2005-9327 G C I T Y O F -- E N C I N I T A S - ENGINEERING SERVICES DEPARTMENT 505 S. VULCAN AVE. ENCINITAS, CA 92024 GRADING PERMIT PERMIT NO.: 9327GI PARCEL NO. 254- 112 -8500 PLAN NO.: CASE N 02062 / CDP JOB SITE ADDRESS: 1348 HYMETTUS APPLICANT NAME ANITA AND JAMES LA BELLE PHONE NO.: 760 -943 - 1079 MAILING ADDRESS: 1348 HYMETTU A V E NU E CITY: ENCINITAS STA ZIP: 92024 - PHONE NO.: 760 - 943 - 1079 CONTRACTOR OWNER - BUILDER LICENSE TYPE: LICENSE NO.: PHONE NO.: 858- 566 - 0626 ENGINEER FLORES LUND CONSULTANTS PERMIT ATE: 0 PERMIT EXP. DATE: 7/07/0 PERMIT ISSUED INSPE TOR: MIKE VALLES ---- PERMIT FEES & DEPOSITS -------"'---------- -- .00 2. PLAN CHECK DEPOSIT: .00 1. PERMIT FEE .00 5. PLAN CHECK FEE . 3. INSPECTION FEE 2,170 ,00 6. SECURITY DEPOSIT 43,391.00 7. FLOOD CONTROL FEE : .00 8. TRAFFIC FEE 00 --------------- ---- - - - - -- DESCRIPTION OF WORK -- ---- - -- ---------------------- GRADING PERMIT ISSUED TO VERIFY PERFORMANCE OF GRADING AND DRAINAGE IMPROVEMENTS W.A.TNCSH. P CONTROL PLAN. LETTER PER W.A DATED JUNE 13, 2005 APPLIES. DATE -- - - - - -- INSPECTOR'S,SIGNATURE - --- ---- INSPECTION - - ----- INITIAL INSPECTION 7 Zfi -c) S" COMPACTION REPORT RECEIVED © �� ENGINEER CERT. RECEIVED ' ROUGH GRADING INSPECTION L� FINAL INSPECTION ----------------------------------- I HEREBY ACKNOWLEDGE THAT I HAVE READ THE APPLICATION AND STATE THAT THE INFORMATION IS CORRECT AGREE TO THE PROVISIONSRANDACONDITIONS S T AT E LAWS REGULATING OF ANY PERMIT ISSUED PURSUANT TO THIS APPLICATION. �o D 4J GNATURE DAT IGNED PRINT NAM TELEPHONE NUMBER 1) 'A VATm Z (1TT.TT.'A ` ATE PROJECT NO. ~ PROJECT LOCATION REPORT FIELD CONTRACTOR OWNER WEATHER TO 4' PRESENT AT SITE SUMMARY OFINSPECTION: Ag GEOPACHWA _ ' SIGNATURE ~"=.~~~,~~~,_____ CONSULTANTS _ TEL: (760)72l-5488 { ) FAX: (760)72]'5539 COPIES TO: 3O6O INDUSTRY ST.. SUITE lO5 {}CEANSDE'CA92O54 Geotechnical ® 1384 Poinsetta Ave., Suite A Environmental Vista, CA 92081 -8505 (760) 599 -0509 FAX (760) 599 -0593 Materials EK, INCo August 8, 2005 Project No: 2668SD3 Jim and Lynn LaBelle 1348 Hymettus Avenue Encinitas, California 92024 Subject: Report of Testing and Observation Services During Earthwork Construction 1348 Hymettus Avenue Encinitas, California 92024 References: 1. Geotechnical Evaluation for Proposed Residential Guesthouse and Garage, 1348 Hymettus Avenue, Encinitas, California, Prepared by GeoTek, Inc., dated August 30, 2004. 2. Addendum Geotechnical Report for Proposed Residential Guesthouse and Garage, 1348 Hymettus Avenue, Encinitas, California, Prepared by GeoTek, Inc., dated March 21, 2005. Dear Mr. and Mrs. LaBelle: In accordance with your request, we have performed geotechnical observation and testing during slope construction and building pad preparation for the areas of proposed residential development at the subject project. These services were performed by a representative of this firm who was on site when requested by the client on July 27 and 28, August 1, 2, 4, and 5, 2005. Fill Slope Construction A keyway for an approximately 6 -foot high fill slope in the western portion of the site was constructed in accordance with the recommendations of the referenced soils reports. The bottom of the keyway was observed to extend a minimum of one (1) foot into suitable formational materials comprising the Terrace Deposits. The exposed keyway bottom was scarified and moisture conditioned prior to placement of select onsite soils that were utilized as compacted fill. The results of our field and laboratory testing indicate that the