2001-7198 G/I - I EN yNEERING SER VICES DEPARTMENT
C'Zt�1 Capital Improvement Projects
Encinitas District Support Services
Field Operations
Sand Replenishment/Stormwater Compliance
Subdivision Engineering
Traffic Engineering
January 16, 2003
Attn: Driver Alliant Insurance Services
C/o Gulf Insurance Company
1620 5th Avenue
San Diego, California 92101
RE: Rossini Park Estates
TM 99-230
Grading Permit 7198-G
APN 260-281-01
Partial release of security
sion
Permit 7198-G authorized earthwork, storm dt The Fned Oiler t ondriveway,
s Dv is�on has
control, all needed to build the described p o ec
approved the rough grading. Therefore, a reduction in the security deposit is merited.
Performance Bond 4000 BE2616282, in the 11 be kept 31,6 3.000,t ma bis educed
by 75% to$32,920.75. The document original w
exonerated. The retention and a separate assignment guarantee completion of finish
grading.
Should you have any questions or concerns,please contact Debra Geishart at (760) 633-
2779 or in writing, attention this Department.
Sincerely,
?ja�y mbach
Masih Maher e Manager
Senior Civil Engineer Financial Services
Field Operations
CC Jay Lembach,Finance Manager
Rossini Park Estates,LLC
Debra Geishart
File
TEL 760-633-2600%FAX 760-633-2627 505 s.Vulcan Avenue, Encinitas,California 92024-3633 TDD 760-633-2700
recycled paper
ENGINEERING SERVICES DEPARTMENT
Capital Improvement Projects
city Of District Support Services
Encinitas Field Operations
Sand Replenishment/Stormwater Compliance
Subdivision Engineering
Traffic Engineering
June 8, 2007
Attn: Driver Alliant Insurance Services
C/o Gulf Insurance Company
16205 th Avenue
San Diego, California 92101
RE: Rossini Park Estates
TM 99-230
Grading Permit 7198-G
APN 260-281-01
Final release of security
Permit 7198-G authorized earthwork, storm drainage, and erosion control, all needed to
build the described project. The Field Operations Division has approved the grading and
finaled the project. Therefore, a full release of the remaining security deposit is merited.
Performance Bond 4000 BE2616282, (in the original amount of$131,683.00) and
was reduced to $32,920.75, and is hereby released in entirety. The document original
is enclosed.
Should you have any questions or concerns,please contact Debra Geishart at (760) 633-
2779 or in writing, attention this Department.
Sincerely,
Debra Geisha y Lembach
Engineering Technician Finance Manager
Subdivision Engineering Financial Services
Cc: Jay Lembach,FinanceManager
Rossini Park Estates
Debra Geishart
File
Enc.
TEL 760-633-2600 / FAX 760-633-2627 505 S. Vulcan Avenue, Encinitas, California 92024-3633 TDD 760-633-2700
�� recycled paper
NGINEERING SERVICES DEPARTMENT
..� Cityo�
Capital Improvement Projects
Encinitas District Support Services
Field Operations
Sand Replenishment/Stormwater Compliance
Subdivision Engineering
Traffic Engineering
August 28, 2007
Attn: Driver Alliant Insurance Services
C/o Gulf Insurance Company
16205 1h Avenue
San Diego, California 92101
RE: Rossini Park Estates
TM 99-230
Improvement Permit 7198-I
APN 260-281-01
Final release of security
Permit 7198-I authorized public road and pathway improvements, all needed to build the
described project. The Field Operations Division has approved the installation of the
improvements and finaled the project. Therefore, a full release of the security deposit is
merited.
Performance Bond 4000 BE2616283, in the amount of$22,398.00, may be released
in entirety. The document original is enclosed.
Should you have any questions or concerns, please contact Debra Geishart at(760) 633-
2779 or in writing, attention this Department.
Sincerely,
Debra Geishart/ J Le ach
Engineering Technician mance Manager
Financial Services
Subdivision Engineering
CC Jay Lembach,Finance Manager
Rossini Park Estates,LLC
Debra Geishart
File
Enc.
TEL 760-633-2600 I FAX 760-633-2627 505 S. Vulcan Avenue, Encinitas, California 92024-3633 TDD 760-633-2700
�� recycled paper
gnipes�Dye associates
G.Howard Dye,L.S. August 22, 2004
File: EN1121
Principal
Mr. Duane Thompson
Robert L.Bruckart,P.E. CITY OF ENCINITAS
Principal
505 South Vulcan Avenue
William A.snipes,P-E. Encinitas, CA 92024-3633
Principal
Re: Rossini Park Estates (Grading Plan 7198-G)
Dear Mr. Thompson:
This letter is to advise you that we have looked at the installation of the
keystone retaining wall on the west side of Lot 4. The installation of the
wall is an acceptable alternative to the 2:1 slope shown on the approved
grading plan. This change will be represented on the record plans at the
conclusion of the project.
If you have any questions or concerns please contact me.
Since rs,
I -DYE SOCIATES
`4SS.
William A. Snipes, P.E.
Principal
S:ASnipes\IAN I121'v.Letters\Easement Plat.doc
civil engineers and land surveyors
8348 Center Drive, Suite G • La Mesa, CA 91942-2910 •619/697-9234• Fax 619/460-2033
ye�Sni P e,5'-D associates
G.Howard Dye,L.S.
Principal
Robert L.Bruckart,P.E.
Principal
William A.Snipes,P.E.
Principal
HYDROLOGY & HYDRAULIC
CALCULATIONS
FOR
ROSSINI PARK ESTATES
TIM 99-230
Quo a
LU N C 504
d EX 3045
��91F OF C
1�P
August 8, 2001
civil engineers and land surveyors
8348 Center Drive, Suite G • La Mesa, CA 91942-2910•619/697-9234• Fax 619/460-2033
ffnipes�B a associates
y
G.Howard Dye,L.S.
Principal
Robert L.Bruckart,P.E. = {
,i
Principal
AJ1 1 5 2001 L',E
William A.Snipes,P.E.
Principal
ENGINLtrtitNG SERU!(;E,^
Q1TY0FEN !NIT-
HYDROLOGY & HYDRAULIC
CALCULATIONS
FOR
ROSSINI PARK ESTATES
TM 99-230
F
No C5 ^'
CC
UP.6- 5
up CALIF
.tom
August 8, 2001
civil engineers and land surveyors
8348 Center Drive, Suite G• La Mesa, CA 91942-2910•619/697-9234• Fax 619/460-2033
INTRODUCTION, SUMMARY & CONCLUSIONS
PRE-DEVELOPMENT
The proposed site is currently vacant. It is bound on the north by recently constructed
Warwick Avenue, on the east by a vacant lot and a single-family home, on the south by
Sheffield Avenue, which is not constructed and a riparian creek area on the west. The
current site discharges to two locations, one is an 18" RCP Storm Drain (North Basin)
and the other is a concrete cross gutter (South Basin). The following are the current
flows from the site to each point of discharge, in the 100-year storm:
NORTH BASIN— 1.43 cfs consisting of 0.66 acres
SOUTH BASIN—0.85 cfs consisting of 0.39 acres
POST DEVELOPMENT
The proposed development of the site is to construct four single-family homes. The
proposed development is made up of 3 sub-basins. Sub-Basin A discharges out the
driveway into Warwick Avenue, Sub-Basin B discharges to the existing 18" RCP Storm
Drain and Sub-Basin C discharges to the concrete cross-gutter. The following are the
proposed flows from the site to each point of discharge, in the 100-year storm:
SUB-BASIN A—0.27 cfs consisting of 0.12 acres
SUB-BASIN B — 1.14 cfs consisting of 0.55 acres
SUB-BASIN C—0.83 cfs consisting of 0.36 acres
SUMMARY
The development of the site results in no net increase in volume of runoff. This is due to
the fact that the site is being flattened out somewhat and the lengthening of the time the
runoff stays on the site. These changes offset the amount of impervious surfaces being
introduced with the development.
The off-site runoff was not analyzed for the basin coming down Sheffield Avenue as
nothing has changed with the proposed development of the subject site. This also true
with the basin for Warwick Avenue, except that the 0.27 cfs of discharge is insignificant
in the overall drainage sub-basin.
