Loading...
2001-7226 G CITY OF ENCINITAS AP ,r-',ANT-SECURITY DEPOSIT RELEASE Depositor Name: Vendor No. /� Address: G Phone No State Zip DEPOSIT DESCRIPTION: 1. MEMO PROJECT NUMBER 2. RELEASED AMOUNT: $ A. 3. DEPOSIT BALANCE: $ Notes: 142w—� v AUTHORIZATION TO RELEASE: Project Coordinator Date �� 7 Supervisor Date Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROJ. # BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101- 0000 - 218.00 -00 ------ Security Deposit - _ _ _ _ _ TOTAL $ I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPROVED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY DEPARTMENTAL APPROVAL FINANCE DATE OF REQUEST DATE CHECK REQUIRED Next Warrant DATE CITY OF ENCINITAS AP ICANT CURITY DEPOSIT RELEASE Vendor No. Depositor Name: Phone Address: tate Zip DEPOSIT DESCRIPTION: 1. MEMO PROJECT NUMBER 2. RELEASED AMOUNT: �� �✓ 3. DEPOSIT BALANCE: $ Notes: ORIZATION TO RELEASE: Project Coordina or Date AUTH Supervisor Date Department Head Date DEPOSIT BALANCE CONFIRMED: Finance Dept Date GENERAL PROD. # BRIEF DESCRIPTION AMOUNT LEDGER # (25 Characters limit) 101-0000-218.00-00 ------ Security Deposit - TOTALS I HEREBY CERTIFY THAT THIS CLAIM REPRESENTS A APPROVED FOR PAYMENT JUST CHARGE AGAINST THE CITY OF ENCINITAS PROCESSED BY FINANCE DEPARTMENTAL APPROVAL DATE OF REQUEST DATE DATECIIECK REQUIRED Next Warrant ENGINEERING M DESIGN GROUP GEOTECHNICAL. CIVIL. STRUCTURAL & ARCHITECTURAL CONSULTANTS FOR RESIDENTIAL & COMMERCIAL CONSTRUC 2121 Montiel Road, San Marcos, California 92069 • (760) 839 -7302 • Fax: (760) 480 -7477 - E -mail: ENGDG @aol.com HYDROLOGY STUDY ROWDEN RESIDENCE ENCI CA r is4 rs� r l r 7f `i Date 1 Job No: 012575 -5 Project Name: Rowden Residence Date: 8 -10 -2001 ' Project Number: 012575 -5 Page: H1 ' PROJECT: Rowden Residence, a proposed single family residence to be located on Guidero Way, Encinitas, CA; A.P.N. 256- 152 -39 ' WATERSHED LESS THAN .5 SQUARE MILE: For an area of this size, the rational method is utilized. ' Q = CIA (Rational Method) ' C =.55 (Urban - Single Family, Soil Group D, Sheet H7) 1 100 = 3.74 (Per sheet 1­14) ' A = Approximately 0.23 ACRE (On -site Tributary Source) ' Q = CIA = (0.55)(3.74)(0.23) = 0.47 CFS SAY 0.50 CFS Note: No off -site tributary sources CONCLUSION: ' Per analysis, the area drain system shall use 6 inch SDR -35 drain pipe placed at 2.0% minimum slope to an on -site rip rap energy dissipator. See attached computer analysis for storm drain pipe sizing and associated analysis. ' (See sheets 1­12 -1­13) t ' Woe1file on mainWOBS15 JOBSIDRAIN1011012575, ROWDEN RESIDENCE.wpd NZ 1 Area Drain System ' Worksheet for Circular Channel ' Project Description Project File c: \haestad \fmw \rowden.fm2 ' Worksheet Area Drain System Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data ' Mannings Coefficient 0.009 Channel Slope 0.020000 ft/ft Diameter 6.00 in ' Discharge 0.50 cfs ' Results Depth 2.8 in Flow Area 0.09 ftZ ' Wetted Perimeter 0.75 ft Top Width 0.50 ft Critical Depth 0.36 ft ' Percent Full 46.20 Critical Slope 0.005032 ft/ft Velocity 5.64 ft/s ' Velocity Head 0.49 ft Specific Energy 0.73 ft Froude Number 2.36 ' Maximum Discharge 1.23 cfs Full Flow Capacity 1.15 cfs Full Flow Slope 0.003806 ft/ft Flow is supercritical. 1 08/14/01 FlowMaster v5.15 ' 09:44:38 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 N3 Area Drain System Rating Table for Circular Channel Project Description Project File c: \haestad \fmw \rowden.fm2 Worksheet Area Drain System Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Constant Data Mannings Coefficient 0.009 Channel Slope 0.020000 ft/ft Diameter 6.00 in Input Data Minimum Maximum Increment Discharge 0.46 0.56 0.02 cfs Rating Table Discharge Depth Velocity (cfs) (in) (ft/s) 0.46 2.6 5.52 0.48 2.7 5.58 0.50 2.8 5.64 0.52 2.8 5.70 0.54 2.9 5.75 0.56 3.0 5.80 08/14101 FlowMaster v5.15 09:44:20 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755 -1666 Page 1 of 1 .:J O O 4- O C O •'- y � � 1 U I Y 1st C r N 4-1 O) 460 412 u a c- cl C a 1 L C C u 3Z cz •- d O Is N 4- O •r- CJ to r„ S_ L r C C C O C v N 4-3 'r V1 i•-1 •O G) O d b Z �d � a Fy ' N G tf- V-• O C T * 47 4-J O N u= E ^ v C '0 L N 4J O 4-11 W b C C O a N J N C i 3 O C 4 _ O co C ' •- N N~- �b 4j S- O O O N� p S 1 P C C. 4>t `0 O < <O r C to - N O E= 0O +J W 4 C) C 4J C i rL 4j 4� 4-J L C ' b C L. r •0 O r r r Q) r cn 04 V O O L C u = CL •�•'• r 1 1 - • - L tc (u U r r •r O O .