2004-1533 CN/G City o - E .ENGINEERING SE ncznitas R VICES DEP14RTAIENT Capital Improvement Projects District Support Services Sand Replenishment/Sto Field Operations nnwater Compliance Subdivision Engineering Traffic Engineering August 17, 2009 Attn: Union Bank Of California Southern California International Operations Cen 1980 Saturn Street, VO1-519 ter Monterey Park, California 91755-7417 �: Erich Wilms 1098 Hymettus Avenue APN 254-262-22 CDP 02-263 Grading permit 1533-G Final release of security Permit 1533-GI authorized earthwork, storm drainage control, all as necessary to build the described security , site retaining Wall and erosion y deposited is merited. project. Therefore, a full release of the Letter of Credit 306S2359599 in te entirety. The document original isenc lose d amount Of$1179883.009 is hereby released in its Should you have an 2779 or in writing, question g attention s or concerns, please contact Debra Geisha rt at(760) 633- Sincerely this Department., Q � Debra Geish Engineering Technician Subdivision Engineering Jay Lem bach Finance Manager CC: Jay LembAch,Finance Financial Services Erich Wilms Manager Debra Geishart File ile TEL 760-633-2600 / FAX 760-633-2627 505 S. Vulcan Avenue, En cinitas' California 92024-3633 TDD 760-633-2700 s j recyc%d paper EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC.:.- 10925 HARTLEY ROB SANTEE, CALIFO ', ERYICes DFE'A LENT (619)258-7 90 Fax 258-7902 I ` (jam Mr. Erich Wilms 1098 H Ymettus Avenue � - - Leucadia, California Cc�o-berA30, 2003 92024 Project No. 03-1147B4 Subject : Limited Site Investigation Proposed Single Family 1098 Hymettus Residence Avenue City o , APN 254-262-22 f Encinitas, California Dear Mr. Wilms : In accordance with investigation Your request, we investigation the soil conditions have performed gation was undertaken at the a limited criteria for site to subject site. The gradin Provide the soil system for the g and recommend engineering proposed residence, an appropriate foundation Our investigation approximately ound that the Deposits y 2 feet of colluvium site is underlain Formation to the and sandstone by maximum explored de of the Terrace The construction depth °f 7 feet . feasible °f the proposed the design the recommendations herein is 9 and construction, herein geotechnically are implemented in Respectfully submitted, �u (D Mam adou Saliiallo, RCE 54071 P. E. MSD/md WILMS PROJECT NO. 03-1147B4 INTRODUCTION This is to present investigation for the findings and the two-story proposed two- conclusions Of a so. to be located at 1098 Y over Of Encinitas Hymettus Avenue basement resident , California. in the Of area, Cit The objectives of the investigation were to determine soils conditions and provide recommendatio construction. the existin ns for the propose In order to accomplish these trenches were excavated °bjectives, three and loose tO a maximum de (3) explorator} bag samples were obtained pth of 7 feet; undisturbec performed. , and laboratory tests were SITE DESCRIPTION AND PROPOSED CONSTRUCTION The subject site in the is located on the west Leucadia area, City side of story residence y °f Encinitas Hnia. s Avenue, that occupies the California. A single- slopes moderately to the west , site will be removed. Avenue to the east Site boundaries The lot directions . and residential include Hymettus The proposed construction Properties a the basement residence, consists of remaining `� the basement will upper two levels will a two-story over footings with aill consist of masonry e WO°d-framed and slab-on- Y walls founded on continuous grade floor, FIELD INVESTIGATION On September 17� to a 2003, three exploratory maximum depth of 7. Y trenches were equipped with a depth inch bucket . with a John Deere excavated are shown The approximate 310 SE backhoe on the attached Plate trench locations Exploratory Trenches" . No. 1, entitled ` was recorded A continuous "Location of at the time of excavation°and ist e soils encountered entitled "Summary Sheet shown on Plate No. 2 The soils were visuall filed identification y and texturally classified accordin No. 3 entitled Procedures set forth g to the Uniform Soil Classification Charthe attached Plate 2 WILMS PROJECT NO. 03-1147B4 SUBGRADE CONDITIONS The subgrade soils investigation were colluvioumntor a during the soils consisted of tan maximum depth of°2rse of os low moisture content . Theoocoilu' was undsilt feet. with sand (SM with �to dense sandstone of the Terrace Deposits Formation• y medium dens EXPANSIVE SOILS An expansion index test formational soils to was Performed on with than determine volumetric a sample Of the change in moisture content, change characteristics a ver�low Potential for expansion for the found de on of 3 indicates GROUNDWATER __._ �� soils. , Groundwater was not investigation, encountered during the Static groundwater course of our depths greater than is generally anticipated affect the 150 feet. We do not expect at proposed development, P groundwater to GEOLOGIC HAZARDS A review of the available site indicates geological literature pertainIn the existence of g to the a1roximatel 2 . 