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985, 1981 HYDROLOGY MANUAL
(c) Copyright 1982-99 Advanced Engineering Software (aes)
Ver. 1. 5A Release Date: 01/01/99 License ID 1305
Analysis prepared by:
Snipes-Dye Associates
8348 Center Drive, Suite G
La Mesa, CA 91942-2910
Fax (619) 460-2033 Phone (619) 697-9234
************************** DESCRIPTION OF STUDY ***********+****+*****+***
*
• ROSSINI PARK ESTATES
• TM 99-230
• PRE—DEVELOPMENT NORTH SUB—BASIN
**************************************************************************
FILE NAME: EN1121PN.DAT
TIME/DATE OF STUDY: 17 :28 8/ 8/2001
-----------------------------------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
-----------------------------------------
1985 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT (YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2.500
SPECIFIED MINIMUM PIPE SIZE(INCH) = 4 . 00
SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0. 95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED
*USER SPECIFIED TIME OF 10.0 MIN. TO BE ADDED TO THE TIME-OF-CONCENTRATION
FOR NATURAL WATERSHED DETERMINED BY THE COUNTY OF SAN DIEGO HYDROLOGY
MANUAL (APPENDIX X-A) .*
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
****************************************************************************
FLOW PROCESS FROM NODE 100.00 TO NODE 101. 00 IS CODE _
-----------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS««<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 11. 15 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 243.00
UPSTREAM ELEVATION = 170.00
DOWNSTREAM ELEVATION = 136. 43
ELEVATION DIFFERENCE = 33. 57
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3. 927
SUBAREA RUNOFF(CFS) = 1. 43
TOTAL AREA(ACRES) = 0. 66 TOTAL RUNOFF(CFS) = 1. 43
END OF STUDY SUMMARY:
PEAK FLOW RATE(CFS) = 1.43 Tc(MIN. ) = 11. 15
TOTAL AREA(ACRES) = 0. 66
END OF RATIONAL METHOD ANALYSIS
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985, 1981 HYDROLOGY MANUAL
(c) Copyright 1982-99 Advanced Engineering Software (aes)
Ver. 1. 5A Release Date: 01/01/99 License ID 1305
Analysis prepared by:
Snipes-Dye Associates
8348 Center Drive, Suite G
La Mesa, CA 91942-2910
Fax (619) 460-2033 Phone (619) 697-9234
************************** DESCRIPTION OF STUDY **************************
• ROSSINI PARK ESTATES
• TM 99-230
• PRE—DEVELOPMENT SOUTH SUB—BASIN
**************************************************************************
FILE NAME: EN1121PS.DAT
TIME/DATE OF STUDY: 17 :33 8/ 8/2001
-------------------------------------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
------------------------------------------
1985 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT (YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2 .500
SPECIFIED MINIMUM PIPE SIZE (INCH) = 4 . 00
SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0. 95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED
*USER SPECIFIED TIME OF 10. 0 MIN. TO BE ADDED TO THE TIME-OF-CONCENTRATION
FOR NATURAL WATERSHED DETERMINED BY THE COUNTY OF SAN DIEGO HYDROLOGY
MANUAL (APPENDIX X-A) . *
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
- FLOW PROCESS FROM NODE 201.00 TO NODE 202. 00 IS CODE = 21
-----------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 92 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 192 .00
UPSTREAM ELEVATION = 173.00
DOWNSTREAM ELEVATION = 143. 11
ELEVATION DIFFERENCE = 29.89
100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 3. 981
SUBAREA RUNOFF(CFS) = 0. 85
TOTAL AREA(ACRES) = 0.39 TOTAL RUNOFF(CFS) = 0. 85
END OF STUDY SUMMARY:
PEAK FLOW RATE(CFS) = 0.85 Tc(MIN. ) = 10. 92
TOTAL AREA(ACRES) = 0. 39
END OF RATIONAL METHOD ANALYSIS
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985, 1981 HYDROLOGY MANUAL
(c) Copyright 1982-99 Advanced Engineering Software (aes)
Ver. 1.5A Release Date: 01/01/99 License ID 1305
Analysis prepared by:
Snipes-Dye Associates
8348 Center Drive, Suite G
La Mesa, CA 91942-2910
Fax (619) 460-2033 Phone (619) 697-9234
************************** DESCRIPTION OF STUDY **************************
*
• ROSSINI PARK ESTATES
• TM 99-230
*
• SUB-BASIN A
**************************************************************************
FILE NAME: EN1121A.DAT
TIME/DATE OF STUDY: 16:30 8/ 8/2001
-----------------------------------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
------------------------------------------
1985 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT (YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2.500
SPECIFIED MINIMUM PIPE SIZE (INCH) = 4 .00
SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0. 95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED
*USER SPECIFIED TIME OF 10.0 MIN. TO BE ADDED TO THE TIME-OF-CONCENTRATION
FOR NATURAL WATERSHED DETERMINED BY THE COUNTY OF SAN DIEGO HYDROLOGY
MANUAL (APPENDIX X-A) .*
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
FLOW PROCESS FROM NODE 1. 00 TO NODE 2.00 IS CODE = 21
-----------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.74 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 75.00
UPSTREAM ELEVATION = 159. 97
DOWNSTREAM ELEVATION = 156.87
ELEVATION DIFFERENCE = 3. 10
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 023
SUBAREA RUNOFF(CFS) = 0.27
TOTAL AREA(ACRES) = 0. 12 TOTAL RUNOFF(CFS) = 0.27
END OF STUDY SUMMARY:
PEAK FLOW RATE (CFS) = 0.27 Tc(MIN. ) = 10.74
TOTAL AREA(ACRES) = 0. 12
END OF RATIONAL METHOD ANALYSIS
****************************************************************************
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985, 1981 HYDROLOGY MANUAL
(c) Copyright 1982-99 Advanced Engineering Software (aes)
Ver. 1.5A Release Date: 01/01/99 License ID 1305
Analysis prepared by:
Snipes-Dye Associates
8348 Center Drive, Suite G
La Mesa, CA 91942-2910
Fax (619) 460-2033 Phone (619) 697-9234
************************** DESCRIPTION OF STUDY **************************
*
• ROSSINI PARK ESTATES
• TM 99-230
• SUB—BASIN B
**************************************************************************
FILE NAME: EN1121B.DAT
TIME/DATE OF STUDY: 17 : 7 8/ 8/2001
-----------------------------------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
----------------------------------------------------------------------------
� . 1985 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT (YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2.500
SPECIFIED MINIMUM PIPE SIZE(INCH) = 4 .00
SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0. 95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED
*USER SPECIFIED TIME OF 10. 0 MIN. TO BE ADDED TO THE TIME-OF-CONCENTRATION
FOR NATURAL WATERSHED DETERMINED BY THE COUNTY OF SAN DIEGO HYDROLOGY
MANUAL (APPENDIX X-A) . *
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
FLOW PROCESS FROM NODE 11.00 TO NODE 12.00 IS CODE _
-----------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
MOBILE HOME DEVELOPMENT RUNOFF COEFFICIENT = . 6500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 95 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 48 .00
UPSTREAM ELEVATION = 168 . 37
DOWNSTREAM ELEVATION = 167 . 95
ELEVATION DIFFERENCE = 0. 42
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3. 972
SUBAREA RUNOFF(CFS) = 0.08
TOTAL AREA(ACRES) = 0.03 TOTAL RUNOFF(CFS) = 0.08
FLOW PROCESS FROM NODE 12.00 TO NODE 13.00 IS CODE = 4
-------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 . 0 INCH PIPE IS 1. 8 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 2. 1
UPSTREAM NODE ELEVATION = 165. 95
DOWNSTREAM NODE ELEVATION = 165.45
FLOWLENGTH(FEET) = 46.50 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.08
TRAVEL TIME (MIN. ) = 0.37 TC (MIN. ) = 11.32
*****************************************+*************************+********
FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 1
------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11.32
RAINFALL INTENSITY (INCH/HR) = 3.89
TOTAL STREAM AREA(ACRES) = 0.03
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.08
****************************************************************************
FLOW PROCESS FROM NODE 14 .00 TO NODE 13. 00 IS CODE = 21
----------------------------------------------------------- ---------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.48 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 30.00
UPSTREAM ELEVATION = 168.20
DOWNSTREAM ELEVATION = 167 . 60
ELEVATION DIFFERENCE = 0. 60
100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4 .086
SUBAREA RUNOFF(CFS) = 0.02
TOTAL AREA(ACRES) = 0.01 TOTAL RUNOFF(CFS) = 0.02
****************************************************************************
FLOW PROCESS FROM NODE 13.00 TO NODE 13.00 IS CODE = 1
--------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.48
RAINFALL INTENSITY(INCH/HR) = 4 .09
TOTAL STREAM AREA(ACRES) = 0.01
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.02
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 08 11. 32 3.888 0. 03
2 0. 02 10.48 4 .086 0. 01
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 10 10. 48 4 . 086
2 0. 10 11.32 3. 888
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0. 10 Tc (MIN. ) = 11.32
TOTAL AREA(ACRES) = 0.04
FLOW PROCESS FROM NODE 13.00 TO NODE 16. 00 IS CODE _
------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 2. 1 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 2 . 1
UPSTREAM NODE ELEVATION = 165. 45
DOWNSTREAM NODE ELEVATION = 165.05
FLOWLENGTH(FEET) = 40. 00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 10
TRAVEL TIME(MIN. ) = 0. 32 TC (MIN. ) = 11. 64
FLOW PROCESS FROM NODE 16.00 TO NODE 16. 00 IS CODE = 1
--------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11. 64
RAINFALL INTENSITY(INCH/HR) = 3.82
TOTAL STREAM AREA(ACRES) = 0.04
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0. 10
FLOW PROCESS FROM NODE 15.00 TO NODE 16.00 IS CODE = 21
---------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 48 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 30.00
UPSTREAM ELEVATION = 168 .20
DOWNSTREAM ELEVATION = 167 . 60
ELEVATION DIFFERENCE = 0. 60
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 .086
SUBAREA RUNOFF(CFS) = 0.04
TOTAL AREA(ACRES) = 0. 02 TOTAL RUNOFF(CFS) = 0. 04
****************************************************************************
FLOW PROCESS FROM NODE 16.00 TO NODE 16.00 IS CODE _
-------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.48
RAINFALL INTENSITY (INCH/HR) = 4 .09
TOTAL STREAM AREA(ACRES) = 0.02
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.04
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 10 11. 64 3.819 0. 04
2 0. 04 10. 48 4 .086 0. 02
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 14 10. 48 4 .086
2 0. 14 11. 64 3.819
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0. 14 Tc(MIN. ) = 11. 64
TOTAL AREA(ACRES) = 0.06
****************************************************************************
FLOW PROCESS FROM NODE 16.00 TO NODE 17 .00 IS CODE = 4
-------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 1.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 6. 8
UPSTREAM NODE ELEVATION = 165.05
DOWNSTREAM NODE ELEVATION = 154 .00
FLOWLENGTH(FEET) = 64 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 14
TRAVEL TIME(MIN. ) = 0. 16 TC (MIN. ) = 11.80
_..
