This Covenant shall run with the land and be binding upon and inure to the benefit of the future owners, encumbrancers, successors, heirs, personal representatives, transferees and assigns of the respective parties . D. OWNER agrees that OWNER' s duties and obligations under this Covenant are a lien upon the PROPERTY. Upon notice and opportunity to respond, CITY may add to the property tax bill of the PROPERTY any past due financial obligation owing to CITY by way of this Covenant . E. If either party is required to incurs costs to enforce the provisions of this Covenant, the prevailing party shall be entitled to full reimbursement of all costs, including reasonable attorney's fees, from the other party. F. Failure of the OWNER to comply with the terms of this Covenant shall constitute consent to the filing by CITY of a Notice of Violation of Covenant. G. Upon OWNER' S satisfaction of OWNER' S duties and obligations contained herein, OWNER may request and CITY shall execute a "Satisfaction of Covenant" . H. By action of the City Council, CITY may assign to a person or persons impacted by the performance of this Covenant, the right to enforce this Covenant against OWNER. ACCEPTED AND AGREED: OWNER Robert F. Mance Date (Notarization of OWNER signature is attached) C NC IT Dated - ® , by (Notari ation not required) Peter Cota-Robles, Director of Engineering Services Attachment 'A' Legal Description of Real Property 258-234-04 THE SOUTH HALF OF LOT 12, BLOCK "B" OF ENCINITAS HIGHLANDS, IN THE CITY OF ENCINITAS, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 2141, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, DECEMBER 4, 1928 . CALIFORNIA ALL. ,�URPOv� ACKNOWLEDGEMENT State of County of On.��' Ltc 'f ( G''L before me, l / Name and Title of Officer(e g.,"Jane Coe,Notary Public") pers Wally appeared Name(s)of Signer(s) ersonally known to me -OR- ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf.of which the person(s) acted, executed the instrument. 0' ' 4xI J a r WIT S my hand a off' seal, f Gt'ir'. Lw J ! ,( Signature of Notary Public ----------------------------------------OPTIONAL----------------------------------------- Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document L Title or Type of Document: C.C.- Velwav � l Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name-: Signer's Name: ❑ Individual ❑ Individual ❑ Corporate Officer ❑ Corporate Officer ❑ Titles(s): ❑ Title(s): ❑ Partner - ❑ Limited ❑ General ❑ Partner- ❑ Limited ❑ General ❑ Attorney-in-Fact ❑ Attorney-in-Fact ❑ Trustee ❑ Trustee ❑ Guardian or Conservator llkslq I ❑ Guardian or Conservator ❑ Other: Top of Thumb here ❑ Other: Top of Thumb here Signer Is Representing: Signer Is Representing: EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 (619) 258-7901 Fax 258-7902 Mr. Robert Mance September 30, 2004 P.O. Box 910 Project No. 8.4,-� 1-4-�7 Cardiff by the Sea, California 92007 Subject: Limited Site Investigation Proposed Two-Story, Single-Family Residence 733 Stratford Drive City of Encinitas, California Dear Mr. Mance : In accordance with your request, we have performed a limited investigation of the soil conditions at the subject site to provide the soil engineering criteria for site grading and recommend an appropriate foundation system for the proposed residence . Our investigation has found that the proposed building pad is underlain by topsoil and colluvium to a maximum depth of approximately 2 . 0 feet below existing grade. Medium dense to dense sandstone of the Terrace Deposits Formation was underlying the colluvium. It is our opinion that the proposed development is feasible provided the recommendations herein are implemented during construction. Respectfully submitted, t, ova 21 c Mamadou Saliou Diallo, P. E EIyUItdEEFiNG SERVICES RCE 54071 C�;Y OE ENCINIS AS MANCE PROJECT NO. 04-1147C7 INTRODUCTION This is to present the findings and conclusions of a soil investigation for a proposed two-story, single-family residence to be located on the east side of Stratford Drive, in the City of Encinitas, California. The objectives of the investigation were to evaluate the existing soils conditions and provide recommendations for the proposed construction. In order to accomplish these objectives, three (3) exploratory borings were drilled to a maximum depth of 4 . 