Loading...
2004-9080 I (Plans) LEGEND P TO BE DONE IMP ROVE) E- PLAN FOR THE CONSIST OF THE FOLLOWING WOIFK TO BE 60 ACCORDING TO TH HE iix E SPECIAL PROVISIONS, MID TH FOLLOWING S T D DWG Y BO SPECIFICATIONS OF THESE PLANS AND STANDARD DRAWINGS: T LJ.�G STANDARD 5PECIFICATIONS AST WATER _ DC NE U -SAN EL130AVENUE 1. 'GREENBOOK' STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION (2000 EDITION), EXIST SEWER UNE - -- EE ' Z~ CALIFORNIA DEPARTMENT OF TRANSPORTATION. 'MANUAL OF TRAFFIC CONTROLS FOR COISISTRUCTION AND " EXIST TELEPHONE - -- 7 &WNTENANOE WORK ZONES." (139.8 EDITION,). EXIST CAS MAIN X; 3 STATE OF CALIFORNIA STANDARD SPECIFICA11ONS -JULY 1592. EXIST STORM DRAIN s sp s Ta EXIST CONTOURS `-- 495 -�-- aE SAN DIEGUITO WATER OiSTRiCT STANDARD SPEgF7CATJ0AiS. EXIST RIGHT-OF-WAY LINE - PROPOSED RIGHT -OF -WAY LIME DRAWNGS ��..; PROPOSED CONTOURS Go 1. COUNTY OF SAN WOO REGIONAL STANDARD DRAWINGS -J=ULY GRADED SLOPES - 2. STATE OF CALIFORNIA STANDARD PLANS -JULY 1092. - - - 3. SAN DiEGU110 WXILK DTSiKILA STANDARD PLANS. < S11 PROPOSED SPAT ELEVATIONS .. BLVD. ° _.- - -- - -- DAYLIGHT UNE -! �+ ► ..J1 h �+1 - - SAL HOTS - - - - - Q Of o COLD PLANE AND AC OVERLAY (5 WIDE) IsEE OQ1. !TOTE 3 1. A PERMIT SHAM BE OBTAINED FROM TW ENCINTTAS ENGINEERING SERACES DEPARTMENT FOR ANY WORK WM04 THE STREET � s s RIGHT -OF- WAY. <. +4 AC O_ VER 6 CLASS 11 BASED f 3. THE STRUCTURAL;ECTION SMALL K iN ACCORDANCE WITH CITY OF ENCIINi R TAS STANDARDS. VALUE PESTS SHALLL IBE iIEQURED PRIOR TO �s n ': S21 I _ CONCRETE DRIVEWAY 9 EN ND� CONSTRUCTION. � �- 3. APPROVAL OF THESE NPROVEIMMT PLANS AS SHOWN DOLES NOT CONSTITUTE APPROVAL OF ANY CONS1RUCTM OUTSIDE THE PROJECT tQUNDrRY. � 4 N 1NiTA ti E C S UNDERGROUND ND U11 WITHIN THE STREET RIG 4. ALL U UTILITIES fTH E HT-OF -WAX SHILL BE CCNSIAIlCTED. CONNECTED AND Pl?!QS TO � U i - CONSTRUCTION OF BERM, CURB„ CROSS GllTIEEi ARID PAYING. - - _ -- - - - -- _ - - - - PROJECT ..: SATNTA FE OR. OCAT�ON' s ,kTtiq; 5. THE EXISTENCE AND LOCATION OF EXISTING UNDERGROUND FACIUTTES SHOWN ON THESE PLANS WERE OBTAMNED BY A SEARCH OF THE - AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO OTHER EXISTING FACILITIES EXCEPT AS SHOWN ON THESE PLANS. 9 APO HOWEVER, THE CONTRACTOR 15 REQUIRED TO TAKE PRECAUTIONARY MEASURES TO PROTECT ANY a<xlsTlrG FACILITY I:INOwN HEREON AND 9.37 Ml x, 2 - SAN 'DIEGO REGIOtVAt STANDARD DRAWINGS ANY OTHER WHICH IS NOT OF RECORD OR NOT MOWN ON THESE PLANS. 