Loading...
7798 ENCINITAS , CA GENERAL_ NOTES CONDUCTORS CONDUITS d AE APROXIMATE. 1 ACTUAL LOCATIONS WILL DLET RM�INED IINIOTHE FELLDNBYR HEPENGINEER. SOURCE AWG TERMINATION CONTRACTOR SHALL OBTAIN APPROVAL FOR LOCATIONS PRIOR TO FINAL 1 2 3 4 5 6 8 9 1 4 PLACEMENT. POLE 1 CAT5 2 2 2 REDFLEX ___J 2 THE SHOWN LOCATION OF ALL EXISTING UNDERGROUND UTILITIES ARE CABINET J APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING POLE 2 CAT5 2 2 2 2 2 2 2 REDFLEX ALL SUBSTRUCTURES, WHETHER SHOWN HERE IN OR NOT AND PROTECTING CABINET THEM FROM DAMAGE. THE EXPENSE OF REPAIR OR REPLACEMENT OF SAID TRAFFIC SIGNAL RED SUBSTRUCTURES SHALL BE BORNE BY THE CONTRACTOR. HAND DIG FOUNDATIONS UNTIL CLEAR OF SUBSTRUTURES. IF REQUIRE, TO PROTECT J PHASE- WBLT #14 2 2 2 2 2 2 REDFLEX UTILITIES. PHONE "UNDERGROUND SERVICE ALERT" AT 800/422-4133 (STREET) 3 ALL PULL BOXES SHALL BE NO. 5 AND ALL CONDUIT SHALL BE 2-INCH, l I I CITY POWER REDFLEX UNLESS SHOWN OTHERWISE. I I PEDESTAL (120V) #8 3 3 3 3 3 3 3 CABINET 4 USE TYPE E LOOPS AND REDFLEX LOOPS PER LOOP DIAGRAM AND CENTER I I I REDFLEX LOOP DLC 4 4 REDFLEX IN LANE. I I I I I LEAD-IN CABINET POWER CIRCUIT 1 #10 2 2 2 POLE 1 5 CONTRACTOR SHALL PROVIDE INFORMATION REGARDING AS-BUILT LOCATIONS O I I I (REDFLEX CABINET) OF ALL FACILITIES. > POWER CIRCUIT 2 6 ALL TRAFFIC SIGNAL, HIGHWAY LIGHTING, SIGNING, AND STRIPING SHALL ` I I I I (REDFLEX CABINET) #10 2 2 2 2 2 2 2 POLE 2 CONFORM TO THE REQUIREMENTS OF THE STATE OF CALIFORNIA, I- -I 1 F- 7 F- � I F_ -1 � � r � SOLID BARE BOND A LL REDFLEX DEPARTMENT OF TRANSPORTATION, STANDARD PLANS AND SPECIFICATIONS J JI I I I #8 1 1 1 1 1 1 1 1 1 DATED JULY, 2002 EDITION. 1 -J J L I L EQUIPMENT COX POINT OF REDFLEX 7 ALL ABBREVIATIONS AND SYMBOLS USED ARE SHOWN ON CALTRANS Q I COAX 1 1 1 1 1 1 1 STANDARD PLAN NO.'S 1 -10A, A-10B, ES-1A, ES-1A, ES-1B AND AS ( / I I I II I I I I SERVICE CABINET DEFINED ON THE PLAN. �.J I I- � I I I � � I I � � I F- 71 I I F- 7 I UL J J I J L I L - TOTAL NEW CONDUCTORS 19 9 5 11 6 6 6 6 5 5 5 5 5 3 1 8 ALL LOCATIONS OF DETECTOR LOOP, SIGNAL POLE AND CABINET REQUIRE - - -=C I -�L� _ 9 4 ENGINEER'S APPROVAL PRIOR TO SAW CUTTING OR EXCAVATION. �__]_-_ - - - - - - - - --- - J I�- tt 141 CONDUIT SIZE (INCHES) 3 2 2 2 3 3 3 3 2 3 3 3 3 3 2 9 CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDELINE ONLY. 7 � 1117 1 7 I -1 F_ 5 IT SHALL BE THE CONTRACTOR'S REPONSIBILITY TO PROVIDE THE CORRECT I'\L J I L L J1 1 L J I L J I L J L J 10' 0 20' NEW/EXISTING CONDUIT N N N N E E E E N E E E E E N CONDUCTORS AND CABLES REQUIRED FOR THE INTENDED OPERATION. I_- 10 UNLESS NOTED OTHERWISE, THE CONTRACTOR SHALL FURNISH AND INSTALL �I � l I ______ ___ ________ __ __-- „ ALL MATERIAL AND EQUIPMENT REQUIRED FOR THE INTENDED OPERATION. ? L L l y r- - SCALE: 1 =20 LJ L -4 1 11 IT IS REQUIRED TO MAINTAIN SIGNAL OPERATION INCLUDING SIGNAL �/ j L L ,c.