5 Km to the west , the Rose Can on Zone or one of the major active faults in then shaking is the W_. e from this fault happening to affect the e most likely site is comparable to others in With respect to this hazard general area. � the The proposed residence seismic design should be designed in the g requirements of the 1997 Uniform dance with Structural Engineers the SAssociation of California Building Code or following seismic design criteria: using the PARAMETER Seismic Zone Factor, Z VALUE UBC REFERENCE Seismic Source 0.40 Table 16-I Soil Profile Ty e B Table 16-U Near-Source Factor, Na SD Table 16-J Near-Source Factor, Nv 1'2 Table 16-S Seismic Coefficient, Ca 1'5 Table 16-T Seismic Coefficient, Cv 0'53 Table 16-Q 0.96 Table 16-R VVV 3 WILMS PROJECT NO. 03-1147B4 Based on the absence of shallow groundwater and formational soils, it is liquefaction is very our opinion that consistency of tt y low. the potential fc CONCLUSIONS AND RECOMMMATIONS The following conclusions and recommendations a analysis of the data and re based u investigation, information obtained Pon th investigation; This includes visual from our soi: g laboratory testing nspection; fielc soils native to the site. g and our general knowledge \ development The site is suitable for g °f the ,during Provided the recommendations set forth aretimpleme°Sec construction. nte� GRADING AND EARTHWORK Site grading should begin with clearing removal of vegetation and deleterious and grubbing, the proposed residence materials . g� e. g. the Terrace Deposits should the colluvium extending In the area of within 2 be overexcavated g tO the underlying percent over optimum and the conditioned percent relative compaction, compacted to The overexcavation s minimum of 90 minimum of five (S) feet beyond should extend a depth and extent of removal Perimeter footings . the time of should be g The actual excavation b evaluated in the field at should be performed in accordan er with the attached this firm. Grading hed appendix A. The proposed basement is the sandstone of the Terrace is anticipated to be entirely founded into FOUNDATION AND SLAB a• Continuous and spread footings two-story residence g are suitable for extend a minimum of 24nd basement . Continuous the proposed or the Terrace Deposits Formation. The footings should properly compacted fill soils 18 inches wide and reinforced with footings should be at least placed near the to two #S steel bars; one bar the bottom of the ootingse footings and the other bar Placed near b• Concrete slabs Reinforcement should consist should a minimum Of 4 inches thick. center each way. Slab reinforcement bars placed at 16 middle third should be inches on concrete third of slab by supporting Placed within the dobies . The slab should be the by or Of clean sand over a 10-mil visqueen moisture barrier. '+ of concrete shrinkage will y 2 inches �t result ier. The effect in cracks in virtually all 4 WILMS PROJECT NO. 03-1147B4 concrete slabs . To reduce should be placed at the extent a maximum shrinkage, recommended is aximum of 4-inch slum the concre intended to prevent shrinka Pe The minimum not i ste c- Where 9 cracks . moisture sensitive or carpet, etc. ) are anticipated or coverings (i . e. moisture barrier should be P over the slab tile, linolet 4 inches underlain b the 10-mil plash thick, consistin Y a capillary break at not exceeding 3/4 inch g of coarse sand, leas the #200 sieve, i11 size with gravel or crushed roc no more than 5 percent passin d• An allowable soil bearing value of may be used for the 2. 500 pounds founded a minimum design of continuous per square foot or the of 24 inches into and spread footin �. Terrace De compacted g- 1, 250 _, posits Formation. Y compacted fill soils PPSf and _730 psf for This value -..��_o respective) each additional foot may be increased`by - y to a maximum value of 4 - - Of depth and width, e. Lateral _ -- . 500 lb7ft _ ..._.v_.. v_.-- d- w -.t the resistance to horizontal soil passive movement soil . An allowable pass - and the friction may be provided by per foot of Passive pressure between concrete depth may of 250 Pounds and friction °f 0. 4 Y be used. An allowable per square foot .,- _ is reco coefficient as the bearin �-- �.-__°'-�--mmended. The soils loading, g value ma passive ° ° --°f Y be increased b Pressure as well Y 1/3 for seism wind and RETAINING WALLS Cantilevered retaining walls with to resist an active a level backfill may cubic __foot , equivalent fluid Y be designed free This Pressure is pressure °f 35 draining and based on the backfill mounds der approved b non-expansive. Backfill soils being y the soils engineer prior to materials use, must be Restrained walls rotate should be ' such as basement walls, designed to resist that are not free to pressure of 55 pounds per cubic an ,Nat-rest" foot. -------_ e qu i va l e _ fluid TE14PORARY SLOPES AND TRENCH BACKFIL Y'M =•a_,. L Excavations for made vertically on-site utility trenches sloped at for shallow depths and temporary cuts may be 1H: 1V for depths P and must be either shored should be observed greater than 4 feet; or and backfilled during construction. OSHA guidelines depth with clean Utilities should be P of at least sand or approved bedded uniform) one foot over the granular soil Y watered and Pipe. This backfill to a compacted to a firm should be condition for pipe 5 WILMS PROJECT NO. 03-1147B4 support. The remainder soils or non Of of the backfill should thin lifts the soils be select on-si moisture-conditioned which should be placed relative compaction. and compacted to at least g( DRAINAGE Adequate measures should the site after the structures undertaken to such and other improvements properly finish grad that the drainage water the site are properties is directed away ithin the in Place slabs and Y from the foundations to and adjacen7 the tops of slopes via surface footings, floor drains towards the swales and and subsurface drainage will drainage for this area . subsurface an water required to proper surface seeking the level of minimize the foundations, footin s the bearing otential in undermining g and floor slabs g soils under the g and differential ' which may otherwise result other improvements . settlement of the structures and LIMITS OF INVESTIGATION The recommendations site investigated and provided in this report conditions do not deviate from upon h set the only to the assumption that the soil any variations or undesirable disclosed in the trenches . If construction, or if conditions are encountered differ from that the proposed construction will significantly Consultation Planned at the present Y and Engineerin time, East Count supplemental recommendations can be should be notified Y Soil provided. so that Plates No. 1 through and A 3, Pages L-1, Shear Test Results Ppendix A are parts of this report . References Respectfully submitted, �RMESS/pN P�pU S. -lF2 w No.C054071 <� m rt Exp.re-V-3 .a CI ll P��P L . Mamadou Saliou Diallo, p. E. RCE 54071 MSD/md 6 N- 71- o� h EAST COUNTY SOIL CONSULTATION & ENGINEERING, INC. 10925 HARTLEY RD..SUITE 1,SANTEE CA 92071 (619)258-7901 Fax(619)258-7902 -3 �ZoG WILMS PROJECT NO. 03-1147B4 PLATE NO. 2 SUMMARY SHEET NO, 1 TRENCH N0. 