Loading...
6444 ENCINITAS , CA GENERAL_ NOTES CONDUCTORS CONDUITS 1 DETECTOR, POLE, AND PULL BOX LOCATIONS SHOWN ARE APPROXIMATE. _ ACTUAL LOCATIONS WILL DETERMINED IN THE FIELD BY THE ENGINEER. CONTRACTOR SHALL OBTAIN APPROVAL FOR LOCATIONS PRIOR TO FINAL SOURCE AWG# 1 /2\1/3\A\]/N 6 7 8 Ag 1 1 4 1 1 TERMINATION PLACEMENT. POLE 1 CAT5 REDFLEX 2 THE SHOWN LOCATION OF ALL EXISTING UNDERGROUND UTILITIES ARE CABINET APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING REDFLEX ALL SUBSTRUCTURES, WHETHER SHOWN HERE IN OR NOT AND PROTECTING POLE 3 CAT5 1 1 1 1 1 THEM FROM DAMAGE. THE EXPENSE OF REPAIR OR REPLACEMENT OF SAID CABINET SUBSTRUCTURES SHALL BE BORNE BY THE CONTRACTOR. HAND DIG REDFLEX FOUNDATIONS UNTIL CLEAR OF SUBSTRUTURES. IF REQUIRE, TO PROTECT POLE 4 CAT5 CABINET UTILITIES. PHONE "UNDERGROUND SERVICE ALERT" AT 800/422-4133 POLE 6 CAT5 1 1 1 1 1 1 1 REDFLEX 3 ALL PULL BOXES SHALL BE N0. 5 AND ALL CONDUIT SHALL BE 2-INCH, CABINET UNLESS SHOWN OTHERWISE. POLE 2 4 'USE TYPE E LOOPS AND REDFLEX LOOPS PER LOOP DIAGRAM AND CENTER POLE 1 #18 FLASH UNIT IN LANE. POLE 5 POLE 4 #18 2 FLASH UNIT 5 CONTRACTOR SHALL PROVIDE INFORMATION REGARDING AS-BUILT LOCATIONS OF ALL FACILITIES. TRAFFIC SIGNAL RED PHASE-SB SBLT REDFLEX 6 ALL TRAFFIC SIGNAL, HIGHWAY LIGHTING, SIGNING AND STRIPING SHALL ECR & EB/ EBLT #14 CABINET CONFORM TO THE REQUIREMENTS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, STANDARD PLANS AND SPECIFICATIONS ,i H µ I ENCINITAS DATED JULY, 2002 EDITION. ' ! ' CITY POWER I REDFLEX 7 ALL ABBREVIATIONS AND SYMBOLS USED ARE SHOWN ON CALTRANS ,�' ! I j PEDESTAL (120V) #8 2 2 CABINET STANDARD PLAN NO.'S 1 -10A, A-1013, ES-1A, ES-1A, ES-113 AND AS ®I REDFLEX LOOP REDFLEX DEFINED ON THE PLAN. i ; ` „ I DLC LEAD-IN CABINET 8 ALL LOCATIONS OF DETECTOR LOOP, SIGNAL POLE AND CABINET REQUIRE POWER CIRCUIT 1 10 2 2 PO 1 ENGINEER'S APPROVAL PRIOR TO SAW CUTTING OR EXCAVATION. I °I 8 9 I ®^® , ' ' (REDFLEX CABINET) # LE 9 CONDUCTOR SCHEDULE IS FURNISHED AS AN INSTALLATION GUIDELINE ONLY. j I POWER CIRCUIT 2 -- I `\ °' II`\I;' ®' I #10 POLE 2 IT SHALL BE THE CONTRACTORS REPONSIBILITY TO PROVIDE THE CORRECT I i °y' y ; j (REDFLEX CABINET) CONDUCTORS AND CABLES REQUIRED FOR THE INTENDED OPERATION. POWER CIRCUIT 3 j REDFLEX CABINET #10 2 2 2 2 2 POLE 3 10 UNLESS NOTED OTHERWISE, THE CONTRACTOR SHALL FURNISH AND INSTALL ( ) ALL MATERIAL AND EQUIPMENT REQUIRED FOR THE INTENDED OPERATION. POWER CIRCUIT 4 >I' j REDFLEX CABINET #10 POLE 4 11 IT IS REQUIRED TO MAINTAIN SIGNAL OPERATION INCLUDING SIGNAL j2 ° o °>!o'+ °�,®°; j (REDFLEX INTERCONNECT DURING MODIFICATION OF EXISTING TRAFFIC SIGNAL SYSTEM. 