` INTERCONNECT DURING MODIFICATION OF EXISTING TRAFFIC SIGNAL SYSTEM. -_---- _ 17 12 ALL CONSTRUCTION OPERATIONS SHALL BE LIMITED TO THE PERIOD 17 4"DIA STD. GALVANIZED BETWEEN 9:OOAM AND 3:OOPM, MONDAY THROUGH FRIDAY, UNLESS OTHERWISE AUTHORIZED IN WRITING BY THE CITY ENGINEER. STEEL PIPE (ASTM A53 13 CONTRACTOR SHALL MAINTAIN TRAFFIC THROUGH THE CONSTRUCTION AREA SCH 40 4- 1 /2" O.D.) AND PROVIDE ALL NECESSARY CONSTRUCTION WARNING SIGNS AND MARKING O C j REQUIRED. CONTRACTOR IS TO SUBMIT A TRAFFIC CONTROL PLAN BEFORE FRANGIBLE BASE ANY WORK IS STARTED. I I r II II � -1- I i 0 � Z J LJII I LJ LJ '- (CASE ALUMINUM OR ' F- �t 1 __ __ _ CAST IRON) 14 I SQUARE AT THE BASE J L J I I. L J L J I ACCESS DOOR CONSTRUCTION NOTES i J - _L J- 4" CONCRETE CAP f/I - - -L L I LJ- _L J - I SIDEWALK OR [ i INSTALL FOUNDATION AND REDFLEX CONTROL CABINET. INSTALL /g x8 J L I J L J L J f r - - _ GROUND GROUND ROD AND BOND TO CABINET WITH #8 BARE Cu. - - - / : _ a - - - _ _ SEE CABINET FOUNDATION DETAIL. L L� _ 2❑ CONTRACTOR SHALL TERMINATE ALL POWER CIRCUITS INTO REDFLEX _ _ _ _ _ _ L J L T- - _ _ z CONDUIT CABINET. f f�, f I- i _ �L 3 - _ 03 INSTALL INLINE FUSE HOLDER ON RED PHASE CONDUCTOR WITH 5 AMP L _L 1 EARTH FUSE INSIDE REDFLEX CABINET, TO PROTECT CITY TRAFFIC CABINET. J _J 55' q. ® INSTALL 40 AMP CIRCUIT .BREAKER INTO EXISTING POWER PANEL FOR L- -1 r- -I I II � � i � 120V SUPPLY TO REDFLEX CABINET. L _L III _J _ ; 75' 1 8 9 2 CONCRETE FOUNDATION ❑5 TERMINATE 14 WIRE TO RED PHASE AND N UTRAL INSIDE TRAFFIC — - - - - - q „ CABINET. S CONDUCTOR SCHEDULE FOR A PROAGHES. F- -1 F- -111 I � -I �- I I (4) X 36 X 5/8 DIA © INSTALL #5 JUNCTION BOX. L -L _ L 11 1 J `�----yy-' I 23 MIN. ANCHOR BOLTS (ASTM I1�1( ), C 2 1 1 A-36 OR A-307. ❑7 INSTALL LOOPS AND CONDUIT STUBOUT FOR REDFLEX DETECTION. — - - - - - - --111-F - - - EACH LOOP MUST HAVE A SEPARATE HOME RUN AND LOOP LEAD IN F- -1 F- 711 �p I-. -� I- I 4 CABLE. MAXIMUM 4 LOOPS PER SAWCUT. REDFLEX LOOPS TO BE 95 ? B:C: POLE BASE LABELED AT REDFLEX CABINET. REPLACE CITY LOOPS IF REQUIRED L -L 1111 _J TEMPLATE TO CITY STADNDARDS. SEE LOOP DETAIL AND DRAWING FOR QUANTITY — — — — - - � � ,• 1 ® INSTALL FOUNDATION AND POLE FOR REDFLEX EQUIPMENT. �, r' 12-j" IMAGINARY CONNECT POLE TO SOLID BARE BOND GROUND. L EUC /1 D/ Al FOUNDATION MAY BE BOLT CIRCLE. SEE DRAWING FOR LOCATION. SEE POLE DETAIL. /`i f j 1- F -I r l L g 5 4 6 1 2 3 ROUND OR SQUARE. ❑9 INSTALL CAMERA AND (2) 250 WATT FLASH ENCLOSURES ON REDFLEX POLE, ® L L __ - _s✓ AIM AT MONITORED APPROACH. 