�•.• C I - l r r r- � U L � U U -c � ]J � r--• N O U E d r — r a s i - r• L 4-J 113 L E 1 J J - =� J 'C v) Q +� u u._ a — , S ' OusO v o,r o LO O t) o N l0 V: IT Q ) M N N r r--- LAI /7 LO ' - - - - - - -A - - �� _'1 -.ter -- — - L- Z•� ?- av- -' -- =- ---- '-- -i-— ch ' uj Z %0 •.4 C 7** CD �• v a' i.. e a.1 7 ' '. — — 1 : 1 I 1 i 1 ' 1 + � + ' 1 i I. 1 + n 1- �O p 1 ' N W ( i 1 '• � � � t l I I i i. 1 I ..III,. ,1 li I I t ' eR J 1.1 d •�i -4 04 wi J w .� r1 r w% APPE14DIX XI IV- -14 :o y �\ cm 77Z `e i �o• N o Elm —W z Lr3 �� - 4/ �/1 N N 71 UN N CV CN CD C O w l .... t!! / z F= it O W W F W C:d 'm_ z cm z O/ V Q ti O v Y Z "Y. U z o o (L. - J f co Y < ' Z u_ J e a U U N C M a. 7 w LL. D y � O uw 0 uj p u ~ V _ , Ic cc < Cc D z 9 CA O F m_ ' J W Ci_- _ � z q J u r a 11-A-7 N( /� , A ow 1 4 r CD ca CN cm LLJ CN P si. � � ,L � ,v �J t � �\ • <_ ( � ��� J'_ � � !� � ��o Lam! � 1 .' I v J o t CD �= o y ra tb } Y•y ' � I f I � X .J Ci G N i o o N 2u ` Q w O p u �'- C: M 1 z < O M F N < u ' H�7 ' RUNOFF COEFFICIENTS (RATIONAL METHOD) ' DEVELOPED AREAS (URBAN) Coefficient. C Soil Group ' Land Use 9 I f. Q ' Residential: Single Family .40 .45 .50 8— La�i_�evp'-c V ' Multi -Units .45 .50 .60 .70 Mobile Homes .45 .50 .55 .65 ' Rural (lots greater than 1/2 acre) .30 .35 .40 .45 ' Commercial '" 80% Impervious .70 .75 .80 .85 ' Industrial 12' 90% Impervious .80 .85 .90 .95 1 ' NOTES: (') Soil Group maps are available at the offices of the Department of Public Works. ' (2) Where actual conditions deviate significantly from the tabulated imperviousness values of 80% or 90%, the values given for coefficient C, may be revised by t multiplying 80% or 90% by the ratio of actual imperviousness to the tabulated imperviousness. However, in no case shall the final coefficient be less than 0.50. For example: Consider commercial property on D soil group. ' Actual imperviousness = 50% Tabulated imperviousness = 80% t Revised C = 50 x 0.85 = 0.53 80 ' IV -A -9 APPENDIX IX Updated 4/93 EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 (619) 258 -7901 Fax 258 -7902 Mr. Mike Rowden November 6, 2003 2352 Altisma Way Project No. 01- 1147C5(D) La Costa, California 92009 Subject: Final Report of Field Density of Tests Proposed Single- Family Residence West Terminus of Guidero Way, APN 256 - 152 -39 City of Encinitas, California References: See Attached Dear Mr. Rowden: In accordance with your request, we ha-,- prepared this final soil report to present the results o` field density tests performed on the utility trench and stem wall backfill for the proposed single- family residence located at the east terminus of Guidero Way, in the City of Encinitas, California. In accordance with your request, in -place field density tests were performed in conformance wi -': ASTM D1556 -90 (Sand Cone). The results of the field density tests are presented on Page T -1 under "Table of Test Results ". The laboratory determinations of the maximum dry density and optimum moisture content of the soils are set forth on Page L -1 under "Laboratory Test Results ". ""_e approximate test locations are shown on Plate No. 1. On -site and imported fill soils consisting of silty sand were placed and compacted in excess o- 90 percent relative compaction while maintaining a moisture content around optimum. Compaction was achieved with the use of a Bomag BM? 851 vibratory compactor and a hand whacker. ROWDEN RESIDENCE PROJECT NO. 01- 1147C5(D) Based on the field observations and density test results, it is our opinion that the grading operation for the proposed residence was performed in accordance with the referenced Limited Site Investigation report (P.eference No. 4) and local grading ordinances. Our services were performed in accordance with the currently accepted standards of practice to provide a resonable measure of compliance of the grading operation with the recommendations in the referenced sc -is reports and local grading ordinances. The opportunity to be of service is ao, reciated. Should you have any questions