16 gg F S. LOCATION AND ELID AT10N OF *01"tOVEhellS TO BE WET BY WORK TO BE DOW STALL BE CON IRMED 18Y FIELD MEASUREMENTS PRIOR TO � IRMINGHAY v � C � DRAWING N0, I)ESCRlPTION CONSTRUCTION OF NEW WORK. CONTRACTOR WILL MAKE EXPLORATORY EXCAVATIONS AND LOCATE EXISTING UNDERGROUND FACILITIES '� C-3 CURB AND ;SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS i0 PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION) OF p SORSID EXISTING FACILITIES. 5 7. THE CONTRACTOR SHALL NOITM'Y SAN OTECO CAS AND ELECTRIC COMPANY PRiOR TO � WORK NEAR iCOfvIPANY FACILITIES AND SHALL � ,( COORDINATE HIS /HER WORK WITH COMPANY REPRESENTATIVES. NOTICE: ALL ELECTRICAL AND GAS SERVICES WITHIN THIS PROJECT ARE `UNDERGROUND INSTALLATIONS'. <. FOR LOCATION OF ELECTRICAL CABLES AND GAS PIPING AND APPURTENANCES CONTACT THE SAN DIEGO SAN GAS do ELECTRIC COMPANY. TELEPHONE: (BOO) 422 -4133 ELD - - -- 0. -- THE CONTRACTOR SHALL -NOTIFY PACIFIC BELL PRIOR TO STARTING WORK NEAR COMPANY FACIUTIES AND 5HALL COORDINATE UjHER WORK SZi WITH COMPANY R.EPRE$EAlTAT1YE$.. ;; ---------- -NOTICE: ALL TELEPHONE SERVICES WITHIN THIS PROJECT BOUNDARY_ ARE 'UNDERGROUND INSTALLATIONS'. - - - - -- - - - -- - - -- - - - - -- -- - - OR I OCAT1 N OF CABLES AND APPS COAITACT PACIFIC BELL ULEPHOUL (800) 422 -4133 , iE iT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER TO CONTACT IHE UTILITY AGENCIES ADVISE THEM OF IME PROPOSED IMPROVEMENTS. VICINITY MAP OW NME ADDR : - AND BEAR THE COST OF RELOCATIONS, IF DEEDED. - - -- - NNO SCALE - - - --- 1QMBERLY JUDTTR bINZOMU LK 1G_KFiAS OWNER - VACANT LOT _ 10. ALL TELEVISION CERVICES WMW THIS PROJECT ARE * UNDERGROUND IINSTALLATIONS'. FOR LOCATION OF CAMMS AND APPURTENANCES CONTACT (800) 422 -4133. CA ANCHORAGE AVE SAN EUJO AVE CRLSBAD, CA 92011 ENCINITAS. CA 92007 1 4.-M ASMI -BE ADONE VWIL -fDt 3TM POWER -ARE MOCATED IXYP IDE -THE 41tEAS -TO H9E SAVED. OWNER'S CERTIFICATE ASSESSOR'S PARCEL NO.: _ 12. TFTE CONTRACTOR S 1XL REQUEST FRM THE EFUINEERRNG SERVICES DEPAK I ML jT A PREP MEETiNG AND SKILL PROWDE AT iIPN: Z60- b2o -54 LEAST 48 HOURS OF NOTICE FOR SUCH A MEETING. PHONE NUMBER 633 -2770. 1 HEREBY AGREE TO COMMENCE WORK ON ANY IMPROVEMENTS SHOWN ON THESE PLANS WITHIN EXISTING CITY RIGHT -OF -WAY WITHIN 60 _ 13. THE l7EVEL'OPER SHALL BE RESPONSIBLE THAT ANY MONUMEFIT OR RENCH NARK WHICH iS DMURM OR DESTROYED SHALL BE DAYS AFTER ISSUANCE OF THE CONSTRUCTION PERMIT AND TO PURSUE R E- ESTABLISHED AND REPLACED BY A REGISTERED CIVIL ENGINEER OR A LICENSED LAND SURVEYOR. COMPLETED, IRRESPECTIVE AND INDEPENDENT OF ANY OTHER WORK L EGAL DESCRIPTION: 14. THE DEVELOPER SHALL MARK THE LOCATION OF EACH SEWER LATERAL AND WATER SERVICE BY CHISELING THE LETTERS `S" AND `W", ASSOCIATED WITH THIS PROJECT OR UNDER MY