1 DEPTH SOIL DESCRIPTION Surface COLLUVIUM Y (Qal) tan, damp, loose fine r silty sand (SM) with g aired 2. 0' TERRACE DEPOSITS palm tree roots (Qtz) tan, moist, medium dense 2 5 fine-grained silty sand to dense, (SM) 5. 0' 7. 0' 113. 6 6. 6 trench backfilled 9f trench, no caving, no groundwater 105. 9 8.2 -------------------/17/03---------------- TRENCH NO. 2 DEPTH SOIL DESCRIPTION Surface COLLUVIUM Y M (Qal) tan, damp, loose silt , fine grained 2. 0, y sand (SM) TERRACE DEPOSITS (Qt2) tan, moist, medium dense 6. 0 fine-grained silty sand to dense, bottom of trench (SM) trench backfilled g no caving, no groundwater /17/03 ----------------------------------------------- TRENCH N0. 3 DEPTH SOIL DESCRIPTION Surface COLLUVIUM Y M (Qal) tan, damp, loose,, fine grained 2. 0' y sand (SM) TERRACE DEPOSITS (Qtz) fine-grained silty tan, moist, medium dense dense, o 3. 0' bottom of sand (tto trench trench backfilled 9 no caving, no groundwater ------------------ /17/03----------------------- 7 MAJOR DIVISIC -S SYMBOL Gam, DF`".'RIPTION WELL GRADED GRAVELS OR GRAVEL.SAND GRAVELS GP MIXTURES.LITTLE OR NO FINES (MORE THAN%, POORLY GRADED GRAVELS OR GRAVEL-SAND OF COARSE MIXTURES.LITTLE OR NO FINES FRACTION GM >NO.4 SIEVE SILTY GRAVELS,GRAVEL-SAND-SILT MIXTURES COARSE SIZE) GRAINED SOILS GC CLAYEY GRAVELS,GRAVEL-SAND CLAY MIXTURES (MORE THAN%:OF SOIL> NO.200 SIEVE SIZE) Sw WELL GRADED SANDS OR GRAVELLY SANDS, SANDS SP LITTLE OR NO FINES (MORE THAN%, POORLY GRADED OF COARSE SANDS OR GRAVELLY SANDS, FRACTION SM LCt'tLE OR NO FINES <NO.4 SIEVE SIZE) ND SILTY SAS,SILT-SAND MIXTURES SC CLAYEY SANDS,SAND-CLAY MIXTURES ML INORGANIC SILTS AND VERY FINE SANDS,ROCK SILTS & FLOUR,SILTY OR CLAYEY FINE SANDS OR CLAYEY CLAYS SILTS WITH SLIGHT PLASTICITY LIQUID LIMIT CL INORGANIC CLAYS OF LOW TO MEDIUM PLASTICITY,GRAVELLY CLAYS,SANDY CLAYS, FINE GRAINED <�0 SILTY CLAYS,LEAN CLAYS SOILS OL (MORE THAN%,OF SOIL< ORGANIC SILTS AND ORGANIC SILTY CLAYS OF NO.200 SIEVE SIZE) MH LOW PLASTICITY SILTS & INORGANIC SILTS,MICACEOUS OR DIATOMACEOUS CLAYS CH FINE SANDY OR SILTY So SILTS LIQUID LIMIT INORGANIC CLAYS OF HIGH PLASTICITY FAT >50 OH CLAYS ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, HIGHLY ORGANIC SOILS Pt ORGANIC SILTY CLAYS,ORGANIC SILTS PEAT AND OTHER HIGHLY ORGANIC SOILS CLASSIFICATION CHART(UNIFIED SOIL CLASSIFICATION SYSTEM) CLASSIFICATION RANGE OF GRAIN 70 SIZES U.S.STANDARD GRAIN SIZE IN eo I I I f BOULDERS SIEVE SIZE NIILLIIVIETERS COBBLES Above 12 Inches Above 305 30 12 Inches To 3 Inches RAVEL 305 To 76.2 3 I I I I G Inches to No.4 Coarse 3 Inches to'/.Inch 76.2 to 4.76 76.2 to 19.I I I I I Fine '/.Inc 1 to 4 76 h to No.4 3o 19 = I SAND No.4 to No.200 r, Coarse No.4 to No. 10 4.76 to 0.074 .o I Medium 4.76 to 2.00 No. 10 to No.40 io I yMYCN Fine No.40 to No.200 2.00 to 0.420 uic`_JL SILT AND CLAY 0.420 to 0.074 S ; i Below No.200 Below 0.074 0 o Zo io GRAIN SIZE CHART 30 so a0 ° uowo um.r ! '10 �° 00 PLASTICITY CHART EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD,SUITE "I" tt!f SANTEE, CALIFORNIA 92071 U.S.C.S. SOIL CLASSIFICATION WILMS PROJECT NO. 03-1147B4 PAGE L-1 LABORATORY TEST RESULTS RESULTS OF EXPANSION INDEX TEST An expansion test in conformance with AST e c epresentative on-site soils to determine volumetric change characteristics M D4829 was performed on a r recorded expansion of the sample is presented as follows: with change in sampl moisture content. Th INITIAL SATURATED MOISTURE MOISTURE INITIAL DRY CONTENT% CONTENT/o DENSITY EXPANSION o LB_16U. FT. 8.5 INDEX LOCATION 15.3 115.1 3 T-1 @ 2.5' RESULTS OF PARTICLE SIZE ANALYSIS U. S: Standard Sieve Size Percent ��ASTM D-422 fi�13@2 1" 1/2" _ 3/8" _ #4 _ #8 #16 100 #30 99 #60 91 #100 36 #200 23 19 INC SM 8 DIRECT SHEAR SUMMARY 5000 4500 4000 i 3500 — a. 3000 f - - --- - - --- LU 2500 ; ------ --_ — _ y r I2 2000 --__- k - --- j 1500 1000 r - - --------- 500 I o i C 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 I NORMAL STRESS [PSF] (2 3/8" SAMPLE) I I I ANGLE OF COHESION SAMPLE DESCRIPTION INTERNAL FRICTION (0) INTERCEPT Hymettus (PSF) Undisturbed TERRACE 35 ° 100 DEPOSITS WILMS PROJECT S C. SOUTHERN CALIFORNIA S-T; SOIL & TESTING INC. ECTL - HYMETTUS _ ...- � BY: DBA/SD JOB NUMBER: 03-1147B4 DATE: 9/26/2003 PLATE NO.: WILMS PROJECT NO. 03-1147B4 REFERENCES 1 • "1997 Edition, Uniform Buildin Engineering and Design Provisions". g Code, Volume 2 Structura, Adjacent Po tions Active Fault Near-Source Zones in C Edition of the Uniform Nevada-, Page 0-37 alifo anc 9 , used with the he 1991 Conference of Building Official Code, Published b y International 3 . "Geologic Maps of the Northwestern Part California. Plate No. 2, Geologic Maps Of San Diego g p of the Encinitas and County, Santa Fe 7 . 5' Quadrangles", by Siang S. Tan and Michael p, Kennedy, 1996. 