65' I 1 ° �r �� _- _-i�' --� I POWER CIRCUIT 5 _-_ _. ---�-- ;�. ! I I I 10 2 2 2 2 POLE 5 12 ALL CONSTRUCTION OPERATIONS SHALL BE LIMITED TO THE PERIOD 10 0 20' (REDFLEX CABINET) BETWEEN 9:OOAM AND 3:OQPM, MONDAY THROUGH FRIDAY, UNLESS 1 3 T `' v® POWER CIRCUIT 6 t°^® �^\ ®j�`` ° ' \ °^\I I , #10 POLE 6 OTHERWISE AUTHORIZED IN WRITING BY THE CITY ENGINEER. � � i� 15 (� '> <° \> ej'; °>� ° � °> I I (REDFLEX CABINET) 13 CONTRACTOR SHALL MAINTAIN TRAFFIC THROUGH THE CONSTRUCTION AREA 35, l;x �'' \ ®! ® I\ d� ii \�,' ! " ' j SCALE: 1 =20 ALL REDFLEX AND PROVIDE ALL NECESSARY CONSTRUCTION WARNING SIGNS AND MARKING j rr --� I ii ; I SOLID BARE BOND #8 1 1 1 1 1 1 1 1 1 1 1 EQUIPMENT REQUIRED. CONTRACTOR IS TO SUBMIT A TRAFFIC CONTROL PLAN BEFORE ' ~ ~- r' ° ° I ANY WORK IS STARTED. ;`°_ ° ;i I; 1 COAX 1 COX POINT OF REDFLEX SERVICE CABINET ______. __________s� TOTAL NEW CONDUCTORS 7 3 0 21 21 7 7 7 7 4 4 7 5 2 1 CONSTRUCTION NOTES ---------- _._._. 6 CONDUIT SIZE (INCHES) 0 INSTALL FOUNDATION AND REDFLEX CONTROL CABINET. INSTALL — _--_-_ �� i I I ;,- 5/ "x8' GROUND ROD AND BOND TO CABINET W T 8 WITH #8 BARE Cu NEW/EXISTING CONDUIT N N N N N N N N N N N N E E N SEE CABINET FOUNDATION DETAIL. _ _ �-- - 0 CONTRACTOR SHALL TERMINATE ALL POWER CIRCUITS INTOd -- - __- � REDFLEX CABINET. ------------------ ----------------------- ------ - 3 INSTALL INLINE FUSE HOLDER ON RED PHASE CONDUCTOR WITH � 5 AMP FUSE INSIDE REDFLEX CABINET, TO PROTECT CITY 65 I I o°^`\ e'r� + ®^\ I I I I I I r i + ® \ i TRAFFIC CABINET. 9 $ I ' T INSTALL 40 AMP CIRCUIT BREAKER INTO EXISTING POWER -- _ PANEL FOR 120V SUPPLY TO REDFLEX CABINET. - --- I+ --1— "-'- - — --- — 0 TERMINATE #14 WIRE TO RED PHASE AND NEUTRAL, INSIDE ° \5 \ ®® TRAFFIC CABINET. SEE CONDUCTOR SCHEDULE FOR 8 9 1'7 ®' ` r� /�\ .> 9 ° I ;' ! v ®`B' i `° <;� " I .�---_-:-- 4 DIA STD. GALVANIZED APPROACHES. — , \° �_� -------.._ _ ° -�— STEEL PIPE ASTM A53 - f > ' \ ° ° ' \ SCH 40 4- 1 /2 0.D.) © INSTALL #5 PULL BOX. 6v ® °', r� <'° \`> �' \ \ I ,�', I I N 4``\ ,> r-� < `> \ POLE SCHEDULE 7 INSTALL LOOPS AND CONDUIT STUBOUT FOR REDFLEX — \ ® �- °> I ` I r-� - _ - ~___ + ___ ® \ -- -- - i L� ®r \ e 7 a i --� \ r�1 � __ _ —__r"°_ �_ NEW/ o i B ,, l ; ,, ! ; ; —W- __ ---------- �:----- ------- --t-- --------�+� --------- � ------ -_-- -------- NO. TYPE HEIGHT DETECTION. EACH LOOP MUST HAVE A SEPARATE HOME RUN + l ® r- " ° \ I/ j I / 1 1 w < > ' ° - FRANGIBLE BASE i i r d u ! I I I �, °,�® \ ®° ° < > EXISTING AND LOOP LEAD IN CABLE. MAXIMUM 2 LOOPS PER SAWCUT. i I e,° `® i j \„® °® ®° ' 1 REDFLEX 12 N ° z REDFLEX LOOPS TO BE LABELED AT REDFLEX CABINET. -~ ir--,` %I I t I I "`"1-4 `- (CASE ALUMINUM OR t'--' ( � I � I I I I REPLACE CITY LOOPS IF REQUIRED, TO CITY STANDARDS. SEE ,' + / j 6 8 919 ---_ REDFLEX 10 N CAST IRON) 14 LOOP DETAIL AND DRAWING FOR QUANTITY AND LOOP ID#. iI , \ 1 ' > i _ __ r \ \ w `' _ 6 SQUARE AT THE BASE - - - - ��-� -- - 3 REDFLEX 10 N r� ® INSTALL FOUNDATION AND POLE FOR REDFLEX EQUIPMENT. '� I 1 , I oar --' -------- -- --��-------------T ACCES S DOOR ---------------- SEE DRAWING FOR LOCATION. SEE POLE DETAIL. REDFLEX 10' N - --------------- E =:_ ----------- ------- -- -- - - --'E----------t----{E -L - -----E--------------E------ F + 1 E-- --- -- °` --' E-- {--- -- E �I ® INSTALL CAMERA AND FLASH ENCLOSURE ON REDFLEX POLE, AIM -- �~ �- - I � � � VD U5 REDFLEX 10' N I 4" CONCRETE CAP AT MONITORED APPROACH. - ---__-_._.