5 feet; undisturbed and loose bag samples were obtained, and laboratory tests were performed. SCOPE OF SERVICES The following services were provided during this investigation: O Site reconnaissance and review of published geologic, seismological and geotechnical reports and maps pertinent to the project area O Drilling of three (3) exploration borings within the limits of the proposed areas of development; the borings were logged by our Staff Geologist . O Collection of representative soil samples at selected depths . The obtained samples where sealed in moisture-resistant containers and transported to the laboratory for subsequent analysis . O Laboratory testing of samples representative of the types of soils encountered during the field investigation • Geologic and engineering analysis of the field and laboratory data, which provided the basis for our conclusions and recommendations • Production of this report, which summarizes the results of the above analysis and presents our findings and recommendations for site development 2 ...... ... ... ........... .... .... ... MANCE PROJECT NO. 04-1147C7 SITE DESCRIPTION AND PROPOSED CONSTRUCTION The subject site is located on the east side of Stratford Drive, in the City of Encinitas, California. It is presently occupied with two single story houses, a shelter and a detached storage unit. The parcel slopes moderately to the west. Site boundaries include Stratford Drive to the west and residential parcels to the remaining directions . Vegetation consisted of trees, shrubs and grass . It is our understanding that the main house will be removed to accommodate the proposed residence. The structure will be two- story, wood-framed and founded on continuous footings with a slab- on-grade floor. FIELD INVESTIGATION On September 21, 2003, three (3) exploratory borings were drilled to a maximum depth of approximately 4 . 5 feet with a hand auger. The approximate locations of the borings are shown on the attached Plate No. 1, entitled "Location of Exploratory Borings" . A continuous log of the soils encountered was recorded at the time of excavation and is shown on Plate No. 2 entitled "Summary _ Sheet" . The soils were visually and texturally classified according to the filed identification procedures set forth on the attached Plate No. 3 entitled "U. S . C. S . Soil Classification.". SUBGRADE CONDITIONS Topsoil and colluvium were encountered to a maximum depth of approximately 2 . 0 feet below existing grade. These soils generally consisted of silty sand with a loose consistency and low moisture content . The colluvium was underlain by medium dense to dense sandstone of the Terrace Deposits Formation. EXPANSIVE SOILS An expansion index test was performed on a sample of the Terrace Deposits Formation to determine volumetric change characteristics with change in moisture content . An expansion index of 9 indicates a very low expansion potential for the foundation soils . 3 MANCE PROJECT NO. 04-1147C7 GROUNDWATER Groundwater was not encountered during the course of our investigation. Static groundwater is anticipated at depths greater than 100 feet . We do not expect groundwater to affect the proposed development . However, perched water may be encountered due to periods of heavy precipitation, landscape watering, leaking water lines, construction activities or unforeseen causes . Mitigative measures regarding oversaturation resulting from improper surface drainage are discussed in the drainage section of this report . GEOLOGIC HAZARDS A review of the available geological literature pertaining to the site indicates the existence of the Rose Canyon Fault Zone approximately 4 . 