after reviewing t:n-_s report, please do not hesitate to contact our office. Pages T -1, L -1, and Plate No. 1 are at- ched. Respectfully Submitted, Cj No. C 054071 ° * Exp. a - 1- t Mamadou Sa iou Diallo, P.E. RCE 54071 MSD /md 2 ROWDEN RESIDENCE PROJECT NO. 01-1147C5(D) PAGE T -1 TABLE OF TEST RESULTS ASTM D1556 -90 MAXIMUM DEPTH FEILD DRY DRY TEST SOIL OF FILL MOISTURE DENSITY DENSITY PERCENT NO. TYPE IN FEET %DRY WT. P.C.F. P.C.F COMPACTION REMARKS 1 1 2' 10.4 124.1 129.5 96 Stem Wall 2 1 1.5" 7.8 120.7 129.5 93 " 3 1 2' 9.1 125.7 129.5 97 " 4 1 1.5' 10.6 121.1 129.5 93 " 5 1 3' 8.7 127.5 129.5 98 " 6 2 4'FG 9.8 116.3 128.0 91 " 7 2 3' 8.5 122.9 128.0 96 " 8 2 4'FG 11.1 119.6 128.0 93 " 9 1 2' 9.5 120.3 129.5 93 Utility Trench FG = FINISH GRADE TEST 3 ROWDEN RESIDENCE PROJECT NO. 01-1147C5(D) PAGE L -1 LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM D1557 -91, Procedure A which uses 25 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 4 inch diameter 1/30 cubic foot compaction cylinder and Procedure C which uses 56 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 6 inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows: OPTIMUM MAXIMUM MOISTURE SOIL TYPE/ DRY DENSITY CONTENT PROCEDURE DESCRIPTION LB/ CU. FT. % DRY WT. 1/A DARK BROWN SILTY, FINE 129.5 8.5 GRAINED SAND 2/A TAN SILTY, FINETO MEDIUM 128.0 9.4 GRAINED SAND WITH GRAVEL (IMPORT) 4 J Gur�,E,eo o f EAST COUNTY SOIL CONSULTATION & ENGINEERING, INC. 10925 HARTLEY RD., SUITE 1, SANTEE, CA 92071 (619) 258 -7901 Fax(619)258 -7902 e � 71 EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE I SANTEE, CALIFORNIA 92071 (619) 258 -7901 Fax 258 -7902 Mr. Mike Rowden September 12, 2002 2352 Altisma Way Project No. 01- 1147C5(A) La Costa, California 92009 Subject: Report of Field Density of Tests Proposed Single Family Residence West Terminus of Guidero Way, APN 256- 152 -39 City of Encinitas, California Reference: "Limited Site Investigation, Proposed Single Family Residence, West Terminus of Guidero Way, APN 256 - 152 -39, City of Encinitas, California ", Project No. 01- 1147C5, Prepared by East County Soil Consultation and Engineering, Inc., Dated August 4, 2001 Dear Mr. Rowden: This report presents the results of field density tests performed on the building pad for the proposed single family residence at the subject site. In accordance with your request, in -place field density tests were taken in conformance with ASTM D1556 -90 (Sand Cone). Site grading was performed between August 19 and August 23, 2002 under the observation and testing of a representative of East County Soil Consultation and Engineering, Inc. The results of the field density tests are presented on Page T -1 under "Table of Test Results ". The laboratory determinations of the maximum dry density and optimum moisture content results are set forth on Page L -1 under "Laboratory Test Results ". The approximate test locations are shown on Plate No. 1. ROWDEN PROJECT NO. 01- 1147C5(A) Prior to the remedial grading operation, brush and vegetation were removed from the subject site. Subgrade soils were overexcavated to a maximum depth of 6 feet below existing grade into dense formational materials. These formational materials were scarified to a depth of approximately 6 inches, moisture conditioned and recompacted. on -site soils consisting of silty sand were placed and compacted in excess of 90 percent relative density while maintaining a moisture content around optimum. Compaction was achieved with the use of a Caterpillar 963B trackloader. Based on our field observations and density test results, it is our opinion that the grading operation for the proposed single family residence was performed in accordance with the referenced soil investigation report and local grading ordinances. If we can be of further assistance, please do not hesitate to contact our office. Pages T -1, L -1 and Plate No. 1 are attached. Respectfully Submitted, z LW No.0O51011 ° * Exp. Iz -�� ctJ M1. Mamadou Saliou Diallo, P.E. RCE 54071 MSD /md 2 ROWDEN PROJECT NO. 01- 1147C5(A) PAGE T -1 TABLE OF TEST RESULTS ASTM D1556 -90 MAXIMUM DEPTH FEILD DRY DRY TEST SOIL OF FILL MOISTURE DENSITY DENSITY PERCENT NO. TYPE IN FEET %DRY WT. P.C.F. P.C.F