9 EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE I SANTEE, CALIFORNIA 92071 (619) 258-7901 APPENDIX A RECOMMENDED EARTHWORK SPECIFICATIONS 1. General Description The intent of these specifications is to obtain uniformity that the proposed structures may be safely supported- and adequate strength in filled ground so preparation of the land to be filled, processing the fill soils, the Preadin include the clearing and filled areas to conform with the lines and grades as shown on the approved g, and compaction of the PP d plans. The owner shall retain a Civil Engineer qualified in soil mechanics here' to inspect and test earthwork in accordance with these specifications. The owner and grading contractor immediately if ( in referred to as engineer) and shall have the authority to reject the compacted fi engineer shall advise the any unsatisfactory conditions are observed to exist measures are taken, necessary to comply with the specifications.ground hall becthe s of the grading contractor to achieve the specified degree of c tiiTie that corrective '�' compaction: sole responsibility 2. Preparing Areas to be Filled disposed of so amts leave vegetation t areas any biodegradable refuse shall be rem filled ground or loose compressible n natural grlound shall be and debris.removed or otherwise otherwise. An moved unless the report recommends Any buried tanks or other structures shall be removed and the depression ba ckflled to the satisfaction of the engineer. (b) The natural ground which is determined to be satisfactory for the s upport of the filled around shall then be plowed or scarified to a depth of at least 12 inches (12"). (c) After the natural ground has been prepared, it shall then be brought moisture content and compacted to not less than 90 percent of maximum dry with ASTM D1557-91. ,ht to the proper , density in accordance (d) where fills are made on slopes greater than 20 percent, horizontal be into the firm natural ground. The initial bench at the toe of the fill shall be a least on firm undisturbed natural ground. The width of all succeeding shall be cut in width ins o benches shall l be at feet least 6 feet. APPENDIX A 3. Fill Materials All material shall be approved b matter, and other lumps Y the engineer and shall consist of materials free from v found w P greater than 6 inches in diameter. If, during which were not encountered egetaE shall be performed to determine theiand tested in the prelimin g grading operations, soils a in the Preliminary Physical characteristics. pry Investigation, tests ec these d pry or subsequent soils reports not covered herein shall pbeattnent recommends these specifications. become an addendum t 4. Placing and Compacting Fill Materials added until the moisture content of the fill material i moisture content is is below that specified, water shall be compaction. near optimum to assure uniform mixing and effective shall be(aerated eb the moisture content of near optimum as pecified the fill materials is above o and scarifying or other satisfactory that specified, the fll material • ry methods until the moisture content is (c) After processing, the suitable fill materials s compacted, shall not exceed six inches thoroughly hall be placed d layers which, when �hly mixed during the spreadinv ' �6�)' Each layer shall be spread event Insure uniformity of materials and y and shall be (d) After each layer has been moisture in each layer. compacted A not less than the density mixed accomplished with a and spread evenly, it shall be approval ty set forth in paragraph 2 (c) above. thorough) the fill material is at types of compaction equipment. Rolling Compaction shall be accordance with ASTM D1 specified moisture content. D shall be accomplished while place density tests shall be performed in (e) The surfaces of the fill slopes shall be compacted suitable equipment. Compacting pacted b there is no appreciable operations shall be continued until the slopes sarre stable d other ppreciable amont of loose soil on the slopes. 5• Inspection ble and until Sufficient inspection b S maintained durin y our firm or the Soil's Eno g the filling and com `ineer of record and/or his/her representative shall was constructed in accordance with the accepted s operations perations so that he/she can verify that the fill P specifications. 6. Seasonal Limits No fiIl material shall be content above Placed, spread, or rolled if weather conditions increase Permissible limits. When the work is interru interrupted b resumed until the moisture content and density of fill are as ass the P y rain, fill operations shall not be All recommendations presented in the attached Previously specified. report are a part of these specifications. HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 1098 Hymettus Ave, Leucadia, CA 92024 APN 254-262-22 Project No: 031014 W.O. # XXXX Grading Permit # XXXX QROFESS/pN AS No 702 z ' m Ex 12/31/05 C/vl\- �P qTf CA��F Prepared By: ENGINES RING ca.NSUI.�NG GROUP PH:(858)259-4711 FX:(858)259-5732 Original: February 1, 2004 Revised: February 12, 2004 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence TABLE OF CONTENTS 1 INTRODUCTION 1.1 Project Site Descrriptiipti....................................................................................... on 1.2 Topographic Source .............. 1.3 Proposed Project 2 RUNOFF CALCULATION 2.1 Design Methodology hodology.,,,,,,,••••• 2.2 Pre Construction Design Runoff noff...................................................................... 2.2.1 On-Site Runoff............. 2.2.2 Off Site Runoff............ ............................. , 2.3 Post Construction De 11 2.3.1 Design Runoff................................................................... 1; On-Site Runoff....................... 2.3.2 Off— Site Run 1� Runoff............. 2.3.3 Total Post Construction Runoff............................................................... 1 SUMMARY AND 3.1 Drive CONCLUSIONS........................................................................ 16 Driveway Drainage................ 