5 Km to the west . Ground shaking from this fault or one of the major active faults in the region is the most likely happening to affect the site. With respect to this hazard, the site is comparable to others in the general area . The- proposed residential structure should be designed in accordance with seismic design requirements of the 1997 Uniform Building Code or the Structural Engineers Association of California using the following seismic design parameters : F ARAMETER VALUE UBC REFERENCE eismic Zone Factor, Z 0.40 Table 16-I eismic Source B Table 16-U il Profile T e SD Table 16-J Near-Source Factor, Na 1.1 Table 16-S Near-Source Factor, Nv 1.3 Table 16-1 Seismic Coefficient, Ca 0.48 Table 16-Q Seismic Coefficient, Cv 0.83 Table 16-R Based on the absence of shallow groundwater and consistency of the underlying Terrace Deposits Formation, it is our opinion that the potential for liquefaction is very low. CONCLUSIONS AND RECOIWNDATIONS The following conclusions and recommendations are based upon the analysis of the data and information obtained from our soil investigation. This includes site reconnaissance; field investigation; laboratory testing and our general knowledge of the soils native to the site. The site is suitable for the proposed residential development provided the recommendations set forth are implemented during construction . 4 MANCE PROJECT NO. 04-1147C7 GRADING AND EARTHWORK Site grading should begin with clearing and grubbing, i . e. the removal of vegetation and deleterious materials within the area of the proposed building. Subgrade soils extending to a depth of 3 feet below existing grade and a minimum of five (5) feet beyond proposed perimeter footings should be overexcavated, moisture conditioned within 2 percent over optimum and compacted to a minimum of 90 percent relative compaction. An alternative to the overexcavation and recompaction of the subgrade soils would be to deepen all footings a minimum of 12 inches into the underlying sandstone of the Terrace Deposits Formation. The actual depth and extent of removal should be evaluated in the field at the time of excavation by a representative of this firm. Grading should be performed in accordance with the attached appendix A. PERMANENT SLOPES Permanent cut and fill slopes are anticipated to be less than 5 feet in height and may be constructed at a maximum slope ratio of 2 : 1 (horizontal to vertical) to the heights indicated .on the plans . Slopes constructed in such a manner are anticipated to be grossly stable. Due to the granular nature of the on-site soils, surficial erosion is a common problem. It is recommended that drought resistant vegetation be planted on the slope faces as soon as practical to enhance the stability of the slope surfaces . EROSION AND SILTATION Due to the granular characteristics of the on-site soils, areas of recent grading or exposed ground may be subject to erosion. During construction, surface water should be controlled via berms, sandbags, siltation basins, positive surface grades, or other method to avoid damage to the finish work or adjoining properties . The contractor should take measures to prevent erosion of graded areas until such time as permanent drainage and erosion control measures have been installed. After completion of grading, all excavated surfaces should exhibit positive drainage and eliminate areas where water might pond. 5 MANCE PROJECT NO. 04-1147C7 FOUNDATION AND SLAB a. Continuous and spread footings are suitable for use and should extend a minimum of 18 inches for the two-story residence into the properly compacted fill soils or the dense sandstone of the Terrace Deposits Formation. Continuous footings should be at least 15 inches in width and reinforced with four #4 two bars placed near the top of the footings and thesother btwo; bars placed near the bottom of the footings . Spread or isolated footings should be at least 18 inches square and reinforced with #4 steel bars spaced 12 inches on center each way and placed horizontally near the bottom. b. Interior concrete floor slabs should be a minimum of 4 inches thick. Reinforcement should consist of #3 bars placed at 18 inches on center each way within the middle third of the slab by supporting the steel on chairs or concrete blocks "dobies" . The slab should be underlain by 2 inches of clean sand over a 10-mil visqueen moisture barrier. The effect of concrete shrinkage will result in cracks in virtually all concrete slabs . To reduce the extent of shrinkage, the concrete should be placed at a maximum of 4-inch slump. The minimum steel