fill materials were compacted to at least 90 percent relative compaction as determined in accordance with ASTM Test Method D 1557 -00. ARIZONA CALIFORNIA IDAHO NEVADA Mr. and Mrs. LaBelle 8/8/2005 Report of Testing and Observation Services Project No: 2668SD3 1348 Hymettus Avenue Page 2 of 3 Subgrade Preparation for Proposed Building Pads Undocumented fill soils within the proposed building pad areas were removed until relatively competent Terrace Deposits were exposed. The approximate depths of these removals were on the order of 3- to 4 -feet belt vv existing site grades. Upon completion of removal of unsuitable materials in the building pad areas, a cut -fill transition at the proposed subgrade elevation existed. The upper one (1) foot of formational materials in the cut portion of the building pads was over - excavated. Compacted fill materials were then placed in the over - excavated areas until finish pad grades were reached. The exposed removal bottoms were scarified and moisture conditioned prior to placement of compacted fill. The results of our field and laboratory testing indicate that the fill materials were compacted to at least 90 percent relative compaction as determined in accordance with ASTM Test Method D 1557 -00. The results of our field density testing are as follows: Moisture Test Dry Soil Max. Test Relative No. Location Elevation Content Density Type Density Type Compaction (0) 1 Slope Area 84 9.1 124.2 A 136.0 N 91 2 Slope Area 85.5 9.5 122.6 A 136.0 N 90 3 Slope Area 86.5 7.2 125.3 A 136.0 N 92 4 Slope Area 88 8.1 125.9 A 136.0 N 93 5 Slope Face 86 8.4 124.6 A 136.0 N 92 6 Lower (west) 92 8.1 124.0 A 136.0 N 91 Building Pad 7 Lower (west) 93 (FG) 7.0 124.7 A 136.0 N 92 Building Pad 8 Upper (east) 95 8.7 127.9 A 136.0 N 94 Building Pad 9 Upper (east) 96 (FG) 9.2 126.3 A 136.0 N 93 Building Pad Soil A is generally described as a silty sand with an optimum moisture content of 7.5 percent as per ASTM D1557. Based on our observations and testing, it is our opinion that the subgrade for the areas of proposed residential development has been prepared in general accordance with the recommendations of our referenced geotechnical reports. The recommendations contained in our referenced geotechnical reports remain applicable to the project and are included by reference herein. It should be noted that during the foundation excavation phase of construction, deepened foundation excavations may be necessary to allow for the foundations to bear entirely on relatively dense materials comprising the Terrace Deposits. As such, we recommend that a IH� Mr. and Mrs. LaBelle 8/8/2005 Report of Testing and Observation Services Project No: 2668SD3 1348 Hymettus Avenue Page 3 of 3 representative of this office observe the foundation excavations prior to concrete placement to check that they extend to adequate bearing materials. We appreciate the opportunity to be of service on this project. If you should have an , ," , ". �pF E S SloN please do not hesitate to call our office. �o Mo lF Respectfully Su I w Res y P Y �,�.�, � - , No. 2468 � GeoTek, Inc ,� x ,�.r� �� ��_ Exp. 12/31�hf " Y +. `r CFO P, CAO Jefdy Blake, J. DeRisi William R. Morrison, CEG 2248, Exp. 10/31%(' Staff Geologist GE 2468, Exp. 12/31/06 , eotechnical Department Manager Senior Engineer Enclosure: Fig 1 — Field Density Test Location Plan Distribution: (3) Addressee WProjects\Projects 2000 to 2999\Projects 2650 to 2699\2668 LaBelle Res \T &O report.doc IH- NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText NoText