3.2 Driveway .... 16 y drain inlet """'�•••••••••• 3.3 Drainage Piping and piping...................................................................... 17 3.4 p g Adjacent to ALU ............ Surface Drainage at South ................................................... 17 4 Side of SFR................................. REFERENCES AND ABBREVIATIONS ..................••••• 19 4.1 References ........................................20 . . ............................................. 4.2 Abbreviations........ .................................... DECLARATIO N OF RESPONS "' ..... . ..................20 IBLE CHARGE......... Figure 1 Vicinity Ma LIST OF FIGURES Figure 2 Overlay of the Soil Runoff Potential Map on the Project Site.... Figure 3 Runoff Coefficients as a function of Land use and Soil Group Figure 4 Six Hour Precipitation for 100 Year Storm Frequency Figure 5 Twenty ........................6 my Four Hour Precipitation for 1 q Y 7 Figure 6 Pre Construction 0 Year Storm Fre ction Site Frequency 8 ...................... Figure 7 Off Site Hydrologic Sub areas Figure 8 Post Construction On-Site Sub ""' 11 Figure 9 Open Channel C areas............................................................ 14 Calculations for Driveway Figure 10 Driveway Drain Inlet """ 17 Figure 11 Dr and Piping Calculation Drain Line Calculations s """"""••••••••••••••••••••••............ 17 Figure 12 Drain - South of ALU Line Calculations - ALU North. •..'•'•.".""" • 18 .......................... Figure 13 Vegetated Swale Calcul ations - SFR South................................................. 19 N:\Prof ects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page i HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 1 INTRODUCTION This hydrology study is prepared to determine the pre construction and post construction influence of precipitation on the proposed project development. 1.1 Project Site Description The 0.46 AC project site is located on the west of Interstate Highway 5 in the Cit of Encinitas (See Figure 1 — Vicinity Map). The project is approximately y of the intersection of Leucadia Blvd and Hymettus Ave and 1260 feet west of feet no h Inte stat rt 5. The project site is legally described as; THE NORTHERLY 100.00 FEET OF LOT 13 IN BLOCK 8 IN SOUTH COAS' PARK, IN THE COUNTY OF SAN DIEGO, STATE OF CALIFORNLA ACCORDING TO MAP THEREOF NO. 1776, FILED IN THE OFFICE OF THI COUNTY RECORDER OF SAN DIEGO COUNTY, JAN. 11, 1924. EXCEPTINC THEREFROM, THE WESTERLY 100.00 FEET. The project area is characterized as a gently sloping knoll with an average slope of 12%. The existing on site elevations range from 141.7 Mean Sea Level (MSL) at the northwesterly corner of the site to 157.8 MSL at the southeasterly corner of a existing on-site single family residence. g 1.2 Topographic Source The topography used for this study is derived from two sources. On-site topography was derived from the project survey as described on the project plans. Off site topography was derived from the County of San Diego Topographic Survey, Panel 326-1677 and 330-1677, dated 4-5-1973. Y 1.3 Proposed Project The project site and surrounding area is designated residential R-3, and is current ly utilized by a single family residence. The proposed project will demolish the existi ng single family residential structure and construct a new four bedroom residential structure and an attached accessory living unit with one bedroom and a kitchen. N AProj ects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 1 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence wirwrr eew•���w�ww���w°�, -0 GOS'C P n LP 0 ANDREW Av OFT R 0 rn Z = z n m �O`GN O C Z °p c v SANFO o G < Z $ > YL L < � m r y fi N O N Z �L fi G � 2 N m y G L N D PROJECT yL L A SITE B G) v m L P ES A y G N � 2 2 UNION S i Z- 0 G ° ° 15 2 m L (Zt1 L N m Z yL Source:SANDAG GIS data, PLSS GIS data,Record Information,San Diego County Cartography Department ENGINEERING Wilms Residence CONSULTING Vicinit Ma SHW GROUP y 1098 Hy GM$ Ave Leucadia, CA 92024 Figure 1 Vicinity Map N:\Projects\ADA-031014\Docs\Hydrology.doc Revised: 211212004 Page 2 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 2 RUNOFF CALCULATIONS 2.1 Design Methodology The watershed is less than 0.5 square miles; therefore the Rational Formula has bees selected to calculate runoff. Q = CIA Where, Q = Peak Rate of Flow (cfs) C = Runoff Coefficient I = Average rainfall intensity (in/hr) A = Drainage Area (acres) 2.2 Pre Construction Design Runoff 2.2.1 On-Site Runoff The drainage area for on site runoff totals 0.46 acres. The soil runoff potential for this site is determined by overlaying the site on the Soil Runoff Potential Map Panel 33 Encinitas published by the C DPLU. The Soil Runoff Potential Overlay sshownin Figure.2 my of San Diego, The soil runoff potential for this site is soil group A. The runoff coefficient for this site can be determined by cross referencing the soil group with the land use and using the table shown in Figure 3. The runoff coefficient C for this site is calculated as follows persuant to section 3.1.2 of the COUNTY Hydrology Land Use Character►stc Manual Permeable 'Coe �ploo sf * ;ground surface Imperv�ocs surf e O �St,btotal- W d"" Averag"eC , . 3� t�03 � � 604 t: . 