recommended is not intended to prevent shrinkage cracks . c. An allowable soil bearing value of 1, 725 pounds per square foot may be used for the design of the above footings founded into properly compacted fill soils or the dense sandstone of the Terrace Deposits Formation. This value may be increased by 300 psf for each additional foot of width or depth to a maximum value of 4500 lb/ft2, as set forth in the 1997 Edition of the uniform Building Code, Table No. 18-I-A. d. Lateral resistance to horizontal movement may be provided by the soil passive pressure and the friction of concrete to soil . An allowable passive pressure of 250 pounds per of depth may be used. A coefficient of frictionf of 0 . 35fois recommended. Should frictional resistance and passive pressure be used conjunctively, the passive pressure should be reduced by one- half (1/2) . The soils passive pressure as well as the bearing value may be increased by 1/3 for wind and seismic loading. 6 !lMNCE PROJECT NO. 04-1147C7 RETAINING WALLS Cantilevered retaining walls should be designed for an "active" lateral earth pressure of 38 psf/ft (38 granular backfill and level backfill conditions . Where for ntilevered walls support 2 : 1 (hor:vert) sloping backfill, the equivalent active fluid pressure should be increased to 58 pcf. Cantilever walls subject to uniform surcharge loads should be designed for an additional uniform lateral pressure equal to one-third (1/3) the anticipated surcharge pressure. Restrained walls should be designed utilizing an "at-rest" earth pressure of 58 psf/ft (58 pcf EFP) for approved granular and level backfill . Restrained walls subject to uniform surcharge loads should be designed for an additional uniform lateral pressure equal to one- half (112) the anticipated surcharge. Retaining wall footings should be embedded a minimum of 18 below the lowest adjacent inches grade. Retaining walls that are to be located near the top of slopes should be designed to allow a minimum daylight distance of 7 feet laterally from the outside edge of the f oozing to the slope face. Soil design criteria, such as bearing capacity, passive earth Pressure and sliding resistance as recommended under the Foundation and Slab Recommendations section, may be incorporated into the retaining wall design. The design and location of retaining walls should be reviewed by our firm for conformance with our recommendations . Footings should be reinforced as recommended by the structural engineer and appropriate back drainage provided to avoid excessive hydrostatic wall pressures . As a minimum we recommend a fabric- wrapped crushed rock and perforated pipe system. At least 2 cubic feet per linear foot of free-drainage crushed rock should be provided. The remaining wall backfill should consist of approved granular material . This fill material should be compacted to a minimum relative compaction of 90 percent as determined by ASTM D-1557 test method. Flooding or jetting of backfill should not be permitted. Granular backfill should be capped with a mimimum 18 --ches of relatively impervious :revert saturation . fill to seal the backfill and 7 A4NCE PROJECT NO. 04-1147C7 It should be noted that the use of heavy compaction equipment in close proximity to retaining structures can result in wall pressures exceeding design values and corresponding wall movement greater than that associated with active or at-rest conditions. In this regard, the contractor should take appropriate precautions during the backfill placement . SETTLEMENT Settlement of compacted fill soils is normal and should be anticipated. Because of the type and thickness of the fill soils under the proposed footings and the light building loads, settlement should be within acceptable limits . UTILITY TRENCH EXCAVATION AND BACKFILL Excavations for on-site utility trenches may be made vertically for shallow depths and must be either shored or sloped at 1H: 1V for depths greater than 4 feet . Utilities should be bedded and backfilled with clean sand or approved granular soil to a depth of at least one foot over the pipe . This backfill should be uniformly watered and compacted to a firm condition for pipe support . The remainder