****************************************************************************
FLOW PROCESS FROM NODE 17 . 00 TO NODE 17 .00 IS CODE _
------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11.80
RAINFALL INTENSITY (INCH/HR) = 3.79
TOTAL STREAM AREA(ACRES) = 0.06
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0. 14
****************************************************************************
FLOW PROCESS FROM NODE 18.00 TO NODE 17 .00 IS CODE = 21
----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
MOBILE HOME DEVELOPMENT RUNOFF COEFFICIENT = . 6500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.22 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 30.00
UPSTREAM ELEVATION = 163.50
DOWNSTREAM ELEVATION = 159.00
ELEVATION DIFFERENCE = 4 .50
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 153
SUBAREA RUNOFF(CFS) = 0. 05
TOTAL AREA(ACRES) = 0. 02 TOTAL RUNOFF(CFS) = 0 . 05
****************************************************************************
FLOW PROCESS FROM NODE 17 .00 TO NODE 17 .00 IS CODE = 1
-----------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.22
RAINFALL INTENSITY(INCH/HR) = 4 .15
TOTAL STREAM AREA(ACRES) = 0.02
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.05
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 14 11.80 3.786 0.06
2 0.05 10.22 4 . 153 0.02
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 18 10.22 4 . 153
2 0. 19 11.80 3.786
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0. 19 TC(MIN. ) = 11.80
TOTAL AREA(ACRES) = 0.08
****************************************************************************
FLOW PROCESS FROM NODE 17 .00 TO NODE 19.00 IS CODE = 4
----------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 1.7 INCHES
PIPEFLOW VELOCITY (FEET/SEC. ) = 4 . 1
UPSTREAM NODE ELEVATION = 154 .00
DOWNSTREAM NODE ELEVATION = 150.89
FLOWLENGTH(FEET) = 80.00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 19
TRAVEL TIME (MIN. ) = 0.33 TWIN. ) = 12. 12
****************************************************************************
FLOW PROCESS FROM NODE 19.00 TO NODE 19.00 IS CODE = 1
---------------------------------------------------
>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 12. 12
RAINFALL INTENSITY (INCH/HR) = 3.72
TOTAL STREAM AREA(ACRES) = 0.08
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 19
****************************************************************************
FLOW PROCESS FROM NODE 20. 00 TO NODE 19.00 IS CODE = 21
-------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.73 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 50.00
UPSTREAM ELEVATION = 154 .83
DOWNSTREAM ELEVATION = 153.89
ELEVATION DIFFERENCE = 0. 94
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 .024
SUBAREA RUNOFF(CFS) = 0. 18
TOTAL AREA(ACRES) = 0.08 TOTAL RUNOFF(CFS) = 0. 18
****************************************************************************
FLOW PROCESS FROM NODE 19.00 TO NODE 19.00 IS CODE = 1
-----------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.73
RAINFALL INTENSITY(INCH/HR) = 4 .02
TOTAL STREAM AREA(ACRES) = 0.08
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 18
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 19 12. 12 3.720 0.08
2 0. 18 10.73 4 .024 0. 08
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 35 10.73 4 .024
2 0. 35 12 . 12 3.720
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0.35 Tc (MIN. ) = 12. 12
TOTAL AREA(ACRES) = 0. 16
****************************************************************************
FLOW PROCESS FROM NODE 19. 00 TO NODE 21.00 IS CODE = 4
---------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 1.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 9. 9
UPSTREAM NODE ELEVATION = 150. 89
DOWNSTREAM NODE ELEVATION = 138 .00
FLOWLENGTH(FEET) = 46. 00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6. 00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.35
FLOW PROCESS FROM NODE 21.00 TO NODE 22.00 IS CODE = 51
----------------------------------------------------
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA<<<<<
UPSTREAM NODE ELEVATION = 138 .00
DOWNSTREAM NODE ELEVATION = 137 .00
CHANNEL LENGTH THRU SUBAREA(FEET) = 18 . 00
CHANNEL SLOPE = 0.0556
CHANNEL BASE (FEET) = 5.00 "Z" FACTOR = 2. 000
MANNING'S FACTOR = 0.030 MAXIMUM DEPTH(FEET) = 1.00
CHANNEL FLOW THRU SUBAREA(CFS) = 0. 35
FLOW VELOCITY(FEET/SEC) = 1. 43 FLOW DEPTH(FEET) = 0. 05
TRAVEL TIME(MIN. ) = 0.21 TC(MIN. ) = 12.41
FLOW PROCESS FROM NODE 22.00 TO NODE 22.00 IS CODE = 1
-----------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION (MIN. ) = 12.41
RAINFALL INTENSITY(INCH/HR) = 3. 66
TOTAL STREAM AREA(ACRES) = 0. 16
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.35
FLOW PROCESS FROM NODE 23.00 TO NODE 24 .00 IS CODE = 21
------------------------------------------------------
>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 11. 66 (MINOTES)
INITIAL SUBAREA FLOW-LENGTH = 100.00
UPSTREAM ELEVATION = 156.00
DOWNSTREAM ELEVATION = 155. 10
ELEVATION DIFFERENCE = 0. 90
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3.815
SUBAREA RUNOFF(CFS) = 0.27
TOTAL AREA(ACRES) = 0. 13 TOTAL RUNOFF(CFS) = 0.27
FLOW PROCESS FROM NODE 24 .00 TO NODE 25.00 IS CODE _
-------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 1. 3 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 8 .4
UPSTREAM NODE ELEVATION = 152. 10
DOWNSTREAM NODE ELEVATION = 139. 00
FLOWLENGTH(FEET) = 63.00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6. 00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.27
TRAVEL TIME (MIN. ) = 0. 13 TC(MIN. ) = 11.79
***************************************************************************+
FLOW PROCESS FROM NODE 25.00 TO NODE 22. 00 IS CODE = 51
------------------------------------------------
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA<<<<<
UPSTREAM NODE ELEVATION = 139. 00
DOWNSTREAM NODE ELEVATION = 137 .00
CHANNEL LENGTH THRU SUBAREA(FEET) = 12.00
CHANNEL SLOPE = 0. 1667
CHANNEL BASE(FEET) = 5.00 "Z" FACTOR = 2.000
MANNING'S FACTOR = 0. 035 MAXIMUM DEPTH(FEET) = 1 .00
CHANNEL FLOW THRU SUBAREA(CFS) = 0.27
FLOW VELOCITY(FEET/SEC) = 1. 61 FLOW DEPTH (FEET) = 0 . 03
TRAVEL TIME (MIN. ) = 0. 12 TC(MIN. ) = 11. 91
****************************************************************************
FLOW PROCESS FROM NODE 22. 00 TO NODE 22.00 IS CODE = 1
-------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION (MIN. ) = 11. 91
RAINFALL INTENSITY(INCH/HR) = 3.76
TOTAL STREAM AREA(ACRES) = 0. 13
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.27
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0.35 12.41 3. 664 0. 16
2 0.27 11. 91 3.763 0. 13
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 62 11. 91 3.763
2 0. 62 12. 41 3. 664
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0. 62 Tc (MIN. ) = 12. 41
TOTAL AREA(ACRES) = 0.29
****************************************************************************
FLOW PROCESS FROM NODE 22.00 TO NODE 26.00 IS CODE = 51
------------------------------------------------------
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA<<<<<
UPSTREAM NODE ELEVATION = 137 .00
DOWNSTREAM NODE ELEVATION = 136.43
CHANNEL LENGTH THRU SUBAREA(FEET) = 25. 00
CHANNEL SLOPE = 0. 0228
CHANNEL BASE(FEET) = 4 .00 "Z" FACTOR = 2.000
MANNING'S FACTOR = 0.035 MAXIMUM DEPTH(FEET) = 1.00
CHANNEL FLOW THRU SUBAREA(CFS) = 0. 62
FLOW VELOCITY(FEET/SEC) = 1.42 FLOW DEPTH(FEET) = 0. 10
TRAVEL TIME (MIN. ) = 0.29 TC(MIN. ) = 12.71
FLOW PROCESS FROM NODE 26.00 TO NODE 26. 00 IS CODE _
-------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 12.71
RAINFALL INTENSITY(INCH/HR) = 3. 61
TOTAL STREAM AREA(ACRES) = 0.29
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 62
FLOW PROCESS FROM NODE 27 .00 TO NODE 26.00 IS CODE = 21
------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 67 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 100.00
UPSTREAM ELEVATION = 146.00
DOWNSTREAM ELEVATION = 136. 43
ELEVATION DIFFERENCE = 9.57
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 040
SUBAREA RUNOFF(CFS) = 0.58
TOTAL AREA(ACRES) = 0.26 TOTAL RUNOFF(CFS) = 0. 58
****************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 26. 00 IS CODE = 1
--------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10. 67
RAINFALL INTENSITY(INCH/HR) = 4 .04
TOTAL STREAM AREA(ACRES) = 0.26
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.58
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 62 12.71 3. 609 0.29
2 0. 58 10. 67 4 .040 0.26
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 1. 13 10. 67 4 . 040
2 1. 14 12.71 3. 609
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 1. 14 Tc (MIN. ) = 12.71
TOTAL AREA(ACRES) = 0.55
****************************************************************************
FLOW PROCESS FROM NODE 26.00 TO NODE 28 .00 IS CODE = 4