0 59 �g The storm frequency for this study has a 100 year recurrence interval. The six hour anticipated precipitation for the project site subject to the design storm frequency; P6 is shown in Figure 4. The twenty four hour anticipated precipitation for the project site subjected to the design storm frequency; P24 is shown in Figure 5. P6 = 2.4 inches P24 = 4.1 inches The time of concentration across the project site Tc is determined from the followin formula (San Diego County Hydrology Manual, dated June 2003). g Tc = ((11.9L3)/H)0.385 N:\Projects\ADA_031014\Does\Hydrology.doe Revised: 2/12/2004 Page 3 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence Where, Tc = Time of Concentration in hours (Tc > 5 mins) L = Length of Watershed (miles) H = Difference in elevation along effective slope line (ft) The preconstruction on-site topography is shown in Figure 6. Area L = 200/5280 = 0.04 miles H = 157.8 — 141.7 = 16.1 feet Tc = 1.3 mins => Tc = 5 mins The average rainfall intensity can now be calculated from the following equation San Diego County Hydrology Manual, June 2003). 1 = 7.44*P6*D-0.645 Where, I = Rainfall Intensity (in/hr) P6 = Six hour precipitation (inches) D = Duration (min.) Therefore, I = 6.32 in/hr The site area in acres, A = 0.46 The pre construction site runoff, Q is calculated as follows; QPRE = CIA = 0.59*6.32*0.46 QPRE = 1.72 cfs N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 4 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence ...w�wrw�.•°wu.°r LeD2 1pIC ,fie sB 6oF Ao Qry Cr Q s u�t Cs d0ooy O s� tip 0� 6 Cs0 c ca Cd31r reF Q TeF T MI �Jq MIC CfD2 s N 41 5 0 sc AtF LEUC MIC fD2 CfCo AJ k fe _ PROJECT c q y SITE a fUt A r Cf z MtC Cf MIE M� • CfC 9 02 MI;, bD C MR a c� y C ME s ! A 7Z z x 16 MIE a MIC US MIC Source:SANDAG GIS data,Record Information,Soil Runoff Potential Map Panel 33.Encinitas by DPLU 9 ENGINEERING Wllms Residence CONSULTING Soil Runoff Potential Overlay 3HW 1098 Hymettus Ave, s ■>> °' Leucadia, CA 92024 « � MM Figure 2 Overlay of the Soil Runoff Potential Map on the Project Site N:\Projects\ADA_031014\Dots\Hydrology.doc Revised: 2/12/2004 Page 5 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence Runoff Coeff►cren#s for; a re s 1riRd USe (J Il §.nr y � Runoff Coefficient s4 ( RG Elernen#s Soil Type County Elements Undisturbed[Natural Te#rafi% permanent Cpen spacef?e Q A ° C Low'Density Re�rdential LDf � k� 0.20 14� 0.3( } ; Residential, 10 DU/A or less 0 27 " Lowj4ensrty Resfden#►al LOR =: 3� 0.3E Residential,2.0 DU/A or less Low'DensityEResidefttial LDR � 0.34 0.42 e Residential, 2.9 DU/A or less2 Medrum 1?ensrtyR�esrdentialgMOR Residential,4.3 DU/A or less 0.38 �4 . 0.46 � � 0.41' # 4 0.48 lUledf>tm Dene1#yROsrdentral MDR Residential 7.3 DU/Aor less ° Med►um Denstt�rR sf0,1004 MD1i Residential, ' 0.48 0.54 � ,. 10.9 DU/A or less �;' 0.52 Mediumt?es� Rstr ientlal MCI Residential, 0.57 <( 14.5 DU/A or.less Htgh Density Res►denfiat HDR 0 55 5 0.60 Residential, 24.0 DU/A or less RrgEt>Oensit Residential HDR 0 0.66f}fi -� 0.69 Residential, 43.0 DU/A or less � Commerclaf/tndustrraf N Com ztr 0.76 ( 0.78 Neighborhood Commercial ComrnerQrel/fncfusiciaC G`CQrn8tk 0.76 0.78 General Commercial Cornr>7ereia(/IridUSfrral (p P Comb , Office Professional/Commercial 0.80 ;$3 0.81 Commercrafffndustr al(L,irr fted i)' � � 90 0.83;10 8g� 0.84 Limited Industrial(General I General Industrial 0.83 - t 8 0.84 }y{ 0.97 121 0 87 9 CQUn l't drQtO m � � � Saurce Table 31 San Die`o tY Y g °Manual, tiane�2003 ��z Figure 3 Runoff Coefficients as a function of Land use and Soil Group N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 6 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 0 b' 3,5 X36 yp 9�y 4.5 S v s `•' .p o ryy 3V w 'sJ � P 4.0 2.5 35 ) 2S w o w PROJECT SITE a 3o b 5J > U o U 2.5 qp 0 w •o 3� 3.5\ 4.5 �p 35 •o 3" ti5 �5 9p Z.o Source:SANDAG GIS data, PLSS GIS data,Record Information,San Diego County Hydrology Manual,June 2003 ENGINEERING Wlims Residence CONSULTING 6 Hour Preci itation - 100 r Storm GROUP '� u 1098 Hymettua Ave. Leucadia, CA 92024 « f sKCrs Figure 4 Six Hour Precipitation for 100 Year Storm Frequency N:\Projects\ADA-031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 7 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence w w.w.wr wwtw�_r�ws�w��wwaw.waw w.w.rw.ww_�wwa�w� try. e0 6.0 50 . 50 G 6'0 50 S O 5.0 0 O°° 0,0'0 9s ° by \ ° 8.0 1.0 50 60 80 10.0 a �° 45 40 4.0— 10 3.5 PROJECT SITE u v0 D'o o S.S to m 6.0 m 60 p m 8.0 9JJJ 8.0� h N^ \ 5.0 U 13.0 0 0 4.5 9�S O 65 4.0 L6.0 b• 5.5 2.0 4.5 .0 /$O 100 4.0 8.5 / / a `J o 5.57 ^4 1 y0 SO 4 0 V roo, Source:SANDAG GIS data, PLSS GIS data,Record Information,San Diego County Hydrology Manual,June 2003 ENGINEERING Wilms Residence CONSULTING 24 Hour Preci nation - 100 vr GROUP ,.� 1098 Hymettus Ave. e ,„ Leucadta, CA 92024 Figure 5 Twenty Four Hour Precipitation for 100 Year Storm Frequency N:\Proj ects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 8 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence w riw•:rr: r°'.� w sl°1w•rr w.wwww.r�rlrwr41w'..Ilw� er.wrw..l�.wrw,r ..rr.n� 1AT ._war• u � °II NI Ml { . tr to l �p ul ZOO X to MI y LE I If a t t I� t e � I1 A � 1 i 0 p g r MI .1 1 Source:Project Survey HYmettus � .,..,,... +�Aver�u� ENGINEERING Wilms Residence CONSULTING Pre Construction $Ite TO O ra h 9 GROUP , 1088 Hymettua Ave. Leucadia, CA 82024 Figure 6 Pre Construction Site Topography N:\Proj ects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 9 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 2.2.2 Off Site Runoff The project site is located at the top of a knoll. All surrounding property is draining away from the project site. Zero off site runoff enters the site as shown in figure 7 an attached exhibit H-1. N:\Projects\ADA-031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 10 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence r..ww�rw wwrewc� wwrw.w eto w.waw.wwww��+w ww�"iwwa�ww ww �"r�r��rsawr ` '. k" Vtk VT �axr s z wrw•5 n r. ` 0 Z -7 : , Source:Project Survey ENGINEERING "- Wilms Resid ence CONSULTING PreConstruction Site To o ra h SHEET GROUP Iw aye "" mss 1098 Hymettue Ave. i es Leucadia, CA 92024 1 Figure 7 Off Site Hydrologic Sub areas N:\Projects\ADA-031014\DOcsHYdrology.doc Revised: 2/12/2004 Page 11 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 2.3 Post Construction Design Runoff 2.3.1 On-Site Runoff The post construction drainage patterns are as shown in Figure 8. The runoff coefficient C for this site is calculated as follows pursuant to section 3.1.2 the COUNTY Hydrology Manual: Land Use Character•rst�c ' a Coeffrcreir�t�� ��A,.A�re�}sf ,�,,,;� �r� � ,.;� Permeabletgrdund sur#ace �� Q 9 81'VIC� ` ` � Imp uS�surfac���� ��E ` �-��� ��, ,��� � .