COMPACTION REMARKS 1 1 2' 8.9 123.4 129.5 95 2 1 2' 11.3 122.5 129.5 95 3 1 4' 10.6 121.2 129.5 94 4 1 4' 9.6 120.4 129.5 93 5 1 6'FG 9.5 122.1 129.5 94 6 1 3' 9.4 123.1 129.5 95 7 1 2' 7.7 125.2 129.5 97 8 1 4'FG 7.9 117.5 129.5 91 9 1 4'FG 9.1 123.2 129.5 95 FG = FINISH GRADE TEST 3 ROWDEN PROJECT NO. 01- 1147C5(A) PAGE L -1 LABORATORY TEST RESULTS RESULTS OF MAXIMUM DENSITY TEST The maximum dry densities and optimum moisture contents of the fill materials as determined by ASTM D1557 -91, Procedure A which uses 25 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 4 inch diameter 1/30 cubic foot compaction cylinder and Procedure C which uses 56 blows of a 10 pound slide hammer falling from a height of 18 inches on each of 5 equal layers in a 6 inch diameter 1/13.3 cubic foot compaction cylinder are presented as follows: OPTIMUM MAXIMUM MOISTURE DRY DENSITY CONTENT SOIL TYPE/ PROCEDURE LB/ CU. FT. % DRY WT 1/A DARK BROWN SILTY FINE 129.5 8.5 GRAINED SAND 4 x Vl \ 0 4 7 I EAST COUNTY SOIL CONSULTATION & ENGINEERING, INC. 10925 HARTLEY RD., SUITE I, SANTEE, CA 92071 (619) 258 -7901 Fax(619)258 -7902 EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 (619) 258 -7901 Fax 258 -7902 August 4, 2001 Mr. Mike Rowden 2352 Altisma Way La Costa, California 92009 Subject: Project No. 01- 1147C5 Limited Site Investigation Proposed Single Family Residence East Terminus of Guidero Way, APN 256 - 152 -39 City of Encinitas, California. Dear Mr. Rowden: In accordance with your request, we have performed a limited investigation of the soil conditions at the subject site. The investigation was undertaken to provide the soil engineering criteria for site grading and recommend an appropriate foundation system for the proposed residential building. Our investigation found that the site is underlain by fill soils to a depth of approximately 4 feet and formational soils classified as Terrace Deposits (Qt2) to the maximum explored depth of 11 feet. The fill soils generally consist of brown, damp to moist, loose, silty sand with a very low expansion potential. It is our opinion that the proposed development is feasible provided the recommendations herein are implemented during construction. Respectfully submitted, L P r IV L Mamadou Saliou Diallo, P.E RCE 54071 4 tOWDEN PROJECT NO. 01- 1147C5, M INTRODUCTION This is to present the findings and conclusions of a soil investigation for a one - story, single family residence to be located at the east terminus of Guidero Way, in the City of Encinitas, California. The objectives of the investigation were to determine the existing soils conditions and provide recommendations for site development. In order to accomplish these objectives, three (3) exploratory trenches were excavated to a maximum depth of 11.0 feet; undisturbed and loose bag samples were obtained, and laboratory tests were performed. SITE DESCRIPTION AND PROPOSED CONSTRUCTION The subject site is located at the east terminus of Guidero Way, in the City of Encinitas, California. The site was previously graded with moderate slopes to the east, where a heavily vegetated drainage swale is located. Site boundaries include Interstate 5 to the east, an easement (Guidero Way) to the south and a residential parcel to the west. The proposed development includes the construction of a one - story, wood- framed, single- family residence founded on continuous and spread footings with a raised wood floor system. FIELD INVESTIGATION Three (3) exploratory trenches were excavated to a maximum depth of 11 feet by a Case 580E Backhoe on June 22, 2001 at the approximate locations shown on the attached Plate No. 1, entitled "Location of Exploratory Trenches ". A continuous log of the soils encountered was recorded at the time of excavation and is shown on Plate No. 2 entitled "Summary Sheet ". The soils were visually and texturally classified according to the filed identification procedures set forth on the attached Plate No. 3 entitled "Uniform Soil Classification Chart. 