Loading...
1991-2668 G (Plans) WORK-7'0 BE DONE 3 . All areas to be filled shall., be prepared to be filled and fill shall be placed in accordance GENERATE with standard specifications. All vegetable - 15D p Gt, SAS EM�N matter and objectionable material shall be 1. All wo7:k shal.a. be done in accordance with these removed by the contractor from the surface upon - plans, the standard specifications for public which the fill is to be placed. Loose fill and - works construction, the design construction alluvial soils shall be removed to suitable firm standai ds of the City of Encinitas and the San natural ground. The exposed. soils shall be Diego area regional standard drawings. Any scarified to a depth of 6" and then compacted to - changer or ri:visions therefrom shall be approved a minimum of 90 percent. It shall be the � v by the City Engineer prior to any request for contractor's responsibility to place, spread, inspection• water and compact the fill in strict accordance N I a iM17 D Sd)L5 I 'TA-T with specifications. 2 . The soils report titled -prepared by _ I I ,-,� KEN- IOC dated 1- 9}_-shall be considered 4 . Cut and fill slopes shall be cut and trimmed to ° N as a part oi' this grading plan. All grading finish grade to produce smooth surfaces and x shall be done in accordance with the uniform cross sections. The slopes of v ' a recommendations and specifications contained in excavations and embankments shall be shaped, said report. planted and trimmed as directed b the engineer P P Y 4 � of work and left in a neat and orderly condition. p1 3 . Approval of this plan does not constitute All stones, roots and other waste matter exposed c / / �1 °' o/ 2 approval of sizes, location and type of drainage or excavation or embankment slopes which are " \9 j N,; b�� +- � facilities, nor of improvements within street liable to become loosened shall be removed and NNUf3bIVlS(©[� �,OUNDh1ZY right:-of-waya,. Separate approvals and permits disposed of. The toe and top of all slopes shall - -= 244 for these shall be required in conjunction with be rounded in accordance with the Grading --- T- - - -- -- improvement plans. Ordinance. o 4 . Written permission shall be obtained for an off-- 5. All trees brush grass, an e objectionable / Z ® 1- p Y d other 7 Y g x II y_r I so te g z-actin g N o 7{ Z2E ? mate rial shall be collected, ilea or otherwise 5. Contractor shall take any necessary precautions disposed of off the site b the contractor so as 18� G 430 `� •-� -;T 'a• f 4 _ +, -- P Y to leave the areas that have been cleared with a O '� required to protect adjacent properties during / neat and finished appearance free from unsightly � � t?��'ls ' • grading operations. Anything damaged or debris. Approval of location of debris fill 3'I� a �, destroyed shall be replaced or repaired to o s } /.'/% I shall be secured from the souls engineer and CtyMOV� )41�jTINLI TOT LOT ' condition existing prior to grading. Engineer prior to the disposal of any such I / / v ift material. t, / 6 . The developer shall be responsible that any I \. \ / k Q A monument or bench mark which is disturbed or Tn11473-' o ; LANDSCAPING ER U TO ?sI0- l destroyed shall be re-established and replaced by T G,®URr a registered civil engineer or a licensed land 1. All slopes shall be planted and irrigated in ✓ '�� I I ; - surveyor. accordance with plans approved by the City �✓ Engineer. Plans shall 12Euc \RE _ /� + \/ ...... o 7 . The contractor shall desi n construct and g conform to the City of ,°\ µG Poi / 100 X12D maintain all safety devices, shoring landscape andadirrigationnstandards. all adopted IS Y 4 , and shall be responsible for conforming to all local, state and federal safety and health g �Cl� D�9 of • 2 . Finish grading and planting shall be accomplished IL 4. = standards, laws and regulations. I �P + +242 CIC '/A25 •.:: :. ::' :: : 242y�t on all slopes prior to October 1 or immediately \ � upon completion of any slopes graded between 1s1 >k�o 8 . Grading nd equipment o eratin within one-half a�' - g operating October 1 and April 15. L �Q-1h PI, % '4 �/ (1/2) mile of a structure for human occupancy � . , q shall not be conducted between the hours of 5: 30 f I,0 I J5 2 p.m. and 7 : 30 a.m. nor on Saturdays, Sundays and EROSION CONTROL _ City recognized holidays. ----- �- }- ' 1. in case emergency work is required, contact UUC> _` �(�� �4� / D r.25.b R1242L&iQI.1 at 4�&- rilo2(n - (Phone No. ) . 