CONTROL - RESPECTIVELY, 2 INCHES HIGH INTO THE FACE OF THE CURB. I E NORTHWESTERLY ONE -HALF OF THE SOUTHWESTERLY ONE -HALF (SAID - - DIMENSIONS BEING MEASURED ALONG THE SOUTHEASTERLY AND SOUTHWESTERLY 15. THE ADDRESS OF EACH LOT SHALL BE PAINTED ON THE CURB IN A MANNER AND LOCATION APPROVED BY THE INSPECTOR LINES) OF THAT PORTION OF THE NORTHWEST QUARTER OF SECTION 22, TOWNSHIP ' 13 SOUTH, RANGE 4 WEST, SAN BERNARDINO MERIDIAN, IN THE COUNTY OF SAN y IC ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (LATEST EDITION), THE �l� �� - ( DIEGO, STATE OF CALIFORNIA. ACCORDING TO UNITED STATES COYERNItdENT $lJKYEX - SAN DIEGO STANDARD SPECIAL PROVISIONS TO THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (ADOPTED BY THE SAN KIMBERLY JUDITH SINSHEIMER ALXHAS, OWNER DATE APB 10. 1881. DESCRIBED AS FOLLOWS: DIEGO REGIONAL STANDARDS COMMITTEE), AND THE SAN DIEGO REGIONAL STANDARD DRAWINGS (LATEST EDITION). 867 ANCHORAGE AVE DEO1fiQNRNG M THE INTERSECTION OF THE WESTERLY PROLOINOATTOFI OF TM 140RTF1 - - - - CARLSBAD, CA 92011 - - t - - =BOUNDARY LINE OF CARDIFF VILLA TRACT, ACCORDING TO THE MAP THEREOF NO. P4 (760)518 -0020 1469, FILED IN THE OFFICE OF THE RECORDER OF SAN DiEGO COUNTY, AUGUST 10, ' 1912, WITH THE NORTHEASTERLY LINE OF THE COUNT) HIGHWAY ROUTE 1, DMSiON SAN DIEGVIM WATER DISTRICT NOTES 1; THENCE NORTH 31 DEGREES 28 WEST ALONG THE SAID HIGHWAY LiNE 213.03 - -- - - TfEET TO THE BEGINNING OF A CURVE CONCAVE TO THE NORTHEAST HAVING A - - RADIUS OF 1275.82 FEET AND A CENTRAL ANGLE OF 08 DEGREES 01'00'; THENCE 1. REVIEW OF THIS PLAN BY SAN DEGUITO WATER DISTRICT DOES NOT CONSTITUTE REPRESENTATION AS TO THE [NORTHWESTERLY ALONG SAID CURVE 178.49 FEET; THENCE TANGENT TO SAID CURVE ACCURACY OF, THE LOCATION OF, OR THE EXISTENCE OR NON - EXISTENCE OF, ANY UNDERGROUND UTiUTY, PIPE OR Ac s ASPHALT CONCRETE BCR s BEGIN CURB RETURN 23 DEGREES 27'00' WEST, 412.59 FEET TO THE TRUE POINT OF BEGINNING; - k STRUCTURE WITHIN THE LIMITS OF THIS PROJECT -- PVMT s PAVEMENT ECR s END CURB RETURN THENCE CONTINUING NORTH 23 DEGREES 27'00" WEST, 100.04 FEET; THENCE NORTH PCC s PORTLAND CEMENT CONCRETE (72ASS) s EXISTING ELEVATION 66 DEGREES 48'00' EAST, 398.71 FEET; THENCE SOUTH 23 DEGREES 12 EAST, LIP s GUTTER UP - PCR POINT OF REVERSED CURVE 100.04 FEET; THENCE SOUTH 66 DEGREES 48'00" WEST, 398.27 FEET TO THE TRUE 2. ALL EXISTING FACILITIES, WHICH MAY AFFECT FINAL DESIGN, I.E., LiNE CROSSING, LiNE PARALLELING OR PROPOSED X--GTR CROSS GUTTER (R) s RADIAL BEARLUG POINT OF BEGINNING. CONNECTION SHALL BE FIELD VERIFIED. ALL EXISTING OR PROPOSED UTILITY CROSSING WITHIN 10 ET