2 1 « 1 4 ROWDEN PROJECT NO. 01- 1147C5 . SURFACE CONDITIONS The surface soils encountered during the course of our investigation were fill soils to a maximum depth of 4 feet. These soils consist of brown, damp to moist, loose, fine - grained silty sand (SM) . The fill soils were underlain by the Terrace Deposits (4t2) EXPANSIVE SOILS An expansion test was performed on a subgrade soil sample to determine volumetric change characteristics with change in moisture content. An expansion index of zero indicates a very low expansion potential. GROUNDWATER Ground water was not encountered during the course of our investigation. Groundwater is anticipated at a depth greater than 100 feet. We do not expect ground water to affect the proposed development. GEOLOGIC HAZARDS A review of the available geological literature pertaining to the site indicates the existence of the Rose Canyon Fault Zone approximately 5.0 Km to the west. Ground shaking from this fault or one of the major active faults in the region is the most likely happening to affect the site. With respect to this hazard, the site is comparable to others in the general area. The proposed residential structure should be designed in accordance with seismic design requirements of the 1997 Uniform Building Code or the Structural Engineers Association of California using the following seismic design parameters: PARAMETER VALUE UBC REFERENCE Seismic Zone Factor, Z 0.40 Table 16 -I Soil Profile Type S Table 16 -J Seismic Coefficient, Ca 0.44 Table 16 -Q Seismic Coefficient, Cv 0.77 Table 16 -R Near- Source Factor, Na 1.0 Table 16 -S Near- Source Factor, Nv 1.2 Table 16 -T Seismic Source B Table 16 -U 3 " OWDEN PROJECT NO. 01- 1147C50 Based on the absence of shallow ground water and the consistency of the subgrade soils, it is our opinion that the potential for liquefaction is low. CONCLUSIONS AND RECOMMNDATIONS The following conclusions and recommendations are based upon the analysis of the data and information obtained from our soil investigation. This includes visual inspection; field investigation; laboratory testing and our general knowledge of the soils native to the site. The site is suitable for the proposed commercial development provided the recommendations set forth are implemented during construction. GRADING AND EARTHWORK Site grading should begin with clearing and grubbing, e.g. the removal of topsoils, vegetation and deleterious materials. The subgrade soils extending to a minimum depth of four (4) feet below finish pad grade and a minimum of five (5) feet beyond perimeter footings should be overexcavated, moisture conditioned to near optimum and recompacted to a minimum of 90 percent relative density. The actual depth and extent of removal should be evaluated in the field at the time of excavation by a representative of this firm. Grading should be done in accordance with the attached appendix A. FOUNDATION AND SLAB a. Continuous and spread footings are suitable for the proposed residential structure. Continuous footings should extend a minimum of 12 inches into the properly compacted fill soils. The footings should be at least 12 inches wide and reinforced with four #4 steel bars; two bars placed near the top of the footings and the other two bars placed near the bottom of the footings. b. The garage concrete floor slab should be a nominal 4 inches thick. Reinforcement should consist of #3 bars placed at 18 inches on center each way. Slab reinforcement should be placed within the middle third of the slab by supporting the steel on chairs or concrete blocks "dobies ". The slab should be underlain by 2 inches of clean sand over a 10 -mil visqueen moisture barrier. The effect of concrete shrinkage will result in cracks in virtually all concrete slabs. To reduce the extent of shrinkage, the concrete should be placed at a maximum of 4 inch slump. The minimum steel recommended is not intended to prevent shrinkage cracks. 