���� �� ���9�4t1�45� s.. Subtotals g � � �� 8 Weig(iteci !4 06 ; The time of concentration across the project site Tc is determined from the foll formula (San Diego County Hydrology Manual, dated June 2003). owing Tc = ((11.9L3)/H)0.385 Where, Tc = Time of Concentration (hours) (Tc > 5mins) L = Length of Watershed (miles) H = Difference in elevation along effective slope line (ft) Area 1 L = 128/5280 = 0.024 miles H = 153.5 — 148.5 = 5 feet Tc = 1.14 mins => Tc = 5 mins The average rainfall intensity can now be calculated from the following equation (Design and Procedure Manual, App XI-A). = 7.44*Ps*D-1.145 Where, I = Rainfall Intensity (in/hr) P6 = Six hour precipitation (inches) D = Duration (min.) Therefore, I = 6.32 in/hr The site area in acres, A = 0.46 Using the revised runoff coefficient the post construction site runoff, Q is calculated as follows; QPOST = CIA = 0.66*6.32*0.46 N:\Projects\ADA-031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 12 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence QPOST = 1.92 cfs N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 13 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence wMeewM_'e�iri% w��wri.w� M�r_w.>.wrww.�ra.rw�rw��� w�rwe���aw�r I S I � µ I I I I vm� I 1/ AREA=14 $F Vim a x I � I I / I I I 1 I AREA=3738 SF I m I I' I I AR ° I I EA 932 SF I I� 0 I tl AREA=25 �SF ro IL I 4 A A=183SF I O 6 AREA=370SF I AREA=785 SF I Source:Project Plans ENGINEERING Wilms Residence CONSULTING Post Construction On-Site H drolo * GROUP 1098 Hymettus Ave. ea.n Leuasdie, CA 92024 Figure 8 Post Construction On-Site Sub areas N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 14 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 2.3.2 Off— Site Runoff The post construction off site runoff will not change. QPOST = 0 CfS 2.3.3 Total Post Construction Runoff The combined total runoff from both on-site and off-site drainage sub-areas affecting the project site is 54.9 g QPOST = (QONSITE+ QOFFSITE) ()POST = 1.92 + 0 QPOST = 1.92 cfs N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 15 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 3 SUMMARY AND CONCLUSIONS The proposed improvements to the grading will affect the quantity of storm water run from the project site. Kl- MR 4 P n .difference _ On site discharge due to storm water run off will increase a o (0.20cfs) to 1.92cfs. This is due to a increase of 13% in the amount of on site impervious area and a corresponding increase in the runoff coefficient for the site. This on site discharge will be routed off site via surface drainage and local storm drains. 3.1 Driveway Drainage The driveway is designed to catch runoff from half of subarea 1, and all of subareas 3 4 and 6. A = 4998SF = 0.115AC ()DESIGN = 0.66*6.32*0.115 = 0.48 cfs S = 0.054 Side Slopes, H: V = 50:1 Channel Calculator Given Input Data: Shape Solve for Advanced Flowrate Depth of Flow Slope 0.4800 cfs Manning's n 0. 0540 ft/ft Height 0.0130 Bottom Width 12 .0000 in Left Radius 0. 0000 in Right Radius 0. 0000 in Left Slope 0.0000 in 0.0200 ft/ft Right Slope (V/H) 0. 0200 ft/ft Depth Computed Results: (V/H) Velocity 0.7307 in Full Flowrate 2.5895 fps Area 836.5613 cfs Perimeter 50.0000 ft2 Flow Area 1200.2400 in Flow Perimeter 0.1854 ft2 Hydraulic Radius 73 .0797 in Top Width 0.3653 in Percent 73 .0651 in Critical Information: 6. 0888 % Critical De th 1.0735 in N:\Projects\ADA-031014\Docs\Hydrology.doc Revised: 211212004 Page 16 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence Critical slope Critical velocity 0. 0069 ft/ft Critical area 1.1996 fps Critical perimeter 0.4001 ft2 Critical hydraulic radius 107.3697 in Critical top width 0.5366 in Specific energy 107.3482 in Minimum energy 0.1651 ft Froude number 0.1342 ft Flow Condition 2 .6164 Su ercritical Figure 9 Open Channel Calculations for Driveway 3.2 Driveway drain inlet and piping Q = 0.48Cfs L = 88LF FDiameter pe Calculator Circular Depth of Flow t Data: 4.0000 in 0.4800 cfs Manning's n 0.0568 ft/ft Computed Results: 0.0090 Depth Area 2 .5432 in Wetted Area 0.0873 ft2 Wetted Perimeter 0. 0585 ft2 Perimeter 7.3833 in Velocity 12.5664 in Hydrualic Radius 8.2005 fps Full flow flowrate 1.1416 in Full flow velocity 0.6552 cfs 7.5075 fps Figure 10 Driveway Drain Inlet and Piping Calculations 3.3 Drainage Piping Adjacent to ALU Two drain lines pass to the north and to the south of the accessory living unit (ALU). The line to the north collects nuisance drainage from the driveway wall and half the runoff from sub-area 7 covering the ALU. The line to the south collects runoff from the driveway drain inlet and half the runoff from sub area 7. Q = 0.55Cfs L = 44ft S = 0.009 Manning Pipe Calculator Shape Solve for Circular De th of Flow N:\Projects\ADA-031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 17 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence FInput Data: ter ate 6. 0000 in 0.5500 cfs Manning's n 0. 0090 ft/ft Computed Results: 0.0090 Depth Area 3 .7531 in Wetted Area 0.1963 ft2 Wetted Perimeter 0.1292 ft2 Perimeter 10.9472 in Velocity 18.8496 in Hydrualic Radius 4.2563 fps Full flow flowrate 1. 6998 in Full flow velocity 0. 7689 cfs 3.9160 fps Critical Information: Critical Depth Critical slope 4.6643 in Critical velocity 0.0046 ft/ft Critical area 3 .2832 fps Critical perimeter 0.1675 ft2 Critical hydraulic radius 12 .7533 in Critical top width 1.8915 in Specific energy 6. 