9 . No grading operations shall commence until a pregrading meeting has been held onsite with the 2 . Equipment and workers for emergency work shall be following people present: City Inspector, Civil made available at all times during he rain Engineer, Soils Engineer, Grading Contractor and g Y Permittee. The pregrade meeting shall. be stockpiled on site ataconvenientallocat locations to 1 - �4 C0 2 � ® PI' I scheduled with the City at least 48 hours in P 111 advance by calling (619) 944-3374 . facilitate rapid construction of temporary } I � ors Cn devices when rain is eminent. -r® EX/ S' NOTIFICATIONS \ 3 . Devices shown on plans shall not be moved or modified without the approval of the Engineering ° utility 5 3 1. The existence and location of underground u o o \ . � g Y D R pipes and structures shown on these plans were Inspector. -� obtained by a search of available records. To the best of our knowledge there are no existing 4 . The Contractor shall restore all erosion control utilities except as shown on these plans, devices to working order to the satisfaction of I however: the City Engineer after each run-off producing rainfall. ` The contractor is required to take due i` III 2 precautionary measures to protect any 5 . The contractor shall install additional erosion / A D-N G1 QI`4 City - existing utilities or struct-in-es located at control measures as may be required by the City. I Engineer due to uncompleted grading operation or ��� Lii- to the work site. It is the contractor's unforeseen circumstances which may arise. responsibility to contact the following P[zopECZ,TY LINE � -- owners of said utilities or structures prior. 6. The contractor shall be res onsible and shall to any excavation, for verification and P Z4� location of utilities and notification Of take necessary precautions to prevent public �XISTINGI GfZP bE COrITOUIZ�j - commencement of work: trespass onto areas when impounded waters create 1�ROQo51�D GrRADE EL11I rlS + %1125 a hazardous condition. a. Sewers. - =L�)CAD1A W?�T�R_ b15T, �53-UI�S VA�(LITE L[NE -" - / ►� � � � `F VAW-C I I�Dp �2%1 MAX I 7 . All erosion control measures provided per the _ I _ b. Gas & Electric S,C�G�, 43�-/ 501 approved grading plan shall be incorporated 0 Z,d '� - hereon. I 'tA50NRY RETAIWNI�T\NAL-�.J�TLYFF_X.7 DWCj. NO, C. water OLty NHA1N NlillllCl�AL X53-G4(AG ' C325, 3 � �X[STINGI F3tzoW D1TGH -fG 8 . Graded areas around the project perimeter must P�oQoSD F3RoW 7ITGH (D 1% TY A d. Telephone - FAelpt6 _6FLL _ od1-.32W drain away from the face of slope at the T NL.IIy- 4URT - - ' - -T (5I ) _- ^b �MCU conclusion of each work da �� TE PhY I " Y• F ' " •'e ...°r.p,; _ � -- x 6u CA 1F GAATN- LINK C110E x x e. Cable TV - CA6UEVI-iIOV4 X142-$G82 It - 9 . All removable protective devices shown shall be 2 2 . Contractor shall notify the City Engineer's in place at the end of each working day when the office 48 hours prior to beginning any work five (5) day rain probability forecast exceeds 1 L on this project. Phone: (619) 944-5070 forty percent (40%) . Silt and other debris shallJ/r I be removed after each rainfall. 3 . The contractor shall give 24 hours notice on calls for inspection. Phone: (619) 944- 10. Should germination of hydroseeded slopes fail to 1, QwtoIESiQy�r 0 � 3374 . All work performed without benefit of provide effective coverage of graded slopes (90% - � ��° ( ?QIL Q \ GENE O��y� O�NNFIZ/ F9IZ,1A1Tre)z ���AL PrEt6w,17•r OW inspection will be subject to rejection and coverage) prior to November 15, the slopes shall � - 7 LN WJ h lOt� - !Q T laZ, aZ removal. be stabilized with punched straw installed in 1 - 2`O - �" v 32 3 c� 132UG� t}�N D�fZ�iOtJ -- ('UUN C 0� LPN 171 CFO sfRT D CAL102N1A 1�i1 accordance with Section 35. 