-----------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 18 .0 INCH PIPE IS 2 .3 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 8 . 6
UPSTREAM NODE ELEVATION = 136. 43
DOWNSTREAM NODE ELEVATION = 132.80
FLOWLENGTH(FEET) = 36. 00 MANNING'S N = 0. 013
GIVEN PIPE DIAMETER(INCH) = 18 . 00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 1. 14
TRAVEL TIME (MIN. ) = 0. 07 TC (MIN. ) = 12.78
END OF STUDY SUMMARY:
PEAK FLOW RATE (CFS) = 1. 14 TO MIN. ) = 12.78
TOTAL AREA(ACRES) = 0. 55
END OF RATIONAL METHOD ANALYSIS
RATIONAL METHOD HYDROLOGY COMPUTER PROGRAM PACKAGE
Reference: SAN DIEGO COUNTY FLOOD CONTROL DISTRICT
1985, 1981 HYDROLOGY MANUAL
(c) Copyright 1982-99 Advanced Engineering Software (aes)
Ver. 1. 5A Release Date: 01/01/99 License ID 1305
Analysis prepared by:
Snipes-Dye Associates
8348 Center Drive, Suite G
La Mesa, CA 91942-2910
Fax (619) 460-2033 Phone (619) 697-9234
************************** DESCRIPTION OF STUDY **************************
*
• ROSSINI PARK ESTATES
*
• TM 99-230
*
• SUB-BASIN C
**************************************************************************
FILE NAME: EN1121C.DAT
TIME/DATE OF STUDY: 8 : 8 8/ 9/2001
-------------------------------------------------
USER SPECIFIED HYDROLOGY AND HYDRAULIC MODEL INFORMATION:
---------------------------------------------------
1985 SAN DIEGO MANUAL CRITERIA
USER SPECIFIED STORM EVENT (YEAR) = 100.00
6-HOUR DURATION PRECIPITATION (INCHES) = 2.500
SPECIFIED MINIMUM PIPE SIZE(INCH) = 4 .00
SPECIFIED PERCENT OF GRADIENTS (DECIMAL) TO USE FOR FRICTION SLOPE = 0. 95
SAN DIEGO HYDROLOGY MANUAL "C"-VALUES USED
*USER SPECIFIED TIME OF 10. 0 MIN. TO BE ADDED TO THE TIME-OF-CONCENTRATION
FOR NATURAL WATERSHED DETERMINED BY THE COUNTY OF SAN DIEGO HYDROLOGY
MANUAL (APPENDIX X-A) .*
NOTE: ONLY PEAK CONFLUENCE VALUES CONSIDERED
FLOW PROCESS FROM NODE 51.00 TO NODE 52.00 IS CODE = 21
----------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 40 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 20. 00
UPSTREAM ELEVATION = 165.50
DOWNSTREAM ELEVATION = 165.20
ELEVATION DIFFERENCE = 0.30
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 108
SUBAREA RUNOFF(CFS) = 0. 05
TOTAL AREA(ACRES) = 0. 02 TOTAL RUNOFF(CFS) = 0. 05
FLOW PROCESS FROM NODE 52.00 TO NODE 53. 00 IS CODE = 4
---------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 1.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 2.2
UPSTREAM NODE ELEVATION = 163.70
DOWNSTREAM NODE ELEVATION = 163.22
FLOWLENGTH (FEET) = 24 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 . 00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.05
TRAVEL TIME(MIN. ) = 0. 18 TC(MIN. ) = 10.58
FLOW PROCESS FROM NODE 53.00 TO NODE 53.00 IS CODE = 1
------------------------------------------------
>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 10. 58
RAINFALL INTENSITY(INCH/HR) = 4 . 06
TOTAL STREAM AREA(ACRES) = 0. 02
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.05
************************************************************************ *
FLOW PROCESS FROM NODE 54 .00 TO NODE 55.00 IS CODE = 21
------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.35 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 20.00
UPSTREAM ELEVATION = 165. 50
DOWNSTREAM ELEVATION = 165. 10
ELEVATION DIFFERENCE = 0. 40
100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4 . 119
SUBAREA RUNOFF(CFS) = 0. 02
TOTAL AREA(ACRES) = 0.01 TOTAL RUNOFF(CFS) = 0.02
****************************************************************************
FLOW PROCESS FROM NODE 55.00 TO NODE 53.00 IS CODE = 4
-----------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 0.7 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 2. 3
UPSTREAM NODE ELEVATION = 163. 60
DOWNSTREAM NODE ELEVATION = 163.22
FLOWLENGTH(FEET) = 8 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.02
TRAVEL TIME (MIN. ) = 0.06 TC (MIN. ) = 10.41
FLOW PROCESS FROM NODE 53.00 TO NODE 53.00 IS CODE = 1
-----------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.41
RAINFALL INTENSITY(INCH/HR) = 4 . 10
TOTAL STREAM AREA(ACRES) = 0.01
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.02
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 05 10.58 4 .062 0. 02
2 0.02 10. 41 4 . 104 0. 01
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 07 10. 41 4 .104
2 0.07 10.58 4 .062
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0. 07 Tc(MIN. ) = 10.58
TOTAL AREA(ACRES) = 0.03
****************************************************************************
FLOW PROCESS FROM NODE 53.00 TO NODE 56.00 IS CODE = 4
------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 1.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 2 . 4
UPSTREAM NODE ELEVATION = 163.22
DOWNSTREAM NODE ELEVATION = 162. 30
FLOWLENGTH(FEET) = 45.00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.07
TRAVEL TIME (MIN. ) = 0. 31 TC (MIN. ) = 10.89
FLOW PROCESS FROM NODE 56. 00 TO NODE 56.00 IS CODE = 1
------------------------------------------------ ---------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION (MIN. ) = 10. 89
RAINFALL INTENSITY(INCH/HR) = 3. 99
TOTAL STREAM AREA(ACRES) = 0.03
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.07
FLOW PROCESS FROM NODE 57 .00 TO NODE 56.00 IS CODE = 21
------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS«<<<
SOIL CLASSIFICATION IS "D"
MULTI-UNITS DEVELOPMENT RUNOFF COEFFICIENT = .7000
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.58 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 28.00
UPSTREAM ELEVATION = 165. 50
DOWNSTREAM ELEVATION = 165.20
ELEVATION DIFFERENCE = 0.30
100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4 .061
SUBAREA RUNOFF(CFS) = 0. 09
TOTAL AREA(ACRES) = 0. 03 TOTAL RUNOFF(CFS) = 0. 09
****************************************************************************
FLOW PROCESS FROM NODE 56.00 TO NODE 56.00 IS CODE = 1
--------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.58
RAINFALL INTENSITY(INCH/HR) = 4 .06
TOTAL STREAM AREA(ACRES) = 0.03
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.09
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 07 10.89 3. 988 0. 03
2 0.09 10. 58 4 .061 0. 03
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 15 10.58 4 .061
2 0. 15 10. 89 3. 988
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0. 15 Tc(MIN. ) = 10.58
TOTAL AREA(ACRES) = 0.06
****************************************************************************
FLOW PROCESS FROM NODE 56.00 TO NODE 58 .00 IS CODE = 4
---------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 2.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 3. 1
UPSTREAM NODE ELEVATION = 162 . 30
DOWNSTREAM NODE ELEVATION = 160. 90
FLOWLENGTH(FEET) = 68 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 15
TRAVEL TIME (MIN. ) = 0.36 TC (MIN. ) = 10. 95
FLOW PROCESS FROM NODE 58.00 TO NODE 58 .00 IS CODE = 1
------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE««<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 10. 95
RAINFALL INTENSITY(INCH/HR) = 3. 97
TOTAL STREAM AREA(ACRES) = 0.06
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 15
************************k **********+** **********************************
FLOW PROCESS FROM NODE 59.00 TO NODE 58 . 00 IS CODE = 21
-------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.74 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 41. 00
UPSTREAM ELEVATION = 165.50
DOWNSTREAM ELEVATION = 165.00
ELEVATION DIFFERENCE = 0.50
100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4 .022
SUBAREA RUNOFF(CFS) = 0. 04
TOTAL AREA(ACRES) = 0.02 TOTAL RUNOFF(CFS) = 0. 04
****************************************************************************
M FLOW PROCESS FROM NODE 58.00 TO NODE 58 .00 IS CODE = 1
--------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.74
RAINFALL INTENSITY(INCH/HR) = 4 .02
TOTAL STREAM AREA(ACRES) = 0.02
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.04
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 15 10. 95 3. 973 0.06
2 0. 04 10.74 4 .022 0. 02
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 19 10.74 4 .022
2 0.20 10. 95 3. 973
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0.20 Tc(MIN. ) = 10. 95
TOTAL AREA(ACRES) = 0.08
****************************************************************************
FLOW PROCESS FROM NODE 58.00 TO NODE 60.00 IS CODE = 4
---------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 1.5 INCHES
PIPEFLOW VELOCITY (FEET/SEC. ) = 6. 6
UPSTREAM NODE ELEVATION = 160. 90
DOWNSTREAM NODE ELEVATION = 153. 60
FLOWLENGTH (FEET) = 57 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 20
TRAVEL TIME (MIN. ) = 0. 14 TC(MIN. ) = 11. 09
FLOW PROCESS FROM NODE 60.00 TO NODE 60.00 IS CODE = 1
