Loading...
2007-675 G (Plans) WORK TO BE DONE STORMWATER POLLUTION CONTROL BMP NOTES GRADING LEGEND: RELATIVE TO CONSTRUCTION ACTIVITIES A. GENERAL C. GRADING SOILS ENGINEER'S CERTIFICATE -- OHE - OVERHEAD POWER LINES p� !� -- SOS--- SEWER LINE Concrete Washout 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS. THE 1. ALL GRADING SHALL BE INSPECTED AND TESTED BY A QUALIFIED SOILS I, A REGISTERED CIVIL ENGINEER IN THE STATE OF STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION, THE DESIGN ENGINEER OR UNDER HIS DIRECTION. HE SHALL INSPECT AND TEST THE CALIFORNIA, PRIN IPA LLY DOING BUSINESS IN THE FIELD OF APPLIED SOIL PROPERTY LINE * Contractor shall establish and use an adequately sized concrete washout area to CONSTRUCTION STANDARDS OF THE CITY OF ENCINITAS AND THE SAN DIEGO EXCAVATION PLACEMENT AND COMPACTION OF FILLS AND BACKFILLS AND MECHANICS, HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL - - CENTER LINE contain washout wastes on site. It is illegal to wash concrete, slurry, mortar, AREA REGIONAL STANDARD DRAWINGS. ANY CHANGES OR REVISIONS COMPACTION OF TRENCHES. HE SHALL SUBMIT SOILS REPORTS AS REQUIRED CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY stucco, plaster and the like into the stormwater conveyance system or any THEREFROM SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ANY AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON DIRECTION BETWEEN THE DATES _$ AND 07 ONE receiving water. Contractor shall post a sign designating the washout location. REQUEST FOR INSPECTION. COMPLETION OF GRADING OPERATIONS HE SHALL STATE THAT INSPECTIONS COMPLETE COPY OF THE SOILS REPORT COMPILED FROM THI STUDY, WITH MY AND TESTS WERE MADE BY HIM OR UNDER HIS SUPERVISION AND THAT IN HIS RECOMMENDATIONS, HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER. Construction Site Access 2. THE SOILS REPORT TITLED GEOTECHNICAL INVESTIGATION OPINION, ALL EMBANKMENTS AND EXCAVATIONS WERE CONSTRUCTED IN FURTHERMORE, I HAVE REVIEWED THESE GRADING PLANS AND CERTIFY THAT THE BIN INDICATES BOTTOM OF WALL FOR 1719 SAN ELIJO AVENUE, ENCINITAS, CALIFORNIA, DATED: ACCORDANCE WITH THE APPROVED GRADING PLANS AND THAT ALL EMBANKMENTS RECOMMENDATIONS INCLUDED IN THE SOILS REPORT FOR THIS PROJECT HAVE BEEN * A stabilized construction site access shall be provided for vehicles egress and JUNE, 2003 AND UPDATE LETTER DATED: AUGUST 24,2.0078Y AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. INCORPORATED IN THE GRADING PLANS AND SPECIFICATIONS. EC INDICATES EDGE OF CONCRETE D ingress to prevent tracking dirt off site. This shall include using material such as ROBERT PRATER ASSOCIATES, SHALL BE CONSIDERED AS A PART OF THIS GRADING. ALL GRADING SHALL BE DONE IN 2. THE CONTRACTOR SHALL PROPERLY GRADE ALL EXCAVATED SURFACES TO INDICA TES EDGE OF PAVEMENT Q gravel and/or corrugated steel panels/plates. ACCORDANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS PROVIDE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. HE SHALL FL INDICATES FLOW LINE CONTAINED IN SAID REPORT. CONTROL SURFACE WATER AND AVOID DAMAGE TO ADJOINING PROPERTIES OR SIGNED: DATE: Z 2e0g Construction Vehicles 1 TO FINISHED WORK ON THE SITE AND SHALL TAKE REMEDIAL MEASURES TO FS INDICATES FINISHED SURFACE 61 3. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE APPROVAL OF SIZES, PREVENT EROSION OF FRESHLY GRADED AREAS UNTIL SUCH TIME AS * A specific area away from gutters and stormdrain shall be designated for LOCATION AND TYPE OF DRAINAGE FACILITIES, NOR OF IMPROVEMENTS PERMANENT DRAINAGE AND EROSION CONTROL MEASURES HAVE BEEN �- NO.: _ 3r( 6 EXP. DATE: 3 TC INDICATES TOP OF CURB d construction vehicles parking, vehicle refueling, and routine equipment maintenance. WITHIN STREET RIGHT-OF-WAYS. SEPARATE APPROVALS AND PERMITS INSTALLED. TW INDICATES TOP OF WALL All major repairs shall be made off-site. FOR THESE SHALL BE REQUIRED IN CONJUNCTION WITH IMPROVEMENT PLANS. 3. ALL AREAS TO BE FILLED SHALL BE PREPARED TO BE FILLED AND FILL ®o�N%D A WM INDICATES WATER METER Erosion Control SHALL BE PLACED IN ACCORDANCE WITH STANDARD SPECIFICATIONS. ALL GEOTECHNICAL EXPLORATION INC. 4. WRITTEN PERMISSION SHALL BE OBTAINED FOR ANY OFF-SITE GRADING. VEGETABLE MATTER AND OBJECTIONABLE MATERIAL SHALL BE REMOVED BY THE 7420 TRADE STREET * Erosion control must be provided for all erosive surfaces. Sloped surfaces CONTRACTOR FROM THE SURFACE UPON WHICH THE FILL IS TO BE PLACED. SAN DIEGO, CA 92121 ; No.396 INDICATES GRASSY SWALE P P 5. CONTRACTOR SHALL TAKE ANY NECESSARY PRECAUTIONS REQUIRED TO LOOSE FILL AND ALLUVIAL SOILS SHALL BE REMOVED TO SUITABLE FIRM 858-549-7222 x. Exp. 3/31/200fil especially shall be protected against PROTECT ADJACENT PROPERTIES DURING GRADING OPERATIONS. ANYTHING NATURAL GROUND. THE EXPOSED SOILS SHALL BE SCARIFIED TO A DEPTH OF J.N. 900-268 sg erosion by installing erosion resistant surfaces such as DAMAGED OR DESTROYED SHALL BE REPLACED OR REPAIRED TO CONDITION 6" AND THEN COMPACTED TO A MINIMUM OF 90 PERCENT. IT SHALL BE THE G0�FOM��G�,�� AREA DRAIN (6" MIN.) erosion control mats, adequate ground cover vegetation, EXISTING PRIOR TO GRADING. CONTRACTOR'S RESPONSIBILITY TO PLACE, SPREAD, WATER AND COMPACT THE and bonded fiber matrix. FILL IN STRICT ACCORDANCE WITH SPECIFICATIONS. 6. THE DEVELOPER SHALL BE RESPONSIBLE THAT ANY MONUMENT OR BENCH - - - 3" P.V.C./A.B.S. DRAIN PIPE * No excavation and grading activities are allowed during MARK WHICH IS DISTURBED OR DESTROYED SHALL BE REESTABLISHED AND 4. CUT AND FILL SLOPES SHALL BE CUT AND TRIMMED TO FINISH GRADE STATEMENT OF ENGINEER OF WORK wet weather. REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. TO PRODUCE SMOOTH SURFACES AND UNIFORM CROSS SECTIONS. THE SLOPES r PROPOSED HOUSE FOOTPRINT OF EXCAVATIONS AND EMBANKMENTS SHALL BE SHAPED, PLANTED AND TRIMMED THE UNDERSIGNED ENGINEER AGREES THAT THE WORK PERFORMED BY THE ENGINEER SHALL COMPLY WITH THE GENERALLY ACCEPTED STANDARDS AND 7. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY AS DIRECTED BY THE ENGINEER OF WORK AND LEFT IN A NEAT AND ORDERLY * Diversion dikes shall be constructed to channel runoff around the construction PRACTICES OF THE ENGINEER'S TRADE or PROFESSION. THE ENGINEER FURTHER PROPOSED PLANTER FOR BMP TREATMENT DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMING CONDITION. ALL STONES, ROOTS AND OTHER WASTE MATTER EXPOSED OR site. Contractor shall protect channels against erosion using permanent and TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS EXCAVATION OR EMBANKMENT SLOPES WHICH ARE LIABLE TO BECOME LOOSENED AGREES THAT THE WORK PERFORMED HEREIN SHALL BE IN ACCORDANCE WITH temporary erosion control measures. AND REGULATIONS. SHALL BE REMOVED AND DISPOSED OF. THE TOE AND TOP OF ALL SLOPES THE RULES AND REGULATIONS REQUIRED BY THE CITY OF ENCINITAS. THE __= PROPOSED RETAINING WALL, SEE SHALL BE ROUNDED IN ACCORDANCE WITH THE GRADING ORDINANCE. ENGINEER AGREES THAT ANY PLAN CHECK or REVIEW PERFORMED BY THE SHEETS 2 & 3 FOR WALL TYPES * Remove existing vegetation only when absolutely 8. GRADING AND EQUIPMENT OPERATING WITHIN ONE-HALF (1/2) MILE OF CITY OF ENCINITAS IN ITS CAPACITY AS A PUBLIC ENTITY FOR THE PLANS necessary. Large projects shall be conducted in phases to avoid unnecessary A STRUCTURE FOR HUMAN OCCUPANCY SHALL NOT BE CONDUCTED BETWEEN 5. ALL TREES, BRUSH, GRASS AND OTHER OBJECTIONABLE MATERIAL SHALL PREPARED BY THE ENGINEER IS NOT A DETERMINATION BY THE CITY OF removal of the natural ground cover. THE HOURS OF 5:30 P.M. AND 7:30 A.M. NOR ON SATURDAYS, SUNDAYS BE COLLECTED, PILED OR OTHERWISE DISPOSED OF OFF THE SITE BY THE ENCINITAS OF THE TECHNICAL SUFFICIENCY or ADEQUACY OF THE PLANS or Do not remove trees or shrubs unnecessarily; they help decrease erosion. AND CITY RECOGNIZED HOLIDAYS CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED WITH A DESIGN OF IMPROVEMENTS BASED THEREON. THE ENGINEER AGREES TO NEAT AND FINISHED APPEARANCE FREE FROM UNSIGHTLY DEBRIS. APPROVAL INDEMNIFY AND HOLD HARMLESS THE CITY OF ENCINITAS AND ITS OFFICERS, * Temporary vegetation must be planted on slopes or where construction is not 9• NO GRADING OPERATIONS SHALL COMMENCE UNTIL A PREGRADING MEETING OF LOCATION OF DEBRIS FILL SHALL BE SECURED FROM THE SOILS ENGINEER AGENTS, AND EMPLOYEES FROM PROPERTY DAMAGE or BODILY INJURY ARISING OWNER & PERMITTEE: SITE LOCATION: P Y 9 P P SOLELY FROM THE NEGLIGENT ACTS, ERRORS, or OMISSIONS OF THE ENGINEER immediate) planned for erosion control purposes. Erosion shall be prevented b HAS BEEN HELD ON-SITE WITH THE FOLLOWING PEOPLE PRESENT: AND CITY ENGINEER PRIOR TO THE DISPOSAL OF ANY SUCH MATERIAL. y P P P p Y CITY INSPECTOR, CIVIL ENGINEER, SOILS ENGINEER,GRADING CONTRACTOR AND HIS/HER AG,KTS or EMPLOYEES ACTING WITHIN THE COURSE. AND SCOPE planting fast-growing annual and perennial grasses to shield and bind the soil. AND PERMITTEE. THE PREGRADE MEETING SHALL BE SCHEDULED WITH THE OF SUCH AGENZY AND EMPLOYMENT AND ARISING OUT OF THE WORK BERNARD & JAMIE MEHREN APN: 260-275-19 CITY AT LEAST 48 HOURS IN ADVANCE BY CALLING (760) 633-2770. D. LANDSCAPING PERFORMED BY THE ENGINE E0 P.O. BOX 1612 * Plant permanent vegetation as soon as possible, once excavation and grading RANCHO SANTA FE, CA 92067 1719 SAN ELIJO AVE activities are complete. 