Loading...
2010-10433 G (Plans) WAZLA14E {tO4' S' LLL OWNER RIGHT OF WAY NOTE NOTIFICATIONS STORMWATER POLLUTION CONTROL BMP NOTES RELATIVE TO CONSTRUCTION ACTIVITIES �(A5b 1UF-2- 0.*22b T l�#dF1/��il[I.,�CA a291 OWNER IS TO OBTAIN A CONSTRUCTION PERMIT FROM THE ENGINEERING DEPARTMENT AT LEAST 48 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND STRUCTURES SHOWN ON CONCRETE WASHOUT _ ___ A _ o _, _poem.. .. _, _A -___G HOURS PRIOR TO WORKING IN THE PUBLIC RIGHT OF WAY. FAILURE TO DO SO WILL RESULT IN THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR CONTRACTOR SHALL ESTABLISH AND USE AN ADEQUATELY SIZED CONCRETE ENCI N 1 TqS ISSUANCE OF A STOP WORK NOTICE AND DOUBLE PERMIT FEES. IT IS THE RESPONSIBILITY OF THE KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: WASHOUT AREA TO CONTAIN WASHOUT WASTES ON SITE. IT IS ILLEGAL TO WASH CONCRETE, SLURRY, MORTAR, STUCCO, F� OWNER TO KNOW WHERE HIS/HER PROPERTY LINE IS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY PLASTER AND THE LIKE INTO THE STORMWATER CONVEYANCE SYSTEM OR ANY RECEIVING WATER. CONTRACTOR SHALL TE ADDRESS EXISTING UTILITIES OR STRUCTURES LOCATED AT THE WORK SITE. IT IS THE CONTRACTOR'S POST A SIGN DESIGNATING THE WASHOUT LOCATION. 680 WESTLAKE STREET, ENCINTAS, CA 92024 DRAINAGE NOTE RESPONSIBILITY TO CONTACT THE FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR APN 258-121-11 A' TO ANY EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND NOTIFICATION OF CONSTRUCTION SITE ACCESS SITE ys NO CONCENTRATED DRAINAGE FLOWS ARE PERMITTED OVER ADJACENT PROPERTY LINES.WATER IS COMMENCEMENT OF WORK: A STABILIZED CONSTRUCTION SITE ACCESS SHALL BE PROVIDED FOR VEHICLES EGRESS AND INGRESS TO PREVENT LEGAL DESCRIPTION TO DRAIN AWAY FROM STRUCTURES FOR A MINIMUM OF 5 FEET AT 2 PERCENT AND BE CONVEYED TO A. SEWERS - ESD-(760)-633-2770 TRACKING DIRT OFF SITE. THIS SHALL INCLUDE USING MATERIAL SUCH AS 3"CRUSHED ROCK AND/OR CORRUGATED STEEL LOT 10 OF RANCH REQUIZA, IN THE CITY OF ENCINITAS, AN APPROVED DRAINAGE FACILITY. B. GAS & ELECTRIC-SDGE-(760}438-6200 PANELS/PLATES. COUNTY OF SAN DIEGO, STATE OF CALIFORNIA,ACCORDING REQUEZA ST. C. WATER-SAN DIEGUITO WATER DISTRICT-1-800-227-2600 TO OFFICIAL MAP THEREOF NO. 2133, FILED IN THE OFFICE OF UTILITY NOTE D. TELEPHONE - SBC BELL-(760}489-3411 CONSTRUCTION VEHICLES THE SAN DIEGO COUNTY RECORDER ON OCTOBER 11, 1928. Q (� E. CABLE TV-COX COMMUNICATIONS-(760)-806-9809 X-2233 A SPECIFIC AREA AWAY FROM GUTTERS AND STORM DRAIN SHALL BE DESIGNATED FOR CONSTRUCTION VEHICLES W \ ALL UTILITIES SERVING THIS SITE SHALL BE INSTALLED UNDERGROUND. PARKING,VEHICLE REFUELING, AND ROUTINE EQUIPMENT MAINTENANCE. ALL MAJOR REPAIRS SHALL BE MADE OFF-SITE. OWNER'S CERTIFICATE 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS PRIOR TO BEGINNING ANY GENERAL NOTES .WORK ON THIS PROJECT. PHONE: (760}633-2770. EROSION CONTROL I (WE) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR VICINITY MAP EROSION CONTROL MUST BE PROVIDED FOR ALL EROSIVE SURFACES. SLOPED SURFACES ESPECIALLY SHALL BE GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER ALL 1.ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS, THE STANDARD SPECIFICATIONS 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR INSPECTION. PHONE: (760)- PROTECTED AGAINST EROSION BY INSTALLING EROSION RESISTANT SURFACES SUCH AS EROSION CONTROL MATS, GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILI OF NO SCALE FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN CONSTRUCTION STANDARDS OF THE CITY OF 633-2770. ALL WORK PERFORMED WITHOUT BENEFIT OF INSPECTION WILL BE SUBJECT TO ADEQUATE GROUND COVER VEGETATION,AND BONDED FIBER MATRIX. jjSLT.E THO ROS. PG. 1 147 C-7 ENCINITAS AND THE SAN DIEGO AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REJECTION AND REMOVAL. SIGNATURE: DATE: - Q REVISIONS THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY REQUEST FOR NO EXCAVATION AND GRADING ACTIVITIES ARE ALLOWED DURING WET WEATHER. AFi D B K R INSPECTION. w DIVERSION DIKES SHALL BE CONSTRUCTED TO CHANNEL RUNOFF AROUND THE CONSTRUCTION SITE. CONTRACTOR SHALL ,�.�c,� 2. THE SOILS REPORT TITLED "GEOTECHNICAL INVESTIGATION, PROPOSED FOUR PARCEL RESIDENTIAL PROTECT CHANNELS AGAINST EROSION USING PERMANENT AND TEMPORARY EROSION CONTROL MEASURES. SIGNATURE: DATE:-, EROSION CONTROL SUBDIVISION, 680 WESTLAKE ST., ENCINITAS, CA 92024", FOR THIS PROPERTY PREPARED BY MARTIN R. ANDREW C ,DY OWEN, R O F THIS GRADING ENGINEER, DATED NOVEMBER L 20 O PROJECT ACCORDANCE SHALL T CONSIDERED 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT LARRY BAKER AT 760 436-7946, REMOVE EXISTING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. LARGE PROJECTS SHALL BE CONDUCTED IN SIGNATURE: DATE: AS A PART OF THIS GRADING PLAN. ALL GRADING SHALL BE DONE IN ACCORDANCE WITH THE ( ) PHASES TO AVOID UNNECESSARY REMOVAL OF THE NATURAL GROUND COVER. DO NOT REMOVE TREES OR SHRUBS RECOMMENDATIONS AND SPECIFICATIONS CONTAINED IN SAID REPORT. 24 HOURS A DAY. UNNECESSARILY; THEY HELP DECREASE EROSION. �i T L ®®ING 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES i 3. SEPARATE APPROVALS AND PERMITS FOR ANY CONSTRUCTION WITHIN PUBLIC RIGHT-OF-WAY OR TEMPORARY VEGETATION MUST BE PLANTED ON SLOPES OR WHERE CONSTRUCTION IS NOT IMMEDIATELY PLANNED FOR SOILS ENGINEER'S CERTIFICATE EASEMENTS SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 15). ALL NECESSARY MATERIALS SHALL BE EROSION CONTROL PURPOSES. EROSION SHALL BE PREVENTED BY PLANTING FAST-GROWING ANNUAL AND PERENNIAL STOCKPILED ON SITE ON OCTOBER 1 AT CONVENIENT LOCATIONS TO FACILITATE RAPID GRASSES TO SHIELD AND BIND THE SOIL. I MR121'/n/etV61A REGISTERED CIVIL ENGINEER IN THE STATE OF CALIFORNIA, PRINCIPALLY DOING BUSINESS IN 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFFSITE CONSTRUCTION OF TEMPORARY EROSION CONTROL MEASURES WHEN RAIN IS IMMINENT. THE FIELD OF APPLIED SOIL MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF TFIE.501L GRADING. PLANT PERMANENT VEGETATION AS SOON AS POSSIBLE, ONCE EXCAVATION AND GRADING ACTIVITIES ARE COMPLETE. CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION ON 11 2..1 CO AND FOR 3. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE AN UPDATE ON ONE COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THIS STUDY,WITH MY 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO PROTECT ADJACENT ENGINEERING INSPECTOR. WATER USAGE FOR DUST CONTROL SHALL BE MINIMIZED. RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. FURTHERMORE, I HAVE PROPERTIES DURING GRADING OPERATIONS.ANYTHING DAMAGED OR DESTROYED SHALL BE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE RECOMMENDATIONS INCLUDED IN THE SOILS 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO ON-SITE CONSTRUCTION MATERIAL STORAGE REPLACED OR REPAIRED TO CONDITION REPORT FOR HIS PROJECT HAVE BEEN INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS. EXISTING PRIOR TO GRADING. THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. STORED MATERIALS SHALL BE CONTAINED IN A SECURE PLACE TO PREVENT SEEPAGE AND SPILLAGE. CONTRACTOR SHALL 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE STORE THESE PRODUCTS WHERE THEY WILL STAY DRY OUT OF THE RAIN. CONTRACTOR SHALL PROVIDE SECONDARY 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH MARK WHICH IS REQUIRED BY THE CITY ENGINEER DUE TO AN INCOMPLETE GRADING OPERATION OR UNFORESEEN CONTAINMENT FOR ALL FUEL STORED ON-SITE. ELIMINATE OR REDUCE POLLUTION OF STORMWATER FROM STOCKPILES 2 $` DISTURBED OR DESTROYED SHALL BE RE-ESTABLISHED AND REPLACED BY A REGISTERED CIVIL KEPT ON-SITE. STOCKPILES MAY INCLUDE SOIL, PARING MATERIALS,ASPHALT CONCRETE, AGGREGATE BASE, ETC. RCE NO.: VST ENGINEER OR A LICENSED LAND CIRCUMSTANCES WHICH MAY ARISE. STOCKPILES SHALL BE LOCATED AWAY FROM CONCENTRATED STORMWATER STORMWATER FLOWS AND STORM DRAIN off a�% S SURVEYOR. INLETS. STOCKPILES SHALL BE COVERED OR PROTECTED WITH SOIL STABILIZATION MEASURES AND PROVIDED WITH A EXP. DATE: 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO s PREVENT PUBLIC TRESPASS ONTO AREAS THAT ARE UNSAFE OR ARE POTENTIALLY UNSAFE. TEMPORARY SEDIMENT BARRIER AROUND THE PERIMETER AT ALL TIMES. 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING JOB#: 091027 SHORING,AND SHALL BE RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE TRAINING ` I" SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. CONTRACTORS' EMPLOYEES WHO PERFORM CONSTRUCTION IN THE CITY OF ENCINITAS SHALL BE TRAINED TO BE FAMILIAR MARTIN R. OWEN INCORPORATED HEREON. 4730 NOYES STREET#402, SAN DIEGO, CA 92109 WITH THE CITY OF ENCINITAS STORMWATER POLLUTION CONTROL REQUIREMENTS. THESE BMP NOTES SHALL BE e 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF A STRUCTURE FOR HUMAN AVAILABLE TO EVERYONE WORKING ON SITE. THE PROPERTY OWNER(S)AND THE PRIME CONTRACTOR MUST INFORM PHONE NUMBER: (619)813-8462 OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:30 P.M.AND 7:30 A.M. NOR ON 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. SUBCONTRACTORS ABOUT STORMWATER REQUIREMENTS AND THEIR OWN RESPONSIBILITIES. SATURDAYS, SUNDAYS AND CITY RECOGNIZED HOLIDAYS. STATEMENT OF ENGINEER OF WORK 9.ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WASTE MANAGEMENT ! ' 9. NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PRE-CONSTRUCTION MEETING HAS BEEN THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH WORKING DAY WHEN THE FIVE 5 DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT 40 CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY DISPOSING OF ALL WASTE AND UNUSED CONSTRUCTION HELD ONSITE WITH THE FOLLOWING PEOPLE PRESENT: CITY INSPECTOR, CIVIL ENGINEER, SOILS u ( ) ( MATERIALS. DUMPING OF UNUSED OR WASTE PRODUCTS ON THE GROUND, WHERE WATER CAN CARRY THEM INTO THE THE GENERALLY ACCEPTED STANDARDS AND PRACTICES OF THE ENGINEER'S TRADE OR PROFESSION. THE `yam ENGINEER, GRADING CONTRACTOR AND PERMITTEE. THE PRE-CONSTRUCTION MEETING SHALL BE �a). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. CONVEYANCE SYSTEM IS STRICTLY PROHIBITED. ENGINEER FURTHER AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH THE SCHEDULED WITH THE CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING(760)633-2770. RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS,TO THE EXTENT THA' THE ENGINEER NO SEEPAGE FROM ANY DUMPSTER SHALL BE DISCHARGED INTO STORMWATER. BERMS/DIKES SHALL BE PLACED AROUND CONTROLS SUCH PERFORMANCE. THE ENGINEER AGREES THAT ANYPLANCHECK OR:2EVIEW PERFORMED BY 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY PROPOSED CONSTRUCTION SITE ALL DUMPSTERS TO DIVERT THE NATURAL STORM RUNOFF. DUMPSITES SHALL BE CHECKED FREQUENTLY FOR LEAKS. THE CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS PREPARED BY THE ENGINEER IS i WITHIN THIS PROJECT THE DEVELOPER SHALL SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY STORMWATER POLLUTION CONTROL POST CONSTRUCTION BMP/IMP NOTES NOT A DETERMINATION BY THE CITY OF ENCINITAS OF THE TECHNICAL SUFFICIENCY OR ADEQUACY OF THE li DUMPSTER LIDS SHALL REMAIN CLOSED AT ALL TIMES. DUMPSTERS WITHOUT LIDS SHALL BE PLACED WITHIN STRUCTURES ENGINEER FOR THE PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS WITH IMPERVIOUS ROOFING OR COVERED WITH TARPS IN ORDER TO AVOID RAIN CONTACT WITH ANY TRASH MATERIAL. PLANS OR DESIGN AND IT THEREFORE DOES NOT RELIFVE THE ENGINEER OF RESPONSIBILITY FOR THE PLANS AND REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE HAULING OPERATION. 1. FOR STORM WATER POLLUTION CONTROL PURPOSES, ALL RUNOFF FROM ALL IMPERVIOUS OR DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO INDEMNIFY AND HOLD HARMLESS I SURFACES INCLUDING ROOF DRAINS SHALL DISCHARGE ONTO GRASS AND LANDSCAPE AREAS THE CITY OF ENCINITAS AND ITS OFFICERS, AGENTS,AND EMPLOYEES FROM PROPERTY DAMAGE OR BODILY PRIOR TO COLLECTION AND DISCHARGE ONTO THE STREET AND/OR INTO THE PUBLIC STORM MANY CONSTRUCTION MATERIALS, INCLUDING SOLVENTS, WATER-BASED PAINTS, VEHICLE FLUIDS, BROKEN ASPHALT AND INJURY ARISING SOLELY FROM THE NEGLIGENT ACTS, ERRORS, OR OMISSIONS OF THE ENGINEER AND HIS/HER 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT, BUT PRIOR TO FINAL CONCRETE, WOOD, AND CLEARED VEGETATION CAN BE RECYCLED. NON-RECYCLABLE MATERIALS MUST BE TAKEN TO AN GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY,AN "AS GRADED CERTIFICATION"SHALL DRAIN SYSTEM. APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE.FOR INFORMATION ON DISPOSAL OF HAZARDOUS GENTS OR EMPLOYEES ACTING WITHIN THE COUF.SE AND SCOPE OF SUCH AGENCY AND EMPLOYMENT AND BE PROVIDED STATING: "THE GRADING UNDER PERMIT MATERIAL, CALL THE HAZARDOUS WASTE HOTLINE TOLL FREE AT 800 714-1195. FOR INFORMATION ON LANDFILLS AND "° A OF TH ORK BY THE ENGINEER. 