OF EP s EDGE OF PAVEMENT , +■ VERTICAL FE VERT ` rt ' PROPOSED WATER MAINS UNLESS GIVEN WRITTEN PERMISSION BY SAN DIEGUITO WATER DISTRICT. TC s TOP OF CURB HORIZ, s HORIZONTAL _ FL s FLOWLINE SDRSD s 'SAN DIEGO REGIONAL STANDARD DRAWINGS - INV s PIPE INVERT _ EXIST. EXISTING - - 3- CONTRACTOR AND OWNER ARE RESPONSIBLE TO RELOCATE AND /OR ADJUST TO GRADE ANY EXISTING WATER FACILITY _ TOP OF BERM s REQUIRED S HEET INDEX - (FIRE HYDRANT, METERS, VALVES, VALVE BOXES, ETC.) WHICH IS AFFECTED BY THEIR PROJECT. ALL AFFECTED WATER BC m BEGIN CURB pVCD. s POLYVINYL CHLORIDE (PIPE AS FACILITIES MUST MEET CURRENT WATER AGENCIES' STANDARDS COMMITTEE ASC STANDARDS. iF FACILITIES DO NOT EC s END CURVE PP s POWER POLE ) SHEEP 1 - TITLE SHEET \ MEET STANDARDS, THEN THEY SHALL BE UPGRADED HE OWNER'S EXPENSE - TO CURRENT STANDARDS AT . F'H w FIRE HYDRANT CMP s CORRUGATED METAL PIPE o - -- R/W s RIGHT OF WAY CAg s CRUSHED AGGREGATE BASE SHEET 2 '� PLAN Nt PROFILE -- 4 . tnXffIES TO MAINTAIN MINIMUM 5-FOOT SEPARATION WHEN RARAL.LELMIG WATER SERVICES -- -- - 3T ALT STREET 11CFiT - �ARHM Am ASPHALT 4tUBBERIZED 4IOT4TX , M m ,r 1'00 3. -MINIMUM HORIZONTAL SEPARATION 'OF -10 -FEET REQUIRED BETWEEN FIRE +iYDRANTS AND SAN DIEGO SAS AND - � - - - -- - <- - - - -- -- - DATE - - -- _ - -- - -- ELECTRIC VAULTS. • ENCWITAS RRE DEPARTMENT SAN DIECIUI'TO WATER DISTRICT PARKS AND CATION Fn.MNING FRUBULiC WORKS - 6• _ ALL WATER SERVICES TO 6E CONSTRUCTED CLEAR OF ORNEWAYS AND ALL OTHER TRAVE[..ED WAYS. WATER METERS _ �o REVIEWED W: RENEWED SY: RENEWED 8Y: REVIEWED BY: REVIEWED BY: s ��r ` " MUST BE W FRONT OF THE PARCEL THEY ARE SERVING. - - : m& xm � H��cH & CO MPANY s % - EV. 1 CONSULTING ENGINEERS 4499 RUFFlN ROAD, STE. 300 7 - - - lF V1LF - SAN DIEGO, AL -IFO RNL F US-45" 1 o -DATE. ATU E EXPIRES 2 YEARS FROM DATE ' DA E DATE DATE 4 aFCAU ) - C / C - REVISIONS APPROVED TE REFERENCES _ DATE BENCH MARK SC 6PECIAL DISTRICT A APPROVALS C 7Y OF EE NIIYAS ENGINEERING SERVICES DEPARTMENT DRAWING NO. 1 S- SUiL.T __ _ 9 5 HOslzON ltet, ►ER Duo W FES doss iTAT10N - j -- PLANS PREPARED UNl?ERPERVISlQN OF REC4M ENDED - K APPROV PUBLIC wP &oVEMENZS FI,a: �A+IPROVEMENT SHEET MONUMENT PEAK - -- _ it PER 98 PM HORIZONTAL NSA, �� DATE 07 -19 -06 BY: BY: A _ SAN EUJO AVE 4 9080 -1 CM STA11ON - i0 VMERTICAL R.C.E. NO! _ LL O� PC TT ,p= ELFV. NnszoTS MICHAEL A SIAWSON DATE: ��ZT a►TE: 04 --00 7 PUBLIC IMPROVEMENTS EXP. 12 -31 -115 R.C.E. R.C.E. WORK PROJECT N0. SHEET 1 OF 2 s _ -, PROF ERTY _- 50 0' i- CONC. T M o m EX R/W EX R/W « IN J + v EXIST TC z Z ' Q o w �°`' EXIST Cm 1D o o o a5 p� � l� M co 00 o N EXIST EOP t #� 20 2X tV r _ N _ c � � N � 00 M [V � � O) 8 --�-- o n m oo�a � o °' FLOWLtNE � rn socncaa' °0r WW a, 0) QA t .j Q w�» o� =o�� 00 _ h TOO cv m e MLj +C) °W�� C) No +� o�� +oQwO' 1QO 0 - \ 0.5% 94 Co • c� a o ez _. - - - -- - - -- - - - -- -- 8 28.3' OWY . b - OPENING RET. WALL PE 9080 -G 6" CURB &GUTTER PER G 2 LL E XI LINE RS . SECTION 'A' (TYP1 20 - - s_ - .