----------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11.09
RAINFALL INTENSITY(INCH/HR) = 3. 94
TOTAL STREAM AREA(ACRES) = 0.08
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.20
FLOW PROCESS FROM NODE 61. 00 TO NODE 60.00 IS CODE = 21
---------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
MULTI-UNITS DEVELOPMENT RUNOFF COEFFICIENT = .7000
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.26 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 30.00
UPSTREAM ELEVATION = 159. 80
DOWNSTREAM ELEVATION = 156. 90
ELEVATION DIFFERENCE = 2. 90
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 142
SUBAREA RUNOFF(CFS) = 0.06
TOTAL AREA(ACRES) = 0.02 TOTAL RUNOFF(CFS) = 0.06
****************************************************************************
FLOW PROCESS FROM NODE 60.00 TO NODE 60.00 IS CODE = 1
--------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.26
RAINFALL INTENSITY(INCH/HR) = 4 . 14
TOTAL STREAM AREA(ACRES) = 0.02
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.06
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0.20 11.09 3. 940 0.08
2 0. 06 10.26 4 . 142 0. 02
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0.24 10.26 4 . 142
2 0.25 11. 09 3. 940
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0.25 TC (MIN. ) = 11.09
TOTAL AREA(ACRES) = 0. 10
****************************************************************************
FLOW PROCESS FROM NODE 60.00 TO NODE 62.00 IS CODE = 4
------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 3.2 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 3. 4
UPSTREAM NODE ELEVATION = 153. 60
DOWNSTREAM NODE ELEVATION = 152. 80
FLOWLENGTH(FEET) = 40.00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.25
TRAVEL TIME (MIN. ) = 0.20 TC (MIN. ) = 11.29
FLOW PROCESS FROM NODE 62.00 TO NODE 62.00 IS CODE = 1
----------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 4
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11.29
RAINFALL INTENSITY(INCH/HR) = 3. 90
TOTAL STREAM AREA(ACRES) = 0. 10
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.25
FLOW PROCESS FROM NODE 63.00 TO NODE 64 .00 IS CODE = 21
----------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.31 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 25.00
UPSTREAM ELEVATION = 156. 90
DOWNSTREAM ELEVATION = 155.80
ELEVATION DIFFERENCE = 1. 10
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 130
SUBAREA RUNOFF(CFS) = 0.02
TOTAL AREA(ACRES) = 0.01 TOTAL RUNOFF(CFS) = 0.02
FLOW PROCESS FROM NODE 64 .00 TO NODE 62.00 IS CODE = 4
---------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
----------------------
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 0. 5 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 3.8
UPSTREAM NODE ELEVATION = 153.80
DOWNSTREAM NODE ELEVATION = 152.80
FLOWLENGTH (FEET) = 8.00 MANNING'S N = 0. 013
GIVEN PIPE DIAMETER(INCH) = 4 . 00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.02
TRAVEL TIME(MIN. ) = 0. 03 TC (MIN. ) = 10. 34
****************************************************************************
FLOW PROCESS FROM NODE 62.00 TO NODE 62.00 IS CODE = 1
------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 4
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION (MIN. ) = 10. 34
RAINFALL INTENSITY(INCH/HR) = 4 . 12
TOTAL STREAM AREA(ACRES) = 0.01
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.02
****************************************************************************
FLOW PROCESS FROM NODE 65.00 TO NODE 66.00 IS CODE = 21
----------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
MULTI-UNITS DEVELOPMENT RUNOFF COEFFICIENT = .7000
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.27 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 30.00
UPSTREAM ELEVATION = 159.20
DOWNSTREAM ELEVATION = 156.50
ELEVATION DIFFERENCE = 2.70
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 140
SUBAREA RUNOFF(CFS) = 0.03
TOTAL AREA(ACRES) = 0.01 TOTAL RUNOFF(CFS) = 0. 03
****************************************************************************
FLOW PROCESS FROM NODE 66.00 TO NODE 62.00 IS CODE = 4
-----------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 0.8 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 2. 4
UPSTREAM NODE ELEVATION = 154 .50
DOWNSTREAM NODE ELEVATION = 152.80
FLOWLENGTH(FEET) = 44 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.03
TRAVEL TIME (MIN. ) = 0.31 TC(MIN. ) = 10.58
FLOW PROCESS FROM NODE 62.00 TO NODE 62.00 IS CODE = 1
---------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 4
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 3 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.58
RAINFALL INTENSITY(INCH/HR) = 4 . 06
TOTAL STREAM AREA(ACRES) = 0.01
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.03
FLOW PROCESS FROM NODE 66. 50 TO NODE 62.00 IS CODE = 21
------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
MOBILE HOME DEVELOPMENT RUNOFF COEFFICIENT = . 6500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.85 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 91.00
UPSTREAM ELEVATION = 159. 66
DOWNSTREAM ELEVATION = 155.80
ELEVATION DIFFERENCE = 3. 86
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 3. 996
SUBAREA RUNOFF(CFS) = 0. 18
TOTAL AREA(ACRES) = 0.07 TOTAL RUNOFF(CFS) = 0. 18
****************************************************************************
FLOW PROCESS FROM NODE 62.00 TO NODE 62.00 IS CODE = 1
------------------------------------------------ --------- -----------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 4
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 4 ARE:
TIME OF CONCENTRATION (MIN. ) = 10. 85
RAINFALL INTENSITY(INCH/HR) = 4 . 00
TOTAL STREAM AREA(ACRES) = 0. 07
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0. 18
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0.25 11.29 3.896 0. 10
2 0.02 10.34 4 . 121 0.01
3 0.03 10.58 4 .062 0.01
4 0. 18 10.85 3. 996 0.07
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 4 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0.46 10.34 4 . 121
2 0. 47 10. 58 4 .062
3 0. 48 10.85 3. 996
4 0. 48 11.29 3.896
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0. 48 Tc (MIN. ) = 11.29
TOTAL AREA(ACRES) = 0. 19
****************************************************************************
FLOW PROCESS FROM NODE 62. 00 TO NODE 67 .00 IS CODE = 4
-------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 3.4 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 4 . 1
UPSTREAM NODE ELEVATION = 152.80
DOWNSTREAM NODE ELEVATION = 152. 40
FLOWLENGTH(FEET) = 20. 00 MANNING'S N = 0. 013
GIVEN PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 48
TRAVEL TIME (MIN. ) = 0. 08 TC(MIN. ) = 11.37
****************************************************************************
FLOW PROCESS FROM NODE 67 .00 TO NODE 67 .00 IS CODE = 1
---------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11.37
RAINFALL INTENSITY(INCH/HR) = 3.88
TOTAL STREAM AREA(ACRES) = 0. 19
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.48
****************************************************************************
FLOW PROCESS FROM NODE 68 .00 TO NODE 67 . 00 IS CODE = 21
-----------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 46 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 20.00
UPSTREAM ELEVATION = 156. 00
DOWNSTREAM ELEVATION = 155.80
ELEVATION DIFFERENCE = 0.20
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 .091
SUBAREA RUNOFF(CFS) = 0.07
TOTAL AREA(ACRES) = 0. 03 TOTAL RUNOFF(CFS) = 0. 07
****************************************************************************
FLOW PROCESS FROM NODE 67 .00 TO NODE 67 . 00 IS CODE = 1
--------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION (MIN. ) = 10. 46
RAINFALL INTENSITY(INCH/HR) = 4 .09
TOTAL STREAM AREA(ACRES) = 0.03
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 07
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 48 11. 37 3.878 0.19
2 0.07 10. 46 4 .091 0.03
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0.52 10.46 4 .091
2 0. 54 11.37 3.878
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0. 54 Tc (MIN. ) = 11. 37
TOTAL AREA(ACRES) = 0.22
****************************************************************************
FLOW PROCESS FROM NODE 67 .00 TO NODE 69.00 IS CODE = 4
---------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 3.7 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 4 .2
UPSTREAM NODE ELEVATION = 152.40
DOWNSTREAM NODE ELEVATION = 151.80
FLOWLENGTH(FEET) = 31. 00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.54
TRAVEL TIME (MIN. ) = 0. 12 TC (MIN. ) = 11.49
FLOW PROCESS FROM NODE 69.00 TO NODE 69.00 IS CODE = 1
--------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11.49
RAINFALL INTENSITY(INCH/HR) = 3. 85