__---- ` Vt BL :- _ ® REDFLEX 10 N SIDEWALK OR 10 INSTALL FLASH UNIT ON REDFLEX POLE, AIM AT VIOLATION - ~�� �I 'n� `- _ _ = �' GROUND LINE. •�•�• % r i I I �. 11 ��.--' ._.__..__._._._-___._.-__ -�_ �__-_._ °�, � • . "•.$•• �°,� .���.•��°•/„ 11 CONDUIT TO BE BORED UNDER ROADWAY. 12 N A, Yrt a_-______ 4 I > < > < > CONDUIT `�._____..___,._.L o, a s a s \ /, �•/ .. • At ' 13 TERMINATE 2" CONDUIT INTO COX CABLE PEDESTAL. ` � -7-' EARTH 14 TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #1 I I ! l 6 I (HOT & NEUTRAL). CONNECT TO SOLID BARE BOND GROUND. I 3 ; 8 °9 ,�° °° 1 6 I <° ; ° <� r> <° ,> °> ' II I CONCRETE FOUNDATION 15 TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #2 (HOT & NEUTRAL). CONNECT TO SOLID BARE BOND GROUND. ,f ❑ TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #3 ;® ' I _-�-� j ! j {4) X 36 X 5/8 DIA 16 II ' II I' ^ I - j 23" MIN. ANCHOR BOLTS (ASTM (HOT & NEUTRAL). CONNECT TO SOLID BARE BOND GROUND. 1 �J I `\ I I j <\I ®�fi! A-36 OR A-307. 1171 TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #4 j ! I (HOT & NEUTRAL). CONNECT TO SOLID BARE BOND GROUND. j '+ I I ' ,rte 18 I I ,+ j I m ;�� B:,C:�• • • POLE BASE ❑ TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #5 j (� j a TEMPLATE (HOT & NEUTRAL). CONNECT TO SOLID BARE BOND GROUND. j I `-J I I ` ® 19 TERMINATE POLE TO REDFLEX CABINET POWER CIRCUIT #6 j Z: 12-j" IMAGINARY (HOT & NEUTRAL). CONNECT TO SOLID BARE BOND GROUND. , ! ; ? j FOUNDATION MAY BE SIDEWALK ROUND OR SQUARE. BOLT CIRCLE. VIOLATION LINE i 28' SIDES W/DUDRS �� I + I I I I I 4 I — LANE LINE POLE DETAIL - 19" RED LIGHT CAMERA SYSTEM -- -- 1 ( T Redflex Loops j I 1 i j I SCALE: 1"=2' i 18 Direction of Travel I New City I New City + j I j Underground Service A I e r t Loop i �� ; Laap , 1 -J II I i OPEN AREA--- N of Southern California �`° ,� �`° °' j j u u q -- Q O�ESS6 Call Toll Free LANE LINE _ — 7�� �� �� CONCRETE A PRODUCT OF 1-800-422-4133 -- — 1 r, REDLIGHT PHOTO ENFORCEMENT FOUNDATION " C4) x I8 X GROUND ROD --69— .„ Z.C�r __11 e )I e fJ/ i' — 28 `" DIA BOLTOS. CABINET BASE REDFLEX TWO WORKING DAYS •J ` xp 130 1 �ivX�. 9.30-06 � TRAFFIC SYSTEMS BEFORE YOU DIG 4 Turns per Redflex Loops, 2 home rune per saw cut RED LIGHT CAMERA SYSTEM 'q���CTR ��` REDFLEX CABINET FOUNDATION DETAIL 6047 BRISTOL PARKWAY.; SUITE 100 D I G A L E R T REDFLEX TRAFFIC SYSTEMS 4,OF' CA�O�®/ CULVER CITY, CA 90230 Loa'DIAGRAM PH: 310 642 0470 REVISIONS APPROVED DATE REFERENCES DATE BENCH MARK SCALE SPECIAL DISTRICT APPROVALS CITY OF ENCINITAS DRAWING ND, PIL S PREPARED UNDER SUPERVISION OF RECOMMENDED APP V D / RED LIGHT PHOTO ENFORCEMENT HORIZONTAL 1'=20' DATE I BY. BYi r/ � - // TS-o-58 VERTICAL R,'E,E, NO.. � DATE� 3`ZS` �� DATE' @ EL CAMIN ❑ REAL & ENCINITAS BLVD l ENGINEER EXP, le M ZO R,C.E, R.C.E. SHEET 1 OF 1