of the backfill should be on-site soils or non-expansive imported soils, which should be placed in thin lifts, moisture conditioned and compacted to at least 90 o relative compaction. DRAINAGE Adequate measures should be undertaken to properly finish grade the site after the structure and other improvements are in place, such that the drainage water within the site and adjacent properties is directed away from the foundations, footings, floor slabs and the tops of slopes via surface swales and subsurface drains towards the natural drainage for this area . Proper surface and subsurface drainage will be required to minimize the potential of water seeking the level of the bearing soils under the foundations, footings and floor slabs, which may otherwise result in undermining and differential settlement of the structures and other improvements . 8 P1-4NCE PROJECT NO. 04-1147C7 LIMITS OF INVESTIGATION The recommendations provided in this report pertain only to the site investigated and based upon the assumption that the soil conditions do not deviate from those disclosed in the borings . If any variations or undesirable conditions are encountered during construction, or if the proposed construction will significantly differ from that planned at the present time, East County Soil Consultation and Engineering, Inc. should be notified so that supplemental recommendations can be provided. Plates No. 1 through 3, Page L-1, References, and Appendix A are parts of this report . Respectfully submitted, opROFESS/�N �POOU r LU NO.0054071 m Exp. rn LP JVIL Mamadou Saliou Diallo RCE 54071 MSD/md 9 40 - -i � Al� -oil r --, - -- I EAST COUNTY SOIL CONSULTATION & ENGINEERING, INC. 10925 HARTLEY RD.,SUITE 1,SANTEE.CA 92071 -- (619)258-7901 Pax(619)258-7902 �GZ��fpr� O� ����l�y .�,2i�1/65 � ^•SF�T, ,� ZG� lz> f A/0 MANCE PROJECT NO. 04-1147C7 PLATE NO.2 SUMMARY SHEET BORING NO. 1 DEPTH SOIL DESCRIPTION Y M Surface TOPSOIL brown, moist, loose, silty sand with rootlets 0.5' COLLUVIUM(Qal) brown, damp, loose, silty fine grained sand (SM) 1.0' TERRACE DEPOSITS FORMATION(Qtz) tan brown, moist, medium dense to dense, silty fine grained sandstone (SM) 124.2 8.3 3.5' bottom of boring, no caving, no groundwater boring backfilled 9/21/04 ----------------------------------------------------------------- BORING NO. 2 DEPTH SOIL DESCRIPTION Y M Surface COLLUVIUM(Qal) brown, damp, loose, silty fine grained sand (SM) TERRACE DEPOSITS FORMATION t tan brown, moist, medium dense to dense, sty fine grained sandstone (SM) K It GC GC 4.5' bottom of boring, no caving, no groundwater 121.5 6.5 boring backfilled 9/21/04 BORINGN0.3----------------------------------------------------------------------- DEPTH SOIL DESCRIPTION 1' M Surface TOPSOIL brown, moist, loose, silty sand with rootlets 0.5' COLLUVIUM(Qal) brown, damp, loose, silty fine grained sand (SM) 2.0' TERRACE DEPOSITS FORMATION t, 101.3 4.2 tan brown, moist, medium dense to dense, sty fine grained sandstone (SM) 3.5' bottom of boring, no caving, no groundwater boring backfilled 9/21/04 ----------------------------------------------------- --------- Y=DRY DENSITY ---- -------------------- M=MOISTURE CONTENT 10 MAJOR DIVISI, S SYMBOL DL ;RIPTION GW WELL GRADED GRAVELS OR GRAVEL-SAND MIXTURES,LITTLE OR NO FINES GRAVELS GP (MORE THAN V, POORLY GRADED GRAVELS OR GRAVEL-SAND OF COARSE . MIXTURES,LI7'i LE OR NO FINES FRACTION GM >NO.4 SIEVE SILTY GRAVELS,GRAVEL-SAND-SILT MIXTURES COARSE SIZE) GC GRAINED SOILS CLAYEY GRAVELS,GRAVEL-SAND-CLAY MIXTURES (MORE THAN%OF SOIL> NO.200 SIEVE SIZE) SW WELL GRADED SANDS OR GRAVELLY SANDS, SANDS SP LITi LE OR NO FINES (MORE THAN'/� POORLY GRADED SANDS OR GRAVELLY SANDS, OF COARSE LITTLE OR NO FINES FRACTION Sm <NO.4 SIEVE SILTY SANDS,SILT-SAND MIXTURES SIZE) SC CLAYEY SANDS,SAND-CLAY MIXXTURES ML, INORGANIC S]LTS AND VERY FINE SANDS,ROCK SILTS & FLOUR,SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY CLAYS CL INORGANIC CLAYS OF LOW TO MEDIUM LIQUID LIMIT PLASTICITY,GRAVELLY CLAYS,SANDY CLAYS, FINE GRAINED <50 SILTY CLAYS, LEA,V CLAYS OL SOILS ORGANIC SILTS AND ORGANIC SILTY CLAYS OF (MORE THAN%:OF SOIL< LOW PLASTICITY N0.200 SIEVE SIZE) NIH SILTS & INORGANIC SILTS,MICACEOUS