4 OWDEN PROJECT NO. 01- 1147C5 • c. Where moisture sensitive floor coverings are anticipated over the slab, the 10 -mil plastic moisture barrier should be underlain by a capillary break at least 4 inches thick, consisting of sand, gravel or crushed rock not exceeding 3/4 inch in size with no more than 5 percent passing the #200 sieve. d. An allowable soil bearing value of 1500 pounds per square foot may be used for the design of continuous and spread footings founded a minimum of 12 inches into the compacted fill soils. This value may be increased by 20 percent for each additional foot of width or depth to a maximum value of 4500 lb /ft2 as set forth in the 1997 edition of the Uniform Building Code, Table No. 18 -1 -A. e. Lateral resistance to horizontal movement may be provided by the soil passive pressure and the friction of concrete to soil. An allowable passive pressure of 250 pounds per square foot per foot of depth may be used. A coefficient of friction of 0.35 is recommended. The soils passive pressure as well as the bearing value may be increased by 1/3 for wind and seismic loading. RETAINING WALLS Unrestrained, cantilevered retaining walls with a level backfill may be designed to resist an active equivalent fluid pressure of 35 pounds per cubic foot. This pressure is based on the backfill soils being free draining and non - expansive. Backfill materials must be approved by the soils engineer prior to use. Restrained walls, such as basement walls, that are not free to rotate should be designed to resist an active equivalent fluid pressure of 55 pounds per cubic foot. SETTLEMENT Settlement of compacted fill soils is normal and should be anticipated. Because of the minor thickness of the fill soil and the light building load, the settlement should be within acceptable limits. UTILITY TRENCH EXCAVATIONS Excavations for on -site utility trenches may be made vertically for shallow depths and must be either shored or sloped at 1H: 1V for depths greater than 4 feet. Utilities should be bedded and backfilled with clean sand or approved granular soil to a depth of at least one foot over the pipe. 5 • ROWDEN PROJECT NO. 01- 1147C5 • This backfill shall be uniformly watered and compacted to a firm condition for pipe support. The remainder of the backfill shall be on -site soils or non - expansive imported soils, which shall be placed in thin lifts, moisture conditioned and compacted to at least 90 o relative compaction. DRAINAGE Adequate measures shall be undertaken to properly finish grade the site after the structures and other improvements are in place, such that the drainage water within the site and adjacent properties is directed away from the foundations, footings, floor slabs and the tops of slopes via surface swales and subsurface drains towards the natural drainage for this area. Proper surface and subsurface drainage will be required to minimize the potential of water seeking the level of the bearing soils under the foundations, footings and floor slabs, which may otherwise result in undermining and differential settlement of the structures and other improvements. LIMITS OF INVESTIGATION The recommendations provided in this report pertain only to the site investigated and based upon the assumption that the soil conditions do not deviate from those disclosed in the trenches. If any variations or undesirable conditions are encountered during construction, or if the proposed construction will differ from that planned at the present time, East County Soil Consultation and Engineering, Inc. should be notified so that supplemental recommendations can be provided. Plates No. 1 through 3, Page L -1, References, and Appendix A are parts of this report. Respectfully submitted, _ S. Mamadou Saliou Dial c RCE 54071 plArE CO-- MSD /md OF C 6 TZ I T T3 17 \ 1 Y AO,r � r ,.. 5 Z z >ZZ e.*7Xv-'y 79 Z EAST COUNTY SOIL CONSULTATION & ENGINEERING, INC. 10925 HARTLEY RD., SUITE 1. SANTEE. CA 92071 �/V (619) 258 -7901 Fax(619)258 -7902 *OWDEN PROJECT NO. 01- 1147C5 • PLATE NO. 2 ` SUMMARY SHEET NO. 1 TRENCH NO. 1 DEPTH SOIL DESCRIPTION Y M Surface UNDOCUMENTED FILL (Qaf) brown, damp, loose silty fine - grained sand with debris 1.0' 107.1 9.2 4.0' TERRACE DEPOSITS (Qt,-) brown, moist, loose to medium dense, fine - grained silty sand (SM) 6.0' tan brown, moist, medium dense, fine grained silty sand (SM) damp to moist, dense 11.0' bottom of trench trench backfilled 6/22/01 ------------------------------------------------------------------------ TRENCH NO. 2 DEPTH SOIL DESCRIPTION Y M Surface TERRACE DEPOSITS (Qtj brown, dry to damp, loose, fine - grained silty sand (SM) 1.0' tan brown, damp, medium dense, fine grained silty sand (SM) 3.0' damp, dense 4.0' 109.7 4.0 6.0' bottom of