TOTAL STREAM AREA(ACRES) = 0.22
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.54
FLOW PROCESS FROM NODE 70. 00 TO NODE 69. 00 IS CODE = 21
---------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = . 5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 49 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 21. 00
UPSTREAM ELEVATION = 156.00
DOWNSTREAM ELEVATION = 155.80
ELEVATION DIFFERENCE = 0.20
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 .085
SUBAREA RUNOFF(CFS) = 0. 02
TOTAL AREA(ACRES) = 0.01 TOTAL RUNOFF(CFS) = 0. 02
FLOW PROCESS FROM NODE 69.00 TO NODE 69. 00 IS CODE = 1
-------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.49
RAINFALL INTENSITY(INCH/HR) = 4 .08
TOTAL STREAM AREA(ACRES) = 0.01
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0.02
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 54 11. 49 3.851 0.22
2 0.02 10. 49 4 .085 0.01
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0.53 10. 49 4 .085
2 0.56 11.49 3. 851
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0.56 Tc(MIN. ) = 11 . 49
TOTAL AREA(ACRES) = 0.23
FLOW PROCESS FROM NODE 69.00 TO NODE 71.00 IS CODE = 4
------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.8 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 6. 3
UPSTREAM NODE ELEVATION = 151. 80
DOWNSTREAM NODE ELEVATION = 148. 10
FLOWLENGTH(FEET) = 66.00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.56
TRAVEL TIME (MIN. ) = 0. 17 TC(MIN. ) = 11. 66
FLOW PROCESS FROM NODE 71.00 TO NODE 71. 00 IS CODE = 1
-------------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11. 66
RAINFALL INTENSITY(INCH/HR) = 3.81
TOTAL STREAM AREA(ACRES) = 0.23
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 56
FLOW PROCESS FROM NODE 72. 00 TO NODE 71.00 IS CODE = 21
----------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.56 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 30.00
UPSTREAM ELEVATION = 151.50
DOWNSTREAM ELEVATION = 151. 10
ELEVATION DIFFERENCE = 0. 40
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 066
SUBAREA RUNOFF(CFS) = 0. 11
TOTAL AREA(ACRES) = 0. 05 TOTAL RUNOFF(CFS) = 0. 11
FLOW PROCESS FROM NODE 71.00 TO NODE 71.00 IS CODE = 1
------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10. 56
RAINFALL INTENSITY(INCH/HR) = 4 .07
TOTAL STREAM AREA(ACRES) = 0.05
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 11
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0.56 11. 66 3.814 0.23
2 0. 11 10. 56 4 .066 0. 05
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 64 10.56 4 . 066
2 0. 67 11. 66 3.814
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE (CFS) = 0. 67 Tc (MIN. ) = 11. 66
TOTAL AREA(ACRES) = 0.28
FLOW PROCESS FROM NODE 71 .00 TO NODE 73. 00 IS CODE = 4
-----------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6. 0 INCH PIPE IS 3. 1 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 6. 6
UPSTREAM NODE ELEVATION = 148 . 10
DOWNSTREAM NODE ELEVATION = 147.20
FLOWLENGTH(FEET) = 16.00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0. 67
TRAVEL TIME (MIN. ) = 0.04 TC(MIN. ) = 11.70
FLOW PROCESS FROM NODE 73.00 TO NODE 73.00 IS CODE = 1
------------------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION (MIN. ) = 11.70
RAINFALL INTENSITY(INCH/HR) = 3.81
TOTAL STREAM AREA(ACRES) = 0.28
PEAK FLOW RATE(CFS) AT CONFLUENCE = 0. 67
FLOW PROCESS FROM NODE 74 .00 TO NODE 75.00 IS CODE = 21
------------------------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10.51 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 25. 00
UPSTREAM ELEVATION = 151.50
DOWNSTREAM ELEVATION = 151.20
ELEVATION DIFFERENCE = 0.30
100 YEAR RAINFALL INTENSITY (INCH/HOUR) = 4 .019
SUBAREA RUNOFF(CFS) = 0. 07
TOTAL AREA(ACRES) = 0.03 TOTAL RUNOFF(CFS) = 0.07
FLOW PROCESS FROM NODE 75. 00 TO NODE 73.00 IS CODE = 4
----------------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 4 .0 INCH PIPE IS 1.0 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 4 .2
UPSTREAM NODE ELEVATION = 149.20
DOWNSTREAM NODE ELEVATION = 147 .20
FLOWLENGTH (FEET) = 24 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 4 .00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.07
TRAVEL TIME (MIN. ) = 0. 10 TC(MIN. ) = 10. 61
****************************************************************************
FLOW PROCESS FROM NODE 73. 00 TO NODE 73.00 IS CODE = 1
----------------------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10. 61
RAINFALL INTENSITY(INCH/HR) = 4 .06
TOTAL STREAM AREA(ACRES) = 0.03
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 07
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0. 67 11.70 3. 806 0.28
2 0. 07 10. 61 4 .055 0.03
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0. 69 10. 61 4 .055
2 0.73 11.70 3. 806
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0.73 T O MIN. ) = 11.70
TOTAL AREA(ACRES) = 0. 31
****************************************************************************
FLOW PROCESS FROM NODE 73.00 TO NODE 76.00 IS CODE = 4
----------------------------------------------------------------
>>>>>COMPUTE PIPEFLOW TRAVELTIME THRU SUBAREA<<<<<
>>>>>USING USER-SPECIFIED PIPESIZE<<<<<
DEPTH OF FLOW IN 6.0 INCH PIPE IS 2.5 INCHES
PIPEFLOW VELOCITY(FEET/SEC. ) = 9.7
UPSTREAM NODE ELEVATION = 147 .20
DOWNSTREAM NODE ELEVATION = 145.20
FLOWLENGTH (FEET) = 14 .00 MANNING'S N = 0.013
GIVEN PIPE DIAMETER(INCH) = 6.00 NUMBER OF PIPES = 1
PIPEFLOW THRU SUBAREA(CFS) = 0.73
TRAVEL TIME (MIN. ) = 0.02 TC(MIN. ) = 11.73
FLOW PROCESS FROM NODE 76.00 TO NODE 77 . 00 IS CODE _
----------------------------------------------
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA<<<<<
UPSTREAM NODE ELEVATION = 145.20
DOWNSTREAM NODE ELEVATION = 143. 11
CHANNEL LENGTH THRU SUBAREA(FEET) = 16.00
CHANNEL SLOPE = 0. 1306
CHANNEL BASE (FEET) = 5. 00 "Z" FACTOR = 50.000
MANNING'S FACTOR = 0.030 MAXIMUM DEPTH (FEET) = 1. 00
CHANNEL FLOW THRU SUBAREA(CFS) = 0.73
FLOW VELOCITY(FEET/SEC) = 2.02 FLOW DEPTH(FEET) = 0.05
TRAVEL TIME(MIN. ) = 0. 13 TC (MIN. ) = 11. 86
FLOW PROCESS FROM NODE 77 .00 TO NODE 77.00 IS CODE = 1
----------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE«<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 1 ARE:
TIME OF CONCENTRATION(MIN. ) = 11. 86
RAINFALL INTENSITY (INCH/HR) = 3.77
TOTAL STREAM AREA(ACRES) = 0.31
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0.73
FLOW PROCESS FROM NODE 78 . 00 TO NODE 77 .00 IS CODE = 21
------------------------------------------------------
>>>>>RATIONAL METHOD INITIAL SUBAREA ANALYSIS<<<<<
SOIL CLASSIFICATION IS "D"
SINGLE FAMILY DEVELOPMENT RUNOFF COEFFICIENT = .5500
NATURAL WATERSHED NOMOGRAPH TIME OF CONCENTRATION (APPENDIX X-A)
WITH 10-MINUTES ADDED = 10. 33 (MINUTES)
INITIAL SUBAREA FLOW-LENGTH = 52. 00
UPSTREAM ELEVATION = 151.50
DOWNSTREAM ELEVATION = 143. 11
ELEVATION DIFFERENCE = 8 . 39
100 YEAR RAINFALL INTENSITY(INCH/HOUR) = 4 . 125
SUBAREA RUNOFF(CFS) = 0. 11
TOTAL AREA(ACRES) = 0.05 TOTAL RUNOFF(CFS) = 0. 11
****************************************************************************
FLOW PROCESS FROM NODE 77 .00 TO NODE 77 .00 IS CODE = 1
---------------------------------------------------
>>>>>DESIGNATE INDEPENDENT STREAM FOR CONFLUENCE<<<<<
>>>>>AND COMPUTE VARIOUS CONFLUENCED STREAM VALUES<<<<<
TOTAL NUMBER OF STREAMS = 2
CONFLUENCE VALUES USED FOR INDEPENDENT STREAM 2 ARE:
TIME OF CONCENTRATION(MIN. ) = 10.33
RAINFALL INTENSITY(INCH/HR) = 4 . 12
TOTAL STREAM AREA(ACRES) = 0.05
PEAK FLOW RATE (CFS) AT CONFLUENCE = 0. 11
** CONFLUENCE DATA **
STREAM RUNOFF Tc INTENSITY AREA
NUMBER (CFS) (MIN. ) (INCH/HOUR) (ACRE)
1 0.73 11. 86 3.773 0. 31
2 0. 11 10.33 4 . 125 0.05
RAINFALL INTENSITY AND TIME OF CONCENTRATION RATIO
CONFLUENCE FORMULA USED FOR 2 STREAMS.
** PEAK FLOW RATE TABLE **
STREAM RUNOFF Tc INTENSITY
NUMBER (CFS) (MIN. ) (INCH/HOUR)
1 0.78 10.33 4 . 125
2 0.83 11.86 3.773
COMPUTED CONFLUENCE ESTIMATES ARE AS FOLLOWS:
PEAK FLOW RATE(CFS) = 0.83 Tc(MIN. ) = 11.86
TOTAL AREA(ACRES) = 0.36
****************************************************************************
FLOW PROCESS FROM NODE 77 .00 TO NODE 78 .00 IS CODE = 51
-----------------------------------------------------------
>>>>>COMPUTE TRAPEZOIDAL CHANNEL FLOW<<<<<
>>>>>TRAVELTIME THRU SUBAREA<<<<<
UPSTREAM NODE ELEVATION = 143. 11
DOWNSTREAM NODE ELEVATION = 142. 50
CHANNEL LENGTH THRU SUBAREA(FEET) = 12.00
CHANNEL SLOPE = 0.0508
CHANNEL BASE(FEET) = 2. 00 "Z" FACTOR = 25. 000
MANNING'S FACTOR = 0.015 MAXIMUM DEPTH(FEET) = 1.00
CHANNEL FLOW THRU SUBAREA(CFS) = 0.83
FLOW VELOCITY(FEET/SEC) = 2. 96 FLOW DEPTH (FEET) = 0. 07
TRAVEL TIME(MIN. ) = 0.07 TC (MIN. ) = 11. 93
END OF STUDY SUMMARY:
PEAK FLOW RATE (CFS) = 0.83 Tc(MIN. ) = 11. 93
TOTAL AREA(ACRES) = 0.36
END OF RATIONAL METHOD ANALYSIS
0
- %D
CWD
,„cam ;�•• � G .