• TA x+00 30 STA 10+00 4 - o to WIDTH DWY _ _ T_ - 94 - O ,o wztnm 17 + LLJ ��U 0 EX - - 5 EX Rip EX RA + 11 I _ EXIST 10' 10` 30' 0 0 It r` 11 P 12' 14' ' -- -SEE DETAIL "Am p - - - - -- _ _ - U" S1iE1`T -_ -- .- - -- - - -EXIST 18 -- OWY OPENING PROFILE - - - -- - - _ -- - -- - - -- ti - - - -- - - - -- c� r HORIZ: 1 =10' 3 � w 5, 2 • LEFT CURBZEDGE OF PAVEMENT VERT. 1 " = 92 9+00 ID 50 10 10-50 11 00 11+50 �' FOR ON= GRADING SE 9080 -G , APN 2 APN 260 - 620 -54 APN 260- 620 -53 -71 ° a SEE 9080 -G >< SECTION " rrypl NEW BUILDING STA 1 ♦ t -- �� I ° 4 APN 280 - 830 -6i O STA 11+00 o+oo T ♦ 10 +1a:a8 ' USE moot m PROPERT LINE ;I - - NEW T WATER SERVICE - - - WITH WATER METER ♦ CLASS 11 BASE EX R/W STA. 0 +63 PER GRADING PLAN. a EXIST CURB INLET - Qp cw - U - - - LENGTH- iO+12. ♦ J - r X11 - 99 50 S9.SD _ 1� - _ D( RJ1N I _ too -Ex - IE 91.44 SEWER LATERAL ♦ W t w I ` w 3 LF -3 a PVC CONNECTION TO 3 PVC r IE 92.02 • (d w I. 16 - 3 9.34 I I - -- ti 4 I 99.4 OUTLET FROM PE)3F SUBDRNN ca `! rte 3 - PER GRADING LAN h ' _ - - 12' 14 PROPOSED 101 ,�9 v NEW ROW WALL TW 102.3 � PATH ♦ 10 t W 9 .9 ; t I ij 7 A BW 99.3 SEE DETAIL 'A' 9 99.9 3 LF -3 0 e PVC C NNECTION TO 3" PVC c t' EXIST ROW VLUI 3 o P C OUT DETAIL bA' 98.8# &Q 9 56 w- i V - 198.7 % I 1R1tLL 1d1T1M AND R11MIT-CF-WAY a dS J.2 CONC 5' GU DRAIN','VE . EASMENT 0 CITY ;;; gg • Kj8.g6 ENCROACHMENT PERMIT DOC REC D N=: 5' `°� CURB OF NCINITAS PE OCUiAFNT S W WALL TO BE REMOVED AT TIME OF A LL UTIL TO E 10' 12 13' L�-- o ♦ LE. GATE DEVELOPMENT OF APN 260- 620 -53 N G REC. 5' LF -3 - "e , s PVCJ SID ROUND. - i- URB OUTLET 0 3% 8 1'.: a : x a 2 * ��� LF. 2 -3 D 0 29 S 3 PER DRSD D -27' EXIST ROW IN STALLED U - _ � N \ - TO' ROW DEDICATION PER . STA 10+49.02C s as,saF; END CURB Qc +' - DOCUMENT ;1 t`s,l °€ sti i ai ` r i TC 98.89, FL 98.39 POINT J T REC - - ,:: ..- .,s t F , B � s '^ . i" +�" T TEL 3 '° T 16 N :., , . 3 ;. 1,956,50 2.12 - I 1 L . �T, S; i R$ r ` E� T r' j SECTION Cj'� T _ -- • V • / / BEGIN CURB de GUTTER ` 4 4 _ PER SDRSD G -2 „ STA. 10 +47.6. PCR STA i 1 +00 TO STA 11 +50 G (; r t .� � V � C .88 w .. � � ...+ €X R so' cn �. - >- t -9s:r - G 4 HP GAS G (n G G ,.� -,: , R/W , , . � 1� w 1A1 N 195654729( 10+03 AN + / 98.40. �, - •I _ 6• 8734 C 98.46 W .