0000 in Minimum energy 0.5941 ft Froude number 0.5830 ft Flow Condition 1.4794 Su ercritical Figure 11 Drain Line Calculations-South of ALU Q = 0.10cfs L = 107 S = 0.053 Manning Pipe Calculator Shape Solve for Circular Depth of Flow Given Input Data: Diameter Flowrate 4.0000 in Slope 0.1000 cfs Manning's n 0.0530 ft/ft Computed Results: 0.0090 Depth Area 1. 0750 in Wetted Area 0.0873 ft2 Wetted Perimeter 0.0189 ft2 Perimeter 4.3600 in Velocity 12.5664 in Hydrualic Radius 5.2945 fps Full flow flowrate 0. 6238 in Full flow velocity 0 . 6329 cfs 7.2520 fps Critical Information: Critical Depth Critical slope 2.1200 in Critical velocity 0. 0044 ft/ft 2.1292 f1ps N:\P roj ects\ADA_031014\Docs\Hyd rology.doc Revised: 2/12/2004 Page 18 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence Critical area Critical perimeter 0.0470 ft2 Critical hydraulic radius 6.5232 in Critical top width 1.0368 in Specific energy 4.0000 in Minimum energy 0.5252 ft Froude number 0.2650 ft Flow Condition 3 .6923 Su ercritica1 Figure 12 Drain Line Calculations-ALU North 3.4 Surface Drainage at South Side of SFR Half of sub-area 1 and all of sub-area 5 drain into a vegetated Swale at the South sidE of the single family residence. A = 2801/43560 = 0.06AC Q = 0.66*6.32*0.06 = 0.25cfs Side Slopes = 2:1 (H: V) S = 0.048 Channel Calculator Given Input Data: Shape Solve for Advanced Flowrate Depth of Flow Slope 0.2500 cfs Manning's n 0.0480 ft/ft Height 0.0750 Bottom Width 12.0000 in Left Radius 0. 0000 in Right Radius 0.0000 in Left Slope 0.0000 in 0.5000 ft/ft Right Slope (V/H) 0.5000 ft/ft Depth Computed Results: (V/H) Velocity 3 .8797 in Full Flowrate 1.1958 fps Area 5.0771 cfs Perimeter 2. 0000 ft2 Flow Area 53 .6656 in Flow Perimeter 0.2091 ft2 Hydraulic Radius 17.3507 in Top Width 1.7351 in Percent 15.5189 in Critical Information: 32 .3311 % Critical Depth Critical slope 2 .9967 in Critical velocity 0.1903 ft/ft Critical area 2.0043 fps Critical perimeter 0.1247 ft2 Critical hydraulic radius 13 .4019 in Critical top width 1.3402 in Specific energy 11.9870 in Minimum energy 0.3455 ft Froude number 0.3746 ft Flow Condition 0.5243 • Subcritical Figure 13 Vegetated Swale Calculations -SFR South N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 19 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 4 REFERENCES AND ABBREVIATIONS 4.1 References • San Diego County Hydrology Manual by Department of Public Works — Flood Control Section, dated June 2003 • Grading Plans for Wilms Residence • San Diego County Soils Interpretation Study, Hydrology Soil Groups — Runoff Potential, Encinitas, Panel No 33, by DPLU 1969 4.2 Abbreviations A Area As Minimum surface area required for settlingarticles ac Acres COUNTY San Die o Count C Runoff Coefficient cfs Cubic Feet per second d Depth D Duration DPLU De artment of Planning and Land Use DPW De artment of Public Works F.S. Factor of safety H Hei ht l Rainfall Intensit in/hr Inches er hour L Len th P24 Twent four hour precipitation P6 Six hour reci itation Q Dischar e ()AVE Average discharge QD Desi n dischar a for detention basin sizin QIN Inflow diczr-hnrrpn QOUT Outflow dischar e QPOST Post Construction Dischar e QPRE Pre Construction Dischar e SF Square Feet SFR Single Family Residence T. I Time of Concentration Vs Settlin Velocit of smallest particle N:\Projects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 20 HYDROLOGY AND HYDRAULIC STUDY Wilms Residence 5 DECLARATION OF RESPONSIBLE CHARGE I, hereby declare that I am the engineer of work for this project. That I have exercisE responsible charge over the design of the project with respect to this study as define in section 6703 of the Business and Professions Code, and that the design is consistent with current standards. I understand that the check of project drawings specifications, studies and reports by the City of Encinitas is confined to a review only and does not relieve me, as eng nee in responsible charge, of my responsibilities for project design. David A. Ashcroft, PE C470 Expires 12/31105 Date N AProjects\ADA_031014\Docs\Hydrology.doc Revised: 2/12/2004 Page 21 F F, 1 fill It 0 0 >/ 0 0 ®m GRAPHIC SCALE too zoo 400 ( IN FEET ) 1 inch = 200 ft DATE No. 47024 EYE' 19n1A1F ENGINEERING CONSULTING CrROUP 437 S. Highway 101, Suite 202 Solana Beach, California 92075 P: 858.259.4711 F: 858.259.5732 c .ecg=Lt m HYDROLOGY NOTES SUBAREA Tc (mins) 0 (cfs) V(fps) 1 5 1.72 0.47 Subarea = Hydrologic subarea Tc = Time of concentraction for the subarea Q = Runoff discharging from the subarea V = Max. velocity of runoff discharging from subarea KEYNOTES OHYDROLOGIC SUBAREA 1 (0.46 AC) LEGEND --� FLOW DIRECTION FOR POTENTIAL RUNOFF HYDROLOGIC SUBAREA BOUNDARY PROPERTY LINE s Residence Hydrology Studi 1098 Hymettus Ave Leucadia, CA 02024 Source: SANDAG GIS data, PLSS GIS data, Record Information, San Diego County Orthotopo 326 -1677 & 330 -1677 SHEET 1 OF 1 SHEETS DATE DESIGNER Feb. 9, 03 D. Ashcroft JOB N0, DRAFTER 031014 D.A.A. DRAWING ID. CHECKER 'RCRIPTION BY DATE H -1 D. Ashcroft DATE No. 47024 EYE' 19n1A1F ENGINEERING CONSULTING CrROUP 437 S. Highway 101, Suite 202 Solana Beach, California 92075 P: 858.259.4711 F: 858.259.5732 c .ecg=Lt m HYDROLOGY NOTES SUBAREA Tc (mins) 0 (cfs) V(fps) 1 5 1.72 0.47 Subarea = Hydrologic subarea Tc = Time of concentraction for the subarea Q = Runoff discharging from the subarea V = Max. velocity of runoff discharging from subarea KEYNOTES OHYDROLOGIC SUBAREA 1 (0.46 AC) LEGEND --� FLOW DIRECTION FOR POTENTIAL RUNOFF HYDROLOGIC SUBAREA BOUNDARY PROPERTY LINE s Residence Hydrology Studi 1098 Hymettus Ave Leucadia, CA 02024 Source: SANDAG GIS data, PLSS GIS data, Record Information, San Diego County Orthotopo 326 -1677 & 330 -1677 SHEET 1 OF 1 SHEETS