8 1013 10 p I I I � = I"" I 1> POLE DETAIL RED LIGHT CAMERA SYSTEM I _ 4t--''1 1 1 li OL l �ENHA IN SCALE: 1'=2' 10 INSTALL CAMERA AND 500 WATT FLASH ENCLOSURE ON REDFLEX POLE, AIM 141518 —_ r- x -11 " AT VIOLATION LINE. 9 ----- "--- — — r T- �l�t F 7 I- -III 1- -1 I I I L I 11 CONDUIT TO BE BORED UNDER ROADWAY. ____ _ ------ J L �I i L i L -L1 T L _ - - T t —= 12 TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #1 (HOT & 16 I I I � f- 7fI (`-1T F— � GROUND NEUTRAL). L I I L 1 y L J 1 1 L J 1 L I L —1 I LANE LINE 10' N0i I LINE ROD 5"—L SIDEWALK ..,,t, .A F 4„ — 28' SIDES W/DDDRS- 13 TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #2 (HOT & �$ =JI 1I I I I RedflexLaape T' •` A. NEUTRAL). T _ \ 4 I I I I L J I L / \\ I / Now City .5 1❑ INSTALL FOUNDATION AND POLE FOR REDFLEX EQUIPMENT WITHOUT BLOCKING LJ I LJ I LJ Direction / New Y 1s" CITY SIGN. I I I ®� LaaR 6' 1 Loop 27 e 15 INSTALL FOUNDATION AND POLE FOR REDFLEX EQUIPMENT WITHIN 10 FT :,' OF CURB FACE SO THAT IS WITHIN CITY RIGHT-OF-WAY. OPEN AREA I I I LANE LINE 1 ., �,a. .•.' •'.�;'',..'•i...:':•..1; O 16 STUB OUT CONDUIT PLACEMENT OF COX CABLE JUNCTION BOX. 1 I I i 1 —6' S�3.5' 11 CONCRETE I I FOUNDATION 28" (4) X 18' X DIA GROUND ROD CABINET BASE 17 PULL BOX TO BE EXCAVATED OF ERODED SOIL FROM HILLSIDE. I I I I 1 4 Tums per Redflex loops, 2 hone runs per saw cut ANCHOR BOLTS, 18 INSTALL STREAMING VIDEO IN FACE CAMERA ENCLOSURES ON REDFLEX i i I I I ��®F ® RED UGHT CAMERA SYSTEM GROUND POLE -#2. ��� REDFLEX TRAFFIC SYSTEMS LOOP DIAGRAM REDFLEX CABINET F❑UNDATI❑N DETAIL M 330A9 Underground Service Alert El of Southern California POLE SCHEDULE OF C&T REDLIONT PHOTO ENFORCEMENT Call Toll Free NO. TYPE HEIGHT NEW/ A PRODUCT OF 1-800-422-4133 EXISTING / REDFLEX O1 REDFLEX 10' N TWO WORKING DAYS TRAFFIC SYSTEM BEFORE YOU DIG O REDFLEX 10 N 6047 BRISTOL PARKWAY, SUITE 1 0 D I G A L_ E R T CULVER CITY, CA 90230 PH: 310 642 0470 REVISIONS APPROVED DATE REFERENCES DATE BENCH MARK SCALE SPECIAL DISTRICT APPROVALS CITY OF EN CI N I TAS DRAWING ND, PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED APP ED HORIZONTAL 1'=20' H❑SSEIN SABBAGH DATE I -/s-oS BY; A, 6 BY; RED LIGHT PHOTO E N F O R C E M E N T VERTICAL / R,C,E, NO, DATE 9 20^�� DATEI — @ EL C A M I N O REAL_ & O L I V E N H A I N . -0 ENGINEER EXP, R.C.E. 0020q R,C,E, 1z57_.zd;Z6 WORK PROJECT NO, SHEET 1 OF 1