1599 !
'^tea
LANDSCAPING
GENERAL CONDITIONS
1 . SITE 3. PLANTING
The proposed work is located at the Cardiff Sanitation District Treat- a. To soil shall be fertile, friable,
natural topsoil , free from alkali ,
ment Plant in Cardiff, California. sticks, stones, and foreign matter and shall be approved by the
Engineer®
2. BIDDERS ' INSPECTION b. Manure shall be good organic steer fertilizer of approved quality,
-:�F '2- pulverized, screened and weed-free, delivered to the site in the two and
F 'T UK Arrangement can be made with the Engineer for access to the site one-half cubic foot sacks of the
distributor.
kD .�, p ri or to the submission of bids. The Owner assumes no responsibility
+ LZ xx for failure of bidders to visit the site before bidding, Use one-sixth of a sack of manure
for each five gallon container, and
one-eighth of a sack for each plant in one gallon container.
T 3. MATER I AL STORAGE AND HANDL 1 NG
�y Mix thoroughly with topsoil and use for backfi l l i ng in pits.
SAS_ 1308 _ - -- Material shall be brought to the site in such a manner as to leave
"�--- driveways free for the regular use of the occupants. Materi al and 4. LOCATIONS
equipment shat 1 be stored on the site where and as approved by the
Engineer. Plant locations shall be staked before excavating pits for planting.
. a , xk Special care shalt be taken to check underground pipe tines before
® UTILITIES digging hales.
'There is no domestic water supply at the plant site. The Contractor 5. PLANT PITS
4 -:xt �g + - - 19 1I Q.G.
� � .- ,'o�, �° _. ,� � , may use treated sewage or provide fresh water at his expense
for
_z- Z ?� t5z* i10 e►8
Z ,.` "'` -_ _ _- w � planting. Power is available at the site and will be supplied with- Excavate
planting pits with vertical sides for all plants. Pits shall
LL
. .• .` , , f- r, '' Po- �y --� out cost to the Contractor. He shall make his own temporary connecw
be at least two feet wider than the ball or spread of roots and shall be
t i ons thereto as approved b the Engineer.neer® `
:: �-.�°-----_ PP Y 9� one foot deeper or as directed by the Engineer.
. w
g , _. -
-_ a. CONTRACT DOCUMENTS 6® PLANTING
= Four complete sets of Contract Documents will be furnished the Con- Remove plants from containers and
e i .
P p t s n set n center of the pit, placing on
g
tractor without charge. One complete set shalt be kept on the job a layer of well compacted prepared planting
soil and manure that is deep.
�' at all times for the use of the Inspector. enough to bri ng the crown of the plant level wi th the
fi ni sh grade, after
allowing for watering and settling of soil . Compact soil around ball
6. INSPECTION of plants and water thoroughly® Form ridge of soil around edge of pits
�. � for watering.
Inspection and approval of materials, equipment, and planting will be tl
made by the Owner 's Inspector under the direction of the Engineer. In planting ground cover plants, scarify planting
n so that the round
ri; ;,! f • ff r r - _�_ - is thoroughly loosened to a depth of six inches, cultivate to
break up
2- 1 i ` x --- WORK SCHEDULE lumps, remove stones over 211, mix with one sack of manure
for each flat
of plants, drag surface until smooth. Make an opening with trowel b
^,- i �,. �ml� _ i The Contractor shall develop a schedule of operations and obtain the pushing
into the ground and pulling to one sides With the trowel still
1" '' + ,� Engineer 's approval thereof before starting any work. in ground, place plant into opening
with root system free Remove
x x t-` -I- trowel and close opening by pressing earth tightly around the roots with
8. SUBSTITUTION AND APPROVAL OF MATERIALS hands.
c
Should the Contractor desire to submit for approval equipment, materials, 7a
PRUNING
PAT }-i C7 N ra 1.C? C?�.
or articles other than those specified, he shall do so within twenty-
five five days after the date of the Contract. Prune plants in accordance with standard horticultural practices
or as
directed by the Engineer.