023 of the Erosion and & Irjlll LION LANE klCClsRiJlNI� -'0 MAr TNr_Rf0F__J0. 166;15. GRADING Sediment Control Handbook of the State of ^ California Department of Conservation. r ,IV 1. All grading shall be observed and tested by a �E,„F ,Po���� h, (0 -30 �3NG1Nl-(JkSi Ga 43(o- SGZIr qualified soils engineer or under his direction. • 'Z'/7- 060 - 27 F He shall observe and test the excavation placement and compaction of fills and backfills and compaction of trenches. He shall submit SOILS ENGINEER'S CERTIFICATE DECLARATION OF RESPONSIBLE CHARGE SITE \�� EN41RON AfNTAI. 9�,115W WDIE6 Z �. soils reports as required and will determine the suitability of any fill material. Upon it -K5N LaIG - a registered civil engineer in the I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS OJECT, THAT I \ an�� �4y� - 1, Q13ANTITY OF CDT = 444 e.Y s completion of grading operations he shall state State of California, principally doing business in the field of HAVE -EXERCISED RESPONSIBLE CHARGE OVER THE DESIGNS OF THE PROJECT AS �R ® ?� �y QUpNT[T ( OF FILL : 440 G. (, r that observations and tests were made by him or applied soil mechanics, hereby certify that a sampling and study DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSION CODE, AND THAT N\h A i I under his supervision and that in his opinion, of the soil conditions prevalent within this site was made by me THE DESIGN IS CONSISTENT WITH CURRENT STANOPRDS• MOUNTMI \ D�iFE ---2. 5TE>;P�ST I:XI.5TINGt_ (%) SWPh V° gFFf, FRorbSED G12ADINZI WILL P�GCUrz, all embankments and excavations were constructed or under my direction between the dates - �131rY 2Jc11) and ff I UNDERSTAND THAT THE cCHECK OF PROJECT DRAWINGS D PEC�FICATIONS BY • dance with the approved radio laps and JULY7- 1, M91 .. . One complete co of the soils report cum ilea l. .THE CITY QF_ lJC! 1TF`= - IS CONFINED TO A REVIEW oRLY AN nOES NOT RELIEVE 3. MAXIMUM Vr2TICAL 9frTH of GuT • & W in occur PP grading P P PY P P E As EN R _OF-v�9121 F MY RESPONSIBILITIES FOR. P JECT DESIGN. MAXIMUM VERTICAL FIE[LjHT of FlL1. S Gj� that all embankments and excavations are from this study, with my recommendations, has been submitted to �NCINIT45 acceptable for their intended use. the office of the City Engineer. Furthermore, I have reviewed _ t ( tJ Q these grading plans and certify that the recommendations included =KN-k0NG-- CIVIL ENGINEERING 0.®FED/® Z -4, (0-) VOLUME o CDT _ O % 2' 2 6c Z 2 . The contractor shall properly grade all excavated in 'the soils report for this project have been incorporated in `- (�t� '~ �Oe YN a �` AREA ol= CUT 42oU - surfaces to provide positive drainage and prevent the grading p a a specifications. Gf�t '1-f ' ' �cd� �� °� �b) VOL.0119 OF I'IL, 440 x 27 _ - ponding of water. He shall control surface water _ f and avoid damage to adjoining properties or to SIGNED: -+-or--rvgv- s _W Y PILL �jG 0 0 z finished work on the site and shall take remedial x tl • measures to prevent erosion of freshly graded RCE NO. : 72 8_ areas until such time as permanent drainage and EXP* -6-30 � 3 c VICINITY MAf2 }44TH % 4IZA,DINI/1 WILL NOT [3ECIN UNTIL AFTER /�PlZll 15TH ANO WILL AND lo-3d-`I - �� f)F $k� - NOhCA►,� No L,ATEt2° THAN OCT05FR erosion control measures have been installed. EXP. DATE: - � °. � 5T• DAWN BY Z R Ns NTE FERE , s DATE BENCH MARK SCALE SPECIAL DISTRICT �ES,�NED_ eY ___CHECKED av -- APPROVALS CITY OF ENCINITAS FUBLIC WORKS DEPARTMENT DRAWING NO. w Q E�_ Jjy&,�-T-f G°l 11-/9, (_ -- _ } PLANS PREPAREC UNDER SUPER ISION OF RECOMJ; E 1:' APPRCVEL G�ApIN� ��J�N 21 IRON PIPE - 37 i W of I71ZIVr- Zoo 'i, Of MELBA RP HORIZONTAL-_1 = DATE 8-5'91- BY. _ @. �L yG� of coRNEa post ar RfWw000 1=tN _ \ , ,, - � / _ d5 IS�IVr C vwFic� - - �AN n1E60 =Wry W, OC 22 VERTICAL J-.- GON11�1uNljY ��VL��O�M�Iy :f/2(E6 f ENGI R.C.E. N0�?D?Q� DATE. l DATE: - - - ' ��� - - _- 51,51, 35022 05 6.1 1 ( EXP. WORK PROJECT NO. SHEET 1 OF 1 NoText