-. wl 12" PVC WA TT j W -W ' 10 _ MEW EASEMENT T 5' COLD CITY OF ENCINITAS PLANE & A CORIGRI" 11r E tI6.4(2 - a RrC) -AS NESSARY FOR SMOOTH OVERLAY SM i iQ# 0 t 1 3 TRANSIT=. 51 +00 CURB DATA TABLE Exlsr � N ?� 0.33 S S S S 11 30 N0. DELTA OR BRG. RADIUS L& H REMARKS GRA DE �� A.C. Itt£FR S S S 6 SEVER 40 SAN E� S • _� SpflsF tot _ - N897844 - - - -- 19.37' 6 CURB GUTTER r PER G- G G G ' G G G 3: HP GAS G G G z 59VO'04 2.00 2.06 4" THICK EOP STA 10 +19.37 I ` � a N3141'13 - - - -- 4.69' FL 98.24 r + N89'18'44 - - - -- 1.39' DG TRAIL 0.50' s 59 i \ - _ ti3'23 200 2 A.D. CLASS 1 . 06 _ ELEC. - OC45 OS7 - EXIST SWR 11H -- s N3 I w W - - , POINT 6 - -- - -- - - -- - - Lt.m 7.8, R- WRLVE& 93 (IE= W.19) PROPOSED CURB & - 6" TER _ CONNECT 7II km A C. 0.33'/A.B.=0.50' W W - I W W W - I j W GUTTER PER G -2 f ! ; W . W T O PER FACEOTE�HR GAOL CITY ENGINEER. & 40 - } r, SA TIS FA CTIO N F ENGINEER. - - -- ----------------- __ - DETAtL A tTYP1 ROW - - - - - -- - -- 10 +33.5 - -- -__ - - _ - O' WIDE 32'28 "_ W 106.25 _ - - - --- _- N 21' _.--�__ -_ _ ao o U.%�NVr E"Fe AEa� 10+12.38 2 -- - LTA 10 +44 T4 STA 1Q + Q (� UJ: ' ail S►ER �+- DWY PER STD - i0 +17.38 G -14, MODIFIED _ - - POC SEWER tAT. 1E 90.181 -POC WATER LATERAL PROJECT CONTROL PT �l (MAIN IE 69.69y) CONNECT TO MAIN SET 60d NAIL D ESIGN NOTE: G1�,p1�iC SCALE - � =� °oo GALCT7.) PROJECT CONTROL PT AS "�1LT N 1,956,414.87 �r,� k_ W I�� & COMPANY - -� ^ - SET 60d NAIL _E 6,243 V ...... VERIFY EXIST LOCATION ' TRENCH R ESulzrXING, N 1 956 513.70 ELLY t3,14 & ELEVATION of EXIST. �0' ?�' W CONSULTING ENGINEERS PER CITY OF ENCINITAS #` 4499 RUFFIN ROAD, STE. 300 L CIV1 ! E 6,243 ,247.44 � r� TELEPHONE ONES SCALE: i i0' � SAN DIEGO CALIFORNIA 92123 STANDARDS. L l TYP 0 TMi - - -- -- - -- - - - - - -- - - - - ( - - - -- ELEV- 97.71 -- - - - -- - - 2 -_ - -- - - ��CALIE� - FH01E (ibi) ii6 -4b4b J VAX (i6!) Md -�64t DgTE O ...... wEr -FLOAT CONIC. s'GGA,tF, PROVIDE ... _ _-- REVISIONS - APPROVED DATE _REFERENCES DATE __ BENCH MARK - .SCALE 6PECIAL DISTPoCT A _ __ _- APPROVAL.6 _ _ _ CITY OF � NCINITAS ENGINEERING 'SERVICES DEPARTMENT �RAW11dG i40. E As -6u1 T PER Ism W) PEA SRS 0"m ! PLANS PREPARED UNDER SUPERVISION OF RECOMMENDED APPROVED �Z PUBUC IMPROVEMEN FOR; IMPROVEMENT SHEET ONUMENT PEAK _- - _ -__ __ APN 260- 620 -54 '90130-1 � 16ATE 07 -i9 -QS BY: _ $Y: A c HORIZONTAL 1 w = O� FYI � D �T es alt Dees srA�r s SAN LIJO AVE jj w r K VERTICAL 1_Z R.C.E. aO I2Z DATE: �T.(rja/_ DATE: 1 � a PG 04 Z UBL[ IMPROVEMENT p= REY • 61=075' MICHAEL A SLAWSON Exp. 1 = R.C.E. R.C.E. WORK PROJECT NO. SHEET 2 OF 2