10. PRIOR TO HAULING DIRT OR CONSTRUCTION MATERIALS TO ANY 1. ALL SLOPES SHALL BE PLANTED AND IRRIGATED IN ACCORDANCE WITH (858) 756-0801 ENCINITAS, CA 92024 PROPOSED CONSTRUCTION SITE WITHIN THIS PROJECT THE DEVELOPER SHALL PLANS APPROVED BY THE CITY ENGINEER. PLANS SHALL CONFORM TO THE /' /��Z� O -7 * Water usage for dust control shall be minimized. SUBMIT TO AND RECEIVE APPROVAL FROM THE CITY ENGINEER FOR THE IRRIGATION ENCINITAS GRADING ORDINANCE AND ALL ADOPTED LANDSCAPE AND SIGNED: LEGAL DESCRIPTION. PROPOSED HAUL ROUTE. THE DEVELOPER SHALL COMPLY WITH ALL CONDITIONS 51GNED: DATE: REQUIREMENTS THE CITY ENGINEER MAY IMPOSE WITH REGARDS TO THE DOUGLAS E. LOGAN HAULING OPERATION. 2. FINISH GRADING AND PLANTING SHALL BE ACCOMPLISHED ON ALL SLOPES RpFESSIo LOT E ALONG WITH A PORTION OF LOT F, BLOCK On-site Construction Material Storage PRIOR TO OCTOBER 1 OR IMMEDIATELY UPON COMPLETION OF ANY SLOPES GRADED RCE NO.: 39726 o e Nei 75 OF CARDIFF VILLA TRACT ACCORDING TO MAP * 11. UPON FINAL COMPLETION OF THE WORK UNDER THE GRADING PERMIT BETWEEN OCTOBER 1 AND APRIL 15. ���` JG�p,S E. Coc �y THEREOF NO. 1469, FILED IN THE OFFICE OF THE Stored materials shall be contained in a secure place to prevent seepage and RANCHO COASTAL ENGINEERING °° 9y `= COUNTY RECORDER OF SAN DIEGO COUNTY, BUT PRIOR TO FINAL GRADING APPROVAL AND/OR FINAL RELEASE OF SECURITY, - z AUGUST 10, 1912. spillage. Contractor shall store these products where they will stay dry out of the 1635 S RANCHO SANTA FE RD w c 39726 m rain. Contractor shall provide secondary containment for all fuel stored on-site. AN AS-GRADED CERTIFICATION SHALL BE PROVIDED STATING: 'THE GRADING E. EROSION CONTROL SUITE 204 P Y UNDER PERMIT N0. 675-G HAS BEEN PERFORMED IN SUBSTANTIAL * Exp. 12/37/09 � CA 92025 CONFORMANCE WITH THE APPROVED GRADING PLAN OR AS SHOWN ON THE SAN MARCOS, s e * Eliminate or reduce pollution of storm water from stockpiles kept on-site. ATTACHED AS-GRADED PLAN. THIS STATEMENT SHALL BE FOLLOWED BY THE 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT RUEBEN MEHREN AT (760) 510-3152 r9rF clvk\- Stockpiles may include soil, paring materials, asphalt concrete, aggregate base, DATE AND SIGNATURE OF THE CIVIL ENGINEER WHO CERTIFIES SUCH GRADING (858) 756-0801 (24 hour No.) ENG. JOB No. 5970-MEHREN OF C etc. Stockpiles shall be located away from concentrated storm water flows and OPERATION. 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE ,12UIIr'r storm drain inlets. Stockpiles shall be covered or protected with soil stabilization AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY A measures and provided with a temporary sediment barrier around the perimeter at B. NOTIFICATIONS MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO /' B g Ln all times. N FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS 1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITY PIPES AND EMINENT. / - ����' v O Training STRUCTURES SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF (�L/1� �Q G�,,� y, D L N Tu- �i�1 VAS AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO 3. DEVICES SHOWN ON PLANS SHALL NOT BE MCVED OR MODIFIED WITH OUT THE cn * Contractors' employees who perform construction in the City of Encinitas shall EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS, HOWEVER: THE APPROVAL OF THE ENGINEERING INSPECTOR. OWNER'S CERTIFICATE 0 E 2 < Q be trained to be familiar with the City of Encinitas storm water pollution control CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO o� p C) requirements. These BMP