trench trench backfilled 6/22/01 ------------------------------------------------------------------------ TRENCH NO. 3 DEPTH SOIL DESCRIPTION Y M Surface TERRACE DEPOSITS (Qtl) brown, dry to damp, loose, fine - grained silty sand (SM) 1.5' tan brown, moist, medium dense, 107.9 2.3 fine grained silty sand (SM) 5.0' .. ., .. damp, dense 6.0' bottom of trench trench backfilled 6/22/01 ------------------------------------------------------------------------ 7 • MAJOR DIVISI SYMBOL D RIPTION GW lw WELL GRADED GRAVELS OR GRAVEL- SAND MIXTURES, LITTLE OR NO FINES GRAVELS GP (MORE THAN POORLY GRADED GRAVELS OR GRAVEL -SAND ` OF COARSE MIXTURES, LITTLE OR NO FINES FRACTION GM >NO. 4 SIEVE SILTY GRAVELS, GRAVEL -SAND -SILT MIXTURES COARSE SIZE) GC CLAYEY GRAVELS, GRAVEL -SAND -CLAY MIXTURES GRAINED SOILS (MORE THAN '/: OF SOIL > NO. 200 SIEVE SIZE) SW WELL GRADED SANDS OR GRAVELLY SANDS, LITTLE OR NO FINES SANDS SP (MORE THAN POORLY GRADED SANDS OR GRAVELLY SANDS, OF COARSE LITTLE OR NO FINES FRACTION SM < NO. 4 SIEVE SILTY SANDS, SILT -SAND MIXTURES SIZE) SC CLAYEY SANDS, SAND -CLAY MIXTURES ML INORGANIC SILTS AND VERY FINE SANDS, ROCK SILTS & FLOUR, SILTY OR CLAYEY FINE SANDS OR CLAYEY SILTS WITH SLIGHT PLASTICITY CLAYS CL INORGANIC CLAYS OF LOW TO MEDIUM LIQUID LIMIT PLASTICITY, GRAVELLY CLAYS, SANDY CLAYS, FINE GRAINED < 50 SILTY CLAYS, LEAN CLAYS OL SOILS ORGANIC SILTS AND ORGANIC SILTY CLAYS OF (MORE THAN V: OF SOIL < LOW PLASTICITY NO. 200 SIEVE SIZE) MH INORGANIC SILTS, MICACEOUS OR DIATOMACEOUS SILTS & FINE SANDY OR SILTY SOILS, ELASTIC SILTS CLAYS CH LIQUID LIMIT INORGANIC CLAYS OF HIGH PLASTICITY, FAT >50 CLAYS OH ORGANIC CLAYS OF MEDIUM TO HIGH PLASTICITY, HIGHLY ORGANIC SOILS Pt ORGANIC SILTY CLAYS, ORGANIC SILTS PEAT AND OTHER HIGHLY ORGANIC SOILS CLASSIFICATION CHART (UNIFIED SOIL CLASSIFICATION SYSTEM) 70 — CLASSIFICATION RANGE OF GRAIN SIZES I I U.S. STANDARD GRAIN SIZE IN x SIEVE SIZE MILLIMETERS ^ 5o I I I BOULDERS Above 12 Inches Above 305 COBBLES 12 Inches To 3 Inches 305 To 76.2 o a0 GRAVEL 3 Inches to No. 4 76.2 to 4.76 30 lill Coarse 3 Inches to % Inch 76.2 to 19.1 I I cc Fine '/. Inch to No. 4 19.1 to 4.76 20 SAND No. 4 to No. 200 4.76 to 0.074 I I wNeoH Coarse No. 4 to No. 10 4.76 to 2.00 10 I Medium No. 10 to No. 40 2.00 to 0.420 Fine No. 40 to No. 200 0.420 to 0.074 0 0 TO 20 30 40 50 60 70 8o 90 100 SILT AND CLAY I Below No. 200 Below 0.074 uou o u it (u.;. s GRAIN SIZE CHART PLASTICITY CHART EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. ROWDEN PROJECT NO. 01- 1147C5 10925 HARTLEY ROAD, SUITE "I" SANTEE, CALIFORNIA 92071 PLATE N0. 3 8/4/01 U.S.C.S. SOIL CLASSIFICATION ' 4 tOWDEN PROJECT NO. 01- 1147C5 1 0 r LABORATORY TEST RESULTS PAGE L -1 An expansion test in conformance with UBC 18 -2 was performed on a representative sample of on- site soils to determine volumetric change characteristics with change in moisture content. The recorded expansion of the sample is presented as follows: INITIAL SATURATED INITIAL DRY MOISTURE MOISTURE DENSITY EXPANSION CONTENT% CONTENT% LB. /CU. FT. INDEX 9.3 21.2 112.0 ZERO TRENCH NO. 2 @ 2.0' 8 *OWDEN PROJECT NO. 01-1147C50 REFERENCES 1. "1997 Edition, Uniform Building Code, Volume 2, Structural Engineering and Design Provisions ". 2. "Maps of Known Active Fault Near - Source Zones in California and Adjacent Portions of Nevada", Page 0 -36, used with the 1997 Edition of the Uniform Building Code, Published by International Conference of Building Officials. 3. "Geologic Maps of the Northwestern Part of San Diego County, California. Plate No. 2, Geologic Maps of the Encinitas and Rancho Santa Fe 7.5' Quadrangles ", by Siang S. Tan and Michael P. Kennedy, 1996. 