OR DIATOMACEOUS FINE SANDY OR SILTY SOILS,ELASTIC SILTS CLAYS CH LIQUID LIMIT I INORGANIC CLAYS OF HIGH PLASTICITY,FAT >50 CLAYS OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, HIGHLY ORGANIC SOILS Pt ORGANIC SILTY CLAYS,ORGANIC SILTS PEAT AND OTHER HIGHLY ORGANIC SOILS CLASSIFICATION CHART(UNIFIED SOIL CLASSIFICATION SYSTEM) 7° - CLASSIFICATION RANGE OF GRAD!SIZES 1 w I - I I I 1/1 I 1 U.S.STANDARD GRAIN SIZE ITV SIEVE SIZE I -MILL IbiETERS x BOULDERS I Above 12 Inches I Above T ac COBBLES 1 12 Inches To 3 Inches I 305 To 76? o I I I I 1 c GRAVse EL I 3 Inches to No.4 76?to 4.76 I I I I 1 Coar 3 Inches to Inch I 76.2 to 19.1 I 70 Fine '/.Inch to No.4 19.1 to 4.76 SAND No.4 to No.200 4.76 to O.U74 '0 Coarse »so» No.4 to No. 10 4.76 to 2.00 ,o Medium No. 10 to No.40 2.00 to 0.420 c.=a nine I �� Fine No.40 to No.200 0.420 to 0.074 0 SILT AND CLAY Below No.200 I. Below 0.074 0 10 2° 30 `0 nc ao -0 ac so Too GRAIN SIZE CHART uawo wnr (t... - PLASTICITY CHART EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. MANCE�PR �rT 0. 0 4-114.7 , 10925 HARTLEY ROAD,SUITE "I" PLATE NO. 3 i SANTEE, CALIFORNIA 92071 i SEPTEMBER 30, 2004 U.S.C.S. SOIL CLASSIFICATION 1 AfANCE PROJECT NO. 04-1147C7 PAGE L-1 LABORATORY TEST RESULTS MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT(ASTM D1557) The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM D1557-91, Procedures A and B which use 25 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal.layers in a 4 inch diameter 1/30 cubic foot compaction cylinder and Procedure C which uses 56 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 6 inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows: MAXIMUM OPTIMUM MOISTURE SOIL TYPE/ DRY DENSITY CONTENT PROCEDURE DESCRIPTION PCF % LOCATION IAA TAN BROWN SILTY SAND 130.0 9.3 B-2 @ 2.0' EXPANSION INDEX TEST (ASTM D4829) INITIAL SATURATED. INITIAL DRY MOISTURE MOISTURE DENSITY EXPANSION CONTENT(%) CONTENT(%) (PCF) INDEX LOCATION 8.0 15.9 119.3 9 B-2 @ 2.0' PARTICLE SIZE ANALYSIS (ASTM D422) U.S.Standard Pecent Passing PercentPassmg7 Sieve Size B-T @ 0,5', <B2'@20=E � w Colluvium Terracs De osihs w 3/4" 1/251 - 3/8" 100 _ #4 99 #8 99 - #16 99 100 #30 96 97 #40 8' 76 #60 #100 �g S9 40 #200 21 30 24 USCS SM SM 11 MANCE PROJECT NO. 04-1147C7 REFERENCES 1. "1997 Edition, Uniform Building Code, Volume 2, Structural Engineering and Design Provisions", Published by International Conference of Building Officials . 2 . "Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of Nevada", Published by International Conference of Building Officials . 3. "Geologic Maps of the Northwestern Part of San Diego County, California", Plate No. 2, Geologic Maps of the Encinitas and Rancho Santa Fe 7 . 5' Quadrangles, by Siang S . Tan and Michael P. Kennedy, 1996. 4 . "Foundation and Earth Structures, Design manual 7 . 2, NAVFAC DM- 7 . 2, by Department of the Navy, Naval Facilities Engineering Command, dated May 1982 . 5 . "Limited Site Investigation, Proposed Two-Story, Single-Family Residence, 370 Hillcrest Drive, City of Encinitas, California", Project No . 04-1147A2, Prepared by East County Soil Consultation and Engineering, Inc. , Dated September 17, 2004 . 6. 11 Limited Site Investigation, Proposed Single-Family Residence, 1098 Hymettus Avenue, APN 254-262-22, California", Project No. 03-1147B4, Prepared Cby of Encinitas, Consultation and Engineering, r t Y East County Soil Inc. , Dared October 30, 2003 . 7 . "Preliminary Geotechnical Investigation, Proposed Minor Subdivision, Parcels 1, 2 & 3, 1866 Sheridan Road, Encinitas, California", W. O. P-317060, prepared by Coast Geotechnical, Dated September 5, 2000 . 