2. GRASS AND LANDSCAPE AREAS DESIGNATED FOR STORM WATER POLLUTION CONTROL SHALL ( ) Q�®FESBp�° NO. 10433-G HAS BEEN PERFORMED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED ORDER DUMPSTERS CALL EDCO AT(760)436-4151. GRADING PLAN OR AS SHOWN ON THE ATTACHED AS-GRADED PLAN". THIS STATEMENT SHALL BE NOT BE MODIFIED WITHOUT A PERMIT FROM THE CITY. aka " Cl 0`3� (t FOLLOWED BY THE DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING POLLUTANTS SHALL BE KEPT OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING RECEPTACLES AROU 0 .� ATURE: x DATE: sCs C OPERATION. 3.ALL IMPERVIOUS AREAS WITHIN THE SITE SHALL DRAIN TO APPROVED BMP/IMP FACILITIES SITE. :a v r� iry R ?° AND/OR TO TURF OR LANDSCAPED AREAS WITH ADEQUATE GROUNDCOVER PRIOR TO DISCHARGE FROM THE SITE. ALL IMPERVIOUS AREAS MUST SLOPE TOWARD THE APPROVED BMP/IMP FACILITY EXP 6.30-2012 �.�lt>�PK C _flnlC� t 2 T 12.ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS ENGINEER OR UNDER HIS PORTABLE TOILETS MUST BE IN GOOD WORKING ORDER AND CHECKED FREQUENTLY FOR LEAKS. CONTRACTOR S LL i 7 AND/OR THE TURF/LANDSCAPED AREAS. O I-Rae _. .__, _A -___. ._, _A 9266- g655me`IESEE we. 41LY, �' 3�) �m°• DIRECTION HE SHALL INSPECT AND TEST THE EXCAVATION PLACEMENT AND COMPACTION OF FILLS PROVIDE SECONDARY CONTAINMENT AND LOCATE PORTABLE TOILETS AWAY FROM STORMDRAIN INLETS ON PERVI S . `�°' = 4 �° AND BACKFILLS AND COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED SURFACES. 8998 5e►,I DIFUO GA �21LI �2-" SURFACES. O "AL' AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING 4. NO DRAINS SHALL BE INSTALLED IN HARDSCAPE, DRIVEWAYS, OR ANY OTHER IMPERVIOUS AREA iiE`r ""^^ �x?I!?Er++-...__'_'." aw Ab ,%m ap: &/Spf OPERATIONS HE SHALL STATE THAT OBSERVATIONS AND TESTS WERE MADE BY HIM OR UNDER HIS UNLESS THE FLOW FROM THE DRAIN DISCHARGES TO AN ADEQUATE IMP/BMP. ALL CONSTRUCTION DEBRIS SHALL BE KEPT AWAY FROM THE STREET, GUTTER,AND STORMDRAIN. CONTRACTOR MUST Q SUPERVISION AND THAT IN HIS OPINION,ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE ROUTINELY CHECK AND CLEAN UP MATERIAL THAT MAY HAVE TRAVELED AWAY FROM CONSTRUCTION SITE IMPERVIOUS AREA SURVEYOR FOR THEIR INTENDED USE. 5. DRIVEWAYS SHALL HAVE A MINIMUM 2 % CROSS SLOPE TOWARD THE IMP/BMP AREA OR HAVE IMPERVIOUS AREA PRIOR TO CONSTRUCTION: 9,120 SQFT STEVEN HOWELL ANOTHER APPROVED DRAINAGE SYSTEM THAT IS DESIGNED TO COLLECT RUNOFF AND DISCHARGE FOR MORE INFORMATION ON STORMWATER POLLUTION CONTROL MEASURES AND REQUIREMENTS PLEASE CONTACT THE IMPERVIOUS AREA AFTER CONSTRUCTION: 14,030 SQFT 9760 MESA SPRINGS WAY- 13. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO PROVIDE POSITIVE IT TO AN ADEQUATE IMP/BMP. ENGINEERING DEPARTMENT, CITY OF ENCINITAS AT (760)633-2770. INCREASE IN IMPERVIOUS AREA: 4,910 SQFT UNIT 33, SAN DIEGO,CA 92126 DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL CONTROL SURFACE WATER AND AVOID PHONE NUMBER: (858)621-6050' DAMAGE TO ADJOINING PROPERTIES OR FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL 6.ALL STORMWATER IMP/BMP FACILITIES SHOWN HEREON SHALL NOT BE MODIFIED OR ALTERED IMPERVIOUS AREA REPLACED: 0 SQFT MEASURE TO PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS PERMANENT WITHOUT A PERMIT FROM THE CITY. DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN INSTALLED. SAN DIEGUITO WATER DISTRICT NOTES: 7.THE INSTALLATION OF ADDITIONAL IMPERVIOUS SURFACES NOT SHOWN ON THIS PLAN MAY 14. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL SHALL BE PLACED IN REQUIRE THAT THIS PLAN BE REVISED OR THAT A SEPARATE ENGINEERING PERMIT BE OBTAINED. 1. WATER MAINS, LATERALS AND APPURTENANCES SHALL BE CONSTRUCTED ACCORDING TO THE STANDARD SPECIFICATIONS OF THE CURRENT WATER AGENCIES'STANDARDS COMMITTEE(WASC). ACCORDANCE WITH STANDARD SPECIFICATION. ALL VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS B. ALL EXISTING AND PROPOSED TRASH ENCLOSURES SHALL BE FITTED TO COMPLY WITH STORM 2. REVIEW OF THIS PLAN BY SAN DIEGUITO WATER DISTRICT DOES NOT CONSTITUTE A REPRESENTATION AS TO THE ACCURACY OF,THE LOCATION OF, OR THE EXISTENCE OR NON-EXISTENCE OF, ANY UNDERGROUND UTILITY, PIPE OR STRUCTURE TO BE PLACED. LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM NATURAL WATER BEST MANAGEMENT PRACTICE REQUIREMENTS. THE TRASH ENCLOSURES SHALL HAVE AN WITHIN THE LIMITS OF THIS PROJECT. GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF 12 INCHES AND THEN IMPERVIOUS, NON-COMBUSTIBLE ROOF THAT WILL NOT ALLOW RAIN WATER TO ENTER THE COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENCLOSURE. THE ENCLOSURE SHALL BE LOCKABLE AND LOCKED WHEN NOT IN USE. A BERM 3. ALL EXISTING FACILITIES, WHICH MAY AFFECT THE FINAL DESIGN, I.E., LINE CROSSING, LINE PARALLELING OR PROPOSED CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 FEET OF PLACE, SPREAD,WATER AND COMPACT THE FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. SHALL BE INSTALLED AT ALL OPENINGS TO HOLD IN ANY LIQUIDS THAT ESCAPE FROM THE PROPOSED WATER MAINS SHALL BE SHOWN ON IMPROVEMENT PLANS. ELECTRICAL AND SEWER TO CROSS UNDER WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. DUMPSTER AND TO PREVENT ANY FLOW OF STORM WATER THROUGH THE TRASH ENCLOSURE 15. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE TO PRODUCE SMOOTH AREA. THE BERM CAN BE CONSTRUCTED WIDE AND FLAT TO ALLOW ROLLING OF THE DUMPSTER IN 4. CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND/OR ADJUST TO GRADE ANY EXISTING WATER FACILITY (FIRE HYDRANT, METERS,VALVES,VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER SURFACE AND UNIFORM CROSS SECTION. THE SLOPES OR EXCAVATION AND EMBANKMENTS SHALL AND OUT. THE ENCLOSURE SHALL BE SELF CONTAINED OR MAY HAVE A DRAIN THAT DISCHARGES FACILITIES MUST MEET CURRENT WATER AGENCIES'STANDARDS COMMITTEE (WASC)STANDARDS. IF FACILITIES DO NOT MEET STANDARDS, THEN THEY SHALL BE UPGRADED TO CURRENT STANDARDS AT THE OWNER'S EXPENSE. BE SHAPED, PLANTED,AND