Should the Contractor fail to submit for approval equipment, materials,
or articles within the indicated period, he shall furnish and install 8. STAKING
those specified without substitution.
Stake such trees that need staking, as directed by the Engineer. Set
j SPECIFICATIONS stakes vertically with at least one-third of the length in the ground, in
-- - - a manner to avoid injury to the roots`
-p� ^�- n�
` 1r N 1 i� L _ _ 1 . WORK INCLUDED
9. MAINTENANCE
This work includes the furnishing of all labor, equipment and material
required to do all landscaping and related work where and as shown All maintenance of planting will be done
by the Owner after the acceptance
_ and specified and proper to completion. and approval of the work,
P' L T L 1 $ 7` K E �! 2> PLANT MATERIALS 10. GUARANTEE
I�,INt) KEY ll M, F F P L A 1 `I E Plants shalt be young vigorous plants of indicated varieties, free
of The Contractor shall guarantee that he will replace, thirty days after com-
t+!_o, _ AT t O 1Vl p AWL 1 E disease, insects, insect eggs, and larvae. Plants shal1 be subject
pletion and acceptance of the work or as soon thereafter as weather permits,
to inspection and approval at place of growth or upon delivery. all -planting which at that time is not
in a healthy and vigorous growing
I t_t� AK_ 5 Gti,t,, Such inspection and approval shall not impair the right of rejection condition,
in the opinion of the Engineer.
LU -C ACI A, _ 13At LEYAW at site for size, condition, defects, or i nj uri es.
j�A�t_�Y A�Ca�1� � Ca�L,
CV-KTOV41A 61LI(4UA GA G�t� Rejected plants shall be removed from site immediately.
CAGE C ti E S-I"N U't � �a A(..
Ground cover plants shall be rooted stock in flats of 100 plants each
V a�
� and shall be delivered to the site in original flats,
cp, �.l s t �.�tc3ra t,at CtrrsL c.rU - B r t; ;t+ rt _. __.. 5 : GAL.
����/\ , calls PROSrRA�A a4var�F :HA-rAL Csttsr�ls3 Gat ;
\✓ .�.
H i 13US r-U-S
GROVRrnt :.Q�' Bf?tt'�i�11A._ t-itBUbCU:S _. 5 �aA6..
N►SUSGUS
� r9 C-,�,L. _
-
'��1��C��a:�y't-tom _ ��NY.a c T P�rRaca��rMa :S
6 llh X`CT:Q`sa✓!A Shl YLGOSla aC. f LO SM/a GAS.:
C? �OQP L� pR. '��� 1 C_Q -Q1�EF�. iFi : PAt?,te4E g i p.ARt�1. .'C -_�Qt.Qt�t�A"a°C1
i
-AX i
�ytt` �! NET?51t)P1, AL!»A,.la EF4 _ CM-MKY 1RE:P c�4E-N,� C`atAk
PICV.�, ;-� 1YYLEAiF GEt-aNtut�'t
M"ti FE,E.,'f A"[`@��t _ _:_ _._:.__ _ I'
:'rA sL�aw a►�A '�RA1l.S_t?�#GNTrt.A :_: >= 1.a
! I ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
COUNTY OF SAN DIEGO
1 RI T d z
0 4005 ROSECRANS ST. SAN DIEGO to. CALIFORNIA
t PLAN-T
I-
4 ! It H .A DIFF NI TAT ION ISTRICT
N O
W —
0 N
PROJECT NO.
> SCALEf
o= DESIGNED k
L f�N D S C A P I ( PL!i ENGINEERING W.O.
__..... _. . t ! 1'
F SHEET
a CHECKED
OF 11
DATE Qa;r 47
FIELD FILE.
' BOOK WARREN A. BARNEY CIVIL ENGINEER .E.NO.7118
NO. ,
VIETZGEN 197M PURAVEL
f �C � °