4z / (•►"J �-. CYJ_• • �/ .�:�
�y fay rs �1 � U. /�/•
M
•<
Z4 0
•u
J
_ ��_.,., •\� � � —Mr,�din �' ^\ o •-
o O c •
a, C <
- / z <
Li a
U H z -
• / J
J p U F
` O < Z
Cu >
U `z
Z � �
O
n Z F
w LA O LA 0. co O
p < M < V M
U
U.
y0
Li z Z uj p U
O w O z
cc C 2 m
< O
O CL O F m
O w ..J zo
U C LL_
- F
N
u
4l
0.
N
n.,,.; _4 i /QC 4PDFr1T1TY YT_F
ALLIED EARTH TECHNOLOGY
P.O.BOX 1932 -EL CAJON, CALIFORNIA 92022-1932
TELEPHONE(619)447-4747
ROBERT CHAN, P.E.
UPDATE OF
REPORT OF GEOTECHNICAL INVESTIGATION
PROPOSED RESIDENTIAL BUILDING SITE
425 WARWICK AVENUE
ENCINITAS, CALIFORNIA
FOR
ROSSINI PARK ESTATES, LLC
PROJECT NO. 01-1167D2
MARCH 1,2001
ALLIED EARTH TECHNOLOGY
P.O.BON 1932 •EL CAJON, CALIFORNIA 92022-1932
TELEPIIONE(61 9)447-4747
ROBERT CHAN, P.E.
March 1, 2001
Rossini Park Estates, LLC
2517 Valmonte Glen
Escondido, CA. 92029
Attn : Mr. Jack H. Dimond
.. Subject : Project No. 0 1-1167132
Update of"Report of Geotechnical Investigation"
Proposed Residential Building Site
_. 425 Warwick Avenue
Encinitas, California
Dear Mr. Dimond :
-- In accordance with your request, we have performed geotechnical engineering
services for subject property, more specifically referred to as being Parcel 2 of Parcel
Map No. 18417, in the City of Encinitas, State of California.
The purpose of our work is to prepare an update report with current geotechical
-- recommendations for the site development as presently proposed. The scope of our work
includes a limited site investigation and a review of the following plans and documents :
"Report of Geotechnical Investigation — Residential Subdivision, Sheffield
Avenue and Bristol Avenue, Encinitas, California" prepared by Southern
California Soil & Testing, Inc. dated May 3, 1989.
Current grading plan for a single-family residence, prepared by Paxco
Engineering..
Project No. 01-1167D2 Rossini Park Estates, LLC 03/01/01 Page 2
425 Warwick Avenue
PROPOSED DEVELOPMENT
Although the legal descriptions are different, subject property (Parcel 2 of Parcel
Map No. 18417) is essentially Lot 10 of the major subdivision as presented in the above-
mentioned Report by Southern California Soil & Testing, Inc.(SCT). It is our
understanding that the proposed development will consist of the construction of a single-
family residence. The proposed structure will be two stories in height, with a full
basement.
SITE INSPECTION
An inspection of the site was recently conducted by the undersigned, and the site
was found to be generally of the same conditions as indicated in the above-mentioned
soil report prepared by SCT, with the following exceptions :
Minor amount of fill soils had been placed in the lower, westerly portion of the
site, especially in the northwesterly portion of the site.
The soil type encountered consist of light brown to brown fine sands.which
possess low expansion potential (Expansion Index= 17).
GEOLOGIC HAZARDS
No faults or ancient landslides are known to exist at the site or in the immediate
vicinity, and none were encountered during the course of our site inspection. The active
Rose Canyon Fault zone has been mapped approximately 3.0 km. (1.9 miles)to the
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 3
425 Warwick Avenue
southwest. The active Elsinore Fault Zone lies approximately 46.l km (28.6 miles) to the
northeast. It is our opinion that the site could be subjected to moderate shaking in the
event of a major earthquake along any of the above-mentioned faults; however the site is
not considered to possess any greater seismic risk than that of the surrounding
development.
SOIL LIQUEFACTION
It is our opinion that due to the relatively high density of the competent natural
soils prevailing at the site, the lack of near-surface groundwater and the grain size
- characteristics of the in-situ soils, the risk for seismically induced soil liquefaction is very
low.
FINDINGS, CONCLUSIONS AND RECOMMENDATIONS
In general, we concur and agree with the findings, conclusions and
recommendations presented in the above-mentioned Report, and said findings,
conclusions and recommendations are still valid and applicable for the proposed
development.
The following addendum recommendations are made, however, as supplement
to the recommendations presented in the subject Report, based on current site conditions..
If there are discrepancies, the addendum recommendations herein will prevail.
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 4
425 Warwick Avenue
Earthwork
--------------
1. All grading should be accomplished in accordance with the Grading Ordinance of
the City of Encinitas, UBC Chapter A33; and Appendix I attached hereto entitled,
"General Grading and Earthwork Specifications",
2. Where the recommendations of this Section of the report conflict with those of
Appendix 1, this Section of the report takes precedence.
3. Grading operation should begin with clearing and grubbing of the site. All debris
should be hauled off and disposed of offsite.
4. The proposed grading will consist of minor earthwork to accommodate the
proposed residence, and will involve excavation for the basement garage and
-- placement of fill soils around the perimeter of the structure. Estimated earthwork
is on the order of 575 cubic yards of excavation and approximately 200 cubic
yards of fill soils, with the excess soils exported to a City approved site.
5. It is recommended that any existing loose fill soils previously placed on the site
that remain below finished grade be removed, and uniformly recompacted. Fill
soils generated on site should be properly moistened, and uniformly compacted in
lifts on the order of 6 to 8 inches. All fill soils should be compacted to at least 90
percent of maximum dry density.
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 5
425 Warwick Avenue
6. The proposed residence may be founded partly in the cut portion and partly in the
fill portion of the building pad, provided that the exposed natural soils within 5
feet outside the foundation line of the proposed structure is removed to a depth of
3 feet and uniformly recompacted to at least 90 percent of maximum dry density.
7. As an alternative to the item #6 above, it is recommended that all foundation for
the proposed residence be extended through any fill soils, at least 12 inches into
the underlying competent natural soils.
Foundation and Slab Design
8. _ ^A safe allowable soil bearing value of 2,000 pounds per square foot may be used
in the design and checking of continuous or spread foundations that are a
minimum of 12 and 24 inches in minimum horizontal dimension, respectively,
and are embedded at least 12 inches (for single-story) or 18 inches (for two-
stories) into the competent natural or compacted filled ground.
9. The above safe allowable soil bearing value may be further increased by one third
when considering wind and/or seismic forces.
10. It is recommended that all continuous footings be reinforced with a minimum of 4
#5 rebars; two rebars located near the top, and the other two rebars near the
bottom of the footings. Isolated pier footings should be reinforced with 2 #5
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 6
425 Warwick Avenue
rebars in both directions, placed at mid height of footing.
11. The concrete slab should be 4 inches net in thickness, and reinforced with a
minimum of#3 rebars @ 18 inches on center, placed at mid-height of slab. The
concrete slab should be underlain by 4 inches of clean sand. In areas to be tiled or
carpeted, a visqueen-type moisture barrier should be placed at grade and be
overlain by one inch of protective sand cover. This moisture barrier should be
heavily overlapped and sealed at splices.
Retaining Wall Design
12. wA steel pile/wood lagging retaining wall is proposed along the east property line.
This proposed retaining wall will be extended below the garage level. After the
garage basement wall is constructed, the area between the garage basement wall
and the retaining wall along the east property line will be backfilled.
13. Masonry block cantilever-type retaining walls with level backfill are proposed for
the site. Based on a review of the on-site soil conditions, standard retaining wall
designs as per the Regional Standard or City of Encinitas Drawings may be used.
14. It is recommended that steelpile/wood lagging retaining wall and the basement
type retaining walls be designed to withstand the pressure exerted by an
equivalent fluid weight of 32 pcf This value assumes that the walls are
unrestrained from movement, have a granular backfill and level backfill surface.
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 7
425 Warwick Avenue
For walls restrained from movement at the top, such as basement walls, an
uniform horizontal pressure of 7H(where H is the height of the retaining wall in
feet) should be applied in addition to the active pressure recommended above.
15. For sloping backfill with slope ratio of 2 : 1 (horizontal : vertical), the equivalent
fluid weight should be increased to 45 pcf. An angle of internal friction of 30
degrees may also be used in design.
16. All retaining walls should be supplied with a backfill drainage system adequate to
prevent the buildup of hydrostatic pressure. The subdrain should consist of 3/4
inch gravel and a perforated pipe near the bottom of the wall. The width of this
subdrain should be at least 12 inches, and extend at least 2/3 the height of the
retaining wall. The subdrain should be enclosed in a geotextile fabric such as
Mirafi 140N or equal.