9 t EAST COUNTY SOIL CONSULTATION AND ENGINEERING, INC. 10925 HARTLEY ROAD, SUITE I SANTEE, CALIFORNIA 92071 (619) 258 -7901 APPENDIX A RECOMMENDED EARTHWORK SPECIFICATIONS 1. General Description The intent of these specifications is to obtain uniformity and adequate strength in filled ground so that the proposed structures may be safely supported. The procedures include the clearing and preparation of the land to be filled, processing the fill soils, the spreading, and compaction of the filled areas to conform with the lines and grades as shown on the approved plans. The owner shall retain a Civil Engineer qualified in soil mechanics (herein referred to as engineer) to inspect and test earthwork in accordance with these specifications. The engineer shall advise the owner and grading contractor immediately if any unsatisfactory conditions are observed to exist and shall have the authority to reject the compacted filled ground until such time that corrective measures are taken, necessary to comply with the specifications. It shall be the sole responsibility of the grading contractor to achieve the specified degree of compaction. 2. Preparing Areas to be Filled (a) All brush, vegetation and any biodegradable refuse shall be removed or otherwise disposed of so as to leave the areas to be filled free of vegetation and debris. Any uncompacted filled ground or loose compressible natural ground shall be removed unless the report recommends otherwise. Any buried tanks or other structures shall be removed and the depression backfilled to the satisfaction of the engineer. (b) The natural ground which is determined to be satisfactory for the support of the filled ground shall then be plowed or scarified to a depth of at least 12 inches (12 "). (c) After the natural ground has been prepared, it shall then be brought to the proper moisture content and compacted to not less than 90 percent of maximum dry density in accordance with ASTM D1557 -91. (d) Where fills are made on slopes greater than 20 percent, horizontal benches shall be cut into the firm natural ground. The initial bench at the toe of the fill shall be at least 15 feet in width on firm undisturbed natural ground. The width of all succeeding benches shall be at least 6 feet. APPENDIX A • 2 ti ' 3. Fill Materials All material shall be approved by the engineer and shall consist of materials free from vegetable matter, and other lumps greater than 6 inches in diameter. If, during grading operations, soils are found which were not encountered and tested in the preliminary investigation, tests on these soils shall be performed to determine their physical characteristics. Any special treatment recommended in the preliminary or subsequent soils reports not covered herein shall become an addendum to these specifications. 4. Placing and Compacting Fill Materials (a) When the moisture content of the fill material is below that specified, water shall be added until the moisture content is near optimum to assure uniform mixing and effective compaction. (b) When the moisture content of the fill materials is above that specified, the fill material shall be aerated by blading and scarifying or other satisfactory methods until the moisture content is near optimum as specified. (c) After processing, the suitable fill materials shall be placed in layers which, when compacted, shall not exceed six inches (6 "). Each layer shall be spread evenly and shall be thoroughly mixed during the spreading insure uniformity of materials and moisture in each layer. (d) After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the density set forth in paragraph 2 (c) above. Compaction shall be accomplished with approval types of compaction equipment. Rolling shall be accomplished while the fill material is at the specified moisture content. In place density tests shall be performed in accordance with ASTM D1556 -90. (e) The surfaces of the fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compacting operations shall be continued until the slopes are stable and until there is no appreciable amount of loose soil on the slopes. 5. Inspection Sufficient inspection by our firm or the Soil's Engineer of record and/or his/her representative shall be maintained during the filling and compacting operations so that he /she can verify that the fill was constructed in accordance with the accepted specifications. 6. Seasonal Limits No fill material shall be placed, spread, or rolled if weather conditions increase the moisture content above permissible limits. When the work is interrupted by rain, fill operations shall not be resumed until the moisture content and density of fill are as previously specified. All recommendations presented in the attached report are a part of these specifications. 2