TRIMMED AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT THROUGH AN ADEQUATELY SIZED OIL/GREASE SEPARATOR AND IS THEN FILTERED THROUGH A 5. UTILITIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN PARALLELING WATER SERVICES. \ AND ORDERLY CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR CITY-APPROVED HYDROCARBON FILTER AND DISCHARGED INTO THE PUBLIC SANITARY SEWER EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED SHALL BE SYSTEM, NOT TO PLANTERS OR THE STORM DRAIN SYSTEM. A SEPARATE BUILDING PERMIT MAY BE 6. MINIMUM HORIZONTAL SEPARATION OF 10-FEET REQUIRED BETWEEN FIRE HYDRANTS AND SAN DIEGO GAS AND ELECTRIC VAULTS. LJ REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES SHALL BE ROUNDED IN REQUIRED FOR THIS STRUCTURE. ACCORDANCE Willi THE GRADING ORDINANCE. �$ ;�(�iai3 � mss` �ly a' ,1�� 7.ALL WATER SERVICES f0 BE CONSTRUCTED CLEAR OF DRIVEWAYS AND ALL OTHER TRAVELED WAYS. WATER METERS MUST BE IN FRONT OF THE PARCEL THEY ARE SERVING. LJ 16. ALL TREES, BRUSH, GRASS,AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED FECf -)j_) 6 ' ,yAN 8. CALIFORNIA STATE LAW ASSEMBLY BILL AB-1953 IS REQUIRING NO-LEAD BRASS BE USED IN THE CONSTRUCTION OR REPAIR OF ALL POTABLE WATER SYSTEM EFFECT OR OTHERWISE DISPOSED OF OFF THE SITE BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT EARTHWORK DATA JANUARY 1, 2010. IN COMPLIANCE WITH THIS LAW, THE DISTRICT SHALL REQUIRE ALL MATERIALS TO BE NO-LEAD BRASS PARTS. HAVE BEEN CLEARED WITH A NET AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. STEEPEST EXISTING NATURAL SLOPE ON-SITE =2:1 BMP PROJECT STATUS APPROVAL OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AND CITY MAXIMUM VERTICAL DEPTH OF CUT=2' f - y _ 9. ALL COPPER TUBING USED FOR AIR RELEASES, BLOW OFFS,AND SERVICES SHALL BE PROVIDED WITH CATHODIC PROTECTION IN ACCORDANCE WITH WC-17 OR WC-18. > LL1 ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. MAXIMUM VERTICAL DEPTH OF FILL=7.5' H1A1dd�A 6RENC! iC a 1J Lr STANDARD � - -• Q 17. THE REMOVAL OF ANY AND ALL CITY TREES SHALL BE CONSISTENT WITH THE CITY'S URBAN CUT=30 C.Y. FILL = 1,450 C.Y. Z FOREST MANAGEMENT PROGRAM. TREES LOCATED WITHIN CITY STREET RIGHT-OF-WAY,ON CITY IMPORT= 1,420 C.Y. PUBLIC WORKS PLANNING AND BUILDING PARKS AND RECREATION SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT PROPERTY, OR WITHIN CITY EASEMENTS ARE REFERRED TO AS CITY TREES AND SHALL BE PROTECTED REMEDIAL=890 C.Y. (3' REMOVAL AND RECOMPACTION UNDER AND 5'OUTSIDE OF BUILDING AREAS) V) IN PLACE DURING CONSTRUCTION UNLESS SPECIFICALLY APPROVED OTHERWISE. NO GRADING, EXCAVATION, OR DISTURBANCE OF CITY TREE ROOT SYSTEMS SHALL OCCUR WITHIN THE CITY LLI TREE DRIP LINE AREA(THE AREA FROM THE TRUNK OF A TREE TO THE OUTERMOST EDGE OF THE TREE Lv CANOPY PROJECTION ON THE GROUND). IF A CITY TREE IS NOT CLEARLY LABELED TO BE REMOVED, Z IT MUST BE PROTECTED IN PLACE. EVEN IF APPROVED IMPROVEMENTS ARE IN CONFLICT WITH A CITY ( 3 �J� �� // 3'Z�'A� �`�Nf� �i�l'/^�IBC�J► �l�J/I (, TREE, IT MUST NOT BE DISTURBED UNLESS THE PLAN IS REVISED TO ADDRESS THE TREE REMOVAL. IGN DATE SI N DATE GN ATE