notes shall be available to everyone working on site. The PROTECT ANY EXISTING UTILITIES OR STRUCTURES LOCATED, AT THE WORK 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO IT IS AGREED THAT FIELD CONDITIONS MAY REQUIRE CHANGES TO THESE PLANS. y G:) ➢ 1-5 0 SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH Z z u7 � property owner(s) and the prime contractor must inform subcontractors about RUN-OFF PRODUCING RAINFALL. Y H N O FOLLOWING OWNERS OF SAID UTILITIES OR STRUCTURES PRIOR TO ANY IT IS FURTHER AGREED THAT THE OWNER ➢ ��0 storm water requirements and their own responsibilities. (DEVELOPER) SHALL HAVE A < EXCAVATION, FOR VERIFICATION AND LOCATION OF UTILITIES AND REGISTERED CIVIL ENGINEER MAKE SUCH CHANGES, ALTERATIONS or ADDITIONS 1 S m O Cr- NOTIFICATION OF COMMENCEMENT OF WORK. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL TO THESE PLANS WHICH THE CITY ENGINEER DETERMINED ARE NECESSARY FOR J Waste Management MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED AND DESIRABLE FOR THE PROPER COMPLETION OF THE IMPROVEMENTS. GRADING OPERATION OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. m K m SANTA FE R. ; z * Contractor shall be responsible for properly disposing of all waste and unused A. SEWER - (760) 633-2770 - CARDIFF SANITATION I HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER or GEOLOGIST HAS BEEN s o O construction materials. Dumping of unused or waste products on the ground, 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY or WILL BE RETAINED TO SUPERVISE OVER ALL GRADING ACTIVITY AND ADVISE 7 Z where water can carry them into the conveyance system is strictly prohibited. B. GAS & ELECTRIC - (800) 227-2600 - SDG&E. PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHEN IMPOUNDED OF THE COMPACTION AND STABILITY OF THE SITE. WATERS CREATE A HAZARDOUS CONDITION. <" oXQ 0 * No seepage from dumpsters shall be discharged into C. WATER - (800) 227-2600 - SAN DIEGUITO WATER DISTRICT W N 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN F°" ��`� p DR. :'- stormwater. Berms/dikes shall be placed around dumpsters SHALL BE INCORPORATED HEREON. a 7 O � D. TELEPHONE - (800) 227-2600 - PACIFIC BELL �" to divert the natural storm runoff. Dumpsters shall be checked frequently for SIGNED: DATE: l2 2G 07 leaks. Dumpster lids shall remain closed at all times. Dumpsters without lids shall E. CABLE TV - (800) 227-2600 - DANIELS CABLE. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE E RUEBEN EN SITE n cn be placed within structures with impervious roofing or covered with tarps in order FACE OF SLOPE AT THE CONCLUSION OF EACH WORK DAY. VICINITY MAP to avoid rain contact with any trash material. ��� 1 DATE:- 2 2 O o 2. CONTRACTOR SHALL NOTIFY THE CITY ENGINEER'S OFFICE 48 HOURS 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT SIGNE . d7 NOT TO SCALE z * Man construction materials, including solvents, water-based paints, vehicle PRIOR TO BEGINNING ANY WORK ON THIS PROJECT. PHONE:(760) 633-2770. THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY JAMIE ANN MEHREN THOMAS BROWS, PAGE 11161-D2. fluids, broken asphalt and concrete, wood, and cleared vegetation can be recycled. FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL w LL_ Non-recyclable materials must be taken to an appropriate landfill or disposed of 3. THE CONTRACTOR SHALL GIVE 24 HOURS NOTICE ON CALLS FOR BE REMOVED AFTER EACH RAINFALL. U Q INSPECTION. PHONE:(760) 633-2770. ALL WORK PERFORMED WITHOUT as hazardous waste. For information on disposal of hazardous material, call the BENEFIT OF INSPECTION WILL BE SUBJECT TO REJECTION AND CD ~ Hazardous Waste Hotline toll free at (800) 714-1195. For information on landfills REMOVAL. EFFECTIVE COVERAGE OF GRADED DSLOPES E(90% COVERAGE) PRIOR IDTO * EARTHWORK THE OPINION OF EARTHWORK QUANT177ES SHOWN ABOVE ARE L! Cn and to order dumpsters call EDCO at (760) 436-4151. UNADJUSTED GROSS VOLUMES AND DO NOT INCLUDE THE EFFECTS OF NOVEMBER 15th THE. SLOPES SHALL BE STABILIZED WITH PUNCHED STRAW � INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND CUT = 800 C.Y. FILL = 0 C.Y. EXPORT = 800 C.Y. SCARIFYING, OVER EXCAVATION, RECOMPACRON, SHRINKAGE, SUBSIDENCE Q O OR OTHER FACTORS AND ARE SUBJECT TO FIELD COND1110NS THAT MAY Pollutants shall be kept off exposed surfaces. Place trash cans and recycling ENVIRONMENTAL DATA CONSERVATION.OL HANDBOOK OF THE STATE OF CALIFORNIA DEPARTMENT OF BE SPECIFIED IN THE PRELIMINARY SOILS REPORT AND ARE FOR Q z receptacles around the site. REFERENCE AND PERMITTING FEE PURPOSES ONLY O Q O � * Portable toilets must be in good working order and checked frequently for leaks. * EARTHWORK QUANTITIES ARE CALCULATED ON A THEORETICAL BASIS SINCE THE CIVIL ENGINEER CANNOT CONTROL THE EXACT METHOD OR Contractor shall provide secondary containment and locate portable toilets away 1) STEEPEST EXISTING NATURAL SLOPE ON-SITE = 43.6% AND ARE UTILIZED FOR PERMIT AND ENVIRONMENTAL PURPOSES ONLY. MfANS USED BY THE CONTRACTOR DURING GRADING OPERATIONS, NOR O Cn from storm drain inlets on pervious surfaces. 2) MAXIMUM VERTICAL DEPTH OF CUT = 5.5' ACTUAL QUANTITIES MAY VARY DUE TO UNFORESEEN LOSSES, CAN THE CIVIL ENGINEER GUARANTEE THE EXACT SOIL CONDITIONS OVER 0 LO SHRINKAGE AND/OR SWELLING FACTORS. THE EN77RE SITE, THE CIVIL ENGINEER ASSUMES NO RESPONSIBILITY FOR :'- * All construction debris shall be kept away from the street, gutter, and 3) MAXIMUM VERTICAL DEPTH OF FILL = 0' FINAL EARTHWORK QUAN7I71ES and clean u Contractor must routinely check P L ORKS SAN DIEGUITO WATER DISTRICT ENCINITAS FIRE DEPARTMENT PARKS AND RECREATION and clean up material that may have traveled away from construction site 4) AVERAGE DEPTH OF CUT = 800 x 27 =9391 = 2.3' ENGINEERING � Storm water Pollution Control BMP Notes Relative to Construction Activities 5) AVERAGE DEPTH OF FILL = 0 x 27_ 9391 = 0' / S I u 9 l e S o u f c e 0 e V e l o I l m e o l C o u S u l l a u l Q 1l-ZL-o 1635 S. RANCHO SANTA FE #204 z APPROVED PY D TE APPRO ED BY DATE i oo'a - /�/27�07 O d SAN MARCOS, CA. 92078 (n (SIGN RE EXPIRES 2 YEARS AFTER DATE) APPROVED BY DATE APP VED BY DATE (760) 510-3152 Ph / (760) 510-3153 Fax . . REVISIONS APPROVE DATE REFERENCES DATE BENCH MARK SCALE PLANNING & BUILDING APPROVALS CITY OF= ENCINITAS ENGINEERING SERVICES DEPARTMENT DRAWING NO. w �S Cn • � * 9 30 CITY OF ENCINITAS CONTROL POINT PLANS iPREPA ED UNDER SUPERVISION OF RECOMMENDE ,cyM• APRi�QV n