Lateral Loading
-------- ----------
- 17. To resist lateral loads, it is recommended that the pressure exerted by an
equivalent fluid weight of 400 psf per foot of depth be used for footings or shear
keys pour neat against competent natural or properly compacted filled ground, up
to a maximum of 2,500 psf.. The upper 12 inches of material in areas not
protected by floor slabs or pavements should not be included in design for passive
resistance. This value assumes that the horizontal distance of the soil mass
Project no. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 8
425 Warwick Avenue
extends at least 10 feet or three times the height of the surface generating the
passive pressure, whichever is greater.
18. If friction is to be used to resist lateral loads, a coefficient of friction between soil
and concrete of 0.35 is recommended. When combining frictional and passive
resistance,the coefficient of friction should be reduced by one-third.
19. All backfill soils behind the retaining wall should be compacted to at least 90
percent of maximum dry density.
Temporary Excavations
------------- ---------------
20. It is recommended that excavations for the basement walls be accomplished at a
near vertical inclination up to a maximum height of 5 feet. Above a height of 5
feet, the iinclination should be flattened to 1 : 1 (horizontal : vertical)or flatter up
to the required. height.
21. It is recommended that surface water is not permitted to flow over the top of the
excavations. During periods of heavy rainfall, the excavation should be covered
- with visqueen sheets.
22. It is recommended that no surcharge loads be placed above the excavations for a
distance back from the face of cut at least equal to the height of the excavation.
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 9
425 Warwick Avenue
UBC Seismic Coefficients
23. Ground Motion—The proposed structure should be designed and constructed to
resist the effects of seismic ground motions as provided in Section 1625 of the
1997 Uniform Building Code. The basis of the design is dependent on and
considers seismic zoning, site characteristics, occupancy, configuration, structural
system and building height.
24. Soil Profile Type—In accordance with Section 1629.3.1, Table 16-J, and the
underlying geologic conditions, a site Soil Profile of Sc is considered appropriate
for the subject property.
25. Seismic Zone—In accordance with Section 1629 and Figure No. 16-2, the subject
site is situated within Seismic Zone 4.
26. Seismic Zone Factor(z)— A seismic zone factor of 0.4 is assigned based on Table
16-1. Since the site is within Seismic Zone 4, Section 1629.4.2 requires a seismic
source type and near-source factor.
27. Near-source Factor(Na and Nv)—Based on the known active faults in the region
and distance of the faults from the site, a Seismic Source Type B per Table 16-U,
and Near Source Factor of Na= 1.1 per Table 16-S and Nv= 1.3 per Table 16-T
are provided.
Project No. 00-1167D2 Rossini Park Estates, LLC 03/01/01 Page 10
425 Warwick Avenue
28. Seismic Coefficients (Ca and Cv)—Using the Soil profile Type and Seismic Zone
Factor along with Table 16-Q and 16-R, the Seismic Coefficients are Ca= 0.44
and Cv=0.74.
29. A Seismic Response Spectrum for subject property is presented on Figure No. 1.
Utility Trench Backfill
30. It is recommended that any backfill sols placed in utility trenches located within 5
feet of any improvements and deeper than 12 inches, or backfill placed in any
trench located 5 feet our more from a building and deeper than 5 feet, be
compacted to at least 90 percent of maximum dry density.
Surface Drainage and Lot Maintenance
----------------------- -----------
31. Surface drainage should be controlled at all times. Positive surface drainage
(such as drainage swales or area drains) should be provided to direct surface water
away from the top of slopes and all structures toward the street or other suitable
- collective drainage facilities. Surface water should not be allowed to pond
adjacent to footings.
LIMITATIONS
The opinions and recommendations presented in this report are based upon surficial
observations and logical projects inferred from observed conditions and the assumption
that the soil conditions do not deviate appreciably from those encountered in the
exploratory borings.
Project No. 00-1167132 Rossini Park Estates, LLC 03/01/01 Page 11
425 Warwick Avenue
Should conditions vary from those presented herein be encountered during the
developmental construction phase, this firm should be notified immediately so that a
qualified soil engineer can inspect the site conditions and evaluate the potential effects
and present recommendations.
This report has been prepared in accordance with generally accepted standards of
geotechnical engineering practice at the time of its preparation. No other warranties,
expressed or implied, are made as to the professional consultation and recommendations
contained herein. This report is provided for the exclusive use of the client or his
authorized agent.
ESSIOAOI F Q�pFESSIONq�F
K6spectfully su mitted, Cy
ALLIED E H TECHNOLOGY �`` o�� �� o
2A6ti3 CM No.G-00198
NExP �ro1 Cr_ Up.12/31/01 �}
Robert an, P.E. c1v� Q� s �FOTECN
F OF C
`fTAT � l OF CA����
a
0
_ LO
L
w
0
U
LO
W
0 0U)
�., M
0
U)
N
O
0000/
U
_ � O
N
L P
V1 y
WO Q
O LO O LO O
O O o
(�) uoileaalaoob jeajoadS
.r isCaC fiES. C<1
3
I
i
i�
f
�M1
h.
3
20 0 20 40 60
U
�
GRAPHIC SCALE
i
REVISIONS APPROVED DATE REFERENCES DATE
w
yr
w
a
COUNTY OF SAN DIEGO BENCHMARK
LOCATED AT FLOWLINE OF SEWER AT
SOMERSET AVENUE AND SHEFFIELD
AVENUE
ELEVATION = 173.25
DATUM 'U.S.C. & G.S.
SCALE
HORIZONTAL 1" = 20'
VERTICAL NONE
SPECIAL DISTRICT
PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED
DATE : 8/08/0'. BY:
WILLIAM A. SNIPES _ R.C.E. NO.: 50477 DATE:
ENGINEER EXP. 6/30/05. R.C.E.
APPROVALS
APPROVED
BY:
DATE:
R.C.E.
ENGINEER OF WORK Q�OFESSIO 81
5►�ipS -Dye associates ��° '�
0
civil engineers and land surveyors N �`AM A
8348 CENTER DRIVE, STE. G, LA MESA, CA 91942 3 No. 50477 v m y
TELEPHONE (619) 697 -9234 FAX (619) 460 -2033 a Exp; 06 -30 -05 a
6D C.1
'.C1Y1�.
WILLIAM A. SNIPES R.C.E. 50477 srgTF of LILLJ
EXPIRES 06 -30 -05
CITY QF ENGINITA S ENGINEERING SERVICES DEPARTMENT DRAWING NO.
PLANS FOR THE GRADING OF: TgAtAAM:
I
L
i
4
�
i
I
it
5
1
I'
jY
I
.r isCaC fiES. C<1
3
I
i
i�
f
�M1
h.
3
20 0 20 40 60
U
�
GRAPHIC SCALE
i
REVISIONS APPROVED DATE REFERENCES DATE
w
yr
w
a
COUNTY OF SAN DIEGO BENCHMARK
LOCATED AT FLOWLINE OF SEWER AT
SOMERSET AVENUE AND SHEFFIELD
AVENUE
ELEVATION = 173.25
DATUM 'U.S.C. & G.S.
SCALE
HORIZONTAL 1" = 20'
VERTICAL NONE
SPECIAL DISTRICT
PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED
DATE : 8/08/0'. BY:
WILLIAM A. SNIPES _ R.C.E. NO.: 50477 DATE:
ENGINEER EXP. 6/30/05. R.C.E.
APPROVALS
APPROVED
BY:
DATE:
R.C.E.
ENGINEER OF WORK Q�OFESSIO 81
5►�ipS -Dye associates ��° '�
0
civil engineers and land surveyors N �`AM A
8348 CENTER DRIVE, STE. G, LA MESA, CA 91942 3 No. 50477 v m y
TELEPHONE (619) 697 -9234 FAX (619) 460 -2033 a Exp; 06 -30 -05 a
6D C.1
'.C1Y1�.
WILLIAM A. SNIPES R.C.E. 50477 srgTF of LILLJ
EXPIRES 06 -30 -05
CITY QF ENGINITA S ENGINEERING SERVICES DEPARTMENT DRAWING NO.
PLANS FOR THE GRADING OF: TgAtAAM:
ti
tl
v
,
, c '
v
-
v
� y
I
- s
'`
REVISIONS
APPROVED'
DATE
REFERENCES
DATE
BENCH MARK
SCALE
SPECIAL DISTRICT
v
vrtHan
�
A
APPROVALS
—
W
W
�
COUNTY OF SAN DIEGO BENCHMARK
A TCT
PLANS PREPARED UNDER
SUPERVISION OF
RECOMMENDED
APPROVED
w
LOCATED AT FLOWLINE OF SEWER AT
HORIZONTAL 1 = 201
DATE : 8/()8/01
BY:
BY:
SOMERSET AVENUE AND SHEFFIELD
s
a
AVENUE
NONE
- WILLIAM A. SNIPES
R.C.E. NO.: 50477
DATE:
DATE:
z
ELEVATION = 173.25'
VERTICAL
ENGINEER
DATUM: U.S.C. & G.S:
EXP. 6 30 05
R.C.E.
RX.E.
WORK PROJECT NO,
sj
ENGINEER OF WORK gROFESSro4
Snipes -0ye aRsociarem
civil engineers and land eurve Drs
� y q
8348 CENTER DRIVE, STE. G, LA MESA, CA 91942 No. 50477 0
6D TELEPHONE (619) 697 -9234 FAX (619) 460 -2033 Exp, 06 -30_05
WILLIAM AEXPIRES IS 06 -30-05 E 50477 9rfi, OF CA\
a ` 1
`f
1EET 4 OF 7
EN1121 (A2)