12 i EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE I SANTEE, CALIFORNIA 92071 (619) 258-7901 APPENDIX A RECOMMENDED EARTHWORK SPECIFICATIONS 1. General Description The intent of these specifications is to obtain uniformity and adequate strength in filled ground so that the proposed structures may be safely supported. The procedures include the clearing and preparation of the land to be filled, processing the fill soils, the spreading, and compaction of the filled areas to conform with the lines and grades as shown on the approved plans. The owner shall retain a Civil Engineer qualified in soil mechanics (herein referred to as engineer) to inspect and test earthwork in accordance with these specifications. The engineer shall advise the owner and grading contractor immediately if any unsatisfactory conditions are observed to exist and shall have the authority to reject the compacted filled ground until such time that corrective measures are taken, necessary to comply with the specifications. It shall be the sole responsibility of the grading contractor to achieve the specified degree of compaction. 2. Preparing Areas to be Filled (a) All brush, vegetation and any biodegradable refuse shall be removed or otherwise disposed of so as to leave the areas to be filled free of vegetation and debris. Any uncompacted filled ground or loose compressible natural ground shall be removed unless the report recommends otherwise. Any buried tanks or other structures shall be removed and the depression backfilled to the satisfaction of the engineer. (b) The natural ground which is determined to be satisfactory for the support of the filled ground shall then be plowed or scarified to a depth of at least 12 inches (12"). (c) After the natural ground has been prepared, it shall then be brought to the proper moisture content and compacted to not less than 90 percent of maximum dry density in accordance with ASTM D1557-91. (d) Where fills are made on slopes greater than 20 percent, horizontal benches shall be cut into the firm natural ground. The initial bench at the toe of the fill shall be at least 15 feet in width on firm undisturbed natural ground. The width of all succeeding benches shall be at least 6 feet. APPENDIX A 2 3. Fill Materials All material shall be approved by the engineer and shall consist of materials free from vegetable matter, and other lumps greater than 6 inches in diameter. If, during grading operations, soils are found which were not encountered and tested in the preliminary investigation, tests on these soils shall be performed to determine their physical characteristics. Any special treatment recommended in the preliminary or subsequent soils reports not covered herein shall become an addendum to these specifications. 4. Placing and Compacting Fill Materials (a) When the moisture content of the fill material is below that specified, water shall be added until the moisture content is near optimum to assure uniform mixing and effective compaction. (b) When the moisture content of the fill materials is above that specified, the fill material shall be aerated by blading and scarifying or other satisfactory methods until the moisture content is near optimum as specified. (c) After processing, the suitable fill materials shall be placed in layers which, when compacted, shall not exceed six inches (6"). Each layer shall be spread evenly and shall be thoroughly mixed during the spreading insure uniformity of materials and moisture in each laver. (d) After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the density set forth in paragraph 2 (c) above. Compaction shall be accomplished with approval types of compaction equipment. Rolling shall be accomplished while the fill material is at the specified moisture content. In place density tests shall be performed in accordance with ASTM D 1556-90. (e) The surfaces of the fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compacting operations shall be continued until the slopes are stable and until there is no appreciable amount of loose soil on the slopes. 5. Inspection Sufficient inspection by our firm or the Soil's Engineer of record and/or his/her representative shall be maintained during the filling and compacting operations so that he/she can verify that the fill was constructed in accordance with the accepted specifications. 6. Seasonal Limits No fill material shall be placed, spread, or rolled if weather conditions increase the moisture content above permissible limits. When the work is interrupted by rain, fill operations shall not be resumed until the moisture content and density of fill are as previously specified. All recommendations presented in the attached report are a part of these specifications. 2